- Prior art keywords
- die
- metal pipe
- forming device
- pipe material
- forming
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D22/00—Shaping without cutting, by stamping, spinning, or deep-drawing
- B21D22/20—Deep-drawing
- B21D22/208—Deep-drawing by heating the blank or deep-drawing associated with heat treatment
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C21/00—Alloys based on aluminium
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D22/00—Shaping without cutting, by stamping, spinning, or deep-drawing
- B21D22/20—Deep-drawing
- B21D22/28—Deep-drawing of cylindrical articles using consecutive dies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D26/00—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
- B21D26/02—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
- B21D26/033—Deforming tubular bodies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D37/00—Tools as parts of machines covered by this subclass
- B21D37/16—Heating or cooling
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/62—Quenching devices
- C21D1/673—Quenching devices for die quenching
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/002—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working by rapid cooling or quenching; cooling agents used therefor
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/04—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon
Definitions
- a certain embodiment of the present invention relates to a forming device and a metal member.
- a forming device that forms a metal material made of an aluminum alloy
- the forming device including: a forming die that forms a metal pipe from a metal pipe material; and a temperature control unit that is provided in the forming die and that control a temperature of the forming die, in which the forming device controls a cooling rate of the aluminum alloy during a solution treatment by using the temperature control unit, to provide a difference in strength of the aluminum alloy after an aging treatment.
- a metal member including a first portion having a high number density of precipitates of alloying elements; and a second portion having a lower number density of the precipitates of the alloying elements than the first portion.
- FIG. 3 is a schematic sectional view illustrating a temperature control mechanism of a forming die.
- FIG. 8 illustrates a precipitation state at each time illustrated in FIG. 7 A .
- FIG. 9 is a graph illustrating a transition of the temperature of the aluminum alloy during the solution treatment and during the aging treatment.
- FIG. 10 is a view illustrating a precipitation state at each time of a high strength region subjected to rapid cooling and a low strength region subjected to slow cooling.
- an aluminum alloy is used as a metal material from the viewpoint of weight saving.
- an aging treatment using heat is performed after a solution treatment accompanying the forming.
- a metal member made of a high-strength aluminum alloy is obtained by this process, it has been required to further provide a difference in strength in the metal member.
- a metal member after the forming may include a first portion having a high number density of precipitates of alloying elements, and a second portion having a lower number density of the precipitates of the alloying elements than the first portion.
- the first portion has a high number density of the precipitates and high strength.
- the second portion has a low number density of the precipitates and low strength. In this way, the difference in strength can be provided between the first portion and the second portion.
- the first portion has a high number density of the precipitates and high strength.
- the second portion has a low number density of the precipitates and low strength. In this way, the difference in strength can be provided between the first portion and the second portion.
- FIG. 1 is a schematic configuration view of a forming device 1 according to the present embodiment.
- the forming device 1 is a device that forms a metal pipe having a hollow shape by blow forming.
- the forming device 1 is installed on a horizontal plane.
- the forming device 1 includes a forming die 2 , a drive mechanism 3 , a holding unit 4 , a heating unit 5 , a fluid supply unit 6 , a temperature control unit 7 , and a control unit 8 .
- a metal pipe material 40 (metal material) refers to a hollow article before the completion of forming via the forming device 1 .
- the metal pipe material 40 is a steel-type pipe material that can be quenched.
- a direction in which the metal pipe material 40 extends during the forming may be referred to as a “longitudinal direction”, and a direction perpendicular to the longitudinal direction may be referred to as a “width direction”.
- the forming die 2 is a die that forms a metal pipe 140 (see FIG. 4 ) from the metal pipe material 40 , and includes a lower die 11 and an upper die 12 that face each other in an up-down direction.
- the lower die 11 and the upper die 12 are configured by blocks made of steel.
- Each of the lower die 11 and the upper die 12 is provided with a recessed part in which the metal pipe material 40 is accommodated.
- the respective recessed parts form a space having a target shape in which the metal pipe material is to be formed. Therefore, surfaces of the respective recessed parts are forming surfaces of the forming die 2 .
- the lower die 11 is fixed to a base stage 13 via a die holder or the like.
- the upper die 12 is fixed to a slide of the drive mechanism 3 via a die holder or the like.
- the metal pipe material 40 is a metal material made of an aluminum alloy.
- the metal pipe material 40 includes a high strength region E 1 in which the strength is high and a low strength region E 2 in which the strength is low. Therefore, the forming die 2 performs rapid cooling in which the cooling rate is increased in the high strength region E 1 of the metal pipe material 40 , and performs slow cooling in which the cooling rate is lowered in the low strength region E 2 of the metal pipe material 40 .
- the upper die 12 and the lower die 11 include rapid cooling portions 12 A and 11 A for performing quenching to the high strength region E 1 and slow cooling portions 12 B and 11 B for preventing the low strength region E 2 from being quenched.
- the low strength region E 2 is provided at a substantially central position of the metal pipe 140 (metal pipe material 40 ), and the high strength regions E 1 are provided to interpose the low strength region E 2 in the longitudinal direction. Therefore, the upper die 12 and the lower die 11 include the slow cooling portions 12 B and 11 B at the central position and the rapid cooling portions 12 A and 11 A that interpose the low strength region E 2 in the longitudinal direction. As a result, as illustrated in FIG. 4 , the low strength region E 2 (hatched portion) of the metal pipe 140 after the forming is a portion partially having low strength, and the high strength region E 1 is a portion having high strength.
- the drive mechanism 3 is a mechanism that moves at least one of the lower die 11 and the upper die 12 .
- the drive mechanism 3 has a configuration of moving only the upper die 12 .
- the drive mechanism 3 includes a slide 21 that moves the upper die 12 such that the lower die 11 and the upper die 12 are joined together, a pull-back cylinder 22 as an actuator that generates a force for pulling the slide 21 upward, a main cylinder 23 as a drive source that downward-pressurizes the slide 21 , and a drive source 24 that applies a driving force to the main cylinder 23 .
- the heating unit 5 heats the metal pipe material 40 .
- the heating unit 5 is a mechanism that heats the metal pipe material 40 by energizing the metal pipe material 40 .
- the heating unit 5 heats the metal pipe material 40 in a state where the metal pipe material 40 is spaced apart from the lower die 11 and the upper die 12 , between the lower die 11 and the upper die 12 .
- the heating unit 5 includes the lower electrodes 26 and the upper electrodes 27 on both sides in the longitudinal direction, and a power supply 28 that causes a current to flow through the metal pipe material 40 via the electrodes 26 and 27 .
- the heating unit may be disposed in a preceding process of the forming device 1 to perform heating externally.
- the fluid supply unit 6 is a mechanism that supplies a high-pressure fluid into the metal pipe material 40 held between the lower die 11 and the upper die 12 .
- the fluid supply unit 6 supplies the high-pressure fluid into the metal pipe material 40 that has been brought into a high-temperature state by being heated by the heating unit 5 , to expand the metal pipe material 40 .
- the fluid supply units 6 are provided on both end sides of the forming die 2 in the longitudinal direction.
- the fluid supply unit 6 includes a nozzle 31 that supplies the fluid from an opening portion of an end portion of the metal pipe material 40 to an inside of the metal pipe material 40 , a drive mechanism 32 that moves the nozzle 31 forward and backward with respect to the opening portion of the metal pipe material 40 , and a supply source 33 that supplies the high-pressure fluid into the metal pipe material 40 via the nozzle 31 .
- the drive mechanism 32 brings the nozzle 31 into close contact with the end portion of the metal pipe material 40 in a state in which sealing performance is secured during the fluid supply and exhaust, and causes the nozzle 31 to be spaced apart from the end portion of the metal pipe material 40 in other cases.
- the fluid supply unit 6 may supply a gas such as high-pressure air and an inert gas, as the fluid. Additionally, the fluid supply unit 6 may include the heating unit 5 together with the holding unit 4 including a mechanism that moves the metal pipe material 40 in the up-down direction as the same device.
- FIG. 2 A is a schematic side view illustrating the heating and expanding unit 150 .
- FIG. 2 B is a sectional view illustrating a state where the nozzle 31 has sealed the metal pipe material 40 .
- the elevating unit 152 includes an elevating frame base 64 attached to an upper surface of the unit base 153 , and an elevating actuator 66 that applies an elevating operation to the elevating frame 154 of the electrode mounting unit 151 by using the elevating frame base 64 .
- the elevating frame base 64 includes guide portions 64 a and 64 b that guide the elevating operation of the elevating frame 154 with respect to the unit base 153 .
- the elevating unit 152 functions as a part of the drive mechanism 60 of the holding unit 4 .
- the heating and expanding unit 150 includes a plurality of the unit bases 153 of which the upper surfaces have different inclination angles, and is allowed to collectively change and adjust inclination angles of the lower electrode 26 , the upper electrode 27 , the nozzle 31 , the electrode mounting unit 151 , the drive mechanism 32 , and the elevating unit 152 by replacing the unit bases 153 .
- the nozzle 31 is a cylindrical member into which the end portion of the metal pipe material 40 can be inserted.
- the nozzle 31 is supported by the drive mechanism 32 such that a center line of the nozzle 31 coincides with a reference line SL 1 .
- An inner diameter of a feed port 31 a at an end portion of the nozzle 31 on the metal pipe material 40 side substantially coincides with an outer diameter of the metal pipe material 40 after expansion forming.
- the nozzle 31 supplies the high-pressure fluid from an internal flow path 63 to the metal pipe material 40 .
- the high-pressure fluid include a gas.
- the temperature control unit 7 is a mechanism that controls a temperature of the forming die 2 .
- the temperature control unit 7 controls the temperature of the forming die 2 to reduce the warpage in the low strength region E 2 .
- the temperature control unit 7 can rapidly cool the metal pipe material 40 to perform quenching when the expanded metal pipe material 40 comes into contact with the forming surface of the forming die 2 , by cooling the forming die 2 in the rapid cooling portions 12 A and 11 A.
- the temperature control unit 7 can control the temperature of the metal pipe material 40 to a temperature at which the quenching does not occur when the expanded metal pipe material 40 comes into contact with the forming surface of the forming die 2 , by performing the temperature control of the forming die 2 in the slow cooling portions 12 B and 11 B.
- the temperature control unit 7 includes flow paths formed inside the lower die 11 and the upper die 12 , a supply mechanism 37 that supplies a temperature control medium and causes the temperature control medium to circulate through the flow paths, and a control unit 8 that controls the supply mechanism 37 .
- the control unit 8 is a device that controls the entire forming device 1 .
- the control unit 8 controls the drive mechanism 3 , the holding unit 4 , the heating unit 5 , the fluid supply unit 6 , and the supply mechanism 37 .
- the control unit 8 repeatedly performs the operation of forming the metal pipe material 40 using the forming die 2 .
- control unit 8 controls, for example, a transport timing from a transport device, such as a robot arm, to dispose the metal pipe material 40 between the lower die 11 and the upper die 12 in an open state. Alternatively, a worker may manually dispose the metal pipe material 40 between the lower die 11 and the upper die 12 . Additionally, the control unit 8 controls an actuator of the holding unit 4 and the like such that the metal pipe material 40 is supported by the lower electrodes 26 on both sides in the longitudinal direction, and then the upper electrodes 27 are lowered to interpose the metal pipe material 40 . In addition, the control unit 8 controls the heating unit 5 to electrically heat the metal pipe material 40 . Therefore, an axial current flows through the metal pipe material 40 , and an electric resistance of the metal pipe material 40 itself causes the metal pipe material 40 itself to generate heat due to Joule heat.
- a transport timing from a transport device, such as a robot arm
- the control unit 8 controls the drive mechanism 3 to lower the upper die 12 and bring the upper die 12 close to the lower die 11 , thereby closing the forming die 2 . Meanwhile, the control unit 8 controls the fluid supply unit 6 to seal the opening portions of both ends of the metal pipe material 40 with the nozzle 31 and supply the fluid. Therefore, the metal pipe material 40 softened by the heating expands and comes into contact with the forming surface of the forming die 2 . Then, the metal pipe material 40 is formed to follow a shape of the forming surface of the forming die 2 .
- a part of the metal pipe material 40 is made to enter a gap between the lower die 11 and the upper die 12 , and then die closing is further performed to crush the entering part to form a flange portion.
- the metal pipe material 40 is rapidly cooled by being rapidly cooled by using the forming die 2 cooled by the temperature control unit 7 .
- the forming device 1 controls the cooling rate of the aluminum alloy during the solution treatment, to provide the difference in strength of the aluminum alloy after the aging treatment.
- the solution treatment is a treatment of forming the heated metal pipe material 40 by using the dies 11 and 12 .
- the aging treatment is a treatment of performing artificial aging (painting firing) after the forming of the metal pipe 140 via the forming device 1 .
- the forming device 1 brings the rapid cooling portions 11 A and 12 A into contact with each other to increase the cooling rate of the high strength region E 1 of the metal pipe material 40 made of the aluminum alloy and perform the rapid cooling.
- the forming device 1 brings the slow cooling portions 11 B and 12 B into contact with each other to lower the cooling rate of the low strength region E 2 of the metal pipe material 40 made of the aluminum alloy and perform the slow cooling on the low strength region E 2 of the metal pipe material 40 .
- the forming device 1 provides the difference in strength in the metal pipe 140 made of the aluminum alloy after the aging treatment.
- the high strength region E 1 after the aging treatment has lower strength than the low strength region E 2 .
- Controlling the cooling rate is performed by partially heating the dies 11 and 12 . Specifically, the slow cooling portions 11 B and 12 B of the dies 11 and 12 are partially heated.
- the temperature control unit 7 includes temperature control mechanisms 70 and 80 that control the temperature of the forming die 2 .
- the temperature control mechanism 70 is provided inside the upper die 12 , and controls the temperature of the forming surface of the die 12 .
- the temperature control mechanism 80 is provided inside the lower die 11 , and controls the temperature of the forming surface of the die 11 .
- the temperature control mechanism 70 has flow paths 71 provided in the rapid cooling portions 12 A on both sides of the die 12 .
- the flow path 71 cools the forming surface of the rapid cooling portion 12 A by causing the cooling water from the supply mechanism 37 to flow.
- the temperature control mechanism 80 has flow paths 81 provided in the rapid cooling portions 11 A on both sides of the die 11 .
- the flow path 81 cools the forming surface of the rapid cooling portion 11 A by causing the cooling water from the supply mechanism 37 to flow.
- the slow cooling portions 12 B and 11 B include heating die blocks 12 Ba and 11 Ba on the forming surface side, and normal die blocks 12 Bb and 11 Bb on the opposite side.
- the normal die blocks 12 Bb and 11 Bb are blocks that connect the rapid cooling portions 12 A and 11 A on both sides to each other.
- the temperature control mechanisms 70 and 80 include flow paths 72 and 82 provided in the normal die blocks 12 Bb and 11 Bb. The same cooling water as that in the flow paths 71 and 81 of the rapid cooling portions 12 A and 11 A is supplied to the flow paths 72 and 82 .
- the heating die blocks 12 Ba and 11 Ba are blocks having a higher temperature than the rapid cooling portions 12 A and 11 A.
- a heat insulating member 75 (or a gap) is provided between the rapid cooling portions 12 A and 11 A and the heating die blocks 12 Ba and 11 Ba.
- the temperature control mechanisms 70 and 80 include flow paths 73 and 83 provided inside the heating die blocks 12 Ba and 11 Ba.
- the flow paths 73 and 83 cause a fluid having a higher temperature than the fluid in the flow paths 71 and 81 to flow, and thus the temperature of the forming surface of the slow cooling portions 12 B and 11 B is higher than the temperature of the forming surface of the rapid cooling portions 12 A and 11 A.
- the temperature control mechanisms 70 and 80 may include a heater and the like instead of the flow paths 73 and 83 . In this manner, the temperature control mechanisms 70 and 80 can control the cooling rate of the aluminum alloy during the solution treatment (during the forming) by partially heating the slow cooling portions 11 B and 12 B.
- FIG. 5 is a view illustrating a state of the alloying element in the aluminum.
- a graph illustrated in FIG. 5 illustrates a relationship between a concentration ratio of aluminum and the alloying element in the aluminum alloy and the temperature.
- a conceptual view illustrated on the right side of the graph illustrates a state of a metal structure of the aluminum alloy in each state.
- “1” indicates a state when the solution treatment of the aluminum alloy (metal pipe 140 ) is performed.
- the aluminum alloy is in a “solid solution state”, and the alloying element is in a completely solid-solved state.
- “2” indicates a state when the aluminum alloy is quenched.
- the aluminum alloy is in the “supersaturated solid solution state”, and the precipitate phase is originally more stable.
- the aluminum alloy is rapidly cooled in a solid-solubilized state, so that the alloying element is in a solid-solubilized state.
- “3” indicates a state when the aging treatment of the aluminum alloy is performed at a relatively low temperature after the quenching. In FIG. 3 , the aluminum alloy is in a state where a “metastable precipitate phase” is precipitated.
- “4” indicates a state when the aging treatment of the aluminum alloy is performed at a relatively high temperature after the quenching.
- the aluminum alloy is in a state where the “stable precipitate phase” is precipitated.
- “5” indicates a state when the aluminum alloy is subjected to the slow cooling.
- the “stable precipitate phase” is precipitated during the cooling via the slow cooling. In this case, the precipitation occurs not only inside the crystal grains but also at the crystal grain boundaries.
- it is effective that the precipitates are densely precipitated inside the crystal grain. The precipitates are more densely precipitated inside the crystal grains in the state of “4” than in the state of “5”.
- FIGS. 6 A to 6 C illustrate images of an atomic arrangement in the precipitation state.
- FIG. 6 A illustrates an image of the atomic arrangement in the solid solution.
- FIG. 6 B illustrates an image of the atomic arrangement in the intermediate phase.
- FIG. 6 C illustrates an image of the atomic arrangement in the stable precipitate phase (equilibrium phase).
- FIG. 7 A is a graph illustrating a transition of the temperature of the aluminum alloy during the solution treatment and during the aging treatment.
- a time t 1 is a time immediately before the aging treatment is started.
- a time t 2 is a time during the aging treatment.
- a time t 3 is a heating end time of the aging treatment when the aging treatment time is appropriately set.
- a time t 4 is a heating end time of the aging treatment heating when the aging treatment time is inappropriately set.
- a graph G 1 in FIG. 7 B is a graph illustrating the size of the precipitates of the alloying elements in the aluminum alloy.
- a graph G 2 is a graph illustrating the strength of the aluminum alloy.
- a graph G 3 is a graph illustrating the number density of the precipitates of the alloying elements in the aluminum alloy.
- the size of the precipitate increases with time.
- the strength of the aluminum alloy reaches a strength peak at the time t 3 and then decreases.
- the number density of the precipitates reaches a peak earlier than the time t 3 , and then decreases.
- the state is the supersaturated solid solution state.
- the metastable precipitate phase is precipitated.
- a high-density stable precipitate phase is precipitated.
- a low-density stable precipitate phase is precipitated.
- FIG. 9 is a graph illustrating a transition of the temperature of the aluminum alloy during the solution treatment and during the aging treatment.
- a solid line graph A of the solution treatment illustrates the temperature of the high strength region E 1 in which the rapid cooling is performed
- a broken line graph B illustrates the temperature of the low strength region E 2 in which the slow cooling is performed.
- a heating holding time T is provided during the heating of the solution treatment. When the heating of the solution treatment is started and the temperature rises to a predetermined temperature, the temperature is held for the heating holding time T.
- the heating temperature of the aluminum alloy is preferably a temperature equal to or lower than a melting point of aluminum and equal to or higher than a solution temperature (about 500 °° C.).
- a time t 5 is a time when the cooling is started by the contact of the dies 11 and 12 with the aluminum alloy. The transition of the temperature up to the time t 5 is the same in both the regions E 1 and E 2 . In addition, the transition of the temperature in the aging treatment is the same in both the regions E 1 and E 2 .
- a time t 6 is a time when the cooling in the low strength region E 2 ends.
- a time t 7 is a time when the temperature reaches the heating temperature in the aging treatment.
- a time t 8 is a time after the aging treatment ends.
- FIG. 10 illustrates the precipitation states in the high strength region E 1 subjected to the rapid cooling and in the low strength region E 2 subjected to the slow cooling at each of the times t 5 , t 6 , 7 , and t 8 .
- the supersaturated solid solution state continues until time t 6 .
- the metastable precipitate phase is precipitated at the time t 7 when the aging treatment is performed.
- the high-density stable precipitate phase is precipitated at the time t 8 after the aging treatment ends.
- the precipitates are already precipitated at the stage of the time t 6 after the solution treatment and before the aging treatment.
- the precipitates are precipitated not only inside the crystal grains but also at the crystal grain boundaries. Therefore, in the low strength region E 2 , the number density of the precipitates in the crystal grains at the time t 8 after the final aging treatment is reduced, and the strength is reduced.
- the metal pipe 140 after the forming may include the high strength region E 1 (first portion) in which the number density of the precipitates of the alloying elements is high and the low strength region E 2 (second portion) in which the number density of the precipitates of the alloying elements is lower than the high strength region E 1 .
- the forming device 1 forms the metal pipe material 40 made of the aluminum alloy.
- the aging treatment using heat is performed after the solution treatment via the forming device 1 .
- the forming device 1 controls the cooling rate of the aluminum alloy during the solution treatment.
- the strength obtained after the aging treatment is changed depending on the cooling rate of the solution treatment. Therefore, the forming device 1 can provide, in the aluminum alloy, a portion in which the cooling rate is high and a portion in which the cooling rate is low. In this way, when the portions having the different cooling rates are provided in the aluminum alloy, the portions having the different strengths can be obtained after the aging treatment. From the above, the difference in strength can be provided in the metal pipe 140 made of the aluminum alloy after the forming.
- Controlling the cooling rate may be performed by partially heating the dies 11 and 12 .
- the heated portions (slow cooling portions 11 B and 12 B) of the dies 11 and 12 and the aluminum alloy come into contact with each other, the cooling rate of the portions is lowered. As a result, the cooling rate can be easily controlled.
- the metal pipe 140 after the forming may include the high strength region E 1 (first portion) in which the number density of the precipitates of the alloying elements is high and the low strength region E 2 (second portion) in which the number density of the precipitates of the alloying elements is lower than the high strength region E 1 .
- the high strength region E 1 has a high number density of the precipitates and high strength.
- the low strength region E 2 has a low number density of the precipitates and low strength. In this way, the difference in strength can be provided between the high strength region E 1 and the low strength region E 2 .
- the heating holding time may be provided during the heating of the solution treatment.
- the time for the alloying element to be solid-solubilized can be secured. As a result, it is easy to provide the difference in strength by controlling the cooling rate.
- a shape of the metal pipe after the forming is not particularly limited, and a metal pipe with a flange may be used, or a metal pipe without a flange may be used.
- the forming device need only be a forming device that heats a metal material to perform the quenching, and a forming device using a hot stamping method may be adopted.
- the metal material is a plate material.
- Another forming device may be adopted.
- a forming device that forms a metal material made of an aluminum alloy, the forming device including: a forming die that forms a metal pipe from a metal pipe material; and a temperature control unit that is provided in the forming die and that control a temperature of the forming die, in which the forming device controls a cooling rate of the aluminum alloy during a solution treatment by using the temperature control unit, to provide a difference in strength of the aluminum alloy after an aging treatment.
- the forming device in which controlling the cooling rate is performed by partially heating a die.
- a metal member after the forming includes a first portion having a high number density of precipitates of alloying elements, and a second portion having a lower number density of the precipitates of the alloying elements than the first portion.
- the forming device according to any one of Aspects 1 to 3, in which a heating holding time is provided during heating of the solution treatment.
- a metal member including: a first portion having a high number density of precipitates of alloying elements; and a second portion having a lower number density of the precipitates of the alloying elements than the first portion.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Fluid Mechanics (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022-173475 | 2022-10-28 | ||
| JP2022173475 | 2022-10-28 | ||
| PCT/JP2023/030327 WO2024089989A1 (ja) | 2022-10-28 | 2023-08-23 | 成形装置、及び金属部材 |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2023/030327 Continuation WO2024089989A1 (ja) | 2022-10-28 | 2023-08-23 | 成形装置、及び金属部材 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20250205767A1 true US20250205767A1 (en) | 2025-06-26 |
Family
ID=90830560
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US19/081,543 Pending US20250205767A1 (en) | 2022-10-28 | 2025-03-17 | Molding device and metal member |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20250205767A1 (cg-RX-API-DMAC7.html) |
| EP (1) | EP4609963A4 (cg-RX-API-DMAC7.html) |
| JP (1) | JPWO2024089989A1 (cg-RX-API-DMAC7.html) |
| KR (1) | KR20250103608A (cg-RX-API-DMAC7.html) |
| CN (1) | CN119730973A (cg-RX-API-DMAC7.html) |
| WO (1) | WO2024089989A1 (cg-RX-API-DMAC7.html) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121289311A (zh) * | 2025-11-29 | 2026-01-09 | 中国第一汽车股份有限公司 | 一种热气胀成形装置及热气胀成形方法 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5639325B2 (ja) * | 2007-01-23 | 2014-12-10 | 株式会社神戸製鋼所 | アルミニウム合金板 |
| JP2009148822A (ja) * | 2007-11-27 | 2009-07-09 | Nippon Steel Corp | 高強度アルミニウム合金板の温間プレス成形方法 |
| JP2009220141A (ja) | 2008-03-14 | 2009-10-01 | Marujun Co Ltd | パイプ製品の製造方法及び同製造装置 |
| US8721812B2 (en) * | 2009-04-07 | 2014-05-13 | Rolls-Royce Corporation | Techniques for controlling precipitate phase domain size in an alloy |
| US8211251B2 (en) * | 2009-08-14 | 2012-07-03 | GM Global Technology Operations LLC | Local heat treatment of aluminum panels |
| US9469892B2 (en) * | 2010-10-11 | 2016-10-18 | Engineered Performance Materials Company, Llc | Hot thermo-mechanical processing of heat-treatable aluminum alloys |
| JP6075304B2 (ja) * | 2013-03-28 | 2017-02-08 | 株式会社豊田中央研究所 | 熱間プレス成形方法および熱間プレス成形装置 |
| GB2527486A (en) * | 2014-03-14 | 2015-12-30 | Imp Innovations Ltd | A method of forming complex parts from sheet metal alloy |
| EP3603837B1 (en) * | 2017-03-30 | 2024-12-18 | Sumitomo Heavy Industries, LTD. | Molding device |
| CN107686954A (zh) * | 2017-07-18 | 2018-02-13 | 北京科技大学 | 一种提高7075铝合金热冲压成形性的热处理方法 |
| JP2021104531A (ja) * | 2019-12-26 | 2021-07-26 | 株式会社神戸製鋼所 | アルミニウム合金板の成形方法 |
| JP7807191B2 (ja) * | 2020-03-17 | 2026-01-27 | 住友重機械工業株式会社 | 成形装置、及び成形方法 |
-
2023
- 2023-08-23 JP JP2024552845A patent/JPWO2024089989A1/ja active Pending
- 2023-08-23 CN CN202380060495.4A patent/CN119730973A/zh active Pending
- 2023-08-23 WO PCT/JP2023/030327 patent/WO2024089989A1/ja not_active Ceased
- 2023-08-23 KR KR1020257004501A patent/KR20250103608A/ko active Pending
- 2023-08-23 EP EP23882205.0A patent/EP4609963A4/en active Pending
-
2025
- 2025-03-17 US US19/081,543 patent/US20250205767A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| KR20250103608A (ko) | 2025-07-07 |
| WO2024089989A1 (ja) | 2024-05-02 |
| CN119730973A (zh) | 2025-03-28 |
| EP4609963A1 (en) | 2025-09-03 |
| EP4609963A4 (en) | 2026-05-06 |
| JPWO2024089989A1 (cg-RX-API-DMAC7.html) | 2024-05-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP4609963A1 (en) | Molding device and metal member | |
| US20220410242A1 (en) | Forming device and forming method | |
| US12502704B2 (en) | Forming device and metal pipe | |
| US20240300000A1 (en) | Forming device | |
| US20240253103A1 (en) | Forming device and forming method | |
| US20260001117A1 (en) | Forming system, forming device, and forming method | |
| US20260084200A1 (en) | Forming device | |
| US12390847B2 (en) | Molding device and metal pipe | |
| US12358037B2 (en) | Forming device and forming method | |
| US20230321713A1 (en) | Molding system | |
| US20250222508A1 (en) | Forming device | |
| WO2022050074A1 (ja) | 成形型 | |
| US20240314892A1 (en) | Electrical heating device, forming device, and electrical heating method | |
| US20260091424A1 (en) | Forming system | |
| US20240051007A1 (en) | Forming system, electric heating system, electrode, forming device, and support device | |
| US20250222510A1 (en) | Forming system | |
| JP7183310B2 (ja) | 成形装置 | |
| CA3162758C (en) | Forming device and forming method | |
| JP2021053688A (ja) | 成形装置及びブロー成形用の金属パイプ材料 | |
| CN121464006A (zh) | 成型装置、成型系统及金属管 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SUMITOMO HEAVY INDUSTRIES, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:NOGIWA, KIMIHIRO;KAWAKAMI, MASASHI;IKEDA, RYOHEI;SIGNING DATES FROM 20250310 TO 20250312;REEL/FRAME:070532/0872 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |