US20130125607A1 - Method for producing a structural part from an iron-manganese steel sheet - Google Patents

Method for producing a structural part from an iron-manganese steel sheet Download PDF

Info

Publication number
US20130125607A1
US20130125607A1 US13/674,243 US201213674243A US2013125607A1 US 20130125607 A1 US20130125607 A1 US 20130125607A1 US 201213674243 A US201213674243 A US 201213674243A US 2013125607 A1 US2013125607 A1 US 2013125607A1
Authority
US
United States
Prior art keywords
sheet metal
metal workpiece
structural part
workpiece
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US13/674,243
Other versions
US9138797B2 (en
Inventor
Ludovic Samek
Martin Peruzzi
Enno Arenholz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voestalpine Stahl GmbH
Original Assignee
Voestalpine Stahl GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voestalpine Stahl GmbH filed Critical Voestalpine Stahl GmbH
Publication of US20130125607A1 publication Critical patent/US20130125607A1/en
Assigned to VOESTALPINE STAHL GMBH reassignment VOESTALPINE STAHL GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: PERUZZI, MARTIN, ARENHOLZ, ENNO, SAMEK, LUDOVIC
Application granted granted Critical
Publication of US9138797B2 publication Critical patent/US9138797B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/20Deep-drawing
    • B21D22/208Deep-drawing by heating the blank or deep-drawing associated with heat treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/02Stamping using rigid devices or tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D31/00Other methods for working sheet metal, metal tubes, metal profiles
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/26Methods of annealing
    • C21D1/30Stress-relieving
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/673Quenching devices for die quenching
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/005Heat treatment of ferrous alloys containing Mn
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0205Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below

Definitions

  • the invention relates to a method for producing a structural part from an iron-manganese steel sheet.
  • Iron-manganese steels are lightweight structural steels which can have a high strength and at the same time a high ductility. This makes iron-manganese steels a material having great potential in vehicle construction. A high material strength makes it possible to reduce the body weight, as a result of which the fuel consumption can be lowered. A high ductility and stability of the steels is important both for the production of the body parts by deep-drawing processes and for the crash behaviour thereof.
  • structural and/or safety parts such as, for example, door impact bars, A-pillars and B-pillars, bumpers or longitudinal and transverse members have to realize complex structural part geometries, and at the same time have to be able to achieve the weight objectives and safety requirements.
  • Hot forming is a known alternative to the cold forming method.
  • Conventional hot forming processes are carried out at high temperatures of approximately 900° C. or thereabove. Hot forming reduces both the spring back effect of the formed structural part and also the cold work-hardening in formed regions. With the hot forming technique, it is thus possible to produce complex deep-drawn parts without a significant spring back effect under tension.
  • Disadvantages of hot forming are, however, the high process temperatures and the material-dependent reduction in the strength of the structural part, brought about by the hot forming, after the cooling process.
  • hot forming is often combined with the hardening technique.
  • heating of the structural part to the so-called hardening temperature above Ac3 produces an austenitic microstructure, which is then transformed completely into martensite by rapid cooling.
  • a condition for the complete martensite transformation in this respect is that a critical cooling rate is exceeded.
  • This requires cooled pressing dies which, as a result of contact between the hot workpiece surface and the cold die surface, make sufficiently rapid cooling of the workpiece possible.
  • An object on which the invention is based can be considered that of providing a method which makes it possible to produce formed structural parts from iron-manganese steel sheet having good mechanical properties in a cost-effective manner.
  • the method should make it possible to produce formed sheet metal workpieces having a complex structural part geometry and favourable material properties even in formed structural part regions.
  • the invention provides a method for producing a structural part from an iron-manganese steel sheet, in which method a sheet metal workpiece is cold-formed in a forming die, the formed sheet metal workpiece is heated to a temperature of between 500° C. and 700° C., and the heated sheet metal workpiece is calibrated in a calibrating die.
  • the calibration of the formed sheet metal workpiece at the elevated temperatures indicated can have the effect that cold work-hardening which has arisen during the cold forming in the formed regions is reduced again. In particular, this can achieve homogenization of the mechanical properties over the entire structural part.
  • Further advantages of the method according to the invention consist in the fact that the calibration of the heated structural part considerably reduces both the risk of delayed cracking as a result of hydrogen embrittlement and also the spring back effect of the structural part after it has been removed from the calibrating die.
  • the austenitization temperature Ac3 is not exceeded, i.e. that no transformation of the workpiece microstructure to a completely austenitic microstructure occurs during heating.
  • the degree to which the cold work-hardening in the formed structural part regions is reduced can be controlled by the selection of the temperature. At high temperatures, the strength of the formed regions can even be lowered to below the strength in regions which have not been formed or have been formed to a lesser extent. In order to avoid an excessive reduction of the cold work-hardening, a temperature of between 600° C. and 680° C. may be advantageous.
  • the formed sheet metal workpiece can be heated in a furnace and, after the heating, can be inserted into the calibrating die. It is also conceivable for the sheet metal workpiece to be heated directly in the calibrating die. In both cases, the initial temperature for the calibration can likewise lie in the indicated range of between 500° C. and 700° C. During the calibration, the formed sheet metal workpiece is then cooled in a held or fixed state.
  • the residence time of the sheet metal workpiece in the furnace can be chosen so as to ensure homogeneous through-heating of the sheet metal workpiece, in which case it is to be taken into consideration that an increase in the duration of the heating process is typically to be expected with an increasing thickness of the sheet metal workpiece.
  • the sheet metal workpiece is rapidly cooled in the held state in the calibrating die. Since no microstructure transformation from the austenite microstructure to the martensite microstructure, as is necessary for the so-called press hardening, has to be effected during the cooling, the critical minimum cooling rate known from press hardening does not have to be observed, i.e. the cooling rate in the calibrating die can be determined according to other aspects (for example cycle times, operating costs, tool costs, etc.).
  • the heating temperature of the formed sheet metal workpiece is important for reducing the cold work-hardening in formed portions of the sheet metal workpiece. In one exemplary embodiment, it may be set such that the cold work-hardening in formed portions of the (formed) sheet metal workpiece is reduced by at least 70%, in particular at least 80%, by the calibration.
  • the heating temperature of the sheet metal workpiece can be set such that the calibrated sheet metal workpiece has a maximum tensile strength fluctuation range of 20%, in particular 10%, over its entire geometry. In other words, it is possible to achieve extensive homogenization of the mechanical properties of the structural part in relation to the tensile strength.
  • FIG. 1 shows a schematic illustration of a sequence of method steps according to one exemplary embodiment of the invention.
  • FIG. 2 shows a graph, in which the hardness of a formed structural part is plotted against a distance from the forming site.
  • the structural part may be, for example, a structural body part for vehicle construction.
  • the structural body part may have a complex structural part geometry. This may involve a structural and/or safety part which may have to satisfy particular safety requirements in the event of loading (crash).
  • the structural part may be an A-pillar or B-pillar, a side impact protective bar in doors, a sill, a frame part, a bumper, a transverse member for the floor and roof or a front or rear longitudinal member.
  • the structural part consists of an iron-manganese (FeMn) steel.
  • FeMn structural parts are known in vehicle construction and can have a manganese content of approximately 12 to 35% by weight. Use can be made, for example, of TWIP, TRIP/TWIP and TRIPLEX steels and also mixed forms of these steels.
  • TWIP (TWinning Induced Plasticity) steels are austenite steels. They are distinguished by a high manganese content (e.g. above 25%) and relatively high alloying additions of aluminum and silicon. During plastic cold forming, intensive twinning which solidifies the steel takes place.
  • TWIP steels have a high elongation at break. They are therefore particularly suitable for producing structural or safety parts in regions of the body pertinent to accidents.
  • TRIP/TWIP steels are combinations of TWIP and TRIP (TRansformation Induced Plasticity) steels.
  • TRIP steels consist essentially of a plurality of phases of iron-carbon alloys, specifically ferrite, bainite and carbon-rich residual austenite. The TRIP effect is based on the deformation-induced transformation of the residual austenite into the high-strength martensitic phase ( ⁇ -martensite).
  • ⁇ -martensite martensitic phase
  • TRIP/TWIP steels a double TRIP effect occurs, since the austenitic microstructure is transformed firstly into the hexagonal and then into the body-centred cubic martensite.
  • TRIP/TWIP steels have a double elongation reserve.
  • TRIPLEX steels consist of a multiphase microstructure of ⁇ -ferrite and ⁇ -austenite solid solutions with a martensitic s-phase and/or K-phase. They have good forming properties.
  • FIG. 1 schematically shows an exemplary embodiment of a method according to the invention, in which optional method steps are also shown.
  • the starting point for the method sequence is a coil 1 of strip steel, as is produced for example in a steelworks and delivered to a client (e.g. vehicle manufacturer or supplier).
  • the FeMn strip steel may be, for example, a cold-rolled and annealed steel. It is also possible, however, to use a hot-rolled steel.
  • the process for producing the FeMn strip steel in the steelworks should be configured such as to ensure good cold forming properties of the steel.
  • the strip steel is then cut into FeMn boards 2 , for example at the vehicle manufacturer or supplier.
  • the cutting is effected in a cutting station.
  • One or more boards 2 are then inserted into a cold forming die 3 and cold-formed.
  • the temperatures in the cold forming die can lie in the conventional range, e.g. at approximately 70° C. to 80° C. Furnaces are not used for realizing these temperatures.
  • the residence time of the workpiece in the cold forming die 3 typically does not have a considerable influence on the workpiece properties.
  • the cold forming die 3 can be realized in the form of a deep-drawing press.
  • the workpiece may simultaneously be trimmed in the cold forming die 3 .
  • This trimming may involve final trimming of the structural part.
  • punching operations which may be required or the production of a hole pattern in the cold forming die 3 . That is to say, after the cold forming step, a structural part having e.g. a completely finished structural part form in terms of material-removing processes can already be present.
  • the cold-formed and possibly trimmed workpiece is then fed to a furnace 4 , where it is heated to a temperature of between 500° C. and 700° C.
  • T 500° C.-700° C.
  • the furnace 4 used may be a radiation furnace, or it is possible to provide furnaces which feed energy to the workpiece in a different way.
  • the formed workpiece heated to the target temperature of between 500° C. and 700° C. is then removed from the furnace 4 and inserted into a calibrating die 5 , where it is fixed in the desired shape and cooled.
  • the temperature of the workpiece at the start of the calibrating process can also be lower than the temperature of the workpiece when it is removed from the furnace; in particular, it can be between 400° C. and 700° C.
  • the calibrating die 5 may be, for example, a calibrating press.
  • the calibration ensures the dimensional stability of the workpiece.
  • the surface geometry of the pressing faces of the die corresponds to the final shape of the workpiece or has a very near-net shape, since the spring back effect is reduced considerably by the calibration in the calibrating die. By holding the workpiece in the calibrating die in the desired shape, the workpiece is thus given the final shape.
  • the workpiece is cooled in the calibrating die 5 with the workpiece in a fixed state, i.e. with the workpiece surfaces bearing against the die surfaces.
  • the heat is dissipated via the die.
  • the cooling rate can be, for example, approximately 30° C./s, but ought to be noncritical, since, unlike in the case of press hardening, no critical cooling rate has to be exceeded.
  • the cooling rate can be less than 50° C./s, which is achievable without a relatively high outlay on tools and in many cases makes sufficiently short cycle times possible. Higher cooling rates, for example in the range of 50° C./s to 150° C./s, are likewise possible.
  • the calibrating die 5 may have a cooling device (e.g. water cooling).
  • the cold work-hardening obtained in the regions of high elongation is reduced, i.e. lowered, equalized or possibly even overcompensated, as will be explained further below in conjunction with FIG. 2 .
  • Another possibility consists in realizing the furnace 4 and the calibrating die 5 in the same press station, i.e. in providing a calibrating die 5 which is coupled to a furnace.
  • coated FeMn steels can be used for the method.
  • the sheet metal workpiece can be coated with an organic and/or inorganic or metallic coating, in particular an alloy based on zinc or aluminum.
  • the coating can be performed before the cold forming or at another point in time, e.g. after the calibration.
  • Cathodic corrosion protection is provided, for example, by galvanizing.
  • the coating can be performed electrolytically or by a hot dipping method before the cold forming step 3 (e.g. already on the coil 1 at the steel manufacturer) or else after the cold forming step 3 and before heating in the furnace 4 .
  • the heat treatment before or during the calibration forms a solid solution layer between the FeMn steel and the Zn coating which ensures good adhesion of the Zn layer on the structural part. It is also possible to perform the coating (e.g. galvanizing) only on the finished structural part, i.e. after the calibration in the calibrating die 5 .
  • FIG. 2 relates to further exemplary embodiments of the method explained by way of example with reference to FIG. 1 , and illustrates the reduction in the cold work-hardening depending on the workpiece temperature reached during heating.
  • FIG. 2 shows the Vickers hardness Hv depending on the distance from the forming site.
  • Use was made of a board 2 which was cut from a cold-rolled, annealed FeMn strip steel.
  • the board 2 had a tensile strength R m ⁇ 1100 MPa, which corresponded to the tensile strength of the strip steel.
  • the elongation at break was A ⁇ 60%.
  • the residence time in the furnace 4 in each case was 10 min, and therefore complete and homogeneous through-heating of the cells was ensured.
  • the hot cells were fixed in the final shape in a calibrating die 5 , where they were cooled.
  • the cooling rate in this example was approximately 30° C./s.
  • the risk of delayed cracking as a result of hydrogen embrittlement is increased, since this arises particularly where a high cold work-hardening gradient is observed on cold forming.
  • the hot calibration according to the invention leads to a reduction in the cold work-hardening in the cells.
  • the cold work-hardening in the region of a structural part close to where forming is performed can be influenced in a targeted manner and reduced as desired to a specific value by choosing a suitable temperature T for the hot calibration.
  • T a suitable temperature

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Materials Engineering (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Child & Adolescent Psychology (AREA)
  • Heat Treatment Of Articles (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

In a method for producing a structural part from an iron-manganese-stell sheet (1), a sheet-metal workpiece (2) is cold-formed in a forming die (3). The formed sheet-metal workpiece is heated to a temperature between 500° C. and 700° C. (4) and calibrated in a calibrating die (5).

Description

  • The invention relates to a method for producing a structural part from an iron-manganese steel sheet.
  • Iron-manganese steels are lightweight structural steels which can have a high strength and at the same time a high ductility. This makes iron-manganese steels a material having great potential in vehicle construction. A high material strength makes it possible to reduce the body weight, as a result of which the fuel consumption can be lowered. A high ductility and stability of the steels is important both for the production of the body parts by deep-drawing processes and for the crash behaviour thereof. By way of example, structural and/or safety parts such as, for example, door impact bars, A-pillars and B-pillars, bumpers or longitudinal and transverse members have to realize complex structural part geometries, and at the same time have to be able to achieve the weight objectives and safety requirements.
  • It is already known to produce structural body parts from iron-manganese steel sheet by cold forming. However, as a result of cold work-hardening in formed regions, the cold forming leads to a reduction in the deformability and thus to a reduction in the energy absorption potential in the event of loading (crash). Such inhomogeneous mechanical structural part properties brought about by the cold work-hardening can have the effect that the structural part does not achieve the safety requirements. Further disadvantages of the cold forming technique are that it increases the risk of delayed cracking as a result of hydrogen embrittlement, the formed part displays a considerable spring back effect and cold-formed structural parts have inadequate numerical simulation properties for the structural part behaviour in the event of loading.
  • Hot forming is a known alternative to the cold forming method. Conventional hot forming processes are carried out at high temperatures of approximately 900° C. or thereabove. Hot forming reduces both the spring back effect of the formed structural part and also the cold work-hardening in formed regions. With the hot forming technique, it is thus possible to produce complex deep-drawn parts without a significant spring back effect under tension. Disadvantages of hot forming are, however, the high process temperatures and the material-dependent reduction in the strength of the structural part, brought about by the hot forming, after the cooling process.
  • In order to avoid the reduction in strength, hot forming is often combined with the hardening technique. This involves the known possibility of increasing the strength of steel materials by martensite formation. During hardening, heating of the structural part to the so-called hardening temperature above Ac3 produces an austenitic microstructure, which is then transformed completely into martensite by rapid cooling. A condition for the complete martensite transformation in this respect is that a critical cooling rate is exceeded. This requires cooled pressing dies which, as a result of contact between the hot workpiece surface and the cold die surface, make sufficiently rapid cooling of the workpiece possible.
  • An object on which the invention is based can be considered that of providing a method which makes it possible to produce formed structural parts from iron-manganese steel sheet having good mechanical properties in a cost-effective manner. In particular, the method should make it possible to produce formed sheet metal workpieces having a complex structural part geometry and favourable material properties even in formed structural part regions.
  • The object on which the invention is based is achieved by the features of claim 1. Advantageous configurations and developments are specified in the dependent claims.
  • The invention provides a method for producing a structural part from an iron-manganese steel sheet, in which method a sheet metal workpiece is cold-formed in a forming die, the formed sheet metal workpiece is heated to a temperature of between 500° C. and 700° C., and the heated sheet metal workpiece is calibrated in a calibrating die. The calibration of the formed sheet metal workpiece at the elevated temperatures indicated can have the effect that cold work-hardening which has arisen during the cold forming in the formed regions is reduced again. In particular, this can achieve homogenization of the mechanical properties over the entire structural part. Further advantages of the method according to the invention consist in the fact that the calibration of the heated structural part considerably reduces both the risk of delayed cracking as a result of hydrogen embrittlement and also the spring back effect of the structural part after it has been removed from the calibrating die.
  • It is pointed out that, at the indicated temperatures, the austenitization temperature Ac3 is not exceeded, i.e. that no transformation of the workpiece microstructure to a completely austenitic microstructure occurs during heating.
  • The degree to which the cold work-hardening in the formed structural part regions is reduced can be controlled by the selection of the temperature. At high temperatures, the strength of the formed regions can even be lowered to below the strength in regions which have not been formed or have been formed to a lesser extent. In order to avoid an excessive reduction of the cold work-hardening, a temperature of between 600° C. and 680° C. may be advantageous. To heat the formed sheet metal workpiece to the elevated temperature required for calibration, the formed sheet metal workpiece can be heated in a furnace and, after the heating, can be inserted into the calibrating die. It is also conceivable for the sheet metal workpiece to be heated directly in the calibrating die. In both cases, the initial temperature for the calibration can likewise lie in the indicated range of between 500° C. and 700° C. During the calibration, the formed sheet metal workpiece is then cooled in a held or fixed state.
  • The residence time of the sheet metal workpiece in the furnace can be chosen so as to ensure homogeneous through-heating of the sheet metal workpiece, in which case it is to be taken into consideration that an increase in the duration of the heating process is typically to be expected with an increasing thickness of the sheet metal workpiece.
  • The sheet metal workpiece is rapidly cooled in the held state in the calibrating die. Since no microstructure transformation from the austenite microstructure to the martensite microstructure, as is necessary for the so-called press hardening, has to be effected during the cooling, the critical minimum cooling rate known from press hardening does not have to be observed, i.e. the cooling rate in the calibrating die can be determined according to other aspects (for example cycle times, operating costs, tool costs, etc.).
  • The heating temperature of the formed sheet metal workpiece is important for reducing the cold work-hardening in formed portions of the sheet metal workpiece. In one exemplary embodiment, it may be set such that the cold work-hardening in formed portions of the (formed) sheet metal workpiece is reduced by at least 70%, in particular at least 80%, by the calibration.
  • According to a further exemplary embodiment, the heating temperature of the sheet metal workpiece can be set such that the calibrated sheet metal workpiece has a maximum tensile strength fluctuation range of 20%, in particular 10%, over its entire geometry. In other words, it is possible to achieve extensive homogenization of the mechanical properties of the structural part in relation to the tensile strength.
  • The invention will be explained in more detail by way of example hereinbelow on the basis of the description, with reference to the drawings, in which:
  • FIG. 1 shows a schematic illustration of a sequence of method steps according to one exemplary embodiment of the invention; and
  • FIG. 2 shows a graph, in which the hardness of a formed structural part is plotted against a distance from the forming site.
  • In the text which follows, exemplary embodiments of a method for producing a structural part from iron-manganese steel sheet are described. The structural part may be, for example, a structural body part for vehicle construction. The structural body part may have a complex structural part geometry. This may involve a structural and/or safety part which may have to satisfy particular safety requirements in the event of loading (crash). By way of example, the structural part may be an A-pillar or B-pillar, a side impact protective bar in doors, a sill, a frame part, a bumper, a transverse member for the floor and roof or a front or rear longitudinal member.
  • The structural part consists of an iron-manganese (FeMn) steel. FeMn structural parts are known in vehicle construction and can have a manganese content of approximately 12 to 35% by weight. Use can be made, for example, of TWIP, TRIP/TWIP and TRIPLEX steels and also mixed forms of these steels. TWIP (TWinning Induced Plasticity) steels are austenite steels. They are distinguished by a high manganese content (e.g. above 25%) and relatively high alloying additions of aluminum and silicon. During plastic cold forming, intensive twinning which solidifies the steel takes place. TWIP steels have a high elongation at break. They are therefore particularly suitable for producing structural or safety parts in regions of the body pertinent to accidents.
  • TRIP/TWIP steels are combinations of TWIP and TRIP (TRansformation Induced Plasticity) steels. TRIP steels consist essentially of a plurality of phases of iron-carbon alloys, specifically ferrite, bainite and carbon-rich residual austenite. The TRIP effect is based on the deformation-induced transformation of the residual austenite into the high-strength martensitic phase (α-martensite). In the case of TRIP/TWIP steels, a double TRIP effect occurs, since the austenitic microstructure is transformed firstly into the hexagonal and then into the body-centred cubic martensite. On account of the two martensitic transformations, TRIP/TWIP steels have a double elongation reserve.
  • TRIPLEX steels consist of a multiphase microstructure of α-ferrite and γ-austenite solid solutions with a martensitic s-phase and/or K-phase. They have good forming properties.
  • Furthermore, combinations of said steels can be used in exemplary embodiments of the invention. The exemplary list of the aforementioned steels is not conclusive; other FeMn steels can likewise be used for the invention.
  • FIG. 1 schematically shows an exemplary embodiment of a method according to the invention, in which optional method steps are also shown. The starting point for the method sequence is a coil 1 of strip steel, as is produced for example in a steelworks and delivered to a client (e.g. vehicle manufacturer or supplier). The FeMn strip steel may be, for example, a cold-rolled and annealed steel. It is also possible, however, to use a hot-rolled steel. The process for producing the FeMn strip steel in the steelworks should be configured such as to ensure good cold forming properties of the steel.
  • The strip steel is then cut into FeMn boards 2, for example at the vehicle manufacturer or supplier. The cutting is effected in a cutting station.
  • One or more boards 2 are then inserted into a cold forming die 3 and cold-formed. The temperatures in the cold forming die can lie in the conventional range, e.g. at approximately 70° C. to 80° C. Furnaces are not used for realizing these temperatures. The residence time of the workpiece in the cold forming die 3 typically does not have a considerable influence on the workpiece properties.
  • During the cold forming, locally different strengths are achieved, depending on the structural part geometry. The greater the local degree of forming, the higher the corresponding strength value. This effect is also referred to as cold work-hardening. Instances of severe cold work-hardening of up to approximately 1800 MPa can occur. The tensile strength of the starting material (board 2) can be e.g. approximately Rm≈1100 MPa, the yield strength can be e.g. Rp0.2≈600 MPa and the elongation at break A of the starting material can be e.g. 40% or more (A 40%). During cold forming, it is possible to take the spring back effect into account and to form the workpiece beyond the final geometrical dimension thereof. This is not absolutely necessary, however, on account of the subsequent process steps. The cold forming die 3 can be realized in the form of a deep-drawing press.
  • Furthermore, it is possible for the workpiece to simultaneously be trimmed in the cold forming die 3. This trimming may involve final trimming of the structural part. Furthermore, it is possible to carry out punching operations which may be required or the production of a hole pattern in the cold forming die 3. That is to say, after the cold forming step, a structural part having e.g. a completely finished structural part form in terms of material-removing processes can already be present.
  • It is also possible for material-removing processes (trimming, hole pattern production, etc.) to be carried out in a cutting line (not shown), which is arranged outside and downstream of the cold forming die 3 (which is located in the so-called press line). In this case, too, the end structural part in terms of material-removing processes may already be present after the trimming or the hole pattern production.
  • The cold-formed and possibly trimmed workpiece is then fed to a furnace 4, where it is heated to a temperature of between 500° C. and 700° C. The heating should be carried out until the structural part is brought homogeneously to a uniform temperature (T=500° C.-700° C.). When the uniform temperature has been reached, it can be held at this temperature for a certain time. By way of example, the residence time in the furnace can be 10 min, where 5 min are used for reaching the homogeneous temperature distribution and the further 5 min are used for keeping the structural part at said homogeneous temperature. Since no microstructure transformation decisive for the properties of the structural part is associated with the increase in temperature, however, it should also be possible for the heating step to be carried out without a holding time. It is possible for the furnace temperature to be considerably higher than the desired target temperature T=500° C.-700° C. of the workpiece and for the workpiece temperature to be controlled over the residence time in the furnace 4.
  • The furnace 4 used may be a radiation furnace, or it is possible to provide furnaces which feed energy to the workpiece in a different way. By way of example, it is possible to use convective heating, inductive heating or infrared heating and also combinations of said mechanisms.
  • The formed workpiece heated to the target temperature of between 500° C. and 700° C. is then removed from the furnace 4 and inserted into a calibrating die 5, where it is fixed in the desired shape and cooled. The temperature of the workpiece at the start of the calibrating process can also be lower than the temperature of the workpiece when it is removed from the furnace; in particular, it can be between 400° C. and 700° C. The calibrating die 5 may be, for example, a calibrating press. The calibration ensures the dimensional stability of the workpiece. The surface geometry of the pressing faces of the die corresponds to the final shape of the workpiece or has a very near-net shape, since the spring back effect is reduced considerably by the calibration in the calibrating die. By holding the workpiece in the calibrating die in the desired shape, the workpiece is thus given the final shape.
  • The workpiece is cooled in the calibrating die 5 with the workpiece in a fixed state, i.e. with the workpiece surfaces bearing against the die surfaces. The heat is dissipated via the die. The cooling rate can be, for example, approximately 30° C./s, but ought to be noncritical, since, unlike in the case of press hardening, no critical cooling rate has to be exceeded. By way of example, the cooling rate can be less than 50° C./s, which is achievable without a relatively high outlay on tools and in many cases makes sufficiently short cycle times possible. Higher cooling rates, for example in the range of 50° C./s to 150° C./s, are likewise possible. The calibrating die 5 may have a cooling device (e.g. water cooling). By virtue of the heating and the subsequent “held” cooling of the workpiece with a fixed workpiece geometry, the cold work-hardening obtained in the regions of high elongation is reduced, i.e. lowered, equalized or possibly even overcompensated, as will be explained further below in conjunction with FIG. 2.
  • The temperature of the heated workpiece at the start of the calibration can likewise be in the indicated range of T=500° C. to 700° C. or only slightly therebelow. This can be ensured by virtue of the fact that the transport path between the furnace 4 and the calibrating die 5 is short and/or that the heated workpiece is heated or kept warm on the transport path between the furnace 4 and the calibrating die 5, e.g. by heat radiation. Another possibility consists in realizing the furnace 4 and the calibrating die 5 in the same press station, i.e. in providing a calibrating die 5 which is coupled to a furnace.
  • The exemplary embodiments of the invention which are described with reference to FIG. 1 can be modified and developed in various ways. By way of example, coated FeMn steels can be used for the method. The sheet metal workpiece can be coated with an organic and/or inorganic or metallic coating, in particular an alloy based on zinc or aluminum. The coating can be performed before the cold forming or at another point in time, e.g. after the calibration.
  • Cathodic corrosion protection is provided, for example, by galvanizing. The coating can be performed electrolytically or by a hot dipping method before the cold forming step 3 (e.g. already on the coil 1 at the steel manufacturer) or else after the cold forming step 3 and before heating in the furnace 4. In the case of a Zn coating, the heat treatment before or during the calibration forms a solid solution layer between the FeMn steel and the Zn coating which ensures good adhesion of the Zn layer on the structural part. It is also possible to perform the coating (e.g. galvanizing) only on the finished structural part, i.e. after the calibration in the calibrating die 5.
  • FIG. 2 relates to further exemplary embodiments of the method explained by way of example with reference to FIG. 1, and illustrates the reduction in the cold work-hardening depending on the workpiece temperature reached during heating. FIG. 2 shows the Vickers hardness Hv depending on the distance from the forming site. Use was made of a board 2 which was cut from a cold-rolled, annealed FeMn strip steel. The board 2 had a tensile strength Rm≈1100 MPa, which corresponded to the tensile strength of the strip steel. The elongation at break was A≈60%. A plurality of identical cells having a diameter D=50 mm were deep-drawn from a plurality of boards 2 by means of a cold forming die 3. The cells were then heated to the different temperatures T=500° C., 600° C., 650° C. and 700° C. in a furnace 4. The residence time in the furnace 4 in each case was 10 min, and therefore complete and homogeneous through-heating of the cells was ensured. Immediately thereafter, and at substantially the same temperature T, the hot cells were fixed in the final shape in a calibrating die 5, where they were cooled. The cooling rate in this example was approximately 30° C./s.
  • The Vickers hardness Hv can be used as a measure for the tensile strength Rm, the conversion factor being approximately 3.1, i.e. a Vickers hardness Hv=350 corresponds approximately to a tensile strength Rm≈1100 MPa of the starting material, see reference numeral 6. For the cold-drawn, non-heated cell, FIG. 2 shows a cold work-hardening in the range of Rm=1600 MPa (corresponds to Hv=520), see reference numeral 7, which leads to greatly inhomogeneous mechanical properties in the structural part. In addition, the risk of delayed cracking as a result of hydrogen embrittlement is increased, since this arises particularly where a high cold work-hardening gradient is observed on cold forming.
  • The hot calibration according to the invention leads to a reduction in the cold work-hardening in the cells. At a temperature T=500° C., the tensile strength in the vicinity of the forming site is still Rm≈1490 MPa (Hv=480), at
    • T=600° C. the maximum cold work-hardening has already been reduced to Rm≈1330 MPa (Hv=430), T=650° C. leads virtually to an equalization of the mechanical properties
    • (Rm≈1120 MPa, corresponding to Hv=360) in formed and non-formed portions of the structural part, and at T=700° C. there is an overcompensation, i.e. the workpiece strength in the portion close to where forming is performed is
    • Rm≈870 MPa (Hv=280), and is therefore significantly below the tensile strength in portions of the workpiece (cell) which have not been formed or have been formed only to a minor extent.
  • It can be seen from FIG. 2 that the cold work-hardening in the region of a structural part close to where forming is performed can be influenced in a targeted manner and reduced as desired to a specific value by choosing a suitable temperature T for the hot calibration. By way of example, it is possible to achieve homogeneous mechanical properties with respect to the tensile strength having a fluctuation range of less than 20% or even 10% in relation to formed and non-formed portions of the structural part. It is also possible to reduce the cold work-hardening by 70% or 80%, for example. FIG. 2 shows that the heat treatment and the hot calibration influence and reduce only the increased strength values brought about by cold work-hardening, whereas the mechanical properties in the other portions of the workpiece, which have not been subjected to forming, barely change. In other words, it is possible for a structural part having a complex structural part geometry to have homogeneous mechanical properties over its entire extent or for it to obtain increased or reduced strengths in a targeted manner compared to non-formed portions at forming sites.

Claims (10)

1. A method for producing a structural part from an iron-manganese steel sheet, comprising the following steps:
cold-forming a sheet metal workpiece (2) in a forming die (3);
heating the formed sheet metal workpiece (2) to a temperature of between 500° C. and 700° C.; and
calibrating the heated sheet metal workpiece in a calibrating die (5).
2. The method according to claim 1, wherein the temperature is between 600° C. and 680° C.
3. The method according to claim 1 or 2, comprising the following step:
heating the formed sheet metal workpiece in a furnace (4); and
inserting the heated sheet metal workpiece into the calibrating die (5).
4. The method according to claim 3, wherein the residence time of the sheet metal workpiece in the furnace (4) is chosen so as to ensure substantially homogeneous through-heating of the sheet metal workpiece.
5. The method according to one of the preceding claims, wherein the iron-manganese steel sheet is a TWIP steel, TRIP/TWIP steel or TRIPLEX steel.
6. The method according to one of the preceding claims, wherein the manganese content of the iron-manganese steel sheet is between 12 and 35% by weight.
7. The method according to one of the preceding claims, wherein the temperature is set such that cold work-hardening in formed portions of the formed sheet metal workpiece is reduced by at least 70%, in particular 80%, by the calibration.
8. The method according to one of the preceding claims, wherein the temperature is set such that the calibrated sheet metal workpiece has a maximum tensile strength fluctuation range of 20%, in particular 10%, over its entire geometry.
9. The method according to one of the preceding claims, further comprising:
coating the sheet metal workpiece with an organic and/or inorganic or metallic coating, in particular an alloy based on zinc or aluminum, before the cold forming.
10. The method according to one of the preceding claims, further comprising:
coating the sheet metal workpiece with an organic and/or inorganic or metallic coating, in particular an alloy based on zinc or aluminum, after the calibration.
US13/674,243 2010-05-12 2012-11-12 Method for producing a structural part from an iron-manganese steel sheet Expired - Fee Related US9138797B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE201010020373 DE102010020373A1 (en) 2010-05-12 2010-05-12 Process for producing a component from an iron-manganese steel sheet
DE102010020373.4 2010-05-12
PCT/EP2011/057280 WO2011141367A1 (en) 2010-05-12 2011-05-06 Method for producing a structural part from an iron-manganese-steel sheet

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2011/057280 Continuation WO2011141367A1 (en) 2010-05-12 2011-05-06 Method for producing a structural part from an iron-manganese-steel sheet

Publications (2)

Publication Number Publication Date
US20130125607A1 true US20130125607A1 (en) 2013-05-23
US9138797B2 US9138797B2 (en) 2015-09-22

Family

ID=44276268

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/674,243 Expired - Fee Related US9138797B2 (en) 2010-05-12 2012-11-12 Method for producing a structural part from an iron-manganese steel sheet

Country Status (7)

Country Link
US (1) US9138797B2 (en)
EP (1) EP2569112B1 (en)
KR (1) KR101567132B1 (en)
CN (1) CN103003002B (en)
DE (1) DE102010020373A1 (en)
ES (1) ES2764790T3 (en)
WO (1) WO2011141367A1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140290322A1 (en) * 2011-07-20 2014-10-02 Salzgitter Flachstahl Gmbh Method for producing a component by hot forming a pre-product made of steel
US20150082636A1 (en) * 2012-05-31 2015-03-26 Outokumpu Nirosta Gmbh Method and Device for Producing Shaped Sheet Metal Parts at a Low Temperature
WO2016006232A1 (en) * 2014-07-10 2016-01-14 Jfeスチール株式会社 Hot-press-molded article and production method for same, and plated steel sheet for use in hot-press molding
US9610657B2 (en) 2013-10-24 2017-04-04 Hyundai Motor Company Hot clamping method and clamping cooling apparatus
WO2017081072A1 (en) * 2015-11-09 2017-05-18 Outokumpu Oyj Method for manufacturing an austenitic steel component and use of the component
JP2017177140A (en) * 2016-03-29 2017-10-05 新日鐵住金株式会社 Method for manufacturing press molding product made of tailored blank material
JP2018531486A (en) * 2016-05-09 2018-10-25 エムエス オートテック カンパニー リミテッド High frequency heating method for hot stamping process
US10190184B2 (en) 2014-07-25 2019-01-29 Thyssenkrupp Steel Europe Ag Method for producing a profile and a manufacturing system for producing a profile
US20200078853A1 (en) * 2016-11-15 2020-03-12 Salzgitter Flachstahl Gmbh Method for the production of chassis parts from micro-alloyed steel with improved cold formability
WO2020096271A1 (en) * 2018-11-08 2020-05-14 Renault-Samsung Motors Co., Ltd. Combination structure of metal sheets for automobile by using trip steel and method for manufacturing the same

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012111959A1 (en) 2012-12-07 2014-06-12 Benteler Automobiltechnik Gmbh Method for producing a motor vehicle component and motor vehicle component
JP6050835B2 (en) * 2013-01-11 2016-12-21 フタバ産業株式会社 Hot stamping heating device
DE102013003516A1 (en) 2013-03-04 2014-09-04 Outokumpu Nirosta Gmbh Process for the production of an ultra-high-strength material with high elongation
DE102016114484A1 (en) * 2016-08-04 2018-02-08 Allgaier Werke Gmbh Method for indirect hot forming of a molded component, mold for performing the method and mold component
RU2631069C1 (en) * 2016-10-27 2017-09-18 Федеральное государственное автономное образовательное учреждение высшего образования "Белгородский государственный национальный исследовательский университет" (НИУ "БелГУ") Method of producing sheets from high-manganese steel
DE102018102974A1 (en) * 2018-02-09 2019-08-14 Salzgitter Flachstahl Gmbh A method of manufacturing a component by hot working a manganese steel precursor and a hot worked steel component
IT201800010394A1 (en) * 2018-11-16 2020-05-16 Mas Mecc S R L PLANT FOR MOLDING PIECES OF SHEET
WO2023023843A1 (en) * 2021-08-24 2023-03-02 Magna International Inc. Process for manufacturing vehicle parts

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6463779B1 (en) * 1999-06-01 2002-10-15 Mehmet Terziakin Instant heating process with electric current application to the workpiece for high strength metal forming
US6564604B2 (en) * 2000-04-07 2003-05-20 Unisor Process for the manufacture of a part with very high mechanical properties, formed by stamping of a strip of rolled steel sheet and more particularly hot rolled and coated
US6941784B2 (en) * 2000-01-17 2005-09-13 Amada Company, Limited Bending method and device therefor
DE102008050315A1 (en) * 2008-10-02 2009-05-20 Daimler Ag mandatory TITLE MAX 240 characters subject of the invention and main use. Spelling American, no full stop
KR100902857B1 (en) * 2008-10-16 2009-06-16 현대하이스코 주식회사 Method for manufacturing ultra high strength steel parts
US8181498B2 (en) * 2008-06-06 2012-05-22 Edag, Inc. Method and apparatus for shaping a rim of a three-dimensionally arched sheet metal

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10120063C2 (en) * 2001-04-24 2003-03-27 Benteler Automobiltechnik Gmbh Process for the production of metallic profile components for motor vehicles
DE10149221C1 (en) * 2001-10-05 2002-08-08 Benteler Automobiltechnik Gmbh Process for producing a hardened sheet metal profile
JP4319987B2 (en) * 2002-09-13 2009-08-26 ダイムラー・アクチェンゲゼルシャフト Press-hardened parts and method of manufacturing the same
DE10314115A1 (en) * 2003-03-28 2004-10-14 Audi Ag Process for forming a sheet from a tempered steel and device for carrying out the process
DE102004038626B3 (en) * 2004-08-09 2006-02-02 Voestalpine Motion Gmbh Method for producing hardened components from sheet steel
CN100361762C (en) * 2005-07-29 2008-01-16 中国科学院金属研究所 Mild hot formation method for making magnesium alloy shell of cell phone and mould specially for the same
DE102008020757A1 (en) * 2007-04-30 2008-11-06 Volkswagen Ag Sheet workpiece forming method, involves inserting sheet workpiece into molding tool at specific temperature, forming workpiece by molding tool, and extracting heat from workpiece during retention period
KR100907225B1 (en) * 2007-05-23 2009-07-10 주식회사화신 Hot forming apparatus and hot forming method
CN101412065B (en) * 2008-12-02 2010-06-30 华映光电股份有限公司 Technique for processing magnesium alloy case

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6463779B1 (en) * 1999-06-01 2002-10-15 Mehmet Terziakin Instant heating process with electric current application to the workpiece for high strength metal forming
US6941784B2 (en) * 2000-01-17 2005-09-13 Amada Company, Limited Bending method and device therefor
US6564604B2 (en) * 2000-04-07 2003-05-20 Unisor Process for the manufacture of a part with very high mechanical properties, formed by stamping of a strip of rolled steel sheet and more particularly hot rolled and coated
US8181498B2 (en) * 2008-06-06 2012-05-22 Edag, Inc. Method and apparatus for shaping a rim of a three-dimensionally arched sheet metal
DE102008050315A1 (en) * 2008-10-02 2009-05-20 Daimler Ag mandatory TITLE MAX 240 characters subject of the invention and main use. Spelling American, no full stop
KR100902857B1 (en) * 2008-10-16 2009-06-16 현대하이스코 주식회사 Method for manufacturing ultra high strength steel parts

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9943894B2 (en) * 2011-07-20 2018-04-17 Salzgitter Flachstahl Gmbh Method for producing a component by hot forming a pre-product made of steel
US20140290322A1 (en) * 2011-07-20 2014-10-02 Salzgitter Flachstahl Gmbh Method for producing a component by hot forming a pre-product made of steel
US20150082636A1 (en) * 2012-05-31 2015-03-26 Outokumpu Nirosta Gmbh Method and Device for Producing Shaped Sheet Metal Parts at a Low Temperature
US10532395B2 (en) * 2012-05-31 2020-01-14 Thyssenkrupp Steel Europe Ag Method and device for producing shaped sheet metal parts at a low temperature
US9610657B2 (en) 2013-10-24 2017-04-04 Hyundai Motor Company Hot clamping method and clamping cooling apparatus
WO2016006232A1 (en) * 2014-07-10 2016-01-14 Jfeスチール株式会社 Hot-press-molded article and production method for same, and plated steel sheet for use in hot-press molding
US10190184B2 (en) 2014-07-25 2019-01-29 Thyssenkrupp Steel Europe Ag Method for producing a profile and a manufacturing system for producing a profile
EP3173504A1 (en) * 2015-11-09 2017-05-31 Outokumpu Oyj Method for manufacturing an austenitic steel component and use of the component
WO2017081072A1 (en) * 2015-11-09 2017-05-18 Outokumpu Oyj Method for manufacturing an austenitic steel component and use of the component
JP2017177140A (en) * 2016-03-29 2017-10-05 新日鐵住金株式会社 Method for manufacturing press molding product made of tailored blank material
JP2018531486A (en) * 2016-05-09 2018-10-25 エムエス オートテック カンパニー リミテッド High frequency heating method for hot stamping process
US20200078853A1 (en) * 2016-11-15 2020-03-12 Salzgitter Flachstahl Gmbh Method for the production of chassis parts from micro-alloyed steel with improved cold formability
WO2020096271A1 (en) * 2018-11-08 2020-05-14 Renault-Samsung Motors Co., Ltd. Combination structure of metal sheets for automobile by using trip steel and method for manufacturing the same

Also Published As

Publication number Publication date
EP2569112B1 (en) 2019-10-23
DE102010020373A1 (en) 2011-11-17
KR20130036250A (en) 2013-04-11
ES2764790T3 (en) 2020-06-04
US9138797B2 (en) 2015-09-22
CN103003002B (en) 2016-03-30
WO2011141367A1 (en) 2011-11-17
KR101567132B1 (en) 2015-11-06
CN103003002A (en) 2013-03-27
EP2569112A1 (en) 2013-03-20

Similar Documents

Publication Publication Date Title
US9138797B2 (en) Method for producing a structural part from an iron-manganese steel sheet
EP3611288B1 (en) Hot stamped component, pre-coated steel plate for hot stamping, and hot stamping process
US11331710B2 (en) Method for producing a motor vehicle component with at least two regions of different strengths
KR102477323B1 (en) Manufacturing method of hot-formed article and obtained article
Fan et al. A review of the physical metallurgy related to the hot press forming of advanced high strength steel
US10385415B2 (en) Zinc-coated hot formed high strength steel part with through-thickness gradient microstructure
US10619223B2 (en) Zinc-coated hot formed steel component with tailored property
US8404061B2 (en) Method for producing a component from an air-hardenable steel and component produced therewith
US20180237877A1 (en) Mitigating liquid metal embrittlement in zinc-coated press hardened steels
WO2012157581A1 (en) Hot stamp molded article, method for producing hot stamp molded article, energy absorbing member, and method for producing energy absorbing member
WO2015037061A1 (en) Hot-pressing steel plate, press-molded article, and method for manufacturing press-molded article
KR20170106480A (en) Hot stamping steel sheet, hot stamping method and hot stamped parts
CZ2010939A3 (en) Method for forming and hardening a blank
US20160130675A1 (en) Method for producing a component by hot forming a pre-product made of steel
US20160145731A1 (en) Controlling Liquid Metal Embrittlement In Galvanized Press-Hardened Components
US20180216205A1 (en) Two-step hot forming of steels
US9943894B2 (en) Method for producing a component by hot forming a pre-product made of steel
CN112534078A (en) Low density press hardened steel with enhanced mechanical properties
EP3473735B1 (en) Treatment process for obtaining graded performance and member thereof
US11519047B2 (en) Motor vehicle component and a method of manufacturing thereof
US20180237878A1 (en) Systems, methods and devices for hot forming of steel alloy parts
US9200358B2 (en) Manufacturing process of a structural component for a motor vehicle, plate bar for hot forming and structural component
CN110551876A (en) Motor vehicle component, method for producing same and production device
EP3327152B1 (en) Method for hot-forming a steel blank
JP2022513667A (en) Press-cured parts with high resistance to delayed fracture and their manufacturing methods

Legal Events

Date Code Title Description
AS Assignment

Owner name: VOESTALPINE STAHL GMBH, AUSTRIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SAMEK, LUDOVIC;PERUZZI, MARTIN;ARENHOLZ, ENNO;SIGNING DATES FROM 20130715 TO 20130725;REEL/FRAME:031172/0001

STCF Information on status: patent grant

Free format text: PATENTED CASE

CC Certificate of correction
MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20230922