US20110087453A1 - Reliability test with monitoring of the results - Google Patents
Reliability test with monitoring of the results Download PDFInfo
- Publication number
- US20110087453A1 US20110087453A1 US12/904,358 US90435810A US2011087453A1 US 20110087453 A1 US20110087453 A1 US 20110087453A1 US 90435810 A US90435810 A US 90435810A US 2011087453 A1 US2011087453 A1 US 2011087453A1
- Authority
- US
- United States
- Prior art keywords
- test
- functional
- circuit
- electronic device
- integrated circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/317—Testing of digital circuits
- G01R31/3181—Functional testing
- G01R31/319—Tester hardware, i.e. output processing circuits
- G01R31/3193—Tester hardware, i.e. output processing circuits with comparison between actual response and known fault free response
- G01R31/31935—Storing data, e.g. failure memory
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/2851—Testing of integrated circuits [IC]
- G01R31/2855—Environmental, reliability or burn-in testing
- G01R31/2856—Internal circuit aspects, e.g. built-in test features; Test chips; Measuring material aspects, e.g. electro migration [EM]
Definitions
- An embodiment relates to the test field. More specifically, such an embodiment relates to reliability tests.
- Electronic devices such as integrated circuits (for example, non-volatile memories)—are generally subject to a functional test to verify their correct operation; this may be of the utmost importance to ensure a high quality of a production process of the electronic devices.
- some electronic devices are provided with a BIST (Built-In Self Test) machine being implemented within the electronic device; such BIST machine is capable of self-performing the functional test of the electronic device and outputting its result.
- BIST Built-In Self Test
- the functional test may be supported by a conditioning procedure, which subjects the electronic devices to be tested to stress conditions for simulating a long period of operation in standard conditions; in such way, the functional test being performed by the BIST machine on an electronic device subject to the conditioning procedure implements a reliability test, which is used for identifying potential defects in the electronic device (that is, that may occur after a certain period of use).
- the conditioning procedure of the electronic devices may be of thermal type, as in the case of a burn-in reliability test, which consists of having the electronic devices operate at very high or very low temperatures (for example, from ⁇ 50° C. to +150° C.); otherwise, the conditioning procedure of the electronic devices may be of both thermal and voltage type, as in the case of an OLT (Operating Life Test) reliability test.
- a burn-in reliability test which consists of having the electronic devices operate at very high or very low temperatures (for example, from ⁇ 50° C. to +150° C.); otherwise, the conditioning procedure of the electronic devices may be of both thermal and voltage type, as in the case of an OLT (Operating Life Test) reliability test.
- the reliability test is performed by having the electronic devices operate continuously (for example, for about 1,000 hours) in a conditioning machine that subjects the electronic devices to variable conditions of temperature and/or voltage (for example, by causing the functional test to be executed cyclically by their BIST machines without detecting the result).
- a conditioning machine that subjects the electronic devices to variable conditions of temperature and/or voltage (for example, by causing the functional test to be executed cyclically by their BIST machines without detecting the result).
- the electronic devices are provided to a verification machine in which they are again subject to the same functional test (being performed by their BIST machines), in order to detect the defective electronic devices.
- defective electronic devices may be identified only at the end of the reliability test (in the verification machine), because the conditioning machine may be incapable of detecting the results provided by the BIST machines.
- the conditioning machine may be incapable of detecting the results provided by the BIST machines.
- no information is available about the particular temperature conditions and/or voltage conditions wherein each defect manifested itself (in the conditioning machine).
- the power consumption of the electronic devices may not be minimized, substantially for two reasons. Firstly, at the end of the conditioning procedure it may be necessary to perform an additional functional test by the BIST machines, with consequent waste of electric power (as well as time). Secondly, since each BIST machine performs the functional test on all the chips included in the corresponding electronic device indiscriminately for the whole (long) duration of the conditioning process, there may also be a waste of processing power, since all the integrated circuits are typically always tested (including the ones being already detected as defective in a previous functional test).
- An embodiment is based on the idea of monitoring a test result.
- an embodiment is an electronic device.
- the electronic device includes functional means for implementing a functionality of the electronic device (for example, a bank of non-volatile memories).
- the electronic device further includes testing means (for example, a BIST machine) for executing a test of the functional means, which test includes a plurality of test operations on the functional means (for example, each one for testing a non-volatile memory); the testing means returns an indication of a result of each test operation.
- the electronic device further includes control means (for example, a microprocessor) for causing the testing means to reiterate the test.
- Monitoring means is provided for monitoring the result of each test operation to detect a failure of the test operation; moreover, storage means is provided for storing failure information indicative of temporal characteristics of each failure (for example, a progressive number of the corresponding test operation).
- Another embodiment is a test apparatus for executing a reliability test on such electronic devices.
- a different embodiment is a corresponding method for executing a reliability test.
- Another embodiment is a program for allowing a microcontroller of the electronic device to perform such method.
- a further embodiment is a complex system including one or more of such electronic devices.
- FIG. 1 is a schematic representation of an electronic device according to an embodiment
- FIG. 2 is a simplified block diagram of a microcontroller of an electronic device according to an embodiment
- FIG. 3 is a schematic representation of a test apparatus according to an embodiment
- FIG. 4 is a simplified activity diagram of the flow of operations being performed by a microcontroller according to an embodiment.
- FIG. 1 With reference in particular to FIG. 1 , there is shown a schematic representation of an electronic device 100 according to an embodiment.
- the device 100 is integrated in a chip of semiconductor material (typically embedded in a suitable package).
- the electronic device 100 includes a plurality of (volatile or non-volatile) memory elements to be tested (or simply “MUTs”, Memories Under Test) 110 .
- the electronic device 100 also includes a BIST test machine 115 , which is coupled with each MUT 110 through a multiplexer 120 .
- the multiplexer 120 also receives a selection signal SEL, which enables the connection of the BIST machine 115 with a selected MUT 110 (corresponding to the value of the signal SEL).
- the BIST machine 115 has an input terminal adapted to receive an enabling signal D of a test operation on a corresponding selected MUT 110 , so that a functional test is obtained when all the MUTs 110 to be tested are subject to the same test operation; it is noted that several cycles (i.e., repetitions or reiterations) of functional tests (in the following, being referred to as test cycles for simplicity) are typically provided during long test procedures (for example, a reliability test), and hereinafter reference will be made to such an exemplary scenario.
- the BIST machine 115 also has four output terminals adapted to provide signals being indicative of a result of the test operation.
- a pulse signal BFAIL provides a pulse in response to the detection of a failure of the selected MUT 110 , and a signal BBAD provides a voltage step in response to that failure (that is, the signal BBAD is the triggered version of the signal BFAIL); moreover, a counting signal RUNB provides a progressive number of the test operations being performed by the BIST machine 115 , and a status signal BEND indicates the end of each run of the test operation.
- the electronic device 100 also includes a microcontroller 125 and an auxiliary non-volatile memory (hereinafter, for simplicity, only referred to as memory) 130 .
- a microcontroller 125 and an auxiliary non-volatile memory 130 .
- the microcontroller 125 interfaces with the BIST machine 115 , to which it provides the signal D for controlling the execution of the test operations provided for the functional test and from which it receives the signals BFAIL, BBAD, RUNB and BEND for monitoring the result of the test operations.
- the microcontroller 125 also provides the signal SEL to the multiplexer 120 (for selecting the MUT 110 on which the test operation has to be executed).
- the microcontroller 125 also interfaces with the memory 130 for storing timing information about any failure of a corresponding MUT 110 (for example, the number of the test operation that has caused the failure as indicated by the signal RUNB).
- the memory 130 communicates with the outside through an output pin 135 of the electronic device 100 , which is used for serially reading (for example, through the IEEE JTAG protocol) failure information (FI) being contained therein (with respect to the failed test operations).
- FI failure information
- the microcontroller 125 receives an enable signal EN from the outside (for example, with the same modalities of the IEEE TAP Standard being commonly used for controlling the BIST machine) at an input pin 140 of the electronic device 100 to activate the execution of the test operations on the MUTs 110 , and a read signal R at a further input pin 145 of the electronic device 100 for activating the reading of the failure information Fl from the memory 130 (from the output pin 135 ).
- EN an enable signal EN from the outside (for example, with the same modalities of the IEEE TAP Standard being commonly used for controlling the BIST machine)
- an input pin 140 of the electronic device 100 to activate the execution of the test operations on the MUTs 110
- a read signal R at a further input pin 145 of the electronic device 100 for activating the reading of the failure information Fl from the memory 130 (from the output pin 135 ).
- An embodiment allows obtaining information about the particular conditions in which each failure has occurred. For example, the above-described failure information allows determining (from the number of test operation that has caused the failure of each MUT) the specific conditions of temperature and/or voltage in which the test operation of the MUT has failed. In such way, a failure analysis (for identifying the causes and devising possible solutions) is greatly facilitated.
- such embodiment does not need further functional test any longer after the conditioning procedure (for identifying the defective electronic devices); this results in a corresponding saving of electric power and time.
- An embodiment may be advantageous since it maintains the number of pins of the electronic device limited; in fact, the pins being added for the signals EN, R and Fl are compensated for by the removal of the pins for the signals D, BFAIL, BBAD, RUNB and BEND (which are now managed within the electronic device by the microcontroller 125 ).
- FIG. 2 there is shown a simplified block diagram of the microcontroller 125 according to an embodiment.
- the microcontroller 125 includes a CPU (Control Processing Unit) 203 , which performs processing operations, as well as synchronization and coordination operations among the various functional blocks being included in the microcontroller 125 ; the CPU 203 receives the signal EN (at the pin 140 ) and the signal R (at the pin 145 )
- the CPU 203 controls a driver 205 , which provides the signal D to the BIST machine (not shown in the figure).
- the CPU 203 also controls a selector 210 , which provides the signal SEL to the multiplexer (not shown in the figure).
- the microcontroller 125 also includes a monitor 215 , which monitors the signals BFAIL, BBAD, BEND and RUNB being received by the BIST machine; the monitor 215 also interfaces with the CPU 203 , to which it provides such signals for their next processing.
- the CPU 203 interfaces with a logger 220 , which controls the writing and reading of the failure information in the memory (not shown in the figure).
- FIG. 3 there is shown a schematic representation of a test apparatus 300 according to an embodiment.
- the test apparatus 300 is used for performing reliability tests of batches of electronic devices 100 .
- the electronic devices 100 are (reversibly) mounted on test cards 305 (only one shown in the figure).
- the test apparatus 300 includes a conditioning machine 310 for performing a conditioning procedure on the electronic devices 100 ; in particular, such conditioning machine 310 is provided with a thermal section 310 a (for example, a furnace); the thermal section 310 a subjects the electronic devices 100 being mounted on the test cards 305 to heat stress conditions (for example, at very high or very low temperatures).
- the conditioning machine 310 is also provided with a control section 310 b , which subjects the electronic devices 100 being mounted on the test cards 305 to voltage stress conditions (for example, at very high voltages).
- the control section 310 b activates the operation of the electronic devices 100 (during the conditioning procedure) by providing the enable signal EN to all the electronic devices 100 (to allow the corresponding microcontrollers driving the execution of several test cycles by the corresponding BIST machines).
- the test apparatus 300 further includes an analysis machine 315 for reading the failure information (stored in the memories of the electronic devices 100 of a specific test card 305 ) at the end of the conditioning procedure.
- an embodiment may be implemented without any change in the conditioning machine 310 (since the same signal being already available for causing the BIST machines to execute the test cycles is now used to activate the microcontrollers). In fact, all the operations (for storing the failure information) are managed within the electronic devices 100 (by the corresponding microcontrollers). In such a way, an embodiment may directly be applied to any existing conditioning machine.
- the analysis machine 315 is independent of the conditioning machine 310 ; therefore, the reading of the failure information may also be performed in separated locations with respect to the conditioning procedure (for example, for analyzing failures that occurred at a customer site by a producer).
- FIG. 4 there is shown a simplified activity diagram of the flow of operations being performed by the microcontroller 125 according to an embodiment. Such operations are performed under the control of a corresponding software program, which is stored in a mass memory of the microcontroller (for example, a ROM), and loaded (at least partly) into a working memory thereof (for example, a RAM) when the program is running.
- a corresponding software program which is stored in a mass memory of the microcontroller (for example, a ROM), and loaded (at least partly) into a working memory thereof (for example, a RAM) when the program is running.
- the program may implement an embodiment of a method 400 , which begins at the starting black circle 405 .
- a test is then performed at the block 410 for determining the progress state of the conditioning procedure of the electronic device; if such procedure has ended (as indicated by the signal EN being de-asserted—for example, at the logical level “0”), then a new test is performed at the block 415 for determining if the reading of the failure information from the memory has been requested (as indicated by the signal R being asserted—for example, at the logical value “1”).
- the operation flow reaches the block 420 , in which the microcontroller commands the sending of the failure information being stored in the memory in succession to the corresponding output terminal; once the request has been satisfied, the operation flow ends at the ending double circle 425 ; instead, if the test being performed at the decision block 415 provides a negative result since no request of reading the failure information occurred (signal R being de-asserted), the method directly proceeds to the ending double circle 425 .
- the method 400 then proceeds to the block 435 , wherein the microcontroller checks if a failure of the current MUT has been detected; such failure is reported by the signal BFAIL, which provides a pulse when the failure occurs.
- the microcontroller temporarily suspends the BIST machine by de-asserting the signal D. In this way, it is avoided that the test operation of the current MUT ends before the execution of the operations that will be described below; this allows saving more pieces of failure information of the same MUT in a same test operation. This may be useful, for example, when it is desired to validate the failure of a MUT only after more than one (for example, two) signals BFAIL are asserted, so as to exclude that a transient failure (for example, being due to errors of the BIST machine) is interpreted as a damage of the MUT.
- the microcontroller allocates a new entry in the memory for the failure that has just been detected, by writing the value of the signal SEL into it so as to identify the damaged MUT. In such way, for each failure it is possible to obtain indications about the specific MUT being involved (in order to further facilitate its analysis).
- the microcontroller then re-activates the BIST machine at the block 450 .
- the method thus continues to the decision block 455 .
- the microcontroller checks whether the test operation of the MUT has ended. In the negative case (as indicated by the signal BEND being de-asserted), the activity flow returns to the block 435 for repeating the same operations described above until the test operation of the MUT has ended.
- the microcontroller suspends the BIST machine at the block 460 by de-asserting the signal D.
- the microcontroller then checks at the block 465 if a failure has occurred during the test operation, as indicated by the signal BBAD that is asserted (and maintained as it is) as soon as a failure has been detected (signal BFAIL being asserted).
- the microcontroller at the block 470 acquires the information, being contained in the signal RUNB that is provided by the BIST machine, about the progressive number of test operations (in all the test cycles) that the BIST machine has performed.
- the information thus obtained is stored by the microcontroller in the corresponding entry of the memory at the block 475 for completing the respective failure information.
- a loop of operations is executed for updating the signal SEL, so as to couple the BIST machine with a new MUT.
- Such result is obtained by increasing the value of the signal SEL by one unit (in module equal to a maximum value corresponding to the total number of MUTs in the electronic device).
- the microcontroller checks whether at least one entry of the memory includes such signal SEL (indicating that a previous test operation on the corresponding MUT has failed). If such condition is satisfied, the method returns to the block 485 (for increasing the signal SEL again). Conversely, the activity flow continues to the block 410 to perform the test operation on a new MUT being selected by the signal SEL thus obtained.
- the MUTs that have been affected by a failure are no more subject to any test operations (during a subsequent test cycle, if provided); this prevents wasting processing power unnecessarily by the electronic device for retesting a MUT being already identified as defective.
- the electronic device has a different architecture or includes equivalent components (either separated from each other or combined together, in whole or in part); in particular, it may be possible to provide any number (one or more) of microcontrollers and/or auxiliary memories in order to speed up some or all of the operations of the above-described method, for example, by managing them in parallel mode.
- the proposed system may be used in any reliability test; in particular, the reliability test may be based on the burn-in procedure, or on any conditioning procedure acting under different and/or additional stress conditions (for example, current, pressure, and the like).
- Analogous considerations apply if the electronic device includes any number (one or more) of memories to be tested.
- test cycles may be performed, each one including any number and type of test operations (for example, each one for testing a memory cell).
- microcontroller might include further functional blocks inside it, with respect to those cited in the description, or that it might be provided with different functional blocks.
- the timing information of the failed test operation may be provided in a different way from the number of the test operations (for example, by a clock signal within the microcontroller).
- the timing information may be provided by different numbers, for example a first number indicating the number of the test operation within a corresponding test cycle, and a second number indicating the number of the test cycle.
- the failure information may include possible other identifications of the failed MUTs—for example, a code thereof (although such feature is not strictly necessary and it may be omitted in a simplified implementation).
- test apparatus has a different structure or includes equivalent components.
- An embodiment lends itself to be implemented with an equivalent method (by using similar steps, removing some steps being non-essential, or adding further optional steps); moreover, the steps may be performed in a different order, concurrently or in an interleaved way (at least in part).
- the proposed structure might be part of the design of an integrated circuit.
- the design may also be created in a programming language; moreover, if the designer does not fabricate chips or masks, the design may be transmitted by physical means to others.
- the resulting integrated circuit may be distributed by its manufacturer in raw wafer form, as a bare die, or in packages.
- an embodiment of the above-described testing circuits may be integrated with other circuits in the same chip, or it may be mounted in intermediate products (such as mother boards) and coupled with one or more other chips (such as a processor or a memory).
- the integrated circuit is suitable to be used in complex systems (such as computers).
- the program (that may be used to implement an embodiment) is structured differently, or if additional modules or functions are provided.
- the program may take any form suitable to be used by the microcontroller or in connection therewith.
- it may be possible to provide the program on any medium being usable by it.
- an embodiment may lend itself to be implemented even with a hardware structure, or with a combination of software and hardware.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Computer Hardware Design (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Tests Of Electronic Circuits (AREA)
Abstract
Description
- The instant application claims priority to Italian Patent Application No. MI2009A001765, filed Oct. 14, 2009, which application is incorporated herein by reference in its entirety.
- An embodiment relates to the test field. More specifically, such an embodiment relates to reliability tests.
- Electronic devices—such as integrated circuits (for example, non-volatile memories)—are generally subject to a functional test to verify their correct operation; this may be of the utmost importance to ensure a high quality of a production process of the electronic devices. For such purpose, some electronic devices are provided with a BIST (Built-In Self Test) machine being implemented within the electronic device; such BIST machine is capable of self-performing the functional test of the electronic device and outputting its result.
- Furthermore, the functional test may be supported by a conditioning procedure, which subjects the electronic devices to be tested to stress conditions for simulating a long period of operation in standard conditions; in such way, the functional test being performed by the BIST machine on an electronic device subject to the conditioning procedure implements a reliability test, which is used for identifying potential defects in the electronic device (that is, that may occur after a certain period of use).
- The conditioning procedure of the electronic devices may be of thermal type, as in the case of a burn-in reliability test, which consists of having the electronic devices operate at very high or very low temperatures (for example, from −50° C. to +150° C.); otherwise, the conditioning procedure of the electronic devices may be of both thermal and voltage type, as in the case of an OLT (Operating Life Test) reliability test.
- In general, the reliability test is performed by having the electronic devices operate continuously (for example, for about 1,000 hours) in a conditioning machine that subjects the electronic devices to variable conditions of temperature and/or voltage (for example, by causing the functional test to be executed cyclically by their BIST machines without detecting the result). At the end of such conditioning procedure, the electronic devices are provided to a verification machine in which they are again subject to the same functional test (being performed by their BIST machines), in order to detect the defective electronic devices.
- However, such reliability test may have some drawbacks that preclude its use on a large scale.
- First of all, in the present state of the art, defective electronic devices may be identified only at the end of the reliability test (in the verification machine), because the conditioning machine may be incapable of detecting the results provided by the BIST machines. However, in this way no information is available about the particular temperature conditions and/or voltage conditions wherein each defect manifested itself (in the conditioning machine).
- Moreover, the power consumption of the electronic devices may not be minimized, substantially for two reasons. Firstly, at the end of the conditioning procedure it may be necessary to perform an additional functional test by the BIST machines, with consequent waste of electric power (as well as time). Secondly, since each BIST machine performs the functional test on all the chips included in the corresponding electronic device indiscriminately for the whole (long) duration of the conditioning process, there may also be a waste of processing power, since all the integrated circuits are typically always tested (including the ones being already detected as defective in a previous functional test).
- An embodiment is based on the idea of monitoring a test result.
- More specifically, an embodiment is an electronic device. The electronic device includes functional means for implementing a functionality of the electronic device (for example, a bank of non-volatile memories). The electronic device further includes testing means (for example, a BIST machine) for executing a test of the functional means, which test includes a plurality of test operations on the functional means (for example, each one for testing a non-volatile memory); the testing means returns an indication of a result of each test operation. In an embodiment, the electronic device further includes control means (for example, a microprocessor) for causing the testing means to reiterate the test. Monitoring means is provided for monitoring the result of each test operation to detect a failure of the test operation; moreover, storage means is provided for storing failure information indicative of temporal characteristics of each failure (for example, a progressive number of the corresponding test operation).
- Another embodiment is a test apparatus for executing a reliability test on such electronic devices.
- A different embodiment is a corresponding method for executing a reliability test.
- Another embodiment is a program for allowing a microcontroller of the electronic device to perform such method.
- A further embodiment is a complex system including one or more of such electronic devices.
- One or more embodiments, as well as features and the advantages thereof, will be best understood with reference to the following detailed description, given purely by way of a non-restrictive indication, to be read in conjunction with the accompanying drawings (wherein corresponding elements are denoted with equal or similar references, and their explanation is not repeated for the sake of exposition brevity). In this respect, it is expressly intended that the figures are not necessarily drawn to scale and that, unless otherwise indicated, they are simply used to conceptually illustrate the described structures and procedures. In particular:
-
FIG. 1 is a schematic representation of an electronic device according to an embodiment, -
FIG. 2 is a simplified block diagram of a microcontroller of an electronic device according to an embodiment, -
FIG. 3 is a schematic representation of a test apparatus according to an embodiment, and -
FIG. 4 is a simplified activity diagram of the flow of operations being performed by a microcontroller according to an embodiment. - With reference in particular to
FIG. 1 , there is shown a schematic representation of anelectronic device 100 according to an embodiment. - The
device 100 is integrated in a chip of semiconductor material (typically embedded in a suitable package). Theelectronic device 100 includes a plurality of (volatile or non-volatile) memory elements to be tested (or simply “MUTs”, Memories Under Test) 110. Theelectronic device 100 also includes aBIST test machine 115, which is coupled with eachMUT 110 through amultiplexer 120. Themultiplexer 120 also receives a selection signal SEL, which enables the connection of theBIST machine 115 with a selected MUT 110 (corresponding to the value of the signal SEL). - The BIST
machine 115 has an input terminal adapted to receive an enabling signal D of a test operation on a corresponding selectedMUT 110, so that a functional test is obtained when all theMUTs 110 to be tested are subject to the same test operation; it is noted that several cycles (i.e., repetitions or reiterations) of functional tests (in the following, being referred to as test cycles for simplicity) are typically provided during long test procedures (for example, a reliability test), and hereinafter reference will be made to such an exemplary scenario. The BISTmachine 115 also has four output terminals adapted to provide signals being indicative of a result of the test operation. In particular, a pulse signal BFAIL provides a pulse in response to the detection of a failure of the selectedMUT 110, and a signal BBAD provides a voltage step in response to that failure (that is, the signal BBAD is the triggered version of the signal BFAIL); moreover, a counting signal RUNB provides a progressive number of the test operations being performed by theBIST machine 115, and a status signal BEND indicates the end of each run of the test operation. - According to an embodiment, the
electronic device 100 also includes amicrocontroller 125 and an auxiliary non-volatile memory (hereinafter, for simplicity, only referred to as memory) 130. - The
microcontroller 125 interfaces with theBIST machine 115, to which it provides the signal D for controlling the execution of the test operations provided for the functional test and from which it receives the signals BFAIL, BBAD, RUNB and BEND for monitoring the result of the test operations. Themicrocontroller 125 also provides the signal SEL to the multiplexer 120 (for selecting theMUT 110 on which the test operation has to be executed). - The
microcontroller 125 also interfaces with thememory 130 for storing timing information about any failure of a corresponding MUT 110 (for example, the number of the test operation that has caused the failure as indicated by the signal RUNB). - The
memory 130 communicates with the outside through anoutput pin 135 of theelectronic device 100, which is used for serially reading (for example, through the IEEE JTAG protocol) failure information (FI) being contained therein (with respect to the failed test operations). - The
microcontroller 125 receives an enable signal EN from the outside (for example, with the same modalities of the IEEE TAP Standard being commonly used for controlling the BIST machine) at aninput pin 140 of theelectronic device 100 to activate the execution of the test operations on theMUTs 110, and a read signal R at afurther input pin 145 of theelectronic device 100 for activating the reading of the failure information Fl from the memory 130 (from the output pin 135). - An embodiment allows obtaining information about the particular conditions in which each failure has occurred. For example, the above-described failure information allows determining (from the number of test operation that has caused the failure of each MUT) the specific conditions of temperature and/or voltage in which the test operation of the MUT has failed. In such way, a failure analysis (for identifying the causes and devising possible solutions) is greatly facilitated.
- Moreover, such embodiment does not need further functional test any longer after the conditioning procedure (for identifying the defective electronic devices); this results in a corresponding saving of electric power and time.
- An embodiment may be advantageous since it maintains the number of pins of the electronic device limited; in fact, the pins being added for the signals EN, R and Fl are compensated for by the removal of the pins for the signals D, BFAIL, BBAD, RUNB and BEND (which are now managed within the electronic device by the microcontroller 125).
- Referring now to
FIG. 2 , there is shown a simplified block diagram of themicrocontroller 125 according to an embodiment. - The
microcontroller 125 includes a CPU (Control Processing Unit) 203, which performs processing operations, as well as synchronization and coordination operations among the various functional blocks being included in themicrocontroller 125; theCPU 203 receives the signal EN (at the pin 140) and the signal R (at the pin 145) - The
CPU 203 controls adriver 205, which provides the signal D to the BIST machine (not shown in the figure). - The
CPU 203 also controls aselector 210, which provides the signal SEL to the multiplexer (not shown in the figure). - The
microcontroller 125 also includes amonitor 215, which monitors the signals BFAIL, BBAD, BEND and RUNB being received by the BIST machine; themonitor 215 also interfaces with theCPU 203, to which it provides such signals for their next processing. - Furthermore, the
CPU 203 interfaces with alogger 220, which controls the writing and reading of the failure information in the memory (not shown in the figure). - Turning now to
FIG. 3 , there is shown a schematic representation of atest apparatus 300 according to an embodiment. - The
test apparatus 300 is used for performing reliability tests of batches ofelectronic devices 100. To such purpose, theelectronic devices 100 are (reversibly) mounted on test cards 305 (only one shown in the figure). Thetest apparatus 300 includes aconditioning machine 310 for performing a conditioning procedure on theelectronic devices 100; in particular,such conditioning machine 310 is provided with athermal section 310 a (for example, a furnace); thethermal section 310 a subjects theelectronic devices 100 being mounted on thetest cards 305 to heat stress conditions (for example, at very high or very low temperatures). Theconditioning machine 310 is also provided with acontrol section 310 b, which subjects theelectronic devices 100 being mounted on thetest cards 305 to voltage stress conditions (for example, at very high voltages). Furthermore, thecontrol section 310 b activates the operation of the electronic devices 100 (during the conditioning procedure) by providing the enable signal EN to all the electronic devices 100 (to allow the corresponding microcontrollers driving the execution of several test cycles by the corresponding BIST machines). - The
test apparatus 300 further includes ananalysis machine 315 for reading the failure information (stored in the memories of theelectronic devices 100 of a specific test card 305) at the end of the conditioning procedure. - It is noted that an embodiment may be implemented without any change in the conditioning machine 310 (since the same signal being already available for causing the BIST machines to execute the test cycles is now used to activate the microcontrollers). In fact, all the operations (for storing the failure information) are managed within the electronic devices 100 (by the corresponding microcontrollers). In such a way, an embodiment may directly be applied to any existing conditioning machine. Moreover, the
analysis machine 315 is independent of theconditioning machine 310; therefore, the reading of the failure information may also be performed in separated locations with respect to the conditioning procedure (for example, for analyzing failures that occurred at a customer site by a producer). - Referring now to
FIG. 4 , there is shown a simplified activity diagram of the flow of operations being performed by themicrocontroller 125 according to an embodiment. Such operations are performed under the control of a corresponding software program, which is stored in a mass memory of the microcontroller (for example, a ROM), and loaded (at least partly) into a working memory thereof (for example, a RAM) when the program is running. - The program may implement an embodiment of a
method 400, which begins at the startingblack circle 405. - A test is then performed at the
block 410 for determining the progress state of the conditioning procedure of the electronic device; if such procedure has ended (as indicated by the signal EN being de-asserted—for example, at the logical level “0”), then a new test is performed at theblock 415 for determining if the reading of the failure information from the memory has been requested (as indicated by the signal R being asserted—for example, at the logical value “1”). In the affirmative case, the operation flow reaches theblock 420, in which the microcontroller commands the sending of the failure information being stored in the memory in succession to the corresponding output terminal; once the request has been satisfied, the operation flow ends at the endingdouble circle 425; instead, if the test being performed at thedecision block 415 provides a negative result since no request of reading the failure information occurred (signal R being de-asserted), the method directly proceeds to the endingdouble circle 425. - Returning to the
decision block 410, if the result of the test is affirmative, since the conditioning procedure has not ended yet (signal EN being asserted), then the microcontroller activates the BIST machine by asserting the signal D (with the signal SEL that is initialized to a starting value—for example, SEL=0) so as to activate the execution of the test operation of the MUT being addressed by the multiplexer (corresponding to the signal SEL). - The
method 400 then proceeds to theblock 435, wherein the microcontroller checks if a failure of the current MUT has been detected; such failure is reported by the signal BFAIL, which provides a pulse when the failure occurs. - If the result of such decision block is affirmative (signal BFAIL being asserted), at
block 440 the microcontroller temporarily suspends the BIST machine by de-asserting the signal D. In this way, it is avoided that the test operation of the current MUT ends before the execution of the operations that will be described below; this allows saving more pieces of failure information of the same MUT in a same test operation. This may be useful, for example, when it is desired to validate the failure of a MUT only after more than one (for example, two) signals BFAIL are asserted, so as to exclude that a transient failure (for example, being due to errors of the BIST machine) is interpreted as a damage of the MUT. - Once the operation at the
block 440 has ended, the microcontroller allocates a new entry in the memory for the failure that has just been detected, by writing the value of the signal SEL into it so as to identify the damaged MUT. In such way, for each failure it is possible to obtain indications about the specific MUT being involved (in order to further facilitate its analysis). - The microcontroller then re-activates the BIST machine at the
block 450. - The method thus continues to the
decision block 455. - The same point is reached directly from the
decision block 435 if no failure of the MUT has been detected (signal BFAIL being de-asserted). - In such phase, the microcontroller checks whether the test operation of the MUT has ended. In the negative case (as indicated by the signal BEND being de-asserted), the activity flow returns to the
block 435 for repeating the same operations described above until the test operation of the MUT has ended. - As soon as this occurs (signal BEND being asserted), the microcontroller suspends the BIST machine at the
block 460 by de-asserting the signal D. The microcontroller then checks at theblock 465 if a failure has occurred during the test operation, as indicated by the signal BBAD that is asserted (and maintained as it is) as soon as a failure has been detected (signal BFAIL being asserted). - In the affirmative case (signal BBAD being asserted), the microcontroller at the
block 470 acquires the information, being contained in the signal RUNB that is provided by the BIST machine, about the progressive number of test operations (in all the test cycles) that the BIST machine has performed. - The information thus obtained is stored by the microcontroller in the corresponding entry of the memory at the
block 475 for completing the respective failure information. - At this point the activity flow passes to the
block 485; the same point is reached directly from theblock 465 if no failure has been detected (signal BBAD being de-asserted). - In such phase, a loop of operations is executed for updating the signal SEL, so as to couple the BIST machine with a new MUT. Such result is obtained by increasing the value of the signal SEL by one unit (in module equal to a maximum value corresponding to the total number of MUTs in the electronic device).
- Continuing to the
block 490, the microcontroller checks whether at least one entry of the memory includes such signal SEL (indicating that a previous test operation on the corresponding MUT has failed). If such condition is satisfied, the method returns to the block 485 (for increasing the signal SEL again). Conversely, the activity flow continues to theblock 410 to perform the test operation on a new MUT being selected by the signal SEL thus obtained. - In this way, the MUTs that have been affected by a failure are no more subject to any test operations (during a subsequent test cycle, if provided); this prevents wasting processing power unnecessarily by the electronic device for retesting a MUT being already identified as defective.
- Naturally, in order to satisfy local and specific requirements, a person skilled in the art may apply to the embodiments described above many logical and/or physical modifications and alterations. More specifically, although the present disclosure has been described with a certain degree of particularity with reference to preferred embodiments thereof, it is understood that various omissions, substitutions and changes in the form and details as well as other embodiments are possible. Particularly, a same embodiment may even be practiced without the specific details set forth in the preceding description to provide a more thorough understanding thereof; conversely, well-known features may have been omitted or simplified in order not to obscure the description with unnecessary particulars. Moreover, it is expressly intended that specific elements and/or method steps described in connection with any disclosed embodiment may be incorporated in any other embodiment as a matter of general design choice.
- For example, similar considerations apply if the electronic device has a different architecture or includes equivalent components (either separated from each other or combined together, in whole or in part); in particular, it may be possible to provide any number (one or more) of microcontrollers and/or auxiliary memories in order to speed up some or all of the operations of the above-described method, for example, by managing them in parallel mode.
- Moreover, the proposed system may be used in any reliability test; in particular, the reliability test may be based on the burn-in procedure, or on any conditioning procedure acting under different and/or additional stress conditions (for example, current, pressure, and the like).
- Analogous considerations apply if the electronic device includes any number (one or more) of memories to be tested.
- Moreover, different test cycles may be performed, each one including any number and type of test operations (for example, each one for testing a memory cell).
- Besides, it is not excluded that the microcontroller might include further functional blocks inside it, with respect to those cited in the description, or that it might be provided with different functional blocks.
- The timing information of the failed test operation may be provided in a different way from the number of the test operations (for example, by a clock signal within the microcontroller). Alternatively, the timing information may be provided by different numbers, for example a first number indicating the number of the test operation within a corresponding test cycle, and a second number indicating the number of the test cycle.
- Moreover, nothing prohibits performing the test operation concurrently on more MUTs (for example, two at a time) in order to speed up testing, in such case providing further control means for managing the operations.
- Furthermore, the failure information may include possible other identifications of the failed MUTs—for example, a code thereof (although such feature is not strictly necessary and it may be omitted in a simplified implementation).
- Nothing prevents suspending the functional test of the MUTs only after a minimum number of failures, up to never.
- The same considerations may be extended to the case in which the elements to be tested are of different types.
- Moreover, similar considerations apply if the memory being used to save the failure information is outside the electronic device (for example, when it is made in a technology that does not provide for the integration of such components).
- Similar considerations are valid if the functional test is not executed by a BIST machine, but by any other circuit being adapted to perform equivalent functions.
- Similar considerations apply if the test apparatus has a different structure or includes equivalent components.
- In any case, there is not excluded the possibility of modifying the conditioning machine in order to perform an embodiment of the described method completely inside it.
- An embodiment lends itself to be implemented with an equivalent method (by using similar steps, removing some steps being non-essential, or adding further optional steps); moreover, the steps may be performed in a different order, concurrently or in an interleaved way (at least in part).
- The proposed structure might be part of the design of an integrated circuit. The design may also be created in a programming language; moreover, if the designer does not fabricate chips or masks, the design may be transmitted by physical means to others. In any case, the resulting integrated circuit may be distributed by its manufacturer in raw wafer form, as a bare die, or in packages. Moreover, an embodiment of the above-described testing circuits may be integrated with other circuits in the same chip, or it may be mounted in intermediate products (such as mother boards) and coupled with one or more other chips (such as a processor or a memory). In any case, the integrated circuit is suitable to be used in complex systems (such as computers).
- Similar considerations may apply if the program (that may be used to implement an embodiment) is structured differently, or if additional modules or functions are provided. In any case, the program may take any form suitable to be used by the microcontroller or in connection therewith. Moreover, it may be possible to provide the program on any medium being usable by it. In any case, an embodiment may lend itself to be implemented even with a hardware structure, or with a combination of software and hardware.
- From the foregoing it will be appreciated that, although specific embodiments have been described herein for purposes of illustration, various modifications may be made without deviating from the spirit and scope of the disclosure. Furthermore, where an alternative is disclosed for a particular embodiment, this alternative may also apply to other embodiments even if not specifically stated.
Claims (38)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITMI20091765 | 2009-10-14 | ||
ITMI2009A1765 | 2009-10-14 | ||
ITMI2009A001765 | 2009-10-14 |
Publications (2)
Publication Number | Publication Date |
---|---|
US20110087453A1 true US20110087453A1 (en) | 2011-04-14 |
US8977513B2 US8977513B2 (en) | 2015-03-10 |
Family
ID=42194755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/904,358 Expired - Fee Related US8977513B2 (en) | 2009-10-14 | 2010-10-14 | Reliability test with monitoring of the results |
Country Status (2)
Country | Link |
---|---|
US (1) | US8977513B2 (en) |
EP (1) | EP2312329B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140053035A1 (en) * | 2012-08-15 | 2014-02-20 | International Business Machines Corporation | On-chip detection of types of operations tested by an lbist |
JP2019100944A (en) * | 2017-12-06 | 2019-06-24 | 日本電信電話株式会社 | Power supply deterioration determination method, power supply deterioration evaluation method, power supply deterioration determination device, power deterioration evaluation device, and program |
CN112305407A (en) * | 2020-10-21 | 2021-02-02 | 上海华力集成电路制造有限公司 | Method for positioning failure position and reason of test structure |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2887079A1 (en) * | 2013-12-20 | 2015-06-24 | Electrolux Appliances Aktiebolag | Electronic system and method for testing capacitive circuit lines |
US10234499B1 (en) * | 2016-08-01 | 2019-03-19 | Keysight Technologies, Inc. | Integrated circuit testing using on-chip electrical test structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040181724A1 (en) * | 2000-08-30 | 2004-09-16 | Mcbride Jerry D. | System for storing device test information on a semiconductor device using on-device logic for determination of test results |
US20060132167A1 (en) * | 2004-12-22 | 2006-06-22 | Jian Chen | Contactless wafer level burn-in |
US20070018677A1 (en) * | 2002-07-29 | 2007-01-25 | Marr Kenneth W | Methods for wafer level burn-in |
US20080092003A1 (en) * | 2006-09-27 | 2008-04-17 | Ajay Khoche | Diagnostic Information Capture from Logic Devices with Built-in Self Test |
US7571363B2 (en) * | 2006-05-18 | 2009-08-04 | Agilent Technologies, Inc. | Parametric measurement of high-speed I/O systems |
-
2010
- 2010-10-14 US US12/904,358 patent/US8977513B2/en not_active Expired - Fee Related
- 2010-10-14 EP EP20100187548 patent/EP2312329B1/en not_active Not-in-force
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040181724A1 (en) * | 2000-08-30 | 2004-09-16 | Mcbride Jerry D. | System for storing device test information on a semiconductor device using on-device logic for determination of test results |
US20070018677A1 (en) * | 2002-07-29 | 2007-01-25 | Marr Kenneth W | Methods for wafer level burn-in |
US20060132167A1 (en) * | 2004-12-22 | 2006-06-22 | Jian Chen | Contactless wafer level burn-in |
US7571363B2 (en) * | 2006-05-18 | 2009-08-04 | Agilent Technologies, Inc. | Parametric measurement of high-speed I/O systems |
US20080092003A1 (en) * | 2006-09-27 | 2008-04-17 | Ajay Khoche | Diagnostic Information Capture from Logic Devices with Built-in Self Test |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140053035A1 (en) * | 2012-08-15 | 2014-02-20 | International Business Machines Corporation | On-chip detection of types of operations tested by an lbist |
US20140053034A1 (en) * | 2012-08-15 | 2014-02-20 | International Business Machines Corporation | On-chip detection of types of operations tested by an lbist |
US8943377B2 (en) * | 2012-08-15 | 2015-01-27 | International Business Machines Corporation | On-chip detection of types of operations tested by an LBIST |
US9128150B2 (en) * | 2012-08-15 | 2015-09-08 | International Business Machines Corporation | On-chip detection of types of operations tested by an LBIST |
JP2019100944A (en) * | 2017-12-06 | 2019-06-24 | 日本電信電話株式会社 | Power supply deterioration determination method, power supply deterioration evaluation method, power supply deterioration determination device, power deterioration evaluation device, and program |
CN112305407A (en) * | 2020-10-21 | 2021-02-02 | 上海华力集成电路制造有限公司 | Method for positioning failure position and reason of test structure |
Also Published As
Publication number | Publication date |
---|---|
US8977513B2 (en) | 2015-03-10 |
EP2312329B1 (en) | 2013-01-02 |
EP2312329A1 (en) | 2011-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7962821B2 (en) | Built-in self testing circuit with fault diagnostic capability | |
US8032803B2 (en) | Semiconductor integrated circuit and test system thereof | |
US20050210348A1 (en) | Microcomputer and method of testing same | |
US20070150777A1 (en) | Memory test circuit and method | |
US8977513B2 (en) | Reliability test with monitoring of the results | |
US20050204232A1 (en) | Technique for combining scan test and memory built-in self test | |
US11295829B2 (en) | Built-in self-test (BIST) engine configured to store a per pattern based fail status in a pattern mask register | |
US8028211B1 (en) | Look-ahead built-in self tests with temperature elevation of functional elements | |
US20050034021A1 (en) | Semiconductor device and method for testing the same | |
US10014074B2 (en) | Failure analysis and repair register sharing for memory BIST | |
CN103345944B (en) | Storage device and method for testing storage device through test machine | |
US10490296B2 (en) | Memory built-in self-test (MBIST) test time reduction | |
WO2019184612A1 (en) | Terminal and electronic device | |
US20150039957A1 (en) | Dynamic built-in self-test system | |
JP2012185895A (en) | Semiconductor integrated circuit, failure diagnosis system and failure diagnosis method | |
CN114121120A (en) | Detection system, method and chip of memory | |
CN115691632A (en) | Test control system and method | |
KR20050121376A (en) | Test device for semiconductor device and method of testing semiconductor device by using the test device | |
US20140281764A1 (en) | Data path memory test | |
US11742044B2 (en) | Memory built-in self-test with adjustable pause time | |
CN115078968B (en) | Chip test circuit, self-test chip and chip test system | |
KR101150961B1 (en) | Tester | |
JPH05341013A (en) | Semiconductor integrated circuit | |
KR100386626B1 (en) | Circuit for testing semiconductor memory | |
JP2022164238A (en) | Semiconductor device and control method of semiconductor device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: STMICROELECTRONICS S.R.L., ITALY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SELVA, CAROLINA;TORELLI, COSIMO;REEL/FRAME:025435/0821 Effective date: 20101124 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20230310 |