US20120304553A1 - Drilling rig system with self-elevating drill floor - Google Patents

Drilling rig system with self-elevating drill floor Download PDF

Info

Publication number
US20120304553A1
US20120304553A1 US13/487,186 US201213487186A US2012304553A1 US 20120304553 A1 US20120304553 A1 US 20120304553A1 US 201213487186 A US201213487186 A US 201213487186A US 2012304553 A1 US2012304553 A1 US 2012304553A1
Authority
US
United States
Prior art keywords
floor
drill floor
base
towers
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/487,186
Other languages
English (en)
Inventor
Kameron Wayne Konduc
Donald Leonard BURLET
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Oilwell Varco LP
Original Assignee
National Oilwell Varco LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Oilwell Varco LP filed Critical National Oilwell Varco LP
Priority to US13/487,186 priority Critical patent/US20120304553A1/en
Assigned to NATIONAL OILWELL VARCO, L.P. reassignment NATIONAL OILWELL VARCO, L.P. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BURLET, DONALD LEONARD, KONDUC, KAMERON WAYNE
Publication of US20120304553A1 publication Critical patent/US20120304553A1/en
Priority to US14/527,537 priority patent/US9458675B2/en
Priority to US15/255,740 priority patent/US10094136B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/344Arrangements for lifting tower sections for placing additional sections under them
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34331Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by three-dimensional elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34384Assembling details for foldable, separable, collapsible or retractable structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/345Arrangements for tilting up whole structures or sections thereof

Definitions

  • the present disclosure relates in general to rig structures for drilling wells such as oil and gas wells.
  • the disclosure relates to rig structures that can be readily transported, rapidly erected, and rapidly disassembled, and further relates to methods for erecting such rig structures.
  • drill string an assembly of drill pipe sections connected end-to-end
  • the drill string is typically rotated by means of a “rotary table” or a “top drive” associated with a drilling rig erected at the ground surface over the wellbore.
  • the primary components of a typical drilling rig include a base support structure, a drill floor, and a mast (also called a derrick) supported on and extending upward from the drill floor.
  • the drill floor is typically elevated well above the ground surface to provide space to accommodate and allow access to various equipment required for drilling operations.
  • An arrangement of pulleys (sheaves) called a crown block is mounted to the top of the rig mast.
  • Hoisting apparatus called a drawworks, comprising a cable drum, a cable winch, and ancillary equipment, is provided in association with the drill floor.
  • Wire-rope cable is fed from the cable drum up to the crown block and threaded over the various sheaves in the crown block, and then down to a “traveling block”, which is an assembly of sheaves that is free to move vertically within the mast structure as the wire-rope cable (“drill line”) is played out or taken up by the cable winch and drum of the drawworks.
  • the traveling block has a lifting hook to support equipment used to raise and lower the drill string, and to add pipe sections during drill string assembly (or “make-up”) and to remove pipe sections during drill string disassembly (“break-out”). For drilling operations using a top drive instead of a rotary table to rotate the drill string, the top drive is suspended from the traveling block hook.
  • Known transportable rigs commonly feature what is called a “bootstrap mast”.
  • a bottom mast section having a large lower opening on one side is mounted to the drill floor, using a mobile crane.
  • the crane then lowers the top section of the finished mast (housing the crown block) into the bottom mast section, and the top mast section is temporarily pinned to the bottom mast section.
  • the crane positions an intermediate mast section through the opening in the bottom mast section so that the upper end of the intermediate mast section can be securely connected to the lower end of the upper mast section.
  • the traveling block is then lowered to engage and support the intermediate section, the upper mast section is unpinned from the bottom mast section, the drawworks is actuated to hoist the upper and intermediate mast sections a distance corresponding to the height of the intermediate mast section, and then the partially-constructed mast assembly (i.e., upper section plus one intermediate section) is temporarily pinned to the stationary bottom mast section.
  • This latter process is then repeated as necessary to install additional intermediate mast sections until the mast has reached its intended final height, whereupon the lowermost intermediate mast section is secured to the bottom mast section so that the rig is ready to be put into service.
  • Drilling sites are often located in remote areas requiring truck transportation of rig components and equipment required for rig assembly (or “rig-up”). Further complicating the rig-up process is the common need to relocate the rig to a more promising site after a wellbore has been drilled and it has been determined that the wellbore will not be sufficiently productive to warrant completion and operation of the well.
  • Wellsite changes can occur once every several months, and, in response, prior art rig systems have attempted to increase the mobility of rig components and the efficiency of rig erection and disassembly procedures in order to minimize associated costs.
  • the need for auxiliary equipment typically remains necessary for performing steps such as placing the drill floor.
  • Wasterval teaches the construction of a drill floor over a base structure, which is provided with hydraulic cylinders for raising the drill floor above the base structure. After the drill floor has been raised by an increment corresponding to the stroke of the hydraulic cylinders, a first set of box beams are disposed between the drill floor and the base structure, and the box beams are anchored to the drill floor. The lift cylinders on the base structure can then be retracted to engage lift points on the box beams.
  • the lift cylinders are then actuated again, this time to raise both the drill floor and the first box beams anchored thereto. This allows insertion of a second set of box beams between the base structure and the first set of box beams, thus elevating the drill floor a further incremental amount. This procedure is repeated as necessary to install additional sets of box beams until the drill floor has reached its intended elevation.
  • the Wasterval system thus allows the drill floor to be erected or constructed close to ground level, followed by erection of the rig mast on the drill floor, whereupon the drill floor (with erected mast) can be elevated as required.
  • this system has an inherent drawback in that the rig floor raising procedure has to be carried out in incremental and comparatively complex stages, and is correspondingly complex and time-consuming.
  • the Wasterval system entails the provision of a robust hydraulic system, which might not otherwise be needed on site during rig-up, and thus increases rig-up costs.
  • the Wasterval system requires the use of mobile cranes or other auxiliary hoisting equipment to manipulate and position the box beams, further adding to rig-up costs.
  • the present disclosure teaches a transportable drilling rig apparatus having a drill floor that can be elevated after erection of the rig mast, without requiring a hydraulic system or auxiliary hoisting equipment.
  • the rig's traveling block and drawworks are used to elevate the drill floor.
  • a worm gear drive mechanism can be used to elevate the drill floor.
  • the rig apparatus includes a rig base structure comprising a plurality of base towers that can be positioned in a suitable spaced relationship on a wellsite.
  • a rig base structure comprising a plurality of base towers that can be positioned in a suitable spaced relationship on a wellsite.
  • a generally horizontal base frame is installed between lower regions of the towers, thus tying the towers together to form a suitably rigid and stable rig base structure.
  • the towers may be provided with height adjustment mechanisms (e.g., hydraulic jacks) to facilitate leveling the base structure over uneven ground surfaces.
  • the towers may optionally be provided with “walking” mechanisms whereby the lateral positions of the towers can be adjusted prior to installation of the horizontal base frame.
  • the walking mechanisms can be coupled for cooperative actuation to
  • a drill floor can then be constructed over the horizontal base frame of the rig base structure.
  • the drill floor may comprise multiple slab sections that are anchored to each other after being positioned over the base frame to form an integral drill floor structure.
  • the horizontal base frame can be advantageously set at a height above ground corresponding to the level of a flatbed truck or trailer, thus facilitating unloading of drill floor sections by shifting them laterally off the trailer bed onto the base frame.
  • the drill floor is mated to the towers with suitable guide means such that the drill floor can be uniformly elevated relative to the towers, with the towers acting to provide lateral stability to the drill floor at all stages of the floor-elevating process.
  • the drill floor has been elevated to the required elevation, it is locked to the towers by any suitable means, such as but not limited to hydraulic clamps.
  • the drill floor is elevated using only the rig's traveling block and drawworks.
  • sheave assemblies are mounted to and under the drill floor adjacent to each tower.
  • Each tower has a floor-lifting cable anchored to an upper region of the tower and disposable under and around the corresponding sheave assembly associated with the drill floor, such that the free (i.e., non-anchored) ends of the floor-lifting cables converge toward a central area of the drill floor.
  • the free ends of all floor-lifting cables can be engaged by the traveling block hook.
  • the drawworks can then be actuated to raise the drill floor in one continuous operation.
  • FIG. 1 is an elevation illustrating the unloading of base towers from a transport truck and positioning of the towers on a wellsite.
  • FIG. 2 is an elevation illustrating a horizontal base frame interconnecting the rig towers.
  • FIG. 3A is a first elevation view of an embodiment of a drilling rig structure in accordance with the present disclosure, showing the drill floor installed over the horizontal base frame, with a rig mast in an early stage of erection upon the drill floor.
  • FIG. 3B is a second elevation view of the assembly in FIG. 3A .
  • FIG. 4A is a first elevation view similar to FIG. 3A , after complete erection of the rig mast, with the floor-raising cables engaging the traveling block hook in preparation for elevating the drill floor.
  • FIG. 4B is a second elevation view of the assembly in FIG. 4A .
  • FIG. 5A is a first elevation view similar to FIG. 4A , after the drill floor has been elevated and the rig is ready to be put into service.
  • FIG. 5B is a second elevation view of the assembly in FIG. 5A .
  • FIG. 6 is a plan cross-section through the base towers of one embodiment of a drilling rig structure and drill floor layout in accordance with the present disclosure, prior to elevation of the drill floor.
  • FIGS. 1 through 5B progressively illustrate the steps involved in assembling one embodiment of a transportable drilling rig in accordance with present disclosure.
  • FIGS. 1 and 2 depict the delivery and positioning of a plurality of base towers 10 at a drill site.
  • towers 10 will be provided with adjustment means 12 for adjusting their height, lateral position, and vertical alignment.
  • adjustment means 12 for adjusting their height, lateral position, and vertical alignment.
  • Persons skilled in the art will know that such means can be provided in a variety of ways using known technologies, and such means do not constitute components of the broadest embodiments of drilling rigs in accordance with this disclosure.
  • Base frame 20 is constructed or installed as shown in FIG. 2 , interconnecting the base towers 10 .
  • Base frame 20 can be of any suitable layout and structural configuration. The structure can also be assembled off the well and “walked” into drilling position if equipped with adjustment means 12 .
  • a drill floor 30 is then constructed over and temporarily supported on base frame 20 , whereupon a rig mast structure 100 can be erected upon drill floor 30 .
  • rig mast 100 is shown as a bootstrap mast of the type described previously herein, comprising:
  • drill floor 30 is provided with a suitable drawworks (generally indicated by reference number 40 ), including a cable drum 42 which carries wire rope used for a drill line fed up and through crown block 122 and down to traveling block 124 as previously described.
  • the rig structure includes four base towers 10 laid out in a rectilinear pattern.
  • Drill floor 30 is configured in the general shape of a cross, with adjacent “arms” of the cross fitted closely around their associated base tower 10 .
  • Reference numbers 35 denote drill floor guide and anchorage means to facilitate stable and uniform vertical movement of drill floor 30 relative to base towers 10 during drill floor lifting operations, and for anchoring drill floor 30 to base towers 10 after drill floor 30 has been elevated to its intended position for drilling operations.
  • the drill floor guide means and the drill floor anchorage means may be separate and independent mechanisms.
  • drawworks 40 The location and general configuration of the drawworks (including cable drum 42 ) are indicated by reference number 40 ; in the illustrated embodiment, drawworks 40 is at least partially installed on a cantilevered section of drill floor 30 .
  • drill floor 30 incorporates a rotary table 135 for rotating a drill string.
  • a driller's control cabin is indicated by reference number 44 .
  • Drill floor 30 may have one or more cantilevered catwalks 31 for worker access.
  • drill floor sheaves 32 A and 32 B are provided in association with each base tower 10 , with the rotational axes of inner and outer drill floor sheaves 32 A and 32 B being parallel and transverse to a radial line extending from their associated base tower 10 to well centerline CL W .
  • drill floor sheaves 32 A and 32 B in the illustrated embodiment are actually mounted below or within the structure of drill floor 30 , they are shown in solid outline in FIG. 6 for purposes of clarity.
  • each base tower 10 there is a set of drill floor sheaves for each base tower 10 , but this is not essential. Alternative embodiments could have one or more base towers 10 that do not have an associated drill floor sheave assemblies. Furthermore, although in the illustrated embodiment each drill floor sheave assembly includes a pair of drill floor sheaves, alternative embodiments could use drill floor sheave assemblies comprising more than two drill floor sheaves or possibly only one drill floor sheave.
  • upper mast section 120 has been positioned and pinned to bottom mast section 110
  • a first intermediate mast section 130 has been positioned within bottom mast section 110 and connected to upper mast section 120 .
  • mast-raising cables 135 anchored to upper regions of bottom mast section 110 extend around sheaves 132 at the lower end of the intermediate mast section 130 disposed within bottom mast section 110 and upward for engagement with traveling block 124 .
  • Drawworks 40 is then actuated to raise traveling block 124 and lift the assembly of upper mast section 120 and intermediate mast section 130 until the lower end of intermediate mast section 130 has been raised sufficiently to allow another intermediate mast section 130 to be positioned within bottom mast section 110 , and so on until rig mast 100 has been constructed to its final intended height as shown in FIGS. 4A and 4B .
  • the mast-raising cables 135 are disengaged from traveling block 124 .
  • a plurality of floor-raising cables 33 are threaded from anchor points 33 X in upper regions of their associated base towers 10 , around drill floor sheaves 32 A and 32 B and then upward for engagement by traveling block 124 , all as seen in FIGS. 4A and 4B .
  • Drawworks 40 is then actuated to raise traveling block 124 , thereby elevating drill floor 30 to an intended service elevation as seen in FIGS. 5A and 5B .
  • Drill floor 30 is then anchored to base towers 10 by suitable anchorage means 35 (which by way of non-limiting example could be provided in the form of hydraulic latches).
  • a worm gear drive unit could be used to elevate drill floor 30 , with guide rollers, and mating racks built into base towers 10 at each corner of drill floor 30 .
  • the worm gear drive mechanism could be actuated by any suitable power means, such as hydraulic or electric motors.
  • a worm gear drive could be provided as a supplement or back-up to a primary cable-implemented floor-raising mechanism.
  • any form of the word “comprise” is to be understood in its non-limiting sense to mean that any item following such word is included, but items not specifically mentioned are not excluded.
  • a reference to an element by the indefinite article “a” does not exclude the possibility that more than one of the element is present, unless the context clearly requires that there be one and only one such element.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Electromagnetism (AREA)
  • Earth Drilling (AREA)
US13/487,186 2011-06-02 2012-06-02 Drilling rig system with self-elevating drill floor Abandoned US20120304553A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US13/487,186 US20120304553A1 (en) 2011-06-02 2012-06-02 Drilling rig system with self-elevating drill floor
US14/527,537 US9458675B2 (en) 2011-06-02 2014-10-29 Method for assembling a drilling rig structure
US15/255,740 US10094136B2 (en) 2011-06-02 2016-09-02 Drilling rig system with self-elevating drill floor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201161492786P 2011-06-02 2011-06-02
US13/487,186 US20120304553A1 (en) 2011-06-02 2012-06-02 Drilling rig system with self-elevating drill floor

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/527,537 Division US9458675B2 (en) 2011-06-02 2014-10-29 Method for assembling a drilling rig structure

Publications (1)

Publication Number Publication Date
US20120304553A1 true US20120304553A1 (en) 2012-12-06

Family

ID=47258210

Family Applications (3)

Application Number Title Priority Date Filing Date
US13/487,186 Abandoned US20120304553A1 (en) 2011-06-02 2012-06-02 Drilling rig system with self-elevating drill floor
US14/527,537 Active US9458675B2 (en) 2011-06-02 2014-10-29 Method for assembling a drilling rig structure
US15/255,740 Active 2033-01-19 US10094136B2 (en) 2011-06-02 2016-09-02 Drilling rig system with self-elevating drill floor

Family Applications After (2)

Application Number Title Priority Date Filing Date
US14/527,537 Active US9458675B2 (en) 2011-06-02 2014-10-29 Method for assembling a drilling rig structure
US15/255,740 Active 2033-01-19 US10094136B2 (en) 2011-06-02 2016-09-02 Drilling rig system with self-elevating drill floor

Country Status (7)

Country Link
US (3) US20120304553A1 (de)
EP (1) EP2715034B1 (de)
AU (1) AU2012262632B2 (de)
CA (1) CA2834709C (de)
PL (1) PL2715034T3 (de)
RU (1) RU2589783C2 (de)
WO (1) WO2012162800A1 (de)

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140224543A1 (en) * 2013-02-13 2014-08-14 Nabors Drilling USA Side Saddle Substructure
US8935901B2 (en) * 2013-03-13 2015-01-20 Nabors Drilling International Limited Self-elevating mast employing draw works
US20150143759A1 (en) * 2013-11-25 2015-05-28 Unit Corporation Box-on-box self-stacking substructure for a drill rig
US20160102508A1 (en) * 2014-10-09 2016-04-14 Nabors Drilling International Limited Automated bootstrap quad-mast rig
US9518429B2 (en) 2013-10-31 2016-12-13 Independence Contract Drilling, Inc. Walking drilling rig
US9556636B2 (en) * 2014-06-27 2017-01-31 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
WO2017081504A1 (es) * 2015-11-09 2017-05-18 Total Petroleum Services S.A.S. Torre mástil portátil para intervención y mantenimiento de pozos, su proceso de fabricación y montaje
US9677298B2 (en) 2014-07-14 2017-06-13 Dreco Energy Services Ulc Mobile drilling rig
CN107060480A (zh) * 2017-06-15 2017-08-18 国网山东省电力公司烟台供电公司 一种电杆架设杆顶物料传递装置
CN107237543A (zh) * 2017-06-15 2017-10-10 国网山东省电力公司烟台供电公司 一种电杆架设杆顶物料传递装置及锁紧结构一
US9926719B2 (en) 2013-02-13 2018-03-27 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
CN107989596A (zh) * 2017-04-11 2018-05-04 中国石油天然气股份有限公司 一种模拟井筒装置及油气水三相流模拟实验系统
US9970211B2 (en) * 2016-05-02 2018-05-15 Dreco Energy Services Ulc Guide rails for mobile drilling rig
US9988807B2 (en) * 2016-02-24 2018-06-05 National Oilwell Varco, L.P. Drilling rig with self-elevating drill floor
US10214936B2 (en) 2016-06-07 2019-02-26 Nabors Drilling Technologies Usa, Inc. Side saddle slingshot drilling rig
US10214970B1 (en) 2018-06-12 2019-02-26 Nabors Drilling Technologies Usa, Inc. Post and non-elongated substructure drilling rig
CN109488103A (zh) * 2018-11-08 2019-03-19 中国化学工程第三建设有限公司 大型全钢结构间冷塔液压提升施工方法
US10280692B2 (en) 2013-02-13 2019-05-07 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
US10428592B2 (en) 2017-01-16 2019-10-01 Nabors Drilling Technologies Usa, Inc. Rig layout system
US10487592B1 (en) 2018-05-03 2019-11-26 Nabors Drilling Technologies Usa, Inc. Multi-direction traversable drilling rig
US10526048B2 (en) * 2016-08-30 2020-01-07 Solar Sailor Pty Ltd. Mast base assembly
US10584541B2 (en) 2016-07-28 2020-03-10 Nabors Drilling Technologies Usa, Inc. Pipe handling apparatus
US10648240B2 (en) 2016-07-13 2020-05-12 Nabors Drilling Technologies Usa, Inc. Mast and substructure
US10704337B2 (en) 2016-11-07 2020-07-07 Nabors Drilling Technologies Usa, Inc. Side-saddle cantilever mast
CN111583414A (zh) * 2020-04-15 2020-08-25 西安石油大学 一种油气井动态井控vr系统的搭建方法
CN111734203A (zh) * 2020-06-24 2020-10-02 国网四川雅安电力(集团)股份有限公司 一种内附式塔上分段组立抢修塔装置
US10822924B2 (en) 2016-03-07 2020-11-03 National Oilwell Varco, L.P. Multi-well bop cellar trailer
US10837238B2 (en) 2018-07-19 2020-11-17 Nabors Drilling Technologies Usa, Inc. Side saddle slingshot continuous motion rig
CN112030831A (zh) * 2020-09-11 2020-12-04 李卫兵 一种路基混凝土护栏施工设备
US10907376B1 (en) * 2019-12-18 2021-02-02 Anthony J. Bonilla Self-building tower
CN112744667A (zh) * 2019-10-31 2021-05-04 中石化石油工程技术服务有限公司 海洋平台应急救生系统
US11021186B2 (en) 2016-10-05 2021-06-01 Dreco Energy Services Ulc Movable rig and steering system
US11035178B2 (en) * 2018-07-13 2021-06-15 James C. Evans Apparatus and methods for moving workover rigs
US11454067B2 (en) 2018-08-06 2022-09-27 Nov Canada Ulc Drill floor support structures
US11603723B2 (en) 2019-08-30 2023-03-14 Nov Canada Ulc Cuttings processing unit
US11873685B2 (en) 2020-09-01 2024-01-16 Nabors Drilling Technologies Usa, Inc. Side saddle traversable drilling rig
US12054993B2 (en) 2021-03-16 2024-08-06 Nabors Drilling Technologies Usa, Inc. Side saddle rig design with retractable top drive
CN118635945A (zh) * 2024-08-14 2024-09-13 成都迈特航空制造有限公司 一种航空螺母管接头的钻孔装置及其钻孔方法

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9512676B2 (en) 2015-03-05 2016-12-06 Patterson-Uti Drilling Company Llc Mast leg pulley
US9938777B2 (en) * 2015-10-07 2018-04-10 Axel Michael Sigmar Land drilling rig and methods of assembly
US10662718B2 (en) * 2016-06-16 2020-05-26 Nabors Drilling Technologies Usa, Inc. Drilling rig stair tower with integrated utility lines and cable tray
CN106050153B (zh) * 2016-08-13 2017-12-22 山东黄金地质矿产勘查有限公司 钻塔平台支撑装置
US11784473B2 (en) 2017-12-12 2023-10-10 Schlumberger Technology Corporation Adjustable cable management system
NO20191071A1 (en) 2018-09-06 2020-03-09 Cameron Tech Ltd Fingerboard
CN109322532A (zh) * 2018-11-05 2019-02-12 国网四川省电力公司成都供电公司 一种组立输电线路塔用的电动起吊抱杆
CN109798014B (zh) * 2019-02-25 2020-07-28 北京大唐智创科技有限公司 一种小型可调节5g信号信号增强塔
US11808091B1 (en) * 2020-04-29 2023-11-07 Lasso Drilling, LLC Modular rig systems and methods
CN111620254A (zh) * 2020-06-10 2020-09-04 中国电建集团山东电力建设有限公司 火炬管提升安装系统及方法
WO2023049166A1 (en) * 2021-09-21 2023-03-30 Schlumberger Technology Corporation Tri-jack hydraulic workover unit

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3228151A (en) * 1962-02-15 1966-01-11 Moore Corp Lee C Drilling apparatus for deep oil wells
US3327997A (en) * 1965-02-16 1967-06-27 Zetco Engineering And Tool Com Sensing apparatus
US3828513A (en) * 1971-02-11 1974-08-13 Research Corp Method of erecting a multi-story building and apparatus therefor
US3922825A (en) * 1973-04-20 1975-12-02 Dresser Ind System for erecting an oil well derrick
US3942593A (en) * 1973-10-17 1976-03-09 Cabot Corporation Drill rig apparatus
US4375241A (en) * 1979-04-11 1983-03-01 Union Industrielle Et D'entreprise Drilling installation, more specifically for oil-drilling operations
US4831795A (en) * 1985-07-10 1989-05-23 Sorokan Ronald S Drilling derrick assembly
US20030172599A1 (en) * 2002-03-13 2003-09-18 Heartland Rig International, Llc Arrangement for self-elevating drilling rig
US6994171B2 (en) * 2004-01-28 2006-02-07 Helmerich & Payne, Inc. Two section mast with self-aligning connections
US20090188677A1 (en) * 2008-01-30 2009-07-30 Process Manufacturing Corp. Small footprint drilling rig
US20100150660A1 (en) * 2007-03-12 2010-06-17 Nadarajah Nagendran C Offshore oil production platform
US7765749B2 (en) * 2003-04-25 2010-08-03 National Oilwell, L.P. Fast moving drilling rig
US20110072737A1 (en) * 2009-09-28 2011-03-31 International Drilling Equipment Company, Llc Portable drilling rig apparatus and assembly method
US20110114386A1 (en) * 2009-11-18 2011-05-19 National Oilwell Varco, L.P. Split Sub-basement Drill Rig
US8468753B2 (en) * 2008-02-29 2013-06-25 National Oilwell Varco L.P. Drilling rigs and erection methods
US8516751B2 (en) * 2008-05-15 2013-08-27 National Oilwell Varco L.P. Mobile drilling rig
US8549815B2 (en) * 2008-02-29 2013-10-08 National Oilwell Varco L.P. Drilling rig masts and methods of assembly and erecting masts
US8555564B2 (en) * 2009-06-26 2013-10-15 Integrated Drilling Equipment Company LLC Drilling rig assembly method and apparatus

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2781108A (en) * 1956-03-30 1957-02-12 Dresser Equipment Company Self-erecting derrick
US3333377A (en) * 1965-08-02 1967-08-01 Moore Corp Lee C Assembly of substructure-constructing components and method of constructing tall substructures
US4128229A (en) * 1977-11-17 1978-12-05 Hydra-Rig, Inc. Hoist apparatus with dual mast structure and compound power transmission system
US4269395A (en) * 1978-07-23 1981-05-26 Newman James L Portable hydraulic rig for performing workover, drilling and other operations on a well
US4290495A (en) * 1979-06-18 1981-09-22 Hydra-Rig, Inc. Portable workover rig with extendable mast substructure, platform mounted drawworks and adjustable wellhead anchor
US4587778A (en) * 1984-10-05 1986-05-13 Lee C. Moore Corporation Method and apparatus for erecting a drilling rig mast
SU1461858A1 (ru) * 1987-03-16 1989-02-28 Предприятие П/Я А-3661 Основание буровой установки
US4837992A (en) * 1987-10-13 1989-06-13 Branham Industries, Inc. Folded/telescoped drill rig mast for limited space platform
FR2760474B1 (fr) * 1997-03-07 1999-05-28 Technip Geoproduction Procede d'assemblage de troncons de jambes de support d'une plate-forme petroliere
US6045297A (en) * 1998-09-24 2000-04-04 Voorhees; Ronald J. Method and apparatus for drilling rig construction and mobilization
US6412576B1 (en) * 1999-10-16 2002-07-02 William J. Meiners Methods and apparatus for subterranean drilling utilizing a top drive
US6634436B1 (en) 2000-04-06 2003-10-21 National Oilwell, L.P. Mobile land drilling apparatus and method
US6581525B2 (en) * 2001-05-09 2003-06-24 Columbia Trailer Co., Inc. Method and apparatus for transporting and steering a load
US7584809B1 (en) * 2004-11-05 2009-09-08 Eagle Rock Manufacruting, Llc Mobile transport rig with four axels
US7828087B2 (en) * 2005-08-16 2010-11-09 Theodore Chen Vora Rocket rig drilling apparatus
WO2009002189A1 (en) * 2007-06-26 2008-12-31 Nordrill As Drilling tower device and drilling machine system
US20090000218A1 (en) 2007-06-28 2009-01-01 Douglas Wayne Lee Land rig
US8047303B2 (en) 2008-02-29 2011-11-01 National Oilwell Varco L.P. Drilling rig drawworks installation
RU81516U1 (ru) * 2008-10-13 2009-03-20 Закрытое акционерное общество "Уралмаш-буровое оборудование" (ЗАО "Уралмаш-буровое оборудование") Мобильная буровая установка для кустового бурения скважин (варианты)
CN102395745B (zh) 2009-05-13 2015-07-22 国民油井华高有限合伙公司 钻机桅杆抬升系统和方法
US20110214919A1 (en) * 2010-03-05 2011-09-08 Mcclung Iii Guy L Dual top drive systems and methods
RU96904U1 (ru) * 2010-03-11 2010-08-20 Закрытое акционерное общество "УРБО" (ЗАО "УРБО") Вышечно-лебедочный блок буровой установки
KR101304195B1 (ko) 2011-06-24 2013-09-05 주식회사 하이딥 향상된 노이즈 필터링 특성을 갖는 정전 용량 센서, 정전 용량 센서의 노이즈 필터링 방법 및 컴퓨터 판독 가능한 기록 매체

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3228151A (en) * 1962-02-15 1966-01-11 Moore Corp Lee C Drilling apparatus for deep oil wells
US3327997A (en) * 1965-02-16 1967-06-27 Zetco Engineering And Tool Com Sensing apparatus
US3828513A (en) * 1971-02-11 1974-08-13 Research Corp Method of erecting a multi-story building and apparatus therefor
US3922825A (en) * 1973-04-20 1975-12-02 Dresser Ind System for erecting an oil well derrick
US3942593A (en) * 1973-10-17 1976-03-09 Cabot Corporation Drill rig apparatus
US4375241A (en) * 1979-04-11 1983-03-01 Union Industrielle Et D'entreprise Drilling installation, more specifically for oil-drilling operations
US4831795A (en) * 1985-07-10 1989-05-23 Sorokan Ronald S Drilling derrick assembly
US20030172599A1 (en) * 2002-03-13 2003-09-18 Heartland Rig International, Llc Arrangement for self-elevating drilling rig
US7765749B2 (en) * 2003-04-25 2010-08-03 National Oilwell, L.P. Fast moving drilling rig
US6994171B2 (en) * 2004-01-28 2006-02-07 Helmerich & Payne, Inc. Two section mast with self-aligning connections
US20100150660A1 (en) * 2007-03-12 2010-06-17 Nadarajah Nagendran C Offshore oil production platform
US20090188677A1 (en) * 2008-01-30 2009-07-30 Process Manufacturing Corp. Small footprint drilling rig
US8468753B2 (en) * 2008-02-29 2013-06-25 National Oilwell Varco L.P. Drilling rigs and erection methods
US8549815B2 (en) * 2008-02-29 2013-10-08 National Oilwell Varco L.P. Drilling rig masts and methods of assembly and erecting masts
US8516751B2 (en) * 2008-05-15 2013-08-27 National Oilwell Varco L.P. Mobile drilling rig
US8555564B2 (en) * 2009-06-26 2013-10-15 Integrated Drilling Equipment Company LLC Drilling rig assembly method and apparatus
US20110072737A1 (en) * 2009-09-28 2011-03-31 International Drilling Equipment Company, Llc Portable drilling rig apparatus and assembly method
US20110114386A1 (en) * 2009-11-18 2011-05-19 National Oilwell Varco, L.P. Split Sub-basement Drill Rig
US8556003B2 (en) * 2009-11-18 2013-10-15 National Oilwell Varco, L.P. Split sub-basement drill rig

Cited By (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9926719B2 (en) 2013-02-13 2018-03-27 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
US10214937B2 (en) 2013-02-13 2019-02-26 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
US10221631B2 (en) 2013-02-13 2019-03-05 Nabors Drilling Technologies Usa, Inc. Side saddle substructure
US9810027B2 (en) * 2013-02-13 2017-11-07 Nabors Drilling Usa, Lp Side saddle substructure
US10094137B2 (en) 2013-02-13 2018-10-09 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
US10094176B2 (en) 2013-02-13 2018-10-09 Nabors Drilling Technologies Usa, Inc. Side saddle substructure
US10280692B2 (en) 2013-02-13 2019-05-07 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
US20140224543A1 (en) * 2013-02-13 2014-08-14 Nabors Drilling USA Side Saddle Substructure
US10407938B2 (en) 2013-02-13 2019-09-10 Nabors Drilling Technologies Usa, Inc. Slingshot side saddle substructure
US8935901B2 (en) * 2013-03-13 2015-01-20 Nabors Drilling International Limited Self-elevating mast employing draw works
US20150107165A1 (en) * 2013-03-13 2015-04-23 Nabors Drilling International Limited Self-elevating mast employing draw works
US9279267B2 (en) * 2013-03-13 2016-03-08 Nabors Drilling International Limited Self-elevating mast employing draw works
US9518429B2 (en) 2013-10-31 2016-12-13 Independence Contract Drilling, Inc. Walking drilling rig
US20150143759A1 (en) * 2013-11-25 2015-05-28 Unit Corporation Box-on-box self-stacking substructure for a drill rig
US9488014B2 (en) * 2013-11-25 2016-11-08 Unit Corporation Box-on-box self-stacking substructure for a drill rig
US9556636B2 (en) * 2014-06-27 2017-01-31 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
US10577819B2 (en) 2014-06-27 2020-03-03 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
US10704286B2 (en) * 2014-06-27 2020-07-07 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
US9677298B2 (en) 2014-07-14 2017-06-13 Dreco Energy Services Ulc Mobile drilling rig
US20160102508A1 (en) * 2014-10-09 2016-04-14 Nabors Drilling International Limited Automated bootstrap quad-mast rig
WO2017081504A1 (es) * 2015-11-09 2017-05-18 Total Petroleum Services S.A.S. Torre mástil portátil para intervención y mantenimiento de pozos, su proceso de fabricación y montaje
US9988807B2 (en) * 2016-02-24 2018-06-05 National Oilwell Varco, L.P. Drilling rig with self-elevating drill floor
US10465377B2 (en) 2016-02-24 2019-11-05 National Oilwell Varco, L.P. Drilling rig with self-elevating drill floor
US10822924B2 (en) 2016-03-07 2020-11-03 National Oilwell Varco, L.P. Multi-well bop cellar trailer
US11549337B2 (en) 2016-03-07 2023-01-10 Nov Canada Ulc Multi-well bop cellar trailer
US9970211B2 (en) * 2016-05-02 2018-05-15 Dreco Energy Services Ulc Guide rails for mobile drilling rig
US10214936B2 (en) 2016-06-07 2019-02-26 Nabors Drilling Technologies Usa, Inc. Side saddle slingshot drilling rig
US10648240B2 (en) 2016-07-13 2020-05-12 Nabors Drilling Technologies Usa, Inc. Mast and substructure
US10584541B2 (en) 2016-07-28 2020-03-10 Nabors Drilling Technologies Usa, Inc. Pipe handling apparatus
US10526048B2 (en) * 2016-08-30 2020-01-07 Solar Sailor Pty Ltd. Mast base assembly
US11021186B2 (en) 2016-10-05 2021-06-01 Dreco Energy Services Ulc Movable rig and steering system
US10704337B2 (en) 2016-11-07 2020-07-07 Nabors Drilling Technologies Usa, Inc. Side-saddle cantilever mast
US10428592B2 (en) 2017-01-16 2019-10-01 Nabors Drilling Technologies Usa, Inc. Rig layout system
CN107989596A (zh) * 2017-04-11 2018-05-04 中国石油天然气股份有限公司 一种模拟井筒装置及油气水三相流模拟实验系统
CN107060480A (zh) * 2017-06-15 2017-08-18 国网山东省电力公司烟台供电公司 一种电杆架设杆顶物料传递装置
CN107237543A (zh) * 2017-06-15 2017-10-10 国网山东省电力公司烟台供电公司 一种电杆架设杆顶物料传递装置及锁紧结构一
US10487592B1 (en) 2018-05-03 2019-11-26 Nabors Drilling Technologies Usa, Inc. Multi-direction traversable drilling rig
US10214970B1 (en) 2018-06-12 2019-02-26 Nabors Drilling Technologies Usa, Inc. Post and non-elongated substructure drilling rig
US11035178B2 (en) * 2018-07-13 2021-06-15 James C. Evans Apparatus and methods for moving workover rigs
US10837238B2 (en) 2018-07-19 2020-11-17 Nabors Drilling Technologies Usa, Inc. Side saddle slingshot continuous motion rig
US11454067B2 (en) 2018-08-06 2022-09-27 Nov Canada Ulc Drill floor support structures
CN109488103A (zh) * 2018-11-08 2019-03-19 中国化学工程第三建设有限公司 大型全钢结构间冷塔液压提升施工方法
US11603723B2 (en) 2019-08-30 2023-03-14 Nov Canada Ulc Cuttings processing unit
CN112744667A (zh) * 2019-10-31 2021-05-04 中石化石油工程技术服务有限公司 海洋平台应急救生系统
US10907376B1 (en) * 2019-12-18 2021-02-02 Anthony J. Bonilla Self-building tower
CN111583414A (zh) * 2020-04-15 2020-08-25 西安石油大学 一种油气井动态井控vr系统的搭建方法
CN111734203A (zh) * 2020-06-24 2020-10-02 国网四川雅安电力(集团)股份有限公司 一种内附式塔上分段组立抢修塔装置
US11873685B2 (en) 2020-09-01 2024-01-16 Nabors Drilling Technologies Usa, Inc. Side saddle traversable drilling rig
CN112030831A (zh) * 2020-09-11 2020-12-04 李卫兵 一种路基混凝土护栏施工设备
US12054993B2 (en) 2021-03-16 2024-08-06 Nabors Drilling Technologies Usa, Inc. Side saddle rig design with retractable top drive
CN118635945A (zh) * 2024-08-14 2024-09-13 成都迈特航空制造有限公司 一种航空螺母管接头的钻孔装置及其钻孔方法

Also Published As

Publication number Publication date
WO2012162800A1 (en) 2012-12-06
US10094136B2 (en) 2018-10-09
US20160369523A1 (en) 2016-12-22
US9458675B2 (en) 2016-10-04
RU2589783C2 (ru) 2016-07-10
AU2012262632A1 (en) 2014-01-09
EP2715034A4 (de) 2015-09-30
RU2013157537A (ru) 2015-07-20
CA2834709C (en) 2018-07-17
CA2834709A1 (en) 2012-12-06
EP2715034B1 (de) 2018-07-18
US20150047290A1 (en) 2015-02-19
EP2715034A1 (de) 2014-04-09
PL2715034T3 (pl) 2019-03-29
AU2012262632B2 (en) 2016-07-28

Similar Documents

Publication Publication Date Title
US10094136B2 (en) Drilling rig system with self-elevating drill floor
US9677298B2 (en) Mobile drilling rig
US9556676B2 (en) Collapsible substructure for a mobile drilling rig
US8181698B2 (en) Multi-function multi-hole drilling rig
EP2324186B1 (de) Multifunktionsbohrgestell mit mehreren öffnungen
RU2745807C2 (ru) Складывающаяся буровая установка с боковым расположением приемных мостков
US9464488B2 (en) Performing simultaneous operations on multiple wellbore locations using a single mobile drilling rig
CA2572663C (en) Automated system for positioning and supporting the work platform of a mobile workover and well-servicing rig
RU2483186C2 (ru) Способ для облегчения монтажа буровой установки
US10407937B2 (en) Methods for elevating drilling rig components with a strand jack
US20030172599A1 (en) Arrangement for self-elevating drilling rig
WO2016025521A2 (en) Drilling rig and method of use
US4595062A (en) Well casing jack mechanism

Legal Events

Date Code Title Description
AS Assignment

Owner name: NATIONAL OILWELL VARCO, L.P., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KONDUC, KAMERON WAYNE;BURLET, DONALD LEONARD;SIGNING DATES FROM 20110622 TO 20110630;REEL/FRAME:028408/0989

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION