WO2000037870A1 - Pyrometallurgical reactor cooling element and its manufacture - Google Patents

Pyrometallurgical reactor cooling element and its manufacture Download PDF

Info

Publication number
WO2000037870A1
WO2000037870A1 PCT/FI1999/001029 FI9901029W WO0037870A1 WO 2000037870 A1 WO2000037870 A1 WO 2000037870A1 FI 9901029 W FI9901029 W FI 9901029W WO 0037870 A1 WO0037870 A1 WO 0037870A1
Authority
WO
WIPO (PCT)
Prior art keywords
flow channel
cooling element
cooling
casting
cross
Prior art date
Application number
PCT/FI1999/001029
Other languages
English (en)
French (fr)
Inventor
Eero Hugg
Ilkka Kojo
Pertti MÄKINEN
Raimo Koota
Original Assignee
Outokumpu Oyj
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Outokumpu Oyj filed Critical Outokumpu Oyj
Priority to PL99349155A priority Critical patent/PL193460B1/pl
Priority to AU17818/00A priority patent/AU768282B2/en
Priority to AT99961080T priority patent/ATE274683T1/de
Priority to EA200100690A priority patent/EA002584B1/ru
Priority to DE69919745T priority patent/DE69919745T2/de
Priority to EP99961080A priority patent/EP1153254B1/de
Priority to BR9916469-8A priority patent/BR9916469A/pt
Priority to CA002356138A priority patent/CA2356138C/en
Priority to JP2000589886A priority patent/JP2002533649A/ja
Publication of WO2000037870A1 publication Critical patent/WO2000037870A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/051Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds into moulds having oscillating walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F1/00Tubular elements; Assemblies of tubular elements
    • F28F1/10Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses
    • F28F1/40Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses the means being only inside the tubular element

Definitions

  • the present invention relates to a method of manufacturing a cooling element for pyrometallurgical reactors, said element having at least one flow channel, and where the manufacture of the element is made by continuous casting, i.e. slip casting.
  • the wall surface area of the cooling channel wall is increased with respect to its round or oval shape on cross-section without increasing the diameter or length of the flow channel.
  • the invention also relates to the element manufactured by this method.
  • the refractory of reactors in pyrometallurgical processes is protected by water-cooled cooling elements so that, as a result of cooling, the heat coming to the refractory surface is transferred via the cooling element to water, whereby the wear of the lining is significantly reduced compared with a reactor which is not cooled. Reduced wear is caused by the effect of cooling, which brings about forming of so called autogenic lining, which fixes to the surface of a heat resistant lining and which is formed from slag and other substances precipitated from the molten phases.
  • cooling elements are manufactured in two ways: primarily, elements can be manufactured by sand casting, where cooling pipes made of a highly thermal conductive material such as copper are set in a sand-formed mould, and are cooled with air or water during the casting around the pipes.
  • the element cast around the pipes is also of highly thermal conductive material, preferably copper.
  • This kind of manufacturing method is described in e.g. GB patent no. 1386645.
  • One problem with this method is the uneven attachment of the piping acting as cooling channel to the cast material surrounding it because some of the pipes may be completely free of the element cast around it and part of the pipe may be completely melted and thus damaged. If no metallic bond is formed between the cooling pipe and the rest of the cast element around it, heat transfer will not be efficient.
  • the casting properties of the cast material can be improved, for example, by mixing phosphorus with the copper to improve the metallic bond formed between the piping and the cast material, but in that case, the heat transfer properties (thermal conductivity) of the copper are significantly weakened by even a small addition.
  • One advantage of this method worth mentioning is the comparatively low manufacturing cost and independence from dimensions.
  • Another method of manufacture is used, whereby glass tubing in the shape of a channel is set into the cooling element mould, which is broken after casting to form a channel inside the element.
  • a well-known method in the prior art has been to manufacture a cooling element for a pyrometallurgical reactor by casting a hollow profile as continuous casting i.e. slip casting through a mandrel.
  • the element is manufactured of a highly thermal conductive metal such as copper.
  • the advantage of this method is a dense cast structure, good surface quality and the cast cooling channel gives good heat transfer from the element to the cooling medium, so that no effects impeding heat transfer occur, rather the heat coming from the reactor to the cooling element is transferred without any excess heat transfer resistance directly to the surface of the channel and onwards to the cooling water.
  • the cross-section of the cooling channel is generally round or oval and the mandrel has a smooth surface. This type of cooling channel is mentioned in US patent 5,772,955.
  • the heat transfer surface area of the element In order to improve the heat transfer capability of a cooling element it is however preferable to increase the heat transfer surface area of the element. As demonstrated by the explanation below, according to the present invention this occurs by increasing the wall surface area of the flow channel without enlarging the diameter or adding length.
  • the wall surface area of the cooling element flow channel is increased by forming grooves in the channel wall during casting or by machining grooves or threads in the channel after casting so that the cross-section of the channel remains essentially round or oval.
  • the invention also relates to cooling elements manufactured by this method. The essential features of the invention will become apparent in the attached patent claims.
  • the difference in temperature between the wall and the tube is limited by the fact that water boils at 100 °C, when the heat transfer properties at normal pressure become significantly worse due to boiling. In practice, it is more advantageous to operate at the lowest possible flow channel wall temperature.
  • the heat transfer coefficient can be influenced largely by changing the flow speed, i.e. by affecting the Reynolds number. This is limited however by the increased loss in pressure in the tubing as the flow rate increases, which raises the costs of pumping the cooling water and pump investment costs also grow considerably after a certain limit is exceeded.
  • the heat transfer surface area can be influenced either by increasing the diameter of the cooling channel and/or its length.
  • the cooling channel diameter cannot be increased unrestrictedly in such a way as to be still economically viable, since an increase in channel diameter increases the amount of water required to achieve a certain flow rate and furthermore, the energy requirement for pumping.
  • the channel diameter is limited by the physical size of the cooling element, which for reasons of minimizing investment costs, is preferably made as small and light as possible.
  • Another limitation on length is the physical size of the cooling element itself, i.e. the quantity of cooling channel that will fit in a given area.
  • At least one flow channel is formed in the cast cooling element during slip casting, and rifle-like grooves are machined into the flow channel after casting.
  • the grooves are advantageously made by using a so-called expanding mandrel, which is drawn through the flow channel. Grooving can be made to e.g. a hole closed at one end, in which case the mandrel is drawn outwards. A hole made in the channel, which is open at both ends, is made either by pushing or drawing a purpose-designed tool through the channel.
  • Figure 1 shows a principle drawing of the cooling element used in the tests
  • Figure 2 shows a cross-sectional profile of the test cooling element
  • Figures 3a -3d indicate the temperature inside the element at different measuring points as a function of melt temperature
  • Figure 4 presents the heat transfer coefficient calculated from the measurements taken as a function of the melt
  • Figure 5 presents the differences in temperature of the cooling water and the channel wall at different cooling levels for normalized cooling elements.
  • Cooling element A had a conventional smooth-surfaced channel, and this element was used for comparative measurements.
  • the amount of cooling water and the temperatures both before feeding the water into the cooling element and afterwards were carefully measured in the tests.
  • the temperature of the molten lead and the temperatures inside the cooling element itself were also carefully measured at seven different measuring points.
  • Figure 1 shows the cooling element 1 used in the tests, and the flow channel 2 inside it.
  • the dimensions of the cooling element were as follows: height 300 mm, width 400 mm and thickness 75 mm.
  • the cooling tube or flow channel was situated inside the element as in Figure 1 , so that the centre of the horizontal part of the tube in the figure was 87 mm from the bottom of the element and each vertical piece was 50 mm from the edge of the plate.
  • the horizontal part of the tube is made by drilling, and one end of the horizontal opening is plugged (not shown in detail).
  • Figure 1 also shows the location of temperature measuring points T1 - T7.
  • Figure 2 presents the surface shape of the cooling channels and Table 1 contains the dimensions of the test cooling element channels and the calculated heat transfer surfaces per metre as well as the relative heat transfer surfaces.
  • Figures 3a - 3d demonstrate that the temperatures of cooling elements B, C and D were lower at all cooling water flow rates than the reference measurements taken from cooling element A. However, since the flow cross-sections of the said test pieces had to be made with different dimensions for technical manufacturing reasons, the efficiency of the heat transfer cannot be compared directly from the results in Figures 3a - 3d. Therefore the test results were normalized as follows:

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Geometry (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Continuous Casting (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Cooling Or The Like Of Semiconductors Or Solid State Devices (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Metal Extraction Processes (AREA)
  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
PCT/FI1999/001029 1998-12-22 1999-12-14 Pyrometallurgical reactor cooling element and its manufacture WO2000037870A1 (en)

Priority Applications (9)

Application Number Priority Date Filing Date Title
PL99349155A PL193460B1 (pl) 1998-12-22 1999-12-14 Element chłodzący reaktora pirometalurgicznego i sposób wytwarzania elementu chłodzącego reaktora pirometalurgicznego
AU17818/00A AU768282B2 (en) 1998-12-22 1999-12-14 Pyrometallurgical reactor cooling element and its manufacture
AT99961080T ATE274683T1 (de) 1998-12-22 1999-12-14 Pyrometallurgisches reaktorkühlelement und dessen herstellung
EA200100690A EA002584B1 (ru) 1998-12-22 1999-12-14 Охлаждающий элемент пирометаллургического реактора и его изготовление
DE69919745T DE69919745T2 (de) 1998-12-22 1999-12-14 Pyrometallurgisches reaktorkühlelement und dessen herstellung
EP99961080A EP1153254B1 (de) 1998-12-22 1999-12-14 Pyrometallurgisches reaktorkühlelement und dessen herstellung
BR9916469-8A BR9916469A (pt) 1998-12-22 1999-12-14 Elemento de resfriamento de reator pirometalúrgico e sua fabricação
CA002356138A CA2356138C (en) 1998-12-22 1999-12-14 Pyrometallurgical reactor cooling element and its manufacture
JP2000589886A JP2002533649A (ja) 1998-12-22 1999-12-14 乾式や金反応炉用冷却要素とその製造

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI982771 1998-12-22
FI982771A FI108751B (fi) 1998-12-22 1998-12-22 Menetelmä liukuvalulla muodostetun jäähdytyselementin valmistamiseksi sekä menetelmällä valmistettu jäähdytyselementti

Publications (1)

Publication Number Publication Date
WO2000037870A1 true WO2000037870A1 (en) 2000-06-29

Family

ID=8553169

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI1999/001029 WO2000037870A1 (en) 1998-12-22 1999-12-14 Pyrometallurgical reactor cooling element and its manufacture

Country Status (19)

Country Link
EP (1) EP1153254B1 (de)
JP (1) JP2002533649A (de)
KR (1) KR100640706B1 (de)
CN (1) CN100449242C (de)
AR (1) AR021961A1 (de)
AT (1) ATE274683T1 (de)
AU (1) AU768282B2 (de)
BR (1) BR9916469A (de)
CA (1) CA2356138C (de)
DE (1) DE69919745T2 (de)
EA (1) EA002584B1 (de)
FI (1) FI108751B (de)
ID (1) ID24579A (de)
PE (1) PE20001446A1 (de)
PL (1) PL193460B1 (de)
PT (1) PT1153254E (de)
RS (1) RS49726B (de)
WO (1) WO2000037870A1 (de)
ZA (1) ZA200104860B (de)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1548133A1 (de) * 2003-12-03 2005-06-29 Paul Wurth S.A. Kühlplatte sowie Verfahren zu ihrer Herstellung
WO2010128197A1 (en) 2009-05-06 2010-11-11 Luvata Espoo Oy Method for producing a cooling element for pyrometallurgical reactor and the cooling element
US9869515B2 (en) 2010-06-29 2018-01-16 Outotec Oyj Suspension smelting furnace and a concentrate burner

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101634520B (zh) * 2009-05-31 2011-03-30 江苏联兴成套设备制造有限公司 铸钢冷却板的铸造方法
CN102489955A (zh) * 2011-12-06 2012-06-13 阳谷祥光铜业有限公司 一种冷却元件的制造方法以及一种冷却元件
JP5983951B2 (ja) * 2013-10-07 2016-09-06 Jfeスチール株式会社 高炉ステーブの設計方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1352815A (en) * 1971-04-09 1974-05-15 Mitsubishi Heavy Ind Ltd Method of and apparatus for continuous casting of finned metal tubes
US4677724A (en) * 1983-12-05 1987-07-07 Takanori Kuroki Heat exchanger structure and method of manufacturing same
US4995252A (en) * 1989-03-06 1991-02-26 Carrier Corporation Method and apparatus for internally enhancing heat exchanger tubing
JPH0471742A (ja) * 1990-07-10 1992-03-06 Mitsubishi Heavy Ind Ltd 断面複雑穴管の製造方法
JPH10166036A (ja) * 1996-12-11 1998-06-23 Hitachi Cable Ltd 内面溝付管の製造方法及びその装置
US5772955A (en) * 1994-02-17 1998-06-30 Outokumpu Engineering Contractors Oy Apparatus for suspension smelting
WO1998030345A1 (de) * 1997-01-08 1998-07-16 Paul Wurth S.A. Verfahren zum herstellen einer kühlplatte für öfen zur eisen- und stahlerzeugung
EP0893509A1 (de) * 1997-07-23 1999-01-27 MANNESMANN Aktiengesellschaft Abhitzekessel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191416474A (en) * 1914-07-10 1915-10-11 Carl Schilling An Improved Process for Rectifying Spirit in Periodically Working Apparatus.

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1352815A (en) * 1971-04-09 1974-05-15 Mitsubishi Heavy Ind Ltd Method of and apparatus for continuous casting of finned metal tubes
US4677724A (en) * 1983-12-05 1987-07-07 Takanori Kuroki Heat exchanger structure and method of manufacturing same
US4995252A (en) * 1989-03-06 1991-02-26 Carrier Corporation Method and apparatus for internally enhancing heat exchanger tubing
JPH0471742A (ja) * 1990-07-10 1992-03-06 Mitsubishi Heavy Ind Ltd 断面複雑穴管の製造方法
US5772955A (en) * 1994-02-17 1998-06-30 Outokumpu Engineering Contractors Oy Apparatus for suspension smelting
JPH10166036A (ja) * 1996-12-11 1998-06-23 Hitachi Cable Ltd 内面溝付管の製造方法及びその装置
WO1998030345A1 (de) * 1997-01-08 1998-07-16 Paul Wurth S.A. Verfahren zum herstellen einer kühlplatte für öfen zur eisen- und stahlerzeugung
EP0893509A1 (de) * 1997-07-23 1999-01-27 MANNESMANN Aktiengesellschaft Abhitzekessel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DATABASE WPI Week 199835, Derwent World Patents Index; AN 1998-406885, XP002947500 *
PATENT ABSTRACTS OF JAPAN *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1548133A1 (de) * 2003-12-03 2005-06-29 Paul Wurth S.A. Kühlplatte sowie Verfahren zu ihrer Herstellung
WO2010128197A1 (en) 2009-05-06 2010-11-11 Luvata Espoo Oy Method for producing a cooling element for pyrometallurgical reactor and the cooling element
US9869515B2 (en) 2010-06-29 2018-01-16 Outotec Oyj Suspension smelting furnace and a concentrate burner

Also Published As

Publication number Publication date
EA002584B1 (ru) 2002-06-27
FI982771A0 (fi) 1998-12-22
CA2356138C (en) 2007-08-14
AU768282B2 (en) 2003-12-04
FI982771A (fi) 2000-06-23
CN100449242C (zh) 2009-01-07
DE69919745D1 (de) 2004-09-30
ZA200104860B (en) 2001-12-14
YU44801A (sh) 2003-12-31
EP1153254B1 (de) 2004-08-25
KR20010099863A (ko) 2001-11-09
PL193460B1 (pl) 2007-02-28
AU1781800A (en) 2000-07-12
PL349155A1 (en) 2002-07-01
FI108751B (fi) 2002-03-15
EP1153254A1 (de) 2001-11-14
AR021961A1 (es) 2002-09-04
BR9916469A (pt) 2001-09-25
ID24579A (id) 2000-07-27
PT1153254E (pt) 2004-11-30
CA2356138A1 (en) 2000-06-29
EA200100690A1 (ru) 2001-12-24
DE69919745T2 (de) 2005-01-20
CN1331791A (zh) 2002-01-16
RS49726B (sr) 2008-04-04
JP2002533649A (ja) 2002-10-08
KR100640706B1 (ko) 2006-10-31
PE20001446A1 (es) 2000-12-28
ATE274683T1 (de) 2004-09-15

Similar Documents

Publication Publication Date Title
KR20110084440A (ko) 야금로의 냉각판 및 이의 제조 방법
EP1153254B1 (de) Pyrometallurgisches reaktorkühlelement und dessen herstellung
EP2427578B1 (de) Verfahren zur herstellung eines kühlelements für einen pyrometallurgischen reaktor und kühlelement
RU2487946C2 (ru) Способ получения охлаждающего элемента для пирометаллургического реактора и охлаждающий элемент
PL193612B1 (pl) Element chłodzący wytwarzany w formie odlewniczej
EP1153255B1 (de) Pyrometallurgisches reaktorkühlelement und dessen herstellung
KR100607855B1 (ko) 빌렛 및 분괴형상으로 강을 연속주조하기 위한 주형
EP2281165B1 (de) Verfahren zur herstellung einer kühlungsplatte für einen metallurgischen ofen
MXPA01006448A (es) Elemento de enfriamiento de reactor pirometalurgico y su fabricacion
RU2030955C1 (ru) Кристаллизатор для непрерывной разливки металлов

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: P-448/01

Country of ref document: YU

Ref document number: 99814955.1

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 2000 17818

Country of ref document: AU

Kind code of ref document: A

AK Designated states

Kind code of ref document: A1

Designated state(s): AU BR CA CN DE ES IN JP KR KZ MX PL PT RU SE TR US YU ZA

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2001/04860

Country of ref document: ZA

Ref document number: 200104860

Country of ref document: ZA

WWE Wipo information: entry into national phase

Ref document number: 17818/00

Country of ref document: AU

Ref document number: 09868284

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2356138

Country of ref document: CA

Ref document number: 2356138

Country of ref document: CA

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 1999961080

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: IN/PCT/2001/00738/MU

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 1020017007839

Country of ref document: KR

ENP Entry into the national phase

Ref document number: 2000 589886

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: PA/a/2001/006448

Country of ref document: MX

WWE Wipo information: entry into national phase

Ref document number: 200100690

Country of ref document: EA

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWP Wipo information: published in national office

Ref document number: 1020017007839

Country of ref document: KR

WWP Wipo information: published in national office

Ref document number: 1999961080

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 17818/00

Country of ref document: AU

WWG Wipo information: grant in national office

Ref document number: 1999961080

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 1020017007839

Country of ref document: KR