US20130248638A1 - Method for Horizontally Winding and Unwinding a Parallel Wire Strand - Google Patents
Method for Horizontally Winding and Unwinding a Parallel Wire Strand Download PDFInfo
- Publication number
- US20130248638A1 US20130248638A1 US13/991,304 US201013991304A US2013248638A1 US 20130248638 A1 US20130248638 A1 US 20130248638A1 US 201013991304 A US201013991304 A US 201013991304A US 2013248638 A1 US2013248638 A1 US 2013248638A1
- Authority
- US
- United States
- Prior art keywords
- strand
- shall
- module
- support plate
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000004804 winding Methods 0.000 title claims abstract description 46
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 32
- 239000010959 steel Substances 0.000 claims abstract description 32
- 238000009434 installation Methods 0.000 claims abstract description 5
- 239000002965 ropes Substances 0.000 claims description 24
- 238000000034 methods Methods 0.000 claims description 22
- 241001236653 Lavinia exilicauda Species 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 3
- 230000000717 retained Effects 0.000 claims description 3
- 239000011901 water Substances 0.000 claims description 3
- 280000434946 Trigon companies 0.000 claims 2
- 206010022114 Injuries Diseases 0.000 description 7
- 239000000725 suspensions Substances 0.000 description 3
- 238000004642 transportation engineering Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000001276 controlling effects Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering processes Methods 0.000 description 2
- 238000005755 formation reactions Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000002131 composite materials Substances 0.000 description 1
- 230000002596 correlated Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H49/00—Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
- B65H49/18—Methods or apparatus in which packages rotate
- B65H49/20—Package-supporting devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H49/00—Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
- B65H49/18—Methods or apparatus in which packages rotate
- B65H49/20—Package-supporting devices
- B65H49/30—Swifts or skein holders
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H54/00—Winding, coiling, or depositing filamentary material
- B65H54/56—Winding of hanks or skeins
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H57/00—Guides for filamentary materials; Supports therefor
- B65H57/14—Pulleys, rollers, or rotary bars
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/36—Wires
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/16—Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
Abstract
Description
- The present invention relates to a parallel wire strand consisting of a multiplicity of individual wires. More particular, the invention relates to horizontally winding and unwinding a parallel wire strand consisting of a multiplicity of individual wires onto and from a cable reel for fanning out and rearranging the wire strands for transport, storage or installation.
- The main cable strands are the chief bearing members of suspension bridge. The cable strand is made of high strength galvanized wire of 5 mm in diameter. Formerly specifications for the cable strand were available in 61 wires, 91 wires and 127 wires. At present the over-length large main cable strands reach 5000 m in length, in 169 wires of 5 mm diameter. The weight of a cable strand reaches 120 tons. Commonly the cross-section of cable strand is regular hexagon. Some special cable strands may be rectangular or other shapes. A cable strand is bound with composite material bands at interval of 1.5 m˜2 m. Traditionally, the winding of main cable strands of suspension bridge all applied large diameter steel reels for winding horizontal parallel wire strands at home and abroad. This process is called by reel processing for short. The one of the characteristics of reel processing was that the manufacturing, shipping and unwinding of cable strands all could not get rid of large diameter steel reel. During the transportation of cable strands on steel reels to large bridge building site, cable strands could give birth to oval traumas from falling down shown in
FIG. 1 , owing to their deadweight. Consequently the cable strands oval traumas from falling down therefore caused cable strand winding loosen and friction between cable strands generated by steel reel rotating. While cable strands were winding along with steel reel rotating continually, this kind of trauma from falling down could result in so-called “Hula-circles” effect, in consequence it disturbed the original arrangement order and could be very difficult to unwinding cable strand from steel reel. Furthermore, in unwinding cable strand the dragging and pulling forces suddenly made the loose cable strands to be tightened or loosened every now and then, which could aggravate the frictions between cable strands and scratch band on strand until breakage and make cable strand steel wires incoherent. During the procedure of unwinding cable strands the “Hula-circles” which had emerged would become more and more bigger along with the unwinding process of cable strands, its loosen amount would increase gradually, and cable strand would collide with ground, until unwinding job implementation had no means of normal proceed. In order to remedy this phenomenon in construction site it was necessary to reshape and bind strands continually by labor. Therefore the working machines should be shut down, after tightening cable strands wires, proceeded with unwinding strand for those already formative “Hula-circles”. This not only brought unlimited inconvenience to assembly molding of main cable of suspension bridge, but also more seriously influence the time limit for a project. Particularly the longer the cable strand, the more serious the “Hula-circles” developed, furthermore the longer the cable strand, the more difficult the remedy measures carried out, even could not carry out. According to experiences under the precondition of holding good cable strand shape, adopting reel processing technology, commonly when cable strand length is over 1500 m, “Hula-circles” will be easy to appear during unwinding process of cable strand. When the “Hula-circles” phenomena become serious, it will direct influence site construction schedule and cable strand quality. - A primary and general object of the present invention is to overcome the aforementioned drawbacks by providing a method for horizontally winding and unwinding a parallel wire strand with high working efficiency, fine quality of winding and unwinding cable strands and low labor intensity.
- To this end, according to present invention, a method for horizontally winding and horizontally unwinding a parallel wire strand is disclosed.
- A method for horizontally winding and horizontally unwinding a parallel wire strand upon a base of a cable reel for transport, storage or installation, a parallel wire strand made up of a plurality of tightly adjacent vertically and horizontally arranged parallel wires, the strand including at least a leading end fitting securing the ends of the wires together, is characterized in that the method comprises the following steps:
- (a) Performing the winding operation, the operation procedure is as follows:
- Fix the guide frame on the ground, the guide frame is composed of the base, support frame, electric hoist, fixed pulley, steel wire rope, lifting mechanism, roller, the pressure sensor, speed encoder, altimeter encoder and limit roller. Fix the base on the ground and fix the support frame and electric hoist on the base. A fixed pulley is equipped at the top of the support frame, also a steel wire rope which one end is connected with electric hoist and the other end is connected with lifting mechanism is winded on the fixed pulley. The lifting mechanism is equipped with three rollers, 2 pressure sensors and a speed encoder, the 3 rollers are arranged in “” shape, and that is, three straight lines connecting the circle center points of three rollers make up of a triangle. A pressure sensor and a speed encoder are equipped at one side of the three rollers, at the side of the fixed pulley, altimeter encoder, electric hoist, pressure sensor, speed encoder are equipped. Both the speed encoder and the altimeter encoder are connected with the programmable logical controller (hereinafter referred to as PLC) by the telecommunication wires. Fix the rotation axis on the ground at one side of the guide frame, connecting the rotation platform with the rotation axis; meantime, the rotating platform rotating about the rotation axis 21. The upper surface of the rotation platform shall be flush with the ground, the platform rail is paved on the rotation platform and the railcar is located on the rail. To The characteristics of rotation platform facilitate the rail platform car easy to select multi-directions and link up with workshop rails.
- The inner module is composed at least by four support plates and the support rod at the top section, the four support plates were aligned uniformly in the ring shape. There is a gap between the adjacent supports plates, the gap length shall be the width of the support plate of 80% to 150%. Operator can get into the inner module to operate through gaps between support plates. The support rod shall be fixed by the hinge at the top of the support plate, each support plate shall fix two support rods and the two top rods shall be symmetrically fixed on the support plate at left and right sides. The bottom of supporting plate and the railcar are connected by the bolt. The top support plate will lean outward. After fixing the support plate and railcar, the centers of gravity of four support plates should be located outside of each hinge.
- Put a ring shape tray onto the railcar and hitch it outside the inner module. Lifting points which are used for lifting the tray and looped cable strands which are winded on the tray shall be set at the tray edges, and lay the water proof film covered on the surface of the tray.
- Put one end of strand through the guide rollers and fix it onto the inner module, then drive rotation platform to rotate, which will drive the railcar and inner module to rotate together. Along with the rotation, the strand will be winded on the inner module one circle by another from the bottom end of the inner module till to the top of the inner module, and then wind the strand from the top of the inner module to the bottom. Repeat this operation until all the strands wrapped into wire strands. During the upward winding procedure, the PLC will control the electric hoist to pull the steel wire rope, thus to lift the lifting mechanism which will enable the guide roller to move upward with the distance which is equivalent to the strand diameter during each circle. During the downward winding procedure, the PLC will control the electric hoist to pull to steel wire rope, thus to pull down the lifting mechanism which will enable the guide roller to move downward with the distance which is equivalent to the strand diameter during each circle, therefore this guarantees that strands are capable of arranging on the inner module regularly and compactly.
- After all the strands are winded into wire strands, dismantle the bolts between the bottom of the inner module and the railcar. Lift the support rod on the inner module which will make the 4 pieces support plates gather together inward, and then extract the inner module from the wire strands. After this, use the prepared waterproof film on the tray to cover the whole outside surface of the wire strand. Connect the platform track on the rotating platform with the track on the ground, pull the railcar to remove the wire strand, until this, the strand winding operation is finished.
- (b) Performing the unwinding operation, the operation procedure is as follows:
- Fix the guide frame on the ground, the guide frame is composed by the base, support frame, electric hoist, fixed pulley, steel wire rope, lifting mechanism, roller, the pressure sensor, speed encoder, altimeter encoder and limit roller. Fix the base on the ground and fix the support frame and electric hoist on the base. A fixed pulley shall be equipped at the top of the support frame, also the steel wire rope whose one end is connected with electric hoist and the other end is connected with lifting mechanism shall be winded on the fixed pulley. The lifting mechanism is equipped with 3 rollers, 2 pressure sensors and a speed encoder. The 3 Rollers are arranged in “” shape, that is, three straight lines connecting the circle center points of three rollers make up of a triangle. A pressure sensor and a speed encoder shall be equipped at one side of the three rollers, altimeter encoder at the side of the fixed pulley, electric hoist, pressure sensor, speed encoder shall be equipped. Both the speed encoder and the altimeter encoder shall be connected with PLC by the telecommunication wires. Fix the rotation axis on the ground at one side of the guide frame, connecting the rotation platform with the rotation axis, meantime, the rotating platform will rotate around the rotation axis. The hydraulic brake which is connected with PLC through pressure sensor is equipped in the rotation axis. During the rotation of the rotating platform, release the hydraulic brake. When the rotating platform stops, the hydraulic brake is always imposing friction on the rotating platform, thus applying portion of reverse compression to prevent against rotating platform continually rotating, bring about cable strand dropped out and damaged when dragging forces temporarily stop.
- The inner module is composed by at least four support plates. The four support plates are aligned uniformly in the ring shape. The gaps shall be retained between the adjacent supports plates, the gap length shall be the width of the support plate of 80% to 150%. The bottoms of the support plates are connected by the hinge with the rotating platform, all the 4 pieces support plates will lean inward. In the middle of the 4 pieces support plates, a hydraulic jack is equipped. The support rod of the hydraulic jack is connected with four pieces push rods, and each push rod shall withstand a piece of support plate.
- Remove the waterproof film cover from the strand, lift the strand wire strands together with the tray onto the rotating platform, meantime, and set the strand wire strands over the inner module. Actuate the hydraulic jack, with the force of the support rod applied to the push rod, the 4 pieces support plates will push outward by the push rod which will fix the strand wire strands. Pull one leading end of the strand throughout of the guide roller, then pull the strand to drive the inner module and the tray to rotate, thus to drive the rotating platform to rotate around the rotation axis. Along with this operation, the strand shall be released and become straight status.
- During the downward winding procedure, the PLC will control the electric hoist to pull to steel wire rope, thus to pull down the lifting mechanism which will enable the guide roller move downward with the distance which is equivalent to the strand diameter during each circle. During the upward winding procedure, the PLC will control the electric hoist to pull the steel wire rope, thus to lift the lifting mechanism which will enable the guide roller move upward with the distance which is equivalent to the strand diameter during each circle. Repeat these operations back and forth till the wire strands become straight status, and fulfill the whole unwinding operation.
- The method in accordance with the present invention is characterized in that the rotation axis is vertical to the ground at the side of the guide frame.
- Further the method in accordance with the present invention is characterized in that in horizontal winding operation the bottom of the support plate is connected with the railcar by bolts, the top of the support plate shall lean outward and the angle between the support plate and upper surface of railcar is between 60°˜85°.
- Further the method in accordance with the present invention is characterized in that in horizontal unwinding operation the bottom of the support plate is connected with the rotating platform by the hinge, all the 4 pieces support plate will lean inward and the angle between the support plate and upper surface of railcar is between 60°˜85°.
- Under the controlling action of the PLC, the unwinding of cable strand is restricted to prevent against out of control for strand, avoiding cable strand damage or injury or loss; in unwinding strand operation, can keep line shape relatively straight and level to protect strand and prevent binding band breakdown, when the speed of unwinding strand is slowed down or stop, gradually control hydraulic brake to lock turning axle; the introduction of pressure sensor furthermore facilitates PLC to control hydraulic brake smoothly.
- Thus according to the invention it is possible to solve the “Hula-circles” effect problem, and remarkably increase cable strand erection benefits and cable strand quality of carrying out the method of the invention. The advantages of present invention are: reasonable arrangement of operating sequence, winding strand, strand wire strands formation, package and transportation, as well as unwinding complete in one breath, reduce labor intensity and operation time; cable strand wire strands formation compact and regular arrangement; winding strand and unwinding strand all may be able to go with a swing; when unwinding strand trauma from falling down phenomena is eliminated, unable to damage cable strand and binding band; Increase automaticity, equipments are controllable and tunable, real-time monitoring correlated data, reduce labor intensity, increase security; shipping reel simplicity and removable, have no use for large size reel, save a great deal of manufacture and transportation costs.
-
FIG. 1 is a structure schematic for the strand drop phenomenon in the existing technology; -
FIG. 2 is a structure schematic for strand winding on the inner module when winding strand; -
FIG. 3 is the front view of the guide frame in this invention; -
FIG. 4 is the left view of the guide frame in this invention, -
FIG. 5 is a structure schematic for extraction of the inner module when winding strand finished, -
FIG. 6 is a structure schematic for straighten of the strand wire strands when unwinding strand. - The accompanying drawings and description herein-below disclose embodiments suitable for carrying out the method of the invention.
- A method for horizontally winding and horizontally unwinding a parallel wire strand upon a base of a cable reel for transport, storage or installation, a parallel wire strand made up of a plurality of tightly adjacent vertically and horizontally arranged parallel wires, the strand including at least a leading end fitting securing the ends of the wires together, comprising the steps of:
- (a) Performing the winding operation, the operation procedure is as follows:
- As shown in
FIG. 2 , fix the guide frame 1 on the ground, the guide frame 1 is composed by the base 11, support frame 12, electric hoist 13, fixed pulley 14, steel wire rope 15, lifting mechanism 16, roller 17, the pressure sensor 181, speed encoder 182, altimeter encoder 183 and limit roller 19 as shown inFIGS. 3 and 4 . Fix the base 1 on the ground and fix the support frame 12 and electric hoist 13 on the base 1. A fixed pulley 14 is equipped at the top of the support frame 12, also a steel wire rope 15 which one end is connected with electric hoist 13 and the other end is connected with lifting mechanism 16 is winded on the fixed pulley 14. The lifting mechanism 16 is equipped with three rollers 17, 2 pressure sensors 181 and a speed encoder 182, the 3 rollers 17 are arranged in a “” shape, that is, three straight lines connecting the circle center points of three rollers make up of a triangle. A pressure sensor 181 and a speed encoder 182 are equipped at one side of the three rollers, at the side of the fixed pulley 14, altimeter encoder 183, electric hoist 13, pressure sensor 181, speed encoder 182 are equipped. Both the speed encoder 182 and the altimeter encoder 183 are connected with PLC by the telecommunication wires. Fix the rotation axis 21 on the ground at one side of the guide frame 1, connecting the rotation platform 2 with the rotation axis, meantime, the rotating platform 2 will rotate about the rotation axis 21. The upper surface of the rotation platform 2 shall be flush with the ground, the platform rail 22 is paved on the rotation platform and the railcar 3 is located on the rail 22. Three straight lines connecting the circle center points of three rollers make up of a triangle. The characteristics of rotation platform facilitate rail platform car easy to select multi-directions and link up with workshop rails. - The inner module 4 is composed by at least four support plates 41 and the support rod 42 at the top section, the four support plates 41 was aligned uniformly in the ring shape. There are gaps between the adjacent support plates 41, the gap length shall be the width of the support plate 41 of 80% to 150% (in this embodiment, 150%). Operator can get into the inner module to operate through gaps between support plates. The support rod 42 shall be fixed by the hinge at the top of the support plate 41, each support plate 41 shall fix two support rods and the two top of the rod 42 shall be symmetrically fixed on the support plate 41 at left and right sides. The supporting plate 41 and the railcar 3 is connected by the bolt. The top of support plate 41 will lean outward. After fixing the support plate 41 and railcar 3, the centers of gravity of four support plates should be located outside of each hinge.
- Put a ring shaped tray 5 onto the railcar 3 and hitch it outside the inner module 4. Lifting points which are used for lifting the tray and looped cable strands which are winded on the tray shall be set at the tray edges, and lay the water proof film cover on the surface of the tray 5.
- Put one end of strand 10 through the guide rollers 11 and fix it onto the inner module 4, then drive rotation platform 2 to rotate in the direction of arrow B as shown in
FIG. 2 , which will drive the railcar 3 and inner module 4 to rotate together. Along with the rotation, the strand 10 will be winded on the inner module 4 one circle by another from the bottom end of the inner module 4 till to the top of the inner module 4, and then wind the strand 10 from the top of the inner module 4 to the bottom. Repeat this operation until all the strands 10 wrapped into wire strands. During the upward winding procedure, the PLC will control the electric hoist 13 to pull the steel wire rope, thus to lift the lifting mechanism 16 which will enable the guide roller 11 move upward with the distance which is equivalent to the strand 10 diameter during each circle. During the downward winding procedure, the PLC will control the electric hoist 13 to pull to steel wire rope 15, thus to pull down the lifting mechanism 16 which will enable the guide roller 11 move downward with the distance which is equivalent to the strand 10 diameter during each circle, therefore guarantee that strands are capable of arranging on the inner module 2 regularly and compactly. - After all the strands 10 are winded into wire strands, as shown in
FIG. 5 , dismantle the bolts between the bottom of the inner module 4 and the railcar 3. Lift the support rod 42 on the inner module 4 in the direction of arrow C as shown inFIG. 3 which will make the 4 pieces support plates 41 gather together inward, and then extract the inner module 4 from the wire strand. After this, use the prepared waterproof film on the tray 5 to cover the whole outside surface of the wire strand 10. Connect the platform track 22 on the rotating platform 2 with the track on the ground, pull the railcar 3 to move the wire strand 10, until this winding operation is finished. - (b) Performing the unwinding operation, the operation procedure is as follows:
- As shown in
FIG. 6 , fix the guide frame 1 on the ground, the guide frame 1 is shown inFIGS. 3 and 4 and composed by the base 11, support frame 12, electric hoist 13, fixed pulley 14, steel wire rope 15, lifting mechanism 16, roller 17, the pressure sensor 181, speed encoder 182, altimeter encoder 183 and limit roller 19. Fix the base 1 on the ground and fix the support frame 12 and electric hoist 13 on the base 1. A fixed pulley 14 shall be equipped at the top of the support frame 12, also the steel wire rope 15 whose one end is connected with electric hoist 13 and the other end is connected with lifting mechanism 16 shall be winded on the fixed pulley 14. The lifting mechanism 16 is equipped with 3 rollers 17, 2 pressure sensors 181 and a speed encoder 182. The 3 Roller 17 is arranged in a “” shape, that is, three straight lines connecting the circle center points of three rollers make up of a triangle. A pressure sensor 181 and a speed encoder 182 shall be equipped at one side of the three rollers, at the side of the fixed pulley 14, altimeter encoder (183), electric hoist 13, pressure sensor 181, speed encoder 182 shall be equipped. Both the speed encoder 182 and the altimeter encoder 183 shall be connected with PLC by the telecommunication wires. Fix the rotation axis 21 on the ground at one side of the guide frame 1, connecting the rotation platform 2 with the rotation axis, meantime, the rotating platform 2 will rotate around the rotation axis 21. The hydraulic brake 24 which is connected by pressure sensor and PLC is equipped in the rotation axis 21. During the rotation of the rotating platform 2, release the hydraulic brake 24. When the rotating platform stops, the hydraulic brake 24 is always imposing friction on the rotating platform 2, thus applying portion of reverse compression to prevent against rotating platform 2 continually rotating, bring about cable strand dropped out and injury when dragging forces temporarily stop. - The inner module 4 is composed by at least four support plates 41 and the support rod 42. The number of support plate 41 in this embodiment is selected as 4. The four support plates 41 are aligned uniformly in the ring shape. The gaps shall be retained between the adjacent support plates 41, the gap length shall be the width of the support plate 41 of 80% to 150% (in this embodiment, 150%). The bottoms of the support plates 41 are connected by the hinge with the rotating platform 2, all the 4 pieces support plates 41 will lean inward. In the middle of the 4 pieces support plates 41, a hydraulic jack 6 is equipped. The support rod of the hydraulic jack 6 is connected with four pieces push rods 61, and each push rod 61 shall withstand a piece of support plate 41.
- Remove the waterproof film cover from the strand 10, lift the strand 10 wire strands together with the tray 5 onto the rotating platform 2, meantime, and set the strand 10 wire strands over the inner module 4. Actuate the hydraulic jack 6, with the force of the support rod applied to the push rod, the 4 pieces support plates 41 will push outward by the push rod 61 which will fix the strand wire strands.
- Pull one leading end of the strand 10 through out of the guide roller 11, then pull the strand 10 to drive the inner module 4 and the tray 5 to rotate, thus to drive the rotating platform 2 to rotate around the rotation axis. Along with this operation, the strand 10 shall be released and will become straight status.
- During the downward winding procedure, the PLC will control the electric hoist 13 to pull to steel wire rope, thus to pull down the lifting mechanism 16 which will enable the guide roller 11 move downward with the distance which is equivalent to the strand 10 diameter during each circle. During the upward winding procedure, the PLC will control the electric hoist 13 to pull the steel wire rope 15, thus to lift the lifting mechanism 16 which will enable the guide roller 11 move upward with the distance which is equivalent to the strand 10 diameter during each circle. Repeat these operations back and forth till the wire strands strand become straight status, and fulfill the whole unwinding operation.
- Under the controlling action of the PLC, the unwinding of cable strand is restricted to prevent against out of control for strand, avoiding cable strand damage or injury or loss; in unwinding strand operation, can keep line shape relatively straight and level to protect strand and prevent binding band breakdown, when the speed of unwinding strand is slowed down or stop, gradually control hydraulic brake 24 to lock turning axle; the introduction of pressure sensor furthermore facilitate PLC to control hydraulic brake 24 smoothly.
- It is a method for horizontally winding and horizontally unwinding a parallel wire strand. The method includes winding strand and unwinding strand operations. During the winding strand the container 4 is composed by 6 support plates 41 and the top support rod 42. The six support plates 41 are aligned uniformly in the ring shape. There is a gap between the adjacent support plates 41, and the gap length is 100 percent of the width of support plate 41. The rest structure and method are the same to embodiment 1.
- It is a method for horizontally winding and horizontally unwinding a parallel wire strand. The method includes winding strand and unwinding strand operations. During the winding strand the container 4 is composed by 10 support plates 41 and the top support rod 42. The ten support plates 41 are aligned uniformly in the ring shape. There is a gap between the adjacent support plates 41, and the gap length is 80 percent of the width of support plate 41. The rest structure and method are the same to embodiment 1.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2010/079953 WO2012079251A1 (en) | 2010-12-17 | 2010-12-17 | Method for horizontal winding and horizontal unwinding parallel stell stranded wire |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date | |
---|---|---|---|---|
PCT/CN2010/079953 A-371-Of-International WO2012079251A1 (en) | 2010-12-17 | 2010-12-17 | Method for horizontal winding and horizontal unwinding parallel stell stranded wire |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/981,599 Continuation-In-Part US10081510B2 (en) | 2010-12-17 | 2015-12-28 | Device and method for winding and unwinding a parallel wire strand horizontally |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130248638A1 true US20130248638A1 (en) | 2013-09-26 |
Family
ID=46243993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/991,304 Abandoned US20130248638A1 (en) | 2010-12-17 | 2010-12-17 | Method for Horizontally Winding and Unwinding a Parallel Wire Strand |
Country Status (4)
Country | Link |
---|---|
US (1) | US20130248638A1 (en) |
EP (1) | EP2653613B1 (en) |
KR (1) | KR101579660B1 (en) |
WO (1) | WO2012079251A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140252906A1 (en) * | 2013-03-11 | 2014-09-11 | Regal Beloit America, Inc. | Electrical coil forming apparatus and methods of assembling electrical coils |
US20140366392A1 (en) * | 2013-06-13 | 2014-12-18 | Ronen ASHKENAZI | System and method for measuring geometry of non-circular twisted strand during stranding process |
US20160257523A1 (en) * | 2015-03-04 | 2016-09-08 | Tyco Electronics Corporation | Mobile processing frame, mobile processing system, and method of processing |
CN106120560A (en) * | 2016-06-29 | 2016-11-16 | 中国五冶集团有限公司 | A kind of suspension cable for science of bridge building puts cable system |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200476269Y1 (en) * | 2013-10-04 | 2015-02-16 | 도규태 | Appatatus for Unbinding Wire |
CN104163357A (en) * | 2014-07-22 | 2014-11-26 | 中铁四局集团有限公司 | Cable spreading disk for cable-stayed bridge |
CN105016136A (en) * | 2015-06-29 | 2015-11-04 | 国网山东省电力公司淄博供电公司 | Multifunctional ground wire winder |
CN108342985A (en) * | 2018-01-22 | 2018-07-31 | 中铁十五局集团有限公司 | A kind of steel strand reversal pipe penetration method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4169566A (en) * | 1975-09-29 | 1979-10-02 | Eprad Incorporated | Film supply and take-up system for motion picture projector |
US5482225A (en) * | 1990-10-12 | 1996-01-09 | Bruderer Ag | Process for loading a processing machine having a fine centering step and apparatus for this purpose |
US5535956A (en) * | 1992-12-23 | 1996-07-16 | W. Schlafhorst Ag & Co. | Pallet with temporarily separable arbor for individual transport of textile bobbins and textile tubes |
US20060196988A1 (en) * | 2004-12-08 | 2006-09-07 | Peter Kurzyniec | Vertical cable reel carrier |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0317533B2 (en) * | 1983-10-27 | 1991-03-08 | Nitto Denko Corp | |
SE466602B (en) * | 1990-06-15 | 1992-03-09 | Maillefer Nokia Holding | DEVICE ON A WIND-UP MACHINE CARRIES A CABLE OR LIKE STRING FORM OF GOODS |
JP3631519B2 (en) * | 1995-02-13 | 2005-03-23 | 大東重機工事株式会社 | Wire rope feeding device |
SE517500C2 (en) * | 2000-10-27 | 2002-06-11 | Ulvator Ab | Tool for a reel of an elongated object |
CN201049853Y (en) * | 2007-06-15 | 2008-04-23 | 上海浦江缆索股份有限公司 | Unbinding device for coiled cable |
US8727262B2 (en) * | 2007-12-14 | 2014-05-20 | The Boeing Company | Cable despooling and spooling |
CN201581352U (en) * | 2009-10-30 | 2010-09-15 | 上海浦江缆索股份有限公司 | Dragline laying-out device |
CN201560386U (en) * | 2009-10-30 | 2010-08-25 | 上海浦江缆索股份有限公司 | Guiding device in installation of main cable strands |
CN201560392U (en) * | 2009-10-30 | 2010-08-25 | 上海浦江缆索股份有限公司 | Horizontal paying out device of suspension cable main cable strands |
-
2010
- 2010-12-17 KR KR1020137015401A patent/KR101579660B1/en active IP Right Grant
- 2010-12-17 WO PCT/CN2010/079953 patent/WO2012079251A1/en active Application Filing
- 2010-12-17 US US13/991,304 patent/US20130248638A1/en not_active Abandoned
- 2010-12-17 EP EP10860703.7A patent/EP2653613B1/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4169566A (en) * | 1975-09-29 | 1979-10-02 | Eprad Incorporated | Film supply and take-up system for motion picture projector |
US5482225A (en) * | 1990-10-12 | 1996-01-09 | Bruderer Ag | Process for loading a processing machine having a fine centering step and apparatus for this purpose |
US5535956A (en) * | 1992-12-23 | 1996-07-16 | W. Schlafhorst Ag & Co. | Pallet with temporarily separable arbor for individual transport of textile bobbins and textile tubes |
US20060196988A1 (en) * | 2004-12-08 | 2006-09-07 | Peter Kurzyniec | Vertical cable reel carrier |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140252906A1 (en) * | 2013-03-11 | 2014-09-11 | Regal Beloit America, Inc. | Electrical coil forming apparatus and methods of assembling electrical coils |
US9230735B2 (en) * | 2013-03-11 | 2016-01-05 | Regal Beloit America, Inc. | Electrical coil forming apparatus and methods of assembling electrical coils |
US20140366392A1 (en) * | 2013-06-13 | 2014-12-18 | Ronen ASHKENAZI | System and method for measuring geometry of non-circular twisted strand during stranding process |
US9404725B2 (en) * | 2013-06-13 | 2016-08-02 | Ronen ASHKENAZI | System and method for measuring geometry of non-circular twisted strand during stranding process |
US20160257523A1 (en) * | 2015-03-04 | 2016-09-08 | Tyco Electronics Corporation | Mobile processing frame, mobile processing system, and method of processing |
US10221034B2 (en) * | 2015-03-04 | 2019-03-05 | Te Connectivity Corporation | Mobile processing frame, mobile processing system, and method of processing |
CN106120560A (en) * | 2016-06-29 | 2016-11-16 | 中国五冶集团有限公司 | A kind of suspension cable for science of bridge building puts cable system |
Also Published As
Publication number | Publication date |
---|---|
WO2012079251A1 (en) | 2012-06-21 |
KR101579660B1 (en) | 2015-12-22 |
KR20130109189A (en) | 2013-10-07 |
EP2653613A1 (en) | 2013-10-23 |
EP2653613A4 (en) | 2017-05-31 |
EP2653613B1 (en) | 2018-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015099540A1 (en) | A semisubmersible, cylindrical net cage, closable bulkheads for a net cage and a bottom for the net cage that can be elevated | |
JP5057344B2 (en) | Method and system for winding heavy components on a wind turbine | |
CN205998751U (en) | A kind of steel wire coiler | |
AU2010280822B2 (en) | Traveling crane having traveler and hoisting winch | |
CN102040173B (en) | Wire rope pretightening device | |
CN201962988U (en) | Cantilever type double-layered parking equipment | |
CN102134028B (en) | Method of reeling elevator suspension cables and suspension cable reeling component | |
EP2652317B1 (en) | Transportation of drive train components in a wind turbine nacelle | |
CN103359644B (en) | A kind of Automatic rope arrangement winch for steel wire rope traction type cargo transport machine | |
KR101085826B1 (en) | Hoist that use friction wheel | |
DE102009041982A1 (en) | Method for cable assembly in the tower of a wind turbine | |
KR100978003B1 (en) | Vehicle mounted type pulling device for 3-phase power cable | |
JP2005138917A (en) | Method for changing main rope on carrier, and main rope changing device | |
CN104795765B (en) | Cable lays and lays frame | |
CN102354926A (en) | Large-section conductor tension stringing construction method | |
KR20070112594A (en) | Temporary supporting machinery of electric wire | |
KR101117490B1 (en) | Loosening equipment of drum cable | |
CN106193108B (en) | A kind of special retaining wall construction equipment of Concrete Highway | |
CA3014564C (en) | Device and method for adjusting tension of a steel wire rope of an ultra-deep vertical shaft at a hoisting-container-end | |
FI127314B (en) | METHOD FOR HANDLING ROPES AND A METHOD FOR MODERNIZING ROPES AND ARRANGEMENTS FOR THE REMOVAL OF ROPES | |
ES2335898T3 (en) | Method and appliance for changing the cable of an elevator with traction pulley. | |
CN201694747U (en) | Twelve-rope container anti-swing mechanism | |
CN203377546U (en) | High speed railway spanning construction apparatus | |
FI119233B (en) | A method of replacing the elevator rope | |
JP6103717B2 (en) | Transfer wire feeding device and feeding method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SHANGHAI PUJIANG CABLE CO., LTD., CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LUO, GUOQIANG;LI, GANG;ZHANG, HAILIANG;AND OTHERS;REEL/FRAME:030534/0408 Effective date: 20130520 Owner name: ZHEJIANG PUJIANG CABLE CO., LTD., CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LUO, GUOQIANG;LI, GANG;ZHANG, HAILIANG;AND OTHERS;REEL/FRAME:030534/0408 Effective date: 20130520 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |