WO1998024673A1 - Personal rapid transit system utilizing both course reservation and branch stop technologies - Google Patents

Personal rapid transit system utilizing both course reservation and branch stop technologies Download PDF

Info

Publication number
WO1998024673A1
WO1998024673A1 PCT/KR1997/000251 KR9700251W WO9824673A1 WO 1998024673 A1 WO1998024673 A1 WO 1998024673A1 KR 9700251 W KR9700251 W KR 9700251W WO 9824673 A1 WO9824673 A1 WO 9824673A1
Authority
WO
WIPO (PCT)
Prior art keywords
prt
vehicle
guideway
network
vehicles
Prior art date
Application number
PCT/KR1997/000251
Other languages
French (fr)
Inventor
Tae Jin Park
Original Assignee
Tae Jin Park
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tae Jin Park filed Critical Tae Jin Park
Priority to JP10525470A priority Critical patent/JP2000510269A/en
Priority to US09/308,979 priority patent/US6318274B1/en
Priority to EP97947213A priority patent/EP0941189A1/en
Priority to AU52350/98A priority patent/AU5235098A/en
Priority to CA002273057A priority patent/CA2273057A1/en
Publication of WO1998024673A1 publication Critical patent/WO1998024673A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/002Control or safety means for heart-points and crossings of aerial railways, funicular rack-railway
    • B61L23/005Automatic control or safety means for points for operator-less railway, e.g. transportation systems

Definitions

  • the present invention relates, in general, to a PRT (personal rapid transit) system allowing PRT vehicles to run along dedicated guideway networks at high speeds and, more particularly, to a computer-based PRT system utilizing both course reservation and branch stop technologies and having tunnel-type dedicated guideways located aboveground, groundlevel or underground and being computer-controlled, thus allowing small-sized and standardized PRT vehicles to run along the guideways at high speeds without having any congestion delays and thereby radically solving traffic congestion in a large metropolitan region.
  • PRT personal rapid transit
  • APM automated people mover
  • PRT personal rapid transit
  • PRT 2000 and Skycar personal rapid transit
  • typical APM or PRT systems are problematic in that they are limited in their passenger carrying capacities in comparison with the traditional public transit systems and cause congestion of urban traffic during rush hour.
  • Such known APM or PRT systems utilize an off-line stop technology and have series platforms, thus reducing transit capacity.
  • the above APM or PRT systems do not allow APM or PRT vehicles to change their lanes on the guideways and so each of the APM or PRT vehicles has to run along a dedicated and fixed lane and this remarkably reduces the transit capacity.
  • the guideways of the above systems consist of one-way paths, thereby forcing vehicles on the guideways to make detours prior to reaching destinations.
  • a further problem experienced in the above APM or PRT systems is that they fail to provide sufficient vehicle storage areas due to both large-sized vehicles and the structural limit of stations .
  • an object of the present invention is to provide a computer-based PRT system, which includes a guideway network consisting of multi-layered guideways located aboveground, groundlevel or underground and is automatically controlled by computers, thus allowing small-sized and standardized PRT vehicles to run along one-way guideways at high speeds without any congestion delays and thereby providing a rapid transit system, having a large passenger carrying capacity and radically solving traffic congestion in a large metropolitan region.
  • Another object of the present invention is to provide a computer-based PRT guideway network, which consists of multi-layered guideways suitable for allowing small-sized and standardized PRT vehicles to effectively start, stop, be branched from and merge with a main guideway, and change lanes through an integrated computer control process, thus allowing the vehicles to run along the guideways at high speeds without having any congestion delays and increasing transit efficiency, and which utilizes both course reservation and branch stop technologies capable of preventing the PRT vehicles from being delayed due to embarking or debarking, and which effectively reduces the loading, unloading and parking areas at stations while maximizing the platform capacity.
  • a further object of the present invention is to provide a computer-based PRT vehicle, which is equipped with a plurality of sensors, such as running reference line sensors and control signal unit sensors, and is standardized in its width and height, thus being automatically operated on a dedicated PRT guideway network without any human drivers under the control of computers using various sensor signals.
  • sensors such as running reference line sensors and control signal unit sensors
  • the present invention provides a PRT system utilizing both course reservation and branch stop technologies and comprising a fully coupled PRT guideway network located aboveground, groundlevel or underground.
  • the network includes main and branch guideways, each of which has a rectangular tunnel- shaped cross-section and is arrayed into a two-layered structure with the guideway on each layer being designed to be exclusively used as a one-way path.
  • the branch guideway is branched from the main guideway and extends to a group of terminals.
  • a running reference line is arrayed along the longitudinal center of the ceiling or bottom of each of the main and branch guideways, thus being used as a reference line for PRT vehicles running on the network.
  • a plurality of control signal units are installed at appropriate positions around the running reference line and are used for outputting control signals for the PRT vehicles running along the guideways.
  • the control signals from the above control signal units indicate reference points of the guideways, designate a desired speed of a vehicle or express the start and end points of a lane changeable area.
  • Each of the PRT vehicles is standardized in its width and height and includes a running reference line sensor for sensing the running reference line of the PRT network, a control signal unit sensor for sensing a control signal unit of the PRT network, an infrared sensor for sensing any obstacle in front of the vehicle running on the network, a side sensor for sensing side traffic conditions of the vehicle, infrared emitter and receiver for sensing running speeds of vehicles next ahead and behind, and an on-board computer having various programs and data for automatically operating the PRT vehicle on the PRT network.
  • Fig. 1 is a PRT guideway network in accordance with the preferred embodiment of the present invention
  • Fig. 2 is a perspective view of the portion "C" of
  • Fig. 3 is a perspective view of the portion "D" of Fig. 1, showing a three-way crossing of the PRT guideway network of this invention
  • Fig. 4 is a plan view of a branch guideway of the PRT guideway network of this invention, showing an arrangement of main and sub-terminals commonly connected to one branch guideway;
  • Fig. 5 is a plan view of a dedicated guideway of the PRT guideway network of this invention, showing an arrangement of both control signal units and a running reference line of the guideway;
  • Figs. 6A to 6D are plan, front, side and rear views of a computer-based PRT vehicle in accordance with the present invention, respectively;
  • Fig. 7 is a plan view showing the design of a terminal allowing for stopping and starting of vehicles and embarking and debarking of passengers in the PRT guideway network of the present invention;
  • Fig. 8 is a side view showing the design of a terminal with passenger passages, vehicle berths and multi-layered parking areas according to the present invention.
  • Fig. 1 is a PRT guideway network in accordance with the preferred embodiment of the present invention.
  • the fully coupled PRT network 1 is arrayed into a #-shaped or net-shaped planar network, with a plurality of specifically designed intersecting crossings allowing the PRT vehicles 3 to run at high speeds in every direction at the intersection without being congestion-delayed.
  • Such a PRT network 1 includes a plurality of linear main guideways 11, a plurality of branch guideways 12 and a plurality of terminals 2.
  • Each of the main and branch guideways 11 and 12 has a tunnel- shaped cross-section as will be described later herein.
  • the linear main guideways 11 allow the PRT vehicles 3 to linearly run along at high speeds without being congestion-delayed, while the branch guideways 12 are branched from the main guideways 11 at the crossings and individually extend to a group of terminals 2.
  • the terminals 2, which are located at the terminated points of the branch guideways 12, allow for parking and stopping of the vehicles 3 and embarking and debarking of passengers.
  • the main and branch guideways 11 and 12 individually have a rectangular tunnel-shaped cross-section with one ceiling, one bottom and two sidewalls.
  • the tunnel guideways 11 and 12 are arrayed into a two or more-layered structure. That is, on low-density travelled routes, one-lane guideway may be arrayed above another guideway with one lane, thus forming a two-layered guideway. However, on heavily travelled routes, two or more one-lane guideways may be arrayed abreast of each other on each layer, thus forming a two- layered guideway with two or more guideways being arrayed on each layer. Alternatively, each of the guideways may be designed into four or more even numbered layers on such heavily travelled routes. In such multi-layered guideways, the guideway on each layer is designed to be exclusively used as a one-way path, thus being completely free from two-way design.
  • Each of the main and branch guideways 11 and 12 having a rectangular tunnel-shaped cross-section with one ceiling, one bottom and two sidewalls, has a vehicle guide function allowing trains of PRT vehicles 3 to travel along a dedicated guideway at high speeds without being delayed or obstructed.
  • the tunnel-type guideways 11 and 12 also completely protect the PRT vehicles 3 from outside weather conditions, such as rain, wind, snow, hail and ice storms.
  • Figs 2 and 3 are perspective views of the portions "C" and "D" of Fig. 1, showing a four-way intersecting crossing and a three-way crossing of the PRT network 1, respectively.
  • the PRT network 1 basically has a two-layered structure with the guideway on each layer being used as a one-way path.
  • two or more one-lane guideways may be arrayed abreast of each other on each layer of a two-layered structure or the guideways may be arrayed into four or more even numbered layers, with the guideway on each layer being used as a one-way path. That is, the layout of the network 1 may be changed in accordance with predicted ridership.
  • the bottom of each guideway is flat, thus being suitable for allowing PRT vehicles 3 to easily change lanes at lane changeable areas.
  • the four-way intersecting crossing 13 is designed to have four arcuate ramps 113, thus having an almost lozenged layout that is defined by the four arcuate ramps 113 at the edges and crosses at the center as best seen in Fig. 2.
  • the four ramps 113 While designing the above four-way intersecting crossing 13, the four ramps 113, individually having a two-layered structure, are designed to connect the two intersecting guideways 11, individually having a two- layered structure, to each other and allow a vehicle 3 on any layer of one of the two intersecting guideways 11 to turn to the left or right prior to reaching any layer of another guideway 11.
  • the top and bottom layers of each of randomly- selected two opposite ramps 113 are designed to be free from intersecting each other, while the top and bottom layers of each of the other two opposite ramps 113' are designed to intersect each other.
  • two of the four ramps have a non-intersecting layer structure, while the other two ramps have an intersecting layer structure.
  • the ramps 113 of this invention Due to the four-way intersecting crossing 13 with such specifically designed four ramps 113, a vehicle 3 on any layer of one of the two intersecting guideways 11 effectively runs straight ahead or smoothly turns to the left or right without being delayed or stopped prior to reaching any layer of another guideway 11.
  • the ramps 113 of this invention have a larger radius of curvature, thereby rendering a vehicle a smoother and safer turning motion.
  • Another advantage experienced in the above crossing 13 is that the crossing 13 has a simple design suitable for remarkably reducing the facility area, reducing the construction cost and allowing all the crossings of the network 1 to be designed into intersecting crossings.
  • a two-layered linear main guideway 11 of the PRT network 1 may be coupled to two arcuate ramps 113 and 113' at two points, with the two ramps 113 and 113' being branched from one branch guideway 12 at the left or right side of the main guideway 11, thus forming a three-way planar crossing 13' having an almost triangular layout.
  • the top and bottom layers of a randomly-selected one ramp 113 of the above three-way crossing 13' are designed to be free from intersecting each other, while the top and bottom layers of the other ramp 113' are designed to intersect each other.
  • one ramp of the three-way crossing 13' has a non-intersecting layer structure, while the other ramp 113* has an intersecting layer structure. Due to the three-way crossing 13' with such specifically designed two ramps 113 and 113', a vehicle 3 on any layer of one of the two guideways 11 and 12 effectively runs without being delayed or stopped prior to reaching any layer of the other guideway.
  • the branch guideway 12, branched from the main guideway 11 and extending to a terminal 2 is similar to a main stream entrance or exit path of a conventional roadway system 4.
  • a long branch guideway 12 without having any ramps 113 it is possible to form the guideway 12 into a two-way layout having a single- layered structure in place of the above-mentioned two- layered structure.
  • the merging area at which a PRT vehicle 3 from an entrance ramp merges into the main stream of vehicles of a main guideway 11, has to be designed to prevent the PRT vehicle 3 from the ramp 113 from colliding with another vehicle 3 running along the main guideway 11.
  • the PRT system of this invention utilizes a course reservation technology capable of reserving an allowed travel space for each and every PRT vehicle passing through merging areas. Such reservations for the merging areas are applied and registered by passengers at start terminals and are managed by a computer so as to allow the vehicles 3 to correctly pass through the merging areas at the reserved times.
  • Fig. 5 is a plan view of a guideway of the PRT guideway network 1 of this invention, showing an arrangement of both control signal units and a running reference line of the guideway.
  • the running reference line 10 is provided on the longitudinal center of the ceiling or bottom of each guideway, thus being used as a reference line for vehicles 3 running along the guideway.
  • the control signal units 20, which perform the same operational functions as those of a road sign of a conventional roadway system 4 are installed at appropriate positions at opposite sides of the reference line 10.
  • the above running reference line 10, used as a reference line for vehicles 3 running on the guideway network 1, guides and allows PRT vehicles 3 to run along dedicated lanes at high speeds without being unexpectedly diverged from those lanes.
  • the control signal units 20 which are installed at appropriate positions at opposite sides of the reference line 10, output control signals indicating a reference point that expresses the position of a guideway along which a PRT vehicle 3 runs.
  • the above units 20 also designate an object speed of a vehicle 3 in accordance with guideway conditions and express the running direction of the vehicle 3.
  • Another operation of the units 20 is to inform of the start and end points of a lane changeable area of the network 1 and to control the PRT system using 4000 preset signals.
  • Fig. 4 is a plan view of a branch guideway 12 of the PRT guideway network 1 of this invention, showing an arrangement of main and sub-terminals commonly connected to the branch guideway 12.
  • the branch guideway 12 is coupled to the main guideway 11 through a three-way interchange 13' as an example.
  • the PRT system of this invention utilizes a branch stop technology. That is, the PRT vehicles 3 exit from a main guideway 11 into a branch guideway 12 through a three-way or four-way crossing 13', 13 prior to approaching a destination terminal.
  • the ramps 113 and 113' of this invention have a larger radius of curvature in comparison with ramp facilities of a traditional interchange, thus rendering a vehicle 3 a smoother and safer turning motion and allowing the vehicle 3 to continue its running speed while exiting from the main guideway 11 into the branch guideway 12. Therefore, the vehicles 3 on the main guideway 11 are not congestion- delayed due to embarking/debarking of passengers at the terminals.
  • the terminals 2 and 2' are commonly connected to the branch guideway 12 through their terminal ramps along which vehicles 3 gradually reduce their speeds prior to being completely stopped at the platforms of the terminals .
  • Fig. 7 is a plan view showing the design of a terminal 2 allowing for stopping and starting of vehicles 3 and embarking and debarking of passengers in the PRT guideway network 1 of this invention.
  • Fig. 8 is a side view showing the design of a terminal 2 with passenger passages 21, vehicle berths and multi-layered parking areas 22 according to the invention.
  • the terminals of the PRT system of this invention are designed as follows.
  • the terminals 2 are primarily used as PRT vehicle berthing areas for stopping/parking of PRT vehicles and embarking/debarking of passengers.
  • the terminals 2 are secondarily used as PRT vehicle bases for checking, washing, battery changing, repairing and parking of PRT vehicles 3.
  • each of the terminal ramps which is branched from a branch guideway 12 and is terminated at its associated terminal 2, converts its layer structure from a two- layered structure into a single-layered structure at a position around the entrance of a terminal 2.
  • a plurality of one-way paths are arrayed abreast of each other and extend broadwise like the ribs of a hand fan.
  • the platforms 23 of the terminal 2 are arrayed abreast like toll collection gates of a conventional roadway system. That is, the berthing area of each terminal 2 of this invention consists of a plurality of parallel platforms 23.
  • the one-way paths from debarking platforms 23 are coupled to their U-turn paths 24, thus guiding the vehicles 3 to embarking platforms 23 or to a parking area 22 for checking, washing, battery changing, repairing and parking of the PRT vehicles 3. Due to such parallel platforms 23, the terminals 2 of this invention remarkably increase the platform capacity.
  • the embarking and debarking platforms 23 are coupled to a passenger passage 21 through stairways. In the present invention, it is preferable to commonly connect two platforms 23 to the passenger passage 21 through one stairway, thus reducing the area of the terminal 2.
  • the PRT vehicles 3 preferably enter the debarking platforms 23 in the registered priority order of vehicle numbers 1-3-2-4.
  • the vehicles 3 may preferably start from the embarking platforms 23 in the same order as the entrance order.
  • the priority order of vehicle numbers 3, starting from the embarking platforms 23, may be changed from the above order of 1-3-2-4.
  • control signal units 20 which are installed at the entrance of the platforms 23.
  • the above units 20 are designed to be stably operated even in the event of an electricity failure, thus almost completely preventing congestion delays at the terminals 2.
  • the platforms 23 are preferably designed into a switchable type suitable for being changeable between embarking and debarking platforms in accordance with the ratio of loading and unloading capacities. That is, each platform 23 may be used as an embarking platform when it is necessary to provide a loading capacity larger than a previous unloading capacity or as a debarking platform when it is necessary to provide an unloading capacity larger than a previous loading capacity.
  • the entrance and exit paths for the platforms 23 are coupled to each other through their running reference lines 10, thus freely switching the platforms 23 between the two types of platforms in accordance with the ratio of loading capacity to unloading capacity.
  • the PRT system of this invention thus remarkably increases platform capacities of the terminals 2.
  • ten or less terminals which are commonly coupled to one branch guideway 12, include one main terminal 2 ' .
  • Such a main terminal 2 ' has a large- capacity parking area and is coupled to the branch guideway 12 through a three-way crossing 13 ' , thus allowing any empty PRT vehicle 3 to rapidly run between the main terminal 2' and any one of the sub-terminals 2.
  • a main computer is installed in one of the terminals 2 and 2' and is used for controlling the start of vehicles at the terminal, checking empty vehicles, requesting a system computer for empty vehicles, monitoring and controlling the vehicles running on the guideways within its jurisdiction, receiving a reservation for using the merging areas under its jurisdiction, managing the merging areas according to the reserved schedule, judging the existing state of the network 1 in the event of emergencies or abnormal running conditions, and appropriately dealing with the abnormal network 1 by judging results during such emergencies or abnormal running conditions.
  • the vehicles 3 suitable for running on the PRT guideway network 1 of this invention are specifically designed as will be described hereinbelow.
  • Figs. 6A to 6D are plan, front, side and rear views of a computer-based PRT vehicle 3 in accordance with the present invention, respectively.
  • the PRT vehicle 3 is specifically designed to effectively and exclusively run on the dedicated PRT guideway network 1 of this invention at high speeds.
  • each of the PRT vehicles 3 is standardized in its width and height.
  • the length of the vehicles 3 may be changed in accordance with the type of vehicles classified into freight, individual and public passenger vehicles.
  • the PRT vehicle 3 is also equipped with a plurality of sensors, such as RRL (running reference line) sensors 31 installed at the top or bottom of the vehicle 3 and used for sensing the running reference lines 10 of the network 1 and CSU (control signal unit) sensors 32 used for sensing the control signal units 20 of the network 1.
  • RRL running reference line
  • CSU control signal unit
  • Each of the front and rear ends of the vehicle 3 is provided with both an infrared emitter 35 and an infrared receiver 36.
  • the front and rear infrared emitters 35 of one of trains of vehicles 3 running along a lane emit infrared signals to the infrared receivers 36 of vehicles 3 next ahead and behind, while the front and rear infrared receivers 36 of the vehicle 3 receive infrared signals from the infrared emitters 35 of the vehicles 3 next ahead and behind, thus controlling both the intervals between the three vehicles 3 and a change of running speed.
  • the vehicle 3 also has a plurality of side sensors 34 for sensing side traffic conditions of the vehicle 3.
  • An infrared sensor 33 is provided at the front of the vehicle 3 so as to recognize any obstacle ahead of a travelling vehicle other than the vehicle 3 next ahead.
  • the vehicle 3 also has a radio antenna 37, a modem and an on-board computer.
  • the on-board computer operates both input signals from the sensors 33, 34, 35 and 36 and radio signals from the radio antenna 37 through a programmed process with stored data, thus outputting pulse signals indicating target speed and steering angle of the vehicle 3.
  • the on-board computer of the above vehicle 3 receives radio-signals from beacons of the network 1 at regular time intervals, thus performing an automated navigation process using input signals from the sensors and radio antenna, programmed data and reserved running course. Therefore, the on-board computer automatically controls the running speed and steering angle of the vehicle 3 and allows the vehicle 3 to automatically move on the network 1 at high speeds and safely reach a reserved destination without any human drivers.
  • the PRT vehicles 3 of this invention are automatically operated on the network 1 under the control of the on-board computers as follows. That is, the LCD screen 38 of the on-board computer of a PRT vehicle 3 continuously displays present time, reserved arrival time, remaining time before arrival and present position of the vehicle 3 in the network 1.
  • a passenger in a vehicle 3 may request permission to change his destination by operating a top-down menu using an arrow key.
  • the passenger who is not responsible for driving the vehicle 3, may freely play a game program, watch TV news, stock exchange quotations or moving picture, talk over the phone, listen to music, request permission to use a lay-by or study the geography of a place using the on-board computer.
  • a changeable battery may be preferably used as a power source for both the propulsion unit and on-board computer of the vehicle 3.
  • additional sensors are preferably provided at positions between the RRL sensors 31 and the CSU sensors 32 so as to sense the signals from the control signal units 20 even when the RRL sensors 31 of the vehicle 3 are diverged from the running reference line 10.
  • the front and rear infrared emitters 35 emit infrared signals to the infrared receivers 36 of vehicles 3 next ahead and behind, while the front and rear infrared receivers 36 receive infrared signals from the infrared emitters 35 of the vehicles 3 next ahead and behind, thus appropriately controlling the intervals between the three vehicles 3 and changing the speed so as to almost completely prevent the trains of vehicles ' 3 on one lane from colliding with each other.
  • the CSU sensors 32 of a vehicle 3, running on the network 1 receive signals from the control signal units 20, the front and rear infrared emitters 35 of the vehicle 3 output infrared signals to the front and rear areas of the vehicle 3, respectively.
  • the on-board computer calculates a time difference between arrival of vehicles 3 at the control signal units 20 and running speeds, thus calculating the interval between the three vehicles 3.
  • the on-board computer When the rear infrared receiver 36 of a vehicle 3 receives an infrared signal from the vehicle 3 next behind, the on-board computer outputs a signal, indicating the running speed and normal or abnormal running conditions, to the rear vehicle 3. In such a case, when the vehicle 3 runs along the guideway at a changed speed, the output signal indicates the changed speed through a predetermined method. However, when the vehicle 3 runs along the guideway at a normal speed, the on-board computer outputs pulse signals with regular time intervals as the vehicle 3 passes by the control signal units 20. When the infrared receiver 36 does not receive any signals from the rear, the on-board computer does not output any signals to the rear except for emergencies such as a sudden braking operation. In order to prevent the vehicles 3 from unexpectedly colliding with each other during such emergencies, the braking distances for the vehicles 3 have to be shortened by forming the bottom of the vehicles 3 using rubber or urethan materials.
  • the vehicle 3 also has two front and two rear side sensors 34 at each side, thus having eight side sensors 34 at both sides.
  • the side sensors 34 are for sensing any side vehicles running along side lanes, thus preventing the vehicle from unexpectedly colliding with another vehicle while changing lanes.
  • the above side sensors 34 also perform a checking operation while a vehicle 3 runs along an entrance ramp for a merging area. During such a checking operation, two of four side sensors 34, individually having a shorter sensing distance, check whether another vehicle 3 runs along the guideway for the target merging area. While the vehicle 3 runs along an entrance ramp for the target merging area, the sensors 34, 35 and 36 check any obstacle in front and rear areas of the vehicle 3 and sense the main stream of vehicles 3 on the main guideway 11. In such a case, the vehicle 3 may be appropriately accelerated or decelerated under the control of the on-board computer, thus being completely prevented from colliding with another vehicle 3 at the merging area.
  • two or more vehicle sensors are preferably provided at the ceiling and bottom or both sidewalls of the guideway at a position around each running direction setting point of the network 1. Therefore, it is possible to sense both the running speeds of vehicles 3 and a difference in the times the vehicles 3 pass by the vehicle sensors.
  • the vehicle sensors control the running speed of the vehicle 3 on the entrance ramp, thus preventing the vehicles 3 from colliding with each other at the merging area.
  • UPS unfailure power source
  • the side door of the vehicle 3 is automatically opened to allow passengers to be debarked at the platform 23.
  • the on-board computer of the vehicle 3 communicates with a sub-computer of the terminal through a preset process, thus giving data of the vehicle 3 to the sub-computer and allowing the sub- computer to check the operational conditions of the vehicle 3.
  • the sub-computer determines that the vehicle 3 requires repairing, the vehicle 3 automatically moves to a parking area 22 of the terminal 2 under the control of the sub-computer.
  • the vehicle 3 is subjected to maintenance, such as checking of vehicle conditions, washing, battery changing or element changing.
  • the vehicle 3 runs along a U-turn path 24 of the terminal 2 under the control of the sub-computer prior to berthing at an embarking platform 23.
  • the on-board computer of the vehicle 3 receives data for a designated running course and checks the completion of embarking and closes the side door of the vehicle 3 prior to starting the vehicle 3 for a reserved destination.
  • the on-board computer of a vehicle 3 also gives data to the sub-computer of the terminal 2, the data indicating a start terminal number, start time interval, vehicle number, running history of the vehicle, guideway conditions, element conditions, vehicle maintenance period, present voltage of power source battery, discrimination between empty vehicles, freight vehicles and passenger vehicles, and any operational error generated while running on the network 1.
  • a radio-beacon monitor station is installed at the main terminal 2, while both a mobile station and a telephone exchange station are installed in the vehicle 3. Therefore, passenger(s) in the vehicles 3 can use TDMA or CDMA-type telecommunication. Such stations also control the vehicles 3 to change their running course while the vehicles 3 run on the network 1. Due to such stations, passenger(s) in a vehicle 3 running on the network 1 can give an account of emergencies or abnormal running conditions to the radio-beacon monitor station and such emergencies or abnormal running conditions can be appropriately dealt with.
  • the PRT guideway network 1 of this invention is equipped with an air conditioning system, while the vehicle 3 is preferably equipped with a HVAC (heating, ventilating and air conditioning) system. Therefore, it is possible to feed appropriate temperature fresh air into the passenger compartments of the vehicles 3 running on the network 1, thus allowing the passengers to feel comfortable.
  • HVAC heating, ventilating and air conditioning
  • the propulsion power source for each PRT vehicle 3 may be preferably achieved by an on-board battery as described above.
  • the propulsion power source may be achieved by an electric power feeding technology in the same manner as a conventional electric railway system.
  • the propulsion power source for the PRT vehicle 3 may be achieved by an internal combustion engine. The operational effect of the PRT system utilizing the course reservation and branch stop technologies will be described hereinbelow.
  • a passenger who wants to use the PRT system of this invention, selects both his destination and desired embarking/debarking times at a ticketing machine and receives a ticket from the ticketing machine. Thereafter, the passenger inserts the ticket into a ticket collection gate, thus being allowed to board a designated PRT vehicle 3 berthing at an embarking platform 23.
  • the ticketing machine may directly designate an embarking platform number for the passenger in place of issuing a ticket. In such a case, the passenger is also allowed to board a PRT vehicle at a designated embarking platform.
  • the vehicle 3 After embarking the passenger as described above, the vehicle 3 is controlled by the sub-computer of the terminal 2. That is, the sub-computer communicates with the ticketing machine so as to select the shortest course for the passenger's destination and reserve a vehicle start time. Thereafter, the sub-computer communicates with the main computer of the group of terminals, thus giving data to the main computer. Upon receiving the data from the sub-computer, the main computer secures the reserved course in the network 1 so as to allow the vehicle 3 to be completely free from colliding with another vehicle while running along the course. The main computer confirms and registers the start time, reserved course and method of passing through the sectioned areas of the course prior to sending data to the sub-computer. Upon receiving the data from the main computer, the sub- computer communicates with the on-board computer of the vehicle 3 through an optical, radio or cable communication. After the communication, the sub-computer confirms the communicated data again.
  • the on-board computer may be operated by a battery.
  • the vehicle 3 from the embarking platform 23 of a terminal 2 runs along a branch guideway 12 prior to merging into the main stream of vehicles on a main guideway 11 for the destination.
  • AGT automated guideway transit
  • the PRT vehicle 3 of this invention also utilizes such a longitudinal lane running technology and runs on the guideway network 1 at high speeds under the control of computers as will be described hereinbelow. That is, the PRT vehicle 3 runs along the main and branch guideways 11 and 12 while sensing the running reference line 10 of the network 1 using the RRL sensors 31. While running along the guideways, the RRL sensors 31 may be somewhat diverged from the reference line 10 due to acceleration force and/or inertia force acting on the vehicle 3.
  • each sectioned area of a guideway is divided into a plurality of sub-sections in lane change areas, such as branching areas, merging areas and other lane changing areas.
  • the above sub-sections are designated by different reference numbers and individually have one merging area.
  • Each of the sub-sections comprises of a plurality of intervals, each of which refers to the length of time one train of vehicles 3, running along a main guideway at normal speeds and normal intervals, spends until it reaches a position of a vehicle next ahead.
  • each sub-section of the PRT network there may be no vehicle, one vehicle running from a left entrance ramp or one vehicle from a right entrance ramp at every interval, thus allowing the PRT vehicles 3 to use the merging area in accordance with reserved priority at every interval.
  • the main computer which is installed at a facility of 10 or less terminals 2 commonly connected to the same branch guideway 12 and is used for controlling the terminals 2, is coupled to both the system computer and the other main computers.
  • the above main computers set a clock by the synchronous time signal(s), which is periodically output from the system computer one or more times a day.
  • the main computers thus synchronize with each other and control the vehicle start time and individually have jurisdiction over a sectioned area of the network 1, which consists of a plurality of subsections.
  • Each of the above main computers controls all the sub-sections under its jurisdiction using a section array structure at every interval and performs inquiry, reservation, registration and cancellation.
  • the network 1 In the event of a small system capacity, it is possible to equip the network 1 with one system computer, which is a large capacity super computer or a parallel- type vector processor, thus allowing the system computer to keep, manage and use the information about the section array structure.
  • a computer has to be installed at each of the terminals so as to properly control the vehicles. In such a case, the computers of the terminals have to be coupled to each other through a communication network.
  • the main computers are coupled to each other through a communication network and are also coupled to associated sub-computers.
  • Each of the main computers selects several start intervals, at each of which a vehicle 3 is scheduled to pass through a branch guideway 12 or merge into the main stream of vehicles on a main guideway 11.
  • the main computer sends data of the selected start intervals to another main computer having jurisdiction over the next sectioned area, thus requesting permission to pass through the next sectioned area without being obstructed.
  • the main computer of the start terminal 2 finally determines one of the selected start intervals at which the vehicle 3 can start and run through the sectioned areas from the start terminal to the last sectioned area under the jurisdiction of the main computer of the destination terminal 2.
  • the finally selected start interval is registered and reserved in the main computers which have jurisdiction over the sectioned areas from the start to the last terminals. Therefore, the vehicle 3 leaves the start terminal at the finally selected start interval and safely passes through the merging areas at the reserved times.
  • the data signals may be erased by a main computer before the vehicle 3 reaches its destination.
  • the main computer erasing the data signals, sends erasion particulars to the main computer of the start terminal through the system computer.
  • the main computer of the start terminal Upon receiving the erasion particulars, the main computer of the start terminal either changes the course to a second or third shortest course in accordance with the erasion particulars or changes the start intervals to other intervals prior to performing an inquiry of the intervals.
  • the area passing course at every branching point is expressed by data indicating priority of vehicles to pass through the branching point.
  • the main computer of the start terminal registers the area passing course and finally determines the starting time, the main computer sends data to the sub-computer of a terminal at which the vehicle 3 berths.
  • the sub- computer Upon receiving the data from the main computer, the sub- computer sends the data to the on-board computer of the vehicle 3, thus allowing the vehicle 3 to appropriately start at a reserved start time and safely run along the reserved course.
  • the on-board computer compares the practical passing interval with a reserved interval at every reference point so as to correct the passing interval, thus allowing the vehicle 3 to safely pass through the merging areas at the reserved times.
  • the data, stored in each element of the section array structure, is shifted at every interval. Therefore, when the vehicle 3 reaches the first point of a sectioned area, the data is shifted from the prior element into the next element and is erased when the vehicle 3 completely passes through the sectioned area.
  • the main computer checks the running conditions of the vehicles 3 running along the guideways 11 within the sectioned area under its jurisdiction. The main computer may control the running speeds of the vehicles 3 in the event of emergencies or abnormal running conditions. When the main computer fails to appropriately control the vehicles 3 in the event of such emergencies or abnormal running conditions, the main computer gives an account of emergencies or abnormal running conditions to the system computer, thus allowing the system computer to appropriately deal with such emergencies or abnormal running conditions. When such emergencies or abnormal running conditions are not completely resolved, the main and system computers send information to other main computers around the area of the emergencies or abnormal running conditions.
  • the main computer When the inquiry success ratio is lower than a reference ratio or the vehicle berthing capacity of a terminal is expected to be full, the main computer completely checks the branch guideway 12 so as to inquire into the array structures of both the debarking areas and the main guideway under its jurisdiction. When the element registration ratio is not lower than a reference ratio, the main computer outputs an alarm signal indicative of a busy area to the system computer, thus preventing any expected congestion delays.
  • the system computer Upon receiving such alarm signals from main computers, the system computer monitors the terminals, which refuse the entrance of passengers due to a traffic accident, busy area or construction area. After the monitoring, the system computer sends alarm signals to the main computers associated with the busy terminals. The main computers output alarm signals to the terminals, thus allowing passengers to be informed of such busy conditions prior to using the PRT system. In the event of an unavoidable case such as a complete sellout of available passenger space, the main computer guides passengers to use roundabout courses, wait at the terminal or use other terminals. Of course, the main computer also may reimburse passengers for issued but unused tickets.
  • the element using ratio of the course is somewhat low and so the array structure for such a long course consists of a memory, having an index value, in place of elements.
  • the index value is reduced at every interval so as to register an index value in the array structure when the lowest element of the array structure is equal to the reduced index value.
  • the washing, checking, maintaining, repairing or rescuing work which is performed on the guideway network 1 one or more times a day, is registered in the array structure prior to being practically performed.
  • the vehicle 3 runs along a designated guideway in accordance with a preset course reserved at the start terminal.
  • the guideways of the network 1 individually have a flat bottom regardless of main or branch guideways, thus allowing the vehicles 3 to easily change lanes at lane changing areas where the guideway is free from sidewalls.
  • the vehicles 3 can change lanes or courses under the control of the main computers while running along the guideways.
  • the on-board computer of a vehicle 3 operates a servomotor or a step-motor through a programmed process, thus changing lanes as desired.
  • the vehicle 3 may be accelerated or decelerated by a half interval so as to continuously change the several lanes. In such a case, it is necessary to decelerate or accelerate the vehicle 3 on the final target lane by a half interval, thus allowing the vehicle 3 to set the interval again.
  • the running speed of a PRT vehicle 3 is controlled by a motor controller which is operated by a computer.
  • a motor controller which is operated by a computer.
  • the main computer having jurisdiction over each sectioned area, checks any traffic accidents in response to radio signals output from both the on-board computers and sensors. In the event of a traffic accident, the main computer tries to appropriately deal with the accident. However, when the main computer fails to appropriately deal with the accident, the main computer communicates with the system computer prior to dispatching a restoration team to the area of the accident. Thus, it is possible to shortly restore normal conditions.
  • the number of lanes of each guideway may be freely designed in accordance with a predicted density of travel.
  • the PRT vehicles 3 of this invention may be separately designed to be suitable for moving passengers or goods exclusively.
  • the PRT vehicles 3 for passengers also may be separately designed into 1- passenger vehicles or public passenger vehicles.
  • the present invention provides a computer-based PRT system, which utilizes both course reservation and branch stop technologies and radically solves the various problems experienced in the conventional roadway systems , conventional railway systems and prior art APM or PRT systems.
  • the PRT system of this invention has tunnel-type dedicated guideways located aboveground, groundlevel or underground and is computer- controlled, thus allowing small-sized PRT vehicles to run along the guideways at high speeds without having any congestion delays.
  • the PRT system of this invention thus remarkably increases transit capacity and transit efficiency, provides a comfortable and rapid transit means and radically solves traffic congestion in a large metropolitan region.
  • the small-sized and standardized PRT vehicles allow the guideway network to be easily constructed within a relatively short time in comparison with conventional transit systems, thus reducing construction costs. Since the above PRT system allows the vehicles to run at high speeds without being congestion-delayed, they are, thus, almost completely free from excessive time or fuel consumption due to congestion delays.
  • the guideways of this invention are designed as a tunnel type, thus completely protecting the PRT vehicles from outside weather conditions, such as rain, wind, snow, hail and ice storms.
  • the PRT network of this invention is also preferably used for moving goods at high speeds, thus reducing transportation costs of goods.
  • the above PRT system is also free from any problems of energy consumption or environmental pollution caused by exhaust gases different from conventional transit systems. Particularly, in comparison with a conventional subway system or a known PRT system utilizing an off-line stop technology, the PRT system utilizing both course reservation and branch stop technologies according to the invention remarkably improves the transit capacity and transit efficiency as will be represented in the following table.
  • each branch guideway has approximately 80 parallel platforms which allow 20,000 or more persons to be debarked per 1 hour. Therefore, it is possible to transit 1,440,000 persons per 1 hour when a guideway for a highly travelled route is designed to have 40 lanes.
  • the following table shows advantages of the PRT system of this invention in detail in comparison with a conventional subway and a known PRT system (PRT 2000) utilizing an off-line stop technology.

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Heart & Thoracic Surgery (AREA)
  • Business, Economics & Management (AREA)
  • Primary Health Care (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Traffic Control Systems (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)

Abstract

A PRT (personal rapid transit) system, utilizing both course reservation and branch stop technologies and radically solving the various problems experienced in conventional roadway systems, conventional railway systems and prior art APM or PRT systems, is disclosed. The PRT system of this invention has tunnel-type dedicated guideways (11) located aboveground, groundlevel or underground and is computer-controlled, thus allowing small-sized and standardized PRT vehicles (3) to run along the guideways (11) at high speeds without having any congestion delays. The PRT system thus remarkably increases transit capacity and transit efficiency, provides a comfortable and rapid transit means and radically solves traffic congestion in a large metropolitan region.

Description

PERSONAL RAPID TRANSIT SYSTEM UTILIZING BOTH COURSE RESERVATION AND BRANCH STOP TECHNOLOGIES
Technical Field
The present invention relates, in general, to a PRT (personal rapid transit) system allowing PRT vehicles to run along dedicated guideway networks at high speeds and, more particularly, to a computer-based PRT system utilizing both course reservation and branch stop technologies and having tunnel-type dedicated guideways located aboveground, groundlevel or underground and being computer-controlled, thus allowing small-sized and standardized PRT vehicles to run along the guideways at high speeds without having any congestion delays and thereby radically solving traffic congestion in a large metropolitan region.
Background Art
As well known to those skilled in the art, traditional public transit systems, such as subways and light electric railways running on fixed schedule, are problematic in that they require long station wait times and are less likely to allow passengers to reach their destinations through shortest courses. Another problem experienced in such public transit systems is that the systems force passengers to make a long distance walk so as to transfer from a train to another train at a transfer station, thus being inconvenient to the passengers, especially to people who transfer. In the above transit systems, each train has to be stopped at every station to debark/embark passengers at the stations, thus being delayed and time-consuming. A further problem of the traditional transit systems resides in that a plurality of trains, with a fixed-passenger carrying capacity, require running along the rails regardless of peak or off- peak hours. Therefore, the trains are unoccupied with passengers during off-peak hours and are highly crowded with passengers during peak hours, thus being run inefficiently. Such transit systems also increase construction costs and require a lengthy period of construction time, causing congestion of urban traffic to become worse.
In an effort to overcome the problems experienced in such traditional public transit systems, several types of automated people mover (APM) systems and personal rapid transit (PRT) systems, such as PRT 2000 and Skycar, have been proposed and feasibly tested in some counties of the world. However, such typical APM or PRT systems are problematic in that they are limited in their passenger carrying capacities in comparison with the traditional public transit systems and cause congestion of urban traffic during rush hour. Such known APM or PRT systems utilize an off-line stop technology and have series platforms, thus reducing transit capacity. The above APM or PRT systems do not allow APM or PRT vehicles to change their lanes on the guideways and so each of the APM or PRT vehicles has to run along a dedicated and fixed lane and this remarkably reduces the transit capacity. In addition, the guideways of the above systems consist of one-way paths, thereby forcing vehicles on the guideways to make detours prior to reaching destinations. A further problem experienced in the above APM or PRT systems is that they fail to provide sufficient vehicle storage areas due to both large-sized vehicles and the structural limit of stations .
Disclosure of the Invention
Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and an object of the present invention is to provide a computer-based PRT system, which includes a guideway network consisting of multi-layered guideways located aboveground, groundlevel or underground and is automatically controlled by computers, thus allowing small-sized and standardized PRT vehicles to run along one-way guideways at high speeds without any congestion delays and thereby providing a rapid transit system, having a large passenger carrying capacity and radically solving traffic congestion in a large metropolitan region. Another object of the present invention is to provide a computer-based PRT guideway network, which consists of multi-layered guideways suitable for allowing small-sized and standardized PRT vehicles to effectively start, stop, be branched from and merge with a main guideway, and change lanes through an integrated computer control process, thus allowing the vehicles to run along the guideways at high speeds without having any congestion delays and increasing transit efficiency, and which utilizes both course reservation and branch stop technologies capable of preventing the PRT vehicles from being delayed due to embarking or debarking, and which effectively reduces the loading, unloading and parking areas at stations while maximizing the platform capacity.
A further object of the present invention is to provide a computer-based PRT vehicle, which is equipped with a plurality of sensors, such as running reference line sensors and control signal unit sensors, and is standardized in its width and height, thus being automatically operated on a dedicated PRT guideway network without any human drivers under the control of computers using various sensor signals.
In order to accomplish the above objects, the present invention provides a PRT system utilizing both course reservation and branch stop technologies and comprising a fully coupled PRT guideway network located aboveground, groundlevel or underground. The network includes main and branch guideways, each of which has a rectangular tunnel- shaped cross-section and is arrayed into a two-layered structure with the guideway on each layer being designed to be exclusively used as a one-way path. The branch guideway is branched from the main guideway and extends to a group of terminals. A running reference line is arrayed along the longitudinal center of the ceiling or bottom of each of the main and branch guideways, thus being used as a reference line for PRT vehicles running on the network.
A plurality of control signal units are installed at appropriate positions around the running reference line and are used for outputting control signals for the PRT vehicles running along the guideways. The control signals from the above control signal units indicate reference points of the guideways, designate a desired speed of a vehicle or express the start and end points of a lane changeable area.
Each of the PRT vehicles is standardized in its width and height and includes a running reference line sensor for sensing the running reference line of the PRT network, a control signal unit sensor for sensing a control signal unit of the PRT network, an infrared sensor for sensing any obstacle in front of the vehicle running on the network, a side sensor for sensing side traffic conditions of the vehicle, infrared emitter and receiver for sensing running speeds of vehicles next ahead and behind, and an on-board computer having various programs and data for automatically operating the PRT vehicle on the PRT network.
Brief Description of the Drawings
The above and other objects, features and other advantages of the present invention will be more clearly understood from the following detailed description taken in conjunction with the accompanying drawings, in which:
Fig. 1 is a PRT guideway network in accordance with the preferred embodiment of the present invention; Fig. 2 is a perspective view of the portion "C" of
Fig. 1, showing a four-way intersecting crossing of the
PRT guideway network of this invention;
Fig. 3 is a perspective view of the portion "D" of Fig. 1, showing a three-way crossing of the PRT guideway network of this invention;
Fig. 4 is a plan view of a branch guideway of the PRT guideway network of this invention, showing an arrangement of main and sub-terminals commonly connected to one branch guideway; Fig. 5 is a plan view of a dedicated guideway of the PRT guideway network of this invention, showing an arrangement of both control signal units and a running reference line of the guideway;
Figs. 6A to 6D are plan, front, side and rear views of a computer-based PRT vehicle in accordance with the present invention, respectively; Fig. 7 is a plan view showing the design of a terminal allowing for stopping and starting of vehicles and embarking and debarking of passengers in the PRT guideway network of the present invention; and Fig. 8 is a side view showing the design of a terminal with passenger passages, vehicle berths and multi-layered parking areas according to the present invention.
Best Mode for Carrying Out the Invention
Fig. 1 is a PRT guideway network in accordance with the preferred embodiment of the present invention. As shown in the drawing, the fully coupled PRT network 1 is arrayed into a #-shaped or net-shaped planar network, with a plurality of specifically designed intersecting crossings allowing the PRT vehicles 3 to run at high speeds in every direction at the intersection without being congestion-delayed. Such a PRT network 1 includes a plurality of linear main guideways 11, a plurality of branch guideways 12 and a plurality of terminals 2. Each of the main and branch guideways 11 and 12 has a tunnel- shaped cross-section as will be described later herein. The linear main guideways 11 allow the PRT vehicles 3 to linearly run along at high speeds without being congestion-delayed, while the branch guideways 12 are branched from the main guideways 11 at the crossings and individually extend to a group of terminals 2. The terminals 2, which are located at the terminated points of the branch guideways 12, allow for parking and stopping of the vehicles 3 and embarking and debarking of passengers.
In the above PRT network 1, the main and branch guideways 11 and 12 individually have a rectangular tunnel-shaped cross-section with one ceiling, one bottom and two sidewalls. The tunnel guideways 11 and 12 are arrayed into a two or more-layered structure. That is, on low-density travelled routes, one-lane guideway may be arrayed above another guideway with one lane, thus forming a two-layered guideway. However, on heavily travelled routes, two or more one-lane guideways may be arrayed abreast of each other on each layer, thus forming a two- layered guideway with two or more guideways being arrayed on each layer. Alternatively, each of the guideways may be designed into four or more even numbered layers on such heavily travelled routes. In such multi-layered guideways, the guideway on each layer is designed to be exclusively used as a one-way path, thus being completely free from two-way design.
Each of the main and branch guideways 11 and 12, having a rectangular tunnel-shaped cross-section with one ceiling, one bottom and two sidewalls, has a vehicle guide function allowing trains of PRT vehicles 3 to travel along a dedicated guideway at high speeds without being delayed or obstructed. The tunnel-type guideways 11 and 12 also completely protect the PRT vehicles 3 from outside weather conditions, such as rain, wind, snow, hail and ice storms. Figs 2 and 3 are perspective views of the portions "C" and "D" of Fig. 1, showing a four-way intersecting crossing and a three-way crossing of the PRT network 1, respectively.
As described above, on low-density travelled routes, the PRT network 1 basically has a two-layered structure with the guideway on each layer being used as a one-way path. However, on heavily travelled routes, two or more one-lane guideways may be arrayed abreast of each other on each layer of a two-layered structure or the guideways may be arrayed into four or more even numbered layers, with the guideway on each layer being used as a one-way path. That is, the layout of the network 1 may be changed in accordance with predicted ridership. The bottom of each guideway is flat, thus being suitable for allowing PRT vehicles 3 to easily change lanes at lane changeable areas. In Fig. 2 showing the network 1 having a two- layered guideway structure as an example, two main guideways 11 intersect with each other at right angles and in three dimensions, thus forming a four-way intersecting crossing 13. Due to the two main guideways 11 individually having a two-layered structure, the intersection of the above crossing 13 has a four-layered structure. Such a four-way intersecting crossing 13 allows a PRT vehicle 3 to turn to the left or right in a desired destination. In such a case, the vehicle 3 continues its running speed without being delayed or stopped. Of course, it is necessary to allow the PRT vehicles 3 to run straight ahead at a crossing 13. That is, the PRT vehicles 3 selectively run straight ahead or turn to the left or right without reducing their running speeds at a crossing 13. In order to accomplish the above object, the four-way intersecting crossing 13 is designed to have four arcuate ramps 113, thus having an almost lozenged layout that is defined by the four arcuate ramps 113 at the edges and crosses at the center as best seen in Fig. 2.
While designing the above four-way intersecting crossing 13, the four ramps 113, individually having a two-layered structure, are designed to connect the two intersecting guideways 11, individually having a two- layered structure, to each other and allow a vehicle 3 on any layer of one of the two intersecting guideways 11 to turn to the left or right prior to reaching any layer of another guideway 11. In order to achieve the above object, the top and bottom layers of each of randomly- selected two opposite ramps 113 are designed to be free from intersecting each other, while the top and bottom layers of each of the other two opposite ramps 113' are designed to intersect each other. In a brief description, two of the four ramps have a non-intersecting layer structure, while the other two ramps have an intersecting layer structure.
Due to the four-way intersecting crossing 13 with such specifically designed four ramps 113, a vehicle 3 on any layer of one of the two intersecting guideways 11 effectively runs straight ahead or smoothly turns to the left or right without being delayed or stopped prior to reaching any layer of another guideway 11. In comparison with ramp facilities of a traditional interchange, the ramps 113 of this invention have a larger radius of curvature, thereby rendering a vehicle a smoother and safer turning motion. Another advantage experienced in the above crossing 13 is that the crossing 13 has a simple design suitable for remarkably reducing the facility area, reducing the construction cost and allowing all the crossings of the network 1 to be designed into intersecting crossings.
Referring next to Fig. 3, a two-layered linear main guideway 11 of the PRT network 1 according to this invention may be coupled to two arcuate ramps 113 and 113' at two points, with the two ramps 113 and 113' being branched from one branch guideway 12 at the left or right side of the main guideway 11, thus forming a three-way planar crossing 13' having an almost triangular layout. In the same manner as that described for the four-way intersecting crossing 13, the top and bottom layers of a randomly-selected one ramp 113 of the above three-way crossing 13' are designed to be free from intersecting each other, while the top and bottom layers of the other ramp 113' are designed to intersect each other. In a brief description, one ramp of the three-way crossing 13' has a non-intersecting layer structure, while the other ramp 113* has an intersecting layer structure. Due to the three-way crossing 13' with such specifically designed two ramps 113 and 113', a vehicle 3 on any layer of one of the two guideways 11 and 12 effectively runs without being delayed or stopped prior to reaching any layer of the other guideway. In such a case, the branch guideway 12, branched from the main guideway 11 and extending to a terminal 2, is similar to a main stream entrance or exit path of a conventional roadway system 4. In a long branch guideway 12 without having any ramps 113, it is possible to form the guideway 12 into a two-way layout having a single- layered structure in place of the above-mentioned two- layered structure.
In the PRT guideway network 1 of this invention, the merging area, at which a PRT vehicle 3 from an entrance ramp merges into the main stream of vehicles of a main guideway 11, has to be designed to prevent the PRT vehicle 3 from the ramp 113 from colliding with another vehicle 3 running along the main guideway 11. In order to accomplish the above object, the PRT system of this invention utilizes a course reservation technology capable of reserving an allowed travel space for each and every PRT vehicle passing through merging areas. Such reservations for the merging areas are applied and registered by passengers at start terminals and are managed by a computer so as to allow the vehicles 3 to correctly pass through the merging areas at the reserved times. Therefore, the vehicles 3 smoothly run on the guideway network 1 at high speeds without unexpectedly colliding with each other or having any congestion delays. In the guideway network 1 of this invention, each of the PRT vehicles 3, which exit into the branch guideway 12 from the main guideway 11, goes to one of several terminals 2 and 2 ' commonly connected to the branch guideway 12 and berths at one of a plurality of parallel platforms of a selected terminal, thus loading or unloading passengers at the platform. Therefore, the PRT system of this invention allows several tens of vehicles 3 to berth at the platforms of the terminals of one branch guideway 12 at the same time, thus remarkably increasing the platform capacity.
Fig. 5 is a plan view of a guideway of the PRT guideway network 1 of this invention, showing an arrangement of both control signal units and a running reference line of the guideway. As shown in the drawing, the running reference line 10 is provided on the longitudinal center of the ceiling or bottom of each guideway, thus being used as a reference line for vehicles 3 running along the guideway. Meanwhile, the control signal units 20, which perform the same operational functions as those of a road sign of a conventional roadway system 4, are installed at appropriate positions at opposite sides of the reference line 10. The above running reference line 10, used as a reference line for vehicles 3 running on the guideway network 1, guides and allows PRT vehicles 3 to run along dedicated lanes at high speeds without being unexpectedly diverged from those lanes.
The control signal units 20, which are installed at appropriate positions at opposite sides of the reference line 10, output control signals indicating a reference point that expresses the position of a guideway along which a PRT vehicle 3 runs. The above units 20 also designate an object speed of a vehicle 3 in accordance with guideway conditions and express the running direction of the vehicle 3. Another operation of the units 20 is to inform of the start and end points of a lane changeable area of the network 1 and to control the PRT system using 4000 preset signals.
Fig. 4 is a plan view of a branch guideway 12 of the PRT guideway network 1 of this invention, showing an arrangement of main and sub-terminals commonly connected to the branch guideway 12. In the drawing, the branch guideway 12 is coupled to the main guideway 11 through a three-way interchange 13' as an example. As shown in the drawing, the PRT system of this invention utilizes a branch stop technology. That is, the PRT vehicles 3 exit from a main guideway 11 into a branch guideway 12 through a three-way or four-way crossing 13', 13 prior to approaching a destination terminal. In such a case, the ramps 113 and 113' of this invention have a larger radius of curvature in comparison with ramp facilities of a traditional interchange, thus rendering a vehicle 3 a smoother and safer turning motion and allowing the vehicle 3 to continue its running speed while exiting from the main guideway 11 into the branch guideway 12. Therefore, the vehicles 3 on the main guideway 11 are not congestion- delayed due to embarking/debarking of passengers at the terminals. The terminals 2 and 2' are commonly connected to the branch guideway 12 through their terminal ramps along which vehicles 3 gradually reduce their speeds prior to being completely stopped at the platforms of the terminals .
As the PRT system of this invention utilizes the above-mentioned branch stop technology, the vehicles 3 on the main guideway 11 run at high speeds without being congestion-delayed due to embarking/debarking of passengers at the terminals 2 and 2'. Therefore, the PRT system, utilizing both the course reservation and branch stop technologies, radically overcomes congestion delays due to stopping/parking of vehicles and embarking/debarking of passengers at the terminals, thus remarkably increasing transit capability in comparison with conventional transit systems. Fig. 7 is a plan view showing the design of a terminal 2 allowing for stopping and starting of vehicles 3 and embarking and debarking of passengers in the PRT guideway network 1 of this invention. Fig. 8 is a side view showing the design of a terminal 2 with passenger passages 21, vehicle berths and multi-layered parking areas 22 according to the invention. The terminals of the PRT system of this invention are designed as follows.
In the PRT system of this invention, the terminals 2 are primarily used as PRT vehicle berthing areas for stopping/parking of PRT vehicles and embarking/debarking of passengers. The terminals 2 are secondarily used as PRT vehicle bases for checking, washing, battery changing, repairing and parking of PRT vehicles 3. As shown in Fig. 7, each of the terminal ramps, which is branched from a branch guideway 12 and is terminated at its associated terminal 2, converts its layer structure from a two- layered structure into a single-layered structure at a position around the entrance of a terminal 2. In the terminal ramp having such a single-layered structure, a plurality of one-way paths are arrayed abreast of each other and extend broadwise like the ribs of a hand fan. Therefore, the platforms 23 of the terminal 2 are arrayed abreast like toll collection gates of a conventional roadway system. That is, the berthing area of each terminal 2 of this invention consists of a plurality of parallel platforms 23. The one-way paths from debarking platforms 23 are coupled to their U-turn paths 24, thus guiding the vehicles 3 to embarking platforms 23 or to a parking area 22 for checking, washing, battery changing, repairing and parking of the PRT vehicles 3. Due to such parallel platforms 23, the terminals 2 of this invention remarkably increase the platform capacity. In each terminal 2, the embarking and debarking platforms 23 are coupled to a passenger passage 21 through stairways. In the present invention, it is preferable to commonly connect two platforms 23 to the passenger passage 21 through one stairway, thus reducing the area of the terminal 2. Due to such an arrangement of the platforms 23, the PRT vehicles 3 preferably enter the debarking platforms 23 in the registered priority order of vehicle numbers 1-3-2-4. The vehicles 3 may preferably start from the embarking platforms 23 in the same order as the entrance order. Of course, the priority order of vehicle numbers 3, starting from the embarking platforms 23, may be changed from the above order of 1-3-2-4.
When PRT vehicles 3 unexpectedly fail to reach the debarking platforms 23 at the scheduled times, the entrance order of the vehicles 3 may be reappointed by control signal units 20 which are installed at the entrance of the platforms 23. The above units 20 are designed to be stably operated even in the event of an electricity failure, thus almost completely preventing congestion delays at the terminals 2.
In the terminals 2, the platforms 23 are preferably designed into a switchable type suitable for being changeable between embarking and debarking platforms in accordance with the ratio of loading and unloading capacities. That is, each platform 23 may be used as an embarking platform when it is necessary to provide a loading capacity larger than a previous unloading capacity or as a debarking platform when it is necessary to provide an unloading capacity larger than a previous loading capacity. In order to design the platforms 23 into such a switchable type, the entrance and exit paths for the platforms 23 are coupled to each other through their running reference lines 10, thus freely switching the platforms 23 between the two types of platforms in accordance with the ratio of loading capacity to unloading capacity. The PRT system of this invention thus remarkably increases platform capacities of the terminals 2. In addition, it is possible to designate the vehicle numbers of trains of vehicles 3 so as to allow the trains of vehicles 3 to sequentially start from an embarking platform with time intervals and run along one guideway prior to sequentially stopping at a debarking platform with time intervals, thus remarkably increasing platform capacity.
As shown in Fig. 4, ten or less terminals, which are commonly coupled to one branch guideway 12, include one main terminal 2 ' . Such a main terminal 2 ' has a large- capacity parking area and is coupled to the branch guideway 12 through a three-way crossing 13 ' , thus allowing any empty PRT vehicle 3 to rapidly run between the main terminal 2' and any one of the sub-terminals 2. A main computer is installed in one of the terminals 2 and 2' and is used for controlling the start of vehicles at the terminal, checking empty vehicles, requesting a system computer for empty vehicles, monitoring and controlling the vehicles running on the guideways within its jurisdiction, receiving a reservation for using the merging areas under its jurisdiction, managing the merging areas according to the reserved schedule, judging the existing state of the network 1 in the event of emergencies or abnormal running conditions, and appropriately dealing with the abnormal network 1 by judging results during such emergencies or abnormal running conditions.
The vehicles 3 suitable for running on the PRT guideway network 1 of this invention are specifically designed as will be described hereinbelow.
Figs. 6A to 6D are plan, front, side and rear views of a computer-based PRT vehicle 3 in accordance with the present invention, respectively. As shown in the drawings, the PRT vehicle 3 is specifically designed to effectively and exclusively run on the dedicated PRT guideway network 1 of this invention at high speeds. In order to allow a PRT vehicle 3 to exclusively run on the dedicated network 1 under the control of computers, each of the PRT vehicles 3 is standardized in its width and height. However, the length of the vehicles 3 may be changed in accordance with the type of vehicles classified into freight, individual and public passenger vehicles. The PRT vehicle 3 is also equipped with a plurality of sensors, such as RRL (running reference line) sensors 31 installed at the top or bottom of the vehicle 3 and used for sensing the running reference lines 10 of the network 1 and CSU (control signal unit) sensors 32 used for sensing the control signal units 20 of the network 1. Each of the front and rear ends of the vehicle 3 is provided with both an infrared emitter 35 and an infrared receiver 36. The front and rear infrared emitters 35 of one of trains of vehicles 3 running along a lane emit infrared signals to the infrared receivers 36 of vehicles 3 next ahead and behind, while the front and rear infrared receivers 36 of the vehicle 3 receive infrared signals from the infrared emitters 35 of the vehicles 3 next ahead and behind, thus controlling both the intervals between the three vehicles 3 and a change of running speed. The vehicle 3 also has a plurality of side sensors 34 for sensing side traffic conditions of the vehicle 3. An infrared sensor 33 is provided at the front of the vehicle 3 so as to recognize any obstacle ahead of a travelling vehicle other than the vehicle 3 next ahead. The vehicle 3 also has a radio antenna 37, a modem and an on-board computer. The on-board computer operates both input signals from the sensors 33, 34, 35 and 36 and radio signals from the radio antenna 37 through a programmed process with stored data, thus outputting pulse signals indicating target speed and steering angle of the vehicle 3.
That is, the on-board computer of the above vehicle 3 receives radio-signals from beacons of the network 1 at regular time intervals, thus performing an automated navigation process using input signals from the sensors and radio antenna, programmed data and reserved running course. Therefore, the on-board computer automatically controls the running speed and steering angle of the vehicle 3 and allows the vehicle 3 to automatically move on the network 1 at high speeds and safely reach a reserved destination without any human drivers. The PRT vehicles 3 of this invention are automatically operated on the network 1 under the control of the on-board computers as follows. That is, the LCD screen 38 of the on-board computer of a PRT vehicle 3 continuously displays present time, reserved arrival time, remaining time before arrival and present position of the vehicle 3 in the network 1. While moving on the network 1, a passenger in a vehicle 3 may request permission to change his destination by operating a top-down menu using an arrow key. In addition, the passenger, who is not responsible for driving the vehicle 3, may freely play a game program, watch TV news, stock exchange quotations or moving picture, talk over the phone, listen to music, request permission to use a lay-by or study the geography of a place using the on-board computer.
In the present invention, a changeable battery may be preferably used as a power source for both the propulsion unit and on-board computer of the vehicle 3. In the above PRT vehicle 3, additional sensors are preferably provided at positions between the RRL sensors 31 and the CSU sensors 32 so as to sense the signals from the control signal units 20 even when the RRL sensors 31 of the vehicle 3 are diverged from the running reference line 10. In one train of vehicles 3, the front and rear infrared emitters 35 emit infrared signals to the infrared receivers 36 of vehicles 3 next ahead and behind, while the front and rear infrared receivers 36 receive infrared signals from the infrared emitters 35 of the vehicles 3 next ahead and behind, thus appropriately controlling the intervals between the three vehicles 3 and changing the speed so as to almost completely prevent the trains of vehicles ' 3 on one lane from colliding with each other. When the CSU sensors 32 of a vehicle 3, running on the network 1, receive signals from the control signal units 20, the front and rear infrared emitters 35 of the vehicle 3 output infrared signals to the front and rear areas of the vehicle 3, respectively. When the front and rear infrared receivers 36 of the vehicle 3 receive infrared signals from other vehicles 3 next ahead and behind, the on-board computer calculates a time difference between arrival of vehicles 3 at the control signal units 20 and running speeds, thus calculating the interval between the three vehicles 3.
When the rear infrared receiver 36 of a vehicle 3 receives an infrared signal from the vehicle 3 next behind, the on-board computer outputs a signal, indicating the running speed and normal or abnormal running conditions, to the rear vehicle 3. In such a case, when the vehicle 3 runs along the guideway at a changed speed, the output signal indicates the changed speed through a predetermined method. However, when the vehicle 3 runs along the guideway at a normal speed, the on-board computer outputs pulse signals with regular time intervals as the vehicle 3 passes by the control signal units 20. When the infrared receiver 36 does not receive any signals from the rear, the on-board computer does not output any signals to the rear except for emergencies such as a sudden braking operation. In order to prevent the vehicles 3 from unexpectedly colliding with each other during such emergencies, the braking distances for the vehicles 3 have to be shortened by forming the bottom of the vehicles 3 using rubber or urethan materials.
The vehicle 3 also has two front and two rear side sensors 34 at each side, thus having eight side sensors 34 at both sides. The side sensors 34 are for sensing any side vehicles running along side lanes, thus preventing the vehicle from unexpectedly colliding with another vehicle while changing lanes. The above side sensors 34 also perform a checking operation while a vehicle 3 runs along an entrance ramp for a merging area. During such a checking operation, two of four side sensors 34, individually having a shorter sensing distance, check whether another vehicle 3 runs along the guideway for the target merging area. While the vehicle 3 runs along an entrance ramp for the target merging area, the sensors 34, 35 and 36 check any obstacle in front and rear areas of the vehicle 3 and sense the main stream of vehicles 3 on the main guideway 11. In such a case, the vehicle 3 may be appropriately accelerated or decelerated under the control of the on-board computer, thus being completely prevented from colliding with another vehicle 3 at the merging area.
In order to allow the PRT vehicles 3 to safely merge into the main stream of vehicles on a main guideway 11, two or more vehicle sensors are preferably provided at the ceiling and bottom or both sidewalls of the guideway at a position around each running direction setting point of the network 1. Therefore, it is possible to sense both the running speeds of vehicles 3 and a difference in the times the vehicles 3 pass by the vehicle sensors. When it is checked that a vehicle 3, running along the entrance ramp, may collide with another vehicle 3, running along the main guideway 11, at a merging area, the vehicle sensors control the running speed of the vehicle 3 on the entrance ramp, thus preventing the vehicles 3 from colliding with each other at the merging area. In the present invention, it is preferable to operate the above vehicle sensors using a UPS (unfailure power source). When a PRT vehicle 3 berths at a debarking platform 23 of a terminal 2, the side door of the vehicle 3 is automatically opened to allow passengers to be debarked at the platform 23. Thereafter, the on-board computer of the vehicle 3 communicates with a sub-computer of the terminal through a preset process, thus giving data of the vehicle 3 to the sub-computer and allowing the sub- computer to check the operational conditions of the vehicle 3. When the sub-computer determines that the vehicle 3 requires repairing, the vehicle 3 automatically moves to a parking area 22 of the terminal 2 under the control of the sub-computer. At the parking area 22, the vehicle 3 is subjected to maintenance, such as checking of vehicle conditions, washing, battery changing or element changing. Meanwhile, when the sub-computer determines that the vehicle 3 does not require any repairing, the vehicle 3 runs along a U-turn path 24 of the terminal 2 under the control of the sub-computer prior to berthing at an embarking platform 23. At the embarking platform 23, the on-board computer of the vehicle 3 receives data for a designated running course and checks the completion of embarking and closes the side door of the vehicle 3 prior to starting the vehicle 3 for a reserved destination. While berthing at a debarking platform 23 of a terminal 2, the on-board computer of a vehicle 3 also gives data to the sub-computer of the terminal 2, the data indicating a start terminal number, start time interval, vehicle number, running history of the vehicle, guideway conditions, element conditions, vehicle maintenance period, present voltage of power source battery, discrimination between empty vehicles, freight vehicles and passenger vehicles, and any operational error generated while running on the network 1.
In addition, a radio-beacon monitor station is installed at the main terminal 2, while both a mobile station and a telephone exchange station are installed in the vehicle 3. Therefore, passenger(s) in the vehicles 3 can use TDMA or CDMA-type telecommunication. Such stations also control the vehicles 3 to change their running course while the vehicles 3 run on the network 1. Due to such stations, passenger(s) in a vehicle 3 running on the network 1 can give an account of emergencies or abnormal running conditions to the radio-beacon monitor station and such emergencies or abnormal running conditions can be appropriately dealt with. The PRT guideway network 1 of this invention is equipped with an air conditioning system, while the vehicle 3 is preferably equipped with a HVAC (heating, ventilating and air conditioning) system. Therefore, it is possible to feed appropriate temperature fresh air into the passenger compartments of the vehicles 3 running on the network 1, thus allowing the passengers to feel comfortable.
In the present invention, the propulsion power source for each PRT vehicle 3 may be preferably achieved by an on-board battery as described above. However, it should be understood that the propulsion power source may be achieved by an electric power feeding technology in the same manner as a conventional electric railway system. As a further alternative, the propulsion power source for the PRT vehicle 3 may be achieved by an internal combustion engine. The operational effect of the PRT system utilizing the course reservation and branch stop technologies will be described hereinbelow.
A passenger, who wants to use the PRT system of this invention, selects both his destination and desired embarking/debarking times at a ticketing machine and receives a ticket from the ticketing machine. Thereafter, the passenger inserts the ticket into a ticket collection gate, thus being allowed to board a designated PRT vehicle 3 berthing at an embarking platform 23. During off-peak hours requiring a negligible platform wait time, the ticketing machine may directly designate an embarking platform number for the passenger in place of issuing a ticket. In such a case, the passenger is also allowed to board a PRT vehicle at a designated embarking platform.
After embarking the passenger as described above, the vehicle 3 is controlled by the sub-computer of the terminal 2. That is, the sub-computer communicates with the ticketing machine so as to select the shortest course for the passenger's destination and reserve a vehicle start time. Thereafter, the sub-computer communicates with the main computer of the group of terminals, thus giving data to the main computer. Upon receiving the data from the sub-computer, the main computer secures the reserved course in the network 1 so as to allow the vehicle 3 to be completely free from colliding with another vehicle while running along the course. The main computer confirms and registers the start time, reserved course and method of passing through the sectioned areas of the course prior to sending data to the sub-computer. Upon receiving the data from the main computer, the sub- computer communicates with the on-board computer of the vehicle 3 through an optical, radio or cable communication. After the communication, the sub-computer confirms the communicated data again.
When the passenger embarking and the data communication between the main, sub and on-board computers are completely accomplished, preparation for vehicle starting is finished. After finishing preparation for vehicle starting, a front sensor covering panel is removed from the platform at the reserved start time, while the on-board computer receives an accelerating signal or a start signal from the sub-computer, thus starting the vehicle 3 for the reserved destination. In such a case, the on-board computer may be operated by a battery. The vehicle 3 from the embarking platform 23 of a terminal 2 runs along a branch guideway 12 prior to merging into the main stream of vehicles on a main guideway 11 for the destination.
As known to those skilled in the art, AGT (automatic guideway transit) vehicles are operated without any human drivers, thus utilizing a longitudinal lane running technology. The PRT vehicle 3 of this invention also utilizes such a longitudinal lane running technology and runs on the guideway network 1 at high speeds under the control of computers as will be described hereinbelow. That is, the PRT vehicle 3 runs along the main and branch guideways 11 and 12 while sensing the running reference line 10 of the network 1 using the RRL sensors 31. While running along the guideways, the RRL sensors 31 may be somewhat diverged from the reference line 10 due to acceleration force and/or inertia force acting on the vehicle 3. However, such a divergence from the reference line 10 may be corrected by a motor controller, which controls the steering angle of the vehicle 3 and allows the vehicle 3 to run along the reference line 10 without failure. In the network 1, each sectioned area of a guideway is divided into a plurality of sub-sections in lane change areas, such as branching areas, merging areas and other lane changing areas. The above sub-sections are designated by different reference numbers and individually have one merging area. Each of the sub-sections comprises of a plurality of intervals, each of which refers to the length of time one train of vehicles 3, running along a main guideway at normal speeds and normal intervals, spends until it reaches a position of a vehicle next ahead. At the merging area of each sub-section of the PRT network 1, there may be no vehicle, one vehicle running from a left entrance ramp or one vehicle from a right entrance ramp at every interval, thus allowing the PRT vehicles 3 to use the merging area in accordance with reserved priority at every interval.
The main computer, which is installed at a facility of 10 or less terminals 2 commonly connected to the same branch guideway 12 and is used for controlling the terminals 2, is coupled to both the system computer and the other main computers. The above main computers set a clock by the synchronous time signal(s), which is periodically output from the system computer one or more times a day. The main computers thus synchronize with each other and control the vehicle start time and individually have jurisdiction over a sectioned area of the network 1, which consists of a plurality of subsections. Each of the above main computers controls all the sub-sections under its jurisdiction using a section array structure at every interval and performs inquiry, reservation, registration and cancellation.
In the event of a small system capacity, it is possible to equip the network 1 with one system computer, which is a large capacity super computer or a parallel- type vector processor, thus allowing the system computer to keep, manage and use the information about the section array structure. However, in the event of a large system capacity, a computer has to be installed at each of the terminals so as to properly control the vehicles. In such a case, the computers of the terminals have to be coupled to each other through a communication network.
The main computers are coupled to each other through a communication network and are also coupled to associated sub-computers. Each of the main computers selects several start intervals, at each of which a vehicle 3 is scheduled to pass through a branch guideway 12 or merge into the main stream of vehicles on a main guideway 11. After selecting the several start intervals, the main computer sends data of the selected start intervals to another main computer having jurisdiction over the next sectioned area, thus requesting permission to pass through the next sectioned area without being obstructed. Due to such a communication between the main computers, the main computer of the start terminal 2 finally determines one of the selected start intervals at which the vehicle 3 can start and run through the sectioned areas from the start terminal to the last sectioned area under the jurisdiction of the main computer of the destination terminal 2. The finally selected start interval is registered and reserved in the main computers which have jurisdiction over the sectioned areas from the start to the last terminals. Therefore, the vehicle 3 leaves the start terminal at the finally selected start interval and safely passes through the merging areas at the reserved times.
During such an inquiry of possible start intervals, the data signals may be erased by a main computer before the vehicle 3 reaches its destination. In such a case, the main computer, erasing the data signals, sends erasion particulars to the main computer of the start terminal through the system computer. Upon receiving the erasion particulars, the main computer of the start terminal either changes the course to a second or third shortest course in accordance with the erasion particulars or changes the start intervals to other intervals prior to performing an inquiry of the intervals.
At every sectioned area, the area passing course at every branching point is expressed by data indicating priority of vehicles to pass through the branching point. When the main computer of the start terminal registers the area passing course and finally determines the starting time, the main computer sends data to the sub-computer of a terminal at which the vehicle 3 berths. Upon receiving the data from the main computer, the sub- computer sends the data to the on-board computer of the vehicle 3, thus allowing the vehicle 3 to appropriately start at a reserved start time and safely run along the reserved course. When the vehicle 3 runs along the reserved course of the network 1, the on-board computer compares the practical passing interval with a reserved interval at every reference point so as to correct the passing interval, thus allowing the vehicle 3 to safely pass through the merging areas at the reserved times.
The data, stored in each element of the section array structure, is shifted at every interval. Therefore, when the vehicle 3 reaches the first point of a sectioned area, the data is shifted from the prior element into the next element and is erased when the vehicle 3 completely passes through the sectioned area. The main computer checks the running conditions of the vehicles 3 running along the guideways 11 within the sectioned area under its jurisdiction. The main computer may control the running speeds of the vehicles 3 in the event of emergencies or abnormal running conditions. When the main computer fails to appropriately control the vehicles 3 in the event of such emergencies or abnormal running conditions, the main computer gives an account of emergencies or abnormal running conditions to the system computer, thus allowing the system computer to appropriately deal with such emergencies or abnormal running conditions. When such emergencies or abnormal running conditions are not completely resolved, the main and system computers send information to other main computers around the area of the emergencies or abnormal running conditions.
When the inquiry success ratio is lower than a reference ratio or the vehicle berthing capacity of a terminal is expected to be full, the main computer completely checks the branch guideway 12 so as to inquire into the array structures of both the debarking areas and the main guideway under its jurisdiction. When the element registration ratio is not lower than a reference ratio, the main computer outputs an alarm signal indicative of a busy area to the system computer, thus preventing any expected congestion delays.
Upon receiving such alarm signals from main computers, the system computer monitors the terminals, which refuse the entrance of passengers due to a traffic accident, busy area or construction area. After the monitoring, the system computer sends alarm signals to the main computers associated with the busy terminals. The main computers output alarm signals to the terminals, thus allowing passengers to be informed of such busy conditions prior to using the PRT system. In the event of an unavoidable case such as a complete sellout of available passenger space, the main computer guides passengers to use roundabout courses, wait at the terminal or use other terminals. Of course, the main computer also may reimburse passengers for issued but unused tickets.
In the event of a long course with the element registration ratio being not higher than 20 - 30 %, the element using ratio of the course is somewhat low and so the array structure for such a long course consists of a memory, having an index value, in place of elements. The index value is reduced at every interval so as to register an index value in the array structure when the lowest element of the array structure is equal to the reduced index value. In addition, the washing, checking, maintaining, repairing or rescuing work, which is performed on the guideway network 1 one or more times a day, is registered in the array structure prior to being practically performed.
In the network 1, the vehicle 3 runs along a designated guideway in accordance with a preset course reserved at the start terminal. The guideways of the network 1 individually have a flat bottom regardless of main or branch guideways, thus allowing the vehicles 3 to easily change lanes at lane changing areas where the guideway is free from sidewalls. In the PRT network 1 of this invention, the vehicles 3 can change lanes or courses under the control of the main computers while running along the guideways.
In order to change lanes at a lane changeable area, the on-board computer of a vehicle 3 operates a servomotor or a step-motor through a programmed process, thus changing lanes as desired. In order to continuously change several lanes, it is necessary to allow an opening in the target lanes for the vehicle to move into at the lane change time. In the event of an unavoidable case, the vehicle 3 may be accelerated or decelerated by a half interval so as to continuously change the several lanes. In such a case, it is necessary to decelerate or accelerate the vehicle 3 on the final target lane by a half interval, thus allowing the vehicle 3 to set the interval again. Since all the vehicles 3, running on the network 1, synchronize with each other, the vehicles 3 on several lanes are positioned abreast of each other while they run along their lanes and trains of vehicles 3 on one lane are spaced apart from each other at regular intervals. In order to allow the vehicles 3 to run on the network 1 in the manner as described above, it is necessary to control the start timing and recognize and correct the speed control signals output from the control signal units which are installed at points corresponding to the integral numbered times of the interval.
The running speed of a PRT vehicle 3 is controlled by a motor controller which is operated by a computer. In addition, it is necessary to increase the number of lanes so as to prevent congestion delays at expected bottleneck areas, such as branching areas, slope areas or turning areas where the vehicles 3 have to reduce their speeds and are individually prevented from smoothly passing through within a preset interval. The main computer, having jurisdiction over each sectioned area, checks any traffic accidents in response to radio signals output from both the on-board computers and sensors. In the event of a traffic accident, the main computer tries to appropriately deal with the accident. However, when the main computer fails to appropriately deal with the accident, the main computer communicates with the system computer prior to dispatching a restoration team to the area of the accident. Thus, it is possible to shortly restore normal conditions.
In the guideways 11 and 12 of the PRT network 1 of this invention, the number of lanes of each guideway may be freely designed in accordance with a predicted density of travel. In addition, the PRT vehicles 3 of this invention may be separately designed to be suitable for moving passengers or goods exclusively. The PRT vehicles 3 for passengers also may be separately designed into 1- passenger vehicles or public passenger vehicles.
Industrial Applicability
As described above, the present invention provides a computer-based PRT system, which utilizes both course reservation and branch stop technologies and radically solves the various problems experienced in the conventional roadway systems , conventional railway systems and prior art APM or PRT systems. The PRT system of this invention has tunnel-type dedicated guideways located aboveground, groundlevel or underground and is computer- controlled, thus allowing small-sized PRT vehicles to run along the guideways at high speeds without having any congestion delays. The PRT system of this invention thus remarkably increases transit capacity and transit efficiency, provides a comfortable and rapid transit means and radically solves traffic congestion in a large metropolitan region.
In accordance with the PRT system of this invention, the small-sized and standardized PRT vehicles allow the guideway network to be easily constructed within a relatively short time in comparison with conventional transit systems, thus reducing construction costs. Since the above PRT system allows the vehicles to run at high speeds without being congestion-delayed, they are, thus, almost completely free from excessive time or fuel consumption due to congestion delays.
Due to the small-size and standardization of the PRT vehicles, the dedicated guideways do not require any large facility area. The guideways of this invention are designed as a tunnel type, thus completely protecting the PRT vehicles from outside weather conditions, such as rain, wind, snow, hail and ice storms. The PRT network of this invention is also preferably used for moving goods at high speeds, thus reducing transportation costs of goods. The above PRT system is also free from any problems of energy consumption or environmental pollution caused by exhaust gases different from conventional transit systems. Particularly, in comparison with a conventional subway system or a known PRT system utilizing an off-line stop technology, the PRT system utilizing both course reservation and branch stop technologies according to the invention remarkably improves the transit capacity and transit efficiency as will be represented in the following table.
In the PRT network of this invention, each branch guideway has approximately 80 parallel platforms which allow 20,000 or more persons to be debarked per 1 hour. Therefore, it is possible to transit 1,440,000 persons per 1 hour when a guideway for a highly travelled route is designed to have 40 lanes. The following table shows advantages of the PRT system of this invention in detail in comparison with a conventional subway and a known PRT system (PRT 2000) utilizing an off-line stop technology. TABLE
compare item pre-condition subway PRT(PRT2000) branch stop PRT
platform 1 station 2,000 720 24,000 capacity 1 branch psn/Hr psn/Hr psn/Hr headway normal operation 120 sec 2.5 sec 0.1 sec moving liner line 40km/Hr 40km/Hr 120 m/Hr velocity line at rush hour 40,000psn/Hr l,440psn/Hr I,440,000psn/Hr capacity 2,000psn x 1.2psn x lpsn x 36000
20times 1200 imes times x 0lane construction ' 97 year βOmillion 15million/km 2million/km cost constancy price /km construction 30km 3~8 year 0.5~2 year 0.3~1 year period construction accessibility distance to 500 m 400 m 80 m the nearest station capacity center:outskirt impossible impossible possible variable = railway = 1 lane = 2~60 lane cross section cross section 10xl0=100m: 4x5=2 Om2 3~100m2 ticket price price/lOkm 500 dollar 1 , 000 doller 200 dollar
Although the preferred embodiments of the present invention have been disclosed for illustrative purposes , those skilled in the art will appreciate that various modifications , additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims .

Claims

Claims :
1. A personal rapid transit (PRT) system, utilizing both course reservation and branch stop technologies and comprising: a fully coupled PRT guideway network located aboveground, groundlevel or underground, said network including: at least two main guideways individually having a rectangular tunnel-shaped cross-section and being arrayed into a two-layered structure with the guideway on each layer being designed to be exclusively used as a oneway path; and a branch guideway branched from each of said main guideways and extending to a group of terminals, said branch guideway having the same structure and configuration as those of said main guideway; and a PRT vehicle dedicated to automatically run on said network without having any human drivers, said vehicle being freely designed into a 1-passenger vehicle, public vehicle or freight vehicle.
2. The PRT system according to claim 1, wherein said PRT guideway network further comprises : a running reference line arrayed along the longitudinal center of the ceiling or bottom of each of the main and branch guideways, thus being used as a reference line for PRT vehicles running on the network; a control signal unit installed at an appropriate position around said running reference line and adapted for outputting control signals for PRT vehicles running on the network, said control signals indicating reference points of the guideways, designating a desired speed of the vehicle or expressing the start and end points of a lane changeable area; and a three-way or four-way crossing provided at a branching area between the guideways, said three-way crossing being designed to have two arcuate ramps, thus having an almost triangular layout, and said four-way crossing being designed to have four arcuate ramps, thus having an almost lozenged layout defined by the four arcuate ramps at its outer edges and crossing at the center.
3. The PRT system according to claim 1, wherein the group of terminals are commonly connected to one branch guideway and include a main terminal, provided with a large-capacity parking area, and a plurality of sub- terminals, thus allowing an empty PRT vehicle to rapidly run between the main terminal and any one of the sub- terminals, each of said main and sub-terminals having a plurality of parallel platforms and a parking area and being equipped with one main computer and a plurality of sub-computers, said main and sub-computers of the terminals being coupled to each other, thus automatically managing the PRT system using a preset program capable of controlling a plurality of sensors and PRT system.
4. The PRT system according to claim 1, wherein said PRT vehicle is standardized in its width and height and includes : a running reference line sensor used for sensing a running reference line of the PRT guideway network; a control signal unit sensor used for sensing a control signal unit of the PRT guideway network; an infrared sensor used for sensing any obstacle ahead of the vehicle running on the network; a side sensor used for sensing side traffic conditions of the vehicle; an infrared emitter and an infrared receiver, both being used for sensing running speeds of vehicles next ahead and behind; and an on-board computer having various programs and data for automatically operating the PRT vehicle on the PRT guideway network.
5. The PRT system according to claim 1 or 2 , wherein a computer reserves an allowed travel space for each and every PRT vehicle passing through merging areas of the PRT guideway network and allows the PRT vehicle to start after completing a reservation for the merging areas in a designated course of the vehicle, thus allowing the vehicle to pass through the merging areas at the reserved times without failure.
6. The PRT system according to claim 3, wherein each of said platforms is designed into a switchable type suitable for being selectively used as an embarking or debarking platform in accordance with the ratio of loading and unloading capacities.
PCT/KR1997/000251 1996-12-02 1997-12-01 Personal rapid transit system utilizing both course reservation and branch stop technologies WO1998024673A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP10525470A JP2000510269A (en) 1996-12-02 1997-12-01 Individual track transportation system using route reservation method and branch stop method
US09/308,979 US6318274B1 (en) 1996-12-02 1997-12-01 Guideway transit system
EP97947213A EP0941189A1 (en) 1996-12-02 1997-12-01 Personal rapid transit system utilizing both course reservation and branch stop technologies
AU52350/98A AU5235098A (en) 1996-12-02 1997-12-01 Personal rapid transit system utilizing both course reservation and branch stop technologies
CA002273057A CA2273057A1 (en) 1996-12-02 1997-12-01 Personal rapid transit system utilizing both course reservation and branch stop technologies

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1019960061002A KR100250021B1 (en) 1996-12-02 1996-12-02 Personal rapid transit
KR1996/61002 1996-12-02

Publications (1)

Publication Number Publication Date
WO1998024673A1 true WO1998024673A1 (en) 1998-06-11

Family

ID=19485406

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR1997/000251 WO1998024673A1 (en) 1996-12-02 1997-12-01 Personal rapid transit system utilizing both course reservation and branch stop technologies

Country Status (8)

Country Link
US (1) US6318274B1 (en)
EP (1) EP0941189A1 (en)
JP (1) JP2000510269A (en)
KR (1) KR100250021B1 (en)
CN (1) CN1102119C (en)
AU (1) AU5235098A (en)
CA (1) CA2273057A1 (en)
WO (1) WO1998024673A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6668729B1 (en) * 2002-08-21 2003-12-30 Bryan Richards Transit system
US6935244B2 (en) 2000-07-11 2005-08-30 Alexander Lechner Transport system
GB2427709A (en) * 2005-06-24 2007-01-03 Advanced Transp Systems Ltd Movement control for a vehicle in a personal rapid transit system.
US8006625B2 (en) 2005-04-15 2011-08-30 Nanzheng Yang Tube car, network of tubes, personal transport system, and control system and control method thereof
CN102328660A (en) * 2011-07-04 2012-01-25 张宁 Independent synchronous rail transit

Families Citing this family (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4463445B2 (en) * 2001-07-24 2010-05-19 本田技研工業株式会社 Work transfer time calculation method and work transfer system
CA2454981A1 (en) * 2001-07-24 2003-02-06 Honda Giken Kogyo Kabushiki Kaisha Method of and system for transporting workpieces
CN1463876A (en) * 2002-06-07 2003-12-31 杨南征 Microlight-type elevated automation railway traffic system
US7409286B2 (en) * 2002-06-24 2008-08-05 Jorge Osvaldo Ambort Application for diminishing or avoiding the unwanted effects of traffic congestion
CN100408401C (en) 2002-06-26 2008-08-06 杰里·M·罗恩 System of mass transit
US8560223B2 (en) 2002-08-29 2013-10-15 Mapquest, Inc. Automated route determination
KR100472225B1 (en) * 2002-09-23 2005-03-10 Terminal for Guideway transit system
US20040262940A1 (en) * 2003-01-10 2004-12-30 Johnson Robert E. Small driverless passenger vehicles and systems, and methods for using such vehicles
CN1309605C (en) * 2003-01-30 2007-04-11 沈湧 Rail transportation system of small vehicle
US20040225421A1 (en) * 2003-05-05 2004-11-11 Hengning Wu Personal transportation system
FI116518B (en) * 2003-08-07 2005-12-15 Ecotaxi Oy Arrangements in an automatic transport system
FI116515B (en) * 2003-08-07 2005-12-15 Ecotaxi Oy Energy supply arrangement in an automatic transport system
KR20040096926A (en) 2004-10-08 2004-11-17 박태진 Flat Terminal for Guideway Transit System
US20080098923A1 (en) * 2004-10-08 2008-05-01 Park Tae-Jin Flat Terminal for Guideway Transit System
US20060201376A1 (en) * 2005-03-04 2006-09-14 Georges Brigham Transportation system with increased capacity
PL236153B1 (en) * 2005-04-04 2020-12-14 Olgierd Mikosza Method for the mass transport of people and goods, particularly in big-city areas and the transport infrastructure to implement this method
CN100519288C (en) * 2007-08-25 2009-07-29 李荣生 Pipe logistics conveying device
JP5148318B2 (en) * 2008-02-26 2013-02-20 株式会社日立製作所 Expressway vehicle transport equipment and automobile vehicles using the same
KR101518506B1 (en) * 2008-05-26 2015-05-07 주식회사 포스코 Method and System for Merge control in an automated vehicle system
US8146508B2 (en) * 2008-10-08 2012-04-03 Patrick Joseph Flynn Pneumatic mass transportation system
US8483895B1 (en) 2009-02-25 2013-07-09 James J. Beregi Transportation system, system components and process
KR101130807B1 (en) * 2009-12-17 2012-03-28 한국철도기술연구원 Vacuum sectional management system and vacuum blocking screen device for the tube railway
US20110218835A1 (en) * 2010-03-02 2011-09-08 International Business Machines Corporation Changing priority levels within a controllable transit system
US10956999B2 (en) 2010-03-02 2021-03-23 International Business Machines Corporation Service class prioritization within a controllable transit system
GB2482119B (en) 2010-07-19 2013-01-23 China Ind Ltd Racing vehicle game
KR101145645B1 (en) 2010-10-20 2012-05-24 한국철도기술연구원 A method to transmit the state information of vehicles and infrastructures for personal rapid transit system
KR101189382B1 (en) 2010-10-27 2012-10-10 주식회사 포스코아이씨티 System for Emulating Personal Rapid Transit System and Method for Operating That System
CN103863362B (en) * 2012-12-12 2016-08-31 南京天铁自动化技术有限公司 The travelling-crane method of the PRT system of PRT system and quasi-moving block
US9610948B2 (en) 2015-03-04 2017-04-04 General Electric Company Movement detection system and method
CN106553656B (en) * 2016-04-22 2018-07-24 宁波市鄞州乐可机电科技有限公司 A kind of means of transportation
CN106541949B (en) * 2016-08-09 2018-10-09 宁波市鄞州乐可机电科技有限公司 A kind of means of transportation
CN106541950B (en) * 2016-08-12 2018-07-10 宁波市鄞州乐可机电科技有限公司 A kind of urban transportation facility
JP6620707B2 (en) * 2016-09-09 2019-12-18 株式会社ダイフク Goods transport equipment
CN107555109B (en) * 2017-10-09 2024-03-22 长沙修恒信息科技有限公司 Tree-shaped track for tubular logistics system
US11760391B2 (en) 2017-10-25 2023-09-19 Swift Rails Llc Intelligent transportation system and method
CN108001459B (en) * 2017-12-08 2023-09-08 杭州久智自动化技术有限公司 Rail car access structure
BR102019007042A2 (en) * 2019-04-05 2020-10-20 Manoel Neto HIGH SPEED AUTONOMOUS RAIL TRANSPORT MODAL
CN116189427B (en) * 2023-01-12 2024-05-28 东风悦享科技有限公司 PRT-based movable site transfer method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3118392A (en) * 1964-01-21 Automatic vehicular monorail system
US3790779A (en) * 1970-10-06 1974-02-05 Secretary Environment Brit Vehicle control apparatus
US3790780A (en) * 1971-03-26 1974-02-05 Messerschmitt Boelkow Blohm Method and means for varying the speeds of vehicles moving along a track
DE1413005B2 (en) * 1958-02-10 1975-01-23 Heidt, Hugo, 4000 Duesseldorf Fully automatic controlled path
US3941201A (en) * 1972-08-01 1976-03-02 Messerschmitt-Bolkow-Blohm Gmbh Traffic merging method and means
DE4118205A1 (en) * 1991-06-04 1992-12-10 Gerd Dipl Ing Riepe Tracked traffic to convey passengers and goods - has crossing free through routes and feeder routes, and individually driven cabins on tracks
DE4241677A1 (en) * 1992-12-11 1994-06-16 Harald Hauschild Aerial railway for conurbations - Has computer-controlled set of private and public electrically-driven cabins with emergency controls and speed-dependent warning systems

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2188293A (en) * 1937-04-29 1940-01-23 Allison R Willams Automatic vehicle control system
US3638751A (en) * 1969-04-21 1972-02-01 Maschf Augsburg Nuernberg Ag Apparatus for automatically steering powered vehicles
US3668624A (en) * 1969-11-20 1972-06-06 Novatek Inc Method and apparatus for vehicle control and guidance
US3648228A (en) * 1970-02-09 1972-03-07 Bendix Corp Control system for vehicles
US3570407A (en) * 1970-04-07 1971-03-16 Clark Equipment Co Automatic vehicle control system
US3675584A (en) * 1970-06-01 1972-07-11 Alden Self Transit Syst Transportation system
US3898652A (en) * 1973-12-26 1975-08-05 Rashid Mary D Vehicle safety and protection system
DE3224429A1 (en) * 1982-06-30 1984-01-12 Horst 6338 Hüttenberg Hellwig PLAN-FREE NODE POINTS
US4841871A (en) * 1984-04-19 1989-06-27 Leibowitz Martin Nick Modular transportation system with aerodynamic lift augmented traction vehicles
SE510567C2 (en) * 1990-09-13 1999-06-07 Stig Aby Methods and apparatus for controlling railway taxi wagons
US5846020A (en) * 1997-06-26 1998-12-08 Mckeown; Kevin Pre-fabricated multi-level roadway structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3118392A (en) * 1964-01-21 Automatic vehicular monorail system
DE1413005B2 (en) * 1958-02-10 1975-01-23 Heidt, Hugo, 4000 Duesseldorf Fully automatic controlled path
US3790779A (en) * 1970-10-06 1974-02-05 Secretary Environment Brit Vehicle control apparatus
US3790780A (en) * 1971-03-26 1974-02-05 Messerschmitt Boelkow Blohm Method and means for varying the speeds of vehicles moving along a track
US3941201A (en) * 1972-08-01 1976-03-02 Messerschmitt-Bolkow-Blohm Gmbh Traffic merging method and means
DE4118205A1 (en) * 1991-06-04 1992-12-10 Gerd Dipl Ing Riepe Tracked traffic to convey passengers and goods - has crossing free through routes and feeder routes, and individually driven cabins on tracks
DE4241677A1 (en) * 1992-12-11 1994-06-16 Harald Hauschild Aerial railway for conurbations - Has computer-controlled set of private and public electrically-driven cabins with emergency controls and speed-dependent warning systems

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6935244B2 (en) 2000-07-11 2005-08-30 Alexander Lechner Transport system
US6668729B1 (en) * 2002-08-21 2003-12-30 Bryan Richards Transit system
US8006625B2 (en) 2005-04-15 2011-08-30 Nanzheng Yang Tube car, network of tubes, personal transport system, and control system and control method thereof
EP2363332A3 (en) * 2005-04-15 2012-08-01 YANG, Nanzheng Tube car, network of tubes, personal transport system, and control system and control method thereof
GB2427709A (en) * 2005-06-24 2007-01-03 Advanced Transp Systems Ltd Movement control for a vehicle in a personal rapid transit system.
GB2427709B (en) * 2005-06-24 2009-03-25 Advanced Transp Systems Ltd Movement control method
CN102328660A (en) * 2011-07-04 2012-01-25 张宁 Independent synchronous rail transit

Also Published As

Publication number Publication date
CN1102119C (en) 2003-02-26
KR100250021B1 (en) 2000-03-15
AU5235098A (en) 1998-06-29
KR19980043219A (en) 1998-09-05
US6318274B1 (en) 2001-11-20
EP0941189A1 (en) 1999-09-15
CN1239456A (en) 1999-12-22
JP2000510269A (en) 2000-08-08
CA2273057A1 (en) 1998-06-11

Similar Documents

Publication Publication Date Title
US6318274B1 (en) Guideway transit system
US7047888B2 (en) Transit system
KR101463250B1 (en) Method for platooning of vehicles in an automated vehicle system
US5797330A (en) Mass transit system
US8146506B2 (en) Active rail transport system
CN101905702B (en) Rail transportation system with wireless network control
US20090299563A1 (en) Method of mass transfortation of people or cargo, especially within city areas and a transport infrastructure for the implementation of this method
US10562529B2 (en) Automatic transport system
WO2004068438A1 (en) Mini-vehicle track traffic system
JP2000264210A (en) Vehicle traffic system
US20130327244A1 (en) Autonomous moving highway
WO2023198134A1 (en) High-speed bus public transport system based on composite specially-shaped flange track
US6389982B1 (en) Transport system
JP3364901B2 (en) How to use the runway
CN101550667B (en) Control method of integrated setting of on-board and off-board stop station of bus and taxi
JP3604943B2 (en) Vehicle traffic system
CN114523991A (en) Station arrangement structure and method for running urban train by using existing single-track railway
CN112498422B (en) Multi-type combined transport rail transport system
CN100457517C (en) Single person carriage elevated track train traffic system
JP4202990B2 (en) A complex transportation system that preserves the environment in business areas
CN109537373B (en) High-speed rail
JP4522804B2 (en) A complex transportation system that preserves the environment in the Bedtown area
CN115288499B (en) Station structure of rapid transit system
JP2000264208A (en) Vehicle traffic system
Ishii et al. CVS: computer-controlled vehicle system

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 97180259.9

Country of ref document: CN

AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GE GH HU IL IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT UA UG US UZ VN YU ZW AM AZ BY KG KZ MD RU TJ TM

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH KE LS MW SD SZ UG ZW AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 2273057

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 09308979

Country of ref document: US

ENP Entry into the national phase

Ref document number: 1998 525470

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 1997947213

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1997947213

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWR Wipo information: refused in national office

Ref document number: 1997947213

Country of ref document: EP

WWW Wipo information: withdrawn in national office

Ref document number: 1997947213

Country of ref document: EP