WO2001011091A1 - A direct smelting process - Google Patents

A direct smelting process Download PDF

Info

Publication number
WO2001011091A1
WO2001011091A1 PCT/AU2000/000938 AU0000938W WO0111091A1 WO 2001011091 A1 WO2001011091 A1 WO 2001011091A1 AU 0000938 W AU0000938 W AU 0000938W WO 0111091 A1 WO0111091 A1 WO 0111091A1
Authority
WO
WIPO (PCT)
Prior art keywords
vessel
direct smelting
gas
molten
iron
Prior art date
Application number
PCT/AU2000/000938
Other languages
French (fr)
Inventor
Rodney James Dry
Original Assignee
Technological Resources Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technological Resources Pty Ltd filed Critical Technological Resources Pty Ltd
Priority to CA002381036A priority Critical patent/CA2381036C/en
Priority to DE60025728T priority patent/DE60025728T2/en
Priority to MXPA02001180A priority patent/MXPA02001180A/en
Priority to AU62544/00A priority patent/AU780104B2/en
Priority to BR0013006-0A priority patent/BR0013006A/en
Priority to JP2001515337A priority patent/JP4837856B2/en
Priority to EP00949007A priority patent/EP1230403B1/en
Priority to NZ516879A priority patent/NZ516879A/en
Publication of WO2001011091A1 publication Critical patent/WO2001011091A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B13/00Making spongy iron or liquid steel, by direct processes
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B13/00Making spongy iron or liquid steel, by direct processes
    • C21B13/0006Making spongy iron or liquid steel, by direct processes obtaining iron or steel in a molten state
    • C21B13/0026Making spongy iron or liquid steel, by direct processes obtaining iron or steel in a molten state introduction of iron oxide in the flame of a burner or a hot gas stream
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B13/00Making spongy iron or liquid steel, by direct processes
    • C21B13/14Multi-stage processes processes carried out in different vessels or furnaces
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/40Gas purification of exhaust gases to be recirculated or used in other metallurgical processes
    • C21B2100/42Sulphur removal
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/62Energy conversion other than by heat exchange, e.g. by use of exhaust gas in energy production
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/66Heat exchange
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/10Reduction of greenhouse gas [GHG] emissions
    • Y02P10/134Reduction of greenhouse gas [GHG] emissions by avoiding CO2, e.g. using hydrogen
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S75/00Specialized metallurgical processes, compositions for use therein, consolidated metal powder compositions, and loose metal particulate mixtures
    • Y10S75/958Specialized metallurgical processes, compositions for use therein, consolidated metal powder compositions, and loose metal particulate mixtures with concurrent production of iron and other desired nonmetallic product, e.g. energy, fertilizer

Definitions

  • the present invention relates to a process for producing molten iron from a metalliferous feed material, such as ores, partly reduced ores, and metal-containing waste streams, in a molten bath-based direct smelting process for producing molten iron from a metalliferous feed material.
  • a metalliferous feed material such as ores, partly reduced ores, and metal-containing waste streams
  • direct smelting process is understood to mean a process that produces a molten material, in this case iron, from a metalliferous feed material.
  • the DIOS process includes a pre-reduction stage and a smelt reduction stage.
  • the DIOS process ore (-8mm) is pre-heated (750°C) and pre-reduced (10 to 30%) in bubbling fluidised beds using offgas from a smelt reduction vessel which contains a molten bath of metal and slag, with the slag forming a deep layer on the metal.
  • the fine (-0.3mm) and coarse (-8 mm) components of the ore are separated in the pre-reduction stage of the process and the -0.3 mm is collected in a cyclone and injected into the smelt reduction furnace with nitrogen whilst the coarse ore is charged by gravity.
  • Pre-dried coal is charged directly to the smelt reduction furnace from the top of the vessel.
  • the coal decomposes into char and volatile matter in the slag layer and the ore dissolves in the molten slag and forms FeO.
  • the FeO is reduced at the slag/metal and slag/char interfaces to produce iron.
  • the carbon monoxide generated at the metal/slag and slag/char interface generates a foaming slag.
  • Oxygen is blown through a specially designed lance that introduces the oxygen inside the foamed slag and improves secondary combustion.
  • Oxygen jets burn carbon monoxide that is generated with the smelting reduction reactions, thereby generating heat that is transferred first to the molten slag and then to the slag/metal interface by the strong stirring effect of bottom blowing gas .
  • the stirring gas introduced into the hot metal bath from the bottom or side of the smelt reduction vessel improves heat transfer efficiency and increases the slag/metal interface for reduction and therefore the vessel productivity and thermal efficiency.
  • injection rates must be limited as strong stirring lowers secondary combustion due to increased interaction between the oxygen jet and metal droplets in the slag with subsequent lowering of productivity and increased refractory wear. Slag and metal are tapped periodically.
  • Romelt process Another known direct smelting process for producing molten ferrous metal is the Romelt process.
  • the Romelt process is based on the use of a large volume, highly agitated slag bath as the medium for smelting metalliferous feed material to metal in a smelt reduction vessel and for post-combusting gaseous reaction products and transferring the heat as required to continue smelting metalliferous feed material.
  • the metalliferous feed material, coal, and fluxes are gravity fed into the slag bath via an opening in the roof of the vessel .
  • the Romelt process includes injecting a primary blast of oxygen- enriched air into the slag via a lower row of tuyeres to cause necessary slag agitation and injection of oxygen- enriched air or oxygen into the slag via an upper row of tuyeres to promote post-combustion.
  • the molten metal produced in the slag moves downwardly and forms a metal layer and is discharged via a forehearth.
  • the metal layer is not an important reaction medium.
  • the AISI process includes a pre-reduction stage and a smelt reduction stage.
  • pre-heated and partially pre-reduced iron ore pellets coal or coke breeze and fluxes are top charged into a pressurised smelt reactor which contains a molten bath of metal and slag.
  • the coal devolatilises in the slag layer and the iron ore pellets dissolve in the slag and then are reduced by carbon (char) in the slag.
  • the process conditions result in slag foaming.
  • Carbon monoxide and hydrogen generated in the process are post combusted in or just above the slag layer to provide the energy required for the endothermic reduction reactions.
  • Oxygen is top blown through a central, water cooled lance and nitrogen is injected through tuyeres at the bottom of the reactor to ensure sufficient stirring to facilitate heat transfer of the post combustion energy to the bath.
  • the process offgas is de- dusted in a hot cyclone before being fed to a shaft type furnace for pre-heating and pre-reduction of the pellets to FeO or wustite.
  • HIsmelt process Another known direct smelting process which, unlike the above-described processes, relies on a molten metal layer as a reaction medium is generally referred to as the HIsmelt process and includes the steps of:
  • a preferred form of the HIsmelt process is characterized by forming the transition zone by injecting carrier gas, metalliferous feed material, coal, and fluxes into the bath through lances that extend downwardly and inwardly through side walls of the vessel so that the carrier gas and the solid material penetrate the metal layer and cause molten material to be projected from the bath.
  • This form of the HIsmelt process is an improvement over earlier forms of the process which form the transition zone by bottom injection of carrier gas and coal through tuyeres into the bath which cause droplets and splashes and streams of molten material to be projected from the bath.
  • the Romelt, DIOS, AISI and HIsmelt direct smelting processes can use coal as the source of energy and reductant . This is an advantage of the direct smelting processes over blast furnace technology which requires coke as the source of energy/reduct nt .
  • the Romelt, DIOS , AISI and HIsmelt direct smelting processes can operate with a wide range of metalliferous feed materials.
  • Iron ore is the major source of metalliferous feed materials for producing molten iron via the Romelt, DIOS, AISI, and HIsmelt processes.
  • One process option for the direct smelting processes is to supply iron ore directly to direct smelting vessels.
  • Another process option is to pre-heat and partially reduce iron ore in a solid state in pre-reduction vessels (which could be a shaft furnace or a fluidised bed or any other suitable vessel), transfer the preheated/partially reduced iron ore to direct smelting vessels containing a molten bath of iron and slag, and smelt the pre-heated/partially reduced iron ore to molten iron in the direct smelting vessels.
  • This process option may also include using off-gas from the direct smelting vessels to pre-heat/pre-reduce iron ore in the pre- reduction vessels.
  • One advantage of the process option is that it provides an opportunity to minimise total energy consumption.
  • undesirable impurities typically coal-derived impurities such as sulphur and alkali salts, which volatilise in direct smelting vessels and are discharged as part of the off-gas, return to the direct smelting vessels with the pre-heated/partially reduced iron ore and accumulate in the vessels.
  • sulphur reacts with FeO in the pre-reduction vessels and forms FeS and alkali salts condense in the pre-reduction vessels, and the FeS and condensed alkali salts are transferred to the direct smelting vessels with the pre-heated/partially reduced iron ore.
  • An object of the present invention is to alleviate the disadvantage of the known 2-stage direct smelting process described in the preceding paragraph and in particular where the smelting medium is metal.
  • step (b) direct smelting partially reduced iron oxides produced in step (a) to molten iron in a direct smelting vessel which contains a molten bath of iron and slag and is supplied with a solid carbonaceous material as a source of reductant and energy and with an oxygen-containing gas for post-combusting carbon monoxide and hydrogen generated in the vessel;
  • step (d) of using only part rather than all of the off-gas from the direct smelting vessel in pre-reduction step (a) is to at least minimise the rate of build-up of undesirable impurities, typically coal-derived impurities, in the direct smelting vessel.
  • undesirable impurities typically coal-derived impurities such as sulphur and alkali salts
  • step (d) includes controlling the amount of off-gas released from the direct smelting vessel and used in pre-reduction step (a) so that the amount of sulphur in molten iron produced in direct smelting step (b) is less than 0.2 wt% of the total weight of the molten iron.
  • the process includes processing the remainder of the off-gas released from the direct smelting vessel for heating and/or for power generation without returning the majority of the sulphur in this part of the off-gas to the direct smelting vessel.
  • Preferably direct smelting step (b) includes injecting pre-heated air or oxygen-enriched air into the direct smelting vessel as the oxygen-containing gas.
  • the process includes using a first stream of the off-gas from the direct smelting vessel in pre-reduction step (a) and using a second stream of the off-gas as a source of energy for heating air or oxygen- enriched air before supplying the air or oxygen-enriched air to the direct smelting vessel.
  • the second stream includes at least
  • the second stream includes at least 30 vol ⁇ of the off-gas released from the direct smelting vessel.
  • the second stream includes at least 40 vol.% of the off-gas released from the direct smelting vessel.
  • the process includes removing entrained sulphur and alkali salts from the second stream prior to using the second stream as the source of energy for heating air or oxygen-enriched air.
  • the oxygen-enriched air contains less than 50 volume % oxygen.
  • pre-reduction step (a) pre-heats the iron ore to a temperature in the range of 600-1000°C.
  • the off-gas from pre-reduction step (a) is used as a fuel gas for heating or power generation.
  • Smelting step (b) may include any suitable direct smelting process and use either the metal or the slag as the smelting medium.
  • smelting step (b) includes using the metal as a smelting medium and more preferably as the principal smelting medium.
  • smelting step (b) includes direct smelting partially reduced iron oxides in accordance with the HIsmelt process which includes the steps of:
  • the term "quiescent surface" in the context of the molten bath is understood herein to mean the surface of the molten bath under process conditions in which there is no gas/solids injection and therefore no bath agitation.
  • Figure 1 is a flow sheet, in largely schematic form, of one preferred embodiment of the process of the present invention.
  • Figure 2 is a vertical section through a preferred form of a direct smelting vessel for use in the process illustrated in Figure 1.
  • iron ore typically in the form of fines is heated and partially reduced in a pre-reduction vessel 103 and is then transferred at a temperature in the range of 600-1000°C to a direct smelting vessel 105 and smelted to molten iron in a molten bath in that vessel.
  • Coal, fluxes, and oxygen-enriched air are supplied to the direct smelting vessel 105.
  • the coal is provided as a source of energy and reductant; the oxygen- enriched air is provided to post-combust combustible reaction products generated in the process; and the flux is provided to form slag.
  • the pre-reduction vessel 103 may be of any suitable type and configuration for the iron ore feed material.
  • the pre-reduction vessel is a shaft furnace.
  • the pre- reduction vessel is a fluidised bed-based furnace.
  • the iron ore feed material is heated and partially reduced in the pre-reduction vessel 103 by offgas released from the direct smelting vessel 105.
  • the offgas passes out of the pre-reduction vessel 103 and may be used as a low energy fuel gas for heating or power generation (not shown) .
  • the off-gas may be transferred directly from the direct smelting vessel 105 to the pre-reduction vessel 103.
  • the extent of heating and reduction in the pre-reduction vessel 103 is a function of the temperature and composition of the off-gas, which in turn is a function of the direct smelting process operating in the direct smelting vessel 105.
  • the off-gas may also be transferred from the direct smelting vessel 105 to the pre-reduction vessel 103 via a gas reformer (not shown) or other means which precondition the off-gas upstream of the pre-reduction vessel 103.
  • the off-gas from the direct smelting vessel 105 is split into two (or more) streams, with one stream being transferred directly or indirectly to the pre-reduction vessel 103 as described in the preceding paragraphs, and with the other stream being used on the combustion side of stoves 107 which pre-heat oxygen-enriched air for post-combusting reaction products in the direct smelting vessel 105.
  • the purpose of splitting the off-gas stream is two-fold.
  • transferring only part of the off-gas stream to the pre-reduction vessel 103 reduces the rate of accumulation in the direct smelting vessel 105 of undesirable impurities, typically coal-derived impurities such as sulphur and alkali salts, that volatilise in the direct smelting process and are recovered in the pre- reduction step and are returned to the direct smelting vessel 105 with incoming partially reduced iron ore.
  • undesirable impurities typically coal-derived impurities such as sulphur and alkali salts
  • this second advantage applies particularly to air-based direct smelting processes where there is usually more off-gas than is required for heating/reducing iron ore in the pre-reduction vessel 103 and splitting the off-gas does not adversely affect the operation of the pre-reduction vessel 103.
  • the direct smelting process operating in the direct smelting vessel 105 may be any suitable process and may be a cold oxygen-based system.
  • the preferred direct smelting process operated in the direct smelting vessel is the HIsmelt process as described in general terms hereinafter with reference to Figure 2 and in more detail in International application PCT/AU99/00538 in the name of the applicant, and the disclosure in the patent specification lodged with the International application is incorporated herein by cross- reference .
  • the direct smelting vessel 105 may be any suitable vessel.
  • the preferred direct smelting vessel is the vessel described in general terms hereinafter with reference to Figure 2 and in more detail in International application PCT/AU99/00537 in the name of the applicant and the disclosure in the patent specification lodged with the
  • the vessel 105 shown in Figure 2 has a hearth that includes a base 3 and sides 55 formed from refractory- bricks; side walls 5 which form a generally cylindrical barrel extending upwardly from the sides 55 of the hearth and which include an upper barrel section 51 and a lower barrel section 53; a roof 7; an outlet 9 for off-gases; a forehearth 77 for discharging molten metal continuously; a forehearth connection 71 that interconnects the hearth and the forehearth 77; and a tap-hole 61 for discharging molten slag.
  • the vessel 105 contains the molten bath which includes a layer 15 of molten iron and a layer 16 of molten slag on the iron layer 15.
  • the arrow marked by the numeral 17 indicates the position of the nominal quiescent surface of the iron layer 15 and the arrow marked by the numeral 19 indicates the position of nominal quiescent surface of the slag layer 16.
  • the term "quiescent surface” is understood to mean the surface when there is no injection of gas and solids into the vessel.
  • the vessel 105 also includes 2 solids injection lances/tuyeres 11 extending downwardly and inwardly at an angle of 30-60° to the vertical through the side walls 5 and into the slag layer 16. The position of the lances/tuyeres 11 is selected so that the lower ends are above the quiescent surface 17 of the iron layer 15 under steady-state process conditions.
  • the partially reduced iron ore, coal, and fluxes typically lime and magnesia
  • a carrier gas typically N2
  • the momentum of the solid material/carrier gas causes the solid material and gas to penetrate the iron layer 15.
  • Carbon partially dissolves into the metal and partially remains as solid carbon.
  • the pre-reduced iron ore is smelted to iron and the smelting reaction generates carbon monoxide gas.
  • the gases transported into the iron layer 15 and generated via smelting produce significant buoyancy uplift of molten iron, solid carbon, and slag (drawn into the iron layer 15 as a consequence of solid/gas/injection) from the iron layer 15 which generates an upward movement of splashes, droplets and streams of molten material, and these splashes, and droplets, and streams entrain slag as they move through the slag layer 16.
  • the buoyancy uplift of molten metal, solid carbon and slag causes substantial agitation in the iron layer 15 and the slag layer 16, with the result that the slag layer 16 expands in volume and has a surface indicated by the arrow 30.
  • the extent of agitation is such that there is reasonably uniform temperature in the metal and the slag regions - typically, 1450 - 1550°C with a temperature variation of the order of 30° in each region.
  • the slag layer 16 is a liquid continuous volume, with gas bubbles therein, and the transition zone 23 is a gas continuous volume with splashes, droplets, and streams of molten metal and slag.
  • the vessel 105 further includes a lance 13 for injecting the heated oxygen-enriched air into the vessel 105.
  • the lance 13 is centrally located and extends vertically downwardly into the vessel. The position of the lance 13 and the gas flow rate through the lance 13 are selected so that under steady-state process conditions the oxygen-containing gas penetrates the central region of the transition zone 23 and maintains an essentially metal/slag free space 25 around the end of the lance 13.
  • the injection of the oxygen-containing gas via the lance 13 post-combusts- reaction gases CO and H2 in the transition zone 23 and in the free space 25 around the end of the lance 13 and generates high temperatures of the order of 2000°C or higher in the gas space.
  • the heat is transferred to the ascending and descending splashes droplets, and streams, of molten material in the region of gas injection and the heat is then partially transferred to the iron layer 15 when the metal/slag returns to the iron layer 15.
  • the free space 25 is important to achieving high levels of post combustion because it enables entrainment of gases in the space above the transition zone 23 into the end region of the lance 13 and thereby increases exposure of available reaction gases to post combustion.
  • the combined effect of the position of the lance 13, gas flow rate through the lance 13, and upward movement of splashes, droplets and streams of molten material is to shape the transition zone 23 around the lower region of the lance 13 - generally identified by the numerals 27. This shaped region provides a partial barrier to heat transfer by radiation to the side walls 5.
  • the ascending and descending droplets, splashes and streams of material is an effective means of transferring heat from the transition zone 23 to the molten bath with the result that the temperature of the transition zone 23 in the region of the side walls 5 is of the order of 1450°C- 1550°C.
  • the vessel 105 is constructed with reference to the levels of the iron layer 15, the slag layer 16, and the transition zone 23 in the vessel 105 when the process is operating under steady-state process conditions and with reference to splashes, droplets and streams of molten material that are projected into the top space 31 above the transition zone 23 when the process is operating under steady-state operating conditions, so that:
  • Each water cooled panel 8, 57, 59 (not shown) in the upper barrel section 51 of the side walls 5 has parallel upper and lower edges and parallel side edges and is curved so as to define a section of the cylindrical barrel.
  • Each panel includes an inner water cooling pipe and an outer water cooling pipe.
  • the pipes are formed into a serpentine configuration with horizontal sections interconnected by curved sections.
  • Each pipe further includes a water inlet and a water outlet.
  • the pipes are displaced vertically so that the horizontal sections of the outer pipe are not immediately behind the horizontal sections of the inner pipe when viewed from an exposed face of the panel, ie the face that is exposed to the interior of the vessel.
  • Each panel further includes a rammed refractory material which fills the spaces between the adjacent horizontal sections of each pipe and between the pipes .
  • Each panel further includes a support plate which forms an outer surface of the panel .
  • the water inlets and the water outlets of the pipes are connected to a water supply circuit (not shown) which circulates water at high flow rate through the pipes .

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture Of Iron (AREA)
  • Saccharide Compounds (AREA)
  • Inorganic Insulating Materials (AREA)
  • Crystals, And After-Treatments Of Crystals (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Treatment Of Steel In Its Molten State (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

A process for direct smelting metalliferous feed material is disclosed. Iron oxides are partially reduced in a solid state in a pre-reduction vessel. The partially reduced iron oxides are smelted to molten iron in a direct smelting vessel which contains a molten bath of iron and slag and is supplied with a solid carbonaceous material as a source of reductant and energy and with an oxygen containing gas for post-combusting carbon monoxide and hydrogen generated in the vessel. The direct smelting step generates an off-gas that contains sulphur and the off-gas is released from the direct smelting vessel. Part only of the off-gas released from the direct smelting vessel is used in the pre-reduction step to pre-reduce iron oxides in the pre-reduction vessel. Part only of the off-gas is used in the pre-reduction step in order to control the amount of sulphur that is returned with the partially reduced iron oxides to the direct smelting vessel.

Description

A DIRECT SMELTING PROCESS
The present invention relates to a process for producing molten iron from a metalliferous feed material, such as ores, partly reduced ores, and metal-containing waste streams, in a molten bath-based direct smelting process for producing molten iron from a metalliferous feed material.
The term "direct smelting process" is understood to mean a process that produces a molten material, in this case iron, from a metalliferous feed material.
One known molten bath-based direct smelting process for producing molten ferrous metal is the DIOS process. The DIOS process includes a pre-reduction stage and a smelt reduction stage. In the DIOS process ore (-8mm) is pre-heated (750°C) and pre-reduced (10 to 30%) in bubbling fluidised beds using offgas from a smelt reduction vessel which contains a molten bath of metal and slag, with the slag forming a deep layer on the metal. The fine (-0.3mm) and coarse (-8 mm) components of the ore are separated in the pre-reduction stage of the process and the -0.3 mm is collected in a cyclone and injected into the smelt reduction furnace with nitrogen whilst the coarse ore is charged by gravity. Pre-dried coal is charged directly to the smelt reduction furnace from the top of the vessel. The coal decomposes into char and volatile matter in the slag layer and the ore dissolves in the molten slag and forms FeO. The FeO is reduced at the slag/metal and slag/char interfaces to produce iron. The carbon monoxide generated at the metal/slag and slag/char interface generates a foaming slag. Oxygen is blown through a specially designed lance that introduces the oxygen inside the foamed slag and improves secondary combustion. Oxygen jets burn carbon monoxide that is generated with the smelting reduction reactions, thereby generating heat that is transferred first to the molten slag and then to the slag/metal interface by the strong stirring effect of bottom blowing gas . The stirring gas introduced into the hot metal bath from the bottom or side of the smelt reduction vessel improves heat transfer efficiency and increases the slag/metal interface for reduction and therefore the vessel productivity and thermal efficiency. However, injection rates must be limited as strong stirring lowers secondary combustion due to increased interaction between the oxygen jet and metal droplets in the slag with subsequent lowering of productivity and increased refractory wear. Slag and metal are tapped periodically.
Another known direct smelting process for producing molten ferrous metal is the Romelt process. The Romelt process is based on the use of a large volume, highly agitated slag bath as the medium for smelting metalliferous feed material to metal in a smelt reduction vessel and for post-combusting gaseous reaction products and transferring the heat as required to continue smelting metalliferous feed material. The metalliferous feed material, coal, and fluxes are gravity fed into the slag bath via an opening in the roof of the vessel . The Romelt process includes injecting a primary blast of oxygen- enriched air into the slag via a lower row of tuyeres to cause necessary slag agitation and injection of oxygen- enriched air or oxygen into the slag via an upper row of tuyeres to promote post-combustion. The molten metal produced in the slag moves downwardly and forms a metal layer and is discharged via a forehearth. In the Romelt process the metal layer is not an important reaction medium.
Another known direct smelting process for producing molten ferrous metal is the AISI process. The AISI process includes a pre-reduction stage and a smelt reduction stage. In the AISI process pre-heated and partially pre-reduced iron ore pellets, coal or coke breeze and fluxes are top charged into a pressurised smelt reactor which contains a molten bath of metal and slag. The coal devolatilises in the slag layer and the iron ore pellets dissolve in the slag and then are reduced by carbon (char) in the slag. The process conditions result in slag foaming. Carbon monoxide and hydrogen generated in the process are post combusted in or just above the slag layer to provide the energy required for the endothermic reduction reactions. Oxygen is top blown through a central, water cooled lance and nitrogen is injected through tuyeres at the bottom of the reactor to ensure sufficient stirring to facilitate heat transfer of the post combustion energy to the bath. The process offgas is de- dusted in a hot cyclone before being fed to a shaft type furnace for pre-heating and pre-reduction of the pellets to FeO or wustite.
Another known direct smelting process which, unlike the above-described processes, relies on a molten metal layer as a reaction medium is generally referred to as the HIsmelt process and includes the steps of:
(a) forming a molten bath having a metal layer and a slag layer on the metal layer in a direct smelting vessel;
(b) injecting metalliferous feed material and coal into the metal layer via a plurality of lances/tuyeres;
(c) smelting metalliferous material to metal in the metal layer;
(d) causing molten material to be projected as splashes, droplets, and streams above a quiescent surface of the molten bath to form a transition zone; and
(d) injecting an oxygen-containing gas into the vessel via one or more than one lance/tuyere to post-combust reaction gases released from the molten bath, whereby ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath, and whereby the transition zone minimises heat loss from the vessel via the side walls in contact with the transition zone.
A preferred form of the HIsmelt process is characterized by forming the transition zone by injecting carrier gas, metalliferous feed material, coal, and fluxes into the bath through lances that extend downwardly and inwardly through side walls of the vessel so that the carrier gas and the solid material penetrate the metal layer and cause molten material to be projected from the bath.
This form of the HIsmelt process is an improvement over earlier forms of the process which form the transition zone by bottom injection of carrier gas and coal through tuyeres into the bath which cause droplets and splashes and streams of molten material to be projected from the bath.
The Romelt, DIOS, AISI and HIsmelt direct smelting processes can use coal as the source of energy and reductant . This is an advantage of the direct smelting processes over blast furnace technology which requires coke as the source of energy/reduct nt .
The Romelt, DIOS , AISI and HIsmelt direct smelting processes can operate with a wide range of metalliferous feed materials.
Iron ore is the major source of metalliferous feed materials for producing molten iron via the Romelt, DIOS, AISI, and HIsmelt processes.
One process option for the direct smelting processes is to supply iron ore directly to direct smelting vessels.
Another process option is to pre-heat and partially reduce iron ore in a solid state in pre-reduction vessels (which could be a shaft furnace or a fluidised bed or any other suitable vessel), transfer the preheated/partially reduced iron ore to direct smelting vessels containing a molten bath of iron and slag, and smelt the pre-heated/partially reduced iron ore to molten iron in the direct smelting vessels. This process option may also include using off-gas from the direct smelting vessels to pre-heat/pre-reduce iron ore in the pre- reduction vessels. One advantage of the process option is that it provides an opportunity to minimise total energy consumption. One disadvantage of the process option is that undesirable impurities, typically coal-derived impurities such as sulphur and alkali salts, which volatilise in direct smelting vessels and are discharged as part of the off-gas, return to the direct smelting vessels with the pre-heated/partially reduced iron ore and accumulate in the vessels. Specifically, sulphur reacts with FeO in the pre-reduction vessels and forms FeS and alkali salts condense in the pre-reduction vessels, and the FeS and condensed alkali salts are transferred to the direct smelting vessels with the pre-heated/partially reduced iron ore. The return of FeS into a direct smelting vessel disrupts the reaction sites of the smelting process and can significantly affect production. One solution to this issue is to increase the temperature of the medium for smelting. However, this leads to increased refractory wear and if pursued too far leads to the partitioning of phosphorus into the metal rather than the slag, and this is a major disadvantage.
An object of the present invention is to alleviate the disadvantage of the known 2-stage direct smelting process described in the preceding paragraph and in particular where the smelting medium is metal.
According to the present invention there is provided a process for direct smelting metalliferous feed material which includes the steps of :
(a) partially reducing iron oxides in a solid state in a pre-reduction vessel and producing partially reduced iron oxides;
(b) direct smelting partially reduced iron oxides produced in step (a) to molten iron in a direct smelting vessel which contains a molten bath of iron and slag and is supplied with a solid carbonaceous material as a source of reductant and energy and with an oxygen-containing gas for post-combusting carbon monoxide and hydrogen generated in the vessel;
(c) generating an off-gas that contains sulphur in direct smelting step (b) and releasing the off-gas from the direct smelting vessel; and
(d) using only part of the off-gas released from the direct smelting vessel in pre-reduction step (a) to pre-reduce iron oxides in the pre-reduction vessel to control the amount of sulphur that is returned to the direct smelting vessel from the pre-reduction vessel .
The effect of step (d) of using only part rather than all of the off-gas from the direct smelting vessel in pre-reduction step (a) is to at least minimise the rate of build-up of undesirable impurities, typically coal-derived impurities, in the direct smelting vessel. As is indicated above, a disadvantage of the known 2-stage direct smelting process is that a number of undesirable impurities, typically coal-derived impurities such as sulphur and alkali salts, that are volatilised in direct smelting vessels are recovered in pre-reduction vessels and thereafter are returned to the direct smelting vessels.
Preferably step (d) includes controlling the amount of off-gas released from the direct smelting vessel and used in pre-reduction step (a) so that the amount of sulphur in molten iron produced in direct smelting step (b) is less than 0.2 wt% of the total weight of the molten iron.
Preferably the process includes processing the remainder of the off-gas released from the direct smelting vessel for heating and/or for power generation without returning the majority of the sulphur in this part of the off-gas to the direct smelting vessel.
Preferably direct smelting step (b) includes injecting pre-heated air or oxygen-enriched air into the direct smelting vessel as the oxygen-containing gas.
More preferably the process includes using a first stream of the off-gas from the direct smelting vessel in pre-reduction step (a) and using a second stream of the off-gas as a source of energy for heating air or oxygen- enriched air before supplying the air or oxygen-enriched air to the direct smelting vessel.
Preferably the second stream includes at least
20% by volume of the off-gas released from the direct smelting vessel.
More preferably the second stream includes at least 30 volΛ of the off-gas released from the direct smelting vessel.
It is preferred particularly that the second stream includes at least 40 vol.% of the off-gas released from the direct smelting vessel.
Preferably the process includes removing entrained sulphur and alkali salts from the second stream prior to using the second stream as the source of energy for heating air or oxygen-enriched air.
Preferably the oxygen-enriched air contains less than 50 volume % oxygen.
Preferably pre-reduction step (a) pre-heats the iron ore to a temperature in the range of 600-1000°C.
Preferably the off-gas from pre-reduction step (a) is used as a fuel gas for heating or power generation.
Smelting step (b) may include any suitable direct smelting process and use either the metal or the slag as the smelting medium.
Preferably smelting step (b) includes using the metal as a smelting medium and more preferably as the principal smelting medium. Preferably smelting step (b) includes direct smelting partially reduced iron oxides in accordance with the HIsmelt process which includes the steps of:
(i) forming the molten bath with a molten iron layer and a molten slag layer on the iron layer in the direct smelting vessel;
(ii) injecting the partially reduced iron oxides and coal into the iron layer via a plurality of lances/tuyeres;
(iii) smelting the partially reduced iron oxides to molten iron in the iron layer;
(iv) causing molten material to be projected as splashes, droplets, and streams into a space above a nominal quiescent surface of the molten bath and forming a transition zone; and
(v) injecting the oxygen-containing gas into the direct smelting vessel via one or more than one lance/tuyere and post-combusting carbon monoxide and hydrogen released from the molten bath, whereby the ascending and thereafter descending splashes, droplets, and streams of molten material in the transition zone facilitate heat transfer to the molten bath, and whereby the transition zone minimises heat loss from the vessel via a side wall of the vessel that is in contact with the transition zone.
The term "quiescent surface" in the context of the molten bath is understood herein to mean the surface of the molten bath under process conditions in which there is no gas/solids injection and therefore no bath agitation.
The present invention is described further by way of example with reference to the accompanying drawings, of which:
Figure 1 is a flow sheet, in largely schematic form, of one preferred embodiment of the process of the present invention; and
Figure 2 is a vertical section through a preferred form of a direct smelting vessel for use in the process illustrated in Figure 1.
With reference to Figure 1, iron ore, typically in the form of fines is heated and partially reduced in a pre-reduction vessel 103 and is then transferred at a temperature in the range of 600-1000°C to a direct smelting vessel 105 and smelted to molten iron in a molten bath in that vessel.
Coal, fluxes, and oxygen-enriched air are supplied to the direct smelting vessel 105. The coal is provided as a source of energy and reductant; the oxygen- enriched air is provided to post-combust combustible reaction products generated in the process; and the flux is provided to form slag.
The pre-reduction vessel 103 may be of any suitable type and configuration for the iron ore feed material. For example, if the iron ore feed is lump ore, typically the pre-reduction vessel is a shaft furnace. Further, if the iron ore feed is fines, typically the pre- reduction vessel is a fluidised bed-based furnace.
The iron ore feed material is heated and partially reduced in the pre-reduction vessel 103 by offgas released from the direct smelting vessel 105. The offgas passes out of the pre-reduction vessel 103 and may be used as a low energy fuel gas for heating or power generation (not shown) .
The off-gas may be transferred directly from the direct smelting vessel 105 to the pre-reduction vessel 103. In that case, the extent of heating and reduction in the pre-reduction vessel 103 is a function of the temperature and composition of the off-gas, which in turn is a function of the direct smelting process operating in the direct smelting vessel 105.
The off-gas may also be transferred from the direct smelting vessel 105 to the pre-reduction vessel 103 via a gas reformer (not shown) or other means which precondition the off-gas upstream of the pre-reduction vessel 103.
In accordance with the present invention, the off-gas from the direct smelting vessel 105 is split into two (or more) streams, with one stream being transferred directly or indirectly to the pre-reduction vessel 103 as described in the preceding paragraphs, and with the other stream being used on the combustion side of stoves 107 which pre-heat oxygen-enriched air for post-combusting reaction products in the direct smelting vessel 105.
In the preferred embodiment of the present invention the purpose of splitting the off-gas stream is two-fold.
Firstly, transferring only part of the off-gas stream to the pre-reduction vessel 103 reduces the rate of accumulation in the direct smelting vessel 105 of undesirable impurities, typically coal-derived impurities such as sulphur and alkali salts, that volatilise in the direct smelting process and are recovered in the pre- reduction step and are returned to the direct smelting vessel 105 with incoming partially reduced iron ore.
Secondly, using part of the off-gas stream to heat the stoves 107 is beneficial from the viewpoint of minimising total energy consumption. This second advantage applies particularly to air-based direct smelting processes where there is usually more off-gas than is required for heating/reducing iron ore in the pre-reduction vessel 103 and splitting the off-gas does not adversely affect the operation of the pre-reduction vessel 103.
The direct smelting process operating in the direct smelting vessel 105 may be any suitable process and may be a cold oxygen-based system.
The preferred direct smelting process operated in the direct smelting vessel is the HIsmelt process as described in general terms hereinafter with reference to Figure 2 and in more detail in International application PCT/AU99/00538 in the name of the applicant, and the disclosure in the patent specification lodged with the International application is incorporated herein by cross- reference .
In the context of the present invention, the direct smelting process described in the International application is based on:
(a) forming a molten bath having a molten iron layer and a molten slag layer on the iron layer in the direct smelting vessel 105;
(b) injecting the partially reduced iron ore and coal and fluxes into the iron layer via a plurality of lances/tuyeres;
(c) smelting the partially reduced iron ore to molten iron in the metal layer;
(d) causing molten material to be projected as splashes, droplets, and streams into a space above a normal quiescent surface of the molten bath and forming a transition zone; and
(e) injecting the heated oxygen-enriched air into the direct smelting vessel 105 via one or more than one lance/tuyere and post- combusting reaction gases, typically carbon monoxide and hydrogen, released from the molten bath and generating temperatures of the order of 2000°C or higher in the transition zone, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath, and whereby the transition zone minimises heat loss from the vessel via the side walls in contact with the transition zone.
The direct smelting vessel 105 may be any suitable vessel.
The preferred direct smelting vessel is the vessel described in general terms hereinafter with reference to Figure 2 and in more detail in International application PCT/AU99/00537 in the name of the applicant and the disclosure in the patent specification lodged with the
International application is incorporated herein by cross- reference . The vessel 105 shown in Figure 2 has a hearth that includes a base 3 and sides 55 formed from refractory- bricks; side walls 5 which form a generally cylindrical barrel extending upwardly from the sides 55 of the hearth and which include an upper barrel section 51 and a lower barrel section 53; a roof 7; an outlet 9 for off-gases; a forehearth 77 for discharging molten metal continuously; a forehearth connection 71 that interconnects the hearth and the forehearth 77; and a tap-hole 61 for discharging molten slag.
In use, under steady-state process conditions, the vessel 105 contains the molten bath which includes a layer 15 of molten iron and a layer 16 of molten slag on the iron layer 15. The arrow marked by the numeral 17 indicates the position of the nominal quiescent surface of the iron layer 15 and the arrow marked by the numeral 19 indicates the position of nominal quiescent surface of the slag layer 16. The term "quiescent surface" is understood to mean the surface when there is no injection of gas and solids into the vessel.
The vessel 105 also includes 2 solids injection lances/tuyeres 11 extending downwardly and inwardly at an angle of 30-60° to the vertical through the side walls 5 and into the slag layer 16. The position of the lances/tuyeres 11 is selected so that the lower ends are above the quiescent surface 17 of the iron layer 15 under steady-state process conditions.
In use, under steady-state process conditions, the partially reduced iron ore, coal, and fluxes (typically lime and magnesia) entrained in a carrier gas (typically N2) are injected into the iron layer 15 via the lances/tuyeres 11. The momentum of the solid material/carrier gas causes the solid material and gas to penetrate the iron layer 15. Carbon partially dissolves into the metal and partially remains as solid carbon. The pre-reduced iron ore is smelted to iron and the smelting reaction generates carbon monoxide gas. The gases transported into the iron layer 15 and generated via smelting produce significant buoyancy uplift of molten iron, solid carbon, and slag (drawn into the iron layer 15 as a consequence of solid/gas/injection) from the iron layer 15 which generates an upward movement of splashes, droplets and streams of molten material, and these splashes, and droplets, and streams entrain slag as they move through the slag layer 16.
The buoyancy uplift of molten metal, solid carbon and slag causes substantial agitation in the iron layer 15 and the slag layer 16, with the result that the slag layer 16 expands in volume and has a surface indicated by the arrow 30. The extent of agitation is such that there is reasonably uniform temperature in the metal and the slag regions - typically, 1450 - 1550°C with a temperature variation of the order of 30° in each region.
In addition, the upward movement of splashes, droplets and streams of molten material caused by the buoyancy uplift of molten iron, solid carbon, and slag extends into the top space 31 above the molten material in the vessel and:
(a) forms a transition zone 23; and
(b) projects some molten material (predominantly slag) beyond the transition zone and onto the part of the upper barrel section 51 of the side walls 5 that is above the transition zone 23 and onto the roof 7.
In general terms, the slag layer 16 is a liquid continuous volume, with gas bubbles therein, and the transition zone 23 is a gas continuous volume with splashes, droplets, and streams of molten metal and slag.
The vessel 105 further includes a lance 13 for injecting the heated oxygen-enriched air into the vessel 105. The lance 13 is centrally located and extends vertically downwardly into the vessel. The position of the lance 13 and the gas flow rate through the lance 13 are selected so that under steady-state process conditions the oxygen-containing gas penetrates the central region of the transition zone 23 and maintains an essentially metal/slag free space 25 around the end of the lance 13.
In use, under steady-state process conditions, the injection of the oxygen-containing gas via the lance 13 post-combusts- reaction gases CO and H2 in the transition zone 23 and in the free space 25 around the end of the lance 13 and generates high temperatures of the order of 2000°C or higher in the gas space. The heat is transferred to the ascending and descending splashes droplets, and streams, of molten material in the region of gas injection and the heat is then partially transferred to the iron layer 15 when the metal/slag returns to the iron layer 15.
The free space 25 is important to achieving high levels of post combustion because it enables entrainment of gases in the space above the transition zone 23 into the end region of the lance 13 and thereby increases exposure of available reaction gases to post combustion.
The combined effect of the position of the lance 13, gas flow rate through the lance 13, and upward movement of splashes, droplets and streams of molten material is to shape the transition zone 23 around the lower region of the lance 13 - generally identified by the numerals 27. This shaped region provides a partial barrier to heat transfer by radiation to the side walls 5.
Moreover, under steady-state process conditions, the ascending and descending droplets, splashes and streams of material is an effective means of transferring heat from the transition zone 23 to the molten bath with the result that the temperature of the transition zone 23 in the region of the side walls 5 is of the order of 1450°C- 1550°C.
The vessel 105 is constructed with reference to the levels of the iron layer 15, the slag layer 16, and the transition zone 23 in the vessel 105 when the process is operating under steady-state process conditions and with reference to splashes, droplets and streams of molten material that are projected into the top space 31 above the transition zone 23 when the process is operating under steady-state operating conditions, so that:
(a) the hearth and the lower barrel section
53 of the side walls 5 that contact the iron/slag layers 15/16 are formed from bricks of refractory material (indicated by the cross-hatching in the figure) ;
(b) at least part of the lower barrel section 53 of the side walls 5 is backed by water cooled panels 8; and
(c) the upper barrel section 51 of the side walls 5 and the roof 7 that contact the transition zone 23 and the top space 31 are formed from water cooled panels 57, 59.
Each water cooled panel 8, 57, 59 (not shown) in the upper barrel section 51 of the side walls 5 has parallel upper and lower edges and parallel side edges and is curved so as to define a section of the cylindrical barrel. Each panel includes an inner water cooling pipe and an outer water cooling pipe. The pipes are formed into a serpentine configuration with horizontal sections interconnected by curved sections. Each pipe further includes a water inlet and a water outlet. The pipes are displaced vertically so that the horizontal sections of the outer pipe are not immediately behind the horizontal sections of the inner pipe when viewed from an exposed face of the panel, ie the face that is exposed to the interior of the vessel. Each panel further includes a rammed refractory material which fills the spaces between the adjacent horizontal sections of each pipe and between the pipes . Each panel further includes a support plate which forms an outer surface of the panel .
The water inlets and the water outlets of the pipes are connected to a water supply circuit (not shown) which circulates water at high flow rate through the pipes .
Many modifications may be made to the preferred embodiment described above without departing from the spirit and scope of the present invention.

Claims

CLAIMS :
1. A process for direct smelting metalliferous feed material which includes the steps of:
(a) partially reducing iron oxides in a solid state in a pre-reduction vessel and producing partially reduced iron oxides;
(b) direct smelting partially reduced iron oxides produced in step (a) to molten iron in a direct smelting vessel which contains a molten bath of iron and slag and is supplied with a solid carbonaceous material as a source of reductant and energy and with an oxygen-containing gas for post-combusting carbon monoxide and hydrogen generated in the vessel;
(c) generating an off-gas that contains sulphur in direct smelting step (b) and releasing the off-gas from the direct smelting vessel; and
(d) using only part of the off-gas released from the direct smelting vessel in pre-reduction step (a) to pre-reduce iron oxides in the pre-reduction vessel to control the amount of sulphur that is returned to the direct smelting vessel from the pre-reduction vessel.
2. The process defined in claim 1 wherein step (d) includes controlling the amount of off-gas released from the direct smelting vessel and used in pre-reduction step (a) so that the amount of sulphur in molten iron produced in direct smelting step (b) is less than 0.2 wt% of the total weight of the molten iron.
3. The process defined in claim 1 or claim 2 includes processing the remainder of the off-gas released from the direct smelting vessel for heating and/or for power generation without returning the majority of the sulphur in this part of the off-gas to the direct smelting vessel .
4. The process defined in any one of the preceding claims includes using a first stream of the off-gas from the direct smelting vessel in pre-reduction step (a) and using a second stream of the off-gas as a source of energy for heating air or oxygen-enriched air before supplying the air or oxygen-enriched air to the direct smelting vessel.
5. The process defined in claim 4 wherein the second stream includes at least 20% by volume of the off-gas released from the direct smelting vessel.
6. The process defined in claim 5 wherein the second stream includes at least 30 vol.% of the off-gas released from the direct smelting vessel.
7. The process defined in claim 6 wherein the second stream includes at least 40 vol.% of the off-gas released from the direct smelting vessel.
8. The process defined in any one of claims 4 to 7 includes removing entrained sulphur and alkali salts from the second stream prior to using the second stream as the source of energy for heating air or oxygen-enriched air.
9. The process defined in any one of the preceding claims wherein the oxygen-containing gas is air or oxygen- enriched air containing less than 50 volume % oxygen.
10. The process defined in claim 9 includes preheating the air or oxygen enriched air for use in direct smelting step (b) .
11. The process defined in any one of the preceding claims wherein pre-reduction step (a) pre-heats the iron ore to a temperature in the range of 600-1000°C.
12. The process defined in any one of the preceding claims includes releasing the off-gas from pre-reduction step (a) and using the off-gas as a fuel gas for heating or power generation.
13. The process defined in any one of the preceding claims wherein smelting step (b) includes direct smelting partially reduced iron oxides in accordance with the steps of:
(i) forming the molten bath with a molten iron layer and a molten slag layer on the iron layer in the direct smelting vessel;
(ii) injecting the partially reduced iron oxides and coal into the iron layer via a plurality of lances/tuyeres ;
(iii) smelting the partially reduced iron oxides to molten iron in the iron layer;
(iv) causing molten material to be projected as splashes, droplets, and streams into a space above a nominal quiescent surface of the molten bath and forming a transition zone; and
(v) injecting the oxygen-containing gas into the direct smelting vessel via one or more than one lance/tuyere and post-combusting carbon monoxide and hydrogen released from the molten bath, whereby the ascending and thereafter descending splashes, droplets, and streams of molten material in the ϊ transition zone facilitate heat transfer to the molten bath, and whereby the transition zone minimises heat loss from the vessel via a side wall of the vessel that is in contact with the transition zone.
10
PCT/AU2000/000938 1999-08-05 2000-08-07 A direct smelting process WO2001011091A1 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
CA002381036A CA2381036C (en) 1999-08-05 2000-08-07 A direct smelting process
DE60025728T DE60025728T2 (en) 1999-08-05 2000-08-07 DIRECT FURNACE
MXPA02001180A MXPA02001180A (en) 1999-08-05 2000-08-07 A direct smelting process.
AU62544/00A AU780104B2 (en) 1999-08-05 2000-08-07 A direct smelting process
BR0013006-0A BR0013006A (en) 1999-08-05 2000-08-07 Process for direct reduction of metal feed material
JP2001515337A JP4837856B2 (en) 1999-08-05 2000-08-07 Direct smelting method
EP00949007A EP1230403B1 (en) 1999-08-05 2000-08-07 A direct smelting process
NZ516879A NZ516879A (en) 1999-08-05 2000-08-07 A direct smelting process

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AUPQ2057 1999-08-05
AUPQ2057A AUPQ205799A0 (en) 1999-08-05 1999-08-05 A direct smelting process

Publications (1)

Publication Number Publication Date
WO2001011091A1 true WO2001011091A1 (en) 2001-02-15

Family

ID=3816237

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2000/000938 WO2001011091A1 (en) 1999-08-05 2000-08-07 A direct smelting process

Country Status (16)

Country Link
US (1) US6379422B1 (en)
EP (1) EP1230403B1 (en)
JP (2) JP4837856B2 (en)
KR (1) KR100710724B1 (en)
CN (1) CN1240851C (en)
AT (1) ATE316427T1 (en)
AU (2) AUPQ205799A0 (en)
BR (1) BR0013006A (en)
CA (1) CA2381036C (en)
DE (1) DE60025728T2 (en)
ES (1) ES2254201T3 (en)
MX (1) MXPA02001180A (en)
NZ (1) NZ516879A (en)
RU (1) RU2260059C2 (en)
WO (1) WO2001011091A1 (en)
ZA (1) ZA200200761B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU90735B1 (en) * 2001-02-23 2002-08-26 Wurth Paul Sa Production of molten iron in an electric arc furnace by melting pre-reduced metal fines which are charged hot directly to the furnace from the reduction stage
WO2002068700A1 (en) * 2001-02-23 2002-09-06 Paul Wurth S.A. Method for producing a melt iron in an electric furnace
LU90788B1 (en) * 2001-06-13 2002-12-16 Wurth Paul Sa Production of molten iron in an electric arc furnace by melting pre-reduced metal fines which are charged hot directly to the furnace from the reduction stage
EP1725688A1 (en) * 2004-03-17 2006-11-29 Technological Resources Pty. Ltd. Direct smelting plant
WO2007121536A1 (en) * 2006-04-24 2007-11-01 Technological Resources Pty. Limited Pressure control in direct smelting process
WO2007121531A1 (en) * 2006-04-24 2007-11-01 Technological Resources Pty. Limited Pressure control in direct smelting process
FR2986984A1 (en) * 2012-02-16 2013-08-23 Profratec Set of equipment used to manufacture, by thermal and metallurgical operations, e.g. bars, comprises slag treatment furnace to produce ferroalloy that produces ferrous metal, argon oxygen decarburization converter, and shaping equipment

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100832418B1 (en) * 2001-11-12 2008-05-26 주식회사 포스코 Method and apparatus for optimum control of operation of induced draft fan in molten metal purifying process utilizing furnace with oxygen lance
US20090308205A1 (en) * 2006-04-24 2009-12-17 Rodney James Dry Direct smelting plant with waste heat recovery unit
US20090077891A1 (en) * 2007-09-25 2009-03-26 New York Energy Group Method for producing fuel gas
US20090077889A1 (en) * 2007-09-25 2009-03-26 New York Energy Group Gasifier
CN101775455B (en) * 2010-01-12 2011-08-17 贾会平 Iron reduction device
EP2616562B1 (en) 2010-09-15 2020-11-25 Tata Steel Limited Direct smelting process
WO2014062702A1 (en) 2012-10-16 2014-04-24 Ambri, Inc. Electrochemical energy storage devices and housings
US9735450B2 (en) 2012-10-18 2017-08-15 Ambri Inc. Electrochemical energy storage devices
US10541451B2 (en) 2012-10-18 2020-01-21 Ambri Inc. Electrochemical energy storage devices
US11721841B2 (en) 2012-10-18 2023-08-08 Ambri Inc. Electrochemical energy storage devices
US11387497B2 (en) 2012-10-18 2022-07-12 Ambri Inc. Electrochemical energy storage devices
US9312522B2 (en) 2012-10-18 2016-04-12 Ambri Inc. Electrochemical energy storage devices
US9520618B2 (en) 2013-02-12 2016-12-13 Ambri Inc. Electrochemical energy storage devices
US11211641B2 (en) 2012-10-18 2021-12-28 Ambri Inc. Electrochemical energy storage devices
US10270139B1 (en) 2013-03-14 2019-04-23 Ambri Inc. Systems and methods for recycling electrochemical energy storage devices
US9502737B2 (en) 2013-05-23 2016-11-22 Ambri Inc. Voltage-enhanced energy storage devices
CN109935747B (en) 2013-10-16 2022-06-07 安保瑞公司 Seal for high temperature reactive material device
US10181800B1 (en) 2015-03-02 2019-01-15 Ambri Inc. Power conversion systems for energy storage devices
WO2016141354A2 (en) 2015-03-05 2016-09-09 Ambri Inc. Ceramic materials and seals for high temperature reactive material devices
US9893385B1 (en) 2015-04-23 2018-02-13 Ambri Inc. Battery management systems for energy storage devices
WO2017014699A1 (en) * 2015-07-23 2017-01-26 Limastian Narong Method of utilizing furnace off-gas for reduction of iron oxide pellets
WO2017185178A1 (en) * 2016-04-26 2017-11-02 Her Majesty The Queen In Right Of Canada As Represented By The Minister Of Natural Resources System and method of high pressure oxy-fired (hiprox) flash metallization
US11929466B2 (en) 2016-09-07 2024-03-12 Ambri Inc. Electrochemical energy storage devices
EP3607603A4 (en) 2017-04-07 2021-01-13 Ambri Inc. Molten salt battery with solid metal cathode
NL2026572B1 (en) * 2020-09-29 2022-05-30 Petrus Greyling Frederik Process and system for melting agglomerates
CN113913578B (en) * 2021-08-16 2022-08-23 北京科技大学 Method for increasing temperature of molten iron in molten pool by using high-temperature exhaust flue gas
CN115216572B (en) * 2022-01-06 2023-10-27 中冶长天国际工程有限责任公司 Method and system for directly reducing iron oxide and application thereof
CN114990273B (en) * 2022-04-22 2024-04-30 中国恩菲工程技术有限公司 Oxygen-enriched side-blown jet smelting method and smelting device for high-phosphorus iron ore

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4804408A (en) * 1986-08-12 1989-02-14 Voest-Alpine Aktiengesellschaft A mill arrangement and a process of operating the same using off gases to refine pig iron
US5630862A (en) * 1992-10-06 1997-05-20 Bechtel Group, Inc. Method of providing fuel for an iron making process
US5683489A (en) * 1995-01-20 1997-11-04 Shoji Hayashi Method of producing iron carbide
US5871560A (en) * 1994-06-23 1999-02-16 Voest-Alpine Industrieanlagenbau Gmbh Process and plant for the direct reduction of iron-oxide-containing materials

Family Cites Families (99)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2647045A (en) 1948-12-06 1953-07-28 Rummel Roman Gasification of combustible materials
US3844770A (en) 1971-09-17 1974-10-29 I Nixon Manufacture of steel and ferrous alloys
US3845190A (en) 1972-06-20 1974-10-29 Rockwell International Corp Disposal of organic pesticides
DE2304369C2 (en) 1973-01-26 1974-12-12 Mannesmann Ag, 4000 Duesseldorf Method and device for the pyrolytic build-up of waste materials
FI50663C (en) 1973-03-21 1976-05-10 Tampella Oy Ab Device for regulating the supply of combustion air and excess oxygen in fall incinerators
JPS5227467B2 (en) 1973-11-21 1977-07-20
IT1038230B (en) 1974-05-22 1979-11-20 Krupp Gmbh PROCEDURE FOR THE PRODUCTION OF STEEL
US4053310A (en) 1976-01-30 1977-10-11 Xerox Corporation Durable carrier coating compositions comprising polysulfone
US4145396A (en) 1976-05-03 1979-03-20 Rockwell International Corporation Treatment of organic waste
GB1600375A (en) 1977-03-16 1981-10-14 Glacier Metal Co Ltd Method and apparatus for reducing metal oxide
DE2759713C2 (en) 1977-10-11 1983-10-27 Mannesmann AG, 4000 Düsseldorf Vessel cover for a metal melting furnace, in particular an electric arc furnace
SE7901372L (en) 1979-02-15 1980-08-16 Luossavaara Kiirunavaara Ab SET FOR MANUFACTURE OF STEEL
ATE5202T1 (en) 1979-12-11 1983-11-15 Eisenwerk-Gesellschaft Maximilianshuette Mbh STEEL MAKING PROCESS.
MX154705A (en) 1979-12-21 1987-12-02 Korf Ikosa Ind Aco IMPROVED OVEN FOR MELTING AND TUNING SCRAP, SPONGE IRON, RAW IRON AND LIQUID IRON FOR STEEL PRODUCTION
DE3034539C2 (en) * 1980-09-12 1982-07-22 Korf-Stahl Ag, 7570 Baden-Baden Method and device for the direct production of liquid pig iron from lumpy iron ore
GB2088892B (en) 1980-12-01 1984-09-05 Sumitomo Metal Ind Process for gasification of solid carbonaceous material
US4400936A (en) 1980-12-24 1983-08-30 Chemical Waste Management Ltd. Method of PCB disposal and apparatus therefor
DE3273996D1 (en) 1981-04-28 1986-12-04 Kawasaki Steel Co Methods for melting and refining a powdery ore containing metal oxides and apparatuses for melt-refining said ore
JPS58133309A (en) 1982-02-01 1983-08-09 Daido Steel Co Ltd Method and apparatus for iron manufacture employing twin reactor
SE457265B (en) 1981-06-10 1988-12-12 Sumitomo Metal Ind PROCEDURE AND ESTABLISHMENT FOR PREPARATION OF THANKS
DE3139375A1 (en) 1981-10-03 1983-04-14 Horst Dipl.-Phys. Dr. 6000 Frankfurt Mühlberger Process for producing agglomerates, such as pellets or briquettes, and for metal production from these
US4402274A (en) 1982-03-08 1983-09-06 Meenan William C Method and apparatus for treating polychlorinated biphenyl contamined sludge
US4431612A (en) 1982-06-03 1984-02-14 Electro-Petroleum, Inc. Apparatus for the decomposition of hazardous materials and the like
JPS5925335A (en) 1982-07-30 1984-02-09 Kitamura Gokin Seisakusho:Kk Method and apparatus for making pcb harmless
US4511396A (en) 1982-09-01 1985-04-16 Nixon Ivor G Refining of metals
US4455017A (en) 1982-11-01 1984-06-19 Empco (Canada) Ltd. Forced cooling panel for lining a metallurgical furnace
DE3244744A1 (en) 1982-11-25 1984-05-30 Klöckner-Werke AG, 4100 Duisburg Process for the direct reduction of iron ore in a shaft furnace
US4468298A (en) 1982-12-20 1984-08-28 Aluminum Company Of America Diffusion welded nonconsumable electrode assembly and use thereof for electrolytic production of metals and silicon
US4468300A (en) 1982-12-20 1984-08-28 Aluminum Company Of America Nonconsumable electrode assembly and use thereof for the electrolytic production of metals and silicon
US4468299A (en) 1982-12-20 1984-08-28 Aluminum Company Of America Friction welded nonconsumable electrode assembly and use thereof for electrolytic production of metals and silicon
FI66648C (en) 1983-02-17 1984-11-12 Outokumpu Oy SUSPENSIONSSMAELTNINGSFOERFARANDE OCH ANORDNING FOER INMATNINGAV EXTRA GAS I FLAMSMAELTUGNENS REAKTIONSSCHAKT
US4447262A (en) 1983-05-16 1984-05-08 Rockwell International Corporation Destruction of halogen-containing materials
DE3318005C2 (en) 1983-05-18 1986-02-20 Klöckner CRA Technologie GmbH, 4100 Duisburg Process for making iron
US4664618A (en) 1984-08-16 1987-05-12 American Combustion, Inc. Recuperative furnace wall
US4622007A (en) 1984-08-17 1986-11-11 American Combustion, Inc. Variable heat generating method and apparatus
US4923391A (en) 1984-08-17 1990-05-08 American Combustion, Inc. Regenerative burner
DE3434004C2 (en) 1984-09-15 1987-03-26 Dornier System Gmbh, 7990 Friedrichshafen Process and device for waste gasification
US4684448A (en) 1984-10-03 1987-08-04 Sumitomo Light Metal Industries, Ltd. Process of producing neodymium-iron alloy
SE453304B (en) 1984-10-19 1988-01-25 Skf Steel Eng Ab KIT FOR MANUFACTURE OF METALS AND / OR GENERATION OF BATTLE FROM OXIDE ORE
US4602574A (en) 1984-11-08 1986-07-29 United States Steel Corporation Destruction of toxic organic chemicals
US4574714A (en) 1984-11-08 1986-03-11 United States Steel Corporation Destruction of toxic chemicals
US4572482A (en) 1984-11-19 1986-02-25 Corcliff Corporation Fluid-cooled metallurgical tuyere
US4565574A (en) 1984-11-19 1986-01-21 Nippon Steel Corporation Process for production of high-chromium alloy by smelting reduction
AU598237B2 (en) 1986-03-04 1990-06-21 Ausmelt Pty Ltd Recovery of values from antimony ores and concentrates
DE3607776A1 (en) 1986-03-08 1987-09-17 Kloeckner Cra Tech METHOD FOR PRODUCING IRON
DE3607775A1 (en) 1986-03-08 1987-09-17 Kloeckner Cra Tech METHOD FOR MELTING REDUCTION OF IRON ORE
DE3607774A1 (en) 1986-03-08 1987-09-17 Kloeckner Cra Tech METHOD FOR TWO-STAGE MELT REDUCTION OF IRON ORE
DE3608802C2 (en) 1986-03-15 1994-10-06 Mannesmann Ag Method and device for the continuous melting of scrap
US4701214A (en) 1986-04-30 1987-10-20 Midrex International B.V. Rotterdam Method of producing iron using rotary hearth and apparatus
US4718643A (en) 1986-05-16 1988-01-12 American Combustion, Inc. Method and apparatus for rapid high temperature ladle preheating
US4999097A (en) 1987-01-06 1991-03-12 Massachusetts Institute Of Technology Apparatus and method for the electrolytic production of metals
US4913734A (en) 1987-02-16 1990-04-03 Moskovsky Institut Stali I Splavov Method for preparing ferrocarbon intermediate product for use in steel manufacture and furnace for realization thereof
CA1337241C (en) 1987-11-30 1995-10-10 Nkk Corporation Method for smelting reduction of iron ore and apparatus therefor
US4940488C2 (en) 1987-12-07 2002-06-18 Kawasaki Heavy Ind Ltd Method of smelting reduction of ores containing metal oxides
ES2010498T3 (en) 1988-02-12 1994-07-16 Kloeckner Cra Patent PROCEDURE AND APPARATUS FOR POSTCOMBUSTION.
JPH01208410A (en) * 1988-02-13 1989-08-22 Kobe Steel Ltd Smelting reduction method for iron oxide raw material
FI84841C (en) 1988-03-30 1992-01-27 Ahlstroem Oy FOERFARANDE OCH ANORDNING FOER REDUKTION AV METALLOXIDHALTIGT MATERIAL.
US4890562A (en) 1988-05-26 1990-01-02 American Combustion, Inc. Method and apparatus for treating solid particles
US5042964A (en) 1988-05-26 1991-08-27 American Combustion, Inc. Flash smelting furnace
DE3835332A1 (en) 1988-10-17 1990-04-19 Ralph Weber METHOD FOR PRODUCING STEEL FROM FINE ORE
US5037608A (en) 1988-12-29 1991-08-06 Aluminum Company Of America Method for making a light metal-rare earth metal alloy
US5238646A (en) 1988-12-29 1993-08-24 Aluminum Company Of America Method for making a light metal-rare earth metal alloy
AT394201B (en) * 1989-02-16 1992-02-25 Voest Alpine Ind Anlagen METHOD FOR GENERATING COMBUSTIBLE GASES IN A MELT-UP CARBURETTOR
US5039480A (en) 1989-02-21 1991-08-13 Nkk Corporation Method for manufacturing molten metal containing Ni and Cr
JPH02221336A (en) 1989-02-21 1990-09-04 Nkk Corp Smelting reduction method of ni ore
US5302184A (en) 1989-06-02 1994-04-12 Cra Services Limited Manufacture of ferroalloys using a molten bath reactor
US5024737A (en) 1989-06-09 1991-06-18 The Dow Chemical Company Process for producing a reactive metal-magnesium alloy
US5005493A (en) 1989-11-08 1991-04-09 American Combustion, Inc. Hazardous waste multi-sectional rotary kiln incinerator
ATE139267T1 (en) 1990-03-13 1996-06-15 Cra Services METHOD FOR PRODUCING METALS AND ALLOYS IN A MELTING REDUCTION VESSEL
US5271341A (en) 1990-05-16 1993-12-21 Wagner Anthony S Equipment and process for medical waste disintegration and reclamation
US5177304A (en) 1990-07-24 1993-01-05 Molten Metal Technology, Inc. Method and system for forming carbon dioxide from carbon-containing materials in a molten bath of immiscible metals
US5332199A (en) 1990-09-05 1994-07-26 Fuchs Systemtechnik Gmbh Metallurgical vessel
DE4042176C2 (en) 1990-12-29 1993-12-09 Tech Resources Pty Ltd Process for the reduction of metal oxides in the molten state
US5191154A (en) 1991-07-29 1993-03-02 Molten Metal Technology, Inc. Method and system for controlling chemical reaction in a molten bath
US5279715A (en) 1991-09-17 1994-01-18 Aluminum Company Of America Process and apparatus for low temperature electrolysis of oxides
BR9206507A (en) 1991-09-20 1995-10-24 Ausmelt Ltd Process for the production of iron
KR100243533B1 (en) 1991-12-06 2000-02-01 테리 에이. 매튜스 Treatment of waste
DE4206828C2 (en) 1992-03-04 1996-06-20 Tech Resources Pty Ltd Melting reduction process with high productivity
US5222448A (en) 1992-04-13 1993-06-29 Columbia Ventures Corporation Plasma torch furnace processing of spent potliner from aluminum smelters
US5324341A (en) 1992-05-05 1994-06-28 Molten Metal Technology, Inc. Method for chemically reducing metals in waste compositions
WO1994000533A1 (en) 1992-06-29 1994-01-06 Technological Resources Pty. Limited Treatment of waste
US6197088B1 (en) * 1992-10-06 2001-03-06 Bechtel Group, Inc. Producing liquid iron having a low sulfur content
DE4234973C1 (en) 1992-10-16 1994-06-01 Tech Resources Pty Ltd Process for protecting the refractory lining in the gas space of metallurgical reaction vessels
DE4234974C2 (en) 1992-10-16 1994-12-22 Tech Resources Pty Ltd Process for increasing the turnover of materials in metallurgical reaction vessels
US5333558A (en) 1992-12-07 1994-08-02 Svedala Industries, Inc. Method of capturing and fixing volatile metal and metal oxides in an incineration process
US5301620A (en) 1993-04-01 1994-04-12 Molten Metal Technology, Inc. Reactor and method for disassociating waste
US5443572A (en) 1993-12-03 1995-08-22 Molten Metal Technology, Inc. Apparatus and method for submerged injection of a feed composition into a molten metal bath
DE4343957C2 (en) 1993-12-22 1997-03-20 Tech Resources Pty Ltd Converter process for the production of iron
US5869018A (en) 1994-01-14 1999-02-09 Iron Carbide Holdings, Ltd. Two step process for the production of iron carbide from iron oxide
US5613997A (en) 1994-03-17 1997-03-25 The Boc Group Plc Metallurgical process
IT1280115B1 (en) 1995-01-17 1998-01-05 Danieli Off Mecc MELTING PROCEDURE FOR ELECTRIC ARC OVEN WITH ALTERNATIVE SOURCES OF ENERGY AND RELATED ELECTRIC ARC OVEN
US5529599A (en) 1995-01-20 1996-06-25 Calderon; Albert Method for co-producing fuel and iron
NL9500264A (en) 1995-02-13 1996-09-02 Hoogovens Staal Bv Method for producing liquid pig iron.
US5741349A (en) 1995-10-19 1998-04-21 Steel Technology Corporation Refractory lining system for high wear area of high temperature reaction vessel
AUPN639995A0 (en) * 1995-11-03 1995-11-30 Technological Resources Pty Limited A method and an apparatus for producing metals and metal alloys
IT1284200B1 (en) * 1996-07-31 1998-05-08 Sviluppo Materiali Spa PROCEDURE FOR THE DIRECT PRODUCTION OF CAST IRON STARTING FROM FERRIFERO MATERIAL AND EQUIPMENT SUITABLE FOR THE EXECUTION OF
US5938815A (en) 1997-03-13 1999-08-17 The Boc Company, Inc. Iron ore refining method
AUPO944697A0 (en) * 1997-09-26 1997-10-16 Technological Resources Pty Limited A method of producing metals and metal alloys
WO1999016691A1 (en) * 1997-09-30 1999-04-08 Minnesota Mining And Manufacturing Company Particulate transfer system for transferring particulate and a method of use

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4804408A (en) * 1986-08-12 1989-02-14 Voest-Alpine Aktiengesellschaft A mill arrangement and a process of operating the same using off gases to refine pig iron
US5630862A (en) * 1992-10-06 1997-05-20 Bechtel Group, Inc. Method of providing fuel for an iron making process
US5871560A (en) * 1994-06-23 1999-02-16 Voest-Alpine Industrieanlagenbau Gmbh Process and plant for the direct reduction of iron-oxide-containing materials
US5683489A (en) * 1995-01-20 1997-11-04 Shoji Hayashi Method of producing iron carbide

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU90735B1 (en) * 2001-02-23 2002-08-26 Wurth Paul Sa Production of molten iron in an electric arc furnace by melting pre-reduced metal fines which are charged hot directly to the furnace from the reduction stage
WO2002068700A1 (en) * 2001-02-23 2002-09-06 Paul Wurth S.A. Method for producing a melt iron in an electric furnace
LU90788B1 (en) * 2001-06-13 2002-12-16 Wurth Paul Sa Production of molten iron in an electric arc furnace by melting pre-reduced metal fines which are charged hot directly to the furnace from the reduction stage
EP1725688A1 (en) * 2004-03-17 2006-11-29 Technological Resources Pty. Ltd. Direct smelting plant
EP1725688A4 (en) * 2004-03-17 2010-11-17 Tech Resources Pty Ltd Direct smelting plant
US8156709B2 (en) 2004-03-17 2012-04-17 Technological Resources Pty. Limited Direct smelting plant
WO2007121536A1 (en) * 2006-04-24 2007-11-01 Technological Resources Pty. Limited Pressure control in direct smelting process
WO2007121531A1 (en) * 2006-04-24 2007-11-01 Technological Resources Pty. Limited Pressure control in direct smelting process
US7976610B2 (en) 2006-04-24 2011-07-12 Technological Resources Pty. Limited Pressure control in direct smelting process
AU2007242070B2 (en) * 2006-04-24 2011-12-22 Technological Resources Pty. Limited Pressure control in direct smelting process
FR2986984A1 (en) * 2012-02-16 2013-08-23 Profratec Set of equipment used to manufacture, by thermal and metallurgical operations, e.g. bars, comprises slag treatment furnace to produce ferroalloy that produces ferrous metal, argon oxygen decarburization converter, and shaping equipment

Also Published As

Publication number Publication date
JP2011241472A (en) 2011-12-01
EP1230403A1 (en) 2002-08-14
DE60025728T2 (en) 2006-07-20
ATE316427T1 (en) 2006-02-15
NZ516879A (en) 2002-08-28
CN1240851C (en) 2006-02-08
AU6254400A (en) 2001-03-05
EP1230403B1 (en) 2006-01-25
CA2381036C (en) 2009-11-24
JP2003506570A (en) 2003-02-18
MXPA02001180A (en) 2002-07-30
AU780104B2 (en) 2005-03-03
KR100710724B1 (en) 2007-04-24
BR0013006A (en) 2002-04-30
ZA200200761B (en) 2003-02-20
DE60025728D1 (en) 2006-04-13
KR20020021173A (en) 2002-03-18
AUPQ205799A0 (en) 1999-08-26
CA2381036A1 (en) 2001-02-15
US6379422B1 (en) 2002-04-30
ES2254201T3 (en) 2006-06-16
RU2260059C2 (en) 2005-09-10
JP4837856B2 (en) 2011-12-14
CN1369018A (en) 2002-09-11
EP1230403A4 (en) 2004-06-23

Similar Documents

Publication Publication Date Title
US6379422B1 (en) Direct smelting process
CA2338591C (en) A direct smelting process
US6379424B1 (en) Direct smelting apparatus and process
CA2338592C (en) A direct smelting process and apparatus
CA2320654C (en) A direct smelting process
US6423115B1 (en) Direct smelting process
US6368548B1 (en) Direct smelting process and apparatus
WO2002008471A1 (en) A direct smelting process and apparatus
EP1098997B1 (en) A direct smelting process
EP1325159A1 (en) A direct smelting process and apparatus
AU768628B2 (en) A direct smelting process
AU769227B2 (en) A direct smelting process
AU780707B2 (en) A direct smelting process and apparatus
AU768255B2 (en) A direct smelting process and apparatus
ZA200100631B (en) A direct smelting process.
AU2001287371A1 (en) A direct smelting process and apparatus
AU2001272223A1 (en) A direct smelting process and apparatus

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 62544/00

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 516879

Country of ref document: NZ

WWE Wipo information: entry into national phase

Ref document number: IN/PCT/2002/157/KOL

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: PA/a/2002/001180

Country of ref document: MX

Ref document number: 2381036

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 1020027001549

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 008113610

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2000949007

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2002 2002105609

Country of ref document: RU

Kind code of ref document: A

WWP Wipo information: published in national office

Ref document number: 1020027001549

Country of ref document: KR

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWP Wipo information: published in national office

Ref document number: 2000949007

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 516879

Country of ref document: NZ

WWG Wipo information: grant in national office

Ref document number: 516879

Country of ref document: NZ

WWG Wipo information: grant in national office

Ref document number: 62544/00

Country of ref document: AU

WWG Wipo information: grant in national office

Ref document number: 2000949007

Country of ref document: EP