US20160017868A1 - Precast concrete post tensioned segmented wind turbine tower - Google Patents
Precast concrete post tensioned segmented wind turbine tower Download PDFInfo
- Publication number
- US20160017868A1 US20160017868A1 US14/868,053 US201514868053A US2016017868A1 US 20160017868 A1 US20160017868 A1 US 20160017868A1 US 201514868053 A US201514868053 A US 201514868053A US 2016017868 A1 US2016017868 A1 US 2016017868A1
- Authority
- US
- United States
- Prior art keywords
- tower
- annular
- segments
- tower segments
- tendons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000011178 precast concrete Substances 0.000 title claims description 14
- 210000002435 tendon Anatomy 0.000 claims abstract description 86
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 239000004567 concrete Substances 0.000 abstract description 29
- 230000007704 transition Effects 0.000 abstract description 17
- 238000005266 casting Methods 0.000 abstract description 14
- 238000009415 formwork Methods 0.000 abstract description 6
- 239000011440 grout Substances 0.000 abstract description 6
- 230000008859 change Effects 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 235000012489 doughnuts Nutrition 0.000 description 17
- 238000000034 method Methods 0.000 description 8
- 239000004593 Epoxy Substances 0.000 description 5
- 238000005452 bending Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000005304 joining Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000000314 lubricant Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Images
Classifications
-
- F03D11/045—
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/16—Prestressed structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/342—Arrangements for stacking tower sections on top of each other
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Definitions
- the existing methods of constructing wind towers vary depending on whether the materials are steel or concrete. The decision process used to select steel or concrete depends on the geographic location, regional resources and access to the wind farm site.
- Steel wind towers are commonly built through bolting of steel tubular sections together at intermediate flanges.
- the heights of steel towers are often limited by the diameter of the steel tubular sections that can be physically transported from the location of the steel fabricator to the wind farm site without significant modifications to existing roads, bridges, rail infrastructure, hauling equipment and other physical constraints. These limitations typically result in steel member diameters to approximately 20 ft., which in turn limits the tower height to approximately 300 ft. using conventional strength steel.
- Energy production from a wind tower has been typically shown to increase by increasing the height of the tower as a result of improved consistency in laminar wind flow.
- To increase the height of steel towers some developers are installing concrete pedestals underneath the base of the steel tower.
- Concrete towers being constructed today by using precast methods and cast in place methods.
- the advantages of concrete towers are they can be constructed using regional labor and materials and typically do not have height limitations as a result of transportation constraints since these towers can be fully fabricated on site.
- Cast in place construction methods utilize vertically extending formwork to support the pouring of fresh concrete into the forms at height. Restrictions to this method are the reduced speed of construction and sensitivity to inclement weather.
- Existing precast concrete techniques commonly precast the elements in a manner that results in vertical and horizontal joints, requiring joining of the elements during construction with grout. In this solution, post-tensioning in both directions can often be required to achieve a durable tower structure.
- precast solutions involve the grinding of the annular horizontal concrete surfaces to achieve a quality load bearing connection.
- the segments are commonly precast offsite or nearby to the tower farm.
- the vertical post-tensioning is commonly located inside the concrete wall where it is anchored.
- the common geometry of a concrete wind tower is tapered, creating additional complexity in the forming system and placement of reinforcing and post-tensioning geometry.
- the challenges inherent to the existing steel and concrete tower designs and construction methods are their limitation on geometry in the case of steel towers and the complexity of the concrete towers.
- This invention improves the construction of a precast concrete wind tower through its design and pre-casting methods.
- One primary feature of the invention is the forming of a stepped tower, whereby transition rings or annular anchor members or donut sections are used to transfer the post-tensioning tendon forces into the sections of the tower.
- the donut segments perform as intermediate diaphragm segments for the post-tensioning and transition zones for the change in tower diameter or horizontal cross-section.
- This feature eliminates the requirement for post-tensioning anchor blisters external to the inside of the tower wall to anchor the post-tensioning tendons. The axial loads and bending moments as a result of the step change in tower diameter or cross-section are resisted by the transition donut sections.
- transition donut sections also allow for vertical tower sections having a constant or uniform geometry between the donut sections which significantly simplifies both the site pre-casting operation and the installation of the precast tower segments.
- Each precast segment is match-cast against the previously cast segment to achieve a match cast joint, eliminating the need for a secondary operation in the field to secure the joint mechanically or the need for using grout.
- the tower structure segments are precast using match casting techniques where each segment connecting face is cast against its adjacent segment. Segments are typically designed to have similar weights, so that the lifting equipment used on site is optimized during the placement of segments.
- the tower segments may be uniform or constant in diameter or cross-section over a length of segments and between segment joints for producing segments for the stepped tower geometry or be tapered to result in a tapered tower shape where the top of the tower is a smaller diameter than its base and linearly tapered.
- the precast segments may be cast on site using a formwork system that is mobile. The formwork is designed and fabricated such that the end of the form is the actual segment previously cast, constituting the match cast face. The formwork can be moved to position it against each segment cast. As a segment is cast and after being used to match cast the next segment, it is moved from the immediate casting area to the casting yard for storage until used in the tower.
- each tower segment being cast can be moved and the formwork held stationary during the match casting process.
- segments are only required in the immediate casting area during casting or match casting.
- the number of forms required on site is a function of the casting production rate required. Only a limited amount of space (only two segments in length) is required to establish the match casting operation from one form.
- a regional precaster may be used to fabricate the segments away from the site and then transport the segments to the site.
- Precast segments are placed onto shims to level the base segment prior to stacking others on top. The base segment, once leveled, is then grouted between the precast base concrete segment and the foundation element.
- shear keys are cast into the segments interfaces with the adjoining segment.
- epoxy is placed onto the joints prior to joining together.
- the epoxy also serves to better seal the joint during the grouting operation of the post-tensioning tendon ducts.
- post-tensioning tendons are used to reinforce the precast segmental tower at the most effective locations along the height of the tower to resist the tension in the tower under externally applied loads.
- the tendon locations are vertically tiered and anchored to provide the post-tensioning forces where loads are higher.
- the tendons terminate over or along the height of the tower into the annular donut sections which act as internal diaphragms. External tendons to the concrete and inside the tower chamber may be used alone or in combination with internal tendons placed within tubes or ducts inside the concrete walls of the tower.
- annular diaphragm rings or anchor members may be cast into the tower segments to anchor internal tendons.
- these diaphragm rings or members serve to anchor tendons and can also be used to deviate or terminate the tendons or allow them to pass through.
- the diaphragm ring or anchor member serves as an annular blister to the concrete where the tendon can exit the concrete wall and be stressed and anchored.
- connection of a steel tip adapter that supports the nacelle and blades is achieved using a precast segment that contains a concrete diaphragm cast into the segment.
- the top of this segment is flat in the area of the steel to concrete connection.
- the precast diaphragm segment is located just below the intersection of the two structures.
- the diaphragm segment is dimensioned such that its weight is compatible with the tower segment weights to optimize the crane or equipment used to install each segment.
- Other criteria that affects the geometry of the top diaphragm is the location of the bolt circle used to secure the nacelle of top tower section to the precast tower.
- the tendons anchored in the precast tower may be extended into the top of the diaphragm and anchored.
- the bolts connecting the nacelle or top tower section can then be anchored to the underside of the concrete diaphragm.
- FIG. 1 is a stepped or tapered segmental concrete wind tower composed of precast concrete segments 47 , transition donut sections 50 , a tip adapter 33 and a foundation type 30 or 32 .
- FIG. 2 illustrates a fragmentary section of a shear key configuration 49 which may be match cast and used to transfer shear across the segmental joints under transverse loads to the tower and to assist in the alignment of one segment placed against the adjacent segment.
- FIG. 3 is a fragmentary section of an internal post-tensioning cables 34 connected to a transition donut section 50 with adjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast.
- FIG. 4 is a fragmentary section of internal post-tensioning cables 34 connected to an alternate transition donut section 48 with adjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast.
- FIG. 5 is a fragmentary section of external post-tensioning cables 35 for a transition donut section 50 with adjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast.
- FIG. 6 is a fragmentary section of external post-tensioning cables 35 for an alternate transition donut section 48 with adjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast.
- FIG. 7 is a vertical section of tower segments having annular diaphragm rings or anchor members where the external post-tensioning tendons 35 terminate or tendons 37 pass through the annular anchor members cast within the precast segments.
- FIG. 8 is a fragmentary section plan view of where the external post-tensioning tendons terminate 35 at the section L 3 -L 3 of FIG. 7 .
- FIG. 9 is a fragmentary section plan view of where the external post-tensioning tendons 35 terminate or tendons 37 pass through the annular diaphragm or anchor member at the section L 2 -L 2 of FIG. 7 .
- FIG. 110 is a fragmentary section plan view of where the external post-tensioning tendons 35 terminate or tendons 37 pass through the annular diaphragm or anchor member at the section L 1 -L 1 of FIG. 7 .
- FIG. 11 is a vertical section of a tower having annular diaphragm rings or anchor members where the internal post-tensioning tendons 34 terminate or pass through the annular diaphragms or anchor members located within the precast segments.
- FIG. 12 is a fragmentary section plan view of where the internal post-tensioning tendons 34 terminate at the section L 3 -L 3 of FIG. 11 .
- FIG. 13 is a fragmentary section plan view of where the internal post-tensioning tendons 34 terminate or tendons 36 pass through the annular diaphragm or anchor member at the section L 2 -L 2 of FIG. 11 .
- FIG. 14 is a fragmentary section plan view of where the internal post-tensioning tendons 34 terminate or tendons 36 pass through the annular diaphragm or anchor member at the section L 1 -L 1 of FIG. 11 .
- FIG. 15 is a fragmentary section of tower segments 28 attached to a foundation base 30 .
- FIG. 16 is a fragmentary section of tower segments 28 seated on shims 31 on the foundation structure 30 to properly align the vertical geometry prior to placing the subsequent segments above.
- FIG. 17 is a fragmentary section of tower segments 28 with grout 44 poured between the bottom base precast segment 28 and the foundation 30 .
- FIG. 18 is a plan view of a base 30 and showing the tendons 38 that connect the tower structure to the base foundation.
- FIG. 19 is a fragmentary section showing the connection of the bottom tower segment 28 to the base foundation 30 with U-shape hoop portions 39 of the tendons.
- FIG. 20 is a fragmentary section showing the connection of the bottom tower segment 28 to the foundation 30 with tendons 38 having L-shape configuration and terminating at the outside of the foundation with terminals 40 .
- FIG. 21 is a fragmentary section of an uppermost precast segment 51 where a nacelle 41 for the tip adapter 33 attaches to the tower structure with external post-tensioning tendons 35 .
- FIG. 22 is a plan view of the FIG. 21 and depicting how anchor rods or bolts 42 attach the nacelle 41 and tip adapter 33 .
- FIG. 23 is a fragmentary section of the uppermost precast segment 51 with the nacelle 41 and tip adapter 33 attached to the tower structure with the internal post-tensioning tendons 35 .
- FIG. 24 is a plan view of FIG. 23 and depicting how the anchor rods 42 attach the tip adapter 33 .
- FIG. 25 is a hybrid tower that uses match casting concrete tower segments supporting a steel tower 33 with the bottom tower segment placed on top of a precast or cast-in-place concrete pedestal 46 .
- FIG. 26 is a top view of the tower shown in FIG. 25 and having match cast segments with flat sides to form either the stepped tower of FIG. 1 or the hybrid tower of FIG. 25 , and
- FIG. 27 is a cross-sectional view showing tapered match cast segments having internal and external post-tensioning tendons 34 & 35 .
- a stepped tower is shown in FIG. 1 and is assembled using precast concrete segments 47 with transverse (horizontal) joints 29 ( FIGS. 3 & 4 ) that are match cast together to achieve a precision fit between adjacent segments.
- the match cast joint detail 45 is shown in FIG. 2 and incorporates a shear key configuration used to transfer shear across the segmental joints under transverse loads to the tower and to assist in the alignment of one segment with each adjacent segment.
- Epoxy is applied onto the bottom surface of the joint 45 of FIG. 2 prior to closing the gap 49 between the two segments. The epoxy serves the purpose of a lubricant during the segment placement operation and also as a sealing of the joint after the epoxy cures.
- a transition annular donut member or segment or anchor member 50 ( FIGS. 3-6 ) transfers the forces through the geometry transition and also serves as an anchorage zone for the vertical post-tensioning tendons 34 .
- the transition donut or anchor member may be used for internal post-tension tendons 34 located inside the wall of the tower structure, as shown in FIGS. 3 & 4 , or for external post-tensioning, as shown in FIGS. 5 & 6 .
- the annular transition donut or anchor member 50 is also match cast against its adjacent tower segments 28 to provide a precision fit during installation of the segments. In the design of post-tensioning tendons 34 placed inside the tower wall ( FIGS.
- the tendons 34 below the transition donut segment 50 pass upwards through the donut segment and may either curve inwards to anchor inside the tower chamber, as shown in FIG. 3 , or extend straight upwards, anchoring on the outside of the tower segment 48 , as shown in FIG. 4 .
- the tendons 35 enter the transition donut segment or 50 from outside of the concrete tower wall and are placed close to the wall.
- the most efficient layout of post-tensioning in the tower includes intermediate points to anchor the tendons 35 . This is achieved by using annular internal and integral anchor members or diaphragm rings, as shown in FIGS. 7 & 11 .
- the anchorages or tendons 35 either terminate or pass through the annular anchor members or diaphragm rings located within the precast segments.
- FIG. 10 a higher concentration of post-tensioning tendons 35 are shown in FIG. 10 than in FIGS. 8 & 9 .
- the annular anchor member or diaphragm is cast directly into segment with the tendon tubes or ducts located and incorporated into the segment.
- the annular diaphragm may also serve as deviation points for the external tendons 35 if necessary to avoid equipment or other interferences located inside the tower structure near the walls.
- the annular anchor members or diaphragms are located within a segment and its bottom shape may be tapered to follow the trajectory of the tendon and exiting the tower wall.
- the use of an annular diaphragm ring allows the internal tendons to exit the tower wall and anchor without having to deviate the tendon transversely within the tower wall to fixed location. This allows the post-tensioning to be more effective with reduced friction losses that commonly accompany tendon deviations.
- the higher concentration of tendons 36 in FIG. 14 in comparison to FIGS. 12 & 13 is a result of the higher bending moments that exist in the tower closer to the base 30 .
- the bottom side of the base precast segment 28 of FIG. 15 is shimmed with shims 31 , as shown in FIG. 16 , engaging the foundation structure 30 to properly align the vertical geometry prior to placing the subsequent tower segments above.
- grout 44 FIG. 17
- a shallow recess or trough formed within the top of the foundation during the foundation concrete pour can be used to contain the grout and fill the void between the bottom of the precast base segment 28 and the foundation 30 .
- the geometry of the tendons shown in FIG. 18 that connect the tower structure to the foundation structure 30 are comprised of either a hoop configuration 39 ( FIG. 19 ) or an L-shape hook configuration 38 shown in FIG. 20 .
- a hoop configuration 39 FIG. 19
- an L-shape hook configuration 38 shown in FIG. 20 .
- both ends of the same tendon are stressed from the anchorages located inside the tower structure.
- a benefit of the tendon configuration of FIG. 20 is that the compressive force of the tendons reduces the shear stresses in the concrete foundation structure 30 when the tendons hook back upwards and have terminals 40 on the surface the foundation 30 .
- a benefit of the tendon configuration of FIG. 19 is that the hoop tubes or ducts for the tendons occupy less space in the foundation structure 30 than the ducts for the tendons 38 shown in FIG. 20 .
- the tendons 38 & 39 will typically be stressed from the anchorages inside the tower.
- the L shaped tendon 38 shown in FIG. 20 can be stressed both from the inside of the tower and from the face of foundation to maximize the force in the tendon in the foundation structure.
- These tendons for both configurations can also be stressed from the top of the precast concrete segment 51 shown in FIGS. 1 , 21 & 23 .
- the uppermost precast segment 51 of the tower connects the tower structure to a tip adapter 33 ( FIG. 1 ) provided by the turbine supplier.
- the connection is accomplished by anchoring the post-tensioning tendons 34 or 35 into a recess or cavity on top of the segment 51 and using anchor rods or bolts 42 to connect the steel flange ring 41 of the tip adapter 33 to the underside of the segment 51 .
- This connection is applicable for both external tendons 35 of FIGS. 21 & 22 and internal tendons of FIGS. 23 & 24 .
- a diaphragm opening is provided to provide access from inside the tower to the inside of the tip adapter.
- match casting segments can be used to construct a hybrid tower whereby a steel tower 33 ( FIG. 25 ) and tower segments 47 are placed on top of a precast concrete pedestal 46 shown in FIG. 25 .
- the cross sectional geometry of the match cast segments may be round ( FIG. 1 ) or flat sided ( FIG. 26 ) for the stepped tower of FIG. 1 or the hybrid tower of FIG. 25 .
- the post-tensioning tendons 34 or 35 are located along the flat sides of the tower as shown in FIGS. 26 & 27 . These tendons can be designed for placement inside the tower wall or external to the tower wall, according to the space available inside the tower.
- the tower may be tapered more easily than a round or cylindrical structure.
- a tapered tower section 46 is provided as the base section before changing to a constant or uniform cross-sectional geometry.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Wind Motors (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
A post-tensioned precast segmental concrete tower has a stack of annular segments with uniform cross-sections which varies over the tower height. The transition between tower segments occurs in stages and is achieved using annular members or segments which support and anchor post-tensioning tendons that transfer loads passing through the tower as a result of a change in tower geometry. The tower segments are match cast against one another in fabrication to create tight matching opposing surfaces when placed into the tower and to create tight joints. The match casting eliminates the need for grout between precast segments, resulting in a faster tower erection time and high durability of the joints. All annular segments have horizontal joints and no vertical joints. The tower geometry simplifies the formwork system used to precast the segments, and the post-tensioning tendons tie all segments together and to the foundation.
Description
- The existing methods of constructing wind towers vary depending on whether the materials are steel or concrete. The decision process used to select steel or concrete depends on the geographic location, regional resources and access to the wind farm site. Steel wind towers are commonly built through bolting of steel tubular sections together at intermediate flanges. The heights of steel towers are often limited by the diameter of the steel tubular sections that can be physically transported from the location of the steel fabricator to the wind farm site without significant modifications to existing roads, bridges, rail infrastructure, hauling equipment and other physical constraints. These limitations typically result in steel member diameters to approximately 20 ft., which in turn limits the tower height to approximately 300 ft. using conventional strength steel. Energy production from a wind tower has been typically shown to increase by increasing the height of the tower as a result of improved consistency in laminar wind flow. To increase the height of steel towers, some developers are installing concrete pedestals underneath the base of the steel tower.
- Concrete towers being constructed today by using precast methods and cast in place methods. The advantages of concrete towers are they can be constructed using regional labor and materials and typically do not have height limitations as a result of transportation constraints since these towers can be fully fabricated on site. Cast in place construction methods utilize vertically extending formwork to support the pouring of fresh concrete into the forms at height. Restrictions to this method are the reduced speed of construction and sensitivity to inclement weather. Existing precast concrete techniques commonly precast the elements in a manner that results in vertical and horizontal joints, requiring joining of the elements during construction with grout. In this solution, post-tensioning in both directions can often be required to achieve a durable tower structure.
- Other precast solutions involve the grinding of the annular horizontal concrete surfaces to achieve a quality load bearing connection. The segments are commonly precast offsite or nearby to the tower farm. The vertical post-tensioning is commonly located inside the concrete wall where it is anchored. The common geometry of a concrete wind tower is tapered, creating additional complexity in the forming system and placement of reinforcing and post-tensioning geometry. The challenges inherent to the existing steel and concrete tower designs and construction methods are their limitation on geometry in the case of steel towers and the complexity of the concrete towers.
- This invention improves the construction of a precast concrete wind tower through its design and pre-casting methods. One primary feature of the invention is the forming of a stepped tower, whereby transition rings or annular anchor members or donut sections are used to transfer the post-tensioning tendon forces into the sections of the tower. The donut segments perform as intermediate diaphragm segments for the post-tensioning and transition zones for the change in tower diameter or horizontal cross-section. This feature eliminates the requirement for post-tensioning anchor blisters external to the inside of the tower wall to anchor the post-tensioning tendons. The axial loads and bending moments as a result of the step change in tower diameter or cross-section are resisted by the transition donut sections. The transition donut sections also allow for vertical tower sections having a constant or uniform geometry between the donut sections which significantly simplifies both the site pre-casting operation and the installation of the precast tower segments. Each precast segment is match-cast against the previously cast segment to achieve a match cast joint, eliminating the need for a secondary operation in the field to secure the joint mechanically or the need for using grout.
- The tower structure segments are precast using match casting techniques where each segment connecting face is cast against its adjacent segment. Segments are typically designed to have similar weights, so that the lifting equipment used on site is optimized during the placement of segments. The tower segments may be uniform or constant in diameter or cross-section over a length of segments and between segment joints for producing segments for the stepped tower geometry or be tapered to result in a tapered tower shape where the top of the tower is a smaller diameter than its base and linearly tapered. The precast segments may be cast on site using a formwork system that is mobile. The formwork is designed and fabricated such that the end of the form is the actual segment previously cast, constituting the match cast face. The formwork can be moved to position it against each segment cast. As a segment is cast and after being used to match cast the next segment, it is moved from the immediate casting area to the casting yard for storage until used in the tower.
- Alternatively, each tower segment being cast can be moved and the formwork held stationary during the match casting process. In both circumstances, segments are only required in the immediate casting area during casting or match casting. The number of forms required on site is a function of the casting production rate required. Only a limited amount of space (only two segments in length) is required to establish the match casting operation from one form. In all cases, a regional precaster may be used to fabricate the segments away from the site and then transport the segments to the site. However, it is considered advantageous to have the option to cast on site and to obtain concrete from a site operated batch plant or ready mix company. Precast segments are placed onto shims to level the base segment prior to stacking others on top. The base segment, once leveled, is then grouted between the precast base concrete segment and the foundation element.
- To increase shear capacity across joint and align joints upon placement, shear keys are cast into the segments interfaces with the adjoining segment. To ease placement and create a tightly sealed seal between segments, epoxy is placed onto the joints prior to joining together. In a design option where tendons are located inside and adjacent the concrete wall, the epoxy also serves to better seal the joint during the grouting operation of the post-tensioning tendon ducts. When the precast segmental tower experiences external wind loads on the blade and tower structure, the bending moment existing at the base of the tower is largely resisted in tension by post-tensioning tendons that extend from the tower into the foundation element.
- The use of post-tensioning tendons are used to reinforce the precast segmental tower at the most effective locations along the height of the tower to resist the tension in the tower under externally applied loads. The tendon locations are vertically tiered and anchored to provide the post-tensioning forces where loads are higher. Example: Where bending moments and resulting forces are higher towards the base of the tower under applied loads, the post-tensioning quantities are also higher to counter these applied loads. The tendons terminate over or along the height of the tower into the annular donut sections which act as internal diaphragms. External tendons to the concrete and inside the tower chamber may be used alone or in combination with internal tendons placed within tubes or ducts inside the concrete walls of the tower.
- To facilitate any requirements for additional intermediate anchor zones for the vertically placed post-tensioning tendons, annular diaphragm rings or anchor members may be cast into the tower segments to anchor internal tendons. When external tendons are used, these diaphragm rings or members serve to anchor tendons and can also be used to deviate or terminate the tendons or allow them to pass through. For internal tendons within the concrete wall, the diaphragm ring or anchor member serves as an annular blister to the concrete where the tendon can exit the concrete wall and be stressed and anchored.
- The connection of a steel tip adapter that supports the nacelle and blades is achieved using a precast segment that contains a concrete diaphragm cast into the segment. The top of this segment is flat in the area of the steel to concrete connection. In the event that a steel tower section, as in a hybrid tower, is placed above the precast concrete tower, the precast diaphragm segment is located just below the intersection of the two structures. The diaphragm segment is dimensioned such that its weight is compatible with the tower segment weights to optimize the crane or equipment used to install each segment. Other criteria that affects the geometry of the top diaphragm is the location of the bolt circle used to secure the nacelle of top tower section to the precast tower. To achieve an efficient transition of forces from the loads at top of the precast tower to the precast tower walls, the tendons anchored in the precast tower may be extended into the top of the diaphragm and anchored. The bolts connecting the nacelle or top tower section can then be anchored to the underside of the concrete diaphragm.
-
FIG. 1 is a stepped or tapered segmental concrete wind tower composed ofprecast concrete segments 47,transition donut sections 50, atip adapter 33 and a 30 or 32.foundation type -
FIG. 2 illustrates a fragmentary section of a shear key configuration 49 which may be match cast and used to transfer shear across the segmental joints under transverse loads to the tower and to assist in the alignment of one segment placed against the adjacent segment. -
FIG. 3 is a fragmentary section of an internalpost-tensioning cables 34 connected to atransition donut section 50 withadjacent segments 28 attached by transverse (horizontal)joints 29 that are match cast. -
FIG. 4 is a fragmentary section of internalpost-tensioning cables 34 connected to an alternatetransition donut section 48 withadjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast. -
FIG. 5 is a fragmentary section of externalpost-tensioning cables 35 for atransition donut section 50 withadjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast. -
FIG. 6 is a fragmentary section of externalpost-tensioning cables 35 for an alternatetransition donut section 48 withadjacent segments 28 attached by transverse (horizontal) joints 29 that are match cast. -
FIG. 7 is a vertical section of tower segments having annular diaphragm rings or anchor members where theexternal post-tensioning tendons 35 terminate ortendons 37 pass through the annular anchor members cast within the precast segments. -
FIG. 8 is a fragmentary section plan view of where the external post-tensioning tendons terminate 35 at the section L3-L3 ofFIG. 7 . -
FIG. 9 is a fragmentary section plan view of where theexternal post-tensioning tendons 35 terminate ortendons 37 pass through the annular diaphragm or anchor member at the section L2-L2 ofFIG. 7 . -
FIG. 110 is a fragmentary section plan view of where theexternal post-tensioning tendons 35 terminate ortendons 37 pass through the annular diaphragm or anchor member at the section L1-L1 ofFIG. 7 . -
FIG. 11 is a vertical section of a tower having annular diaphragm rings or anchor members where theinternal post-tensioning tendons 34 terminate or pass through the annular diaphragms or anchor members located within the precast segments. -
FIG. 12 is a fragmentary section plan view of where theinternal post-tensioning tendons 34 terminate at the section L3-L3 ofFIG. 11 . -
FIG. 13 is a fragmentary section plan view of where theinternal post-tensioning tendons 34 terminate ortendons 36 pass through the annular diaphragm or anchor member at the section L2-L2 ofFIG. 11 . -
FIG. 14 is a fragmentary section plan view of where theinternal post-tensioning tendons 34 terminate ortendons 36 pass through the annular diaphragm or anchor member at the section L1-L1 ofFIG. 11 . -
FIG. 15 is a fragmentary section oftower segments 28 attached to afoundation base 30. -
FIG. 16 is a fragmentary section oftower segments 28 seated onshims 31 on thefoundation structure 30 to properly align the vertical geometry prior to placing the subsequent segments above. -
FIG. 17 is a fragmentary section oftower segments 28 withgrout 44 poured between the bottombase precast segment 28 and thefoundation 30. -
FIG. 18 is a plan view of abase 30 and showing thetendons 38 that connect the tower structure to the base foundation. -
FIG. 19 is a fragmentary section showing the connection of thebottom tower segment 28 to thebase foundation 30 withU-shape hoop portions 39 of the tendons. -
FIG. 20 is a fragmentary section showing the connection of thebottom tower segment 28 to thefoundation 30 withtendons 38 having L-shape configuration and terminating at the outside of the foundation with terminals 40. -
FIG. 21 is a fragmentary section of anuppermost precast segment 51 where a nacelle 41 for thetip adapter 33 attaches to the tower structure withexternal post-tensioning tendons 35. -
FIG. 22 is a plan view of theFIG. 21 and depicting how anchor rods orbolts 42 attach the nacelle 41 andtip adapter 33. -
FIG. 23 is a fragmentary section of theuppermost precast segment 51 with the nacelle 41 andtip adapter 33 attached to the tower structure with theinternal post-tensioning tendons 35. -
FIG. 24 is a plan view ofFIG. 23 and depicting how theanchor rods 42 attach thetip adapter 33. -
FIG. 25 is a hybrid tower that uses match casting concrete tower segments supporting asteel tower 33 with the bottom tower segment placed on top of a precast or cast-in-placeconcrete pedestal 46. -
FIG. 26 is a top view of the tower shown inFIG. 25 and having match cast segments with flat sides to form either the stepped tower ofFIG. 1 or the hybrid tower ofFIG. 25 , and -
FIG. 27 is a cross-sectional view showing tapered match cast segments having internal and externalpost-tensioning tendons 34 & 35. - A stepped tower is shown in
FIG. 1 and is assembled using precastconcrete segments 47 with transverse (horizontal) joints 29 (FIGS. 3 & 4 ) that are match cast together to achieve a precision fit between adjacent segments. The match cast joint detail 45 is shown inFIG. 2 and incorporates a shear key configuration used to transfer shear across the segmental joints under transverse loads to the tower and to assist in the alignment of one segment with each adjacent segment. Epoxy is applied onto the bottom surface of the joint 45 ofFIG. 2 prior to closing the gap 49 between the two segments. The epoxy serves the purpose of a lubricant during the segment placement operation and also as a sealing of the joint after the epoxy cures. - At each step or change in diameter of the tower structure, a transition annular donut member or segment or anchor member 50 (
FIGS. 3-6 ) transfers the forces through the geometry transition and also serves as an anchorage zone for thevertical post-tensioning tendons 34. The transition donut or anchor member may be used for internalpost-tension tendons 34 located inside the wall of the tower structure, as shown inFIGS. 3 & 4 , or for external post-tensioning, as shown inFIGS. 5 & 6 . The annular transition donut oranchor member 50 is also match cast against itsadjacent tower segments 28 to provide a precision fit during installation of the segments. In the design ofpost-tensioning tendons 34 placed inside the tower wall (FIGS. 3 & 4 ), thetendons 34 below thetransition donut segment 50 pass upwards through the donut segment and may either curve inwards to anchor inside the tower chamber, as shown inFIG. 3 , or extend straight upwards, anchoring on the outside of thetower segment 48, as shown inFIG. 4 . In the design of externalpost-tensioning tendons 35, as shown inFIGS. 5 & 6 within the tower, thetendons 35 enter the transition donut segment or 50 from outside of the concrete tower wall and are placed close to the wall. - The most efficient layout of post-tensioning in the tower includes intermediate points to anchor the
tendons 35. This is achieved by using annular internal and integral anchor members or diaphragm rings, as shown inFIGS. 7 & 11 . For external post-tensioning, the anchorages ortendons 35 either terminate or pass through the annular anchor members or diaphragm rings located within the precast segments. As a result of the increased bending moments at the base of the tower and reducing along the tower's height, a higher concentration ofpost-tensioning tendons 35 are shown inFIG. 10 than inFIGS. 8 & 9 . The annular anchor member or diaphragm is cast directly into segment with the tendon tubes or ducts located and incorporated into the segment. The annular diaphragm may also serve as deviation points for theexternal tendons 35 if necessary to avoid equipment or other interferences located inside the tower structure near the walls. For internal post-tensioning as shown inFIG. 11 , the annular anchor members or diaphragms are located within a segment and its bottom shape may be tapered to follow the trajectory of the tendon and exiting the tower wall. The use of an annular diaphragm ring allows the internal tendons to exit the tower wall and anchor without having to deviate the tendon transversely within the tower wall to fixed location. This allows the post-tensioning to be more effective with reduced friction losses that commonly accompany tendon deviations. The higher concentration oftendons 36 inFIG. 14 in comparison toFIGS. 12 & 13 is a result of the higher bending moments that exist in the tower closer to thebase 30. - The bottom side of the
base precast segment 28 ofFIG. 15 is shimmed withshims 31, as shown inFIG. 16 , engaging thefoundation structure 30 to properly align the vertical geometry prior to placing the subsequent tower segments above. Once aligned, grout 44 (FIG. 17 ) is poured between the bottom of the base precast segment and thefoundation structure 30. A shallow recess or trough formed within the top of the foundation during the foundation concrete pour can be used to contain the grout and fill the void between the bottom of theprecast base segment 28 and thefoundation 30. - The geometry of the tendons shown in
FIG. 18 that connect the tower structure to thefoundation structure 30 are comprised of either a hoop configuration 39 (FIG. 19 ) or an L-shape hook configuration 38 shown inFIG. 20 . In the hoop configuration, both ends of the same tendon are stressed from the anchorages located inside the tower structure. A benefit of the tendon configuration ofFIG. 20 is that the compressive force of the tendons reduces the shear stresses in theconcrete foundation structure 30 when the tendons hook back upwards and have terminals 40 on the surface thefoundation 30. A benefit of the tendon configuration ofFIG. 19 is that the hoop tubes or ducts for the tendons occupy less space in thefoundation structure 30 than the ducts for thetendons 38 shown inFIG. 20 . In both tendon configurations, thetendons 38 & 39 will typically be stressed from the anchorages inside the tower. The L shapedtendon 38 shown inFIG. 20 can be stressed both from the inside of the tower and from the face of foundation to maximize the force in the tendon in the foundation structure. These tendons for both configurations can also be stressed from the top of the precastconcrete segment 51 shown inFIGS. 1 , 21 & 23. - The
uppermost precast segment 51 of the tower, shown inFIGS. 1 , 21 & 23, connects the tower structure to a tip adapter 33 (FIG. 1 ) provided by the turbine supplier. The connection is accomplished by anchoring the 34 or 35 into a recess or cavity on top of thepost-tensioning tendons segment 51 and using anchor rods orbolts 42 to connect the steel flange ring 41 of thetip adapter 33 to the underside of thesegment 51. This connection is applicable for bothexternal tendons 35 ofFIGS. 21 & 22 and internal tendons ofFIGS. 23 & 24 . To provide access from inside the tower to the inside of the tip adapter, a diaphragm opening is provided. - The use of match casting segments can be used to construct a hybrid tower whereby a steel tower 33 (
FIG. 25 ) andtower segments 47 are placed on top of a precastconcrete pedestal 46 shown inFIG. 25 . The cross sectional geometry of the match cast segments may be round (FIG. 1 ) or flat sided (FIG. 26 ) for the stepped tower ofFIG. 1 or the hybrid tower ofFIG. 25 . In the case of a flat sided tower, the 34 or 35 are located along the flat sides of the tower as shown inpost-tensioning tendons FIGS. 26 & 27 . These tendons can be designed for placement inside the tower wall or external to the tower wall, according to the space available inside the tower. When using the flat walls ofFIG. 27 , the tower may be tapered more easily than a round or cylindrical structure. Using flat walls, a taperedtower section 46 is provided as the base section before changing to a constant or uniform cross-sectional geometry. - While the forms of segmental wind turbine towers herein described constitute preferred embodiments of the invention, it is to be understood that the invention is not limited to these precise forms, and that the changes made therein without departing from the scope of the invention as defined in the appended claims.
Claims (21)
1-18. (canceled)
19. A precast concrete tower for supporting a wind turbine, comprising:
a base member positioned to support a tower;
a series of precast concrete annular tower segments supported by the base member forming a vertical stack of the tower segments;
a plurality of anchor members connected to at least one of the annular tower segments and the base member;
a series of vertically extending post tensioning tendons spaced interior to the annular walls of the tower segments connected to the anchor members;
match-cast annular joints between the annular tower segments, the joints comprising:
a flat annular surface proximate an outer surface of the annular tower segments, and
an inclined annular surface contiguous with the flat annular surface forming an obtuse angle with respect to the flat annular surface wherein the inclined annular surface is spaced apart from the outer surface of the annular tower segments.
20. The tower according to claim 19 , further comprising:
a plurality of lower tower segments of the annular tower segments having substantially the same horizontal cross-sectional configuration;
a plurality of upper tower segments of the annular tower segments having substantially the same horizontal cross-sectional configuration; and
the upper tower segments being smaller than the lower tower segments in horizontal cross-section.
21. The tower of claim 20 , wherein the anchor members engage terminating end portions of the tendons extending from the lower tower segments.
22. The tower of claim 19 , wherein the anchor members are integral with the annular tower segments and project from annular walls of the tower segments.
23. The tower of claim 19 , wherein an uppermost annular tower segment of the tower segments comprises at least one of the anchor members connected to an upper end portion of the tendons.
24. The tower of claim 23 , wherein the uppermost annular tower segment of the tower segments also comprises a connection to a steel tip adapter.
25. The tower of claim 19 , wherein the tendons have U-shaped portions extending through the base member.
26. The tower of claim 19 , wherein the tendons have L-shape portions extending through the base member; and the tendons have end portions secured to an outer base surface of the base member.
27. The tower of claim 19 , wherein at least one of the annular tower segments has flat outer wall surfaces around the tower segments.
28. The tower of claim 19 , wherein the vertical stack includes at least five of the annular tower segments of the same diameter.
29. The tower of claim 19 , wherein a bottommost precast segment is placed on shims on the base member.
30. A precast concrete tower for supporting a wind turbine, comprising:
a base member positioned to support a tower;
a series of precast concrete annular tower segments supported by the base member forming a vertical stack of the tower segments;
a plurality of lower annular tower segments of the annular tower segments having substantially the same horizontal cross-sectional configuration;
a plurality of upper tower segments of the annular tower segments having substantially the same horizontal cross-sectional configuration;
the upper tower segments being smaller than the lower tower segments in horizontal cross-section; and
match-cast annular joints between the annular tower segments, the joints comprising:
a flat annular surface proximate an outer surface of the annular tower segments; and
an inclined annular surface contiguous with the flat annular surface forming an obtuse angle with respect to the flat annular surface wherein the inclined annular surface is spaced apart from the outer surface of the annular tower segments.
31. The tower of claim 30 , further comprising:
precast anchor members incorporated into the tower segments;
a series of vertically extending post tensioning tendons spaced interior to the annular walls of the tower segments connected to the anchor members.
32. The tower of claim 32 , wherein an uppermost annular tower segment of the tower segments comprises at least one of the precast anchor members that is connected to upper end portions of the tendons.
33. The tower of claim 30 , wherein the tendons have U-shaped portions extending through the base member.
34. The tower of claim 30 , wherein the tendons have L-shape portions extending through the base member; and the tendons have end portions secured to an outer base surface of the base member.
35. The tower of claim 30 , wherein at least one of the annular tower segments has flat outer wall surfaces around the tower segments.
36. The tower of claim 30 , wherein the vertical stack includes at least five of the annular tower segments of the same diameter.
37. The tower of claim 30 , wherein the bottommost precast segment is placed on shims on the base member.
38. A precast concrete tower for supporting a wind turbine, comprising:
a base member positioned to support a tower;
a series of precast concrete annular tower segments supported by the base member forming a vertical stack of the tower segments;
the vertical stack includes at least five of the annular tower segments of the same diameter;
a plurality of lower annular tower segments of the annular segments having substantially the same horizontal cross-sectional configuration;
a plurality of upper tower segments of the annular segments having substantially the same horizontal cross-sectional configuration;
the upper tower segments being smaller than the lower tower segments in horizontal cross-section;
an uppermost annular tower segment of the tower segments comprises at least one of precast anchor members that is connected to upper end portions of the tendons;
precast anchor members incorporated into the tower segments;
a series of vertically extending post tensioning tendons spaced interior to the annular walls of the tower segments connected to the anchor members; and
match-cast annular joints between the annular tower segments, the joints comprising:
a flat annular surface proximate an outer surface of the annular tower segments; and
an inclined annular surface contiguous with the flat annular surface forming an obtuse angle with respect to the flat annular surface wherein the inclined annular surface is spaced apart from the outer surface of the annular tower segments.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/868,053 US20160017868A1 (en) | 2012-08-03 | 2015-09-28 | Precast concrete post tensioned segmented wind turbine tower |
| US15/974,822 US20190106856A1 (en) | 2012-08-03 | 2018-05-09 | Precast concrete post tensioned segmented wind turbine tower |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201261742070P | 2012-08-03 | 2012-08-03 | |
| US13/957,596 US9175670B2 (en) | 2012-08-03 | 2013-08-02 | Precast concrete post tensioned segmented wind turbine tower |
| US14/868,053 US20160017868A1 (en) | 2012-08-03 | 2015-09-28 | Precast concrete post tensioned segmented wind turbine tower |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/957,596 Continuation US9175670B2 (en) | 2012-08-03 | 2013-08-02 | Precast concrete post tensioned segmented wind turbine tower |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/974,822 Continuation US20190106856A1 (en) | 2012-08-03 | 2018-05-09 | Precast concrete post tensioned segmented wind turbine tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20160017868A1 true US20160017868A1 (en) | 2016-01-21 |
Family
ID=50024107
Family Applications (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/957,596 Active US9175670B2 (en) | 2012-08-03 | 2013-08-02 | Precast concrete post tensioned segmented wind turbine tower |
| US14/868,053 Abandoned US20160017868A1 (en) | 2012-08-03 | 2015-09-28 | Precast concrete post tensioned segmented wind turbine tower |
| US15/974,822 Abandoned US20190106856A1 (en) | 2012-08-03 | 2018-05-09 | Precast concrete post tensioned segmented wind turbine tower |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/957,596 Active US9175670B2 (en) | 2012-08-03 | 2013-08-02 | Precast concrete post tensioned segmented wind turbine tower |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/974,822 Abandoned US20190106856A1 (en) | 2012-08-03 | 2018-05-09 | Precast concrete post tensioned segmented wind turbine tower |
Country Status (7)
| Country | Link |
|---|---|
| US (3) | US9175670B2 (en) |
| BR (1) | BR112015002426A2 (en) |
| CA (1) | CA2880788C (en) |
| CL (1) | CL2015000263A1 (en) |
| MX (1) | MX357895B (en) |
| WO (1) | WO2014021927A2 (en) |
| ZA (1) | ZA201500855B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160215761A1 (en) * | 2013-09-06 | 2016-07-28 | youWINenergy GmbH | Tower assembly for a wind turbine installation |
| ES2662926A1 (en) * | 2016-10-06 | 2018-04-10 | Deltacore Estudios Y Proyectos, S.L. | WIND TOWER PEDESTAL (Machine-translation by Google Translate, not legally binding) |
| US10280643B2 (en) * | 2015-08-31 | 2019-05-07 | Wind Tower Technologies, Llc | Tower segment and method utilizing segmented bearing plate |
| US10392233B2 (en) * | 2015-03-26 | 2019-08-27 | Liebherr-Werk Biberach Gmbh | Crane tower |
| CN111852154A (en) * | 2020-07-28 | 2020-10-30 | 安徽凯越电力杆塔有限公司 | High-strength composite material electric pole |
| US20240240615A1 (en) * | 2021-07-13 | 2024-07-18 | General Electric Company | Wind turbine tower structure with transition system between sections thereof |
Families Citing this family (59)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2012052029A1 (en) * | 2010-10-20 | 2012-04-26 | Vestas Wind Systems A/S | Foundation for a wind turbine and method of making same |
| ES2471641B1 (en) * | 2012-12-21 | 2015-04-07 | Acciona Windpower, S.A. | Prefabricated concrete dovela, wind turbine tower comprising said dovela, wind turbine comprising said tower and assembly procedure of said wind turbine |
| EP2781673B1 (en) * | 2013-03-21 | 2016-03-16 | ALSTOM Renewable Technologies | Tower |
| DE102013213976A1 (en) * | 2013-07-17 | 2015-01-22 | Wobben Properties Gmbh | A method of manufacturing a precast concrete segment of a wind turbine tower |
| DE102013216343A1 (en) * | 2013-08-19 | 2015-02-19 | Wobben Properties Gmbh | Wind turbine foundation and wind turbine |
| PT2846041T (en) * | 2013-09-06 | 2018-03-20 | youWINenergy GmbH | Retrofitted wind turbine installation |
| DE102013225128A1 (en) * | 2013-12-06 | 2015-06-11 | Wobben Properties Gmbh | Wind turbine and wind turbine tower |
| DE102013226536A1 (en) * | 2013-12-18 | 2015-06-18 | Wobben Properties Gmbh | Arrangement with a concrete foundation and a tower and method for erecting a tower |
| CA2940979C (en) | 2014-02-28 | 2022-04-05 | University Of Maine System Board Of Trustees | Hybrid concrete - composite tower for a wind turbine and method of manufacturing |
| CN104018724B (en) * | 2014-06-13 | 2015-04-15 | 湖南大学 | Connecting device of prestress concrete tower section and steel tower section of combination wind power tower |
| WO2015195593A1 (en) | 2014-06-17 | 2015-12-23 | Tindall Corporation | Pipe racks |
| US9032677B1 (en) * | 2014-06-17 | 2015-05-19 | Tindall Corporation | Pipe racks |
| US11536045B2 (en) * | 2014-10-30 | 2022-12-27 | Byo Towers, S.L. | Method for installing a hollow concrete tower made from more than one segment and corresponding hollow concrete tower |
| US10494830B2 (en) * | 2014-10-31 | 2019-12-03 | Soletanche Freyssinet | Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system |
| US10900467B2 (en) * | 2014-11-27 | 2021-01-26 | Universitat Politecnica De Catalunya | Floating structure for supporting a marine wind turbine |
| FR3029231B1 (en) * | 2014-12-01 | 2016-12-30 | Lafarge Sa | CONCRETE SECTION |
| CN104626353B (en) * | 2015-01-22 | 2017-01-11 | 北京金风科创风电设备有限公司 | Prefabricated concrete tower transition section mold and its application method |
| ES2580332B1 (en) * | 2015-01-22 | 2017-06-23 | Ingecid Investigación Y Desarrollo De Proyectos, S.L. | Concrete tower |
| EP3322858A4 (en) | 2015-07-15 | 2019-01-09 | Rute Foundation Systems, Inc. | Beam and pile anchor foundation for towers |
| CN108603380B (en) | 2015-08-31 | 2020-04-24 | 西门子歌美飒可再生能源有限公司 | System and method for installing tensioning tendons in a wind turbine tower |
| EP3329119A2 (en) | 2015-08-31 | 2018-06-06 | Siemens Gamesa Renewable Energy, Inc. | Equipment tower having a concrete plinth |
| CA2997726C (en) | 2015-08-31 | 2019-10-29 | Siemens Gamesa Renewable Energy, Inc. | Concrete equipment tower with tensioning tendon guide slot |
| CA2916228C (en) * | 2015-12-23 | 2019-02-26 | 649119 N.B. Inc. | Pre-cast concrete foundation of modular construction for telecommunication or wind turbine tower |
| JP6635591B2 (en) * | 2016-01-27 | 2020-01-29 | 東日本旅客鉄道株式会社 | Post foundation |
| DK3203065T3 (en) * | 2016-02-02 | 2019-07-29 | Dywidag Sist Constructivos S A | Wind Tower Connection System |
| EP3211154B1 (en) * | 2016-02-26 | 2022-02-23 | Nordex Energy Spain, S.A. | Manufacturing process of concrete towers for wind turbines |
| DE102016109818A1 (en) * | 2016-05-27 | 2017-11-30 | Wobben Properties Gmbh | Climbing device for carrying out a movement relative to a tower and method for producing a tower |
| CN106438215A (en) * | 2016-10-08 | 2017-02-22 | 霍尔果斯新国金新能源科技有限公司 | Tower drum used for wind driven generator |
| CN106438216A (en) * | 2016-10-31 | 2017-02-22 | 江苏金海新能源科技有限公司 | Pre-stressed concrete fan tower provided with segmented straight tower cylinder and installation method of pre-stressed concrete fan tower |
| CN106949017A (en) * | 2017-05-05 | 2017-07-14 | 同济大学建筑设计研究院(集团)有限公司 | A kind of prefabricated mixing pylon of Wind turbines bottom burst |
| EP3827134A4 (en) | 2017-10-25 | 2022-07-06 | Rute Foundation Systems, Inc. | Tower foundation with concrete box girder beams |
| US10988909B1 (en) | 2018-08-29 | 2021-04-27 | RCAM Technologies, Inc. | Additive manufacturing of support structures |
| WO2020072710A1 (en) | 2018-10-04 | 2020-04-09 | Tetra Tech, Inc. | Wind turbine foundation and method of constructing a wind turbine foundation |
| CN109296502A (en) * | 2018-11-06 | 2019-02-01 | 重庆大学 | A prestressed hollow sandwich concrete-filled steel tubular wind power tower and its combined foundation |
| CN111287905B (en) * | 2018-12-06 | 2024-04-19 | 上海风领新能源有限公司 | Tower drum |
| CN111287892A (en) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | Prefabricated tower section of thick bamboo section and tower section of thick bamboo that has it |
| US10822764B2 (en) * | 2019-02-21 | 2020-11-03 | General Electric Company | Method of connecting a tower to a foundation |
| FR3093741B1 (en) * | 2019-03-13 | 2021-04-30 | Cte Wind Civil Eng | Earthmoving process for a foundation for an onshore wind turbine |
| CN109869283A (en) * | 2019-04-09 | 2019-06-11 | 重庆大学 | A kind of basis ring type wind-power tower basic property lift technique |
| CN110439758B (en) * | 2019-08-14 | 2024-08-09 | 北京中建建筑科学研究院有限公司 | Node transition tower section of wind power steel-concrete combined tower, wind power tower and construction method of wind power tower |
| DE102019133132A1 (en) * | 2019-12-05 | 2021-06-10 | Rwe Renewables Gmbh | Wind turbine foundation structure and method of manufacturing a wind turbine foundation structure |
| CN113494425B (en) * | 2020-04-07 | 2025-09-05 | 江苏正锐达新能源有限公司 | Towers and tower components |
| JP7241050B2 (en) * | 2020-05-29 | 2023-03-16 | 東京製綱株式会社 | Precast/prestressed concrete foundation structure and its construction method |
| CN114060225B (en) * | 2020-08-04 | 2025-07-29 | 库珀新能源股份有限公司 | Steel-concrete combined tower and construction method thereof |
| WO2022032403A1 (en) * | 2020-08-13 | 2022-02-17 | Mecal Intellectual Property And Standards B.V. | Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar |
| CN112096573B (en) * | 2020-08-21 | 2022-02-11 | 中国电建集团华东勘测设计研究院有限公司 | Grouting-free dry-type prestressed bolt splicing and slicing prefabricated assembly type mixed tower |
| CN112282215A (en) * | 2020-09-21 | 2021-01-29 | 华南理工大学 | Prefabricated FRP pipe-concrete-steel pipe double-wall hollow column and construction method |
| CN112483328A (en) * | 2020-12-18 | 2021-03-12 | 明阳智慧能源集团股份公司 | Prefabricated dry-type assembled concrete-steel hybrid tower of wind generating set |
| CN114837897A (en) * | 2021-02-02 | 2022-08-02 | 上海市机电设计研究院有限公司 | All section tension prestressed steel-concrete structure wind power tower |
| WO2022263697A1 (en) * | 2021-06-14 | 2022-12-22 | Hws Concrete Towers, S.L. | High-rise tower with prefabricated concrete elements |
| EP4375455A4 (en) | 2021-07-22 | 2025-06-04 | Windtechnic Engineering, S.L. | Concrete tower with multiple sections |
| US20230295891A1 (en) * | 2022-03-17 | 2023-09-21 | Rute Foundation Systems, Inc. | Post-tensioned wind turbine foundation |
| WO2023194629A1 (en) * | 2022-04-05 | 2023-10-12 | Windtechnic Engineering S.L. | Vertical concrete structure with variable pre-stressing and wind turbine comprising the structure |
| CN114753402A (en) * | 2022-04-06 | 2022-07-15 | 中国船舶重工集团海装风电股份有限公司 | Steel-concrete composite structure switching section for wind power tower |
| DE102022120299A1 (en) * | 2022-08-11 | 2024-02-22 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Wind turbine and method for setting up a wind turbine |
| CN115467362A (en) * | 2022-10-25 | 2022-12-13 | 中国船舶重工集团海装风电股份有限公司 | Connection structure and construction method of land wind power assembly type foundation prefabricated part |
| CN116641845A (en) * | 2023-05-17 | 2023-08-25 | 湖南大学 | A UHPC-based wind power tower with ground anchors and its construction method |
| DE102023120009A1 (en) * | 2023-07-27 | 2025-01-30 | Bettels Betonfertigteile GmbH | Tower segment for a tower of a wind turbine and the tower in question |
| CN117536788A (en) * | 2023-11-30 | 2024-02-09 | 盛东如东海上风力发电有限责任公司 | Reinforced concrete tower, wind turbine tower and tower installation method |
Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB638089A (en) * | 1946-08-13 | 1950-05-31 | Eugene Hippolyte Garnier | Improvements in the construction of poles for power transmission or the like |
| US3300942A (en) * | 1964-02-10 | 1967-01-31 | Dravco Corp | Method of constructing natural draft cooling tower |
| US4187660A (en) * | 1977-02-14 | 1980-02-12 | T. Y. Lin International | Method of constructing cooling tower employing precast reinforced concrete panels |
| US4486984A (en) * | 1982-09-24 | 1984-12-11 | Carty John J | Method for construction of a precast chimney |
| US5066167A (en) * | 1990-01-19 | 1991-11-19 | Vsl International Ag | Prestressed concrete lining in a pressure tunnel |
| US5072553A (en) * | 1987-09-28 | 1991-12-17 | Electricite De France (Service National) | Shell structure for a cooling tower |
| US5687537A (en) * | 1996-05-24 | 1997-11-18 | Pi Rod Inc. | Modular antenna pole |
| DE29809541U1 (en) * | 1998-05-27 | 1999-10-07 | Arand, Wilfried, 59425 Unna | Device for producing tall, hollow, tower-like structures of two hundred meters in height and more, in particular towers for wind turbines |
| US20050129504A1 (en) * | 2002-02-12 | 2005-06-16 | De Roest Anton H. | Wind turbine |
| US7105940B2 (en) * | 2004-03-31 | 2006-09-12 | General Electric Company | Mobile renewable energy generator |
| US20100058673A1 (en) * | 2007-08-31 | 2010-03-11 | Mitsubishi Heavy Industries Ltd | Tubular-member flange coupling |
| US20100325986A1 (en) * | 2009-06-24 | 2010-12-30 | Garcia Maestre Ivan | System for joining a gondola to the concrete tower of an aerogenerator |
| US8272181B2 (en) * | 2009-03-03 | 2012-09-25 | Tooman Norman L | Grout sleeve for foundation anchor bolts and method for protection of anchor bolts for a vertical structure, including wind turbines |
| US8490337B2 (en) * | 2009-06-09 | 2013-07-23 | Thomas Nott Word, III | Structural flange connection system and method |
| US8561363B2 (en) * | 2010-10-01 | 2013-10-22 | Thomas H. DeArmond, Jr. | Apparatus and method for stabilizing headstones |
| US8572905B1 (en) * | 2011-12-28 | 2013-11-05 | Tab F. Driggers | Method and apparatus for anchoring beam |
| US9518564B2 (en) * | 2010-11-04 | 2016-12-13 | University Of Maine System Board Of Trustee | Floating hybrid composite wind turbine platform and tower system |
Family Cites Families (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US909299A (en) * | 1908-05-22 | 1909-01-12 | Herbert H Hilborn | Method of reinforcing tubular structures. |
| US1206484A (en) * | 1915-03-30 | 1916-11-28 | Charles H Swan | Silo construction. |
| DE613696C (en) | 1931-06-13 | 1935-05-27 | Hermann Walter | Butt connection for telescopically nested tubular parts of a detached reinforced concrete hollow mast |
| US3385197A (en) * | 1966-08-05 | 1968-05-28 | Greber Henry | Wind ejector for cooling towers and stacks |
| US3628223A (en) * | 1970-05-11 | 1971-12-21 | Alexander Babee | Climbing concrete form hoist |
| US4261931A (en) * | 1979-08-03 | 1981-04-14 | Chicago Bridge & Iron Company | Cooling tower with fluted wall |
| DE3115212A1 (en) | 1981-04-15 | 1982-11-11 | Teplotechna N.P., Praha | Building structure |
| US4454693A (en) * | 1982-03-05 | 1984-06-19 | Rochester Silo, Inc. | Continuous-unloading silo |
| US5117604A (en) * | 1989-06-26 | 1992-06-02 | M.H. Detrick Co. | Refractory brick wall system |
| US5858493A (en) * | 1996-09-16 | 1999-01-12 | Sandt; Hartley | Tapered composite structural member and method of making same |
| DE19823650C2 (en) * | 1998-05-27 | 2001-05-23 | Wilfried Arand | Method and device for producing tall, hollow, tower-like structures of up to two hundred meters in height and more, in particular towers for wind turbines |
| DE10033845A1 (en) | 2000-07-12 | 2002-01-24 | Aloys Wobben | Pre-stressed concrete tower |
| AU2002225600A1 (en) | 2000-11-09 | 2002-05-21 | Beaird Industries, Inc. | Wind tower with ladders and platforms |
| US6851231B2 (en) * | 2001-06-27 | 2005-02-08 | Maher K. Tadros | Precast post-tensioned segmental pole system |
| DK200200178A (en) * | 2002-02-06 | 2003-08-07 | Vestas Wind Sys As | Wind turbine tower suspension means |
| ES2246734B1 (en) | 2005-04-21 | 2007-04-16 | STRUCTURAL CONCRETE & STEEL, S.L. | PREFABRICATED MODULAR TOWER. |
| WO2008136717A1 (en) * | 2007-05-07 | 2008-11-13 | Telefonaktiebolaget Lm Ericsson (Publ) | Antenna tower structure with installation shaft |
| DE102007031065B4 (en) * | 2007-06-28 | 2011-05-05 | Nordex Energy Gmbh | Wind turbine tower |
| WO2009056898A1 (en) | 2007-11-02 | 2009-05-07 | Alejandro Cortina-Cordero | Post-tensioned concrete tower for wind turbines |
| US8734705B2 (en) * | 2008-06-13 | 2014-05-27 | Tindall Corporation | Method for fabrication of structures used in construction of tower base supports |
| JP5328910B2 (en) * | 2008-07-15 | 2013-10-30 | シーメンス アクチエンゲゼルシヤフト | Method for assembling tower and tower |
| DE102009016893B4 (en) * | 2009-04-08 | 2011-12-08 | Nordex Energy Gmbh | Anchoring component for a wind turbine tower |
| PT2631394E (en) * | 2009-05-19 | 2015-11-16 | Pacadar Sa | A support structure for a wind turbine |
| CN102482892B (en) * | 2009-07-13 | 2014-10-08 | Vsl国际股份公司 | Telescopic tower assembly and method |
| KR100950715B1 (en) * | 2009-10-26 | 2010-03-31 | (주)대우건설 | Method for constructing precast coping for bridge |
| EP2330263B1 (en) | 2009-12-01 | 2016-03-16 | Siemens Aktiengesellschaft | Concrete tower |
| US9021757B2 (en) | 2010-02-01 | 2015-05-05 | Conelto Aps | Tower construction and a method for erecting the tower construction |
| FI122076B (en) | 2010-03-12 | 2011-08-15 | Peikko Group Oy | Method for foundation of tower-like structures and foundation of tower-like structures |
| DE102010039796A1 (en) * | 2010-06-14 | 2011-12-15 | Max Bögl Bauunternehmung GmbH & Co. KG | Tower with an adapter piece and method of making a tower with an adapter piece |
| WO2012052029A1 (en) * | 2010-10-20 | 2012-04-26 | Vestas Wind Systems A/S | Foundation for a wind turbine and method of making same |
-
2013
- 2013-08-02 CA CA2880788A patent/CA2880788C/en active Active
- 2013-08-02 BR BR112015002426A patent/BR112015002426A2/en not_active Application Discontinuation
- 2013-08-02 US US13/957,596 patent/US9175670B2/en active Active
- 2013-08-02 MX MX2015001624A patent/MX357895B/en active IP Right Grant
- 2013-08-02 WO PCT/US2013/000182 patent/WO2014021927A2/en active Application Filing
-
2015
- 2015-02-03 CL CL2015000263A patent/CL2015000263A1/en unknown
- 2015-02-05 ZA ZA2015/00855A patent/ZA201500855B/en unknown
- 2015-09-28 US US14/868,053 patent/US20160017868A1/en not_active Abandoned
-
2018
- 2018-05-09 US US15/974,822 patent/US20190106856A1/en not_active Abandoned
Patent Citations (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB638089A (en) * | 1946-08-13 | 1950-05-31 | Eugene Hippolyte Garnier | Improvements in the construction of poles for power transmission or the like |
| US3300942A (en) * | 1964-02-10 | 1967-01-31 | Dravco Corp | Method of constructing natural draft cooling tower |
| US4187660A (en) * | 1977-02-14 | 1980-02-12 | T. Y. Lin International | Method of constructing cooling tower employing precast reinforced concrete panels |
| US4486984A (en) * | 1982-09-24 | 1984-12-11 | Carty John J | Method for construction of a precast chimney |
| US5072553A (en) * | 1987-09-28 | 1991-12-17 | Electricite De France (Service National) | Shell structure for a cooling tower |
| US5066167A (en) * | 1990-01-19 | 1991-11-19 | Vsl International Ag | Prestressed concrete lining in a pressure tunnel |
| US5687537A (en) * | 1996-05-24 | 1997-11-18 | Pi Rod Inc. | Modular antenna pole |
| DE29809541U1 (en) * | 1998-05-27 | 1999-10-07 | Arand, Wilfried, 59425 Unna | Device for producing tall, hollow, tower-like structures of two hundred meters in height and more, in particular towers for wind turbines |
| US20050129504A1 (en) * | 2002-02-12 | 2005-06-16 | De Roest Anton H. | Wind turbine |
| US7160085B2 (en) * | 2002-02-12 | 2007-01-09 | Mecal Applied Mechanics B.V. | Wind turbine |
| US7105940B2 (en) * | 2004-03-31 | 2006-09-12 | General Electric Company | Mobile renewable energy generator |
| US20100058673A1 (en) * | 2007-08-31 | 2010-03-11 | Mitsubishi Heavy Industries Ltd | Tubular-member flange coupling |
| US8272181B2 (en) * | 2009-03-03 | 2012-09-25 | Tooman Norman L | Grout sleeve for foundation anchor bolts and method for protection of anchor bolts for a vertical structure, including wind turbines |
| US8490337B2 (en) * | 2009-06-09 | 2013-07-23 | Thomas Nott Word, III | Structural flange connection system and method |
| US20100325986A1 (en) * | 2009-06-24 | 2010-12-30 | Garcia Maestre Ivan | System for joining a gondola to the concrete tower of an aerogenerator |
| US8561363B2 (en) * | 2010-10-01 | 2013-10-22 | Thomas H. DeArmond, Jr. | Apparatus and method for stabilizing headstones |
| US9518564B2 (en) * | 2010-11-04 | 2016-12-13 | University Of Maine System Board Of Trustee | Floating hybrid composite wind turbine platform and tower system |
| US8572905B1 (en) * | 2011-12-28 | 2013-11-05 | Tab F. Driggers | Method and apparatus for anchoring beam |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160215761A1 (en) * | 2013-09-06 | 2016-07-28 | youWINenergy GmbH | Tower assembly for a wind turbine installation |
| US10392233B2 (en) * | 2015-03-26 | 2019-08-27 | Liebherr-Werk Biberach Gmbh | Crane tower |
| US10280643B2 (en) * | 2015-08-31 | 2019-05-07 | Wind Tower Technologies, Llc | Tower segment and method utilizing segmented bearing plate |
| ES2662926A1 (en) * | 2016-10-06 | 2018-04-10 | Deltacore Estudios Y Proyectos, S.L. | WIND TOWER PEDESTAL (Machine-translation by Google Translate, not legally binding) |
| CN111852154A (en) * | 2020-07-28 | 2020-10-30 | 安徽凯越电力杆塔有限公司 | High-strength composite material electric pole |
| US20240240615A1 (en) * | 2021-07-13 | 2024-07-18 | General Electric Company | Wind turbine tower structure with transition system between sections thereof |
| US12292029B2 (en) * | 2021-07-13 | 2025-05-06 | Ge Vernova Infrastructure Technology Llc | Wind turbine tower structure with transition system between sections thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2880788A1 (en) | 2014-02-06 |
| MX357895B (en) | 2018-07-27 |
| WO2014021927A2 (en) | 2014-02-06 |
| WO2014021927A3 (en) | 2014-05-30 |
| BR112015002426A2 (en) | 2017-07-04 |
| US9175670B2 (en) | 2015-11-03 |
| CA2880788C (en) | 2020-03-24 |
| ZA201500855B (en) | 2020-01-29 |
| MX2015001624A (en) | 2015-07-14 |
| US20140033628A1 (en) | 2014-02-06 |
| US20190106856A1 (en) | 2019-04-11 |
| CL2015000263A1 (en) | 2015-07-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9175670B2 (en) | Precast concrete post tensioned segmented wind turbine tower | |
| US20240018736A1 (en) | Foundation with pedestal and ribs for towers | |
| US10513833B2 (en) | Foundation with pedestal and ribs for towers | |
| US9937635B2 (en) | Method of constructing a wind tower foundation | |
| US9163613B2 (en) | Support structure for a wind turbine and procedure to erect the support structure | |
| US10724204B2 (en) | Foundation for a windmill | |
| US20120047830A1 (en) | Fatigue resistant foundation | |
| US11072903B2 (en) | Equipment tower having a concrete plinth | |
| CN211714003U (en) | Center cylinder, tower cylinder foundation and tower cylinder | |
| US10024306B2 (en) | Structure including non-structural joint | |
| WO2020248313A1 (en) | Precast high-strength concrete composite bridge pier structure and construction method therefor | |
| CA3162517A1 (en) | Foundation for a wind turbine | |
| AU2021352083A1 (en) | Foundation for a wind turbine | |
| CN221798202U (en) | Windbreak wall assembled from reinforced concrete components of railways operating in windy areas | |
| US20240035247A1 (en) | System for manufacturing a precast foundation structure for a wind turbine, related manufacturing method and wind turbine manufactured with said method | |
| US20230220698A1 (en) | Elevated tank tower | |
| DK2427603T3 (en) | Exhaustion-resistant foundation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: WIND TOWER TECHNOLOGIES, LLC, COLORADO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LOCKWOOD, JAMES D.;LOCKWOOD, WILLIAM D.;REEL/FRAME:037086/0883 Effective date: 20151118 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |