coal
coal dust
grid
primary
plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/262,391
Other languages
English (en)
Inventor
Hellmuth Brueggemann
Olivier DRENIK
Michael Heim
Haider Mirza
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Technology GmbH
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=42333293&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=US20120122042(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Assigned to ALSTOM TECHNOLOGY LTD reassignment ALSTOM TECHNOLOGY LTD ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRUEGGEMANN, HELLMUTH, DRENIK, OLIVIER, HEIM, MICHAEL, MIRZA, HAIDER
Publication of US20120122042A1 publication Critical patent/US20120122042A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C6/00Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion
    • F23C6/02Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in parallel arrangement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C6/00Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion
    • F23C6/04Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in series connection
    • F23C6/045Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in series connection with staged combustion in a single enclosure
    • F23C6/047Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in series connection with staged combustion in a single enclosure with fuel supply in stages
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23DBURNERS
    • F23D1/00Burners for combustion of pulverulent fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K1/00Preparation of lump or pulverulent fuel in readiness for delivery to combustion apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K3/00Feeding or distributing of lump or pulverulent fuel to combustion apparatus
    • F23K3/02Pneumatic feeding arrangements, i.e. by air blast
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N1/00Regulating fuel supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K2201/00Pretreatment of solid fuel
    • F23K2201/10Pulverizing
    • F23K2201/1006Mills adapted for use with furnaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K2203/00Feeding arrangements
    • F23K2203/10Supply line fittings
    • F23K2203/103Storage devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K2203/00Feeding arrangements
    • F23K2203/10Supply line fittings
    • F23K2203/105Flow splitting devices to feed a plurality of burners

Definitions

  • the invention relates to a method and assembly for improving the dynamic behavior of a coal-fired power plant for primary and/or secondary requirements of the power grid operator with respect to current output into the grid.
  • Deviations from the predetermined grid frequency value mainly occur when the power requirement on the power plants connected to the power grid suddenly changes because for instance a power plant is disconnected from the grid because of an accident or a large consumer is connected to the grid or because the grid configuration or grid distribution changes.
  • the primary control is additionally supported by the secondary control or secondary control output, which following the balancing of a sudden change of the consumed or the generated power through the primary control offsets quasi-stationary deviations both of the frequency as well as of the transfer power.
  • coal-fired power plants are designed with coal dust furnaces, with which the coal ground in the coal grinding plant can be directly fed to the firing box of the power plant via coal dust lines (so-called “direct” coal dust furnaces).
  • the condition of the fuel is one of the main factors for good combustion, a sound efficiency, low emissions and little that is uncombusted in the ash in order to be able to utilize this by-product.
  • the coal grinding plant or coal mill has to be in a stationary heat and mass flow equilibrium, which results in load changes on the coal dust furnace and thus on the power plant itself being able to be carried out only slowly and thus a delay time occurring when load changes are carried out or are required.
  • the delay time of the coal mill with changing fuel quantity or charge is a substantial part of the overall plant delay time.
  • the delay time of the coal mill can be long depending on the raw coal conditioning process (dependent on fineness, moisture, hardness of the raw coal and the mill loading) and therefore has a detrimental effect on the delay time of the overall plant.
  • the object of the invention now is to create a method for improving the dynamic behavior of a coal-fired power plant for primary and/or secondary requirements of the power grid operator with respect to the current output into the grid, with which the delay time of the coal dust furnace of the power plant is reduced so that the power plant meets the targets or conditions of respective national operators of power grids. It is, moreover, an object of the invention to create an assembly for improving the dynamic behavior of a coal-fired power plant for primary and/or secondary requirements of the power grid operator with respect to the current output into the grid.
  • An advantageous embodiment of the invention provides that the silo having a storage volume V Sp in normal operation of the indirect firing system is filled, in terms of volume, approximately half with coal dust for storage and use upon increase of the primary and/or secondary requirements of the power grid operator with respect to the current output into the grid and the remaining storage volume is used for receiving and storing the excess-produced coal dust upon reduction of the primary and/or secondary requirements of the power grid operator with respect to the current output into the grid.
  • the increase or reduction of the indirectly fed-in coal dust quantity is effected through a controlled increase or reduction of the throughput rate of the apportioning organs.
  • An advantageous configuration provides increasing or reducing the volumetric flow of the conveying gas blower in a controlled manner upon an increase or a reduction of the indirectly fed-in coal dust quantity. Thus, the smooth input of the coal dust in the firing box is maintained.
  • the increase or the reduction of the throughput rate of the apportioning organs and/or the increase or the reduction of the volumetric flow of the conveying gas blower is brought about by the block output control of the coal-fired power plant influenced by the requirements of the power grid.
  • the primary requirement or the primary control is triggered through a remote-controlled signal.
  • the secondary requirement or the secondary control is likewise triggered through a remote-controlled signal.
  • the secondary requirement or the secondary control can be additionally triggered through written or oral instruction to the operating personnel of the power plant.
  • FIG. 1 shows an extract from the British Electricity Grid Regulations (Grid Code (UK)), wherein the extract shows the minimum requirement profile of the frequency dependency for a 0.5 Hz frequency change from the target frequency (minimum frequency response requirement profile for a 0.5 Hz frequency change from target frequency),
  • Grid Code UK
  • FIG. 2 shows an extract from the British Power Grid Regulations (Grid Code (UK)), wherein the extract shows the interpretation of the primary and secondary control or primary and secondary requirement (interpretation of primary and secondary response values),
  • Grid Code UK
  • FIG. 3 shows, represented schematically, an assembly for improving the dynamic behavior of a coal-fired power plant for primary and/or secondary requirements of the power grid operator for the current output into the grid, wherein the coal grinding plant including coal dust lines of the furnace of the power plant are shown,
  • FIG. 4 shows, represented schematically, the relation of an output increase as a function of time and of the firing method.
  • the generated power In an electrical energy supply system (power grid) the generated power has to be constantly in equilibrium with the consumer power. Changes to the consumer load or power plant fault impair this equilibrium and cause frequency deviations in the grid, to which the machines involved in the primary control or the primary requirement, react. Because of its control behavior, the primary control or the equivalent primary requirement guarantees the restoration of the equilibrium between generated and consumed power within a few seconds, while the frequency is held within the permissible limit values.
  • the primary control or the equivalent primary requirement guarantees the restoration of the equilibrium between generated and consumed power within a few seconds, while the frequency is held within the permissible limit values.
  • the power grid there are quasi-stationary deviations (with respect to the target values) both of the frequency ⁇ f as well as the transfer power ⁇ Pi between the individual control zones following the balancing of a sudden change of the consumed or generated power through the primary control or the primary requirement.
  • the secondary control or secondary requirement becomes functional whose objective it is to return the frequency to its target value and the transfer outputs to the agreed values and thus to have
  • FIG. 1 shows the interpretation of the primary and secondary control or primary and secondary control output or primary and secondary requirement (interpretation of primary and secondary response values) of the British Power Grid Regulations (Grid Code UK) that has to occur upon a frequency deviation (frequency change) of ⁇ 0.5 Hz from the target frequency of the power grid.
  • the diagram of FIG. 1 shows that a power plant connected to the power grid according to the primary control P has to react within a time span T Sp of 10 seconds with a plant response and thus increase the power plant output. The amount of the output increase within this time span T Sp is dependent on the load range with which the power plant happens to be operated at the time of the drop in frequency.
  • the British Power Grid Regulations determine for example with a fixed required minimum load (minimum generation) of 65% of the nominal output (RC) (registered capacity) of the power plant that with this part load the power plant output has to be increased within the 10 seconds by 10% (percentage A p ) of the nominal output or capacity RC of the power plant (see FIG. 2 ).
  • the abscissa shows the load range (in percent of the RC) of the power plant
  • the ordinate shows the primary or secondary control ranges (in percent of the RC)
  • the increase by 10% of the rated capacity RC of the power plant has to be guaranteed between the part load range of 65 to 80% of the nominal power plant output RC.
  • the power increase decreases linearly from 10% to 0.
  • FIG. 2 In the event of the frequency being exceeded or a reduction of the primary and/or secondary requirements of the power grid operator with respect to the current output into the grid it is provided according to FIG. 2 to lower the power plant output in the part load range between 95% and 70% of the rated power of the power plant by 10% of the rated power RC of the power plant within the 10 seconds. Between the part load ranges of 70% to 65% of the nominal power plant output RC the output reduction decreases linearly from 10% to approximately 6.5 and between 100% and the part load range of 95%, the power reduction increases linearly from approximately 5% to 10%.
  • FIG. 2 additionally shows the minimum load (minimum generation MG) of the power plant required by the British Power Grid, which is at 65% of the nominal power plant output.
  • minimum load minimum generation MG
  • FIG. 3 exemplarily shows how these requirements raised by the British Power Grid Regulations can be satisfied.
  • the furnace 1 of the power plant according to the invention which is not shown is exemplarily designed with four coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 , all of which directly fire the firing box of the power plant which is not shown (direct firing system), wherein at least one of the coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 is designed in such a manner that it can be used to fire the firing box indirectly (indirect firing system) instead of directly, i.e. that at least one of the coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 in addition to the direct firing system is additionally designed with an indirect firing system.
  • Directly fired or a direct firing system means to say that the coal reduced in the coal grinding plant or coal mill 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 is directly fed to the firing box by means of a carrier gas or support air via coal dust lines 3 . 1 , 3 . 2 , 3 . 3 , 3 . 4 and fired therein.
  • a burner level each can be serviced by each coal grinding plant 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 and the coal dust lines 3 . 1 , 3 . 2 , 3 . 3 , 3 . 4 originating from the respective coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 each service the burners which are not shown in the respective corners or side walls of the generally rectangular firing boxes of the coal-fired power plant.
  • Indirectly fired or an indirect firing system means to say that the coal reduced or ground in the coal grinding plant or coal mill 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 is discharged via coal dust lines 3 . 1 , 3 . 2 , 3 . 3 , 3 . 4 and initially conducted in the direction of the firing box, but then, via a coal dust switch 6 each arranged in the coal dust line 3 . 1 , 3 . 2 , 3 . 3 , 3 . 4 and via storage lines 7 . 1 , 7 . 2 , 7 . 3 , 7 . 4 is fed to a separator 4 common to all storage lines.
  • the coal dust is separated from the carrier gas or support air and via a connecting line 8 fed to a silo 5 and stored therein.
  • a feed lines 9 . 1 , 9 . 2 , 9 . 3 , 9 . 4 and regulated apportioning organs 10 arranged in these feed lines the coal dust can be extracted from the silo 5 and via a charging device 15 each and a further coal dust switch 13 fed to the coal dust lines 3 . 1 , 3 . 2 , 3 . 3 , 3 . 4 downstream of the first coal dust switches 6 in order to be conveyed into the firing box by these.
  • the charging devices 15 arranged in the feed lines 9 .
  • the charging device 15 can for example be an injector, a feeder shoe, a dust pump or the like.
  • the carrier gas or support air separated in the separator 4 is discharged via a carrier gas discharge line 14 and fed into the atmosphere, while it is one more time cleaned before that in a dust separating system.
  • the carrier gas can also be conducted into the firing box or the smoke gas drafts of the coal-fired power plant connected downstream of the firing box and freed of dust in the existing dust separating system (e.g. e-filter, hose filter of the like) of the power plant system.
  • each of the storage lines 7 . 1 , 7 . 2 , 7 . 3 , 7 . 4 can each have its own separator 4 and its own silo 5 connected downstream, from which the respective feed lines 9 . 1 , 9 . 2 , 9 . 3 , 9 . 4 then originate.
  • the coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 of the furnace 1 according to FIG. 3 work in such a manner that the coal dust ground therein is directly fed to the firing box for firing via the respective carbon dust lines 3 . 1 , 3 . 2 , 3 . 3 , 3 . 4 .
  • the coal grinding plant 2 . 4 which exemplarily (instead of the grinding plant 2 . 4 , it can also be any other grinding plant) is designed with an indirect firing system in addition to the direct firing system, the respective coal dust switches 6 and 13 arranged in the coal dust lines 3 . 1 , 3 . 2 , 3 . 3 , 3 .
  • the apportioning organs 10 arranged in the feed lines 9 . 1 , 9 . 2 , 9 . 3 , 9 . 4 and charging devices 15 are in operation and conveying gas is provided to the charging devices 15 through the conveying gas line 11 and the conveying gas blower 12 .
  • the conveying gas picks up the respective coal dust apportioned by the apportioning organs 10 and conveys it into the firing box. The operation of the grinding plant 2 .
  • the grinding output of the grinding plant 2 . 4 is such that as a rule, at the start of the operation, the grinding output of the grinding plant 2 . 4 compared with the grinding output of the grinding plants 2 . 1 , 2 . 2 , 2 . 3 or compared with the current requirement of the grinding output of the grinding plant 2 . 4 or compared with the present actual output of the grinding plant 2 . 4 is increased in order to half fill the volume of the silo 5 having a storage volume V Sp with the excess offer of ground fuel. Following completed filling of the silo 5 the grinding output of the grinding plant 2 . 4 is adapted to those of the grinding plant 2 . 1 , 2 . 2 , 2 . 3 or the current requirement of the grinding output of the grinding plant 2 . 4 .
  • the discharge or conveying output of the apportioning organs 10 corresponds to the quantity-based grinding output of the grinding plant 2 . 4 , i.e. after the filling operation, the quantity of coal dust as produced by the grinding plant 2 . 4 is discharged from the silo 5 and conveyed into the silo 5 , while minute losses in the separator 4 are taken into account.
  • the block output control of the coal-fired power plant is influenced via the grid control of the power grid or its primary and/or secondary requirements of the power grid operator with respect to the current output into the grid, which substantially increases the quantity of the coal dust discharged by the apportioning organs 10 from the silo 5 and indirectly fed to the firing box relative to the present actual output or relative to the coal dust quantities in each case supplied by the coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 .
  • the coal dust stored and stocked in the silo 5 for these purposes can be introduced into the firing box for firing in a very short time and thereby, on the part of the furnace, a substantial contribution can be made for improving the dynamic behavior of the coal-fired power plant.
  • the present actual output designates the output or the part load with which the coal-fired power plant is currently operated and on which the fuel quantity fed in to the firing box and thus also the respective throughput rate of the individual coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 is dependent.
  • the block output control of the coal-fired power plant is influenced via the grid control of the power grid or its primary and/or secondary requirements of the power grid operator with respect to the current output into the grid, which substantially reduces the quantity of the coal dust discharged by the apportioning organs 10 from the silo 5 and indirectly fed to the combustion chamber compared with the present actual output or compared with the coal dust quantities supplied in each case by the coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 and thus, as with the increase of the coal dust quantity, a substantial contribution is made by the furnace to the improvement of the dynamic behavior of the coal-fired power plant.
  • coal dust provided by the grinding plant 2 . 4 during this process and which is not necessary, i.e. excess, is buffer-stored in the silo 5 .
  • the silo 5 connected downstream of the coal grinding plant 2 . 4 is dimensioned and designed with a receiving capacity or a storage volume V Sp for the coal dust to be stored.
  • additional coal grinding plants of the exemplary four coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 . 4 in FIG. 3 can each be designed with an indirect firing system and thus with a silo 5 for the storage of coal dust. If for example two, three or all four coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 .
  • the entire storage volume or the receiving capacity V Sp of coal dust can be divided over the existing number of silos 5 or the storage volume V Sp increased through the increased number of silos 5 .
  • the dynamics of the fuel apportioning of the coal-fired power plant can be further improved if required.
  • the primary and secondary reserve of the coal-fired power plant can also be improved or increased.
  • the storage volume V Sp of the silo 5 is dimensioned in such a manner that upon normal operation, i.e. with stationary state, the storage volume V Sp of the silo 5 is filled to about half and thereby has stored sufficient coal dust in order to be able to introduce an increased coal dust quantity into the firing box in the event of a frequency drop or a primary and/or secondary requirement of the power grid operator with respect to the current output into the grid, i.e. of an instationary state, in order to improve the dynamic behavior of the power plant.
  • the silo 5 still has to have sufficient storage capacity in order to be able to introduce a reduced coal dust quantity into the firing box in the event of a frequency being exceeded or a primary and/or secondary requirement of the power grid operator with respect to the current output into the grid, i.e. in turn of an instationary state, and thereby receive or store the excess coal dust quantity produced by the grinding plant 2 . 4 during the instationary state in the silo 5 .
  • the charging devices 15 and the coal dust lines can be suitably designed dimensionally downstream of the silo or of the silos 5 as far as to the firing box in order to be able to conduct and feed to the firing box the required fuel quantities in the short time required.
  • the conveying gas or support air required for this purpose is supplied in a controlled manner through the conveying gas line 11 and by means of the conveying gas blower 12 .
  • FIG. 4 schematically shows the dynamic behavior of a direct and an indirect furnace or of a direct as well as an indirect firing system of a coal-fired power plant. While the increase of the boiler output from L 0 to L 1 with the direct furnace starting out from t 0 takes the time t 2 , the increase of the same boiler output with the indirect furnace starting out from t 0 only requires the time t 1 and thus comes substantially closer to an ideal, rapid increase within a time t 0 (step response).
  • step response Through the method according to the invention or the assembly according to the invention of designing at least one of the coal grinding plants 2 . 1 , 2 . 2 , 2 . 3 , 2 .
  • the dynamic behavior of the furnace according to FIG. 4 in addition to the direct furnace with an indirect furnace and operating said furnace as indirect furnace and upon a frequency change in the power grid or a primary and/or secondary requirement of the power grid operator with respect to the current output into the grid of increasing or reducing the quantity of the coal dust discharged from the silo 5 and indirectly fed to the firing box compared with the indirectly supplied coal dust quantity upon stable grid frequency, the dynamic behavior of the furnace according to FIG. 4 and thus also the plant response behavior, i.e. the dynamic behavior of the coal-fired power plant can be substantially improved.
  • the increase of the boiler output from L 0 to L 1 constitutes a percentage A p of the nominal power plant output RC, for example an increase by 10% of the nominal power plant output RC.
  • coal grinding plants 3 are additionally designed with an indirect firing system, one or a plurality of coal grinding plants can be reset by means of resetting of the coal dust switches 6 and 13 to the operation as indirect firing system and thus temporarily replace the indirect firing system of the coal grinding plant 2 . 4 currently undergoing maintenance.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Feeding And Controlling Fuel (AREA)
  • Breeding Of Plants And Reproduction By Means Of Culturing (AREA)
US13/262,391 2009-04-03 2010-03-19 Method and assembly for improving the dynamic behavior of a coal-fired power plant Abandoned US20120122042A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102009016191.0 2009-04-03
DE102009016191A DE102009016191B4 (de) 2009-04-03 2009-04-03 Verfahren und Anordnung zur Verbesserung des dynamischen Verhaltens eines kohlegefeuerten Kraftwerkes bei primären und/oder sekundären Anforderungen des Elektrizitätsnetz-Betreibers an die Stromabgabe in das Netz
PCT/DE2010/000323 WO2010115396A1 (de) 2009-04-03 2010-03-19 Verfahren und anordnung zur verbesserung des dynamischen verhaltens eines kohlegefeuerten kraftwerkes bei primären und/oder sekundären anforderungen des elektrizitätsnetz-betreibers an die stromabgabe in das netz

Publications (1)

Publication Number Publication Date
US20120122042A1 true US20120122042A1 (en) 2012-05-17

Family

ID=42333293

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/262,391 Abandoned US20120122042A1 (en) 2009-04-03 2010-03-19 Method and assembly for improving the dynamic behavior of a coal-fired power plant

Country Status (9)

Country Link
US (1) US20120122042A1 (zh)
EP (1) EP2414731B1 (zh)
CN (1) CN102388267B (zh)
DE (1) DE102009016191B4 (zh)
ES (1) ES2597961T3 (zh)
HR (1) HRP20161325T1 (zh)
HU (1) HUE029851T2 (zh)
PL (1) PL2414731T3 (zh)
WO (1) WO2010115396A1 (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3016806A1 (fr) * 2014-01-28 2015-07-31 Electricite De France Procede de reduction des emissions de nox dans une centrale thermique a charbon.
WO2016020559A1 (es) * 2014-08-07 2016-02-11 Inerco Ingeniería, Tecnología Y Consultoría, S.A. Sistema de optimización de la combustión para calderas de combustible sólido pulverizado y caldera que incorpora dicho sistema
US10781807B2 (en) 2016-08-25 2020-09-22 Dipl. Ing. Ernst Schmitz Gmbh & Co. Kg Maschinen Und Apparatebau Double membrane for a dust pump
US10914299B2 (en) 2016-01-27 2021-02-09 Dipl. Ing. Ernst Schmitz Gmbh & Co. Kg Maschinen Und Apparatebau Diaphragm pump comprising dust suction from below
US11215174B2 (en) 2016-08-25 2022-01-04 Dipl. Ing. Ernst Schmitz Gmbh & Co. Kg Maschinen Und Apparatebau Diaphragm pump having a porous, arched aluminum filter
US11590440B2 (en) 2016-08-25 2023-02-28 Dipl. Ing. Ernst Schmitz GmbH & Co. KG Maschinen and Apparatebau Production of a porous aluminum filter for a diaphragm pump

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201114894D0 (en) 2011-08-30 2011-10-12 Doosan Power Systems Ltd Combustion apparatus
DE102011053656A1 (de) * 2011-09-15 2013-03-21 Hitachi Power Europe Gmbh Verfahren zum Betrieb einer Feuerungsanlage eines kohlegefeuerten Kraftwerks

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2110356A (en) * 1981-11-27 1983-06-15 Steag Ag Furnace and method of operating the furnace
US6418866B1 (en) * 1998-06-16 2002-07-16 Mitsubishi Heavy Industries, Ltd. Operating method of fluidized-bed incinerator and the incinerator
US20090301437A1 (en) * 2006-02-07 2009-12-10 Hiroaki Mizoguchi Air-fuel ratio control device of internal combustion engine

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1027835B (de) * 1954-12-23 1958-04-10 Steinkohlen Elek Zitaet Ag Verfahren zum Betreiben von Staubfeuerungen
US4332207A (en) * 1980-10-30 1982-06-01 Combustion Engineering, Inc. Method of improving load response on coal-fired boilers
WO1984001016A1 (en) * 1982-09-02 1984-03-15 Combustion Eng Supplying pulverized coal to a coal-fired furnace
PL152729B1 (en) * 1987-04-06 1991-01-31 Method of controlling operation of a power unit
CZ280159B6 (cs) * 1987-04-06 1995-11-15 Poludniowy Okreg Energetyczny Katowice Elektrownia Laziska Zařízení pro řízení energetického bloku
DE19521505B4 (de) * 1995-06-13 2004-07-01 Babcock Borsig Power Systems Gmbh Verfahren zum Verbrennen von Kohle mit weniger als 10 % flüchtigen Bestandteilen
CN1328235A (zh) * 2000-06-13 2001-12-26 冯燧成 煤粉炉发电机组全烧煤矸石大幅度调峰技术
PL206626B1 (pl) * 2000-08-04 2010-09-30 Babcock Hitachi Kk Palnik do paliwa stałego oraz sposób spalania za pomocą palnika do paliwa stałego
DE10100331B4 (de) * 2001-01-05 2006-08-10 Alstom Power Boiler Gmbh Mühleneinrichtung und -Verfahren sowie Feuerungseinrichtung
CN100498060C (zh) * 2005-11-11 2009-06-10 南京科远控制工程有限公司 循环流化床锅炉燃烧优化控制方法
DE102008004400C5 (de) * 2008-01-14 2017-01-26 Babcock Borsig Steinmüller Gmbh Verfahren zur Dosierung von Kohlenstaub in eine Feuerungseinrichtung

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2110356A (en) * 1981-11-27 1983-06-15 Steag Ag Furnace and method of operating the furnace
US6418866B1 (en) * 1998-06-16 2002-07-16 Mitsubishi Heavy Industries, Ltd. Operating method of fluidized-bed incinerator and the incinerator
US20090301437A1 (en) * 2006-02-07 2009-12-10 Hiroaki Mizoguchi Air-fuel ratio control device of internal combustion engine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3016806A1 (fr) * 2014-01-28 2015-07-31 Electricite De France Procede de reduction des emissions de nox dans une centrale thermique a charbon.
WO2016020559A1 (es) * 2014-08-07 2016-02-11 Inerco Ingeniería, Tecnología Y Consultoría, S.A. Sistema de optimización de la combustión para calderas de combustible sólido pulverizado y caldera que incorpora dicho sistema
US10914299B2 (en) 2016-01-27 2021-02-09 Dipl. Ing. Ernst Schmitz Gmbh & Co. Kg Maschinen Und Apparatebau Diaphragm pump comprising dust suction from below
US10781807B2 (en) 2016-08-25 2020-09-22 Dipl. Ing. Ernst Schmitz Gmbh & Co. Kg Maschinen Und Apparatebau Double membrane for a dust pump
US11215174B2 (en) 2016-08-25 2022-01-04 Dipl. Ing. Ernst Schmitz Gmbh & Co. Kg Maschinen Und Apparatebau Diaphragm pump having a porous, arched aluminum filter
US11590440B2 (en) 2016-08-25 2023-02-28 Dipl. Ing. Ernst Schmitz GmbH & Co. KG Maschinen and Apparatebau Production of a porous aluminum filter for a diaphragm pump

Also Published As

Publication number Publication date
EP2414731A1 (de) 2012-02-08
ES2597961T3 (es) 2017-01-24
HRP20161325T1 (hr) 2016-11-18
CN102388267B (zh) 2014-05-07
DE102009016191B4 (de) 2013-04-04
PL2414731T3 (pl) 2017-08-31
EP2414731B1 (de) 2016-07-13
HUE029851T2 (en) 2017-04-28
DE102009016191A1 (de) 2010-10-07
CN102388267A (zh) 2012-03-21
WO2010115396A1 (de) 2010-10-14

Similar Documents

Publication Publication Date Title
US20120122042A1 (en) Method and assembly for improving the dynamic behavior of a coal-fired power plant
CN104179704B (zh) 一种电厂增压风机辅机故障减负荷rb的方法及装置
CN110056903B (zh) 燃煤掺烧情况下不同煤种的煤量的确定方法及系统
CN112183924A (zh) 火电机组配煤掺烧方法
JP2015001347A (ja) 竪型粉砕分級装置
CN111981459A (zh) 多种燃料混烧燃煤机组rb工况下的优化控制方法
CN113441268A (zh) 一种磨煤机磨制高挥发分煤种的防爆方法
JP2014090535A (ja) 蓄電システム及び蓄電池システムの制御方法
CN109058968A (zh) 一种深度调峰锅炉控制方法、装置和火力发电系统
CN104913325A (zh) 锅炉的燃烧控制方法
CN105841488A (zh) 流化床锅炉负荷调节及低氮燃烧方法与装置
KR20140036016A (ko) 발전소 및 발전소의 작동 방법
CN110645588A (zh) 一种锅炉系统
CN115234903A (zh) 一种循环流化床锅炉机组深度调峰系统
CN109058959A (zh) 一种降低600mw超临界“w”火焰机组深度调峰油耗的方法
Kvrivishvili et al. Primorskaya thermal power plant: construction of modern pulverized coal-fired boilers
JP6365553B2 (ja) 電力調整方法
KR100834055B1 (ko) 500메가와트급 보일러 연소제어계통 노 내압 안정화 방법
JP4129818B2 (ja) ボイラ自動制御方法およびその装置
KR100952270B1 (ko) 보일러 연료유 제어 시스템
CN216103970U (zh) 一种原煤仓充气保护系统
CN111023086B (zh) 一种亚临界循环流化床锅炉适应电网深度调峰的方法
CN116576446A (zh) 一种基于rb逻辑的机组控制方法
JPS6238126Y2 (zh)
CN113217908A (zh) 一种生物质成型燃料燃烧系统

Legal Events

Date Code Title Description
AS Assignment

Owner name: ALSTOM TECHNOLOGY LTD, SWITZERLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BRUEGGEMANN, HELLMUTH;DRENIK, OLIVIER;HEIM, MICHAEL;AND OTHERS;REEL/FRAME:027213/0862

Effective date: 20111005

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION