WO2001068306A1 - Continuous high-speed depositing method for double-wound metal tube and depositing furnace for the method - Google Patents

Continuous high-speed depositing method for double-wound metal tube and depositing furnace for the method Download PDF

Info

Publication number
WO2001068306A1
WO2001068306A1 PCT/JP2001/002089 JP0102089W WO0168306A1 WO 2001068306 A1 WO2001068306 A1 WO 2001068306A1 JP 0102089 W JP0102089 W JP 0102089W WO 0168306 A1 WO0168306 A1 WO 0168306A1
Authority
WO
WIPO (PCT)
Prior art keywords
double
furnace
metal tube
tube
wound metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2001/002089
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
Yukito Nomura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of WO2001068306A1 publication Critical patent/WO2001068306A1/ja
Priority to US10/246,345 priority Critical patent/US6808103B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • C—CHEMISTRY; METALLURGY
    • C21—METALLURGY OF IRON
    • C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/34—Methods of heating
    • C21D1/44—Methods of heating in heat-treatment baths
    • C21D1/46—Salt baths
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00—Soldering, e.g. brazing, or unsoldering
    • B23K1/0002—Soldering by means of dipping in a fused salt bath
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K28/00—Welding or cutting not covered by groups B23K5/00 - B23K26/00
    • C—CHEMISTRY; METALLURGY
    • C21—METALLURGY OF IRON
    • C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length
    • C21D9/54—Furnaces for treating strips or wire
    • C21D9/56—Continuous furnaces for strip or wire
    • C21D9/58—Continuous furnaces for strip or wire with heating by baths
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00—Articles made by soldering, welding or cutting
    • B23K2101/04—Tubular or hollow articles
    • B23K2101/06—Tubes
    • C—CHEMISTRY; METALLURGY
    • C21—METALLURGY OF IRON
    • C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2251/00—Treating composite or clad material
    • C21D2251/02—Clad material
    • C—CHEMISTRY; METALLURGY
    • C21—METALLURGY OF IRON
    • C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes

Definitions

  • the present invention relates to a continuous high-speed welding method for a double-wound metal tube, particularly a double-wound metal tube used for a brake tube of an automobile, and a welding furnace for performing the method.
  • a thin strip of 0.34 mm thick with copper plating of about 3 micron on the front and back, wound in a coil of about 2,500 to 3,000 m long This is made into a double winding by a tube making machine (US Patent Nos. 2, 292, 8100). This is cut to a length of 30 to 5 Om, and from the front of the welding furnace, 40 to 50 pieces are sent in parallel into the furnace horizontally, and copper brazing of the superposed surface of the double wound steel pipe is performed. (JP-B-32-6111, U.S. Pat. Nos. 1,892,607).
  • the tube forming speed of the tube forming machine is high, for example, 150 mZin or more when the tube diameter is 4.76 mm, while the passage speed of the welding furnace is 3 to 4 m / ⁇ in. And slow. Therefore, in order to maintain the balance of the process and perform the production rationally, the length of the tube is cut to 30 to 50 m, and 40 to 50 tubes are arranged side by side in the welding furnace horizontally. And welded. In that case, a large space and a worker are needed to align the tubes.
  • guide pipes for example, pine full pipes (heat-resistant pipes), are arranged in the welding furnace to smoothly advance the tubes. Ube is passed through the pipe and sent into the furnace.
  • the muffle pipe bends due to thermal stress when used for a long period of time, hindering the progress of the tube and causing uneven welding, resulting in welding failure.
  • the present invention provides a welding method and a welding furnace that solve these problems.
  • the gist of the present invention is a method for continuously welding a double-wound metal tube, characterized in that a neutral or reducing molten salt is used as a heating medium.
  • the neutral or reducing molten salt, BaCl 2, BaCl 2 and mixtures of MgF 2, a mixture of BaCl 2 and MgF 2, B 2 0 3, and BaCl 2 and NaCl, MgF 2, B 2 0 3 , Ca-Si is at least one selected from a mixture of one or more of Ca-Si and a mixture thereof.
  • a step of feeding a strip-shaped metal material with metal plating on the front and back to a tube forming machine to form a double-wound metal tube, and forming the double-wound metal tube into a neutral or reducible material A step in which the metal tube is fed into a continuous heating furnace using a molten salt as a heating medium and the double-wound metal tube is immersed in a high-temperature neutral or reducing molten bath in the furnace; Including a step of sending the double-wound metal tube to a high-temperature auxiliary furnace in a reducing atmosphere to remove a chloride thin film attached to the outer periphery of the metal tube, and a step of cooling the obtained double-wound metal tube 2 It is in the method of continuous high-speed welding of heavy metal tubes.
  • a continuous heating furnace using a neutral or reducing molten salt as a heat medium characterized by sequentially disposing them.
  • the heating medium of the conventionally used welding furnace is a reducing gas such as DX gas, which has a small heat capacity. If this is replaced with a neutral or reducing molten salt according to the present invention, since the heat capacity of the molten salt is large, the speed of passage through the welding furnace can be dramatically increased, and the speed balance between the tube forming machine and the welding furnace can be improved. With significant improvements and a suitable furnace length, as mentioned above, there is no need to cut and send tubes shortly, enabling continuous integrated production, reducing the plant area, Is also reduced.
  • the type of molten salt is not limited as long as it has a large non-oxidizing heat capacity.
  • BaCl 2 (melting point 9 6 2 ° C, boiling 1 5 6 0 ° C, the specific heat 0. 2 7), BaCl 2 9 5% and MgF 2 5% of the mixture (mp 9 6 2 ° C, boiling 1 5 6 0 ° C, specific heat 0.2 7), a mixture of BaCl 2 94% and MgF 2 5%, B 2 0 3 1% (melting point 100 ° C, boiling point 1560 ° C, specific heat 0.2 7), a mixture of BaCl 2 and NaCl, BaCl 2 and NaCl, a mixture of MgF 2, a mixture of BaCl 2 and NaCl, MgF 2, B 2 0 3, BaCl 2 and NaCl, MgF 2, B 2 0 3 , Ca-Si and the like are preferable, and the composition is as shown in Table 1.
  • the high-temperature auxiliary furnace filled with the reducing gas is used for equalizing the temperature of the tube and removing the chloride thin film adhering to the outer periphery of the tube when passing through the molten salt bath. For cooling the tube Things.
  • FIG. 2 is a schematic elevational view of manufacturing a double wound metal tube.
  • FIG. 1 showing an outline of a manufacturing process.
  • the tube material 1 is made of a metal material with a thickness of 0.2 to 0.6 mm, a width of 200 to 100 mm, a length of 2,500 to 3,000 m, Copper or copper with a thickness of 2 to 6 ⁇ m, bronze, brass, etc.
  • the tube material 1 While unwinding the tube material 1 from the uncoiler 2, the tube material 1 is fed into the tube making machine 3 to form the double-wound metal tube 4 as shown in FIG. In the figure, 7 is a plating layer.
  • the obtained double-wound metal tube 4 is immersed and heated in a high-temperature neutral or reducing molten salt bath 6 in a heating furnace 5 to weld a plating layer 7 on the polymerization surface of the tube material 4.
  • the chloride thin film adheres to the outer periphery of the welded double-wound metal tube, it is removed through an auxiliary heating furnace 8, cooled by a connected cooling device 9, and cooled by a recoiler 17. Wind or cut to required dimensions. If there is a chloride thin film that is not removed even after passing through the auxiliary heating furnace 8, after passing through the cooling device, it is removed by brushing or air blowing.
  • the heating furnace 5 has a length of, for example, 5 to 25 m and is maintained at a temperature of 900 to 1200 ° C, preferably at a temperature of 1110 to 115 ° C.
  • High temperature neutral or reducing molten salt bath is 900 ⁇ 1200 ° C, preferred Or 1 1 1 0 or more: L is kept at 150 ° C.
  • the double-wound metal tube 4 is fed into the heating furnace 5 at a rate of 50 to 15 Om per minute, and immersed in the reducing molten salt bath for about 2 to 30 seconds.
  • the heating furnace 5 is provided with a funnel-shaped receiver 11 at the inlet, and a straight or downwardly curved guide pipe 12 having a diameter of, for example, 50 mm is provided in the furnace.
  • the heated high-temperature molten salt also penetrates into this pipe.
  • an appropriate number of holes can be made in the guide pipe 12 as long as the strength of the pipe is maintained, to help the infiltration of the molten salt.
  • the fed double-rolled metal tube 4 is immersed in the molten salt bath 6 from the receiver 11 through the inside of the pipe 12, heated, and then sent out of the furnace.
  • the double-wound metal pipe 4 can be immersed in the bath 6 and heated while the molten salt bath 6 overflows from the furnace 5. At that time, the molten salt must be supplied to the furnace 5 in a slightly excessive manner by a circulation means (not shown). Although not shown, if a guide pipe that is curved downward is used, the tube can be heated without overflowing the molten salt bath 6 from the furnace.
  • the double-wound metal tube 4 may be immersed in a molten salt bath 6 and heated, and any means may be used.
  • the double-wound metal tube leaving the heating furnace 5 enters, for example, a high-temperature auxiliary furnace 8 having a length of about 1 Om.
  • Furnace is a neutral or reducing gas, for example, DX gas (CO, H 2 and 8 ⁇ : L 0% comprising N 2, C0 2, H 2 0 gas) is filled, 1 1 2 0-1 1 5 It is kept at 0 ° C.
  • the double-wound metal tube 4 has a chloride thin film attached to its surface removed.
  • a cooling device 9 provided at the rear of the auxiliary furnace 4. Air or water is used as the refrigerant.
  • the cooling device 9 has, for example, a total length of 50 m, and uses an air-cooled cooler (for example, 35 m in length) in the front stage 13 and an indirect water-cooled cooler (for example, 15 m in length) in the rear stage 14. Use to cool in stages.
  • the tube leaving the cooling device 9 passes through an eddy current detector 15.
  • This flaw detector 15 detects only the magnetic field generated by the flaw detector when there is an abnormality in the tube, and thereby detects, for example, alloy particles of iron and copper that have adhered to the surface of the tube, It has the effect of finding voids (voids) and peeling (loose seams) at the joint ends.
  • the product is cut into required dimensions by a coiling force by a recoiler 17 and a cutting machine 16 to obtain a product.
  • a tube forming machine for example, a tube forming machine disclosed in U.S. Patent Nos. 2,292,810 is used.
  • the formed double wound steel pipe 4 has a diameter of 4.76 mm and is fed into the continuous heating furnace 5 at a speed of 150 m / min.
  • Furnace 5 Ri 1 2 mm der length, 1 1 2 5 ° BaCl 2 , MgF 2 held in the C, B 2 0 3 (product name HS1100, manufactured by Parker heat treatment Industrial Co., Ltd.) bath therein 6 Are formed.
  • the fed double wound steel pipe 4 is heated by the molten salt bath for about 5 seconds while passing through the guide pipe 12.
  • the double-rolled steel tube 4 coming out of the continuous heating furnace 5 enters a high-temperature auxiliary furnace 8 having a length of 10 m.
  • the inside of the furnace is filled with DX gas and kept at 1125 ° C.
  • heating is performed for about 4 seconds.
  • it enters the cooling device 9 from the high-temperature auxiliary furnace 8 and is cooled.
  • the obtained product is wound on a recoiler 17 for about 600 m, with or without passing through an overcurrent flaw detector.
  • the wound product can be subjected to, for example, a helicopter leak test.
  • This helium test seals a helium gas at a pressure of 20 to 3 O kg / cra 2 in a tube, puts it in a vacuum chamber, and evacuates it. If the tube has a hole in it, helium leaks out of the tube, and the helium detector detects it and reports a defect in the tube. This test guarantees 100% weld quality.
  • the present invention is configured as described above, and has the following effects. Since pipe production can be performed at high speed continuously for all processes, the number of workers can be significantly reduced. Since the welding time is short, uniform welding can be achieved without generating a cavity phenomenon. Since the tube is not cut as short as 30 to 50 m, the cutting loss at both ends can be reduced by 2.5%.
  • the molten salt becomes a thin film and covers the surface of the double-wound metal tube, so that the melted copper becomes granular due to its surface tension. Does not occur.
  • a thin tube of molten salt prevents the metal tube from the molten salt bath from being oxidized, has a good finish of the metal tube, has a high gloss, and has a good glue.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Coating With Molten Metal (AREA)
  • Arc Welding In General (AREA)
PCT/JP2001/002089 2000-03-17 2001-03-16 Continuous high-speed depositing method for double-wound metal tube and depositing furnace for the method Ceased WO2001068306A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/246,345 US6808103B2 (en) 2000-03-17 2002-09-17 Method for continuous high-speed welding of double-ply metal tubes and welding furnace for performing the same

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2000-147062 2000-03-17
JP2000147062 2000-03-17
JP2001064518A JP3348093B2 (ja) 2000-03-17 2001-03-08 2重巻金属管の連続高速溶着方法およびそれを実施する溶着炉
JP2001-64518 2001-03-08

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US10/246,345 Continuation US6808103B2 (en) 2000-03-17 2002-09-17 Method for continuous high-speed welding of double-ply metal tubes and welding furnace for performing the same

Publications (1)

Publication Number Publication Date
WO2001068306A1 true WO2001068306A1 (en) 2001-09-20

Family

ID=26592166

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2001/002089 Ceased WO2001068306A1 (en) 2000-03-17 2001-03-16 Continuous high-speed depositing method for double-wound metal tube and depositing furnace for the method

Country Status (4)

Country Link
US (1) US6808103B2 (enExample)
JP (1) JP3348093B2 (enExample)
CN (1) CN1193854C (enExample)
WO (1) WO2001068306A1 (enExample)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007142163A1 (en) * 2006-06-09 2007-12-13 Semiconductor Energy Laboratory Co., Ltd. Method for manufacturing semiconductor device
CN102950388A (zh) * 2011-08-23 2013-03-06 北京威斯顿亚太光电仪器有限公司 一种耐高温高压医用硬管内窥镜
CN108907606B (zh) * 2018-07-10 2020-02-11 郑州煤矿机械集团股份有限公司 Cloos焊接机器人焊枪修复方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62199293A (ja) * 1986-02-26 1987-09-02 Kanto Yakin Kogyo Kk アルミニウム又はその合金部材の浸漬ろう付け法
JPH10277637A (ja) * 1997-04-08 1998-10-20 Usui Internatl Ind Co Ltd 多重巻金属管製造装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1892607A (en) * 1930-10-27 1932-12-27 Bundy Tubing Co Method for making a tube
US2292810A (en) * 1940-07-29 1942-08-11 Bundy Tubing Co Method and apparatus for making tube
US3339269A (en) * 1962-03-15 1967-09-05 Gen Motors Corp Method of bonding
US4224086A (en) * 1979-05-17 1980-09-23 Aluminum Company Of America Dip brazing flux
US5447179A (en) * 1990-05-18 1995-09-05 Itt Corporation Non-corrosive double-walled steel tube characterized in that the steel has a face-centered cubic grain structure
US5738723A (en) * 1995-11-28 1998-04-14 Pilot Industries, Inc. System for forming metal tubing

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62199293A (ja) * 1986-02-26 1987-09-02 Kanto Yakin Kogyo Kk アルミニウム又はその合金部材の浸漬ろう付け法
JPH10277637A (ja) * 1997-04-08 1998-10-20 Usui Internatl Ind Co Ltd 多重巻金属管製造装置

Also Published As

Publication number Publication date
JP2001334362A (ja) 2001-12-04
JP3348093B2 (ja) 2002-11-20
US6808103B2 (en) 2004-10-26
US20030015571A1 (en) 2003-01-23
CN1418141A (zh) 2003-05-14
CN1193854C (zh) 2005-03-23

Similar Documents

Publication Publication Date Title
US4765529A (en) Method of manufacturing an externally clad tubular product
US6719034B2 (en) Process for producing a tube-shaped cathode sputtering target
JP2002113582A (ja) 多種類の金属を液−固圧延接合する方法及びそれに使用する装置
NO320236B1 (no) Forbedret fremgangsmate ved faststoffsveising
CN106077912B (zh) 一种复杂黄铜复合钢板未结合区补焊方法
NO315697B1 (no) Fremgangsmåte ved sammenföyning av ferritiske og austenitiske tofase rustfrie stål
CN104250802B (zh) 一种热轧无缝钢管张减辊激光熔覆超硬高速钢工艺方法
CN117260293B (zh) 层状复合金属带材制造卷焊管的电磁感应钎焊工艺及装置
JP3348093B2 (ja) 2重巻金属管の連続高速溶着方法およびそれを実施する溶着炉
CN109773308B (zh) 铜合金导轨的端面堆焊方法
CN111468858A (zh) 三明治复合钎料及其制备方法和应用以及硬质合金器件
JPS58204169A (ja) クラツド材の製造方法
JPH08215743A (ja) 多重巻金属管およびその製造方法ならびに装置
US6135160A (en) Multi-wound stainless steel pipe
JP4632428B2 (ja) 鋼管の高周波誘導加熱造管方法
US5297587A (en) Sealed double wall steel tubing having steel outer surface
WO2020196646A1 (ja) 溶接管の製造方法及び溶接管の製造装置
CN113458412B (zh) 一种薄壁管状构件的增材制造方法
JP2001334362A5 (enExample)
US20060096955A1 (en) Method for repairing a hole in a metallic workpiece
CN224642668U (zh) 用于钛板对接焊的防焊缝塌陷装置
JP2018176193A (ja) 電縫管溶接装置
JP6045094B2 (ja) 自溶合金皮膜の形成方法
CN221064776U (zh) 一种用于氩弧焊接的焊枪冷却装置
US3060556A (en) Method and apparatus for producing finned tubing

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): CN DE GB US

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 018066399

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 10246345

Country of ref document: US