US2055876A - Tunneling - Google Patents

Tunneling Download PDF

Info

Publication number
US2055876A
US2055876A US740595A US74059534A US2055876A US 2055876 A US2055876 A US 2055876A US 740595 A US740595 A US 740595A US 74059534 A US74059534 A US 74059534A US 2055876 A US2055876 A US 2055876A
Authority
US
United States
Prior art keywords
tunnel
posts
excavating
tunneling
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US740595A
Inventor
William J Newman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US740595A priority Critical patent/US2055876A/en
Application granted granted Critical
Publication of US2055876A publication Critical patent/US2055876A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines

Definitions

  • This invention relates to an improved method of tunneling and is particularly intended for use where the tunnel is to be dug through earth or clay as distinguishedv from tunneling through rock, although some features of my improved method may be applicable to various kinds of tunnels.
  • the principal object of the invention is to provide an improved method of tunneling through earth, clay, or the like, whereby the operations may be carried on in an economical and safe manner.
  • Other objects of the invention are to provide means for tunneling whereby the roof and walls may be supported to the fullest extent to prevent caving or leakage; to provide an improved system of tunneling whereby an excavating machine may be freely used for ⁇ taking out the larger portion of the material; to provide a step by step method of tunneling in which the material will be taken out in different areas and the lining and bracing will be'introduced in a novel manner; and to provide such other improvements as will appear from the following description.
  • Figure 1 is a sectional view illustrating the rst step or operation which consists in making an opening at the bottom of the tunnel and inserting suitable supports;
  • Figure 2 is a view showing the next step or opening at the top of the tunnel and roof supports
  • Figure 3 is a detail showing the arrangement at the ⁇ top of the tunnel for further supporting the roof;
  • Figure 4 fillustrates the next succeeding step which consists in making vertical cuts or channels-preferably by means ofa suitable excavating machine and placing supporting members there-
  • Figure 5 shows the next step or removal of the core or center part of the tunnel after suitable braces have been placed in position;
  • Figure 6 shows the tunnel after the sides have been excavated, preferably by hand, and further bracing installed
  • Figure 7 is similar to Figure 6, showing the raised temporary ilooring and indicating the positioning of the concrete re-inforcing members;
  • Y Figure 8 is a longitudinal sectional view of the tunnel showing the excavating machine in position
  • Figure 9 is a sectional detail taken on the line 9 9 of Figure 7;
  • Figure 10 is a sectional detail taken on the' line IU--III of Figure 6;
  • Figure 11 is a sectional detail taken on the line II-II of Figure 6.
  • Figure 12 is a detail of the temporary or removable door.
  • a substantially rectangular hole I4 is dug at the bottom of the tunnel, preferably by means of an excavating machine.
  • the drawings are intended to illustrate a .tunnel having an excavation of approximately 21 feet in height and for this size tunnel the hole I4 may conveniently be made about four feet high and twelve feet wide and extending inwardly about five feet.
  • Planking I5 is placed at the bottom of the hole and other planking or plates I6 placed at the top of the hole with jacks I 'l arranged as shown for supporting the roof.
  • next steps as shown in Figure 2 consist'in making a central vertical cut at the top of the tunnel as indicated at b, which cut is made by a machine and may be about twenty-two inches wide and four feet deep and four to six feet in height.
  • a liner plate I8 such as usually used for roof support is then placed in position and is held by one or more jacks I9. Additional cuts as indicated at c, c', d, d', etc. are then made and as each cut is completed a liner plate and supporting jacks is placed therein so that when all oi such cuts have been finished the roof of the tunnel will be outlined as shown and will be supported by means of liner plates and jacks which rest on the iioor of this upper cut.
  • curved ribs 20 preferably formed of I-beams are placed in position under the liner plates preparatory to subsequently supporting said plates after the removal of the jacks I9.
  • 'Ihe ribs 20 may be made in single pieces or may be made in two pieces joined together at the center as shown at 2
  • ribs may be supported temporarily in any desired manner but are subsequently supported by posts and framework which will presently be de-
  • the next step as shown in Fig. 4 consists in making two vertical cuts or kerfs, 22. These cuts are preferably made by means of an excavating machine and may conveniently be made about 22 inches Wide and extend back in the same distance as the previous excavations. After these cuts have been made posts or struts, 23, are placed therein. These posts should be strong and substantial and adapted t ⁇ o withstand lateral as well as vertical pressure. They are preferably formed of two I-beams with a filler of wood as indicated in Fig. 11.
  • the lower ends of these posts are supported on the planking, I5, and they are connected or braced at the top by cross beams, 24, having screw jacks, 25, at the ends for tightening the same.
  • These beams may be connected to the posts by angle irons, 28, or other suitable connections.
  • the posts are provided at the top with jacks or screws, 21, as shown in Fig. 10, which support beams, 28, which extend longitudinally of the tunnel and engage with the ribs, 20. These beams engage with lugs or bosses 29 ⁇ on the ribs which provide a suitable bearing for the same.
  • theY jacks I 9 mayY be removed Yand the liner plates I8 and the roof of the tunnel willbe securely supported by such posts and framework.
  • the nextstep in the operation is shown in Fig. 5 and consists in the removal of the core or center portion of the material which remains between the top and bottom cuts and the side cuts 22.
  • This material is also preferably all removed by means of the excavating machine, the framing provided by the posts and their connections leaving ample space in which the machine may operate.
  • Fig. 6 the material 30 remaining at the sides of the tunnel as seen in Fig., 5 may be removed preferably by hand andthus completing the excavation of a section.
  • the side liner plates 3l and ribs 32 are then placed in position and are supported by means of jacks or braces 33 which are inserted between the posts 23 and the ribs 32. Any suitable nurnber of such jacks or vbraces may be used depending upon the nature of the material.
  • Additional cross beams 34 may also be inserted between the posts 23these beams being preferably provided with screws or jacks 35 so that they may be tightened in position.
  • the platform or planking 36 is preferably about two feet above the bottom of the tunnel and serves as a flooring upon which the excavating machine 39 may run. It also serves as a flooring for tracks for cars or wheelbarrows which may be used for taking out the material excavated at the sides of the tunnel.
  • This elevation of the platform also serves to provide a suitable space for placing the lower reinforcement rods 40, as indicated in Fig. '7. These rods may be arranged in any desired man- 38 remain in position in the concrete.
  • ner but ordinarily will be overlapped at the center and extend outwardly and up for a short distance adjacent to the sides of the tunnel. They connect with other reinforcing rods 4I such as ordinarily are used for reinforcing the concrete in the tunnel lining or walls.
  • the concrete may be run in over the ooring 36 and dumped into position at the bottom of the tunnel, and preferably carried up at the sides to about the bottom of the arch.
  • the flooring or platforms 36 may then be removed, together with the legs 31, while the boxes In this manner the flooring may be repeatedly used and moved forward as the work progresses.
  • the forms (not shown) for the sides and roof may be placed in position and the concrete work carried on in the usual manner, the liner plates and the ribs ordinarily being left in position in the concrete.
  • sections of the platforms 36 may be removed for placing concrete in the bottom while the other sections remain in position to provide runways for the wheelbarrows or carts.
  • a few inches is preferably left at the top to be filled in after the top and sides of the tunnel have been completed, and this final layer will be bonded to the lower filling by the boxes 38 which serve in the nature of reinforcement for the flooring.
  • FIG. 8 shows a portion of a machine adapted for this purpose in position to make one of the forward cuts.
  • the machine is provided with a swinging boom 42 which carries the excavating buckets and may be driven in any suitable manner, but as the machine forms no part of the present invention further description is unnecessary.
  • one of the top cross braces 24 is shown as being removed from its original position between the forward posts 23 and lowered a sufficient distance to permit the operation of the cutters at the top of the tunnel. After the cut has been partially completed this brace or frame member may be returned to its original position.
  • Longitudinal beams or frame members 43 are also shown between the posts 23 as indicating any suitable bracing to be used to make the open framework through which the machine may operate. In some methods of tunnel excavation it is common to use a needle beam or central longitudinal beam which serves' as a support for the radial props.
  • the herein described method of tunneling which includes excavating holes in the face of the tunnel at the bottom and top thereof, providing supports for the roofs of said holes, then making vertical openings at the sides of the tunnel connecting said holes, then placing an open framework in the spaces provided by such excavating and supporting the roof by means of such framework, then removing the remaining material at the face and finally placing the supports for the sides of the tunnel and bracing the same from said framework.
  • the method of excavating a tunnel which includes digging a hole in the face of the tunnel at the bottom thereof by means of an excavating machine, then placing planking in the bottom of the hole and inserting means to support the ceiling of the hole, then digging a hole at the top of the tunnel of substantially the same depth as the one at the bottom thereof, placing liner plates and jacks in the upper hole'to temporarily support the ceiling thereof, then placing transverse ribs in position to support the liner plates, then making vertical cuts by means of an excavating machine adjacent to the sides of the tunnel andl connecting said bottom and top holes, then placing posts in said vertical cuts and connecting the same with the ribs to support the roof, then excavating the core at the center of the face by means of an excavating machine, and finally excavating the material at the sides by hand to complete the section.
  • the herein described tunneling method which consists in making an opening in the face at the top thereof with its upper wall conforming to the shape of the tunnel roof, inserting liner plates and jacks for temporarily supporting the roof, then making vertical openings in the face which are spaced apart leaving a center core and placing posts therein with jacks at the top for supporting the roof, then removing the remaining material of the section, and finally placing liner plates at the sides of the tunnel and bracing the same from said posts, said posts being spaced to permit an excavating machine to pass between the same substantially as described.
  • the method of building a tunnel or the like which includes the excavating of a hole in the face at the bottom of the tunnel, placing planking in the bottom of the hole, placing means for temporarily supporting the ceiling of the hole, then excavating a hole in the section at the top of the tunnel, placing means therein for tempo'- rarily supporting the ceiling of such hole, then making vertical kerfs at either side of the face and placing posts in said kerfs which are supported on said planking, then placing longitudinal beams above said posts and pressing the same upwardly against the roof supports by means of jacks, then removing the temporary supports from the bottom hole and excavating the remainder of the section, then bracing the posts by transverse bracing and applying liner plates to the sides of the section and bracing said liner plates by means of jacks against the posts, said posts being spaced apart to provide an open entry for machines or the like at the center of the tunnel.

Description

Sept. 29, 1936. I W,A J NEWMAN I 2,055,876
TUNNELING Filed Aug. 20, 1934 2 Sheets sheet 1 M M M ATTORNEY.
Sept. 29,l 1936. w. 1 NEWMAN TUNNELING .Filed Aug. 20, 1934 2 Sheets-Sheet 2 Patented Sept. 29, 1936 UNITED STATES PATENT GFFICE TUNNELING William J. Newman, Chicago, Ill.
Application August 20, 1934, Serial No. 740,595 5 Claims. (Cl. (S1- 42) This invention relates to an improved method of tunneling and is particularly intended for use where the tunnel is to be dug through earth or clay as distinguishedv from tunneling through rock, although some features of my improved method may be applicable to various kinds of tunnels.
The principal object of the invention is to provide an improved method of tunneling through earth, clay, or the like, whereby the operations may be carried on in an economical and safe manner.
Other objects of the invention are to provide means for tunneling whereby the roof and walls may be supported to the fullest extent to prevent caving or leakage; to provide an improved system of tunneling whereby an excavating machine may be freely used for `taking out the larger portion of the material; to provide a step by step method of tunneling in which the material will be taken out in different areas and the lining and bracing will be'introduced in a novel manner; and to provide such other improvements as will appear from the following description.
In the accompanying drawings illustrating this invention,
Figure 1 is a sectional view illustrating the rst step or operation which consists in making an opening at the bottom of the tunnel and inserting suitable supports;
Figure 2 is a view showing the next step or opening at the top of the tunnel and roof supports;
Figure 3 is a detail showing the arrangement at the `top of the tunnel for further supporting the roof; A
Figure 4fillustrates the next succeeding step which consists in making vertical cuts or channels-preferably by means ofa suitable excavating machine and placing supporting members there- Figure 5 shows the next step or removal of the core or center part of the tunnel after suitable braces have been placed in position;
Figure 6 shows the tunnel after the sides have been excavated, preferably by hand, and further bracing installed;
Figure 7 is similar to Figure 6, showing the raised temporary ilooring and indicating the positioning of the concrete re-inforcing members;
Y Figure 8 is a longitudinal sectional view of the tunnel showing the excavating machine in position;
scribed.
Figure 9 is a sectional detail taken on the line 9 9 of Figure 7;
Figure 10 is a sectional detail taken on the' line IU--III of Figure 6;
Figure 11 is a sectional detail taken on the line II-II of Figure 6; and
Figure 12 is a detail of the temporary or removable door.
In these figures some of the parts are shown diagrammatically and other parts may be omitted for convenience in illustration, suicient detail being supplied so that the invention can be readily understood by those familiar with the art.
As shown in Figure 1, the outline of the excavation for the tunnel is illustrated in dotted lines and it may be assumed that the work is to be begun at an exposed working face. A substantially rectangular hole I4 is dug at the bottom of the tunnel, preferably by means of an excavating machine. The drawings are intended to illustrate a .tunnel having an excavation of approximately 21 feet in height and for this size tunnel the hole I4 may conveniently be made about four feet high and twelve feet wide and extending inwardly about five feet. Planking I5 is placed at the bottom of the hole and other planking or plates I6 placed at the top of the hole with jacks I 'l arranged as shown for supporting the roof.
The next steps as shown in Figure 2, consist'in making a central vertical cut at the top of the tunnel as indicated at b, which cut is made by a machine and may be about twenty-two inches wide and four feet deep and four to six feet in height. A liner plate I8 such as usually used for roof support is then placed in position and is held by one or more jacks I9. Additional cuts as indicated at c, c', d, d', etc. are then made and as each cut is completed a liner plate and supporting jacks is placed therein so that when all oi such cuts have been finished the roof of the tunnel will be outlined as shown and will be supported by means of liner plates and jacks which rest on the iioor of this upper cut.
When all of these plates have been inserted in the arch or roof portion, curved ribs 20 preferably formed of I-beams are placed in position under the liner plates preparatory to subsequently supporting said plates after the removal of the jacks I9. 'Ihe ribs 20 may be made in single pieces or may be made in two pieces joined together at the center as shown at 2| in Figure 3.
These ribs may be supported temporarily in any desired manner but are subsequently supported by posts and framework which will presently be de- The next step as shown in Fig. 4 consists in making two vertical cuts or kerfs, 22. These cuts are preferably made by means of an excavating machine and may conveniently be made about 22 inches Wide and extend back in the same distance as the previous excavations. After these cuts have been made posts or struts, 23, are placed therein. These posts should be strong and substantial and adapted t`o withstand lateral as well as vertical pressure. They are preferably formed of two I-beams with a filler of wood as indicated in Fig. 11. The lower ends of these posts are supported on the planking, I5, and they are connected or braced at the top by cross beams, 24, having screw jacks, 25, at the ends for tightening the same. These beams may be connected to the posts by angle irons, 28, or other suitable connections. The posts are provided at the top with jacks or screws, 21, as shown in Fig. 10, which support beams, 28, which extend longitudinally of the tunnel and engage with the ribs, 20. These beams engage with lugs or bosses 29 `on the ribs which provide a suitable bearing for the same. As soon as the beams 28 have been placed securely in position and are pressed up against the ribs, theY jacks I 9 mayY be removed Yand the liner plates I8 and the roof of the tunnel willbe securely supported by such posts and framework.
The nextstep in the operation is shown in Fig. 5 and consists in the removal of the core or center portion of the material which remains between the top and bottom cuts and the side cuts 22. This material is also preferably all removed by means of the excavating machine, the framing provided by the posts and their connections leaving ample space in which the machine may operate.
The next operations are indicated in Fig. 6, the material 30 remaining at the sides of the tunnel as seen in Fig., 5 may be removed preferably by hand andthus completing the excavation of a section. The side liner plates 3l and ribs 32 are then placed in position and are supported by means of jacks or braces 33 which are inserted between the posts 23 and the ribs 32. Any suitable nurnber of such jacks or vbraces may be used depending upon the nature of the material. Additional cross beams 34 may also be inserted between the posts 23these beams being preferably provided with screws or jacks 35 so that they may be tightened in position.
When these steps have been completed it will be seen that all of the walls of the tunnel are properly supported and the excavating work can be continued for any reasonable distance ahead of the placing of the concrete or lining of the tunnel. Furthermore, by means of this novel framework and bracing, ample space is left for carrying on both the excavating and the lining of the tunnel.
As shown in Figs. '7, 8, 9 and 12 I provide an elevated removable platform 36 which is preferably made in sections and each section provided with posts 31 which are secured thereto and may be moved with these sections. These posts rest upon the bottom planking and each post is encased in pockets 38. The platform or planking 36 is preferably about two feet above the bottom of the tunnel and serves as a flooring upon which the excavating machine 39 may run. It also serves as a flooring for tracks for cars or wheelbarrows which may be used for taking out the material excavated at the sides of the tunnel.
This elevation of the platform also serves to provide a suitable space for placing the lower reinforcement rods 40, as indicated in Fig. '7. These rods may be arranged in any desired man- 38 remain in position in the concrete.
ner but ordinarily will be overlapped at the center and extend outwardly and up for a short distance adjacent to the sides of the tunnel. They connect with other reinforcing rods 4I such as ordinarily are used for reinforcing the concrete in the tunnel lining or walls. After the reinforcing rods 40 have been placed in position the concrete may be run in over the ooring 36 and dumped into position at the bottom of the tunnel, and preferably carried up at the sides to about the bottom of the arch. The flooring or platforms 36 may then be removed, together with the legs 31, while the boxes In this manner the flooring may be repeatedly used and moved forward as the work progresses. After the 'concretehas been placed in the bottom of the tunnel, the forms (not shown) for the sides and roof may be placed in position and the concrete work carried on in the usual manner, the liner plates and the ribs ordinarily being left in position in the concrete. It will be noted that sections of the platforms 36 may be removed for placing concrete in the bottom while the other sections remain in position to provide runways for the wheelbarrows or carts. Instead of completely filling in the bottom, a few inches is preferably left at the top to be filled in after the top and sides of the tunnel have been completed, and this final layer will be bonded to the lower filling by the boxes 38 which serve in the nature of reinforcement for the flooring.
The use of a tunneling machine in these operations is illustrated in Fig. 8 which shows a portion of a machine adapted for this purpose in position to make one of the forward cuts. The machine is provided with a swinging boom 42 which carries the excavating buckets and may be driven in any suitable manner, but as the machine forms no part of the present invention further description is unnecessary. In this figure one of the top cross braces 24 is shown as being removed from its original position between the forward posts 23 and lowered a sufficient distance to permit the operation of the cutters at the top of the tunnel. After the cut has been partially completed this brace or frame member may be returned to its original position. Longitudinal beams or frame members 43 are also shown between the posts 23 as indicating any suitable bracing to be used to make the open framework through which the machine may operate. In some methods of tunnel excavation it is common to use a needle beam or central longitudinal beam which serves' as a support for the radial props.
needle beam is not practicable as it does `not provide for suflicient space for supporting or operating the machine. It will be noted that in accordance with my invention the rectangular framework formed by means of the posts and transverse braces, leaves a clear open space for the excavating machine and such framework tends to protect not only the machine but the Workmen, throughout the various operations, and fully supports the entire inner walls of the excavation, thus preventing caving or falling in during the tunneling operations. It will thus be seen that my improved system, which includes such framing to provide a relatively large central passageway, is particularly applicable for use in machine tunneling as distinguished from the previous methods of hand tunneling in which the requirements are substantially different, as will be readily appreciated by those familiar with this work.
While I have shown and described the principal However when an' excavating machine is tol be used the use of such apparatus used in connection with my tunneling operations and the various steps of the method of carrying out the same, it will be noted that changes may be made in order to adapt the same to different conditions, as for different excavations, or for different shaped tunnels, and therefore I do not wish to be limited to the particular method or apparatus herein shown and described, except as set forth in the following claims in which, I claim:
l. The herein described method of tunneling which includes excavating holes in the face of the tunnel at the bottom and top thereof, providing supports for the roofs of said holes, then making vertical openings at the sides of the tunnel connecting said holes, then placing an open framework in the spaces provided by such excavating and supporting the roof by means of such framework, then removing the remaining material at the face and finally placing the supports for the sides of the tunnel and bracing the same from said framework.
2. The method of excavating a tunnel, which includes digging a hole in the face of the tunnel at the bottom thereof by means of an excavating machine, then placing planking in the bottom of the hole and inserting means to support the ceiling of the hole, then digging a hole at the top of the tunnel of substantially the same depth as the one at the bottom thereof, placing liner plates and jacks in the upper hole'to temporarily support the ceiling thereof, then placing transverse ribs in position to support the liner plates, then making vertical cuts by means of an excavating machine adjacent to the sides of the tunnel andl connecting said bottom and top holes, then placing posts in said vertical cuts and connecting the same with the ribs to support the roof, then excavating the core at the center of the face by means of an excavating machine, and finally excavating the material at the sides by hand to complete the section.
3. The herein described tunneling method which consists in making an opening in the face at the top thereof with its upper wall conforming to the shape of the tunnel roof, inserting liner plates and jacks for temporarily supporting the roof, then making vertical openings in the face which are spaced apart leaving a center core and placing posts therein with jacks at the top for supporting the roof, then removing the remaining material of the section, and finally placing liner plates at the sides of the tunnel and bracing the same from said posts, said posts being spaced to permit an excavating machine to pass between the same substantially as described.
4. The method of building a tunnel or the like which includes the excavating of a hole in the face at the bottom of the tunnel, placing planking in the bottom of the hole, placing means for temporarily supporting the ceiling of the hole, then excavating a hole in the section at the top of the tunnel, placing means therein for tempo'- rarily supporting the ceiling of such hole, then making vertical kerfs at either side of the face and placing posts in said kerfs which are supported on said planking, then placing longitudinal beams above said posts and pressing the same upwardly against the roof supports by means of jacks, then removing the temporary supports from the bottom hole and excavating the remainder of the section, then bracing the posts by transverse bracing and applying liner plates to the sides of the section and bracing said liner plates by means of jacks against the posts, said posts being spaced apart to provide an open entry for machines or the like at the center of the tunnel.
5. The method of tunnel building in clay or the like, which consists in making an entry at the bottom of the tunnel, then shoring up and supporting the roof of the entry; then making an entry in the face at the top thereof and shoring Y up and temporarily supporting the roof of such entry from the floor thereof; then excavating vertical kerfs extending from the bottom entry to the top entry, leaving a substantially rectangular central mass of material and side shoulders at the` outer sides of the kerfs; then placing posts in said kerfs and transverse bracing in the top and bottom entries between the posts and providing longitudinal beams on said posts and supporting the roof of the top entry thereon, then excavating the center mass and side shoulders Aand introducing liner plates and bracing from WILLIAM J. NEWMAN.
US740595A 1934-08-20 1934-08-20 Tunneling Expired - Lifetime US2055876A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US740595A US2055876A (en) 1934-08-20 1934-08-20 Tunneling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US740595A US2055876A (en) 1934-08-20 1934-08-20 Tunneling

Publications (1)

Publication Number Publication Date
US2055876A true US2055876A (en) 1936-09-29

Family

ID=24977223

Family Applications (1)

Application Number Title Priority Date Filing Date
US740595A Expired - Lifetime US2055876A (en) 1934-08-20 1934-08-20 Tunneling

Country Status (1)

Country Link
US (1) US2055876A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3260054A (en) * 1962-04-12 1966-07-12 Entpr S Leon Chagnaud & Fils Process for producing excavations in water-bearing ground
US3916630A (en) * 1973-04-27 1975-11-04 Gewerk Eisenhuette Westfalia Tunneling methods and apparatus
US5199817A (en) * 1991-09-04 1993-04-06 Mayreder Consult Of The United States, Inc. Process of providing an elongate underground cavity
US5444948A (en) * 1994-02-09 1995-08-29 Trapp; William B. Adjustable arch support
US20080053012A1 (en) * 2006-08-31 2008-03-06 Tom Scanlan Removable arch form assembly and method of installing
US10753101B1 (en) 2016-12-09 2020-08-25 Baton, LLC Artificial lightweight stone

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3260054A (en) * 1962-04-12 1966-07-12 Entpr S Leon Chagnaud & Fils Process for producing excavations in water-bearing ground
US3916630A (en) * 1973-04-27 1975-11-04 Gewerk Eisenhuette Westfalia Tunneling methods and apparatus
US5199817A (en) * 1991-09-04 1993-04-06 Mayreder Consult Of The United States, Inc. Process of providing an elongate underground cavity
US5444948A (en) * 1994-02-09 1995-08-29 Trapp; William B. Adjustable arch support
US20080053012A1 (en) * 2006-08-31 2008-03-06 Tom Scanlan Removable arch form assembly and method of installing
US7712262B2 (en) 2006-08-31 2010-05-11 Tom Scanlan Removable arch form assembly and method of installing
US20100170191A1 (en) * 2006-08-31 2010-07-08 Tom Scanlan Removable Arch Form Assembly and Method of Installing
US10753101B1 (en) 2016-12-09 2020-08-25 Baton, LLC Artificial lightweight stone

Similar Documents

Publication Publication Date Title
US3184893A (en) Contact foundation method
RU2125652C1 (en) Method of extracting operations
US2055876A (en) Tunneling
US4174135A (en) Underground formed wall single-entry mining method
US2166632A (en) Method of constructing concrete manholes
US2188077A (en) Means for sheathing excavation walls
CN112796783B (en) Construction method for dismantling shield through underground excavation tunnel inner pipe sheet in advance
US1800819A (en) Method and means for constructing tunnel stations
JPH09144049A (en) Temporary holding method of construction
US960940A (en) Art of constructing tunnels in the earth.
US1948114A (en) Method of building and construction for underground railroads
US1877351A (en) Trench bracing
US1608258A (en) Method of building corewalls for dams and similar structures
US960941A (en) Constructing concrete and like walls in the earth.
JPH05141004A (en) Two-step placing construction
US2128284A (en) Method of constructing subways and like underground structures
IL34532A (en) System for the deepening of the bottom in front of moles and retaining walls of marine and river installations and the re-inforced moles so obtained
US1179750A (en) Method of making excavations.
US2164003A (en) Method of building subterranean structures
JPH0726877A (en) Construction method of underground structure
US933776A (en) Sinking shafts and the like.
US1706971A (en) Method of and apparatus for facilitating the building of wall structures
SU1097795A1 (en) Method of working steep coal seam by hydraulic excavation
US435492A (en) Method of and apparatus for supporting and lowering foundations of buildings
US1665797A (en) Method of excavating and producing foundations