WO2001020046A1 - High temperature premelting apparatus - Google Patents

High temperature premelting apparatus Download PDF

Info

Publication number
WO2001020046A1
WO2001020046A1 PCT/US2000/025100 US0025100W WO0120046A1 WO 2001020046 A1 WO2001020046 A1 WO 2001020046A1 US 0025100 W US0025100 W US 0025100W WO 0120046 A1 WO0120046 A1 WO 0120046A1
Authority
WO
WIPO (PCT)
Prior art keywords
premelting
charge
melting
vessel
volume
Prior art date
Application number
PCT/US2000/025100
Other languages
English (en)
French (fr)
Inventor
Gianpietro Benedetti
Milorad Pavlicevic
Alfredo Poloni
Angelico Della Negra
Original Assignee
Danieli Technology, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Danieli Technology, Inc. filed Critical Danieli Technology, Inc.
Priority to AU20392/01A priority Critical patent/AU2039201A/en
Priority to EP00983663A priority patent/EP1226283B1/de
Priority to DE60032504T priority patent/DE60032504D1/de
Publication of WO2001020046A1 publication Critical patent/WO2001020046A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/56Manufacture of steel by other methods
    • C21C5/562Manufacture of steel by other methods starting from scrap
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/5252Manufacture of steel in electric furnaces in an electrically heated multi-chamber furnace, a combination of electric furnaces or an electric furnace arranged for associated working with a non electric furnace

Definitions

  • This invention relates to a device, used mainly in the steelmaking and metallurgical industry, for preheating the charge to be fed into a furnace, converter or melting vessel by combusting combustible materials available in the charge or from secondary gases recovered from related sources in the process.
  • Another known preheating method is the preheating of scrap in a charging bucket at high temperature (800 to 850 C).
  • This is generally not an acceptable practice, in part because it requires high-temperature heat-resistant buckets (often involving pressure water cooling), it generates a considerable amount of pollutants, and it requires a combustion chamber capable of thermally destroying pollutants (mainly dioxin) and of completing the combustion of certain gases (mainly carbon monoxide).
  • pollutants mainly dioxin
  • carbon monoxide gases
  • This method is costly because thermal losses must be regained by using auxiliary burners.
  • the process can be very complicated, and the very short melting time may so reduce the time available for preheating such that there is insufficient time for processing all scrap buckets, thereby limiting production.
  • Another known preheating method is the use of shaft preheating plants, in which a charge volume is directed toward the melting volume arranged in correspondence with the roof section of the furnace where the gases are exhausted.
  • This method has the disadvantage of making it difficult or impossible to operate if there is welding between the scrap pieces in the shaft (because the shaft is an integral part of the melting volume), thus preventing normal charging.
  • Other disadvantages include containing only limited charge quantities, the impossibility of independently managing gases generated in the melting volume from those generated in the preheating volume, and the need to create a downstream post-combustion chamber.
  • preheating and continuous charging processes enable only a limited and poorly efficient regeneration of energy from the process gases, because the exposed exchange surface of the scrap is but a just a fraction of the total surface.
  • Our invention overcomes the above-described limitations in known preheating devices and processes by heating the entire charge in an adequate premelting volume (separated from the melting location in a furnace or other melting vessel), in a fast and homogenous manner at temperatures ranging from 800 to 1200° C. in parallel with the melting phase which occurs in an independent vessel.
  • a key concept of the invention is the use, in the premelting volume, of all energy sources having a chemical origin and of process gases from the plant.
  • the transfer of thermal energy is much greater, resulting in a reduction in melting phase time and consequent production increases; simplification of the melting process; energy recovery from and the upgrading of the process gases; improved input energy efficiency with consequent reduction in the specific consumption of the integrated plant; and elimination of the post-combustion chamber as opposed to conventional preheating methods.
  • This principle is implemented through this invention by achieving a premelting process in an independent volume separated from the melting volume, in parallel with the melting phase of the previous charge.
  • This invention comprises a process for premelting charge before the charge is introduced into a melting furnace in the steelmaking and metallurgical industry, comprising the steps of: premelting the charge in a premelting vessel, defining a premelting volume, to an average temperature near the melting temperature using essentially chemical energy; discharging the premelted charge from the premelting vessel into a melting furnace; and completing the melting process in the melting furnace using essentially electrical energy.
  • This invention further comprises a melting apparatus in the steelmaking and metallurgical industry comprising: a premelting vessel equipped with devices for the utilization of chemical energy; a melting furnace equipped with devices for the utilization of electrical energy; and a discharging device utilized for transferring the premelted charge from the premelting vessel to the melting vessel.
  • Figure 1 is a diagrammatic cut-away view of the premelting apparatus, in longitudinal section.
  • Figure 2 illustrates a bottom-up embodiment of the premelting apparatus in conjunction with a melting furnace.
  • Figure 3 illustrates a top-down embodiment of the premelting apparatus in conjunction with a melting furnace.
  • Figure 4 depicts the top-down embodiment illustrated in Figure 3, having a carbon dispersed in the charge.
  • Figure 5 depicts the top-down embodiment illustrated in Figure 4, in which off-gases from the furnace are fed through the body of the premelting apparatus.
  • Figure 6 depicts the top-down embodiment illustrated in Figure 4, having burners in the shell of the premelting apparatus.
  • Figure 7 depicts the top-down embodiment illustrated in Figure 4, having liquid fuel dispersed in the charge.
  • the premelting apparatus is comprised of a heat-resistant shell 1 , which in turn defines an enclosed interior space known as the premelting volume 2 in which occurs the actual premelting of the charge 20 utilizing chemical energy.
  • Shell 1 preferably has at least one off-gas feeding duct 3, into which are directed off-gases 30 from a melting furnace or other suitable source within the plant, and at least one exhaust duct 4 for exhausting gases 40 generated within the premelting volume 2.
  • the preferred embodiment illustrated in Figure 1 shows one off-gas feeding duct 3 and one exhaust duct 4.
  • These ducts can be connected to shell 1 by a suitable means, including ring connectors.
  • ducts 3 and 4 are cooled by an appropriate means, and gas flow through them is regulated by a suitable means such as valves or regulators.
  • Shell 1 must be heat resistant and be capable of maintaining its integrity during the premelting process. This can be accomplished in various possible solutions, such as by providing interior panels 7 which can be lined with refractory materials and/or fitted with welded pipes for cooling by pressurized water. In another solution, interim panels 7 can be thinly arranged in such a way as to form a serpentine into which refractory material is gunned. This material protects against excessive heat dispersion and must be replaced less frequently than in a solution with just refractory material. A mixed solution can also be installed in shell 1, with some parts of the inner wall of shell 1 being made of refractory material and other parts made of water-cooled panels, depending on the heat stress resulting from different zones of the premelting volume 2.
  • Shell 1 also has an outlet channel 6 for discharging pre-melted charge 20 from premelting volume 2 into the melting furnace or vessel.
  • Such valves open through lateral rotation, like universally adopted scrap buckets, to discharge pre-melted charge 20 into a bucket, ladle or other suitable carrying device.
  • pre-melted charge 20 can be discharged through outlet channel 6 through a chute, revolving tunnel, or any other system capable of transferring the charge from the premelting volume 2 directly into a melting furnace or vessel.
  • Shell 1 also has moving roof or a port 9 for charging scrap into premelting volume 2.
  • the premelting apparatus can be charged using well-known methods such as charging buckets, a belt conveyor or other charging system.
  • the premelting apparatus can be fitted with industrial burners 8 which can be arranged along the containing walls and/or roof of the shell and which protrude through shell 1 and into premelting volume 2.
  • Figure 1 illustrates one embodiment of the invention showing two industrial burners fitted into shell 1 near the point of connection with an off-gas feeding duct
  • FIG. 3 illustrates another embodiment of the invention showing a plurality of supplemental burners 8 fitted into shell 1. Burners situated in this position use fossil fuel
  • FIG. 5 shows another embodiment in which an high power burner 8 can be fitted on off-gas feeding duct 3.
  • the premelting apparatus also can be fitted with a means 10 for introducing, into premelting volume 2, gases holding oxygen (O 2 ) or air, or air enriched with O 2 and a means for introducing, into premelting volume 2, partially unburned gases from other sources in the plant.
  • said means directs the gaseous effluents through the charge-fuel combination inside premelting volume 2.
  • Means 10 may take the form of a ring header consisting of a hollow space obtained in shell 1 and may be fed by fans or by an oxygen system to allow a part of the air or comburent mixture to be directed to the intermediate or final part of premelting volume 2.
  • Means 10 for introducing O 2 or air or air enriched with O 2 provides a very flexible control of the gaseous mixture burning temperature, of the oxygen enrichment, and of the temperature of the exhaust gases.
  • the temperature of the gases inside premelting volume 2 should be maintained as uniformly as possible and sufficiently high, but not so high as to melt, the solid charge over its whole stay time inside premelting volume 2.
  • a means to further heat gaseous effluents to a temperature between 1500 and 1800° C, such as one or more industrial burners, may be fitted within the roof or side walls of premelting volume 2.
  • the partial melting of the charge that percolates downwards homogenizes the charge temperature by transferring energy from hotter to colder regions in the charge.
  • the premelting apparatus can have different configurations, such as those illustrated exclusively but not exhaustively in the figures.
  • Figure 1 shows the basic features of the invention.
  • Figure 2 depicts a "bottom-up" embodiment of the premelting apparatus in relation to an electric arc furnace.
  • the premelting apparatus is positioned with respect to the melting furnace 50 such that exhaust gases from melting furnace 50 enter the premelting apparatus through feeding duct 3 near the bottom of premelting volume 2.
  • Figures 3 through 7 depict a "top-down" embodiment of the invention, wherein exhaust gases from melting furnace 50 enter the premelting apparatus through feeding duct 3 at the top of premelting volume 2.
  • the premelting process can be carried out using the following elements, indiscriminately, either independently or combined in suitable combinations: partially unburned gaseous effluents, which may be arranged so as to mix with the comburent gases (O 2 or air or air enriched with O 2 ); industrial burners acting directly on the contents of premelting volume 2; fuels included in the charge 20 that improve combustion; and particular fuel in the charge 20 such as aluminothermic powders.
  • the gaseous effluents may be selected from a suitable group such as carbon monoxide (CO), hydrogen (H2), hydrocarbons, or a combination thereof.
  • the source of said gaseous effluents can be melting furnace 50 when that melting process is complete or can be another part of the steelmaking or metallurgical plant which is dedicated to producing gases rich in one or more of CO, H 2 . or hydrocarbons.
  • essentially chemical energy from fuels within charge 20 and/or from suitable gaseous effluents produced in melting furnace 50 or elsewhere in the plant
  • premelting vessel 2 to premelt charge 20 to an average temperature near its intended melting temperature.
  • a desired average temperature near the melting temperature is between 800 and 1200° C.
  • this premelting process is shorter than 40 minutes.
  • the premelted charge is discharged from premelting volume 2 into melting furnace 50. in which the melting process is completed using essentially electrical energy within melting furnace 50, accomplished by devices for the utilization of electrical energy within melting furnace 50. such as electrodes to generate an electric current.
  • premelting of a first charge may be conducted in premelting volume 2, while the melting of a second charge is being conducted in melting furnace 50, said second charge having been previously premelted in premelting volume 2.
  • the premelted charge is discharged from melting furnace 50, the premelted charge is discharged from premelting volume 2 into melting furnace 50, and then a third charge is charged into premelting volume 2.
  • Charge preparation, distribution of combustion gases, combustion control in steps temperature control, and the timing of premelting with respect to melting in the main melting vessel, are key components of the operation of the premelting apparatus.
  • the charge needs to be stratified with the fuels included in the charge, such as anthracite, coke, oil, fuel oil or other suitable fuel.
  • the fuels must be suitably arranged to form a fluid bed through which flow the gases rich in oxidization potential to improve combustion.
  • layers of solid or liquid fuel are interspaced between layers of the charge so that the fuel is burned in two successive stages, as described below.
  • Figures 3 and 7 show the use of coke 12 and heavy fuel oil 13, respectively. as the fuel layers. Gases for preheating burn layer by layer inside the prepared charge, pre- heating it with greater heat exchanging efficiency. This arrangement allows for controlled combustion within the charge.
  • combustion gases must be properly distributed to maximize the operational efficiency of the premelting apparatus.
  • Combustion gases must reach the fuel directly to form and keep a desired reducing atmosphere in the entire premelting volume.
  • Gas inlet ports 11 provide for the proper circulation of combustion gases within premelting volume 2 to accomplish this. Maintenance of a reducing atmosphere prevents a heavy formation of iron oxides, which would require more energy and lower the yield of the charge.
  • the formation of iron oxide in the premelting process can also be controlled by increasing the speed of the energy transfer when the charge temperature reaches and exceeds 800° C. which is the condition, which thermodynamically facilitates iron oxidation.
  • the method to reduce the formation of iron oxide during the premelting process is to achieve a pluristage or multistage combustion, keeping the reducing conditions over the whole charge volume so as to complete combustion in the terminal part of the charge before removing the exhaust gases.
  • This average temperature will promote a gradual and continuous oxidation of fuel in the charge. In this way, the oxidation potential of the charge is reduced, in spite of the fact that very high temperatures are reached and, in these conditions, oxidation is a very fast process.
  • the first stage produces carbon monoxide, which promotes the reducing atmosphere in the first half or two-thirds of the charge through which flow the gases and where the temperature causes the iron oxide to react.
  • the second phase produces carbon dioxide (the species supplies approximately two-thirds of the total transformation energy) in the remaining part of the charge, thus favoring a uniform temperature as mentioned above.
  • the timing of melting in premelting volume 2 vis a vis melting in the melting furnace 50 is an important feature of the invention. The advantageous thing to do is to arrange a maximum degree of contemporaneity between the charge heating phase and the real melting phase. This principle is implemented through this invention by achieving the premelting process in the independent premelting volume 2 separate from the melting furnace 50, in parallel with the melting phase of the previous charge.
  • This strategy to control the charge premelting process assures the maximum heat exchange from the off-gases (through radiation and convection) in a short time and with minimum energy losses. Even though it is an independent unit, the premelting apparatus and its method of operation cooperate with the melting furnace or vessel, the most adaptive (but not exclusive) being an electric arc furnace. Using the premelting apparatus with the melting process in a furnace considerably simplifies the operations performed in the furnace to fast melting by means of an electric arc, decarburization and refining, and slight post-combustion above the slag to protect against heat losses in the charge.
  • the premelting apparatus is a high efficiency pre-heating technology, because fuel burns progressively inside the charge with the special design of the invention.
  • a main aim of the invention is to bring the charge, for example an electric arc furnace charge, to a high (about 1000° C) and as homogenous temperature as possible, and close to the melting temperature. This is essentially achieved using the energy derived from the direct combustion of combustible components in the gases and materials already available in the charge or from secondary gases recovered from other plant components and which are thermally upgraded by use of the burners.
  • the following table shows the performance achieved by the premelting apparatus in the case of a 100 ton charge of scrap in two different processes having a different duration, one using carbon and the other using oxymethane burners:

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Furnace Details (AREA)
  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
  • Processing Of Solid Wastes (AREA)
  • Thermotherapy And Cooling Therapy Devices (AREA)
  • Oscillators With Electromechanical Resonators (AREA)
  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Manufacture Of Iron (AREA)
PCT/US2000/025100 1999-09-14 2000-09-12 High temperature premelting apparatus WO2001020046A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AU20392/01A AU2039201A (en) 1999-09-14 2000-09-12 High temperature premelting apparatus
EP00983663A EP1226283B1 (de) 1999-09-14 2000-09-12 Hochtemperatur-vorschmelzvorrichtung
DE60032504T DE60032504D1 (de) 1999-09-14 2000-09-12 Hochtemperatur-vorschmelzvorrichtung

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US15377599P 1999-09-14 1999-09-14
US60/153,775 1999-09-14

Publications (1)

Publication Number Publication Date
WO2001020046A1 true WO2001020046A1 (en) 2001-03-22

Family

ID=22548696

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2000/025100 WO2001020046A1 (en) 1999-09-14 2000-09-12 High temperature premelting apparatus

Country Status (5)

Country Link
EP (1) EP1226283B1 (de)
AT (1) ATE348897T1 (de)
AU (1) AU2039201A (de)
DE (1) DE60032504D1 (de)
WO (1) WO2001020046A1 (de)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006032347A2 (de) * 2004-09-25 2006-03-30 Sms Demag Ag Verfahren und einrichtung zum herstellen von flüssigem stahl
ES2332852A1 (es) * 2008-04-02 2010-02-12 Javier Guiu Lapresta Sistema de control del flujo termico en el horno electrico de arco.
CN103364195A (zh) * 2013-03-15 2013-10-23 哈尔滨汽轮机厂有限责任公司 燃气轮机燃烧室试验用高温测量段
CN113891946A (zh) * 2019-05-10 2022-01-04 非洲彩虹矿产有限公司 含金属原料的熔炼方法
CN115584372A (zh) * 2021-09-07 2023-01-10 F·P·格雷林 一种熔炼含金属原料的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4852858A (en) * 1987-04-21 1989-08-01 Kortec Ag Charging material preheater for preheating charging material for a metallurgical smelting unit
US6024912A (en) * 1997-11-27 2000-02-15 Empco (Canada) Ltd. Apparatus and process system for preheating of steel scrap for melting metallurgical furnaces with concurrent flow of scrap and heating gases
US6126716A (en) * 1996-02-13 2000-10-03 Nippon Steel Corporation Iron-base scrap preheating apparatus and method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2628972C2 (de) * 1976-06-28 1983-12-01 Paderwerk Gebr. Benteler, 4794 Schloss Neuhaus Verfahren zur kontinuierlichen Erzeugung von Stahl
AT395656B (de) * 1990-11-19 1993-02-25 Voest Alpine Ind Anlagen Anlage zur herstellung von fluessigen metallen

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4852858A (en) * 1987-04-21 1989-08-01 Kortec Ag Charging material preheater for preheating charging material for a metallurgical smelting unit
US6126716A (en) * 1996-02-13 2000-10-03 Nippon Steel Corporation Iron-base scrap preheating apparatus and method
US6024912A (en) * 1997-11-27 2000-02-15 Empco (Canada) Ltd. Apparatus and process system for preheating of steel scrap for melting metallurgical furnaces with concurrent flow of scrap and heating gases

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006032347A2 (de) * 2004-09-25 2006-03-30 Sms Demag Ag Verfahren und einrichtung zum herstellen von flüssigem stahl
WO2006032347A3 (de) * 2004-09-25 2007-06-21 Sms Demag Ag Verfahren und einrichtung zum herstellen von flüssigem stahl
ES2332852A1 (es) * 2008-04-02 2010-02-12 Javier Guiu Lapresta Sistema de control del flujo termico en el horno electrico de arco.
CN103364195A (zh) * 2013-03-15 2013-10-23 哈尔滨汽轮机厂有限责任公司 燃气轮机燃烧室试验用高温测量段
CN113891946A (zh) * 2019-05-10 2022-01-04 非洲彩虹矿产有限公司 含金属原料的熔炼方法
JP2022531896A (ja) * 2019-05-10 2022-07-12 アフリカン レインボー ミネラルズ リミテッド 金属含有原料の製錬のための方法
US20220220572A1 (en) * 2019-05-10 2022-07-14 African Rainbow Minerals Limited Process for the Smelting of a Metalliferous Feedstock Material
JP7358511B2 (ja) 2019-05-10 2023-10-10 アフリカン レインボー ミネラルズ リミテッド 金属含有原料の製錬のための方法
CN115584372A (zh) * 2021-09-07 2023-01-10 F·P·格雷林 一种熔炼含金属原料的方法

Also Published As

Publication number Publication date
AU2039201A (en) 2001-04-17
EP1226283A4 (de) 2003-07-23
ATE348897T1 (de) 2007-01-15
DE60032504D1 (de) 2007-02-01
EP1226283B1 (de) 2006-12-20
EP1226283A1 (de) 2002-07-31

Similar Documents

Publication Publication Date Title
US5042964A (en) Flash smelting furnace
JP5552754B2 (ja) アーク炉の操業方法
US4701216A (en) Melting of metals
US8114185B2 (en) Method of melting a mixture of scrap metal using scrap rubber
EP0116720B1 (de) Verfahren und Vorrichtung zum Einschmelzen von Schrott
EP1226283B1 (de) Hochtemperatur-vorschmelzvorrichtung
CA1043575A (en) Method and device for melting metals
JP2001526318A (ja) 多段炉において直接還元鉄を製造するための方法
JPS63503006A (ja) 炉用廃金属の予熱方法および装置
RU2295574C2 (ru) Способ получения металла и установка для его осуществления
MXPA03008526A (es) Horno modular.
JPH0631686B2 (ja) 溶解炉の排ガス熱回収方法及びその装置
JP3650193B2 (ja) 金属原料の溶解方法
RU2594927C2 (ru) Способ и устройство для производства жидкого чугуна и стали
CA2343212A1 (en) Method for producing directly reduced metal in a multi-tiered furnace
WO2001038455A1 (en) Retort
AU2005215826B2 (en) Direct smelting plant and process
JP2000008115A (ja) 冷鉄源の溶解方法
AU767268B2 (en) Retort
JPS58199809A (ja) リアクタ−製鉄のための装置
JPH06228623A (ja) エネルギ−使用量の少ない製鋼方法
JPH07107174B2 (ja) 電気炉,転炉の固体燃料吹込み方法及び吹込み装置
CN116368244A (zh) 生物质直接还原铁
JPH0579911B2 (de)
JPS62182582A (ja) 迅速溶解炉

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AL AM AT AU AZ BA BB BG BR BY CA CH CN CR CU CZ DE DK DM EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2000983663

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2000983663

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

NENP Non-entry into the national phase

Ref country code: JP

WWG Wipo information: grant in national office

Ref document number: 2000983663

Country of ref document: EP