US20110188945A1 - Support structure for supporting an offshore wind turbine - Google Patents

Support structure for supporting an offshore wind turbine Download PDF

Info

Publication number
US20110188945A1
US20110188945A1 US13/018,687 US201113018687A US2011188945A1 US 20110188945 A1 US20110188945 A1 US 20110188945A1 US 201113018687 A US201113018687 A US 201113018687A US 2011188945 A1 US2011188945 A1 US 2011188945A1
Authority
US
United States
Prior art keywords
support structure
tower
section
post
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/018,687
Other languages
English (en)
Inventor
Rune Hartkopf
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: Hartkopf, Rune
Publication of US20110188945A1 publication Critical patent/US20110188945A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0004Nodal points
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0082Spudcans, skirts or extended feet
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Definitions

  • the present invention relates to a support structure for supporting an offshore wind turbine. It further relates to a wind turbine.
  • Offshore wind turbine foundations normally fall into three groups, gravity foundations, mono-pile foundations, and advanced foundations such as tripods or suction bucket foundations.
  • Gravity foundations are typically made of concrete. They may be made hollow and have sufficient buoyancy for floatation to site, possibly supported with buoyancy elements, or they may be shipped by barge and lifted into place. The weight of the foundation itself is typically increased by ballasting with a heavy type of ballast, such as olivine. Gravity foundations have the disadvantage that they tend to become very expensive for large turbines and/or large water depths.
  • a mono-pile foundation consists of a steel pile, typically with a diameter of 4-5 metres. The pile is driven some 20-30 metres into the seabed depending on the type of underground. The mono-pile foundation is effectively extending the turbine tower under water and into the seabed.
  • the most common advanced offshore foundation is the tripod foundation. This type of foundation draws on the experiences with light weight and cost efficient three-legged steel jackets for marginal offshore fields in the oil industry.
  • the structure typically consists of a central pipe and three inclined legs. The three legs are connected at the bottom and are also connected to the central pipe. At the end of each leg a short vertical pipe is used as jacket around a steel pile driven deeply into the seabed. After completion of the piling the jackets is injected with high-strength mortar and a firm connection between pile and leg is established.
  • EP 1 884 598 an offshore foundation is disclosed, which comprises a pile and a superstructure.
  • the pile is rammed down into the seabed and only projects a limited stretch above the seabed.
  • the pile provides a foundation stub for the superstructure, which is fastened on top of the pile.
  • a challenge will be to establish the joint between pile and superstructure; a task that will normally be accomplished by injection with high-strength mortar.
  • steel has been the preferred material, as it works well under changing stress conditions. Further steel has the advantage that the strength per mass is significantly better than for instance concrete. Towers are therefore typical made of steel to allow road transportation. However steel has three mayor disadvantages compared to concrete. Firstly, the price in relation to the strength is significantly larger, and widely influenced by fluctuations in the economy. Secondly, for steel in wind turbines fatigue is often the design driver, where extreme loads are for concrete. Concrete towers or foundations have therefore automatically longer lifetime if proper treated. Thirdly, steel requires very careful surface treatment to avoid corrosion in a marine environment.
  • Mono-piles and wind turbine generators are typically installed in pieces with a jack-up vessel, e.g. of mono-pile, transition piece, 2-3 tower sections, nacelle and blades.
  • a jack-up vessel e.g. of mono-pile, transition piece, 2-3 tower sections, nacelle and blades.
  • foundations and wind turbine generators are installed in two steps, thus the jack-up have to install at each wind turbine generator location twice. Because the turbine is assembled offshore expensive vessel time and man hours is used, complete test is further difficult and must be preformed offshore.
  • a jack-up vessel is an advanced piece of equipment. It has, for instance, an expensive jack-up system and a large revolving crane including a number of moving parts.
  • a first objective of the present invention is to provide an advantageous support structure for supporting offshore wind turbines.
  • a second objective of the present invention is to provide an advantageous wind turbine.
  • the first objective is solved by a support structure for supporting offshore wind turbines and the second objective is solved by a wind turbine as claimed in the independent claims.
  • the depending claims define further developments of the invention.
  • the inventive support structure for supporting offshore wind turbines comprises a foundation configured to at least partly contact a seabed and at least part of a tower.
  • the foundation and the at least part of the tower are one-piece. This has the advantage that a costly fastening of the tower onto the foundation is no longer necessary.
  • one-piece means that the foundation and the tower or part of the tower are integrally formed or made of one piece. At last, there is no connecting means between the foundation and the tower or part of the tower, or within different sections of the foundation.
  • the at least part of a tower as part of the inventive support structure is also designated as tower section.
  • the tower or tower section may be connectable to a wind turbine generator, especially to a wind turbine nacelle.
  • the foundation can comprise a narrow section which has a smaller diameter than the maximum diameter of the tower.
  • the narrow section can be located in a splash and spray zone of the sea when the support structure is installed onto the seabed.
  • the advantage of the narrow section being narrower than the tower or tower section is the fact that the narrow section is exposed to wave loads and the tower or tower section is exposed to wind loads.
  • the larger diameter of the tower or tower section gives a stiffer structure of the tower.
  • the support structure may comprise concrete and/or steel.
  • it may comprise concrete of the type 45 Mpa or 30 Gpa. Concrete has the advantage that it is a relatively cheep material. Therefore the costs for the foundation and for the wind turbine can be reduced.
  • the foundation can comprise a lower section and/or a transition section having a changing diameter.
  • the lower section may be configured to at least partly contact the seabed.
  • the lower section may be at least partly conical, for example to reduce scour.
  • the transition section may be located between the narrow section and the tower or tower section.
  • the transition section can advantageously be located above highest wave level.
  • the diameter of the transition section increases, for example continuously or stepwise, from the narrow section to the tower section to form a platform and/or to support a tower with a diameter which is greater than the diameter of the narrow section.
  • the transition section can have a bigger diameter than the narrow section.
  • the transition section can be used to lift the support structure during installation.
  • the tower or the tower section may comprise an outer wall.
  • the narrow section may also comprise an outer wall.
  • the outer wall of the narrow section can be thicker than the outer wall of the tower or tower section.
  • At least part of the support structure can be post-stressed.
  • Post stressing may be utilized to lower tensile stress, especially in at least part of the concrete.
  • the post stress level in the narrow section can be different from the stress level in the tower.
  • post stress level means the stress in the particular structure element after tightening, activating or torquing a stressing means.
  • the stressing means may be, for example, a cable, a rod or a wire.
  • the support structure may comprise at least one post stressing means and/or at least one post tension reinforcement means, for example a cable, wire or rod.
  • the at least one post stressing means and/or at least one post tension reinforcement means may be placed inside of the support structure or inside of a wall of the support structure or external along the side of the structure.
  • the post stressing in the lower and narrow section may be drawn inside the support structure, for example inside the concrete support structure.
  • the post stressing in the tower or tower section may be drawn at least partly outside of the outer wall, which may be a concrete wall, e.g. inside the tower or tower section.
  • the at least one post stressing means and/or at least one post tension reinforcement means can be placed in the tower or in the tower section at least partly outside of an outer wall and/or inside of the tower or tower section. Furthermore, the at least one post stressing means and/or at least one post tension reinforcement means can be placed in the lower section inside of an outer wall of the lower section. Moreover, the at least one post stressing means and/or at least one post tension reinforcement means can be placed in the narrow section inside of an outer wall of the narrow section.
  • the post stressing means in the tower or tower section can be connected to a post stressing means in the transition section and/or to a post stressing means in the narrow section and/or to a post stressing means in the lower section.
  • the post stressing means in the transition section can be connected to a post stressing means in the narrow section and/or to a post stressing means in the lower section.
  • the post stressing means in the narrow section can be connected to a post stressing means in the lower section.
  • a post tension reinforcement can either be drawn in duct inside the concrete structure or drawn external along the side of the structure.
  • In conjunction with internal post tension corrugated steel or at least one plastic duct may be casted into the concrete construction with anchors in both ends. Wires may be drawn through the ducts and tensioned by means of a hydraulic tension jack, for example.
  • a protection may be filled into the ducts.
  • an expanding high strength grout can be used to lock the cables to the duct wall casted into the concrete structure.
  • Other protection materials can be utilized such as grease or wax, which both allow additional tensioning, which can be a preferable way to cope with relaxation in steel wire and deformation of concrete.
  • Internal reinforcement has the advantage that tension wires are well protected inside the concrete wall, especially protected from humidity by grout, grease or wax.
  • An external post tension wire may be plastic sheathed and/or protected by grease. Preferably, the external post tension wire may be placed next to the concrete structure.
  • the foundation is internal post-stressed
  • the duct can be filled with protection material e.g. grout, grease or wax for corrosion protection.
  • the post tension of the tower part can be internal post-stressed.
  • Wires can be connected to anchors for foundation post-stressing.
  • post tension wire for foundation part is drawn from the bottom of the structure, and stressed at this level to minimize crane work, platform and scaffold arrangement.
  • the lower section and/or the narrow section and/or the transition section and/or the tower or tower section are/is hollow.
  • at least part of the support structure can be filled with ballast, for instance soil. This increases the stability under load of the support structure.
  • the lower section may comprise at least one skirt, for instance to provide a fixation of the support structure with the seabed.
  • the skirt can be configured or to reduce scour or to grout underneath to secure connection between the support structure and underlying soil.
  • the skirt may be split into 3 or more champers. It can be used to level the foundation.
  • the soil interface can be either deep or shallow foundation.
  • a deep foundation can comprise one or more piles.
  • a shallow foundation can be gravity or suction bucket. Gravity foundations may be produced with skirt to lower demand for seafloor preparation and/or scour protection. Gravity without skirt is preferred.
  • the inventive wind turbine especially offshore wind turbine, comprises an inventive support structure as previously described.
  • the inventive wind turbine has the same advantages as the inventive support structure has.
  • Buckle reinforcement can be prefabricated either by rolling net or by spinning reinforcement on to a revolving model. Jumpforming can be used for good surface quality.
  • Floating crane can be made as a catamaran that lifts above centre and thereby don't need to move ballast when lifting. Further, the floating crane can be made with ballast tanks allowing submerging more of the floating crane during installation to gain stability. For barge transportation the moving production line can be extended to load complete turbines on to transportation barges.
  • An advantage of the inventive support structure and the inventive wind turbine is that the support structure and/or the wind turbine can be installed and tested onshore. Wind turbine and foundation can be installed at once. This is possible due to the relatively low mass of the structure. No jacking system is necessary on the installation vessel. No large revolving crane is necessary on the installation vessel. Little or no maintenance of the support structure is necessary due to the choice of material, especially concrete. The lifetime of the support structure can probably meet the lifetime of the collector system, which is about 60 years. Moving production lines may create a more industrialised production. Local production can create local jobs which can be a factor for decision makers. The structure is stiff and has therefore potential against deeper water. Inexpensive concrete can be used, e.g. 45 Mpa and 30 Gpa. Therefore, the invention provides a low-cost offshore wind turbine foundation and tower and a low-cost offshore wind turbine.
  • FIG. 1 schematically shows an inventive support structure in a sectional view.
  • FIG. 2 schematically shows a variant of an inventive support structure.
  • FIG. 3 schematically shows an inventive wind turbine.
  • FIG. 4 schematically shows an inventive wind turbine and an installation vessel.
  • FIG. 5 schematically shows an inventive support structure with post-stressing cables.
  • FIGS. 1 to 5 An embodiment of the present invention will now be described with reference to FIGS. 1 to 5 .
  • FIG. 1 schematically shows an inventive support structure for supporting offshore wind turbines in a sectional view.
  • the support structure 1 comprises a foundation 2 and at least part of a tower 3 .
  • the centre line of the support structure 1 is designated with reference numeral 11 .
  • the foundation 2 and at least part of the tower 3 are one-piece. This means, that the foundation 2 and at least part of the tower 3 are made of one-piece or are integrally formed. In other words, there is no connection between the different sections of the support structure 1 .
  • the foundation 2 comprises a lower section 4 , a narrow section 5 and a transition section 6 .
  • the lower section 4 is followed by the narrow section 5 .
  • the narrow section 5 is followed by the transition section 6 .
  • the transition section 6 is followed by the tower 3 or the tower section 3 .
  • the lower section 4 is configured to at least partly contact the seabed. It has a conical shape to reduce score.
  • the lower section 4 comprises a number of skirts 8 .
  • the skirts 8 are placed at the bottom of the lower section 4 .
  • the skirts 8 are made suitable for reduction of scour and can be used to grout underneath to secure connection between the support structure 1 and underlying soil.
  • the skirts 8 can be used to level the foundation 2 by splitting the skirts 8 into three or more champers.
  • the complete support structure 1 or at least the foundation 2 or at least part of the foundation 2 , for example the lower section 4 or part of the lower section 4 can be hollow.
  • the hollow parts or at least part of the hollow sections can be filled with ballast such as soil.
  • the complete support structure 1 is hollow comprising a hollow space 24 inside.
  • the tower 3 has a maximum diameter 10 .
  • the narrow section has a diameter 9 .
  • the maximum diameter 10 of the tower 3 is bigger than the diameter 9 of the narrow section 5 .
  • the tower 3 comprises an outer wall 22 and the narrow section 5 comprises an outer wall 23 .
  • the thickness 12 of the outer wall 22 of the tower 3 is thinner than the thickness 13 of the outer wall 23 of the narrow section 5 .
  • the lower section 4 has a conical shape with a decreasing diameter from the bottom to the narrow section 5 .
  • the transition section 6 has a continuously or stepwise increasing diameter 29 from the narrow section 5 to the tower section 3 . Moreover, the transition section 6 has an increasing wall thickness from the narrow section 5 to the tower section 3 .
  • a platform 18 is formed on the upper surface of the transition section 6 , where the transition section 6 is followed by the tower section 3 . The platform extends inside of the support structure 1 .
  • the tower 3 or the tower section 3 has a decreasing diameter from the bottom, where it follows the transition section 6 , to the top, where a wind turbine generator may be mounted onto the tower 3 .
  • the tower section 3 or the tower 3 is connectable to a wind turbine, especially to a wind turbine nacelle.
  • the narrow section 5 is located in a splash and spray zone and the transition section 6 is located above the highest wave level.
  • the support structure 1 comprises concrete. Furthermore, the support structure 1 comprises post-stressing means, for example at least one cable, wire, rod or any other suitable means for post-stressing the structure or at least part of the support structure 1 .
  • the support structure 1 comprises at least two post-stressing cables 7 .
  • the post-stressing cables 7 are placed inside the support structure 1 . More concretely, a first portion of the post-stressing cables 7 a is located inside of the tower section 3 in the hollow space 24 inside of the tower section 3 .
  • the first portion of the post-stressing cables 7 a is connected to the tower section 3 on top or close to the top of the tower section 3 .
  • a second portion of the post-stressing cables 7 b is located inside of the outer walls 23 , 25 , 26 of the transition section 6 , the narrow section 5 and the lower section 4 .
  • the ends of the second portion of the post-stressing cables 7 b are connected to the lower section 4 at the bottom of the lower section 4 , for example close to the skirts 8 .
  • the post-stressing cables 7 can be connected to the support structure 1 in another suitable way.
  • the post-stressing cables 7 can be located at least partly outside of the support structure 1 .
  • the post-stress level in the narrow section 5 can be different from the stress level in the tower section 3 .
  • FIG. 5 schematically shows a variation of the inventive support structure 1 of FIG. 1 .
  • the skirts 8 are omitted for simplification.
  • the transition section 6 has a slightly different shape compared to FIG. 1 .
  • FIG. 5 shows fixing elements 19 , 20 and 21 for fixing the post-stressing cables 7 .
  • the fixing elements 21 are located on top of the tower section 3 close to the outer wall 22 of the tower section 3 .
  • the fixing elements 20 are located at the platform 18 of the transition section 6 .
  • the first portions 7 a of the post-stressing cables run from the fixing elements 21 to the fixing elements 22 in the inner hollow space 24 of the tower section 3 close to the outer wall 22 .
  • the second portions 7 b of the post-stressing cables run from the second fixing elements 20 at the transition section 6 to the third fixing elements 19 .
  • the third fixing elements 19 are located close to the bottom of the lower section 4 inside of the outer wall 25 of the lower section 4 .
  • the second portion 7 b of the post-stressing cables runs inside of the outer wall 23 of the narrow section 5 and/or inside of the outer wall 25 of the lower section 4 . Moreover, the second portion 7 b of the post-stressing cables can also run inside of the wall 26 of the transition section 6 .
  • the first portion 7 a of the post-stressing cable and the second portion 7 b of the post-stressing cable can be stressed separately. This means, that the stress level in the tower section 3 and in the foundation 2 can be different. Additional fixing elements can be placed, for example, between the lower section 4 and the narrow section 5 to provide for difference stress levels in the lower section 4 and the narrow section 5 .
  • FIG. 2 schematically shows a variant of an inventive support structure 100 , which is slightly different from the support structure 1 of FIGS. 1 and 5 .
  • the support structure 100 differs from the support structure 1 in that it comprises a first intermediate section 26 between the narrow section 5 and the transition section 6 and a second intermediate section 27 , which is located between the lower section 4 and the narrow section 5 .
  • FIG. 3 schematically shows an inventive wind turbine 28 in a partly perspective view.
  • the wind turbine 28 comprises a support structure 100 , which was described in conjunction with FIGS. 1 , 2 and 5 .
  • a nacelle 14 is mounted on top of the tower 3 .
  • the nacelle 14 comprises a rotor with a number of rotor blades 15 .
  • a wind turbine typically comprises two or three rotor blades 15 .
  • FIG. 4 schematically shows the inventive wind turbine 28 of FIG. 3 , which is fixed to an installation vessel 16 .
  • the sea level is designated by reference numeral 17 .
  • the installation vessel 16 may comprise a floating catamaran crane with a lifting crane.
  • the installation vessel 16 may comprise two self propellered barges, which may be connected by a giant frame carrying lifting or revolving crane. In this case the offshore work is reduced to a minimum, only including the transport and placement of the support structure with the preinstalled and tested wind turbine.
US13/018,687 2010-02-02 2011-02-01 Support structure for supporting an offshore wind turbine Abandoned US20110188945A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP10152435A EP2354536A1 (de) 2010-02-02 2010-02-02 Stützstruktur zur Stützung einer Offshore-Windturbine
EP10152435.3 2010-02-02

Publications (1)

Publication Number Publication Date
US20110188945A1 true US20110188945A1 (en) 2011-08-04

Family

ID=42668599

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/018,687 Abandoned US20110188945A1 (en) 2010-02-02 2011-02-01 Support structure for supporting an offshore wind turbine

Country Status (6)

Country Link
US (1) US20110188945A1 (de)
EP (1) EP2354536A1 (de)
JP (1) JP2011157971A (de)
CN (1) CN102213193A (de)
CA (1) CA2730672A1 (de)
NZ (1) NZ590831A (de)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120012727A1 (en) * 2009-03-19 2012-01-19 Telefonaktiebolaget Lm Ericsson (Publ) Tubular Telecom Tower Structure
US20140079490A1 (en) * 2012-09-20 2014-03-20 Korea Institute Of Ocean Science And Technology Supporting structure for offshore wind power generator
US20150204102A1 (en) * 2010-07-13 2015-07-23 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets
US9856621B2 (en) 2013-09-09 2018-01-02 Dbd Systems, Llc Method of construction, installation, and deployment of an offshore wind turbine on a concrete tension leg platform
US10844565B2 (en) * 2014-02-06 2020-11-24 Exxonmobil Upstream Research Company Systems and methods for reducing scouring
CN113026803A (zh) * 2019-12-09 2021-06-25 中国电建集团华东勘测设计研究院有限公司 一种应用于海上电气平台的吸力桶-桩基础复合结构及施工方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101387741B1 (ko) * 2012-07-27 2014-04-21 삼성중공업 주식회사 풍력 발전기의 타워 구조체
CN106014873B (zh) * 2016-06-15 2018-09-11 江苏金风科技有限公司 海上风力发电机组塔架基础的防护装置
CN107740753B (zh) * 2017-10-20 2024-03-15 中交三航(上海)新能源工程有限公司 一种用于单桩基础的海上风力发电机组整体安装下部就位系统及柔性安装系统
GB2605377B (en) * 2021-03-29 2023-11-29 Equinor Energy As Foundation for an offshore wind turbine
WO2023006955A1 (en) * 2021-07-30 2023-02-02 Lak Mohammad Amin Gravity based foundation
CN117028157B (zh) * 2023-10-09 2023-12-15 中国电力工程顾问集团有限公司 泥浮式海上风机系统的安装方法

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3733834A (en) * 1972-05-01 1973-05-22 L Ludwig Dynamic damper for offshore structures
US3738113A (en) * 1971-10-14 1973-06-12 Chicago Bridge & Iron Co Offshore oil storage structure with submergence shell
US3793840A (en) * 1971-10-18 1974-02-26 Texaco Inc Mobile, arctic drilling and production platform
US4114392A (en) * 1976-06-24 1978-09-19 Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous-Marines Platform structure for maritime installations
US4222682A (en) * 1976-06-30 1980-09-16 Enterprise D'equipments Mechaniques Et Hydrauliques, E.M.H. Platforms for sea-bottom exploitation
US4272929A (en) * 1979-08-23 1981-06-16 Hanson Bror H Tower and method of construction
US4639167A (en) * 1985-04-24 1987-01-27 Odeco, Inc. Deep water mobile submersible arctic structure
US4664556A (en) * 1983-10-24 1987-05-12 Dixon Richard K Method for building structures in water
US4693637A (en) * 1984-12-20 1987-09-15 Takenaka Komuten Co., Ltd. Gravity type oceanic structure and its stable installation
US4749309A (en) * 1985-10-23 1988-06-07 Norwegian Contractors Offshore platform structure of reinforced concrete and a method of producing same
US4767235A (en) * 1986-07-29 1988-08-30 Antonio Ferruccio Prefabricated composite element for the building of a sea wall
US4767241A (en) * 1985-11-13 1988-08-30 Wells Gordon T Method for simultaneous forming of concrete footings and piers
US4778308A (en) * 1985-02-12 1988-10-18 Saga Petroleum A.S. Arrangement in an offshore concrete platform
US5094567A (en) * 1986-02-05 1992-03-10 Techocompositi S.P.A. Flexible column from composite material
US5316413A (en) * 1992-09-28 1994-05-31 Chevron Research And Technology Company Offshore double cone structure
US5318385A (en) * 1991-08-29 1994-06-07 Petroleo Brasileiro S.A.-Petrobras Supporting system for lines and conductor pipes at offshore platforms
US5320452A (en) * 1992-03-24 1994-06-14 Kabushiki Kaisha Ask Kenkyusho Cast-in-place concrete pile and method of constructing the same in the ground
US5433557A (en) * 1993-12-27 1995-07-18 Spencer, White & Prentis Foundation Corporation Method for underpinning an existing footing
US5513929A (en) * 1994-08-11 1996-05-07 Mcdermott International, Inc. Fixed offshore platform structures, using small diameter, tensioned, well casing tiebacks
US5960597A (en) * 1996-10-24 1999-10-05 Schwager Davis, Inc. Method for post-tensioning columns
US6371695B1 (en) * 1998-11-06 2002-04-16 Exxonmobil Upstream Research Company Offshore caisson having upper and lower sections separated by a structural diaphragm and method of installing the same
EP1777348A1 (de) * 2005-10-21 2007-04-25 Dredging International N.V. Vorrichtung und Methode zum installieren von Offshore-Anlagen
US20090191003A1 (en) * 2008-01-28 2009-07-30 Kruse Darin R Apparatus and methods for underground structures and construction thereof
US7770343B2 (en) * 2005-04-21 2010-08-10 Structural Concrete & Steel, S.L. Prefabricated modular tower

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000283019A (ja) * 1999-03-31 2000-10-10 Pc Bridge Co Ltd コンクリート製風車支持タワー及びその構築方法
GB0020410D0 (en) * 2000-08-19 2000-10-04 Ocean Technologies Ltd Offshore windtower
DE10126912A1 (de) * 2001-06-01 2002-12-19 Oevermann Gmbh & Co Kg Hoch Un Turmbauwerk aus Spannbeton
FR2872843B1 (fr) * 2004-07-12 2006-10-06 Electricite De France Procede de construction d'un mat longitudinal en beton, element tubulaire pour sa mise en oeuvre et mat obtenu
US7367780B2 (en) * 2005-09-30 2008-05-06 General Electric Company System and method for driving a monopile for supporting an offshore wind turbine
CN102099538B (zh) * 2008-07-15 2013-08-14 西门子公司 用于组装塔架的方法和塔架

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3738113A (en) * 1971-10-14 1973-06-12 Chicago Bridge & Iron Co Offshore oil storage structure with submergence shell
US3793840A (en) * 1971-10-18 1974-02-26 Texaco Inc Mobile, arctic drilling and production platform
US3733834A (en) * 1972-05-01 1973-05-22 L Ludwig Dynamic damper for offshore structures
US4114392A (en) * 1976-06-24 1978-09-19 Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous-Marines Platform structure for maritime installations
US4222682A (en) * 1976-06-30 1980-09-16 Enterprise D'equipments Mechaniques Et Hydrauliques, E.M.H. Platforms for sea-bottom exploitation
US4272929A (en) * 1979-08-23 1981-06-16 Hanson Bror H Tower and method of construction
US4664556A (en) * 1983-10-24 1987-05-12 Dixon Richard K Method for building structures in water
US4693637A (en) * 1984-12-20 1987-09-15 Takenaka Komuten Co., Ltd. Gravity type oceanic structure and its stable installation
US4778308A (en) * 1985-02-12 1988-10-18 Saga Petroleum A.S. Arrangement in an offshore concrete platform
US4639167A (en) * 1985-04-24 1987-01-27 Odeco, Inc. Deep water mobile submersible arctic structure
US4749309A (en) * 1985-10-23 1988-06-07 Norwegian Contractors Offshore platform structure of reinforced concrete and a method of producing same
US4767241A (en) * 1985-11-13 1988-08-30 Wells Gordon T Method for simultaneous forming of concrete footings and piers
US5094567A (en) * 1986-02-05 1992-03-10 Techocompositi S.P.A. Flexible column from composite material
US4767235A (en) * 1986-07-29 1988-08-30 Antonio Ferruccio Prefabricated composite element for the building of a sea wall
US5318385A (en) * 1991-08-29 1994-06-07 Petroleo Brasileiro S.A.-Petrobras Supporting system for lines and conductor pipes at offshore platforms
US5320452A (en) * 1992-03-24 1994-06-14 Kabushiki Kaisha Ask Kenkyusho Cast-in-place concrete pile and method of constructing the same in the ground
US5316413A (en) * 1992-09-28 1994-05-31 Chevron Research And Technology Company Offshore double cone structure
US5433557A (en) * 1993-12-27 1995-07-18 Spencer, White & Prentis Foundation Corporation Method for underpinning an existing footing
US5513929A (en) * 1994-08-11 1996-05-07 Mcdermott International, Inc. Fixed offshore platform structures, using small diameter, tensioned, well casing tiebacks
US5960597A (en) * 1996-10-24 1999-10-05 Schwager Davis, Inc. Method for post-tensioning columns
US6371695B1 (en) * 1998-11-06 2002-04-16 Exxonmobil Upstream Research Company Offshore caisson having upper and lower sections separated by a structural diaphragm and method of installing the same
US7770343B2 (en) * 2005-04-21 2010-08-10 Structural Concrete & Steel, S.L. Prefabricated modular tower
EP1777348A1 (de) * 2005-10-21 2007-04-25 Dredging International N.V. Vorrichtung und Methode zum installieren von Offshore-Anlagen
US20090191003A1 (en) * 2008-01-28 2009-07-30 Kruse Darin R Apparatus and methods for underground structures and construction thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120012727A1 (en) * 2009-03-19 2012-01-19 Telefonaktiebolaget Lm Ericsson (Publ) Tubular Telecom Tower Structure
US20150204102A1 (en) * 2010-07-13 2015-07-23 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets
US9175494B2 (en) * 2010-07-13 2015-11-03 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets
US20140079490A1 (en) * 2012-09-20 2014-03-20 Korea Institute Of Ocean Science And Technology Supporting structure for offshore wind power generator
US9011047B2 (en) * 2012-09-20 2015-04-21 Korea Institute Of Ocean Science And Technology Supporting structure for offshore wind power generator
US9856621B2 (en) 2013-09-09 2018-01-02 Dbd Systems, Llc Method of construction, installation, and deployment of an offshore wind turbine on a concrete tension leg platform
US10844565B2 (en) * 2014-02-06 2020-11-24 Exxonmobil Upstream Research Company Systems and methods for reducing scouring
CN113026803A (zh) * 2019-12-09 2021-06-25 中国电建集团华东勘测设计研究院有限公司 一种应用于海上电气平台的吸力桶-桩基础复合结构及施工方法

Also Published As

Publication number Publication date
EP2354536A1 (de) 2011-08-10
CN102213193A (zh) 2011-10-12
CA2730672A1 (en) 2011-08-02
NZ590831A (en) 2012-03-30
JP2011157971A (ja) 2011-08-18

Similar Documents

Publication Publication Date Title
US20110188945A1 (en) Support structure for supporting an offshore wind turbine
KR102155394B1 (ko) 부체식 해상 풍력발전 설비
US8657534B2 (en) Floating platform with improved anchoring
KR102295722B1 (ko) 부유식 풍력 터빈 플랫폼을 조립하는 방법
US9592889B2 (en) Submersible active support structure for turbine towers and substations or similar elements, in offshore facilities
KR101437379B1 (ko) 해양 지지구조체 및 그와 관련된 설치방법
US7508088B2 (en) System and method for installing a wind turbine at an offshore location
EP2836708B1 (de) Schwimmende windturbinenplattform und verfahren zur montage
CN101109359B (zh) 用于风力发电基础的方法和装置
US9238896B2 (en) Floating structure for supporting a wind turbine
EP1101935A2 (de) Schiff und Methode zur Installation von Windturbinen in See
JP2012515114A (ja) コンクリート・鋼の混成解決手段における外洋の沖合風力発電所のためのブロック式推力を有する潜水可能プラットフォーム
US20110146192A1 (en) Stayed connection for wind turbine
EP2495370A1 (de) Reihenpfahlrammverfahren für Fundamentanwendungen für Offshore-Windturbinen
CN110745216A (zh) 一种渔业网箱与浮式风机基础组合结构及施工方法
US9771700B2 (en) Structures for offshore installations
CN115110591B (zh) 一种用于海上风电单桩基础加固、纠偏的装置及方法
US20140311058A1 (en) Precast concrete floating structure for supporting a wind turbine
FI122698B (fi) Menetelmä ja laitteisto tuulivoimalan asentamiseksi korkeaan perustusrakennelmaan
US11897585B1 (en) Anchoring floating structures to an underwater floor
US20240084537A1 (en) Portal frame platform and construction method for large offshore wind turbines
Flores Ganuza et al. Development of a Modular, Adaptable and Scalable Gravity Anchor System for Various Floating Foundations
BR112016017971B1 (pt) Parque de turbina eólica flutuantes

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HARTKOPF, RUNE;REEL/FRAME:025728/0310

Effective date: 20101215

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION