US20120291380A1 US13/475,705 US201213475705A US2012291380A1 US 20120291380 A1 US20120291380 A1 US 20120291380A1 US 201213475705 A US201213475705 A US 201213475705A US 2012291380 A1 US2012291380 A1 US 2012291380A1
Authority
US
United States
Prior art keywords
grout
viscosity
slurry
trough
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/475,705
Other languages
English (en)
Inventor
Norman Tooman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13/475,705 priority Critical patent/US20120291380A1/en
Publication of US20120291380A1 publication Critical patent/US20120291380A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Definitions

  • This invention relates to concrete foundations set within excavations or bore holes which are installed to support wind turbines. More particularly, this invention comprises an apparatus and method for configuring, installing, and setting the anchor bolts for a cylindrical foundation for a wind turbine.
  • U.S. Pat. Nos. 5,586,417 and 5,826,387 both by Henderson, disclose a foundation “which can be poured-on-site monolithically and is of cylindrical construction with many post-tensioned anchor bolts which maintain the poured portion of the foundation under heavy compression, even during periods when the foundation may be subject to high overturning moment.”
  • Henderson's foundation is preferably in the shape of a cylinder, having an outer boundary shell and an inner boundary shell each formed of corrugated metal pipe. Between the outer boundary shell and the inner boundary shell elongated high strength steel bolts extend vertically up through concrete from a peripheral anchor plate, called an inbed plate, located near the bottom of the cylinder.
  • the bolts extend upwardly from the inbed plate to a connecting plate or flange above the ground surface.
  • the bolts extend through hollow tubes to prevent adhesion of the concrete to the bolts and thus allowing the tensioning of the bolts to the necessary pre-load.
  • the foundation typically uses no rebar reinforcing steel. This design uses the mechanical interaction with the earth to prevent over turning instead of the mass of the foundation typically used by other foundations for tower structures.
  • FIG. 1 schematically shows an embodiment of the Henderson foundation.
  • the “hollow tubes” of the known foundation are typically elongated plastic tubes which encase the bolts substantially through the entire vertical extent of the concrete and allow the bolts to be tensioned after the concrete has hardened and cured, thereby post-tensioning the entire concrete foundation.
  • the elongated bolts can be wrapped in plastic tape, or coated with a suitable lubrication, which will allow the bolts to stretch under tension over the entire operating length of the bolt through the vertical extent of the concrete.
  • Henderson further discloses the post-stressing of the concrete in great compression by tightening the high strength bolts to provide heavy tension between a heavy top flange and the inbed plate at the bottom of the foundation, thereby placing the entire foundation under high unit compression loading.
  • the bolts are tightened so as to exceed the maximum expected overturning force of the turbine tower on the foundation. Therefore, the entire foundation withstands various loads with the concrete always in compression and the bolts always in static tension.
  • the tensioning bolts in the Henderson foundation are preferably in side-by-side pairs, the pairs extending radially from the center of the foundation, forming an inner ring of bolts and an outer ring of bolts as shown in FIG. 2 .
  • the inner ring of bolts define a circle having a slightly shorter diameter than a circle defined by an outer ring of bolts.
  • the bolt pattern is, of course, determined by the bolt pattern on the mounting flange of the turbine tower to be installed on the foundation. A large number of bolts is typically used for this type of foundation. Typically seventy tensioning bolts are used in the inner ring and seventy tensioning bolts in the outer ring for a total of one hundred forty.
  • the lower ends of the bolts are anchored to the inbed plate at the bottom of the foundation which may be constructed of several circumferentially butted and joined sections.
  • a bore hole is drilled or excavated and an outer boundary shell of corrugated metal pipe (“CMP”) is set within the hole.
  • CMP corrugated metal pipe
  • Bolt bundles are lowered into the borehole.
  • the bolt bundles typically comprise about thirty bolts, with each bolt weighing up to two hundred pounds per bolt.
  • Workers are lowered into the CMP lined bore hole. Working from the bottom of the bore hole, the workers lift and/or position each individual bolt so it can be inserted into a template at the surface, which is suspended above the bore hole by a crane having a capacity of approximately 100 tons.
  • a nut made up onto the threads extending above the template, such that the weight of each bolt is suspended by the template.
  • FIG. 3 shows such an assembly suspended by a lifting frame which is connected to the template. The entire assembly is then lowered back into the bore hole and an inner boundary shell of CMP is lowered into the bore hole such that the bolts are extending upwardly through an annulus formed by the outer boundary shell and the inner boundary shell.
  • Concrete is poured into this annulus around the upwardly extending bolts, with the template at the top of the bolts used to form a “grout trough” in the upper surface of the concrete.
  • the upwardly facing ends of the bolts extend into the grout trough and, following the hardening of the concrete, the grout trough is filled with a high strength grout upon which the tower flange is placed.
  • flange 14 of the turbine tower 10 is set upon the anchor bolts 16 . Because flange 14 must be set nearly perfectly level, shims 5 (as shown in FIG. 5 ) are placed in the grout trough and the shims and flange leveled through laser leveling techniques. Once the shims are leveled, the high strength grout is poured into the grout trough and the flange 14 set down on the anchor bolts 16 and the grout allowed to set up.
  • the sleeve typically terminates at approximately the top of the concrete foundation, with the bare metal of the anchor bolt extending above the sleeve, where the bolts extend through the flange and have a nut and bolt cap installed on the top side of the flange.
  • the bolt holes in the circular template are sized to accommodate the bolt diameter, but not the diameter of the PVC sleeve, so the tops of the bolt sleeves will generally be flush with the bottom of the grout trough formed by the circular template.
  • the tower flange is set on the grout before the grout sets so that the tower base may be leveled. It is hoped that the foam sleeve will prevent grout from adhering to the body of the bolt, such that when the grout fully cures the bolt may be tensioned and slide through the foam sleeve without damage to the grout. However, in reality the foam sleeve is likely so deformed by the flange of the tower base that the bolts will not slide freely through the sleeves once the grout cures.
  • a low viscosity grout slurry is used as disclosed herein with the commonly used bolt sleeves, the flow properties of the slurry will cause it to flow into the annulus created by the PVC sleeve and the anchor bolt. Because of this problem, the use of low viscosity grouts, including epoxy grouts, has not been practical. However, the low viscosity grouts would otherwise be preferred because of the self-leveling which may be achieved with such a material. In particular, the use of a self-leveling grout slurry would eliminate the need for leveling shims and allow the grout to be poured and adequately cure before setting the flange onto the grout, as opposed to the current practice of setting and leveling the tower flange before the grout cures.
  • the current practice requires the service of a high capacity crane for the initial setting of the tower flange and subsequently for the assembly of the complete turbine.
  • the crane can be used more efficiently with less rigging up and rigging down time at each turbine tower installation.
  • the annulus between the bolt and PVC is sealed, as illustrated in FIGS. 4 and 5 .
  • the annulus between the bolt and the PVC sleeve is open thereby providing a pathway for water and other fluids to enter the annulus and be trapped between the PVC sleeve and the metallic bolt, forming a corrosion cell. Because of this opening, steps are usually taken to protect the bolt from corrosive attack and/or to seal the sleeve-bolt annulus during installation.
  • the currently practiced installation procedure aggravates the situation, because, as described above, the procedure typically includes pouring water in the grout trough to allow the grout to cure. This practice allows to water to accumulate at the top of the PVC sleeve, and potentially migrate into the sleeve-bolt annulus.
  • the initial attempt at solving the anchor bolt corrosion problem was to paint the anchor bolts along the entire length.
  • this solution is labor intensive and does not prevent liquid accumulation around the anchors.
  • this protection method requires that the anchors be repainted periodically, as well as after re-tensioning the anchor if required in the particular application.
  • the currently practiced method of protecting the anchor bolts is to seal the annulus between the top of the PVC sleeve and the bolt with a sealant, such as a silicon gel.
  • the current practice also includes placing foam rings 32 or other material around the portion of the bolt extending above the PVC sleeve, so as to prevent adhesion of the grout to the bolt and to block the migration of water into the sleeve-bolt annulus.
  • foam cylinders with longitudinal slits are placed around the bolts, with duct tape wrapped around each cylinder, and the cylinder pushed downwardly into contact with the top of the PVC sleeve.
  • the cylinders are greatly deformed. It is non-unlikely that when the anchor bolts are tensioned, the bolt does not slide through the foam cylinder, but that the deformed foam cylinder moves within the grout, potentially damaging the integrity of the grout.
  • the PVC sleeves because of the outside diameter, displace, in totality, a significant volume of concrete in the foundation, thereby reducing the overall compressive strength of the foundation.
  • the present application is directed toward methods and apparatus which allow the utilization of a slurry of low viscosity, self-leveling grout, which results in a level surface for installing the base flange of a wind turbine tower.
  • the self-leveling grout is placed within the foundation grout trough as an initial slurry having a viscosity at ambient temperature approximately the same as the viscosity of known grout slurries utilized in turbine foundations.
  • elevated temperature is applied to the grout slurry, which lowers the viscosity of the slurry such that the slurry becomes self-leveling and the top surface assumes a nearly perfectly level surface. Additional elevated temperature is applied which initiates the curing of the grout to the required compressive strength for supporting the turbine tower.
  • a cover structure may be utilized in combination with the low viscosity grout slurry, where the cover structure may provide the heat transfer required to trigger the changes in the rheological properties of the grout slurry.
  • the cover structure also provides protection from environmental conditions which might disturb the grout as is cures, such as rain, wind, hail, etc., and potentially disrupt the top surface of the grout.
  • the present invention comprises anchor bolt packages comprising a sheath or sleeve which extends above the grout trough and, if desired, may partially extend inside the base flange of the wind turbine base.
  • the sleeve may be manufactured from polypropylene, polyethylene or other materials having satisfactory mechanical properties, primarily that the material be capable of withstanding sufficient plastic deformation to cause the material to conform to the shape of the threads of the anchor bolts without failing.
  • a tool such as the swaging tool disclosed in the inventor's U.S. Pat. No. 7,975,519, may be used to crimp the polypropylene sleeve along the threads of the anchor bolt.
  • the use of the polypropylene sleeve and the swaging of the sleeve onto a portion of the bolt provides a bolt package (i.e. a bolt/sleeve combination) which has an overall diameter less than the overall diameter of the currently utilized bolt-PVC sleeve combination.
  • This reduced diameter allows the bolt and crimped sleeve to extend through the bolt holes of the circular template, and into the bolt holes of the tower flange, which under the known apparatus and method, only a sleeveless bolt would extend.
  • the crimped sleeve extends above the top of the grout trough, the encased bolts will not be exposed to water placed within the grout trough, or to a low viscosity grout slurry.
  • the top of the crimped sleeve extends above the level of the grout, the crimped sleeve prevents adhesion of the grout to the bolt, thereby allowing the bolt to move relative to the grout.
  • a method of utilizing a low viscosity grout may comprise the following steps. Once the cement foundation has set, the foundation surface is blown free of any loose material.
  • the components of the epoxy grout comprising a base component and a catalyst component, are mixed together and pumped into the grout trough.
  • the base component and catalyst are mixed in a sealed mixer which prevents entrainment of air bubbles in the grout slurry.
  • the rheological properties of the low viscosity grout are such that when initially catalyzed and at ambient temperature, the viscosity may be generally in the range of viscosities normally observed for grout slurries as the slurry is pumped into the grout trough.
  • the cover structure is erected over the grout trough, covering all of the pumped in grout slurry.
  • the cover structure will typically be constructed in arc length segments which are joined together to form a circular structure.
  • the cover structure has a top surface and sides which, when joined together, cover the top of the grout trough and enclose it on the outward side of the grout trough and the inward side of the grout trough.
  • the cover structure comprises heat generating means, such as resistance heat elements, heat lamps or burners. Utilizing the heat generating means, the temperature under the tent structure is raised to 120 degrees Fahrenheit and held at this temperature for approximately two hours.
  • the grout remains ungelled and the viscosity of the grout slurry decreases to approximately 100 centipoise. At this viscosity, the grout becomes self-leveling such that the top surface of the grout will be sufficiently close to being perfectly level. In addition, with a grout of this low viscosity for this period of time, the grout will be able to penetrate the concrete foundation.
  • the temperature is brought up to 180 degrees Fahrenheit and held at the elevated temperature for two hours, during which time the epoxy grout gels and hardens. The heat is thereafter turned off and the grout allowed to cool for twenty-four hours, with the protective cover, or other protective cover, maintained over the foundation for protection.
  • An acceptable grout formulation is an epoxy grout manufactured by the Polyset Company of Mechanicville, N.Y.
  • the advantage of the above procedure is that all of the turbine components can be installed with a single crane set, thereby speeding up the erection of the turbine while reducing the cost of equipment and manpower.
  • utilization of the disclosed procedure allows the foundation bolts to be shortened by approximately eight inches each, which saves approximately $400 per installation.
  • FIG. 1 shows the foundation of Henderson following installation of the anchor bolts.
  • FIG. 2 shows a completed foundation, showing an inner ring of anchor bolts and an outer ring of anchor bolts with a tower base attached.
  • FIG. 3 shows the prior art method of placing the anchor bolts, where all of the anchor bolts are lowered into the borehole with the prior art grout template.
  • FIG. 4 shows front view of a portion of a tower foundation, with the tower base flange begin lowered onto the anchor bolts.
  • FIG. 5 shows a portion of a grout trough, prior to the lowering of the tower base, showing the existing method of protecting the bolt-sleeve annulus with foam sleeves and utilizing shims for leveling the tower flange.
  • FIG. 6 shows a cross section of a portion of the base flange, grout, anchor bolt and PVC sleeve of a prior art foundation.
  • FIG. 7 shows a cross section of a portion of the base flange, grout, anchor bolt and sleeve according to the present invention.
  • FIG. 8 shows a portion of an embodiment of an anchor bolt according to present invention showing how the sleeve is swaged around some of the threads of the anchor bolt.
  • FIG. 9 shows an embodiment of a cover structure which may be used to apply heat to the grout mixture and protective the uncured grout.
  • FIG. 10 shows an embodiment of a cover structure utilizing a control unit for applying heat.
  • FIG. 11 shows a section of the cover structure shown in FIGS. 9 and 10 , showing a heating element which may be utilized.
  • FIG. 12A shows a sectioned side view of the cover structure shown in FIGS. 9 and 10 .
  • FIG. 12B shows a sectioned front view of the cover structure shown in FIGS. 9 and 10 .
  • FIG. 1 depicts an embodiment of a known foundation 100 utilized for installation of a relatively tall vertical structure, such as a wind turbine. It is to be appreciated that while the disclosed method and apparatus may be utilized to obtain a foundation 100 such as that depicted in FIG. 1 , the procedure for obtaining the foundation is entirely different from the known methods.
  • Foundation 100 comprises a bore hole 120 , an outer boundary shell 140 and an inner boundary shell 160 , each typically fashioned of corrugated metal pipe (“CMP”), set within the bore hole hole.
  • CMP corrugated metal pipe
  • An inner ring 180 of bolts 16 and an outer ring 200 of bolts 16 are disposed within the annulus formed between the outer boundary shell 140 and the inner boundary shell 160 , with the bolts 16 anchored at the lower end of the bore hole 120 to an inbed plate 220 .
  • the annulus between the outer boundary shell 140 and the inner boundary shell 160 is filled with concrete 240 and the portion of the bore hole 120 inside the inner boundary shell 160 typically filled with loosely compacted soil 260 .
  • FIG. 2 generally depicts the base 10 of a wind turbine set upon a foundation 12 .
  • Base 10 comprises a flange 14 , by which the base is attached to foundation 12 with anchor bolts 16 .
  • the anchor bolts 16 may be placed in side-by-side pairs, the pairs extending radially from the center of the foundation 12 forming an inner ring of bolts and an outer ring of bolts.
  • the bolt pattern is, of course, determined by the bolt pattern on the mounting flange 14 .
  • Each anchor bolt 16 has a corresponding nut 18 which is used to secure the base 10 , and to apply tension to the bolt.
  • the exposed portion of each bolt 16 is usually protected with a bolt cap 19 .
  • FIG. 3 depicts a bolt assembly 20 comprising a plurality of anchor bolts 16 being lifted in preparation for being placed within a relatively deep excavation prepared for construction of the foundation 12 .
  • the anchor bolts 16 typically used for wind turbines are approximately thirty feet in length, and usually have outside diameters of 11 ⁇ 4 inch or 13 ⁇ 8 inch.
  • Each anchor bolt 16 is partially enclosed within a “hollow tube” or sleeve 22 .
  • the sleeve is typically an elongated plastic tube fabricated from polyvinyl chloride (“PVC”) which encases the bolt 16 substantially through the entire vertical extent of the concrete and allows the bolt to be tensioned after the concrete has hardened and cured, thereby post-tensioning the entire concrete foundation.
  • PVC polyvinyl chloride
  • the bolts 16 comprising bolt assembly 20 are secured at the end by circular template 23 , which is attached to a lifting assembly 24 and lifted by crane 26 .
  • FIG. 5 shows a close view of a portion of the grout trough 28 before grout has been poured or base flange 14 has been placed.
  • Grout trough 28 is formed as follows: when the concrete is poured, circular template 23 , which remains attached to lifting assembly 24 and held in place by crane 26 , holds the bolt assembly 20 in place. Concrete is poured up around circular template 23 , thereby forming an inner ring groove in the top of the foundation 12 known as the grout trough 28 . Before grout 30 is placed in grout trough 28 , a sealing member 32 comprising foam, plastic or other material, is placed around each bolt 16 .
  • Sealing member 32 is typically cylindrical in shape, having a circular opening and longitudinal slit cut through from the outside edge to the circular opening so the sealing member may be placed around each bolt 16 .
  • the sealing member 32 often has duct tape wrapped around it to secure it to the bolt 16 .
  • a leveling block 5 which is used, in combination with a number of other leveling blocks contained within the grout trough, to properly level the base flange 14 . It is to be appreciated that the placement of leveling block 5 immediately adjacent to sealing members 32 , which is not an uncommon occurrence in the prior art installations, inhibits the uniform deformation of the sealing members as the base flange 14 is lowered into the grout trough 28 , resulting in the non-uniform deformation discussed below.
  • FIG. 4 depicts a portion of a prior art foundation 12 after the grout has been poured and cured, but before flange 14 has been set upon the foundation and nuts 18 made up onto bolts 16 . As shown in FIG. 5 , flange 14 will be set on top of the grout 30 contained within grout trough 28 .
  • FIG. 6 shows a cross section of a portion of the base flange 14 , grout layer 30 , and sleeve 22 of a prior art anchor bolt installation for a wind turbine, where sleeve 22 contains bolt 16 .
  • the top of sleeve 22 is generally flush with the bottom 34 of grout trough 28 . It is to be appreciated that before grout 30 is placed within grout trough 28 , the top of sleeve 22 is exposed to whatever liquids may enter the grout trough, such as water which may be placed in the grout trough to provide for hydration of the grout.
  • An annulus 36 is formed between bolt 16 and sleeve 22 , which provides a potential path for water or other liquids, such as low viscosity grout, to travel along the length of bolt 16 .
  • sealing member 32 is substantially deformed once engaged by base flange 14 .
  • FIG. 4 shows an idealized view of the deformed sealing member 32 , in which the deformation has been uniform. In actuality, it is expected that the deformation will not be uniform because, for example, of obstructions which may inhibit uniform deformation such as the leveling block 5 shown in FIG. 5 . It is also to be appreciated that the deformed sealing member 32 displaces more volume than the non-deformed sealing member.
  • each bolt requires the sealing member, a typical installation may have ninety-six of the deformed sealing members 32 in the grout trough 28 , thereby reducing the overall volume of grout which may be placed, resulting in a final grout pack with less strength than one having less grout displacement. It is also to be appreciated that once the grout 30 sufficiently cures, tension will be applied to each anchor bolt 16 by the tightening of a nut at the top of base flange 14 , causing the bolt to move relative to the grout. Ideally, sealing member 32 would remain stationary, allowing bolt 16 to slide through the sealing member 32 . However, deformation of sealing member 32 reduces the ease with which anchor bolt 16 will slide through the sealing member, potentially causing sealing member 32 to also move, potentially damaging the surrounding grout 30 .
  • FIG. 7 shows a cross section of a portion of the base flange 14 , grout 30 ′, and sleeve 38 which results by application of the prevent invention.
  • the crimped sleeve 38 does not terminate at the bottom 34 of the grout trough 28 as with the prior art structure, but rather extends upwardly through and past the space in which low viscosity grout 30 ′ will be placed.
  • the crimped sleeve 38 will partially penetrate the bolt hole 13 of base flange 14 once the base flange is placed over the upwardly extending bolts 16 ′ as shown in FIG. 7 .
  • crimped sleeve 38 as the protective sleeve for bolt 16 ′ is a substantial departure from the present use of PVC sleeve 22 , and allows the use of low viscosity grout 30 ′ according to the invention described herein. It is to be appreciated that the term “low viscosity grout” is utilized to describe the flow characteristics of the grout slurry during a portion of the construction phase of the foundation. Once the “low viscosity grout” cures, it will have comparable compressive strength to the conventional cured grout and suitable for the service required for a wind turbine foundation.
  • the critical distinction between the crimped sleeve 38 shown in FIG. 7 from the sleeve 22 shown in FIG. 6 is that the wall thickness of the crimped sleeve is substantially reduced, and the tolerance between the internal diameter of the crimped sleeve and the outer diameter of the bolt threads is substantially reduced, resulting in an external diameter of the crimped sleeve which is smaller than possible with the thicker-walled PVC sleeves. This reduced diameter allows the crimped sleeves 38 to extend into the bolt holes 13 of the base flange 14 .
  • a crimped sleeve comprising polypropylene sleeves has a closer tolerance than the available PVC, such that the crimped sleeves may have a clearance of 20 thousands of an inch between the internal diameter of the crimped sleeve and the outer diameter of the anchor bolt threads.
  • this smaller outside diameter of the crimped sleeve 38 allows a portion of the sleeve to be disposed within the holes 13 in the base flange 14 .
  • the known installations utilize PVC sleeves 22 which terminate at the bottom 34 of the grout trough 28 as shown in FIG. 5 , rather than extending into the base flange 14 of the wind turbine because the external diameters of commonly available PVC sleeves 22 are too large to be inserted within the holes of the flange.
  • the top of the crimped sleeve 38 is “swaged” such that a portion of the sleeve conforms to the threads of the anchor bolt 16 ′.
  • the swaging serves several purposes. First, the swaging retains the crimped sleeve 38 on the anchor bolt 16 ′ such that nuts are not required to retain the sleeve on the anchor bolt during transportation. This characteristic allows the anchor bolts 16 ′ to be shipped without nuts, which reduces manpower required for placing the nuts on the bolts for transportation and removing of the bolts upon arrival.
  • the swaging further inhibits the flow of liquids into the annulus between the crimped sleeve 38 and the anchor bolt 16 ′, although it is to be appreciated that the exposure of the sleeve end to liquid is reduced or eliminated, because of the capability of placing the top of the crimped sleeve 38 above the grout trough 28 and partially within the base flange 14 once the tower base is installed. It has been found that swaging approximately two inches of the top of the crimped sleeve 38 forms a sufficient length of “crimps” 17 (i.e., portions of the sleeve 38 which conform to the shape of individual threads 21 ) to form an interference fit which adequately inhibits liquid penetration into the sleeve-bolt annulus.
  • sleeves 38 comprising polypropylene, or similar materials, have the desired mechanical properties for swaging the sleeve material such that it conforms to the shape of the threads.
  • the mechanical properties of the polypropylene are such that the material has a “memory” and retains the crimps 17 once the swaging operation has been completed.
  • U.S. Pat. No. 7,975,519 discloses a swaging tool which may be utilized to swage the polypropylene sleeve 38 .
  • the mechanical properties of the sleeve material are such that upon tensioning of the anchor bolt 16 ′, the material will plastically deform and the crimps 17 will relax and allow relative movement of the anchor bolt with little resistance such that the anchor bolts 16 ′ may be properly preloaded.
  • FIGS. 9 through 12 show a cover structure 50 which may be utilized to apply heat to the slurry of the low viscosity grout 30 ′.
  • FIGS. 9 through 12 show a portion of the foundation after the anchor bolts 16 ′ have already been set within cement 240 and a slurry of the low viscosity grout 30 ′ is introduced into the grout trough 28 .
  • polypropylene sleeves 38 are not shown in these figures, but it should be understood that the anchor bolts 16 ′ are contained within the polypropylene sleeves as described above.
  • the cover structure may comprise a plurality of individual sections 52 .
  • the cover structure 50 comprises a plurality of apertures 54 which are sized to fit over the upwardly facing ends of anchor bolts 16 ′
  • the cover structure 50 may further comprise a fan 56 which evenly disperses heat throughout the cover structure.
  • FIG. 10 shows a cover structure 50 placed over the grout trough 28 after the slurry of low viscosity grout 30 ′ has been introduced into the trough.
  • FIG. 11 shows a bottom view of an individual section 52 of the cover structure 50 , with cover plate 62 removed.
  • the individual sections 52 may comprise heater elements 58 .
  • Heater elements 58 may be resistance-type heating elements which receive current from a controller 60 .
  • Controller 60 may be controlled with a programmable controller to provide current at particular magnitudes for pre-selected times to provide a desired temperature sequence for controlling the rheological properties of the low viscosity grout 30 ′.
  • the cover structure may further comprise a thermostat (not shown) so that the controller 60 may make temperature corrections to adjust the temperature within the cover structure 50 as necessary to achieve the desired rheological properties.
  • a method of utilizing a low viscosity grout may comprise the following steps. Once the cement foundation has set, with a grout trough 28 formed in the top surface of the concrete, the foundation surface is blown free of any loose material.
  • the components of the low viscosity grout 30 ′ comprising an epoxy base component and a catalyst component, are mixed together in a slurry and pumped into the grout trough.
  • the epoxy base component and catalyst are mixed in a sealed mixer which prevents entrainment of air bubbles in the grout slurry.
  • the rheological properties of the low viscosity grout are such that when initially catalyzed and at ambient temperature, the viscosity may be generally in the range of viscosities normally observed for grout slurries as the slurry is pumped into the grout trough.
  • a cover structure 50 is erected over the grout trough 28 , covering all of the pumped in grout.
  • the cover structure 50 will typically been constructed in arc length sections 52 which are joined together to form a continuous structure, such the circular structure shown in the figures.
  • the cover structure 50 has a top surface and sides which, when joined together, cover the top of the grout trough 28 and enclose it on the outward side of the grout trough and the inward side of the grout trough.
  • the cover structure comprises heat generating means, such as resistive heat elements 58 , heat lamps or burners.
  • the heat generating means is utilized to raise the temperature under the cover structure to approximately 120 degrees Fahrenheit. This temperature is held approximately constant for approximately two hours. At this elevated temperature, the slurry of low viscosity grout 30 ′ remains ungelled and the viscosity of the grout slurry decreases to approximately 100 centipoise. At this viscosity, the low viscosity grout slurry 30 ′ becomes self-leveling such that the top surface of the grout slurry will be sufficiently close to being perfectly level to provide a suitable landing surface for the tower flange 14 .
  • the temperature is brought up to approximately 180 degrees Fahrenheit and held at the elevated temperature for two hours, during which time the grout gels and hardens.
  • the heat is thereafter turned off and the grout allowed to cool for twenty-four hours, with the cover structure 50 remaining in place over the foundation for protection.
  • the cover structure 50 is removed from the foundation.
  • Foundation nuts 18 are made up on both the inside ring 180 of anchor bolts 16 ′ and outside ring 200 of anchor bolts, and equipment for placing the anchor bolts at the desired tension is put into position.
  • the tower base 10 is positioned on the anchor bolts 16 ′ with several nuts 18 installed to prevent bounce-off.
  • a half-inch bead of fast setting epoxy may be placed on the outside peripheral edge of the grout trough, while simultaneously a half-inch bead of fast setting epoxy is placed on the inside peripheral edge of the grout trough, to form an outer ring and inner ring of bedding epoxy.
  • This bedding epoxy is a very fast set and cure catalyzed epoxy with a five minute open time and 5,000 plus psi compressive strength in one hour. While not an essential element of the present invention, the bedding epoxy does allow the correction of any deviation in the tower flange 14 to insure 100 percent tangency to the cured grout, because tower base flanges are held to less than 0.020 deviation in the flange.
  • the tower base 10 is set down on the uncured bedding epoxy and nuts 18 are installed and run down on the anchor bolts 16 ′. After the midsection of the tower is installed, the bedding epoxy is cured to at least the compressive strength of the foundation concrete.
  • the anchor bolts 16 ′ are thereafter tensioned to the desired amount before the installation of the upper tower section.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Foundations (AREA)
US13/475,705 2011-05-18 2012-05-18 Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout Abandoned US20120291380A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/475,705 US20120291380A1 (en) 2011-05-18 2012-05-18 Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201161487649P 2011-05-18 2011-05-18
US13/475,705 US20120291380A1 (en) 2011-05-18 2012-05-18 Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout

Publications (1)

Publication Number Publication Date
US20120291380A1 true US20120291380A1 (en) 2012-11-22

Family

ID=47173866

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/475,705 Abandoned US20120291380A1 (en) 2011-05-18 2012-05-18 Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout

Country Status (2)

Country Link
US (1) US20120291380A1 (fr)
WO (1) WO2012159061A1 (fr)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130000236A1 (en) * 2011-06-28 2013-01-03 Gamesa Innovation & Technology, S.L. Footing for wind turbine towers
CN103243746A (zh) * 2013-05-20 2013-08-14 四川谦泰仁投资管理有限公司 风力发电机基础环精准校平系统及其施工方法
US8833004B2 (en) * 2010-10-08 2014-09-16 Timbertower, GmbH Foundation for a wind turbine
US20140318033A1 (en) * 2011-11-08 2014-10-30 Wobben Properties Gmbh Foundation for a wind turbine
US20150007523A1 (en) * 2013-07-03 2015-01-08 Mainstream Energy Corporation Devices, systems, and methods for securing a component to a surface
CN104594374A (zh) * 2014-12-23 2015-05-06 上海建工材料工程有限公司 一种组合式通讯塔基的组合施工方法
JP2015096667A (ja) * 2013-11-15 2015-05-21 株式会社クボタ 流体機器の基礎構造体および基礎構造体の施工方法および流体機器の据付方法
JP2016089545A (ja) * 2014-11-10 2016-05-23 株式会社クボタ セルフレベリング材の打設方法とポンプの更新方法およびポンプの据付方法
CN106468113A (zh) * 2015-08-19 2017-03-01 中国电力科学研究院 一种适用于8颗地脚螺栓连接的输电铁塔塔脚板确定方法
US9707699B2 (en) * 2013-07-17 2017-07-18 Wobben Properties Gmbh Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
US20180119381A1 (en) * 2016-11-02 2018-05-03 Inventus Holdings, Llc Pier and mat foundation fortification and monitoring system
US20180209111A1 (en) * 2014-07-18 2018-07-26 Henry K. Obermeyer Water Control Gate Anchoring Methods and Systems
US10138615B2 (en) * 2014-09-17 2018-11-27 Korea Electric Power Corporation Base body of electric transmission tower using micropile
CN110644525A (zh) * 2019-10-22 2020-01-03 中联建设集团股份有限公司 预应力锚栓风力发电机基础二次保护环结构
US10662605B2 (en) * 2018-04-19 2020-05-26 RRC Power & Energy, LLC Post-tension tube foundation and method of assembling same
US11085165B2 (en) * 2018-04-19 2021-08-10 RRC Power & Energy, LLC Post-tension tube foundation and method of assembling same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201848B (zh) * 2017-03-28 2019-06-04 上海电气风电集团有限公司 一种混凝土塔架安装调平方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3676641A (en) * 1971-01-15 1972-07-11 Wallace A Olson Apparatus for assisting in the curing of concrete and for heating
ES2145509T3 (es) * 1995-12-15 2000-07-01 Monsanto Co Procedimientos para mejorar el control reologico en sistemas cementosos.
US20090044482A1 (en) * 2007-01-30 2009-02-19 Tooman Norman L Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation
US7584791B2 (en) * 2007-02-08 2009-09-08 Halliburton Energy Services, Inc. Methods for reducing the viscosity of treatment fluids comprising diutan
US8519091B2 (en) * 2007-04-10 2013-08-27 Air Products And Chemicals, Inc. Polyalkyleneamine adducts as curing agents for thick layer water-based epoxy systems
EP2164295A1 (fr) * 2008-09-16 2010-03-17 Deleage SA Dispositif de câble chauffant électrique

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8833004B2 (en) * 2010-10-08 2014-09-16 Timbertower, GmbH Foundation for a wind turbine
US20130000236A1 (en) * 2011-06-28 2013-01-03 Gamesa Innovation & Technology, S.L. Footing for wind turbine towers
US9322396B2 (en) * 2011-11-08 2016-04-26 Wobben Properties Gmbh Foundation for a wind turbine
US20140318033A1 (en) * 2011-11-08 2014-10-30 Wobben Properties Gmbh Foundation for a wind turbine
CN103243746A (zh) * 2013-05-20 2013-08-14 四川谦泰仁投资管理有限公司 风力发电机基础环精准校平系统及其施工方法
US20150007523A1 (en) * 2013-07-03 2015-01-08 Mainstream Energy Corporation Devices, systems, and methods for securing a component to a surface
US9151315B2 (en) * 2013-07-03 2015-10-06 Sunrun South Llc Devices, systems, and methods for securing a component to a surface
US9707699B2 (en) * 2013-07-17 2017-07-18 Wobben Properties Gmbh Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
JP2015096667A (ja) * 2013-11-15 2015-05-21 株式会社クボタ 流体機器の基礎構造体および基礎構造体の施工方法および流体機器の据付方法
US11186960B2 (en) * 2014-07-18 2021-11-30 Henry K. Obermeyer Water control gate anchoring methods
US11739488B2 (en) * 2014-07-18 2023-08-29 Henry K. Obermeyer Systems for water control gate anchoring
US20180209111A1 (en) * 2014-07-18 2018-07-26 Henry K. Obermeyer Water Control Gate Anchoring Methods and Systems
US20220049444A1 (en) * 2014-07-18 2022-02-17 Henry K. Obermeyer Systems for water control gate anchoring
US10138615B2 (en) * 2014-09-17 2018-11-27 Korea Electric Power Corporation Base body of electric transmission tower using micropile
JP2016089545A (ja) * 2014-11-10 2016-05-23 株式会社クボタ セルフレベリング材の打設方法とポンプの更新方法およびポンプの据付方法
CN104594374A (zh) * 2014-12-23 2015-05-06 上海建工材料工程有限公司 一种组合式通讯塔基的组合施工方法
CN106468113A (zh) * 2015-08-19 2017-03-01 中国电力科学研究院 一种适用于8颗地脚螺栓连接的输电铁塔塔脚板确定方法
US10544559B2 (en) * 2016-11-02 2020-01-28 Inventus Holdings, Llc Pier and mat foundation fortification and monitoring system
US20180119381A1 (en) * 2016-11-02 2018-05-03 Inventus Holdings, Llc Pier and mat foundation fortification and monitoring system
US10662605B2 (en) * 2018-04-19 2020-05-26 RRC Power & Energy, LLC Post-tension tube foundation and method of assembling same
US11085165B2 (en) * 2018-04-19 2021-08-10 RRC Power & Energy, LLC Post-tension tube foundation and method of assembling same
US20210324598A1 (en) * 2018-04-19 2021-10-21 RRC Power & Energy, LLC Post-Tension Tube Foundation and Method of Assembling Same
CN110644525A (zh) * 2019-10-22 2020-01-03 中联建设集团股份有限公司 预应力锚栓风力发电机基础二次保护环结构

Also Published As

Publication number Publication date
WO2012159061A1 (fr) 2012-11-22

Similar Documents

Publication Publication Date Title
US20120291380A1 (en) Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout
US20090044482A1 (en) Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation
US8726589B2 (en) Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation
US8272181B2 (en) Grout sleeve for foundation anchor bolts and method for protection of anchor bolts for a vertical structure, including wind turbines
EP2041371B1 (fr) Structure de tour
CA2950997C (fr) Systeme de fondations pour des tours et procede d'installation du systeme de fondations pour des tours
CA2809429C (fr) Systeme d'ancrage d'une charge
CN108474193B (zh) 一种形成风轮机基座的方法及用于形成此基座的相关系统
EP0793754B1 (fr) Fondations sans tension pour piliers
EP2064393B1 (fr) Système de fondation modulaire partiellement préfabriqué
US11976431B2 (en) Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
JP2007535634A (ja) タワーの立設方法
JP2007527971A (ja) タワーの立設方法
US20160201350A1 (en) Tower and method for assembling tower
CA2730679A1 (fr) Procede pour l'assemblage d'une tour et tour
US10655287B2 (en) Reinforcement apparatus for reinforcing a structure comprising a pier and a cross-beam
US10704252B2 (en) Method for lifting and supporting a new slab foundation with hydraulic jacks
JP5693372B2 (ja) 免震構造、及びその施工方法
US9828739B2 (en) In-line battered composite foundations
KR101601876B1 (ko) 복합말뚝 이음장치 및 이를 이용한 복합말뚝 시공방법
KR200329996Y1 (ko) 낙석방지책의 지주 정착구
CN110578326A (zh) 人工挖孔桩结构及其施工方法
CN211447873U (zh) 烟囱加固装置
JP2008308847A (ja) ベースプレート設置方法

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION