WO2000065158A1 - Improved formation of capping beams for piles - Google Patents
Improved formation of capping beams for piles Download PDFInfo
- Publication number
- WO2000065158A1 WO2000065158A1 PCT/IB2000/000504 IB0000504W WO0065158A1 WO 2000065158 A1 WO2000065158 A1 WO 2000065158A1 IB 0000504 W IB0000504 W IB 0000504W WO 0065158 A1 WO0065158 A1 WO 0065158A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wall structure
- guide wall
- piles
- piling
- excavation
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/005—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
Definitions
- the present invention relates to capping beams which are formed across the tops of piles in the construction industry, and in particular, but not exclusively, to an improved method and apparatus for forming a capping beam for piles formed using auger piling methods.
- Auger piling comprises the steps of rotating an auger into the ground, and then withdrawing the auger, with or without rotation, while pumping concrete to its lower end, thereby forming a concrete pile.
- a reinforcement member may be inserted into the concrete before it sets so as to provide additional structural strength.
- the simplest method is to form a contiguous bored pile wall, in which a series of piles are formed in a line but without touching one another. This is a. relatively straightforward operation and the wall will not be watertight owing to the gaps between the piles.
- An alternative technique is to form an interlocking bored pile wall.
- a series of 'female' piles are formed in the desired line of the wall and concreted with a weak concrete mix. No reinforcements are used.
- a complementary series of male' piles is then formed by boring down at the midpoint between two adjacent female piles, thereby cutting into the weak concrete mix.
- Each male pile is then concreted and reinforced in the usual manner, so as to leave a series of reinforced, hard concrete piles with the gaps therebetween filled by the weak concrete female piles.
- secant wall piling The technique which results in the highest structural integrity is known as secant wall piling. This is similar to the interlocking bored pile wall construction method outlined above, but strong concrete is used for both the female and the male piles. This means that when forming the male piles, it is necessary for the piling auger to remove concrete from the hardened female piles. This is a difficult and time- consuming process, resulting in significant wear on the piling auger. However, the result is a wall which has excellent integrity against water penetration.
- a capping beam across the tops of the piles at or close to ground level.
- This capping beam provides a sound, generally level surface upon which construction of a superstructure can take place, and is useful in seeking to equalise differential settlement or movement of the piles.
- Such beams are often of width larger than the pile diameter and typically have a depth in the region of 0.5m. It is possible to prepare previously- installed piles by forming a trench along the line of the piles, breaking the concrete away from the top of each pile and exposing the steel reinforcing elements so that a beam may be cast across several piles.
- the polystyrene spacers are generally over-sized, which means that the piling auger will tend to have a high degree of play within the guide walls - often as much as 10cm or even more, which can lead to considerable positional inaccuracy with little lateral restraint.
- the reason that the polystyrene spacers are oversized is so as to ensure than once the temporary guide walls have been cast, there remains sufficient room between them to accommodate the piling auger.
- the polystyrene used for the spacers is not environmentally- friendly and may contaminate the surrounding area upon disposal . Chemical removal of the polystyrene is even more undesirable, since this involves the use of organic solvents which can be toxic and damaging to the environment .
- a method of forming a capping beam across two or more piles comprising the steps of: i) forming an excavation in the ground; ii) inserting a precast or preformed guide wall structure in the excavation, the guide wall structure including means for receiving and guiding a piling auger along its longitudinal axis at a plurality of locations in the guide wall structure; iii) forming a plurality of cast-in-situ piles by applying a piling auger to the ground through the means for receiving and guiding the piling auger provided in the guide wall structure; iv) removing the guide wall structure and filling the trench with concrete so as to form the capping beam.
- shuttering elements are provided between the guide wall structure and the sides of the excavation prior to piling so to precisely define a casting mould for the capping beam.
- the shuttering elements are left in place as the guide wall structure is removed, and concrete is cast into the space between the shuttering elements.
- the shuttering elements which determine the configuration of the resulting capping beam are put in place before commencement of piling, the need to break down the tops of hardened concrete piles prior to casting the capping beam is avoided - excess concrete and spoil which may fall into the guide wall structure and/or between the shuttering elements can be removed before the concrete has hardened and deposited, for example, between the shuttering elements and the sides of the excavation as a filler.
- the shuttering elements are placed snugly on each external side of the guide wall structure. If a wider capping beam is desired, the shuttering elements may be placed at any desired location between the external sides of the guide wall and the sides of the excavation. Alternatively, if a narrower capping beam is required, spacers may be placed on the internal sides of the shuttering elements once the guide wall structure has been removed.
- concreting is generally continued up to ground level as the auger is withdrawn, and a reinforcing member introduced before the concrete has hardened. It is desirable to cover those parts of the guide wall structure near to where piling is taking place so as to reduce the chances of spoil and/or excess concrete being spilled into areas where it is not required. Removal of excess spoil and/or concrete, for example to the region between the sides of the excavation and the shuttering elements, may be carried out manually or by a slurry pump or the like.
- the guide wall structure is removed and the capping beam concrete can be immediately cast between the shuttering elements.
- a reinforcing member may additionally be introduced. This can reduce the construction time by several weeks over traditional methods.
- the method of the present invention is not limited to the formation of capping beams for piled walls, but may also be used in pile group capping applications.
- One or more piles can be grouped together and capped, for example a group of four piles may be cast so as to form the corners of a square, and a capping beam in the form of a large plate is then formed on top of the piles.
- the plate may be square, triangular, rectangular, circular, etc as appropriate.
- a guide wall structure for use in forming capping beams comprising one or more preformed members which are provided with apertures adapted to receive and guide a piling auger along its longitudinal axis at a plurality of locations in the guide wall structure.
- the guide wall structure may comprise a simple concrete or metal unit with holes provided therein for receiving and guiding a piling auger. This, however, is somewhat limiting in terms of the auger diameters which may be used and in terms of the locations of the piles which are to be capped.
- the guide wall structure comprises at least two opposing wall members which are provided with retaining means on their facing surfaces, and at least one insert adapted to be releasably retained by the retaining means and shaped so as to define, individually or in combination, one or more apertures which are shaped so as to receive and guide a piling auger.
- Various inserts may be used with the same guide wall structure so as to accommodate augers of different diameters, and to allow a degree of positional flexibility depending on the distribution of the retaining means on the opposing surfaces of the wall members.
- the wall members may be formed of precast concrete or metal sheets or any other suitable material, as may be the inserts.
- the retaining means may comprise metal lugs or the like, or any other suitable arrangements for allowing the inserts to be removably located between the wall members without lateral movement.
- the at least one insert is shaped so as to provide an aperture for the piling auger which allows no more than 50mm of lateral play when the piling auger is inserted therein.
- the inserts may be shaped so as to allow no more than 25mm, or no more than 10mm, or even no more than 5mm play. This level of accuracy is attainable because the inserts, in common with the guide wall structure as a whole, are not cast-in-situ but are preformed or precast under controlled conditions, thereby avoiding the constructional uncertainty inherent when working in the field. Accordingly, a much greater degree of positional piling accuracy and lateral auger restraint is achievable over the prior art .
- FIGURE 1 shows a plan view of a guide wall structure according to the present invention
- FIGURE 2 shows a section through the structure of Figure 1;
- FIGURE 3 shows a stage in the formation of a capping beam after the piles have been installed and the guide wall structure removed.
- Figure 1 shows a guide wall structure 1 comprising opposing wall members 2 each having a number of retaining lugs 3 on their opposed surfaces.
- the retaining lugs 3 are adapted to receive a number of inserts 4 between the wall members 2 in such a way that the inserts 4 can be removed but are not allowed significant lateral movement.
- the particular wall members 2 shown in Figures 1 and 2 are formed of precast concrete and are 300mm thick, 500mm deep and 3m long, and are dovetailed at the ends so as to allow interlocking.
- the net weight of each member 2 is under 2000kg, which allows for easy movement using commercial lifting equipment. It is to be appreciated that the wall members 2 may have any suitable dimensions.
- the inserts 4 shown in the present embodiment have an hourglass section which, when two inserts 4 are located between adjacent pairs of retaining lugs 3, defines a circular aperture 5 which is adapted to receive a piling auger (not shown) along its longitudinal axis.
- Polystyrene gaskets 6 may be provided between the wall members 2 and the inserts 4.
- a removable cover 7 is provided so as to prevent ingress of concrete or spoil into adjacent parts of the guide wall structure 1 when piles are being installed.
- Figure 2 shows the guide wall structure 1 of Figure 1 in section and located within a trench 8. The bottom of the trench is provided with blinding 9 so as to define the base of the capping beam, and a shuttering element 10 is positioned on each of the outer sides of the wall members 2. The gap between the outer sides of the shuttering elements 10 and the sides of the trench 8 may be infilled with weak concrete or spoil and concrete generated during the installation of piles .
- a number of cast-in-situ piles 11 are then installed by applying a piling auger (not shown) to the ground through the apertures 5 and reinforcing members 12 are inserted into the unset concrete of the piles before the guide wall structure 1 is removed. Concrete is then poured into the space between the shuttering elements 10 so as to form the required capping beam.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Investigating Materials By The Use Of Optical Means Adapted For Particular Applications (AREA)
- Revetment (AREA)
- Mechanical Pencils And Projecting And Retracting Systems Therefor, And Multi-System Writing Instruments (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/720,837 US6394703B1 (en) | 1999-04-26 | 1999-04-25 | Formation of capping beams for piles |
AT00917232T ATE241048T1 (en) | 1999-04-26 | 2000-04-25 | IMPROVED FORMATION OF A COVER SUPPORT FOR PILE FOUNDATIONS |
EP00917232A EP1090189B1 (en) | 1999-04-26 | 2000-04-25 | Improved formation of capping beams for piles |
DE60002810T DE60002810T2 (en) | 1999-04-26 | 2000-04-25 | IMPROVED EDUCATION OF A COVER SUPPORT FOR PILE FOUNDATIONS |
AU38322/00A AU3832200A (en) | 1999-04-26 | 2000-04-25 | Improved formation of capping beams for piles |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB9909506.9 | 1999-04-26 | ||
GB9909506A GB2349395B (en) | 1999-04-26 | 1999-04-26 | Guide wall structure and use thereof in joining a capping beam across a plurality of piles |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2000065158A1 true WO2000065158A1 (en) | 2000-11-02 |
Family
ID=10852222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2000/000504 WO2000065158A1 (en) | 1999-04-26 | 2000-04-25 | Improved formation of capping beams for piles |
Country Status (7)
Country | Link |
---|---|
US (1) | US6394703B1 (en) |
EP (1) | EP1090189B1 (en) |
AT (1) | ATE241048T1 (en) |
AU (1) | AU3832200A (en) |
DE (1) | DE60002810T2 (en) |
GB (1) | GB2349395B (en) |
WO (1) | WO2000065158A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6394703B1 (en) * | 1999-04-26 | 2002-05-28 | Cementations Foundations Skanska Limited | Formation of capping beams for piles |
GB0124991D0 (en) * | 2001-10-17 | 2001-12-05 | Cementation Found Skanska Ltd | Perimeter walls |
US9206599B2 (en) * | 2007-02-02 | 2015-12-08 | Les Materiaux De Construction Oldcastle Canada, Inc. | Wall with decorative facing |
FI2959065T3 (en) | 2013-02-25 | 2024-01-30 | Les Materiaux De Construction Oldcastle Canada Inc | Wall assembly |
KR101796897B1 (en) * | 2017-05-31 | 2017-12-01 | 강한주 | Apparatus of guide casing for a ground excavator and drilling method using thereof |
CN111778960B (en) * | 2020-06-15 | 2022-02-22 | 中铁三局集团有限公司 | Low-clearance water-rich sand-egg layer steel side mold secant pile construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4163621A (en) * | 1978-02-08 | 1979-08-07 | Tadayasu Higuchi | Method for forming a continuous footing with prefabricated footing blocks |
GB2216153A (en) * | 1988-03-25 | 1989-10-04 | Roydon John Chute Thompson | Permanent shuttered in situ beam foundation system |
GB2304136A (en) * | 1995-08-04 | 1997-03-12 | Bicc Plc | Groundwork |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4165198A (en) * | 1976-09-07 | 1979-08-21 | Farmer Foundation Company | Method for forming pier foundation columns |
US5259705A (en) * | 1989-08-25 | 1993-11-09 | Breaux Louis B | Guide box assembly system for in-ground barrier installation |
US5501550A (en) * | 1994-07-11 | 1996-03-26 | Calabrese; Salvatore J. | Pile assembly and method employing external mandrel |
GB2303868B (en) * | 1995-07-31 | 1999-04-14 | Cementation Piling & Found | Improved auger piling |
US5713701A (en) * | 1995-12-06 | 1998-02-03 | Marshall; Frederick S. | Foundation piling |
US6394703B1 (en) * | 1999-04-26 | 2002-05-28 | Cementations Foundations Skanska Limited | Formation of capping beams for piles |
-
1999
- 1999-04-25 US US09/720,837 patent/US6394703B1/en not_active Expired - Fee Related
- 1999-04-26 GB GB9909506A patent/GB2349395B/en not_active Expired - Fee Related
-
2000
- 2000-04-25 EP EP00917232A patent/EP1090189B1/en not_active Expired - Lifetime
- 2000-04-25 AU AU38322/00A patent/AU3832200A/en not_active Abandoned
- 2000-04-25 WO PCT/IB2000/000504 patent/WO2000065158A1/en active IP Right Grant
- 2000-04-25 AT AT00917232T patent/ATE241048T1/en not_active IP Right Cessation
- 2000-04-25 DE DE60002810T patent/DE60002810T2/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4163621A (en) * | 1978-02-08 | 1979-08-07 | Tadayasu Higuchi | Method for forming a continuous footing with prefabricated footing blocks |
GB2216153A (en) * | 1988-03-25 | 1989-10-04 | Roydon John Chute Thompson | Permanent shuttered in situ beam foundation system |
GB2304136A (en) * | 1995-08-04 | 1997-03-12 | Bicc Plc | Groundwork |
Also Published As
Publication number | Publication date |
---|---|
EP1090189B1 (en) | 2003-05-21 |
US6394703B1 (en) | 2002-05-28 |
GB2349395B (en) | 2003-04-02 |
GB9909506D0 (en) | 1999-06-23 |
EP1090189A1 (en) | 2001-04-11 |
DE60002810D1 (en) | 2003-06-26 |
DE60002810T2 (en) | 2004-02-26 |
AU3832200A (en) | 2000-11-10 |
GB2349395A (en) | 2000-11-01 |
ATE241048T1 (en) | 2003-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2010350042B2 (en) | Method and assembly for constructing a diaphragm wall | |
GB1561053A (en) | Construction of concrete walls | |
KR102009077B1 (en) | Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type | |
EP1090189B1 (en) | Improved formation of capping beams for piles | |
US2166632A (en) | Method of constructing concrete manholes | |
KR20120126573A (en) | Soil cement wall structure and method for constructing thereof | |
KR102021496B1 (en) | Retaining wall construction method and retaining wall structure by the method | |
EP0337680A2 (en) | Tunnel construction | |
JP4146250B2 (en) | Open caisson bottom plate construction method | |
KR102505449B1 (en) | Casing for retaining wall construction and method for retaining wall construction using the same | |
KR102426192B1 (en) | File fof retaining wall and construction method using file | |
KR101971554B1 (en) | Method constructuring an underground structure using a temporary structure | |
CN118087511A (en) | Construction method for retaining wall of manual hole digging pile | |
CN117738065A (en) | Construction method for seamless connection of steel-concrete trestle and earthwork ramp | |
CA1235302A (en) | Method of making cast-in-place prestressing concrete pile by means of movable casing set | |
SU1339192A1 (en) | Method of constructing a canal | |
CN111827267A (en) | Underground continuous wall construction method | |
SU1763558A1 (en) | Channel building method | |
JP3281347B2 (en) | Underground structure construction method | |
JPH086333B2 (en) | Concrete foundation construction method, concrete foundation footing section formwork casing, and underground beam section formwork panel | |
EP2653617A2 (en) | Method for carrying out a sheet piling underneath an existing wall and associated device | |
KR200400509Y1 (en) | United type C-panel concrete by SSM | |
JPH01165815A (en) | Construction of continuous underground wall | |
JPH0949236A (en) | Method for constructing foundation of reinforced concrete building | |
JPH0359223A (en) | Foundation constructing method for reinforced concrete building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT UA UG US UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2000917232 Country of ref document: EP |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 09720837 Country of ref document: US |
|
WWP | Wipo information: published in national office |
Ref document number: 2000917232 Country of ref document: EP |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
WWG | Wipo information: grant in national office |
Ref document number: 2000917232 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: JP |