US2745164A - Production of prestressed building elements - Google Patents

Production of prestressed building elements Download PDF

Info

Publication number
US2745164A
US2745164A US307228A US30722852A US2745164A US 2745164 A US2745164 A US 2745164A US 307228 A US307228 A US 307228A US 30722852 A US30722852 A US 30722852A US 2745164 A US2745164 A US 2745164A
Authority
US
United States
Prior art keywords
production
wires
elements
reinforcing
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US307228A
Inventor
Ros Mirko Robin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US2745164A publication Critical patent/US2745164A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed

Definitions

  • the aim of the present invention isto eliminate the described disadvantages.
  • the invention relates to a method for producing pre-stressed building elements as well as to a device for carrying out said method;
  • the method according to the invention is characteriz'ed in that a reinforcem ent of any desired length is mowed 'across'a progressive production support and is simultaneously brought to the desired initial tension, and that the building elements are formed on the progressive production'support by embedding the reinforcement in concrete,.wh'ereupon they are fed through a setting duct and thereafter are cut apart, care being taken that the initial tension in the reinforcement stretched along the,
  • the device for carrying out said method is characterized by a progressive production support for the elements to be produced provided with means for. advancing the building elements, at least one stock'spool forat least one reinforcing wire stretched longitudinally across the progressive production support in connection with a wire tensioning device arranged in advance of said support, andin addition by a setting duct through which said progressiveproduction support passes, and a cutting-01f or for dividing the-individual building elements.
  • Fig. 1 is a first form of construction of the device shown diagrammatically in side elevation;
  • Fig. 2 is a second form of construction of'the device, likewise in side elevation;
  • Fig. 3 is a third example of construction of the device in top view
  • Fig. MS a fourth example of construction-of the device in top view
  • t Fig. 5 is a fifth form of construction of the-device top view.
  • the device has a progressive production: belt 1 passing the guide pulley 6b the reinforcement 4 passes longit'ue dinally above the conveyor track 1 and is anchored a endlessly over the rollers 2a, 2b, the rollers 2a being the driving rollers. It is assumed that the endlessly designed production'belt 1 moves in the direction of the arrow P. Adjacent to the driving roller Zaof the production belt there is located a production table 3., p
  • the reinforcement consistingof at least one reinforcing wire 4 is led from a stock" spool 5 arranged in front of the production belt over the guide pulleys 6a, 6b and the pulley 7 from which a weight'8 is suspended, From releasable lock 9 by which the wound-on reinforcing wire 4 is prevented from unwinding from the stock spool 5.
  • an hydraulic press might'be provided for tensioning the reinforcement
  • draulic press 30, seen in Fig. 5 comprises a'pis'ton moving in a cylinder.
  • the hydraulic fluid prevents the, rotation of the stock spool, as illustrated.
  • the pre-stressed reinforcing wires already provided in the right number and distribution are surrounded by molding means such as an' en closure or way of example by a shuttering, and the latter is filled with binding material.
  • the building elements to. be produced are already given theirshape on theproduc tion table 3 so that with exception of the setting and,,.the removal of the shuttering the production procedure'is completed at this point.
  • the production belt 1 which is provided with special drivers 10 pushes the element 11 lying on the production table 3 into the heating duct 12;
  • the drivers 10 may abut against the shuttering to'which the wires 4 are connected, or they may be connected directly to the wires 4.
  • the shuttering may be connected'frictionally to the wires 4 whereby the clamping action of the component parts of, the shuttering will be suificientopull the shutterings along with the wires.
  • the element 11 After passing the heating duct 12 the element 11 has been artificially set so that the set elements. 11 issuing from the heating duct 12 can have the shuttering removed. On its return to the driving roller 2a the production belt 1 can carry along with it the shuttering elements inasfar as such arerequired for the production of the elements.
  • a cutting device 13 by which the reinforcing wires 4 are cut apart between the individual elements 11 so that the finished elements can be fed onto a roller table 14 arranged behindthe production belt for their removal.
  • the anchoring of the fire-stressed wire 4 takes place, in the foremost set element 11 which issup ported o' n' the production belt 1 by means of the driver 10a.
  • WeightiS is lifted. By releasing the locking-device 9 atthe stock; spool the'v weight 8: can again be; lowered.
  • Stock spool 5 comprises a toothed wheel, which uponrotation feeds;- wire: 4;
  • Locking device 9' comprises a toothed rack which; can efiecttthe requisite-rotation of stoclc.spool:5'; By. locking'sthe toothedrack against move ment, the stock spool is also prevented'from moving and the; desired tension: can. be; maintained;
  • the special device. may compri'sea notch-in drivers.10. which notch. is lined withfrictional..material, thereby assuring seating. of .the'
  • a. spring; clamp. may be seated. in the apex of thexnotch to securethewires .4in position.
  • the advancing speed offtheproduction belt 1 and thusthe output of the device. is conditioned by:
  • the length of the heating duct By the correct choice. of the length of the heating duct an advancing speed can be used which depends onthe production time at the production table only. If the. length 'of' tlie heating duct is not to be too great, several elements might be produced'side by side. on theproduction table.3 by oneworker, said elements also moving on side. by. sideon one and the same production belt.
  • Theadvanceof the production belt 1 can at will takev place continuously or intermittently.
  • Theaemploymentofa weight 8 is not necessary for obtaining theinitialtension of the reinforcement.
  • the initial. tension'tcanw also' be obtained bya. co-action of the: drivezflmand the.lock.9 adapted to'each other.
  • an arrangement could be'provided with which' the production beltand thedrivers would have to overcome tlie'frictionalforces only, whilst a special feed' dee vice"'located"atthe outgoing end would take up the prestress'"force'. I'n'themost simple case there is a sliding plane insteadv of the. production belt. In this casethe. feed. device handles the sum of the pre-stress forces and the frictionaliforces.
  • FIG. 2 The. example. of embodiment shownin Fig. 2 employs a'stationary table 3, 3a instead of a conveyor belt, said stationary table serving as a production support of the b'ui1ding .elements. to be produced.
  • the; production table can be provided with special means such as closely spaced rollers. formingv the.v support. for. the..elements..
  • This embodiment is particularly suitable for the production of the building elements by means of shutterings 15.
  • Each shuttering is connected at its rear side to the reinforcement 4, for example by clamping plates clampable to the reinforcement; as is" indicated in the drawing at 16.
  • a driving roller 17 is arranged at the end of the progressive production table. to which, by way of example by the interposition of a pulley block, a reciprocating draw belt 18"issecured the free ends of which can be linkedi to. the shuttering ofan element already, setor to the reinforcement directly by means of a hook or the like for the purpose of advancingthe elements.
  • the reinforcement unwound from the stock spool 5 is passed through a-tensioning device consistingxof za roller. 19 provided with a catch or toothed rack, the arrangement:
  • ASfS0OI11aS th6 draw belt 18 has advanced a coupled buildingelement by its forward movement towards v the driving roller-.117. and thus all the. elements on the. pro.
  • the cutting-01f device 13 for separating the; individual elements can come into operation whilst the securing member 20 is in engagement.
  • the two rollers 17 and 19 may with advantage be electric winches.
  • any desired lengths can be produced without interruption since, after. exhaustion of the supply on the spools the. reinforcingwires can be lengthened by joining.
  • normal'method of. operation by increasing the working time or by introducingshifb work there-is the possibility hitherto unattainable with pre-stressed concrete of increasing the production output without having to expand the existing plant.
  • special arrangement according to the invention allthe well-known advantages of progressing production are. exploited; Compared with the so-called' tension table method considerable. saving of working time results by avoiding pauses, by simplifying the operating cycle, by reducing the various types of operations and by extensive mechanization.
  • the wires are fed from respective sources while maintained under uniform stress. They are separated into an inner group and an outer group and these groups are displaced relative to each other between two positions. In displacement towards each other, the number of reinforcing wires in each element is increased. In displacement away from each other, the number of reinforcing wires is decreased. This is effected by the use of coupling means to which all of said wires are connected. Winches may be employed to maintain the stress on the wires being displaced, the winches being positioned on that side of the coupling means where the groups of wires are more distant from each other.
  • Fig. 3 shows how the number of reinforcing wires may be increased from two to four after elements of the production length L have produced.
  • the additional wires 4b running off the stock spools 19 provided with catches or toothed racks are anchored by their beginnings to a coupling member 22 extending transversely across the production line and also passing through the heating duct not shown.
  • the ends of the coupling member 22 are connected to tensile elements 24, wires or wire cables, which in turn are connected to a winch 23 each.
  • the tensile elements 24 pass through the heating duct not shown, but are disposed outside of the elements positioned on the production line.
  • the winches 23 and the stock spools 19 are rotated simultaneously in such a manner that the coupling member 22 moves to the right from the point dd in Fig. 3 and the tension on the wires 4b is continuously maintained.
  • the initial tension force can be transferred to the drive 17 by means of the draw device 18.
  • Fig. 4 shows diagrammatically how the production of building elements having four reinforcing wires can be changed over to the production of elements having two wires only.
  • the ends of the wires 4b to be removed are anchored to a coupling member 22 connected by means of the tensile elements 25 to the winches 23 which can be retarded in accordance with the desired initial tension in the wires 4b when the drive 17 pulls the wires to the right in Fig. 4 by means of the draw device 18.
  • the winches 2b may be identical with stock spools 19 provided with a lock.
  • the device shown in Fig. has two endless draft ropes 27 extending along the production line and passing over a drive pulley 29 and a reverse pulley 28 each of the latter being adapted as a tensioning pulley and being under the action of an hydraulic press 30. At least one strand of the draft rope 27 passes within the heating duct not shown, but outside of the building elements being produced, and is detachably connected to two coupling members 22a and 22b. By means of the front coupling member 22a the full initial tension force is transferred to the driving rollers 29, since the front ends of the reinforcing wires are anchored to the coupling member 22a.
  • the two central reinforcing wires 4a run off from the stock spools 19 provided with locks whilst, the two outside reinforcing wires 4b are anchored with their rear ends to the coupling member 22b in the example shown since in this case there is to be a changeover from production with four wires that with two. wires. If production withfour wires were to be con;
  • an endless production belt it can be used on its return path not'only for returning the empty shuttering or the finished building elements, but it can also be used for the production of pre-stressed building elements.
  • the whole device may be of advantage to sink the whole device to such an extent that the heating duct is disposed completely below the surface of the ground. In this manner a better heating insulation is obtained and in addition the whole area between the production table and the cutting off device can be used as storage space.
  • the concrete of the building elements can be made to set in the heating duct by high frequency heating, by infra-red irradiation, by treatment with gases and vapours, or by continuous vibration.
  • An apparatus for continuous production of prestressed reinforced concrete elements including supporting means, a plurality of molding means for said elements, reinforcing means passing through said molding means consecutively, supply means for said reinforcing means, means for advancing said molding means along said supporting means, means for supplying concrete to said molding means, and means for severing said reinforcing means between adjacent elements on said supporting means, said supply means for said reinforcing means including spool feeding means, intermittently actuated locking means for said spool feeding means, and weighed means suspended on said reinforcing means for maintaining a predetermined stress on said reinforcing means, said weighted means being positioned between said locking means and said molding means.
  • said means for advancing said molding means including a reciprocating draw device for advancing each of said molding means upon arrival of the latter at a predetermined location and further locking means for maintaining said predetermined stress when said reciprocating draw device is being returned to said predetermined location while disengaged from said molding means.
  • An apparatus including coupling means to which said reinforcing means are connected, the relative positions of said reinforcing means being different on either side of said coupling means, said relative positions representing a compacted position wherein all of said reinforcing means are included in said element and a distant position wherein only part of said reinforcing means are included in said element, whereby the number of reinforcing means passing through each element may be varied.
  • An apparatus including a winch for each of said reinforcing means to be displaced and coupled thereto, said winch being positioned on that side of said coupling member where said reinforcing means are in said distant position.
  • said supporting means including an endless belt
  • said means for advancing said molding means including a plurality of actuation of said belt said molding means are advanced and saidpredetermined stress on said reinforcing means is maintainedby the coaction of said lugs, said weighted pplly 'nieans, andsaid' locking means.

Description

May 15, 1956 M. R. RO
PRODUCTION OF PRESTRESSED BUILDING ELEMENTS Filed Aug. :0, 1952 2 Sheets-Sheet 1 Inns-#7224 May 15, 1956 E; 2,745,164
PRODUCTION OF PRESTRESSED BUILDING ELEMENTS Filed Aug. 30, 1952 2 Sheets-Sheet 2 United States Patent PRODUCTION OF PRESTRESSED BUILDING ELEMENTS.
At present it is customary to produce'pre-stressed concrete on long tracks above which steel wires are stretched. The concrete surrounding the wires is charged into shuttering, "and after sufiicient setting of the concrete the wires are released and cut. Instead of shuttering to be filled with concrete a line of moulded bricks provided with grooves for the reception of the reinforcing wires may be used, said grooves being filled'with mortar.
The necessity of having to apply concrete and shuttering and moulded bricks respectively to the production track along the whole of its considerable length and'to compact the concrete by vibration leads to tedious transport and complicated manufacturing operations.
Therefore the suggestion has been made to arrange a table at a certain point of the production track where the shuttering is assembled and the concrete is charged and compacted. The elements thus produced are then pushed along the reinforcing Wires to their positions on the production tables where a second vibration takes care of a renewed tight envelopment of the Wires by the concrete. After setting the elements are drawn by the wires to a further table where the shutteringfis removed and the wires are out between the individual 'elements. In this manner a certain rationalization can be achieved. The following disadvantages, however, still exist: For one it is necessary to lay out and pre-stress the wires on each track again after completing the production of a certain number of building elements; furthermore the elements contained in their shuttering have to be slid along the wires, necessitating as a rule that at the final setting place the concrete has to be compacted once more by vibration.
. The aim of the present invention isto eliminate the described disadvantages. The invention relates to a method for producing pre-stressed building elements as well as to a device for carrying out said method;
The method according to the invention, is characteriz'ed in that a reinforcem ent of any desired length is mowed 'across'a progressive production support and is simultaneously brought to the desired initial tension, and that the building elements are formed on the progressive production'support by embedding the reinforcement in concrete,.wh'ereupon they are fed through a setting duct and thereafter are cut apart, care being taken that the initial tension in the reinforcement stretched along the,
progressive production support is maintained at all times. The device for carrying out said method is characterized by a progressive production support for the elements to be produced provided with means for. advancing the building elements, at least one stock'spool forat least one reinforcing wire stretched longitudinally across the progressive production support in connection with a wire tensioning device arranged in advance of said support, andin addition by a setting duct through which said progressiveproduction support passes, and a cutting-01f or for dividing the-individual building elements.
severing" device arranged towards theend of said support 2,745,164 Patented May 15, 1956 By way'of example several embodiments of the device according to the invention are shownin the drawings accompanying and forming part of this Specification in which: i Y
Fig. 1 is a first form of construction of the device shown diagrammatically in side elevation;
Fig. 2 is a second form of construction of'the device, likewise in side elevation;
Fig. 3 is a third example of construction of the device in top view;
Fig. MS a fourth example of construction-of the device in top view; and t Fig. 5 is a fifth form of construction of the-device top view.
According to the form of construction shown in'Fig. 1
the device has a progressive production: belt 1 passing the guide pulley 6b the reinforcement 4 passes longit'ue dinally above the conveyor track 1 and is anchored a endlessly over the rollers 2a, 2b, the rollers 2a being the driving rollers. It is assumed that the endlessly designed production'belt 1 moves in the direction of the arrow P. Adjacent to the driving roller Zaof the production belt there is located a production table 3., p
The reinforcement consistingof at least one reinforcing wire 4 is led from a stock" spool 5 arranged in front of the production belt over the guide pulleys 6a, 6b and the pulley 7 from which a weight'8 is suspended, From releasable lock 9 by which the wound-on reinforcing wire 4 is prevented from unwinding from the stock spool 5. Instead of the weight an hydraulic press might'be provided for tensioning the reinforcement The ;hy-
draulic press 30, seen in Fig. 5, comprises a'pis'ton moving in a cylinder. The hydraulic fluid prevents the, rotation of the stock spool, as illustrated. I
On the production table 3 the pre-stressed reinforcing wires already provided in the right number and distribution are surrounded by molding means such as an' en closure or way of example by a shuttering, and the latter is filled with binding material. The building elements to. be produced are already given theirshape on theproduc tion table 3 so that with exception of the setting and,,.the removal of the shuttering the production procedure'is completed at this point. i I
The production belt 1 which is provided with special drivers 10 pushes the element 11 lying on the production table 3 into the heating duct 12; Forfthis purpose the drivers 10 may abut against the shuttering to'which the wires 4 are connected, or they may be connected directly to the wires 4. The shuttering may be connected'frictionally to the wires 4 whereby the clamping action of the component parts of, the shuttering will be suificientopull the shutterings along with the wires.
After passing the heating duct 12 the element 11 has been artificially set so that the set elements. 11 issuing from the heating duct 12 can have the shuttering removed. On its return to the driving roller 2a the production belt 1 can carry along with it the shuttering elements inasfar as such arerequired for the production of the elements.
In the rear of the heating duct 12, but still above the production belt 1, there is provided a cutting device 13 by which the reinforcing wires 4 are cut apart between the individual elements 11 so that the finished elements can be fed onto a roller table 14 arranged behindthe production belt for their removal. i I The anchoring of the fire-stressed wire 4 takes place, in the foremost set element 11 which issup ported o' n' the production belt 1 by means of the driver 10a. As
WeightiS is lifted. By releasing the locking-device 9 atthe stock; spool the'v weight 8: can again be; lowered.
Stock spool 5 comprises a toothed wheel, which uponrotation feeds;- wire: 4; Locking device 9'comprises a toothed rack which; can efiecttthe requisite-rotation of stoclc.spool:5'; By. locking'sthe toothedrack against move ment, the stock spool is also prevented'from moving and the; desired tension: can. be; maintained;
At the start of production there is not thezpossibility of:.anchoring -.the:reinforcement in: the set:.elements .as at that moment no such elements are yet in-existence'. In: this 1 case: the. procedure 115.135. follows The weight 8 is first of all locked by preventingrelativermovernent ofzspoolfi. and toothed rack. 9. Then the reinforcing wires14-are secured to the :driversll) by means ofr'a special.device. andiare'then put under; initial tension. by. operation. of. the. drive 2a,v whereupon production of; theelementsscanstart. As soonas the first element with thegspecial. securing device. reachestthe cuttingmachine 13, said device cantberemoved from the driver, since the anchorage .of.the.reinforcement1is ensuredby the elements set .in the heating,duct.-12 themselves.- The special device. may compri'sea notch-in drivers.10. which notch. is lined withfrictional..material, thereby assuring seating. of .the'
wires .4 in. the.notch .and simultaneously preventing; relatiye rntfwen entof. the wires and. drivers. Alternately, a. spring; clamp. may be seated. in the apex of thexnotch to securethewires .4in position.
' The operators. have toattend to:
' (1.).Tlie-..production table 3 where the main work is. carried. out, namely shuttering, charging of the material, vibratingandfromwhere the feed of. the production beltv 1" is: controlled;
(2), The cuttingmachine 13, and
(3) The roller. table 14, where; the. finished elements.
are loaded for. conveying to store.
The advancing speed offtheproduction belt 1 and thusthe output of the device. is conditioned by:
(1)) The time required for producing one element on the production table,
(2) The settingtitne. in the heating duct.
By the correct choice. of the length of the heating duct an advancing speed can be used which depends onthe production time at the production table only. If the. length 'of' tlie heating duct is not to be too great, several elements might be produced'side by side. on theproduction table.3 by oneworker, said elements also moving on side. by. sideon one and the same production belt.
Theadvanceof the production belt 1 can at will takev place continuously or intermittently.
Theaemploymentofa weight 8 is not necessary for obtaining theinitialtension of the reinforcement. The initial. tension'tcanwalso' be obtained bya. co-action of the: drivezflmand the.lock.9 adapted to'each other. Furthermore, instead of: having the'production belt with the drivers take: up the pre-stress force andall frictional forces; an arrangement could be'provided with which' the production beltand thedrivers would have to overcome tlie'frictionalforces only, whilst a special feed' dee vice"'located"atthe outgoing end would take up the prestress'"force'. I'n'themost simple case there is a sliding plane insteadv of the. production belt. In this casethe. feed. device handles the sum of the pre-stress forces and the frictionaliforces.
' The. example. of embodiment shownin Fig. 2 employs a'stationary table 3, 3a instead of a conveyor belt, said stationary table serving as a production support of the b'ui1ding .elements. to be produced. For reducing. thefi'iction-duringfeeding of the elements the; production table can be provided with special means such as closely spaced rollers. formingv the.v support. for. the..elements..
This embodiment is particularly suitable for the production of the building elements by means of shutterings 15. Each shuttering is connected at its rear side to the reinforcement 4, for example by clamping plates clampable to the reinforcement; as is" indicated in the drawing at 16. For. the feed of the elements and the shutterings 15 respectively and for the: initial. tensioning-ofthe-reinforcement a driving roller 17 is arranged at the end of the progressive production table. to which, by way of example by the interposition of a pulley block, a reciprocating draw belt 18"issecured the free ends of which can be linkedi to. the shuttering ofan element already, setor to the reinforcement directly by means of a hook or the like for the purpose of advancingthe elements. Before being led over the progressive production table, the reinforcement unwound from the stock spool 5 is passed through a-tensioning device consistingxof za roller. 19 provided with a catch or toothed rack, the arrangement:
being such that the catchof. the roller'19 is-madesto co-operate with. the driving roller. 17 in. such a manner;
that the reinforcement is always maintained at the prevscribed tension, even during feeding'thereof. To achieve this the driving roller 17 is at all times rotated slightly;-
more than the roller 19 thus tobalance the linear exten: sion of.the reinforcement resulting from the initial. tensioning.
ASfS0OI11aS th6 draw belt 18 has advanced a coupled buildingelement by its forward movement towards v the driving roller-.117. and thus all the. elements on the. pro.
duction: support. connected to the reinforcement 4-have advancedby one step from a.-a to bb a. securing member. 20- of beam-like shape and abutting. against special; abutments is placed behind the next-following element 15 at aa in order to maintain the initial tension. inithe reinforcement 4, whilst the draw belt 18 is released;
and its end provided with the hook is returned, for
exampleby hand, from bbto a-aand ishooked to.
the next element. The cutting-01f device 13 for separating the; individual elements can come into operation whilst the securing member 20 is in engagement. The two rollers 17 and 19 may with advantage be electric winches.
Obviously the two examples of construction may be combined, e. g. in such a manner that in. they device.
according to Fig. 2 the progressive-production support.
is anv endless conveyor belt which may or may not be provided withdrivers and is in connection with a drive themovements of which being additionally coordinated.
method. Once. the reinforcements have been anchored.
any desired lengths can be produced without interruption since, after. exhaustion of the supply on the spools the. reinforcingwires can be lengthened by joining. Thus with the most rationalized, normal'method of. operationby increasing the working time or by introducingshifb work there-is the possibility hitherto unattainable with pre-stressed concrete of increasing the production output without having to expand the existing plant. special arrangement according to the invention allthe well-known advantages of progressing production are. exploited; Compared with the so-called' tension table method considerable. saving of working time results by avoiding pauses, by simplifying the operating cycle, by reducing the various types of operations and by extensive mechanization.
To. permit more or lessheavily reinforced building; elements. to. be produced on the same production line. without interruption it must bev possible to changp. the" By the number of reinfor'cing'wires at any time without atfecting the initial tension of the reinforcing wires inthe element in the process of production at the time. This is'possible with the constructions of the device according to Figs. 3 to 5, which represent top views of devices generally similar to that of Fig. 2. The several reinforcing wires 4a and 4b are equivalent to .wire 4 ;of'Fig.; 2.
The wires are fed from respective sources while maintained under uniform stress. They are separated into an inner group and an outer group and these groups are displaced relative to each other between two positions. In displacement towards each other, the number of reinforcing wires in each element is increased. In displacement away from each other, the number of reinforcing wires is decreased. This is effected by the use of coupling means to which all of said wires are connected. Winches may be employed to maintain the stress on the wires being displaced, the winches being positioned on that side of the coupling means where the groups of wires are more distant from each other.
By way of example Fig. 3 shows how the number of reinforcing wires may be increased from two to four after elements of the production length L have produced.
The additional wires 4b running off the stock spools 19 provided with catches or toothed racks are anchored by their beginnings to a coupling member 22 extending transversely across the production line and also passing through the heating duct not shown. The ends of the coupling member 22 are connected to tensile elements 24, wires or wire cables, which in turn are connected to a winch 23 each. By driving the winches 23 and at the same time locking the rollers 19 the reinforcing wires 4b are subjected to the desired initial tension without thus affecting the initial tension on the two other wires 4a. The tensile elements 24 pass through the heating duct not shown, but are disposed outside of the elements positioned on the production line. At each advance step of the building elements the winches 23 and the stock spools 19 are rotated simultaneously in such a manner that the coupling member 22 moves to the right from the point dd in Fig. 3 and the tension on the wires 4b is continuously maintained. When the point d--d has reached the point c-c the initial tension force can be transferred to the drive 17 by means of the draw device 18.
Fig. 4 shows diagrammatically how the production of building elements having four reinforcing wires can be changed over to the production of elements having two wires only. For this purpose the ends of the wires 4b to be removed are anchored to a coupling member 22 connected by means of the tensile elements 25 to the winches 23 which can be retarded in accordance with the desired initial tension in the wires 4b when the drive 17 pulls the wires to the right in Fig. 4 by means of the draw device 18. When the coupling member 22 has moved from the point d-d to the point c-c said coupling member can be removed. The winches 2b may be identical with stock spools 19 provided with a lock.
The device shown in Fig. has two endless draft ropes 27 extending along the production line and passing over a drive pulley 29 and a reverse pulley 28 each of the latter being adapted as a tensioning pulley and being under the action of an hydraulic press 30. At least one strand of the draft rope 27 passes within the heating duct not shown, but outside of the building elements being produced, and is detachably connected to two coupling members 22a and 22b. By means of the front coupling member 22a the full initial tension force is transferred to the driving rollers 29, since the front ends of the reinforcing wires are anchored to the coupling member 22a. The two central reinforcing wires 4a run off from the stock spools 19 provided with locks whilst, the two outside reinforcing wires 4b are anchored with their rear ends to the coupling member 22b in the example shown since in this case there is to be a changeover from production with four wires that with two. wires. If production withfour wires were to be con;
front coupling. member 22a can be removed; With further progress of the production the two coupling members 22a and 220 must be exchanged in their role continuously.
If an endless production belt is used, it can be used on its return path not'only for returning the empty shuttering or the finished building elements, but it can also be used for the production of pre-stressed building elements.
It may be of advantage to sink the whole device to such an extent that the heating duct is disposed completely below the surface of the ground. In this manner a better heating insulation is obtained and in addition the whole area between the production table and the cutting off device can be used as storage space.
Instead of by customary heating the concrete of the building elements can be made to set in the heating duct by high frequency heating, by infra-red irradiation, by treatment with gases and vapours, or by continuous vibration.
What I claim and desire to secure by Letters Patent is:
1. An apparatus for continuous production of prestressed reinforced concrete elements, including supporting means, a plurality of molding means for said elements, reinforcing means passing through said molding means consecutively, supply means for said reinforcing means, means for advancing said molding means along said supporting means, means for supplying concrete to said molding means, and means for severing said reinforcing means between adjacent elements on said supporting means, said supply means for said reinforcing means including spool feeding means, intermittently actuated locking means for said spool feeding means, and weighed means suspended on said reinforcing means for maintaining a predetermined stress on said reinforcing means, said weighted means being positioned between said locking means and said molding means.
2. The apparatus according to claim 1, said means for advancing said molding means including a reciprocating draw device for advancing each of said molding means upon arrival of the latter at a predetermined location and further locking means for maintaining said predetermined stress when said reciprocating draw device is being returned to said predetermined location while disengaged from said molding means.
3. An apparatus according to claim 2, including coupling means to which said reinforcing means are connected, the relative positions of said reinforcing means being different on either side of said coupling means, said relative positions representing a compacted position wherein all of said reinforcing means are included in said element and a distant position wherein only part of said reinforcing means are included in said element, whereby the number of reinforcing means passing through each element may be varied.
4. An apparatus according to claim 3, including a winch for each of said reinforcing means to be displaced and coupled thereto, said winch being positioned on that side of said coupling member where said reinforcing means are in said distant position.
5. An apparatus according to claim 1, said supporting means including an endless belt, and said means for advancing said molding means including a plurality of actuation of said belt said molding means are advanced and saidpredetermined stress on said reinforcing means is maintainedby the coaction of said lugs, said weighted pplly 'nieans, andsaid' locking means. i
References Cited'in the file of this patent UNITED STATES PATENTS I v Trickey et all May 16, 1944 Earlier et a1 m Feb. 5, 1946 D'anhofl Sept; 25; 1951' Schroder Aug. 19; 1952 FOREIGN PATENTS Sweden Mar; 23; 1946 Italy Nov. 20, 1947'
US307228A 1951-08-30 1952-08-30 Production of prestressed building elements Expired - Lifetime US2745164A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH2745164X 1951-08-30

Publications (1)

Publication Number Publication Date
US2745164A true US2745164A (en) 1956-05-15

Family

ID=4571443

Family Applications (1)

Application Number Title Priority Date Filing Date
US307228A Expired - Lifetime US2745164A (en) 1951-08-30 1952-08-30 Production of prestressed building elements

Country Status (2)

Country Link
US (1) US2745164A (en)
CH (1) CH292714A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3074116A (en) * 1957-09-20 1963-01-22 English Electric Co Ltd Method for making combined plastic and metallic structures
US3128521A (en) * 1959-10-05 1964-04-14 J L Cone Jr C W Cone Apparatus for molding pre-stressed concrete members
US3283385A (en) * 1963-08-21 1966-11-08 Richard Lees Ltd Apparatus for making prestressed concrete
US3903222A (en) * 1974-04-11 1975-09-02 Jr Patrick F Brown Method for producing prestressed concrete
US3969872A (en) * 1971-09-20 1976-07-20 Wesse Harry M Method of constructing modular buildings
US4186169A (en) * 1976-10-21 1980-01-29 Universal Development Company Limited Process and apparatus for continuously prestressing concrete products
US4269579A (en) * 1976-09-13 1981-05-26 Imperial Chemical Industries Limited Apparatus for injection molding against a preformed web
US4462946A (en) * 1982-10-12 1984-07-31 Goldsworthy Engineering, Inc. Apparatus and method for producing reinforced plastic composite articles of non-uniform shape and non-uniform volume
WO1985004362A1 (en) * 1984-04-02 1985-10-10 Oy Partek Ab A method of and an apparatus for producing a prestressed, continuous concrete product
EP0628675A1 (en) * 1993-06-07 1994-12-14 Horst Dr.-Ing. Kinkel Method for reinforcing a concrete structure and reinforcing elements for carrying out the method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1956967A (en) * 1929-04-16 1934-05-01 Raymond Concrete Pile Co Revetment and method and apparatus for forming the same
US1977374A (en) * 1927-08-06 1934-10-16 Bergen Building Block Company Method of making blocks of plastic material and apparatus therefor
US2348765A (en) * 1941-09-04 1944-05-16 Lock Joint Pipe Co Method and machine for winding
US2394228A (en) * 1943-07-26 1946-02-05 Dowsett Engineering Constructi Apparatus and method for the production of prestressed concrete sleepers
US2569231A (en) * 1949-06-10 1951-09-25 Concrete Patents Ltd Apparatus for molding prestressed reinforced concrete elements
US2590478A (en) * 1946-09-13 1952-03-25 Weinberg Victor Apparatus and method for molding prestressed concrete structural members
US2607099A (en) * 1948-10-01 1952-08-19 Schroder Werner Method and apparatus for molding reinforced concrete elements

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1977374A (en) * 1927-08-06 1934-10-16 Bergen Building Block Company Method of making blocks of plastic material and apparatus therefor
US1956967A (en) * 1929-04-16 1934-05-01 Raymond Concrete Pile Co Revetment and method and apparatus for forming the same
US2348765A (en) * 1941-09-04 1944-05-16 Lock Joint Pipe Co Method and machine for winding
US2394228A (en) * 1943-07-26 1946-02-05 Dowsett Engineering Constructi Apparatus and method for the production of prestressed concrete sleepers
US2590478A (en) * 1946-09-13 1952-03-25 Weinberg Victor Apparatus and method for molding prestressed concrete structural members
US2607099A (en) * 1948-10-01 1952-08-19 Schroder Werner Method and apparatus for molding reinforced concrete elements
US2569231A (en) * 1949-06-10 1951-09-25 Concrete Patents Ltd Apparatus for molding prestressed reinforced concrete elements

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3074116A (en) * 1957-09-20 1963-01-22 English Electric Co Ltd Method for making combined plastic and metallic structures
US3128521A (en) * 1959-10-05 1964-04-14 J L Cone Jr C W Cone Apparatus for molding pre-stressed concrete members
US3283385A (en) * 1963-08-21 1966-11-08 Richard Lees Ltd Apparatus for making prestressed concrete
US3969872A (en) * 1971-09-20 1976-07-20 Wesse Harry M Method of constructing modular buildings
US3903222A (en) * 1974-04-11 1975-09-02 Jr Patrick F Brown Method for producing prestressed concrete
US4269579A (en) * 1976-09-13 1981-05-26 Imperial Chemical Industries Limited Apparatus for injection molding against a preformed web
US4186169A (en) * 1976-10-21 1980-01-29 Universal Development Company Limited Process and apparatus for continuously prestressing concrete products
US4240776A (en) * 1976-10-21 1980-12-23 Universal Development Company Ltd. Process and apparatus for continuously prestressing concrete products
US4462946A (en) * 1982-10-12 1984-07-31 Goldsworthy Engineering, Inc. Apparatus and method for producing reinforced plastic composite articles of non-uniform shape and non-uniform volume
WO1985004362A1 (en) * 1984-04-02 1985-10-10 Oy Partek Ab A method of and an apparatus for producing a prestressed, continuous concrete product
EP0628675A1 (en) * 1993-06-07 1994-12-14 Horst Dr.-Ing. Kinkel Method for reinforcing a concrete structure and reinforcing elements for carrying out the method

Also Published As

Publication number Publication date
CH292714A (en) 1953-08-31

Similar Documents

Publication Publication Date Title
US2745164A (en) Production of prestressed building elements
EP0289017B1 (en) Plant to manufacture elongated elements of prestressed reinforced concrete
US3720493A (en) Machine for the manufacture of reinforced concrete or prestressed concrete elements
US2394227A (en) Production of prestressed reinforced concrete units
GB744907A (en) Improvements in or relating to the manufacture of belting
US1956967A (en) Revetment and method and apparatus for forming the same
US3271215A (en) Method of continuously forming reinforced resinous sheet material
US2842257A (en) Extensible flexible frame conveyor and method of mining therewith
US2607099A (en) Method and apparatus for molding reinforced concrete elements
US3897869A (en) Conveyor construction
GB1330204A (en) Prestressing apparatus and method
BG62057B1 (en) Deeply ribbed sandwich-type panel, method for its preparation and device for carrying out the method
US3694118A (en) Production of prestressed concrete
GB1389738A (en) Concrete pipes
DE60114375T2 (en) METHOD AND APPARATUS FOR PREPARING PRE-LOADED CONCRETE PRODUCTS
ES444308A1 (en) Flexible belt arrangement for securing winding conductors
US3759112A (en) V-belt
GB1457639A (en) Warp knitted fabric a method and an apparatus for producing the same
DE7425366U (en) DEVICE FOR SCREW-SHAPED, NON-OVERLAPPING WINDING OF A CYLINDRICAL HOLLOW BODY
SU94911A1 (en) Armature Coiling Device
US3325870A (en) Article handling and treating system for block making
GB1486182A (en) Machine for compacting and facilitating the tying of coil
SU969864A1 (en) Installation for forming reinforcement packages
SU676664A1 (en) Apparatus for making flat rubberized ropes
DE859871C (en) Process and device for the continuous production of pre-stressed reinforced concrete prefabricated parts