US20120232879A1 - Data center efficiency analyses and optimization - Google Patents

Data center efficiency analyses and optimization Download PDF

Info

Publication number
US20120232879A1
US20120232879A1 US13/045,474 US201113045474A US2012232879A1 US 20120232879 A1 US20120232879 A1 US 20120232879A1 US 201113045474 A US201113045474 A US 201113045474A US 2012232879 A1 US2012232879 A1 US 2012232879A1
Authority
US
United States
Prior art keywords
data center
parameters
component
time
components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/045,474
Other languages
English (en)
Inventor
Madhusudan K. Iyengar
Roger R. Schmidt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
International Business Machines Corp
Original Assignee
International Business Machines Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by International Business Machines Corp filed Critical International Business Machines Corp
Priority to US13/045,474 priority Critical patent/US20120232879A1/en
Assigned to INTERNATIONAL BUSINESS MACHINES CORPORATION reassignment INTERNATIONAL BUSINESS MACHINES CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: IYENGAR, MADHUSUDAN K., SCHMIDT, ROGER R.
Priority to JP2012011998A priority patent/JP5904488B2/ja
Priority to CN201210060264.7A priority patent/CN102708419B/zh
Publication of US20120232879A1 publication Critical patent/US20120232879A1/en
Priority to US13/708,993 priority patent/US8965748B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Definitions

  • the present invention relates to tools for estimating and optimizing the cooling energy consumption of an existing or new data center based on, for example, various parameters, such as component selection, geographic location, operation time and/or data center footprint.
  • a data center is a facility for operating a large number of servers.
  • Servers typically include computational hardware, such as circuit boards, memory and computer processors.
  • the servers are generally installed in racks or cabinets. Each cabinet typically holds approximate 40 servers. There may be hundreds of such cabinets in a data center floor.
  • Data centers often consume large amounts of electricity and generate a lot of heat.
  • the generated heat must be dissipated from the data center in order to meet the operational requirements of the server components.
  • Various cooling equipment can be employed in a data center to dissipate the generated heat.
  • Such solutions include, but are not limited to, air conditioners, free cooling units, pressurized air plenums, chilled water, water pumps, chiller plants, cooling towers, water side economizers, and server rack fans.
  • Determining which heat dissipation solutions are the most energy efficient for a particular data center can be a difficult endeavor. Furthermore, external factors, such as climate conditions and energy costs at the data location can influence the best cooling strategy for a data center.
  • One example aspect of the invention is a method for estimating the overall energy efficiency of a data center over a period of time by a computer.
  • the method includes receiving one or more time parameters indicating the period of time over which the overall energy efficiency of the data center is estimated over which the overall energy efficiency of the data center is estimated.
  • a plurality of component parameters is also received.
  • the component parameters indicate performance characteristics of data center components and operational interactions between the data center components.
  • the method further includes simulating the operation and interaction of the data center components based, at least in part, on the component parameters for the period of time over which the energy efficiency is estimated, and outputting results of the simulation. The results indicate the overall energy efficiency of the data center.
  • Another example aspect of the invention is a system for estimating the overall energy efficiency of a data center over a period of time.
  • the system includes computer readable memory and a computer processor.
  • the computer is configured to receive time parameters indicating the period of time over which the overall energy efficiency of the data center needs is estimated, receive component parameters indicating the performance characteristics of data center components and the operational interactions between the data center components, simulate the operation and interaction of the data center components based, at least in part, on the component parameters for the period of time over which the energy efficiency is estimated, and output results of the simulation to estimate the overall energy efficiency of the data center.
  • Yet a further example aspect of the invention is a computer program product for estimating the overall energy efficiency of a data center over a period of time.
  • the computer program product includes computer readable program code configured to: receive one or more time parameters, the time parameters indicating the period of time over which the overall energy efficiency of the data center needs is estimated, receive a plurality of component parameters, the component parameters indicating the performance characteristics of data center components and the operational interaction between the data center components, simulate the operation and interaction of the data center components based, at least in part, on the component parameters for the period of time over which the overall energy efficiency is estimated, and output results of the simulation to indicate the overall energy efficiency of the data center.
  • FIG. 1 shows an example computer system for estimating the energy efficiency of a data center over a period of time, as contemplated by an embodiment of the present invention.
  • FIG. 2 shows the computer system embodiment of FIG. 1 configured to provide reports of data center energy efficiency estimates by component and time period.
  • FIG. 3 shows an example flowchart for estimating the energy efficiency of a data center over a period of time, as contemplated by an embodiment of the present invention.
  • FIGS. 4A and 4B show two possible enhancements to the flowchart of FIG. 3 where an environment database and a component model database are utilized to receive the environment parameters and the component parameters, respectively.
  • FIGS. 5A and 5B show two possible enhancements to the flowchart of FIG. 3 providing reports of data center energy efficiency estimates by component and time period or for multiple simulation runs.
  • FIG. 6 shows several typical data center components that may be simulated by an embodiment of the present invention to estimate the energy efficiency of a data center over a period of time.
  • FIG. 7 shows an example of a graphical user interface (GUI) that may be utilized by an embodiment of the present invention to receive component and model parameters from the user to estimate the energy efficiency of a data center over a period of time.
  • GUI graphical user interface
  • FIGS. 1-7 The present invention is described with reference to embodiments of the invention. Throughout the description of the invention reference is made to FIGS. 1-7 .
  • embodiments of the present invention can help estimate and optimize the cooling energy consumption of an existing or new data center.
  • the tool user may specify various parameters for the data center, such as cooling components, geographic location, operation time and/or data center footprint.
  • the tool allows the user to simulate the energy consumption of a specified data center and help the user converge on an optimal energy consumption configuration of the data center. For example, the user may simulate various data center configurations and conduct a comparative analysis on the simulation results to arrive that the most energy efficient data center configuration.
  • FIG. 1 illustrates an example computer system 102 for estimating the overall energy efficiency of a data center over a period of time contemplated by the present invention. It is noted that the computer system shown in FIG. 1 is just one example of various arrangements of the present invention and should not be interpreted as limiting the invention to any particular configuration.
  • the computer system 102 presented in FIG. 1 includes a computer processor 106 coupled to computer readable memory 104 .
  • the computer processor 106 is configured to read and write data 108 in the computer memory 104 .
  • the computer system 102 is configured to receive input data from a user or another computer system (illustrated by arrows 112 , 116 , 120 , 124 , 128 , 132 , and 136 ).
  • receiving input data from a user is performed through a graphical user interface (GUI) shown on a computer display and one or more input devices.
  • GUI graphical user interface
  • Some common input devices utilized in the art are computer keyboards, computer mice, and touch-screen displays.
  • Receiving data from another computer system is generally accomplished through a network connection that links the data receiving and sending computer systems.
  • the computer system 102 is also configured to display output data to a user and/or send the output data to another computer system (illustrated by arrow 156 ).
  • displaying output data to a user is done through a computer display or a printer.
  • Sending data to another computer system is generally done through a network connection that links the receiving and sending computer systems.
  • the computer system 102 shown in FIG. 1 is additionally configured to communicate with several databases in a way that allows the computer processor 106 to save data in the databases, query the databases for previously saved data, and receive data from the databases (illustrated by arrows 140 , 144 , 148 , and 152 ).
  • a database can be any persistent computer storage that allows the computer processor to write and read data.
  • Such computer storage can be implemented as part of the computer system itself; for example, in the form of a hard drive that is connected to the rest of the components of the computer system 102 through a SATA bus.
  • the computer storage can also be implemented, for example, as network-attached storage that is linked via a network connection to the computer system 102 .
  • the computer system 102 is configured to receive a number of parameters 114 , 118 , 122 , 126 , 130 , 134 , and 138 that are utilized to estimate the energy efficiency of a data center. It should be noted that not all parameters illustrated in FIG. 1 may be necessary for the computer system to estimate the data center energy efficiency.
  • Time parameters 114 indicate the period of time over which the overall energy efficiency of the data center is estimated.
  • An example of time parameters may be a range of dates, such as from January 1 to December 31, or a single time period, such as six months or one year.
  • the time parameters can be typed on a computer keyboard or selected on the computer display utilizing a GUI element such as a drop-down list or a graphical calendar.
  • the component parameters 118 describe the type of individual data center components, the performance characteristics of these data center components, and the operational interactions between them.
  • Component parameters that describe the type of individual data center components are, for example, computer server, computer room air conditioner (CRAC), or chiller plant.
  • Examples of performance characteristic parameters that further describe those same example data center components are the heat output and the electrical power consumption of the computer server for a given time period, the cooling capacity and electrical power consumption of the CRAC for a given time period, and the cooling capacity and electrical or gas power consumption of the chiller plant for a given time period.
  • examples of component parameters that describe operational interactions between the same example data center components may be a parameter indicating that the computer server is being cooled by the CRAC and the CRAC is connected to the chiller plant.
  • the component parameters may describe thirty identical computer servers that are cooled by two CRACs connected to a single chiller plant.
  • the user may utilize a GUI to describe individual data center components by selecting or typing each component type, selecting or typing the performance characteristics of each component, and indicating interactions between components.
  • the component parameters 118 that describe the type, performance characteristics, and operational interactions of the data center components may be provided separately for each data center component or type of component.
  • Another option illustrated in FIG. 1 is to provide a number of model parameters 122 that describe predefined models of data center components which can be referenced 140 by the computer processor 106 from a component model database 142 .
  • the computer processor 106 can retrieve the component parameters associated with the predefined data center component models stored in the component model database 142 .
  • the component model database 142 may contain information about the power consumption and cooling capacity of three models of CRACs (i.e., model A, B, and C).
  • the user may select model B and indicate that two components of the given type are present in the data center.
  • the computer processor 106 receives 120 the selection as model parameters 122 and uses it to lookup 140 the component parameters for CRAC model B in the component model database 142 .
  • the embodiment illustrated in FIG. 1 also envisions that the computer system 102 is configured to receive 124 environment parameters 126 that describe characteristics of the ambient environment in which the data center operates. Such environmental characteristics are, for example, air temperature, air humidity, and atmospheric pressure.
  • the environment parameters 126 may describe environment characteristics for the overall time period over which the energy efficiency is estimated, as indicated by the time parameters 114 .
  • the environment parameters 126 may specify the average yearly air temperature when the energy efficiency is estimated for one year.
  • the environment parameters 126 may describe environment characteristics for a number of discrete intervals within the time period indicated by the time parameters 114 .
  • environment parameters 126 may specify the average monthly air temperature for each month of the year when the energy efficiency is again estimated for one year.
  • the system 102 may include an environment database 146 storing information about environmental characteristics for a plurality of geographic locations and time periods. Furthermore, the computer processor 106 may receive geographic parameters 130 indicating the geographic location of the data center under analysis. The computer processor 106 may query the environment database 146 based on the geographical parameters 130 and the time parameters 114 to receive the environment parameters 126 .
  • the system 102 may receive a plurality of cost parameters 134 indicating unit costs of energy resources consumed by the data center. These energy resources may include electrical power, natural gas, and/or water utilized by the data center.
  • the system 102 may receive a plurality of data center parameters 138 .
  • the data center parameters 138 may include the number of data center buildings, number of floors, number of server rooms, size of server rooms, maximum server room temperature, and operating hours of the data center.
  • the computer processor 106 is configured to simulate the operation and interaction of the data center components based, at least in part, on the component parameters for the period of time over which the energy efficiency is estimated.
  • the simulation results 158 may be output to a user terminal or a results database 154 .
  • the results database 154 stores the results of a plurality of simulations of the operation and interaction of the data center components.
  • an intermediate data 150 may be stored by the computer processor 106 in computer memory.
  • the intermediate data 150 includes simulation results per data center component per time interval in different time intervals within the time period over which overall energy efficiency is estimated.
  • the computer processor 106 is configured to generate a thermodynamic model 110 of heat exchanges resulting from the operational interaction between the data center components and heat exchanges between the data center components and the ambient environment.
  • the thermodynamic model 110 is utilized to estimate energy consumption by the data center components. Simulating the operation and interaction of the data center components may further include using one or more of the cost parameters 134 .
  • the energy consumption of a data center facility is calculated by the computer processor 106 using various approximation methods.
  • each coolant loop can be assumed to have a particular relationship between pressure and flow.
  • Electro-mechanical inefficiencies are factored to estimate the pump and/or blower power consumption.
  • Regression models may be used for chiller plants to predict the compressor power consumption under the calculated pressure and flow conditions.
  • Weather data can be averaged over various granularities of a given year. Alternatively, hour-by-hour weather data calculations can be performed using commercially available software known to those skilled in the art.
  • the computer processor 106 can determine an optimal data center configuration based on the data center parameters 136 .
  • the computer processor 106 is further configured to store the results of the simulation of the operation and interaction of the data center components in the results database 154 .
  • the computer processor 106 can further receive simulation reporting parameters indicating simulations of the operation and interaction of the data center components.
  • the results database 154 may be queried based on the simulation reporting parameters to retrieve the results of one or more simulations, and display the retrieved results.
  • the system 102 may also be configured to generate “what if” reports 160 .
  • the “what if” reports 160 allow the user to explore proposed changes to the data center and determine if the changes would improve the data center's overall energy efficiency. For example, by adjusting the component parameters 118 , model parameters 122 , environment parameters 126 , geographic parameters 130 , cost parameters 134 , and data center parameters 138 , the user can simulate proposed changes to an existing or new data centers and quickly determine if such changes would be advantageous to the data center's design.
  • a further embodiment of the invention is shown configuration of the system 102 for generating slicing reports 214 .
  • the slicing reports 214 present simulation results focused on particular data center components and/or parameters.
  • component reporting parameters are received by the computer processor 106 .
  • the reporting parameters 204 indicate one or more data center components to be included in the slicing report 214 .
  • the processor 106 may also receive time reporting parameters 208 .
  • the time reporting parameters 208 indicate one or more time intervals within the time period over which overall energy efficiency is estimated.
  • the computer processor 106 queries the intermediate data 150 based on the reporting parameters 204 and/or the reporting parameters 208 for matching reports.
  • the intermediate data 150 includes simulation results per data center component per time interval in different time intervals within the time period over which overall energy efficiency is estimated.
  • Intermediate data 150 matching the input reporting parameters 204 and/or the reporting parameters 208 is output to the slicing reports 214 .
  • FIG. 3 shows an example flowchart for estimating the energy efficiency of a data center over a period of time, as contemplated by an embodiment of the present invention.
  • the flowchart may be embodied as computer code in non-transient computer memory, as hardware, or a combination thereof.
  • Process flow begins at receiving operation 304 .
  • receiving operation 304 one or more time parameters are received by a computer processor.
  • the time parameters indicate the period of time over which the overall energy efficiency of the data center is estimated.
  • control passes to receiving operation 306 .
  • a plurality of component parameters are received.
  • the component parameters indicate performance characteristics of data center components and operational interactions between the data center components.
  • the performance characteristics of the data center components may include electrical power consumption, natural gas consumption, water consumption, heat generation, heat dissipation, air volume, air pressure, water volume, water pressure, maximum area that can be cooled, and/or maximum number of floors that can be serviced.
  • component parameters are stored and retrieved from a database of data center types.
  • the database includes information about the performance characteristics and operational interactions of data center components for a plurality of data center types.
  • receiving operation 306 may include receiving one or more data center type parameters.
  • the data center type parameters indicate a data center type, with the data center type comprising a plurality of data center components configured to operate and interact together.
  • the database of data center types is queried based on the received data center type parameters, and the resulting query results from the database include component parameters based on the data center type parameters.
  • control passes to receiving operation 308 .
  • a plurality of environment parameters is received.
  • the environment parameters indicate characteristics of an ambient environment over one or more time intervals within the period of time over which the overall energy efficiency is estimated.
  • the characteristics of the ambient environment may be, for example, air temperature, air humidity, dew point, atmospheric pressure, and/or precipitation.
  • the cost parameters indicate unit costs of energy resources consumed by the data center.
  • the energy resources may be, for example, electrical power, natural gas, and/or water.
  • the data center parameters may include, for example, the number of data center buildings in the data center, the number of floors in the data center, the number of server rooms in the data center, the size of server rooms in the data center, the maximum server room temperature in the data center, and/or operating hours of data center.
  • thermodynamic model of heat exchanges is generated by a computer processor.
  • the thermodynamic model describes the operational interactions between the data center components, and heat exchanges between the data center components and the ambient environment.
  • simulating operation 316 the operation and interaction of the data center components are simulated by the computer processor based, at least in part, on the component parameters for the period of time over which the energy efficiency is estimated. After simulating operation 316 is completed, control passes to storing operation 318 .
  • intermediate data from simulating the operation and interaction of the data center components is stored in computer-readable memory.
  • the intermediate data includes simulation results per data center component per time interval in time intervals within the time period over which overall energy efficiency is estimated.
  • thermodynamic model generated at operation 314 is utilized to estimate energy consumption by the data center components.
  • simulation results are used to estimate the energy cost of the data center based in part on the received cost parameters at operation 310 .
  • the simulation operation 316 may include determining operation 324 . During this operation, an optimal data center configuration based on the data center parameters is determined.
  • the results of the simulation of the operation and interaction of the data center components are stored in a results database.
  • the results database is configured to contain the results of a plurality of simulations of the operation and interaction of the data center components.
  • the results of the simulation are output.
  • the results can indicate the overall energy efficiency of the data center.
  • the outputting operation 328 may include receiving one or more simulation reporting parameters indicating one or more simulations of the operation and interaction of the data center components, querying the results database based on the simulation reporting parameters to retrieve the results of one or more simulations, and displaying the retrieved results of the one or more simulations.
  • results from the simulation may indicate the total energy consumption for the data center, energy consumption per data center component, total energy consumption for the data center per time interval in a plurality of time intervals within the time period over which overall energy efficiency is estimated, energy consumption per data center component per time interval in a plurality of time intervals within the time period over which overall energy efficiency is estimated, average server room temperature for the time period over which overall energy efficiency is estimated, and/or maximum server room temperature for the time period over which overall energy efficiency is estimated.
  • the simulation may incorporate geographic the geographic location of the data center.
  • FIG. 4A the steps for such an embodiment are shown.
  • the geographical parameters include an indication of the geographic location of the data center.
  • a database of environmental information is queried based on the geographical parameters and the period of time over which the overall energy efficiency is estimated.
  • the database of environmental information includes information about environmental characteristics for a plurality of geographic locations over at least one time interval.
  • the environmental parameters are received from the database of environmental information based on the geographical parameters.
  • the environment information can describe characteristics of the ambient environment in which the data center operates.
  • the process may proceed to simulating operation 316 (see FIG. 3 ) where the operation and interaction of the data center components are simulated by the computer processor based, at least in part, on the received environmental information.
  • the processor may utilize predefined models of data center components to be simulation.
  • FIG. 4B shows the steps for such an embodiment.
  • the model parameters may indicate a data center component model.
  • the data center component model may include a plurality of data center components configured to operate and interact together.
  • the data center components may include, for example, an air conditioner (AC), computer room air conditioner (CRAC), free cooling unit (FCU), pressurized air plenum, chilled water (CHW) pipe, CHW pipe valve, CHW pump, boosted cold water (BCW) pump, chiller plant, chiller compressor, cooling tower, water side economizer, computer server, network switch, computer server rack, computer server rack fan, uninterruptible power supply (UPS), and/or electrical co-generation system.
  • AC air conditioner
  • CRAC computer room air conditioner
  • FCU free cooling unit
  • pressurized air plenum chilled water
  • CHW chilled water
  • CHW pipe valve CHW pump
  • BCW boosted cold water
  • chiller plant chiller compressor
  • cooling tower water side economizer
  • control passes to querying operation 416 .
  • a database of data center component models is queried based on the model parameters.
  • the database of data center component models includes information about performance characteristics and operational interactions of data center components for a plurality of data center component models.
  • the component parameters are received from the database of data center component models based on the model parameters.
  • the process may proceed to simulating operation 316 (see FIG. 4 ) where the operation and interaction of the data center components are simulated by the computer processor based, at least in part, on the received component parameters.
  • the embodiment allows users to display stored intermediate data of the simulation data for a simulation time and for particular data center components.
  • the process includes receiving operation 504 , in which component reporting parameters are received by the computer processor; the component reporting parameters indicate one or more data center components. After receiving operation 504 is completed, control passes to receiving operation 506 .
  • time reporting parameters are received from the user.
  • the time reporting parameters indicate one or more time intervals within the time period over which overall energy efficiency is estimated.
  • control passes to displaying operation 508 .
  • the stored intermediate data is displayed for the received component reporting parameters and the received time reporting parameters.
  • FIG. 5B shows a further embodiment of the invention for displaying saved data center simulation results.
  • the data center simulation results may be saved in a results database 154 (see FIG. 1 ).
  • the results database contains the results of a plurality of simulations of the operation and interaction of the data center components.
  • the process includes receiving operation 514 , where simulation reporting parameters are received.
  • the simulation reporting parameters indicate one or more simulations of the operation and interaction of the data center components.
  • the results database is queried based on the simulation reporting parameters. As a result, one or more simulations results are retrieved from the results database. After querying operation 516 is completed, control passes to displaying operation 518 .
  • the retrieved results of the simulations as displayed.
  • displaying output data to a user is typically performed through a computer display or a printer.
  • the results may be sent over a network as data packets.
  • FIG. 6 shows an example schematic of a data center facility that may be simulated by the simulation tool discussed above. It is noted that the simulation tool may be used to simulate countless other configurations of data center facilities.
  • the facility includes a data center building 602 . As shown, the data center building contains server racks, a raised floor and air conditioning units.
  • a first water loop 604 and 606 circulates water (or another refrigerant) from a chiller plant 608 to the air conditioning units using a pumping station 610 .
  • cooled water 604 enters the air conditioning units and cools the air in the data center 602 .
  • the heated water 606 then passes to the chiller plant 608 .
  • the chiller plant 608 using, for example, vapor compression refrigeration cycle, cools the heated water.
  • the chiller plant 608 interfaces with a condenser water loop 610 and 612 .
  • the condenser water loop 610 and 612 includes a pumping station 616 and a cooling tower 614 .
  • heated water 612 is sprayed over a blower 618 , causing air 620 to evaporate a portion the heated water 612 and cool it down.
  • the cooled water 610 is then collected and circulated back to the chiller plant 608 .
  • FIG. 7 shows an example user-interface (UI) 702 for a simulator contemplated by the present invention.
  • the user interface 702 includes a schematic section 710 .
  • the schematic section 710 displays a power consumption model of the data center facility under simulation. This section provides the user with a visualization of the data center facility being analyzed. As the user enters data center operating parameters, the schematic section 710 is automatically updated to display a representation of current data center configuration.
  • facility equipment is selected by the user.
  • the user may indicate whether the data center includes a water cooled chiller, a water side economizer, an air side economizer, and/or a co-generation system.
  • Each selected component is associated with a simulation model.
  • the schematic section 710 is updated to illustrate the selected components.
  • the user may select pre-configured models typical for the geographic location of the data center.
  • the electrical model parameter section 706 allows the user to indicate the electrical model description.
  • the electrical model parameters section 706 may be used to specify the tier level of the data center.
  • the tier levels correspond to the level of redundancy and availability required in the data center.
  • the models may be, for example, algebraic equations and regression functions representing configurations of data center components and thermal loops.
  • the models may also be created using commercially available tools, such as Matlab.
  • the total cost of ownership parameter section 708 allows the user to indicate the total cost of ownership model description. These sections are used to calculate the energy consumption and cost of such consumption. The cost of equipment used by the data center may also be specified.
  • the user interface 702 further includes a simulation results section 720 . This portion of the display shows plots of the simulation results.
  • the “standard results” section 712 allows users to view pre-defined plots of the simulation results.
  • the pre-defined plots of the simulation results may include, for example, a breakdown of the data center expenses by functional unit (IT, cooling, electrical power, etc.), the power loss for specific cooling equipment (chiller, cooling tower, pump etc.), coefficient of performance plots.
  • the “detailed results” section 716 lets users customize the displayed plots of the simulation results. This section allows users to more closely inspect generated data.
  • the “data slicing” section 718 provides the user with data filtering options. This section can be used, for example, to generate psychrometric charts and yearly histograms.
  • the scenarios section 714 inputs “what if” scenarios for running different model inputs, as discussed above. The user can use this option to investigate the data center efficiency by varying one or more parameters over a range of values.
  • aspects of the invention may be embodied as a system, method or computer program product. Accordingly, aspects of the invention may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc.) or an embodiment combining software and hardware aspects that may all generally be referred to herein as a “circuit,” “module” or “system.” Furthermore, aspects of the invention may take the form of a computer program product embodied in one or more computer readable medium(s) having computer readable program code embodied thereon.
  • the computer readable medium may be a computer readable signal medium or a computer readable storage medium.
  • a computer readable storage medium may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing.
  • a computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device.
  • a computer readable signal medium may include a propagated data signal with computer readable program code embodied therein, for example, in baseband or as part of a carrier wave. Such a propagated signal may take any of a variety of forms, including, but not limited to, electro-magnetic, optical, or any suitable combination thereof.
  • a computer readable signal medium may be any computer readable medium that is not a computer readable storage medium and that can communicate, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device.
  • Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.
  • Computer program code for carrying out operations for aspects of the present invention may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, Smalltalk, C++ or the like and conventional procedural programming languages, such as the C programming language or similar programming languages.
  • the program code may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server.
  • the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider).
  • LAN local area network
  • WAN wide area network
  • Internet Service Provider for example, AT&T, MCI, Sprint, EarthLink, MSN, GTE, etc.
  • These computer program instructions may also be stored in a computer readable medium that can direct a computer, other programmable data processing apparatus, or other devices to function in a particular manner, such that the instructions stored in the computer readable medium produce an article of manufacture including instructions which implement the function/act specified in the flowchart and/or block diagram block or blocks.
  • the computer program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other devices to cause a series of operational steps to be performed on the computer, other programmable apparatus or other devices to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide processes for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks.
  • each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s).
  • the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Air Conditioning Control Device (AREA)
US13/045,474 2011-03-10 2011-03-10 Data center efficiency analyses and optimization Abandoned US20120232879A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US13/045,474 US20120232879A1 (en) 2011-03-10 2011-03-10 Data center efficiency analyses and optimization
JP2012011998A JP5904488B2 (ja) 2011-03-10 2012-01-24 データ・センタの効率分析及び最適化のための方法、システム、コンピュータ・プログラム
CN201210060264.7A CN102708419B (zh) 2011-03-10 2012-03-09 数据中心效率分析及优化的方法和系统
US13/708,993 US8965748B2 (en) 2011-03-10 2012-12-08 Data center efficiency analyses and optimization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/045,474 US20120232879A1 (en) 2011-03-10 2011-03-10 Data center efficiency analyses and optimization

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/708,993 Continuation US8965748B2 (en) 2011-03-10 2012-12-08 Data center efficiency analyses and optimization

Publications (1)

Publication Number Publication Date
US20120232879A1 true US20120232879A1 (en) 2012-09-13

Family

ID=46796864

Family Applications (2)

Application Number Title Priority Date Filing Date
US13/045,474 Abandoned US20120232879A1 (en) 2011-03-10 2011-03-10 Data center efficiency analyses and optimization
US13/708,993 Active 2031-07-26 US8965748B2 (en) 2011-03-10 2012-12-08 Data center efficiency analyses and optimization

Family Applications After (1)

Application Number Title Priority Date Filing Date
US13/708,993 Active 2031-07-26 US8965748B2 (en) 2011-03-10 2012-12-08 Data center efficiency analyses and optimization

Country Status (3)

Country Link
US (2) US20120232879A1 (ja)
JP (1) JP5904488B2 (ja)
CN (1) CN102708419B (ja)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130110306A1 (en) * 2011-10-26 2013-05-02 Zhikui Wang Managing multiple cooling systems in a facility
CN104696234A (zh) * 2015-03-23 2015-06-10 扬州大学 大型低扬程泵装置能量性能推算方法
US20150220069A1 (en) * 2014-02-04 2015-08-06 Ingersoll-Rand Company System and Method for Modeling, Simulation, Optimization, and/or Quote Creation
US9546575B2 (en) 2014-11-19 2017-01-17 International Business Machines Corporation Fuel vaporization using data center waste heat
WO2017054659A1 (en) * 2015-09-30 2017-04-06 Huawei Technologies Co., Ltd. An approach for end-to-end power efficiency modeling for data centers
US9655283B2 (en) 2014-06-30 2017-05-16 Microsoft Technology Licensing, Llc Submerged datacenter
US9713290B2 (en) 2014-06-30 2017-07-18 Microsoft Technology Licensing, Llc Datacenter immersed in cooling liquid
US9913409B2 (en) 2015-06-26 2018-03-06 Microsoft Technology Licensing, Llc Intrusion detection for submerged datacenters
CN108105898A (zh) * 2017-12-26 2018-06-01 酷仑冷却技术(上海)有限公司 一种用于数据中心的绝热闭式冷却系统及其冷却方法
RU2665266C1 (ru) * 2017-06-16 2018-08-28 Федеральное государственное автономное образовательное учреждение высшего образования "Национальный исследовательский Томский политехнический университет" Устройство для моделирования фазоповоротного устройства в энергетических системах
EP3403151A1 (en) * 2016-01-12 2018-11-21 Optimum Energy, LLC Predictive free cooling
US10156834B2 (en) * 2014-10-10 2018-12-18 Lg Electronics Inc. Central control apparatus for controlling facilities, facility control system comprising the same, and facility control method
US20190033945A1 (en) * 2017-07-30 2019-01-31 Nautilus Data Technologies, Inc. Data center total resource utilization efficiency (true) system and method
US10524395B2 (en) 2015-06-26 2019-12-31 Microsoft Technology Licensing, Llc Artificial reef datacenter
CN113139317A (zh) * 2021-05-12 2021-07-20 四川长虹空调有限公司 空调压缩机配管振动仿真方法
US11076509B2 (en) 2017-01-24 2021-07-27 The Research Foundation for the State University Control systems and prediction methods for it cooling performance in containment
US11270043B2 (en) * 2014-02-04 2022-03-08 Ingersoll-Rand Industrial U.S., Inc. System and method for modeling, simulation, optimization, and/or quote creation
US20230176641A1 (en) * 2014-01-09 2023-06-08 Nautilus Data Technologies, Inc. Data center total resource utilization efficiency (true) system and method

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0812116B1 (pt) 2007-05-15 2018-12-18 American Power Conv Corp método e sistema para proporcionar uma representação de uma capacidade de um recurso de central de dados
AU2011383606A1 (en) 2011-12-22 2014-07-17 Schneider Electric It Corporation System and method for prediction of temperature values in an electronics system
CN104137105B (zh) * 2011-12-22 2017-07-11 施耐德电气It公司 关于瞬时事件对数据中心中的温度的影响分析
EP2898376A4 (en) 2012-09-21 2016-05-18 Schneider Electric It Corp METHOD AND DEVICE FOR CHARACTERIZING A HEAT TRANSFER PERFORMANCE
EP2951652A4 (en) * 2013-01-30 2016-10-05 Hewlett Packard Entpr Dev Lp UNIFIED CONTROL OF AN ELECTRONIC CONTROL SYSTEM AND A SYSTEM FOR CONTROLLING FACILITIES
KR101597571B1 (ko) * 2013-07-08 2016-02-25 한국과학기술정보연구원 고성능 컴퓨터 시스템에 대한 웹 기반 소요 용량 계산 장치 및 그 방법
US9529641B2 (en) * 2013-08-26 2016-12-27 Cisco Technology, Inc. Data center thermal model
KR101628784B1 (ko) * 2013-10-21 2016-06-13 삼성물산 주식회사 데이터센터 건물의 에너지 소비량을 평가하는 장치 및 데이터센터 건물의 에너지 소비량 평가 방법
EP3074835B1 (en) * 2013-11-29 2024-02-28 Tata Consultancy Services Limited System and method for facilitating optimization of cooling efficiency of a data center
WO2015134655A2 (en) * 2014-03-05 2015-09-11 Adeptdc Co. Systems and methods for intelligent controls for optimal resource allocation for data center operations
US10129611B2 (en) 2014-09-27 2018-11-13 Rf Code, Inc. System and method for monitoring sensor output
EP3377951B1 (en) 2015-11-19 2019-11-06 Carrier Corporation Diagnostics system for a chiller and method of evaluating performance of a chiller
CN105299846B (zh) * 2015-11-23 2017-11-07 成都凯莱特科技有限公司 一种基于全局关联优化的机房群控装置及其控制方法
US10152394B2 (en) 2016-09-27 2018-12-11 International Business Machines Corporation Data center cost optimization using predictive analytics
CN106529021B (zh) * 2016-11-09 2019-07-26 东南大学 一种基于特征识别的空调系统仿真模拟方法
KR102368592B1 (ko) * 2019-12-16 2022-02-28 주식회사 어니언소프트웨어 데이터센터 서버룸의 온도 시뮬레이션 모델링 방법 및 모델링 장치

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7069232B1 (en) * 1996-01-18 2006-06-27 Planalytics, Inc. System, method and computer program product for short-range weather adapted, business forecasting
US20060173580A1 (en) * 2001-02-07 2006-08-03 Desrochers Eric M Air quality monitoring systems and methods
US20080174954A1 (en) * 2007-01-24 2008-07-24 Vangilder James W System and method for evaluating equipment rack cooling performance
US20090099832A1 (en) * 2007-10-12 2009-04-16 Edsa Micro Corporation Systems and methods for automatically converting cad drawing files into intelligent objects with database connectivity for the design, analysis, and simulation of electrical power systems
US20090231152A1 (en) * 2008-02-12 2009-09-17 Accenture Global Services Gmbh System for monitoring the energy efficiency of technology components
US20100049494A1 (en) * 2008-08-15 2010-02-25 Edsa Corporation Method for predicting power usage effectiveness and data center infrastructure efficiency within a real-time monitoring system
US20100241881A1 (en) * 2009-03-18 2010-09-23 International Business Machines Corporation Environment Based Node Selection for Work Scheduling in a Parallel Computing System
US20110077795A1 (en) * 2009-02-13 2011-03-31 American Power Conversion Corporation Data center control
US20110144932A1 (en) * 2009-12-10 2011-06-16 Harold Gene Alles Power Monitoring and Analysis System for Identifying and Tracking Individual Electrical Devices
US20110161251A1 (en) * 2005-01-18 2011-06-30 Carey Margaret M Method and System for Tracking and Budgeting Energy Usage
US20120166616A1 (en) * 2010-12-23 2012-06-28 Enxsuite System and method for energy performance management

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002007365A2 (en) 2000-07-13 2002-01-24 Nxegen System and method for monitoring and controlling energy usage
US6775997B2 (en) 2002-10-03 2004-08-17 Hewlett-Packard Development Company, L.P. Cooling of data centers
US7210048B2 (en) 2003-02-14 2007-04-24 Intel Corporation Enterprise power and thermal management
JP4115402B2 (ja) * 2004-02-06 2008-07-09 三洋電機株式会社 シミュレーション装置、シミュレーション方法、およびシミュレーションシステム
JP2008090828A (ja) * 2006-09-08 2008-04-17 Sanyo Electric Co Ltd モデル化装置、シミュレータ装置、モデル化プログラム、シミュレーションプログラム、熱収支モデル利用方法及び熱収支モデル利用システム
US20080301473A1 (en) 2007-05-29 2008-12-04 International Business Machines Corporation Method and system for hypervisor based power management
JP2009014245A (ja) * 2007-07-03 2009-01-22 Daikin Ind Ltd 空調機選定支援システム
JP2011505784A (ja) * 2007-10-29 2011-02-24 アメリカン パワー コンバージョン コーポレイション データセンタのための電力効率測定
EP2098956A1 (en) 2008-03-03 2009-09-09 British Telecommunications Public Limited Company Computing system and method for managing a server pool
US7791882B2 (en) 2008-04-23 2010-09-07 International Business Machines Corporation Energy efficient apparatus and method for cooling an electronics rack
US20100037071A1 (en) 2008-08-05 2010-02-11 Hsiang-Li Chang Using Internet to control delivery of power to a set of remote loads(devices)

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7069232B1 (en) * 1996-01-18 2006-06-27 Planalytics, Inc. System, method and computer program product for short-range weather adapted, business forecasting
US20060173580A1 (en) * 2001-02-07 2006-08-03 Desrochers Eric M Air quality monitoring systems and methods
US20110161251A1 (en) * 2005-01-18 2011-06-30 Carey Margaret M Method and System for Tracking and Budgeting Energy Usage
US20080174954A1 (en) * 2007-01-24 2008-07-24 Vangilder James W System and method for evaluating equipment rack cooling performance
US20090099832A1 (en) * 2007-10-12 2009-04-16 Edsa Micro Corporation Systems and methods for automatically converting cad drawing files into intelligent objects with database connectivity for the design, analysis, and simulation of electrical power systems
US20090231152A1 (en) * 2008-02-12 2009-09-17 Accenture Global Services Gmbh System for monitoring the energy efficiency of technology components
US20100049494A1 (en) * 2008-08-15 2010-02-25 Edsa Corporation Method for predicting power usage effectiveness and data center infrastructure efficiency within a real-time monitoring system
US20110077795A1 (en) * 2009-02-13 2011-03-31 American Power Conversion Corporation Data center control
US20100241881A1 (en) * 2009-03-18 2010-09-23 International Business Machines Corporation Environment Based Node Selection for Work Scheduling in a Parallel Computing System
US20110144932A1 (en) * 2009-12-10 2011-06-16 Harold Gene Alles Power Monitoring and Analysis System for Identifying and Tracking Individual Electrical Devices
US20120166616A1 (en) * 2010-12-23 2012-06-28 Enxsuite System and method for energy performance management

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Madhusudan Iyengar; Roger Schmidt; "Analytical Modeling for Thermodynamic Characterization of Data Center Cooling Systems" Journal of Electronic Packaging, June 2009, Vol. 131, 9 pages. *

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130110306A1 (en) * 2011-10-26 2013-05-02 Zhikui Wang Managing multiple cooling systems in a facility
US11847007B2 (en) * 2014-01-09 2023-12-19 Nautilus True, Llc Data center total resource utilization efficiency (TRUE) system and method
US20230176641A1 (en) * 2014-01-09 2023-06-08 Nautilus Data Technologies, Inc. Data center total resource utilization efficiency (true) system and method
US11270043B2 (en) * 2014-02-04 2022-03-08 Ingersoll-Rand Industrial U.S., Inc. System and method for modeling, simulation, optimization, and/or quote creation
US20150220069A1 (en) * 2014-02-04 2015-08-06 Ingersoll-Rand Company System and Method for Modeling, Simulation, Optimization, and/or Quote Creation
US10394970B2 (en) * 2014-02-04 2019-08-27 Ingersoll-Rand Company System and method for modeling, simulation, optimization, and/or quote creation
US20220198101A1 (en) * 2014-02-04 2022-06-23 Ingersoll-Rand Industrial U.S., Inc. System and method for modeling, simulation, optimization, and/or quote creation
US9713290B2 (en) 2014-06-30 2017-07-18 Microsoft Technology Licensing, Llc Datacenter immersed in cooling liquid
US9655283B2 (en) 2014-06-30 2017-05-16 Microsoft Technology Licensing, Llc Submerged datacenter
US10285309B2 (en) 2014-06-30 2019-05-07 Microsoft Technology Licensing, Llc Submerged datacenter
US10156834B2 (en) * 2014-10-10 2018-12-18 Lg Electronics Inc. Central control apparatus for controlling facilities, facility control system comprising the same, and facility control method
US9546576B2 (en) 2014-11-19 2017-01-17 International Business Machines Corporation Fuel vaporization using data center waste heat
US10082048B2 (en) 2014-11-19 2018-09-25 International Business Machines Corporation Fuel vaporization using data center waste heat
US10544707B2 (en) 2014-11-19 2020-01-28 International Business Machines Corporation Fuel vaporization using data center waste heat
US10753236B2 (en) 2014-11-19 2020-08-25 International Business Machines Corporation Fuel vaporization using data center waste heat
US10287925B2 (en) 2014-11-19 2019-05-14 International Business Machines Corporation Fuel vaporization using data center waste heat
US9546575B2 (en) 2014-11-19 2017-01-17 International Business Machines Corporation Fuel vaporization using data center waste heat
CN104696234A (zh) * 2015-03-23 2015-06-10 扬州大学 大型低扬程泵装置能量性能推算方法
US9913409B2 (en) 2015-06-26 2018-03-06 Microsoft Technology Licensing, Llc Intrusion detection for submerged datacenters
US10524395B2 (en) 2015-06-26 2019-12-31 Microsoft Technology Licensing, Llc Artificial reef datacenter
US10401933B2 (en) 2015-09-30 2019-09-03 Futurewei Technologies, Inc. Approach for end-to-end power efficiency modeling for data centers
WO2017054659A1 (en) * 2015-09-30 2017-04-06 Huawei Technologies Co., Ltd. An approach for end-to-end power efficiency modeling for data centers
US11294343B2 (en) 2016-01-12 2022-04-05 Optimum Energy, Llc Predictive free cooling
EP3403151A4 (en) * 2016-01-12 2019-12-25 Optimum Energy, LLC NATURAL COOLING PREDICTION
EP3403151A1 (en) * 2016-01-12 2018-11-21 Optimum Energy, LLC Predictive free cooling
US11985802B2 (en) 2017-01-24 2024-05-14 The Research Foundation For The State University Of New York Control systems and prediction methods for it cooling performance in containment
US11076509B2 (en) 2017-01-24 2021-07-27 The Research Foundation for the State University Control systems and prediction methods for it cooling performance in containment
RU2665266C1 (ru) * 2017-06-16 2018-08-28 Федеральное государственное автономное образовательное учреждение высшего образования "Национальный исследовательский Томский политехнический университет" Устройство для моделирования фазоповоротного устройства в энергетических системах
US10852805B2 (en) * 2017-07-30 2020-12-01 Nautilus Data Technologies, Inc. Data center total resource utilization efficiency (TRUE) system and method
US20190033945A1 (en) * 2017-07-30 2019-01-31 Nautilus Data Technologies, Inc. Data center total resource utilization efficiency (true) system and method
CN108105898A (zh) * 2017-12-26 2018-06-01 酷仑冷却技术(上海)有限公司 一种用于数据中心的绝热闭式冷却系统及其冷却方法
CN113139317A (zh) * 2021-05-12 2021-07-20 四川长虹空调有限公司 空调压缩机配管振动仿真方法

Also Published As

Publication number Publication date
JP5904488B2 (ja) 2016-04-13
CN102708419A (zh) 2012-10-03
JP2012190442A (ja) 2012-10-04
US8965748B2 (en) 2015-02-24
CN102708419B (zh) 2015-09-16
US20130096905A1 (en) 2013-04-18

Similar Documents

Publication Publication Date Title
US8965748B2 (en) Data center efficiency analyses and optimization
Brady et al. A case study and critical assessment in calculating power usage effectiveness for a data centre
US20170219241A1 (en) Data Center Infrastructure Management (DCIM) system comprising predictive analytics
US9310092B2 (en) Analytics for optimizing usage of cooling subsystems
CN102436296A (zh) 用于在数据中心中预测温度值的系统和方法
US11906180B1 (en) Data center management systems and methods for compute density efficiency measurements
RU2010121826A (ru) Измерение электрического кпд для центров обработки данных
US10001761B2 (en) Power consumption model for cooling equipment
CN105452984A (zh) 计算数据中心中的电源使用效率
US20140088945A1 (en) System and method for an energy management system
US8880225B2 (en) Data center cooling control
US20220183191A1 (en) It-room-cooling-performance assessment
Conficoni et al. Hpc cooling: A flexible modeling tool for effective design and management
US8630739B2 (en) Exergy based evaluation of an infrastructure
EP3942486A1 (en) Data center management systems and methods for compute density efficiency measurements
JP2018060271A (ja) 管理装置、管理装置の制御方法、管理装置の制御プログラム及び情報処理システム
KR101986686B1 (ko) Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치
Dumitrescu et al. Methods for reducing energy consumption, optimization in operational data centers
US20200278130A1 (en) Operation control method, storage medium, and operation control device
CN113170592B (zh) 基于监测/控制机制的热控制优化
Kumar et al. Data center air handling unit fan speed optimization using machine learning techniques
Levy New Family of Data Center Metrics Using a Multidimensional Approach for a Holistic Understanding
Rubenstein et al. Data center cold aisle set point optimization through total operating cost modeling
Wenning et al. High performance computing data center metering protocol
CN114828579B (zh) 集装箱数据中心的节能控制方法及相关设备

Legal Events

Date Code Title Description
AS Assignment

Owner name: INTERNATIONAL BUSINESS MACHINES CORPORATION, NEW Y

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:IYENGAR, MADHUSUDAN K.;SCHMIDT, ROGER R.;REEL/FRAME:025936/0738

Effective date: 20110309

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE