US3682259A - Rod stacking and handling apparatus - Google Patents
Rod stacking and handling apparatus Download PDFInfo
- Publication number
- US3682259A US3682259A US27930A US3682259DA US3682259A US 3682259 A US3682259 A US 3682259A US 27930 A US27930 A US 27930A US 3682259D A US3682259D A US 3682259DA US 3682259 A US3682259 A US 3682259A
- Authority
- US
- United States
- Prior art keywords
- girder
- pulley block
- control
- derrick
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005553 drilling Methods 0.000 claims abstract description 30
- 230000033001 locomotion Effects 0.000 claims abstract description 26
- 230000008054 signal transmission Effects 0.000 claims description 19
- 125000004122 cyclic group Chemical group 0.000 claims description 2
- 238000009877 rendering Methods 0.000 claims description 2
- 230000004044 response Effects 0.000 claims description 2
- 230000000712 assembly Effects 0.000 abstract description 7
- 238000000429 assembly Methods 0.000 abstract description 7
- 230000007246 mechanism Effects 0.000 description 29
- 230000004913 activation Effects 0.000 description 22
- 238000006073 displacement reaction Methods 0.000 description 19
- 238000010586 diagram Methods 0.000 description 10
- 230000003213 activating effect Effects 0.000 description 9
- 230000009471 action Effects 0.000 description 7
- 230000008901 benefit Effects 0.000 description 5
- 238000012546 transfer Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 239000012530 fluid Substances 0.000 description 4
- 238000005286 illumination Methods 0.000 description 3
- 230000000994 depressogenic effect Effects 0.000 description 2
- 238000009795 derivation Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000881 depressing effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001483 mobilizing effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 229910052718 tin Inorganic materials 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/20—Combined feeding from rack and connecting, e.g. automatically
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/15—Racking of rods in horizontal position; Handling between horizontal and vertical position
- E21B19/155—Handling between horizontal and vertical position
Definitions
- Control means are provided [56] Reiemnces Cited for the girder, the derrick and their assemblies, and a switching circuit is provided to connect said control UNITED STATES PATENTS means and to control the movement of the girder, the 3,280,920 10/1966 Scott ..214/2.5 demck and mmbhes' 2,643,005 6/1953 Jarnett ..2l4/2.5 10 Claims, 20 Drawing figures PATENTED F 8 3.682 259 SHEET 1 [IF 9 PATENTEDMIF BIHTZ 3.682 259 sum 2 0f 9 PATENTEDMIB 8'97?
- This invention relates to automatic rod stacking and handling apparatus, especially for drilling in the ocean, in which the rods are transferred to a derrick by means of a tipping girder, the entire assembly being designed to constitute a rapid and reliable automatic system.
- the systems using a tipping girder for the transfer of rods from a horizontal position to a vertical position situated in the axis of the drill hole require a radical change in conventional derricks so as to prevent the loss of time which would result from having to raise the conventionally designed handling pulley block prior to bringing up a new rod.
- the rod must be centered automatically and must be raised or lowered automatically by means of a special lifting head, with an automatic key of a novel type assuring the maintenance of the train of rods during the screwing or unscrewing of the rod that is being held. This then leads to a rather cumbersome and awkward solu- IIOI'I.
- the system using the pulley block of the derrick to move the rod from a horizontal position into a vertical position is worthwhile in that none of the conventional members of the derrick is in any way afi'ected, but it does entail the inconvenience of mobilizing the pulley block, which in turn leads to a major loss of time, particularly every time the drilling tool must be changed.
- this solution entails the inconvenience of having to control the complex movement and supplying energy to the mechanical members carried on such a girder.
- the systems for lining up the rods in a horizontal position are more or less adapted to the automatic pick up of rods with the help of a tipping girder and do not lend themselves to flexible, reliable, and rapid transfer automation.
- the primary object of this invention consists of a rapid, economical, and highly reliable system, characterized by the fact that it involves, in combination: (a) a derrick including, in addition to the maneuvering arms, the pulley block, the elevator and its collar, a holding means, and a means for moving the pulley block outside the drilling axis, the pulley block being capable of shifting vertically in its new position; and (b) a girder tipping around the horizontal axis including retractable means for grasping a rod in order to move it from a horizontal position into a vertical position and vice versa, one of said grasping means involving a locking mechanism capable of grasping the rod in order to move it perpendicularly to the axis of the girder.
- Another object of the invention is a stacking system for drilling of this type, involving furthennore a station for the horizontal line up of rods, including means for moving each rod over a precise distance from the axis of said girder, when the latter is in a horizontal position, as well as means for moving the end of each rod perpendicularly to a precise point on the axis of the girder, the rotation axis of the girder itself being situated on the derrick in such a position that the tipping of the girder, carrying a rod picked up by said grasping means in a retracted position, will move said rod outside the track of the pulley block into a nonstaggered position, said grasping means in the nonretracted position moving the rod into the axis of the drill hole.
- Such a system offers many advantages. We might note that, contrary to certain automatic assemblies, it can be used with such component parts of the normal derrick as the winch, the pulley block, the automatic rod screwing and unscrewing device, constituting the train of drilling rods, while providing a reliable and rapid system.
- a rod which can be moved on the derrick into the vertical position outside the track of the pulley block when the grasping means of the grider are retracted, pennits simultaneous operations. Furthermore, since the pulley block can be staggered outside the axis of drilling, it is possible, without waiting for the pulley block to come back up, to place a rod, grasped by the girder, in the axis of the drill hole by simply displacing said retractable grasping means.
- Another object of the invention is a stacking system of the type indicated whose pulley block staggering device involves a slide bar along which the pulley block can move, with a cart supporting said slide bar and a jack, said cart being guided vertically by means of two rails and said jack displacing the pulley block from a first position, in which the axis of the pulley block coincides with the axis of the drill hole, to a second position situated in the vertical axis of the mouse hole.
- Another object of the invention is an automatic stacking system of the type indicated, in which said tipping girder furthermore involves a means for engaging or hooking onto its upper portion, cooperating with a locking device attached on the derrick, with a view to positioning the transported rods with precision, as well as a lower stop to support heavy elements, such as drill collars and pipes, the position of the stop on the girder being such that, when the girder is tipped into the vertical position, it is at a vertical distance from the joint having to receive the new rod or element and this distance is less than 30 cm.
- This device not only facilitates the precise and reliable manipulation of rods but also that of heavy elements, such as pipes and drill collars, since these elements are transported by said tipping girder until they are in the vertical position above the axis of the drill hole and these elements are positively retained thereon. In this way we avoid the risks of danger produced by the fortuitous displacements of these elements in the course of their handling and especially the displacements caused by a swell, in the case of a maritime installation.
- This system furthermore offers the advantage of increasing the speed of the placement of the elements since the latter are moved to the proximity of the tightening device.
- Another object of the invention is the system of the type indicated, each of whose displaced components, such as the pulley block moved beyond the axis of the drill hole, grasping means moved away from their initial grasping position, tightening mechanism, and girder tipped from a horizontal position to a vertical position, is associated with two members each of which transmits a control signal, one signal when the member is in its initial position and the other signal when said member has been displaced to a second position.
- Each of said signal transmission members is activated by the displaced member or by its moving mechanism arriving at the end of its travel, similar transmitter members being furthermore provided on the arms and the nippers of the derrick as well as on the collar of the elevator and the rod tightening mechanism, control connections, associated with triggering means operated by the operator, being provided between said control signal transmission members and said members serving for the displacement of the various above mentioned components, so that: (a) the triggering of similar member displacement means belonging to one and the same assembly; assembly of nippers of derrick, assembly of arms of derrick, assembly of thrust stop and of girder arms, and assembly of girder nippers, will bring about the simultaneous and synchronized displacement of the displacement members belonging to that same assembly; and (b) the displacements, within each assembly of similar members, will take place so as to accomplish the same function; either the retraction of the arms or the outward extension of the arms, or the closing of the nippers, or their opening.
- the automatic system may be either total or it may be limited, in which case the operator must, as in the past, control the winch of the derrick during the performance of a group of particular functions.
- the advantage of such a system is that it permits the automation of certain operations while still preserving the conventional components of the derrick.
- Another object of the invention is a system of the preceding type, in which:
- the control signal transmitting member associated with the opening of the elevator, is connected to the means for controlling the offset movement of the pulley block outside of the axis of the drill holes;
- the control signal transmission member associated with the means for the control of the return of the pulley block into the axis of the drill hole is connected to the means for the control of the closing of the elevator;
- the control signal transmission member associated with the outward extension of the arms of the derrick is connected to the means for the control of the closing of the nippers of the arms of the derrick;
- the control signal transmission member associated with the opening of the nippers in the derrick, is connected to the means for the control of the retraction of the arms of the derrick;
- a triggering member handled by the operator, is provided for the individual control of the following components: the opening and closing of the collar of the elevator, the offsetting and return of the pulley block into the axis of the drill hole, the operation of the tightening key, the tipping and return of the girder into the initial position, the retraction and return of the girder arms, the raising and lowering of the intermediate arm of the girder, the opening and closing of the nippers of the girder, the extension and return of the arms of the derrick, the opening and closing of the nippers of the derrick and the locking-unlocking of the girder in the vertical position; and
- a special switch enables the operator either to use said control means individually, when said switch is switched to a first control position, the so-called semiautomatic position, or to trigger the automatic performance of the operations of raising the train of rods when said switch is connected to a second position, or to trigger the automatic performance of the operations involving the lowering of the train of rods when said switch is switched to a third position, or to suppress the automatic and semi-automatic connections when the switch is switched to a fourth position.
- Another object of the invention is a system of this type in which a portion of said grasping means,
- a second switch member placing off-circuit the connections used exclusively for holding the rods when said second member is switched to a second position.
- the system involved in this invention therefore, enables us to easily proceed to automatic operations involving the raising and lowering of the rod train or of heavy elements such as pipes and collars by means of the successive activation of the means for the control of the displacement of the above mentioned components, since it suffices to manipulate, in addition to a simple switch mechanism for the purpose of switching from one automatic arrangement to another one, a second switch member for the purpose of changing from the holding of the rods to the holding of heavy elements.
- FIG. 1 is a schematic elevational and partially cutaway view of the assembly of the mechanical parts of the system or apparatus of the present invention
- FIG. 2 is a schematic plan view of the system shown in FIG. 1, after the girder has been tipped into the horizontal position, with the metallic structure of the derrick being cut away and the components for holding the rods and the pulley block being shown;
- FIG. 3 is a schematic elevational view of a device for the control of the displacement of one arm of the derrick
- FIG. 4 is a schematic elevational view of a device for the control of the mechanism used in closing and opening nippers of the derrick;
- FIG. 5 is a schematic elevational view of the mechanism for the displacement of the pulley block on its support
- FIG. 6 is a schematic plan view of the collar of the elevator
- FIG. 7 is the schematic representation of the member of the key for tightening the rods on their joints
- FIG. 8 is a schematic elevational view of the girder in the vertical position with its locking device
- FIG. 9 is a schematic elevational view of the end of the girder tipped into the horizontal position
- FIG. 10 is a schematic elevational view of the device for controlling the opening and closing of one of the nippers of an arm of a girder;
- FIG. 11 is a schematic elevational view of the mechanism for the displacement of an arm of the girder perpendicularly to the axis of the girder and of the mechanism for displacement parallel to the axis;
- FIG. 12 shows the portion of the circuit diagram for the controls that start the automatic operation of the system
- FIG. 13 shows a portion of the circuit diagram shown in FIG. 12, relative to the control of the displacement of the arms of the girder perpendicularly to its axis;
- FIG. 14 shows a portion of the circuit diagram shown in FIG. 12, relative to the control of the nippers of the arms of the girder;
- FIG. 15 shows the portion of the circuit diagram of FIG. 12, relative to the control of one of the arms of the girder parallel to its axis;
- FIG. 16 shows the portion of the circuit diagram of FIG. 12, relative to the control of the opening and closing of the elevator as well as to the control of the sideways staggering of the pulley block;
- FIG. 17 shows the portion of the circuit diagram of FIG. 12, relative to the control of the tightening key
- FIG. 18 shows the portion of the circuit diagram of FIG. 12, relative to the control of the arms and the nippers of the derrick;
- FIG. 19 shows the portion of the circuit diagram of FIG. 12, relative to the control of the tipping of the girder and to the control of its locking in the vertical position;
- FIG. 20 shows the diagram for the connection of FIGS. 13-19 to FIG. 12.
- the automatic stacking system for drilling and especially for ocean drilling essentially involves a horizontal rod stacking device designated by reference 15, FIG. 1, the tipping girder l6 and a derrick 17.
- the horizontal stacking device has already been described in French Pat. application No. 6,938,7Sl, filed by applicant on Nov. 12, I969, under the title: System for Lining Up and Withdrawing Rods in the Horizontal Position
- the tipping girder 16 having been described in French Pat. application No. 6,939,135, filed by applicant on Nov. 14, I969 under the title: Tipping Girder for a Transfer of Rods or Tubular Elements Especially for Drilling
- the derrick here differing from earlier derricks only by virtue of the arrangements and the new components which alone will be described here.
- the two members associated with any displacement of the movable members of the system which each transmit a control signal in accordance with the invention are constituted, for example, by a valve that is open when it is in contact with the displaced member or the means serving to displace it, said valve closing automatically the moment the displaceable member has left it in order to stop any distribution of control fluid.
- collar 18 of the elevator FIGS. 1, 5, arid 6, supports a control member in the form of a jack I whose rod 19, attached by one of its ends to the pivoting portion 20 of the collar, involves two stops 21 and 22, cooperating respectively with the two control members or valves e and f, carried by jack 1.
- the valve f activated by stop 22, allows the passage of control fluid
- valve f is closed and valve e is opened to allow the passage of control fluid.
- pulley block 23, FIGS. 1 and 5 controls one or the other of the two control members or valves and d, depending upon the position which it occupies on slide bar 24.
- the pulley block 23 may in effect be displaced with the help of jack 2 so as to occupy a first position in the axis of the drill hole, as shown in FIG. 1, and in this case, 23 is in contact with member d, or a second position, where it is in contact with member c. In this latter position, the axis of the pulley block coincides with the axis of the mouse hole 25, FIG. 2.
- the axis of the mouse hole is vertical and not obliquie, thus greatly facilitating the operations of adding the rods stored at 26.
- the transition of the pulley block 23 from one position to the other is accomplished by simply activating jack 2 whose rod end is pivoted on lever 27 having a groove 28 in which a shaft 29 of pulley block 23 is engaged.
- the slide bar 24 is mounted on a support cart 30 of the pulley block, said cart moving on the vertical guide rails 31 and 32, and cable 33 moving the pulley block vertically.
- Each of the derrick holding arms 8A1, 831, and 8C], FIGS. I and 2 has nippers 9A], 981, or 9CI, and is controlled by mechanisms similar to those shown in FIGS. 3 and 4 so as to move toward the axis of drilling and so as to grasp the rods that are positioned there.
- the arm 8A1 is controlled by any mechanism, e. g., a chain controlled by a motor, and this mechanism involving the control members 211 and bl activated respectively by stops 34 and 35, depending upon whether arm 8A] is extended outwardly or is in the retracted position.
- the mechanism for the opening and closing of nippers 9A] is shown schematically at 9A, FIG.
- this mechanism being mounted on support 9A3 of the nippers, the rod bearing the two stops 36 and 37 activating the closing lever 9A2 of the nippers.
- stop 36 activates the control member I I
- stop 37 activates member ml.
- the upper arm 8A1 can be moved in a horizontal plane along two perpendicular directions, arm 881 can be moved also vertically along post 38, and arm 8C1 can pivot around the vertical axis of its support.
- Tightening key 3 is of any known type and is shown schematically in FIG. 2 and FIG. 7. This device is associated with two control members shown symbolically by rectangles g and x. The first member 3 is activated every time the pushbutton 39 of member 3 is depressed by the descent of key 3, which occurs whenever the key 3, having been set in rotary motion and raised to tighten or loosen a rod on its joint, returns to its initial position. When the torque indicator 1 1 indicates a predetermined value, member .r is activated.
- Girder 16 pivots around the axis 40 of the derrick. It is set in motion by jack 4 and has in its upper portion a locking piece 41, on which is hooked the lock 42, controlled by the rod of jack 10.
- This lock has two control members I and s activated by stops 43 and 44 on the rod of the jack.
- the girder l6 arrives in the vertical position, as shown in FIG. 8, it activates the member h by stop 45.
- another stop 46 triggers the control member 1'.
- the device for moving rods 15 includes horizontal screw conveyors 47 which accomplish the perfectly parallel translation of the rods, which are then displaced vertically by vertical conveyors 48, after which they are advanced longitudinally to a stop 49 to assume the position of the rod 50 shown in FIGS. I and 2.
- the support level 51 of the rod 50 is such that, when the girder is in the horizontal position, its grasping arms are at the same level as the position of the rod 50 in the waiting position.
- nippers 7B1 function to engage 27 meter rods, such as 50, and support them.
- the other nippers 7A1, 7C], and 7D] serve as guides.
- the jacks 5A, 5B, 5C, and 5D control the displacement of the nippers perpendicularly to the axis of the girder, with jack 6 controlling the longitudinal displacement of nippers 7B], and jack 5E controlling the displacement of a stop serving to support heavy elements such as pipes and drill collars.
- the jack for the control of the opening and closing of nippers 7A1.
- the jack rod has two stops 5] and 52, activating the control members r] and ql, r1 being activated when the nippers are closed.
- Jack 58 which controls the displace ment perpendicularly to the girder, has two control members j2 and k2, activated by stops 53 and 54.
- Rod 6A of jack 6 displaces the jack assembly 53 toward the interior of the support 55, rigidly attached to girder 16.
- jack 5B When jack 5B is moved toward the top of the girder by rod 6A of jack 6, it activates control member m. Inversely, when jack 5B is moved toward the bottom of the girder by rod 6A, it activates the control member n.
- a rod 56 mounted thereon is removed from the axis of the drill hole.
- the nippers 7Al-7Dl are moved transversely outwardly from the girder and then nippers 7Bl are longitudinally displaced by the jack 6 so as to move the rod into a position suitable for being screwed, for example, to the train of rods.
- the lower stop of the girder 16 is at a short distance from the tightening key 3, which enables us to increase the speed of handling. This is particularly important when the element transported is a heavy element, such as a pipe, which only has to be displaced over a short vertical distance in order to put it in tightening position on its joint.
- the elements G1 to G24 represent, in a symbolic manner, switches which can be moved to connect a circuit with one or another of four lines, one being destined for automatic rod train lifting operations; another one for automatic rod train lowering operations; the third for the semi-automatic operations of the members of the system with a view to accomplishing special holding operations relative to the placement of tubing, for example; and the fourth being used for manual operations. It is clear that the positions of members G1 through G24 can be changed by the use of a single general switch.
- connection of the circuits shown in FIGS. 12-19 is accomplished in accordance with the scheme in FIG. 20.
- the representation of the connection circuits between the various members described earlier has been designed to facilitate the explanation here but it goes without saying that the hydraulic circuits represented here involve valves permitting the circulation of control fluid exclusively in the direction indicated by the arrows and that, in fact, the diagram could be modified depending upon the technique adopted, particularly if all or a portion of the control members are replaced by electric valves.
- connection 105 activates the jacks 5A, 5B, and SD of the girder, FIG. 13, Le, the upper, middle and lower nippers carrier arms.
- 105, FIG. 12 activates a delay timer 14 which in turn activates control member w and by 61, G5, and 72, FIG.
- the three jacks are then extended when the corresponding control members jl, j2, and j4 have been activated, each bringing about the transmission of a signal to the device ET 110 whose output is transmitted by H1 and 75.
- connection 106 activates the opening of the collar of the elevator controlled by jack 1.
- connection 106 leads through G1 to the connection 81 triggering by means of 1', FIG. 16 (whose role is similar to 5' as indicated in the symbolic representation adopted for FIGS. 16 and 13), the control of the re-entry of the rod of jack 1 by line 111.
- the rod activates the member f which, through 112 and H11, controls the withdrawal of the pulley block 23 through the activation of jack 2.
- the control member 0 transmits a signal through connection 85 to light v3.
- connection 107 controls the automatic tightening key 3 by means of G3 and connection 87, FIG. 17.
- the torque exerted by key 3 reaches a certain predetermined value, shown by indicator 11, the latter activates member x.
- This member lights up the lamp s3, and through 89 and a connection to be described later on, prepares for the activation of the nippers of the girder.
- member x FIG. 17, placed in action by torque indicator 11, transmits a signal via 89 and G15, FIG. 12, leading via 57 to the device ET 114, whereas the signal coming from device ET 1 10, FIG. 13, and indicating the end of the girder jack extension operation, is transmitted by 75 and G14, FIG. 12, to the connection 58, leading to the device ET 114.
- the simultaneous presence of signals at 57 and 58 enables us to arrange, at 115, an output signal transmitted by G7 and 94, FIG. 14, to the inverter 7' and from there to the control jacks 7A, 7B, and 7D of the nippers of the girder which close tight on the rod.
- the rods of these jacks activate members r1, r2, and r4, transmitting a signal to the device ET 116, H19, the connection 95, FIG. 12, and G21 and from there toward lines 59 and 60.
- the signal activates 9' and, through 117, the opening of the nippers 9A, 9B, and 9C of the derrick, whereas, through line 60, G6, and 97, FIG. 15, the signal activates the rise of the middle jack of the girder through the activation of the inverter 6' and then ofjack 6 via 118.
- the members m1, m2, and m3, respectively transmit a signal whose coincidence permits the passage of the signal to the output of device ET 119, connected, by connections 120 and H20, to the control members of mechanisms 8A, 8B, and 8C, bringing about the return of the arms of the derrick.
- these mechanisms activate, respectively, the control members b1, b2, and b3, transmitting a signal whose simultaneous presence permits the transmission of the signal to the output of device ET 121 and via H16, to the connection 98, FIG. 12, leading via G11 and 93 to the device ET 113.
- the middle jack of the girder When jack rod 6 finishes its run, the middle jack of the girder is in the top position and activates the member n which transmits a signal via 99, FIG. 12, G23, 61, G5, 72, FIG. 13, and activates the inverter activating the retraction of the arms of the girder by the activation of jacks 5A to SE via 108.
- k1, k2, and k4 transmit a signal whose simultaneousness permits the transmission of a signal to the output of a device ET 122 and via H18 and the connection 123, FIG. 12 to G24, then via 64 to the device ET 184.
- the signal available at G11, coming from the members r1, r2, r4, FIG. 14, through wire 94, is also transmitted to ET 184 via derivation connection 185, so that a signal is available at 180 connected to the device ET 113.
- the operator directly activates the pushbutton R4 the moment lamp v4 goes on and the moment the pulley block 23 has completed its descent.
- a signal is transmitted by v4 and it is transmitted by 124 to circuit ET 125, while a second signal, transmitted at the end of the run of the pulley block 23 and shown schematically by the junction of DM and of line 126, is transmitted to the device ET 125, controlling R4, in case of the simultaneous presence of signals on lines 126 and 124.
- button R4 brings about the activation ofjack 2 byline 62, G2, line 127, FIG. 16, 2' and 128.
- Jack 2 returns the pulley block 23 to its original central position with the pulley block then activating the member d at the end of the run.
- the signal transmitted by d is transmitted, via line 129 and via H10, to jack 1, which, by closing the collar 18 of the elevator, activates at the end of the run of its rod, the member e which in turn transmits a signal.
- This signal is transmitted via 130, FIG. 12, G16 and 63 thus lighting up v1.
- control member k transmitted a signal to connection 80, a signal was also being transmitted to jack 10 for the unlocking of the girder by 65, G10, and 131, FIG. 19, as well as to the delay timer 12 via lines 65 and 186.
- control member 1' transmits a signal through line 132, FIG. 12, and G13.
- the delay timer 12, FIG. 12 activates the control member u, which, through connection 61, G5, 72, FIG. 13, the inverter 5', the line 109, brings about the outward extension of the jacks 5A, 5B and SD of the girder, activated in parallel as described earlier.
- the outward extension of the activated jacks produces, through j1,j2, and j4, a signal transmitted via 75, FIG. I, and G14.
- the members qI, q2, and q4 transmit a signal which is transmitted to the device ET 135 and from there via H6 and 137, FIG. 12, G22, 68, 61, G5, 72, FIG. 13, to the inverter 5', with a view to the withdrawal of the girder jacks.
- the pulley block 23 continues to go up. At the end of the run, it is then possible to order the placement on wedges and to trigger the button R1, as indicated by dotted lines 136, connecting MM and PC and 138 connecting MM to R1.
- the triggering of R1 produces, via 67, G8, and 139, FIG. 18, the activation of the inverter 8' and, consequently, the outward extension of the arms of the derrick by mechanisms 8A, 8B, and 8C through 140.
- the rods of these jacks activate the control members a1, a2, and a3, transmitting a signal to the device ET 141 and from there, via H17, 142, H21, 143, to jacks 9A, 9B, 9C, bringing about the closing of the nippers of the arms of the derrick and, at the end of the closing, the activation of control members l1, l2, and 13.
- These members transmit a signal to the device ET 103, controlling, via H14, 104, FIG. 12, and G18, a signal to ET 100.
- the signal transmitted to the inverter FIG. 13, brings about, through 108, the activation of jacks 5A, 5B, and 5D.
- the signal transmitted to the inverter FIG. 13 brings about, through 108, the activation of jacks 5A, 5B, and 5D.
- the signal transmitted to the inverter FIG. 13 brings about, through 108, the activation of jacks 5A, 5B, and 5D.
- the signal transmitted to the inverter FIG. 13 brings about, through 108, the activation of jacks 5A, 5B, and 5D.
- the signal transmitted to the inverter FIG. 13 brings about, through 108, the activation of jacks 5A, 5B, and 5D.
- the signal transmitted to the inverter FIG. 13 brings about, through 108, the activation of jacks 5A, 5B, and 5D.
- the signal transmitted to the inverter FIG. 13 brings about, through 108, the activation of jacks 5A, 5B, and
- the member h When the girder arrives in the vertical position, the member h, FIG. 8, triggers the locking jack 10 of the girder.
- the exit of the rod of this jack at the end of the run activates the member I which, through 101, FIG. 12, and G20, transmits a signal to the device ET 100.
- Light V2 is on and the operator activates the member MM for the raising of the pulley block 23 by depressing D2, if a direct connection, such as 146, is provided, or he directly activates the corresponding winch in the absence of an automatic connection.
- D2 controls the exit of the arms of the derrick through 147, with the time delay member 13 activating v, the line 148 being linked to D by G8, the connection 139, FIG. 18, the inverter 8', 140, and the mechanisms 8A, 8B, and 8C.
- D2 also activates the exit of the arms of the girder through 147, 149, connected to stud D of G5, 72, FIG. 13, 5', 109, and the jacks 5A, 5B, and 5D.
- members 31, j2, and j4, FIG. 2 controlled by the exit of the girder arms, transmit a signal via 110,
- the device ET 189 receives two input signals, one from the connection 72, and the other one from the connections 95, G21, 85, and derivation 190. From this there results an output signal 291, G6, 97, FIG. 15, 6, 145, with jack 6 bringing about the descent of the middle jack of the girder, thus assuring the engagement of the joint of the rod.
- the member p is placed in action and, through 102, FIGS.
- G19 in the position D and connection 73 transmits a signal to b3, which in turn is transmitted to the control 3, FIG. 17, of the tightening member of the joints via 87.
- the signal coming from 73 is also transmitted to the device ET 150 via 15], which when receiving a signal via 74, coming from members 11, I2, and 13, FIG. 18, via 104, FIG. 12, and G18, transmits a signal via 76, G7, 94, FIG. 14, to 7', then via 134 to 7A, 7B, 7C, and 7D for the opening of the nippers of the girder 16.
- the member x is activated the moment the tightening torque attains a predetermined value, lighting up the lamp V3 by means of 89, FIG. 12, G15, and 192.
- D3 can be depressed by the operator or it can be triggered automatically by the connection 152.
- the device ET 153 receives two input signals and can in effect transmit an output signal at D3.
- the member 7, controlling the opening of the nippers of the girder brings about the activation of the members ql, q2, and q4, which, through and 137, FIG. 12, G22, 79, G5, 72, FIG. 12, 5', and 108, bring about the command for the retraction of the arms 5A 5B, and 5D.
- the corresponding members It], k2, and k4 emit a signal, through 122, H18, 123, FIG. 12, G24, and 155, supplying the device ET 193 with power, while the connection 179, connected to G22 and 137, transmits, to the same device, the signal coming from ql q2, and q4.
- the member 1' transmits a signal, via 132, FIG. 12, G13, 83, 79, G5, 72, FIG. 13, 5', and 109, to the jacks 5A, 5B, and 5D, thus bringing about the exit of the corresponding arms of the girder.
- the members jl, j2, and j4 produce the transmission of a signal which is transmitted, via 75, FIG. 12, to the device ET 194, while the signal i, coming from 132, FIGS. 19 and 12, reaches the same device.
- a signal is then transmitted through the output of ET 194, 84, 76, G7, 94, FIG.
- the inverter 7 to the inverter 7 and from there, via 157, to the jacks 7A, 7B, and 7D, controlling the closing of the nippers of the corresponding arms and, hence, the members r1, r2, and r4.
- the latter transmit a signal via 116, H19, 95, FIG. 1,021, 85' the delay timer 14, with the member w activating 5' through 159, 97, G5, and 72, FIG. 13, and from there, via 108, the jacks 5A, 5B, and 5d.
- the members ml, m2, and m3, FIG. 18, emit a signal, through 119, 120, H20, thus controlling the mechanisms 8A, 8B, and 8C, bringing about the retraction of the derrick arms.
- these mechanisms activate the members b1, b2, and b3, which transmit a signal, through 98, FIG. 12, and G1 I, to the device ET 161.
- the tightening device 3 having been activated at the beginning of the cycle and having in turn activated 3 at the end of the work, a signal is then also applied to the device ET 161 through g, FIG. 17, 91, FIG. 1, and G12. A signal is then transmitted through ET 161 and through 8b up to lamp VI which lights up.
- the member I activated at the end of the run, in turn activates jack 2, through 112, and H11, thus bringing about the sideways staggering of the pulley block 23.
- the rod of jack 2 activates c, transmitting a signal, via 85, FIG. 12, G17, and 87, to the device ET 165.
- the member h activates the locking jack 10, whose rod at the end of the run activates the member I.
- the latter transmits a signal through 101, FIG. 12, G20, and 166, through the device ET 165.
- the presence of a signal at the two inputs of the device then, through its output line, causes V2 to light up.
- control means for the various components is so designed as to permit the maneuvering of the tubing and the drill collars by simple switching so as to isolate, in the automatic control circuits which we have just described, the connections which normally bring about the transition from one operation to the next with a view to the automatic lifting or lowering of the rods.
- switching we eliminate the connections that activate the members used exclusively for holding the rods.
- the index of the general switch G is moved from R (or D) to SA, activating the connections corresponding to semi-automatic operations, and the index of switch H is moved from T to Dr.
- This switching enables us to select the members of the derrick and of the girder involved in the particular operations.
- the operator simultaneously pushes pushbuttons S8, FIG. 18, and S2, FIG. 16, pushbutton S8 through 169, FIG. 12, G8, 139, FIG. 18, 8', and 140, controls the mechanisms 88 and 8C, since SA has not been activated because of the opening of H12.
- the members a1 and a3 have been placed in action by the mechanisms reaching the end of the run; they transmit a signal to the device ET 170, connected via H17 and 171 to s8.
- the light 58 goes on, warning the operator as to the exit of the middle arm 88 and the lower arm 8C of the derrick.
- jack 2 is activated by 172, FIG. 12, G2, 127, FIG. 16, 2, and 128, so as to return the pulley block 23 to the axis of the derrick.
- the member d transmits a signal via 173 to s2 which goes on.
- the operator activates S9, bringing about the closing of the nippers 9 via 174, FIG. 12, 96, FIG. 18, 9', 117.
- the members m2 and m3 then bring about the emission of a signal which lights up the lamp s9 via 175.
- the operator can then activate S1, thus operating, by means of 176, FIG. 12, G1, 81, FIG. 16, 1', 177 and H10, the jack 1, which closes the collar of the elevator.
- the member e transmits a signal which is transmitted via 130, to the lamp s1 which goes on.
- the operator In order to pick up the weight of the pipe, the operator causes the pulley block 23 to rise and he activates S in order to withdraw the arms of the girder.
- the jacks 5C, 5D, and 5E are controlled through 167, FIGS. 13 and 12, 72, FIG, 13. 5', and 180.
- s5 is lit up due to the activation of the signal emitted by k3, k4, and k5, 180, H18, and 123.
- S10 by means of 181, FIG. 1, 131, FIG. 8, controls the jack 10.
- the member s illuminates s10 and activates the jack 4 for the tipping of the girder.
- the operator can then activate S8 for the retraction of the arms of the derrick which is accomplished by circuit 169, FIG. 12, 139, FIG. 18,8, H20, and jacks 8B and 8C.
- the members b2 and b3 at the end of the operation cause s8 to be lit up by 183 and H16.
- the member 1' transmits a signal which, through 132, causes $4 to light up.
- the operator can then pick up a new element and for this purpose he successively activates s5, for the exit of the arms of the girder, S7 for closing of the nippers of the girder whose control is accomplished, FIG. 14, by 94 and 157, r3 and r4 emitting a signal at 198, S4 for the raising of the girder whose control is performed by 195, G4, and 144, FIG. 19, the jack 4 returning to the loaded girder into the vertical position and the member h causing it to be locked.
- the moment S4 triggers the lifting of the girder, the operator activates S5 in order to withdraw the arms of the girder.
- the first element has been screwed and the operator disengages the corners with the help of the pulley block 23 and then he sees to the lowering of the pulley block under load in order finally to put the pipes on the wedges.
- the action of the hydraulic circuits may take on many other forms especially when the members that transmit the control signals, such as x, r, u, etc., are electrical contacts.
- the conditions bringing about the activation of well determined members in the course of an automatic cycle can be replaced by combinations of equivalent conditions.
- the condition where we have a signal k and a signal r, in the course of the automatic lifting of the rods for the control of jack 10 could be replaced by the condition where we have signals j and m.
- a girder pivotable about a horizontal axis between vertical and horizontal positions and including retractable means for supporting a rod so as to take it from a horizontal position to a vertical position and vice versa, said supporting means having means for grasping the rod and moving it from a retracted position to an extended position and vice versa perpendicularly to the axis of the girder.
- Apparatus as in claim 1 further comprising a station for the horizontal alignment of drilling rods, said station having means for moving each rod over a precise distance from the axis of said girder when the latter is in the horizontal position, and means for moving the end of each rod perpendicularly with respect to a precise point on the axis of the girder, said girder being pivoted on said derrick in such a position that the tipping of the girder to a vertical position, bearing a rod picked up by said grasping means, in the retracted position, moves said rod into a position spaced from said pulley block when it is in said offset position, said grasping means serving to move the rod to the extended position in alignment with the drilling axis.
- said pulley block moving means comprises a slide bar rigidly mounted on said support along which the pulley block can move, and a jack, said jack moving said pulley block between said offset position and a second position in which the axis of said pulley block coincides with the drilling axis.
- said girder further comprises a means for hooking onto its upper portion cooperating with a locking device attached to said derrick, and a lower stop for supporting heavy tubular elements, the position of said stop on said girder being such that, when the girder is pivoted to the vertical position, said stop is at a small vertical distance from a drilling joint adapted to receive said elements.
- each of said pulley block, said supporting means, said grasping means and said girder is associated with two members, each of which transmits a control signal in response to the movement of said pulley block, supporting means, grasping means and girder to their extreme positions, and wherein similar transmitter members are provided on said derrick arms and said elevator collar and are responsive to the movement of said arms and said collar to their extreme positions.
- control signal transmission member associated with the opening of said elevator collar, is connected to control means for movement of said pulley block to said offset position
- control signal transmission member associated with the extension of said arms of the derrick, is connected to the means for the control of the closing of nippers on the arms of the derrick;
- control signal transmission member associated with the opening of said nippers on said derrick arms is connected to the means for the control of the withdrawal of the derrick arms;
- Apparatus as in claim 7 further comprising a general switch and a series of switching members connected to said general switch and to four lines inserted in control connections for the movable components of said a pa ratus, said ge eral switch providing for t e contro 0 each group 0 associated components in ependent of each other when it is switched into a first position, said general switch connecting the component controls and the associated component groups with each other, so as to assure the cyclic and automatic performance of the operations of raising the rods or lowering the rods, depending on whether it is switched to a second or a third position, and said general switch rendering each component control of one and the same group of components independent when it is switched to a fourth position.
- Apparatus as in claim 8 wherein a portion of said grasping means, mounted on said girder, is used exclusively for holding pipes and drill collars, and another portion thereof is used for holding drilling rods, control means are provided for said portions of said grasping means, and switching means is connected to said control means to provide for the independent operation of said portions of said grasping means.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR707000681A FR2111996B1 (da) | 1970-01-09 | 1970-01-09 |
Publications (1)
Publication Number | Publication Date |
---|---|
US3682259A true US3682259A (en) | 1972-08-08 |
Family
ID=9048805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US27930A Expired - Lifetime US3682259A (en) | 1970-01-09 | 1970-04-13 | Rod stacking and handling apparatus |
Country Status (4)
Country | Link |
---|---|
US (1) | US3682259A (da) |
FR (1) | FR2111996B1 (da) |
GB (1) | GB1295698A (da) |
NL (1) | NL7100050A (da) |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3960360A (en) * | 1972-06-27 | 1976-06-01 | Thomas L. Elliston | Internally pressurized load supporting mast |
US4024925A (en) * | 1976-01-12 | 1977-05-24 | Brown Joe R | Equipment handling apparatus |
US4042123A (en) * | 1975-02-06 | 1977-08-16 | Sheldon Loren B | Automated pipe handling system |
EP0171368A1 (en) * | 1984-08-08 | 1986-02-12 | REMOSA S.p.A. | Apparatus for transferring drill rods from a rod store to the rotation head of a drilling machine and vice versa |
US4591006A (en) * | 1981-03-26 | 1986-05-27 | Chevron Research Company | Well servicing rig |
US4708581A (en) * | 1985-06-21 | 1987-11-24 | W-N Apache Corporation | Method of positioning a transfer arm |
US4834604A (en) * | 1987-10-19 | 1989-05-30 | Lee C. Moore Corporation | Pipe moving apparatus and method |
WO1993002272A1 (en) * | 1991-07-16 | 1993-02-04 | W-N Apache Corporation | Lifting device for down hole tubulars |
US5294228A (en) * | 1991-08-28 | 1994-03-15 | W-N Apache Corporation | Automatic sequencing system for earth drilling machine |
US5437527A (en) * | 1989-05-12 | 1995-08-01 | Hitech A/S | Arrangement in a pipe handling system |
WO1997021902A2 (en) * | 1995-12-12 | 1997-06-19 | Boart Longyear Company | Drilling rig |
NL1007799C2 (nl) * | 1997-12-15 | 1999-06-17 | Huisman Spec Lifting Equip Bv | Inrichting voor verplaatsing van een langwerpig voorwerp, in het bijzonder een riserdeel of een boorpijpcassette. |
US20060137910A1 (en) * | 2004-12-29 | 2006-06-29 | Atlas Copco Secoroc Ab | Drilling machine having a movable rod handling device |
EP1746247A2 (en) * | 2005-07-19 | 2007-01-24 | National-Oilwell, L.P. | A pipe handling system, a drilling system and a method for operating a drilling rig |
US20100032213A1 (en) * | 2007-10-24 | 2010-02-11 | T&T Engineering Services | Apparatus and method for pre-loading of a main rotating structural member |
US20100230166A1 (en) * | 2009-03-12 | 2010-09-16 | T&T Engineering Services | Derrickless tubular servicing system and method |
US20110200412A1 (en) * | 2007-10-24 | 2011-08-18 | T&T Engineering Services | Pipe Handling Apparatus and Method |
CN102242613A (zh) * | 2011-05-13 | 2011-11-16 | 刘东武 | 油管、钻杆起下作业地面自动传送装置 |
US8192129B1 (en) | 2007-10-24 | 2012-06-05 | T&T Engineering Services, Inc. | Pipe handling boom pretensioning apparatus |
US20120305233A1 (en) * | 2010-01-19 | 2012-12-06 | Suk Shin In | Rod-mounting apparatus for drilling apparatus |
US8408334B1 (en) | 2008-12-11 | 2013-04-02 | T&T Engineering Services, Inc. | Stabbing apparatus and method |
US8419335B1 (en) | 2007-10-24 | 2013-04-16 | T&T Engineering Services, Inc. | Pipe handling apparatus with stab frame stiffening |
WO2012165951A3 (en) * | 2011-05-27 | 2013-04-25 | Itrec B.V. | Drilling rig for moving a tubular and automatic tripping |
US20130330151A1 (en) * | 2011-11-28 | 2013-12-12 | T&T Engineering Services, Inc. | Tubular Stand Building and Racking System |
US20130343836A1 (en) * | 2012-06-21 | 2013-12-26 | Complete Production Services, Inc. | Long lateral completion system and method for pipe handling |
US8905699B2 (en) | 2009-05-20 | 2014-12-09 | T&T Engineering Services, Inc. | Alignment apparatus and method for a boom of a pipe handling system |
US9091128B1 (en) | 2011-11-18 | 2015-07-28 | T&T Engineering Services, Inc. | Drill floor mountable automated pipe racking system |
US9476267B2 (en) | 2013-03-15 | 2016-10-25 | T&T Engineering Services, Inc. | System and method for raising and lowering a drill floor mountable automated pipe racking system |
US9500049B1 (en) | 2008-12-11 | 2016-11-22 | Schlumberger Technology Corporation | Grip and vertical stab apparatus and method |
US9556689B2 (en) | 2009-05-20 | 2017-01-31 | Schlumberger Technology Corporation | Alignment apparatus and method for a boom of a pipe handling system |
US9790752B2 (en) | 2012-06-28 | 2017-10-17 | Atlas Copco Craelius Ab | Handling device and method for handling drill string components in rock drilling and rock drill rig |
WO2023055240A1 (en) * | 2021-10-01 | 2023-04-06 | Akofs Offshore Operations As | Wireline tool exchange assembly |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1141505B (it) * | 1979-04-09 | 1986-10-01 | Chevron Res | Impianto mobile autonomo per la trivellazione di pozzi con mezzi per il movimento automatico degli elementi di pozzo |
CN113530478B (zh) * | 2021-08-04 | 2023-09-15 | 国能神东煤炭集团有限责任公司 | 装卸钻杆的装置和方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US26284A (en) * | 1859-11-29 | Gak-tetick | ||
US2187392A (en) * | 1937-01-11 | 1940-01-16 | Alvin H Lane | Derrick |
US2643005A (en) * | 1948-03-12 | 1953-06-23 | Paul A Medearis | Well pipe handling equipment |
US2692059A (en) * | 1953-07-15 | 1954-10-19 | Standard Oil Dev Co | Device for positioning pipe in a drilling derrick |
US3061011A (en) * | 1955-05-05 | 1962-10-30 | Joy Mfg Co | Transfer mechanism for the drill pipe of an oil field drill rig |
US3177944A (en) * | 1959-06-02 | 1965-04-13 | Dowty Rotol Ltd | Racking mechanism for earth boring equipment |
US3280920A (en) * | 1964-03-18 | 1966-10-25 | Hycalog Inc | Portable apparatus for drilling slim hole wells |
-
1970
- 1970-01-09 FR FR707000681A patent/FR2111996B1/fr not_active Expired
- 1970-04-13 US US27930A patent/US3682259A/en not_active Expired - Lifetime
- 1970-11-26 GB GB1295698D patent/GB1295698A/en not_active Expired
-
1971
- 1971-01-05 NL NL7100050A patent/NL7100050A/xx unknown
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US26284A (en) * | 1859-11-29 | Gak-tetick | ||
US2187392A (en) * | 1937-01-11 | 1940-01-16 | Alvin H Lane | Derrick |
US2643005A (en) * | 1948-03-12 | 1953-06-23 | Paul A Medearis | Well pipe handling equipment |
US2692059A (en) * | 1953-07-15 | 1954-10-19 | Standard Oil Dev Co | Device for positioning pipe in a drilling derrick |
US3061011A (en) * | 1955-05-05 | 1962-10-30 | Joy Mfg Co | Transfer mechanism for the drill pipe of an oil field drill rig |
US3177944A (en) * | 1959-06-02 | 1965-04-13 | Dowty Rotol Ltd | Racking mechanism for earth boring equipment |
US3280920A (en) * | 1964-03-18 | 1966-10-25 | Hycalog Inc | Portable apparatus for drilling slim hole wells |
Cited By (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3960360A (en) * | 1972-06-27 | 1976-06-01 | Thomas L. Elliston | Internally pressurized load supporting mast |
US4042123A (en) * | 1975-02-06 | 1977-08-16 | Sheldon Loren B | Automated pipe handling system |
US4024925A (en) * | 1976-01-12 | 1977-05-24 | Brown Joe R | Equipment handling apparatus |
US4591006A (en) * | 1981-03-26 | 1986-05-27 | Chevron Research Company | Well servicing rig |
EP0171368A1 (en) * | 1984-08-08 | 1986-02-12 | REMOSA S.p.A. | Apparatus for transferring drill rods from a rod store to the rotation head of a drilling machine and vice versa |
US4708581A (en) * | 1985-06-21 | 1987-11-24 | W-N Apache Corporation | Method of positioning a transfer arm |
US4834604A (en) * | 1987-10-19 | 1989-05-30 | Lee C. Moore Corporation | Pipe moving apparatus and method |
US5437527A (en) * | 1989-05-12 | 1995-08-01 | Hitech A/S | Arrangement in a pipe handling system |
US5273388A (en) * | 1991-07-16 | 1993-12-28 | W-N Apache Corporation | Lifting device for down hole tubulars |
WO1993002272A1 (en) * | 1991-07-16 | 1993-02-04 | W-N Apache Corporation | Lifting device for down hole tubulars |
US5294228A (en) * | 1991-08-28 | 1994-03-15 | W-N Apache Corporation | Automatic sequencing system for earth drilling machine |
WO1997021902A2 (en) * | 1995-12-12 | 1997-06-19 | Boart Longyear Company | Drilling rig |
WO1997021902A3 (en) * | 1995-12-12 | 1997-08-07 | Boart Longyear Company | Drilling rig |
US5794723A (en) * | 1995-12-12 | 1998-08-18 | Boart Longyear Company | Drilling rig |
NL1007799C2 (nl) * | 1997-12-15 | 1999-06-17 | Huisman Spec Lifting Equip Bv | Inrichting voor verplaatsing van een langwerpig voorwerp, in het bijzonder een riserdeel of een boorpijpcassette. |
WO1999031346A1 (en) * | 1997-12-15 | 1999-06-24 | Huisman Special Lifting Equipment B.V. | Device for moving an elongated object, in particular a riser part or a drill pipe cassette |
US20060137910A1 (en) * | 2004-12-29 | 2006-06-29 | Atlas Copco Secoroc Ab | Drilling machine having a movable rod handling device |
US7347285B2 (en) | 2004-12-29 | 2008-03-25 | Atlas Copco Drilling Solutions Inc. | Drilling machine having a movable rod handling device and a method for moving the rod handling device |
EP1746247A2 (en) * | 2005-07-19 | 2007-01-24 | National-Oilwell, L.P. | A pipe handling system, a drilling system and a method for operating a drilling rig |
US20070017704A1 (en) * | 2005-07-19 | 2007-01-25 | National-Oilwell, L.P. | Single joint drilling system |
US8192129B1 (en) | 2007-10-24 | 2012-06-05 | T&T Engineering Services, Inc. | Pipe handling boom pretensioning apparatus |
US8419335B1 (en) | 2007-10-24 | 2013-04-16 | T&T Engineering Services, Inc. | Pipe handling apparatus with stab frame stiffening |
US20110200412A1 (en) * | 2007-10-24 | 2011-08-18 | T&T Engineering Services | Pipe Handling Apparatus and Method |
US9194193B1 (en) | 2007-10-24 | 2015-11-24 | T&T Engineering Services, Inc. | Pipe handling apparatus and method |
US20100032213A1 (en) * | 2007-10-24 | 2010-02-11 | T&T Engineering Services | Apparatus and method for pre-loading of a main rotating structural member |
US8696288B2 (en) | 2007-10-24 | 2014-04-15 | T&T Engineering Services, Inc. | Pipe handling boom pretensioning apparatus |
US8506229B2 (en) | 2007-10-24 | 2013-08-13 | T&T Engineering Services, Inc. | Pipe handling apparatus and method |
US8469648B2 (en) | 2007-10-24 | 2013-06-25 | T&T Engineering Services | Apparatus and method for pre-loading of a main rotating structural member |
US9500049B1 (en) | 2008-12-11 | 2016-11-22 | Schlumberger Technology Corporation | Grip and vertical stab apparatus and method |
US8408334B1 (en) | 2008-12-11 | 2013-04-02 | T&T Engineering Services, Inc. | Stabbing apparatus and method |
US8371790B2 (en) * | 2009-03-12 | 2013-02-12 | T&T Engineering Services, Inc. | Derrickless tubular servicing system and method |
US20100230166A1 (en) * | 2009-03-12 | 2010-09-16 | T&T Engineering Services | Derrickless tubular servicing system and method |
US9556689B2 (en) | 2009-05-20 | 2017-01-31 | Schlumberger Technology Corporation | Alignment apparatus and method for a boom of a pipe handling system |
US8905699B2 (en) | 2009-05-20 | 2014-12-09 | T&T Engineering Services, Inc. | Alignment apparatus and method for a boom of a pipe handling system |
US20120305233A1 (en) * | 2010-01-19 | 2012-12-06 | Suk Shin In | Rod-mounting apparatus for drilling apparatus |
US9103167B2 (en) * | 2010-01-19 | 2015-08-11 | Suk Shin In | Rod-mounting apparatus for drilling apparatus |
CN102242613B (zh) * | 2011-05-13 | 2016-02-10 | 刘东武 | 油管、钻杆起下作业地面自动传送装置 |
CN102242613A (zh) * | 2011-05-13 | 2011-11-16 | 刘东武 | 油管、钻杆起下作业地面自动传送装置 |
WO2012165951A3 (en) * | 2011-05-27 | 2013-04-25 | Itrec B.V. | Drilling rig for moving a tubular and automatic tripping |
US9945193B1 (en) | 2011-11-18 | 2018-04-17 | Schlumberger Technology Corporation | Drill floor mountable automated pipe racking system |
US9091128B1 (en) | 2011-11-18 | 2015-07-28 | T&T Engineering Services, Inc. | Drill floor mountable automated pipe racking system |
US9121235B2 (en) * | 2011-11-28 | 2015-09-01 | T&T Engineering Services, Inc. | Tubular stand building and racking system |
US20130330151A1 (en) * | 2011-11-28 | 2013-12-12 | T&T Engineering Services, Inc. | Tubular Stand Building and Racking System |
US8985928B2 (en) * | 2012-06-21 | 2015-03-24 | Superior Energy Services—North America Services, Inc. | Long lateral completion system and method for pipe handling |
US20130343836A1 (en) * | 2012-06-21 | 2013-12-26 | Complete Production Services, Inc. | Long lateral completion system and method for pipe handling |
US9790752B2 (en) | 2012-06-28 | 2017-10-17 | Atlas Copco Craelius Ab | Handling device and method for handling drill string components in rock drilling and rock drill rig |
US9476267B2 (en) | 2013-03-15 | 2016-10-25 | T&T Engineering Services, Inc. | System and method for raising and lowering a drill floor mountable automated pipe racking system |
WO2023055240A1 (en) * | 2021-10-01 | 2023-04-06 | Akofs Offshore Operations As | Wireline tool exchange assembly |
Also Published As
Publication number | Publication date |
---|---|
GB1295698A (da) | 1972-11-08 |
FR2111996B1 (da) | 1974-03-01 |
FR2111996A1 (da) | 1972-06-16 |
NL7100050A (da) | 1971-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3682259A (en) | Rod stacking and handling apparatus | |
SU1061700A3 (ru) | Устройство дл проведени спуско-подъемных операций с бурильными трубами | |
CN110952972B (zh) | 一种煤矿钻机及其控制方法 | |
US3266582A (en) | Drilling system | |
US3655071A (en) | Horizontal pipe racking and handling apparatus | |
US5294228A (en) | Automatic sequencing system for earth drilling machine | |
US5988299A (en) | Automated oil rig servicing system | |
US5437527A (en) | Arrangement in a pipe handling system | |
CN102191923B (zh) | 一种修井作业远程控制井口作业装置 | |
US4274778A (en) | Mechanized stand handling apparatus for drilling rigs | |
US2692059A (en) | Device for positioning pipe in a drilling derrick | |
US3799364A (en) | Automatic racker board finger pivot system | |
US3921823A (en) | Movement compensating apparatus for floating drilling | |
CN110792399A (zh) | 钻机上处理管件的提升系统、自动机械手和方法以及管件处理系统和方法 | |
NO175604B (no) | Boreutstyr | |
GB1432532A (en) | Mechanism for changing fuel elements and control rods in a nuclear reactor | |
US3633767A (en) | Pipe-racking apparatus for oil well derricks or the like | |
GB2119684A (en) | Bolt receiving and holding means on a drilling and bolting turret | |
US3158212A (en) | Earth drilling rigs | |
NO774103L (no) | Betjeningsanordning for fingerlaaser | |
CN113073948B (zh) | 一种网电驱动自动化修井机 | |
US5309774A (en) | Installation for taking fluid samples in a confined area | |
SU1141180A1 (ru) | Автоматический агрегат дл ремонта скважин,мостки,автоматический ключ | |
CN109264441B (zh) | 排管装备 | |
SU1016474A1 (ru) | Бурова установка |