US20080277560A1 - Tie Rod for Formwork - Google Patents

Tie Rod for Formwork Download PDF

Info

Publication number
US20080277560A1
US20080277560A1 US12/092,336 US9233606A US2008277560A1 US 20080277560 A1 US20080277560 A1 US 20080277560A1 US 9233606 A US9233606 A US 9233606A US 2008277560 A1 US2008277560 A1 US 2008277560A1
Authority
US
United States
Prior art keywords
tie rod
canceled
accordance
mid portion
securing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/092,336
Inventor
John A. Simonsen
Vidar Skjorestad
Birger Ersdal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JURISDICTIO BERGENSIS AS
JURISDICTIO STAVANGERIS AS
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from NO20055158A external-priority patent/NO20055158D0/en
Application filed by Individual filed Critical Individual
Assigned to SIMONSEN, JOHN A., JURISDICTIO BERGENSIS AS, ERSDAL, BIRGER, SKJORESTAD, VIDAR, JURISDICTIO STAVANGERIS AS reassignment SIMONSEN, JOHN A. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ERSDAL, BIRGER, SIMONSEN, JOHN A., SKJORESTAD, VIDAR
Publication of US20080277560A1 publication Critical patent/US20080277560A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0707One-piece elements
    • E04G17/0721One-piece elements remaining completely or partially embedded in the cast material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/18Forms, which are completely dismantled after setting of the concrete and re-built for next pouring for double walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0728Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts
    • E04G17/0742Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts remaining completely or partially embedded in the cast material

Definitions

  • the invention relates to a tie rod for connecting opposite sections of a casting formwork, especially formwork for concrete. More particularly, the invention relates to a tie rod formed with a mid portion which is arranged to form supporting abutment surfaces against the internal surfaces of the formwork to maintain a predetermined distance between the formwork sides, and the mid portion is arranged to be fixed in the set casting material to form anchoring points in the concrete in such a way that good adherence is ensured between the concrete and the tie rod in order to prevent moisture from entering along the rod and cause damage to the concrete, and by good thermal properties to prevent condensation at the end portion of the tie rod, the tie rod being formed in one piece of a non-corrosive material, preferably a composite material.
  • the casting material is described as “concrete”, and in this description there are also used other casting-process-related terms known from the casting of concrete. Nevertheless, the invention is not limited to applying only to formworks, which are to be filled with concrete, but also relates to formworks, which are used when pouring building structures with other casting materials.
  • tie rods When concrete is poured, tie rods must be used to keep the formwork in position, that is to say to prevent the distance between two opposite sections of formwork which are to define a wall, for example, from changing when the formwork is loaded in the supporting of or by the pressure from the plastic concrete which is filled into the formwork.
  • the rods are set with relatively regular spacing and fix the opposite formwork sections with a distance determined by the dimension of the tie rod.
  • the tie rods are locked with wedges to braces extending along the external sides of the formwork.
  • Prior art tie rods are formed of steel with spacers which are arranged to bear on the internal wall surface of the formwork sections, made of plastic, slipped over the tie rod in the production process and positioned axially on the tie rod, each bearing on a respective widened portion of the tie rod or an equivalent item.
  • the projecting end portions of the tie rods are broken by bending them at a weakened portion located at the spacers.
  • the surface of fracture is exposed in the wall surface, and the spacers, which are often of a conical shape with their widest portions facing outwards, often fall out.
  • the tie rod or, more accurately, the remainder of the tie rod, which is inside the concrete structure forms an entry gate for moisture.
  • the moisture penetrates the concrete structure and comes into contact with the reinforcement, which lies, in part, immediately adjacent to or in direct contact with the tie rod.
  • the reinforcement corrodes, the reinforcing strength is weakened, the adherence between the concrete and reinforcement is weakened and the concrete scales off due to corroded steel (rust coating) swelling relative to non-corroded steel. Corrosion also occurs on the tie rod.
  • the tie rods In concrete structures which are to retain a liquid, that is prevent the liquid from entering or escaping, the tie rods will often be a source of leakage along the tie rods because of, among other things, poor adherence between steel and concrete.
  • the invention has as its object to remedy or reduce at least one of the drawbacks of the prior art.
  • the invention relates to a tie rod formed of non-corrosive materials, preferably composite materials, in which a mid portion, exhibiting opposite abutment surfaces arranged to rest supportingly on the inside of a formwork section, and a rod stem forms a continuous structure.
  • the mid portion may also include supporting and securing portions for other building materials and also include elements, which increase the adherence to the surrounding concrete and/or reduce the possibility for water to enter along the tie rod.
  • the projecting rod end portions may be cut off at any position with a cutting tool suitable therefore, for example cutting pliers.
  • tie rod according to the invention exhibits improved properties in several areas:
  • Any fasteners for securing building materials to the tie rod are preferably also formed of a non-corrosive material.
  • the invention relates to a tie rod for joining opposite side sections of a casting formwork, the tie rod being provided with a mid portion and two rod end portions, and there being formed in the transitions between the mid portion and either rod end portion at least one abutment surface which is arranged to bear supportingly on an internal surface of the side sections, the rod end portion including rests for wedges for securing the side sections of the casting formwork, characterized in that the tie rod includes a stem of large tensile strength and a surrounding mantle, the mid portion and the mantle of the stem being formed as a continuous structure, the stem, mantle and mid portion being formed of non-corrosive materials.
  • the tie rod is preferably formed of a composite material, the stem being fibre-reinforced in the axial direction of the tie rod.
  • the mantle and the mid portion are advantageously formed of the same type of material.
  • the mantle and the mid portion are preferably joined by fusion of the material forming the mantle and the material forming the mid portion. Alternatively the mantle and the mid portion are joined by gluing.
  • the mid portion is preferably provided with means for non-releasable engagement with a surrounding casting material when this has been poured into the formwork and has set.
  • the mid portion and the stem portion surrounded by the mid portion is advantageously arranged to form a watertight, non-releasable, through plug in a completed cast structure.
  • the abutment surface is preferably formed by the mid portion exhibiting a widened cross-section towards its abutment portions.
  • At least one portion of the mid portion advantageously exhibits a cross-section exhibiting, when the cross-section lies perpendicularly to the centre axis of the tie rod, a non-circular shape.
  • the mid portion is advantageously provided with a plurality of concentric cross-sectional widenings.
  • the mid portion is advantageously arranged to receive and fix one or more locking means for a plate-shaped building material, for example an insulating material, substantially annular grooves being complementary to a portion of the locking means.
  • the locking means are preferably formed of a non-corrosive material.
  • the mid portion of the tie rod advantageously includes one or more means arranged to receive a reinforcing means, preferably in the form of one or more substantially annular grooves.
  • the substantially annular grooves advantageously have a trapezoidal cross-section with the smallest width at the bottom of the groove, the side edges of the groove exhibiting the same angle of inclination relative to the centre axis of the tie rod.
  • the mid portion of the tie rod is advantageously arranged to receive one or more securing means for securing the reinforcing means.
  • the securing means for securing the reinforcing means is advantageously formed of a non-corrosive material.
  • the rod end portion is preferably arranged to receive one or more securing discs for securing a plate-shaped building material, for example an insulating material.
  • the securing disc advantageously includes means for releasable connection to the mantle surface of the rod end portion.
  • the securing disc is advantageously provided with a plurality of resilient fingers extending from a circumferential portion and in a radial direction towards a centre opening.
  • the securing disc is preferably formed of a non-corrosive material.
  • the thermal conductivity of the tie rod is advantageously smaller than the thermal conductivity of the surrounding completed cast structure.
  • FIG. 1 shows a perspective sketch of a tie rod according to the invention
  • FIG. 2 shows a perspective sketch on a larger scale of a locking disc for the tie rod according to the invention
  • FIG. 3 shows a perspective sketch of a securing disc for the tie rod according to the invention
  • FIG. 4 shows a perspective sketch on a smaller scale of a partially assembled formwork, in which the tie rod connects opposite formwork sections and positions reinforcement iron and insulating material;
  • FIG. 5 shows, on a smaller scale, a completed cast wall section, in which a side surface has isolation material applied thereon, fixed by means of the tie rod according to the invention
  • FIG. 6 shows a perspective sketch of a further exemplary embodiment of a mid portion of the tie rod according to the invention.
  • a tie rod 1 includes a stem 2 with a mantle 2 a , a mid portion 3 and two rod end portions 5 a , 5 b . At either one of the transitions between the mid portion 3 and the rod end portions 5 a , 5 b the mid portion exhibits a cross-sectional widening 7 a , each forming an abutment surface 7 .
  • the tie rod 1 is formed of a composite material, the stem 2 being reinforced in a manner known in itself with a fibre material of large tensile strength and surrounded by a bonding material forming the mantle 2 a of the stem 2 .
  • the mid portion 3 may be formed of the same type of material as the mantle 2 a.
  • the cross-sectional widening forms a frustum of a cone, a bottom surface 7 b facing the mid portion 3 .
  • the centre axis of the cone coincides with the centre axis of the tie rod 1 .
  • a top surface faces the adjacent rod end portion 5 a , 5 b, respectively, and is placed perpendicularly to the centre axis of the tie rod 1 , forming the abutment surface 7 .
  • the bottom surface 7 b exhibits a non-circular shape, four segment surfaces 7 c lying parallel to the centre axis of the tie rod 1 in the direction towards the abutment surface 7 and extending into a side surface 7 d . Two by two opposite segment surfaces 7 c are parallel to each other, the bottom surface 7 b forming a square with rounded corners.
  • the abutment surface 7 is formed as a first four-armed cross 57 b .
  • a second four-armed cross 57 a of larger arm length is formed at a distance from the first cross 57 b , and four ribs 58 a projecting radially and diametrically opposite, extend axially between the arms 59 a , 59 b of the crosses 57 a , 57 b .
  • this embodiment exhibits several concentric, circular cross-sectional widenings forming securing and sealing ribs 58 b.
  • the mid portion 3 is joined in a sealing manner to the stem 2 , liquid, for example water, being unable to enter in an axial direction from the end portion 5 a , 5 b towards the mid portion 3 due to the passage of the stem 2 through the mid portion 3 forming a tight connection.
  • the tight connection is formed by fusion of the materials of the mantle 2 a and the mid portion 3 in the production, or by joining them with, for example, glue forming a watertight joint between the stem 2 and the mid portion 3 .
  • Either rod end portion 5 a , 5 b is provided at its outer end with a projecting rest 9 for a wedge device 11 for securing the side sections 23 a , 23 b of a formwork 21 .
  • the mid portion 3 is provided with several grooves 3 a extending round the entire periphery of the mid portion and arranged to receive a locking disc 13 for positioning and fixing a plate-shaped cast-in material 15 , for example an insulating material.
  • the locking disc 13 is arranged to be slipped onto the mid portion 3 , preferably in a radial direction, as a sector opening 13 a leads in to a circular centre hole 13 b positioned substantially centrically.
  • the thickness of the locking disc 13 forms, at least at the centre hole 13 b , a press fit with the side edges of groove 3 a of the mid portion 3 , or the periphery of the centre hole 13 b forms a press fit with the bottom surface of the groove 3 a.
  • the mid portion 3 is also provided with several grooves 3 b extending round the entire periphery of the mid portion and having a transversal profile which is arranged to receive a reinforcing means 25 in the form of reinforcing steel or similar, the cross-section of the groove being trapezoidal, for example.
  • the tie rod 1 may expedient also include a securing disc 17 which is arranged to be secured to a cut rod end portion 5 a , 5 b projecting from a set casting material 31 , for example a concrete wall, after the formwork 21 has been removed, the securing disc 17 being provided with a number of radially oriented, resilient fingers 17 a extending from a circumferential portion 17 b and in a radial direction towards a centre opening 17 c , each finger 17 a being separated from an adjacent finger by a slot 17 d extending in a radial direction from the centre opening 17 c to a circular opening 17 e in the circumferential portion 17 b of the securing disc.
  • a securing disc 17 which is arranged to be secured to a cut rod end portion 5 a , 5 b projecting from a set casting material 31 , for example a concrete wall, after the formwork 21 has been removed, the securing disc 17 being provided with a number of radially oriented,
  • the centre opening 17 c exhibits a diameter, which is smaller than the diameter of the rod end portions 5 a , 5 b to ensure that the securing disc 17 is retained in a prescribed position on the rod end portion 5 a, 5 b in that the fingers 17 a are under tension.
  • At least the projections 9 and the stem 2 of the tie rod 1 are formed of a composite material of a tensile strength which is great enough for absorbing the relevant tensile loads to which the tie rod 1 for a formwork 21 is subjected during installation and during pouring of the casting material 31 , for example concrete, into the formwork gap.
  • the composite material has fibre reinforcement and a binder material, which do not convey water or corrode.
  • the mid portion 3 and stem 2 are formed of a material which is suitable for securing a fastener, for example a nail or screw.
  • the rod end portions 5 a, 5 b are arranged to be cut at any point between the projection 9 and the abutment surface 7 by means of a tool suitable therefore.
  • the entire tie rod 1 with projections 9 and mid portion 3 may be formed in one forming operation.
  • the locking disc 13 and the securing disc 17 are advantageously formed of a non-corroding material, for example a plastics material.
  • the tie rod 1 is installed in a manner known per se as the formwork 21 is being built, side sections 23 a being put together before the reinforcing means 25 then being positioned and locked relative to each other and the formwork 21 .
  • Insulating material 15 if any, for casting in, is fixed by means of the locking discs 13 before the opposite side sections 23 b are mounted and the formwork is closed and secured by fitting the wedge devices 11 to the tie rods 1 within the projections 9 and tightening the tie rods 1 .
  • the abutment surface 7 rests supportingly on an internal side surface 23 c of the side sections 23 a , 23 b of the formwork 21 .
  • the formwork 21 is removed in a manner known per se, and the projecting rod end portions 5 a, 5 b of the tie rods 1 are cut off.
  • rod end portions 5 a , 5 b are to be used for securing plate-shaped building materials 33 , for example insulating plates, on one or both sides of the completed cast structure 31 , these are secured by slipping the securing discs 17 onto the rod end portions 5 a , 5 b into abutment on the plates 33 after the projection 9 and suitable lengths of the rod end portions 5 a, 5 b have been cut off.
  • building materials are to be secured by screwing or nailing, for example, this may be done by securing the fasteners to the mid portion 3 through the centre of the abutment surface 7 which is level with the outer surface of the cast structure 31 and formed by the cut stem 2 . Due to the unbroken axial extent and partly non-circular cross-section of the mid portion 3 they are held in a secure grip in the set casting material 31 , both in axial strain and radial rotational strain.
  • the means 3 a , 3 b , 13 ensure a better positioning of the insulating materials 15 and reinforcement 25 in the cast structure, which leads to a more efficient utilization of the materials and better quality of the cast structure.

Abstract

A tie rod (1) for joining opposite side sections (23 a, 23 b) of a casting formwork (21), the tie rod (1) being provided with a mid portion (3) and two rod end portions (5 a, 5 b) and there being formed, in the transitions between the mid portion (3) and either rod end portion (5 a, 5 b) at least one abutment surface (7) which is arranged to rest supportingly on an internal side surface (23 c) of the side sections (23 a, 23 b), and the rod end portions (5 a, 5 b) including rests (9) for wedge devices (11) for securing the side sections (23 a, 23 b) of the casting formwork (21), and the tie rod (1) including a stem (2) of great tensile strength and a surrounding mantle (2 a), the mid portion (3) and the mantle (2 a) of the stem (2) being formed as a continuous structure, the stem (2), the mantle (2 a) and mid portion (3) being formed of non-corrosive materials.

Description

  • The invention relates to a tie rod for connecting opposite sections of a casting formwork, especially formwork for concrete. More particularly, the invention relates to a tie rod formed with a mid portion which is arranged to form supporting abutment surfaces against the internal surfaces of the formwork to maintain a predetermined distance between the formwork sides, and the mid portion is arranged to be fixed in the set casting material to form anchoring points in the concrete in such a way that good adherence is ensured between the concrete and the tie rod in order to prevent moisture from entering along the rod and cause damage to the concrete, and by good thermal properties to prevent condensation at the end portion of the tie rod, the tie rod being formed in one piece of a non-corrosive material, preferably a composite material.
  • In what follows, the casting material is described as “concrete”, and in this description there are also used other casting-process-related terms known from the casting of concrete. Nevertheless, the invention is not limited to applying only to formworks, which are to be filled with concrete, but also relates to formworks, which are used when pouring building structures with other casting materials.
  • When concrete is poured, tie rods must be used to keep the formwork in position, that is to say to prevent the distance between two opposite sections of formwork which are to define a wall, for example, from changing when the formwork is loaded in the supporting of or by the pressure from the plastic concrete which is filled into the formwork. The rods are set with relatively regular spacing and fix the opposite formwork sections with a distance determined by the dimension of the tie rod. At the same time, the tie rods are locked with wedges to braces extending along the external sides of the formwork.
  • Prior art tie rods are formed of steel with spacers which are arranged to bear on the internal wall surface of the formwork sections, made of plastic, slipped over the tie rod in the production process and positioned axially on the tie rod, each bearing on a respective widened portion of the tie rod or an equivalent item. After the concrete has set and the formwork is removed, the projecting end portions of the tie rods are broken by bending them at a weakened portion located at the spacers. The surface of fracture is exposed in the wall surface, and the spacers, which are often of a conical shape with their widest portions facing outwards, often fall out. The need arises for trowelling the wall surface at each tie rod, partly in order to cover the surface of fracture, partly to fill the recess from the spacer. This is laborious and costly. Still, the largest drawback of the prior art is that the tie rod or, more accurately, the remainder of the tie rod, which is inside the concrete structure, forms an entry gate for moisture. The moisture penetrates the concrete structure and comes into contact with the reinforcement, which lies, in part, immediately adjacent to or in direct contact with the tie rod. The reinforcement corrodes, the reinforcing strength is weakened, the adherence between the concrete and reinforcement is weakened and the concrete scales off due to corroded steel (rust coating) swelling relative to non-corroded steel. Corrosion also occurs on the tie rod.
  • Also in conditions in which a concrete structure is not in direct contact with water, prior art tie rods will be of disadvantage as the thermal properties of the steel will make the tie rod work as a cold bridge, so that at a great temperature gradient across the cross-section of the concrete structure, condensation will easily form on the warm side. This moisture creates various maintenance challenges caused by the moisture directly or by rust formation on the tie rod.
  • In concrete structures which are to retain a liquid, that is prevent the liquid from entering or escaping, the tie rods will often be a source of leakage along the tie rods because of, among other things, poor adherence between steel and concrete.
  • Another problem of the prior art is the lacking possibility of the tie rods for accurate positioning of reinforcement in the axial direction of the rod when the reinforcement is placed directly on the tie rods. Prior art tie rods lack means for this.
  • From U.S. Pat. No. 3,430,914 is known a formwork tie rod of metal provided with diabolo-shaped spacer members, in which the outer part of the spacer member can be removed as required, and the diabolo shape ensures that the spacer member cannot inadvertently come loose from the wall. There is also described a plastic plug for sealing the centre hole of the spacer member after the rod end has been removed in a known manner. There are also described conical filler plugs of wood and ceramics. The rod exhibits the drawbacks described above as regards corrosion.
  • From NO 19980475 is known a formwork tie rod, in which spacers of plastic exhibit one or more plane partial surfaces in the circumferential surface to bring about good adherence of finishing mortar when the holes from the spacer shims are to be sealed up. The rod exhibits the drawbacks described above as regards corrosion.
  • The invention has as its object to remedy or reduce at least one of the drawbacks of the prior art.
  • The object is achieved through features specified in the description below and in the Claims that follow.
  • The invention relates to a tie rod formed of non-corrosive materials, preferably composite materials, in which a mid portion, exhibiting opposite abutment surfaces arranged to rest supportingly on the inside of a formwork section, and a rod stem forms a continuous structure. In addition to exhibiting said abutment surfaces the mid portion may also include supporting and securing portions for other building materials and also include elements, which increase the adherence to the surrounding concrete and/or reduce the possibility for water to enter along the tie rod. After the formwork has been removed, the projecting rod end portions may be cut off at any position with a cutting tool suitable therefore, for example cutting pliers.
  • Thereby the tie rod according to the invention exhibits improved properties in several areas:
    • no corrosion damage will occur in the part of the formwork tie rod which is left in the concrete structure;
    • the continuous, non-corrosive tie rod structure with good adherence to the surrounding concrete prevents water from penetrating into or through the concrete structure in channels formed along the tie rod, whereby the tie rod according to the invention thereby contributes to a concrete structure of better watersealing properties and a concrete structure exhibiting less risk of rust formation on the reinforcing steel;
    • the mid portion of the tie rod may be shaped at minimal costs to form a large number of positioning and securing details for reinforcement and internal insulation in plate form,
    • the mid portion of the tie rod may be formed with radial anchoring elements which prevent the tie rod, under torque strains, from coming loose from the surrounding, set concrete, and the through plug which is formed by the remaining part of the tie rod can thereby function as installation fixtures for external building materials, the through stem of the rod being suitable as a screw attachment, for example
    • the thermal conductivity of the rod materials is small in relation to that of the concrete structure, and the problem of condensation at the tie rods is eliminated;
    • projecting end portions of the tie rod can be used for mounting external building materials, for example insulation material in plate form, as the material is slipped onto the projecting end portions and secured with locking elements suitable therefore, before excess lengths of the end portions are cut off; and
    • after the formwork has been removed, there are no parts of the tie rod that can fall out of the cast structure and thereby create a need for surface repairs by trowelling hollows with mortar, putting in plugs etc.
  • Any fasteners for securing building materials to the tie rod are preferably also formed of a non-corrosive material.
  • More particularly, the invention relates to a tie rod for joining opposite side sections of a casting formwork, the tie rod being provided with a mid portion and two rod end portions, and there being formed in the transitions between the mid portion and either rod end portion at least one abutment surface which is arranged to bear supportingly on an internal surface of the side sections, the rod end portion including rests for wedges for securing the side sections of the casting formwork, characterized in that the tie rod includes a stem of large tensile strength and a surrounding mantle, the mid portion and the mantle of the stem being formed as a continuous structure, the stem, mantle and mid portion being formed of non-corrosive materials.
  • The tie rod is preferably formed of a composite material, the stem being fibre-reinforced in the axial direction of the tie rod.
  • The mantle and the mid portion are advantageously formed of the same type of material.
  • The mantle and the mid portion are preferably joined by fusion of the material forming the mantle and the material forming the mid portion. Alternatively the mantle and the mid portion are joined by gluing.
  • The mid portion is preferably provided with means for non-releasable engagement with a surrounding casting material when this has been poured into the formwork and has set.
  • The mid portion and the stem portion surrounded by the mid portion is advantageously arranged to form a watertight, non-releasable, through plug in a completed cast structure.
  • The abutment surface is preferably formed by the mid portion exhibiting a widened cross-section towards its abutment portions.
  • At least one portion of the mid portion advantageously exhibits a cross-section exhibiting, when the cross-section lies perpendicularly to the centre axis of the tie rod, a non-circular shape.
  • The mid portion is advantageously provided with a plurality of concentric cross-sectional widenings.
  • The mid portion is advantageously arranged to receive and fix one or more locking means for a plate-shaped building material, for example an insulating material, substantially annular grooves being complementary to a portion of the locking means.
  • The locking means are preferably formed of a non-corrosive material.
  • The mid portion of the tie rod advantageously includes one or more means arranged to receive a reinforcing means, preferably in the form of one or more substantially annular grooves.
  • The substantially annular grooves advantageously have a trapezoidal cross-section with the smallest width at the bottom of the groove, the side edges of the groove exhibiting the same angle of inclination relative to the centre axis of the tie rod.
  • The mid portion of the tie rod is advantageously arranged to receive one or more securing means for securing the reinforcing means.
  • The securing means for securing the reinforcing means is advantageously formed of a non-corrosive material.
  • The rod end portion is preferably arranged to receive one or more securing discs for securing a plate-shaped building material, for example an insulating material.
  • The securing disc advantageously includes means for releasable connection to the mantle surface of the rod end portion.
  • The securing disc is advantageously provided with a plurality of resilient fingers extending from a circumferential portion and in a radial direction towards a centre opening.
  • The securing disc is preferably formed of a non-corrosive material.
  • The thermal conductivity of the tie rod is advantageously smaller than the thermal conductivity of the surrounding completed cast structure.
  • In what follows is described a non-limiting example of a preferred embodiment which is visualized in the accompanying drawings, in which:
  • FIG. 1 shows a perspective sketch of a tie rod according to the invention;
  • FIG. 2 shows a perspective sketch on a larger scale of a locking disc for the tie rod according to the invention;
  • FIG. 3 shows a perspective sketch of a securing disc for the tie rod according to the invention;
  • FIG. 4 shows a perspective sketch on a smaller scale of a partially assembled formwork, in which the tie rod connects opposite formwork sections and positions reinforcement iron and insulating material;
  • FIG. 5 shows, on a smaller scale, a completed cast wall section, in which a side surface has isolation material applied thereon, fixed by means of the tie rod according to the invention; and
  • FIG. 6 shows a perspective sketch of a further exemplary embodiment of a mid portion of the tie rod according to the invention.
  • A tie rod 1 includes a stem 2 with a mantle 2 a, a mid portion 3 and two rod end portions 5 a, 5 b. At either one of the transitions between the mid portion 3 and the rod end portions 5 a, 5 b the mid portion exhibits a cross-sectional widening 7 a, each forming an abutment surface 7.
  • The tie rod 1 is formed of a composite material, the stem 2 being reinforced in a manner known in itself with a fibre material of large tensile strength and surrounded by a bonding material forming the mantle 2 a of the stem 2. The mid portion 3 may be formed of the same type of material as the mantle 2 a.
  • In a first embodiment shown in FIG. 1, the cross-sectional widening forms a frustum of a cone, a bottom surface 7 b facing the mid portion 3. The centre axis of the cone coincides with the centre axis of the tie rod 1. A top surface faces the adjacent rod end portion 5 a, 5 b, respectively, and is placed perpendicularly to the centre axis of the tie rod 1, forming the abutment surface 7. The bottom surface 7 b exhibits a non-circular shape, four segment surfaces 7 c lying parallel to the centre axis of the tie rod 1 in the direction towards the abutment surface 7 and extending into a side surface 7 d. Two by two opposite segment surfaces 7 c are parallel to each other, the bottom surface 7 b forming a square with rounded corners.
  • In another embodiment shown in FIG. 6 the abutment surface 7 is formed as a first four-armed cross 57 b. A second four-armed cross 57 a of larger arm length is formed at a distance from the first cross 57 b, and four ribs 58 a projecting radially and diametrically opposite, extend axially between the arms 59 a, 59 b of the crosses 57 a, 57 b. In addition this embodiment exhibits several concentric, circular cross-sectional widenings forming securing and sealing ribs 58 b.
  • The mid portion 3 is joined in a sealing manner to the stem 2, liquid, for example water, being unable to enter in an axial direction from the end portion 5 a, 5 b towards the mid portion 3 due to the passage of the stem 2 through the mid portion 3 forming a tight connection. The tight connection is formed by fusion of the materials of the mantle 2 a and the mid portion 3 in the production, or by joining them with, for example, glue forming a watertight joint between the stem 2 and the mid portion 3.
  • Either rod end portion 5 a, 5 b is provided at its outer end with a projecting rest 9 for a wedge device 11 for securing the side sections 23 a, 23 b of a formwork 21.
  • The mid portion 3 is provided with several grooves 3 a extending round the entire periphery of the mid portion and arranged to receive a locking disc 13 for positioning and fixing a plate-shaped cast-in material 15, for example an insulating material.
  • The locking disc 13 is arranged to be slipped onto the mid portion 3, preferably in a radial direction, as a sector opening 13 a leads in to a circular centre hole 13 b positioned substantially centrically. To ensure that the locking disc 13 will not fall off after having been fitted on the tie rod 1, the thickness of the locking disc 13 forms, at least at the centre hole 13 b, a press fit with the side edges of groove 3 a of the mid portion 3, or the periphery of the centre hole 13 b forms a press fit with the bottom surface of the groove 3 a.
  • The mid portion 3 is also provided with several grooves 3 b extending round the entire periphery of the mid portion and having a transversal profile which is arranged to receive a reinforcing means 25 in the form of reinforcing steel or similar, the cross-section of the groove being trapezoidal, for example.
  • The tie rod 1 may expedient also include a securing disc 17 which is arranged to be secured to a cut rod end portion 5 a, 5 b projecting from a set casting material 31, for example a concrete wall, after the formwork 21 has been removed, the securing disc 17 being provided with a number of radially oriented, resilient fingers 17 a extending from a circumferential portion 17 b and in a radial direction towards a centre opening 17 c, each finger 17 a being separated from an adjacent finger by a slot 17 d extending in a radial direction from the centre opening 17 c to a circular opening 17 e in the circumferential portion 17 b of the securing disc. The centre opening 17 c exhibits a diameter, which is smaller than the diameter of the rod end portions 5 a, 5 b to ensure that the securing disc 17 is retained in a prescribed position on the rod end portion 5 a, 5 b in that the fingers 17 a are under tension.
  • At least the projections 9 and the stem 2 of the tie rod 1, that is to say the rod end portions 5 a, 5 b and the through core of the mid portion 3, are formed of a composite material of a tensile strength which is great enough for absorbing the relevant tensile loads to which the tie rod 1 for a formwork 21 is subjected during installation and during pouring of the casting material 31, for example concrete, into the formwork gap. The composite material has fibre reinforcement and a binder material, which do not convey water or corrode. The mid portion 3 and stem 2 are formed of a material which is suitable for securing a fastener, for example a nail or screw. The rod end portions 5 a, 5 b are arranged to be cut at any point between the projection 9 and the abutment surface 7 by means of a tool suitable therefore.
  • The entire tie rod 1 with projections 9 and mid portion 3 may be formed in one forming operation.
  • The locking disc 13 and the securing disc 17 are advantageously formed of a non-corroding material, for example a plastics material.
  • The tie rod 1 is installed in a manner known per se as the formwork 21 is being built, side sections 23 a being put together before the reinforcing means 25 then being positioned and locked relative to each other and the formwork 21. Insulating material 15, if any, for casting in, is fixed by means of the locking discs 13 before the opposite side sections 23 b are mounted and the formwork is closed and secured by fitting the wedge devices 11 to the tie rods 1 within the projections 9 and tightening the tie rods 1. In the tightening the abutment surface 7 rests supportingly on an internal side surface 23 c of the side sections 23 a, 23 b of the formwork 21.
  • After the casting material 31, for example the concrete, has been filled into the formwork and has set, the formwork 21 is removed in a manner known per se, and the projecting rod end portions 5 a, 5 b of the tie rods 1 are cut off.
  • If the rod end portions 5 a, 5 b are to be used for securing plate-shaped building materials 33, for example insulating plates, on one or both sides of the completed cast structure 31, these are secured by slipping the securing discs 17 onto the rod end portions 5 a, 5 b into abutment on the plates 33 after the projection 9 and suitable lengths of the rod end portions 5 a, 5 b have been cut off.
  • If building materials are to be secured by screwing or nailing, for example, this may be done by securing the fasteners to the mid portion 3 through the centre of the abutment surface 7 which is level with the outer surface of the cast structure 31 and formed by the cut stem 2. Due to the unbroken axial extent and partly non-circular cross-section of the mid portion 3 they are held in a secure grip in the set casting material 31, both in axial strain and radial rotational strain.
  • Due to the choice of material the tie rod 1 will not corrode and lead water in to the cast-in reinforcement or through the cast structure. The means 3 a, 3 b, 13 ensure a better positioning of the insulating materials 15 and reinforcement 25 in the cast structure, which leads to a more efficient utilization of the materials and better quality of the cast structure.
  • The possibility of using the rod end portions 5 a, 5 b of the tie rod and the abutment surface 7 of the mid portion when fitting external building materials, adds favourable additional functions to the tie rod 1.

Claims (46)

1. (canceled)
2. (canceled)
3. (canceled)
4. (canceled)
5. (canceled)
6. (canceled)
7. (canceled)
8. (canceled)
9. (canceled)
10. (canceled)
11. (canceled)
12. (canceled)
13. (canceled)
14. (canceled)
15. (canceled)
16. (canceled)
17. (canceled)
18. (canceled)
19. (canceled)
20. (canceled)
21. (canceled)
22. (canceled)
23. (canceled)
24. A tie rod for joining together opposite side sections of a formwork, said tie rod comprising:
a mid portion;
two rod end portions having a rest for a wedge device for securing the side sections of the casting formwork; and
at least one abutment surface located between said mid portion and either rod end portion, said abutment arranged to rest supportingly on an internal side surface of the side sections,
wherein said tie rod includes a stem of great tensile strength with a surrounding mantle, said mid portion and said mantle of said stem being a continuous structure of a non-corrosive material.
25. The tie rod in accordance with claim 24, further comprising said tie rod formed of a composite material.
26. The tie rod in accordance with claims 24, said stem comprising fibre-reinforcement in an axial direction of said tie rod.
27. The tie rod in accordance with claims 24, further comprising said mantle and said mid portion formed of the same type of material.
28. The tie rod in accordance with claims 24, further comprising said mantle and said mid portion are joined by fusion of a material forming said mantle and a material forming said mid portion.
29. The tie rod in accordance with claim 24, further comprising said mantle and said mid portion joined by glue.
30. The tie rod in accordance with claim 24, said mid portion comprising a means for non-releasable engagement with a surrounding casting material.
31. The tie rod in accordance with claim 24, further comprising said mid portion and said stem portion surrounded by said mid portion arranged to form a watertight, non-releasable, through plug.
32. The tie rod in accordance with claim 24, said abutment surface comprising a widened cross-section in an end portion of said mid portion.
33. The tie rod in accordance with claim 24, further comprising at least one portion of said mid portion having a non-circular cross section.
34. The tie rod in accordance with claim 24, said mid portion comprising a plurality of concentric cross-sectional widenings.
35. The tie rod in accordance with claim 24, said mid portion comprising one or more substantially annular grooves arranged to receive and fix in a radial and an axial directions at least one locking means for a plate-shaped building material, said annular grooves being complementary to a portion of said locking means.
36. The tie rod in accordance with claim 35, said locking means comprising a non-corrosive material.
37. The tie rod in accordance with claim 24, said mid portion comprising at least one means arranged to receive a reinforcing means.
38. The tie rod in accordance with claim 24, said mid portion comprising at least one substantially annular groove.
39. The tie rod in accordance with claim 38, said substantially annular groove comprising a trapezoidal cross-section having a smallest width at a bottom of said groove, and side edges of said groove having a constant angle of inclination relative to a centre axis of said tie rod.
40. The tie rod in accordance with claim 24, said mid portion comprising being arranged to receive at least one securing means for securing said reinforcing means.
41. The tie rod in accordance with claim 40, said securing means comprising a non-corrosive material.
42. The tie rod in accordance with claim 24, said rod end portion comprising being arranged to receive at least one securing disc for securing a plate-shaped building material.
43. The tie rod in accordance with claim 42, said securing disc comprising a means for releasable connection to said mantle surface of said rod end portion.
44. The tie rod in accordance with claim 42, said securing disc comprising a plurality of resilient fingers extending from a circumferential portion in a radial direction towards a center opening.
45. The tie rod in accordance with claim 42, said securing disc comprising a non-corrosive material.
46. The tie rod in accordance with claim 24, further comprising said tie rod having a thermal conductivity less than a thermal conductivity of a surrounding completed cast structure.
US12/092,336 2005-11-03 2006-10-27 Tie Rod for Formwork Abandoned US20080277560A1 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
NO20055158 2005-11-03
NO20055158A NO20055158D0 (en) 2005-11-03 2005-11-03 Spacer stop spacing rod
NO20063831 2006-08-28
NO20063831A NO333274B1 (en) 2005-11-03 2006-08-28 Spacer bars for joining a stop railing's opposite side sections.
PCT/NO2006/000376 WO2007053027A1 (en) 2005-11-03 2006-10-27 A tie rod for formwork

Publications (1)

Publication Number Publication Date
US20080277560A1 true US20080277560A1 (en) 2008-11-13

Family

ID=38006096

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/092,336 Abandoned US20080277560A1 (en) 2005-11-03 2006-10-27 Tie Rod for Formwork

Country Status (7)

Country Link
US (1) US20080277560A1 (en)
EP (1) EP1945883B1 (en)
JP (1) JP4888490B2 (en)
CA (1) CA2665789C (en)
DK (1) DK1945883T3 (en)
NO (1) NO333274B1 (en)
WO (1) WO2007053027A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160281361A1 (en) * 2013-12-17 2016-09-29 Benjamin Baader Insulated concrete panel form and method of making same
US20180223533A1 (en) * 2017-02-08 2018-08-09 Michael G. RUSH Adjustable rebar positioning device
CN110499914A (en) * 2019-08-06 2019-11-26 深圳市胜德建筑科技有限公司 Anti- bank formwork reinforcement built-in fitting, anti-bank formwork reinforcement structure and its construction method
WO2021202963A1 (en) * 2020-04-03 2021-10-07 Cetres Holdings, Llc Reinforced tie rod and a building wall using the same
CN113898175A (en) * 2021-08-30 2022-01-07 成都建工第二建筑工程有限公司 Opposite-pulling fixing structure of ultra-high turnover rate non-penetrating sleeve

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9033302B2 (en) 2011-08-03 2015-05-19 Composite Technologies Corporation Taper-ended form tie
KR101292523B1 (en) 2011-08-29 2013-08-12 한국건설기술연구원 Concrete composite wall construction method with inner insulation, composite shear connector and composite form-tie
KR101861254B1 (en) * 2017-05-26 2018-05-25 (주)태성산업개발 construction method and structure of insulation in concrete outer walls
FR3072701B1 (en) * 2017-10-19 2020-11-06 G B E TOOLS FOR IN-SITU REALIZATION OF A SANDWICH WALL AND PROCESS BY APPLYING

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3430914A (en) * 1967-05-18 1969-03-04 Superior Concrete Accessories Tie rod assembly for a concrete wall form and with novel spacer members for the form sides
US4208030A (en) * 1978-06-15 1980-06-17 Wilson Thomas W Concrete form tie rod and fastener
US4234156A (en) * 1979-04-24 1980-11-18 Acrow-Richmond Limited Snap-tie
WO1996015335A1 (en) * 1994-11-09 1996-05-23 Superdex Investments Limited Shuttering element
US6854229B2 (en) * 2003-05-29 2005-02-15 H.K. Marketing Llc Form tie sleeves for composite action insulated concrete sandwich walls

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3734453A (en) * 1970-12-18 1973-05-22 A Bailey Tie rod assembly
US3933332A (en) * 1974-01-14 1976-01-20 Tullio E. Lovisa Self-sealing tie assembly for erecting concrete forms
DE2913836A1 (en) * 1979-04-06 1980-10-16 Otto Teufel Tie rod for shuttering - made of plastics with expanding wedge fixture at one end
JPS61282642A (en) * 1985-06-05 1986-12-12 Penta Ocean Constr Co Ltd Tie rod
NL9101666A (en) * 1991-10-03 1993-05-03 Hakron Nunspeet B V Shuttering arrangement for concrete
FR2686915B1 (en) * 1992-01-31 1998-10-16 Gtm Batimen Travaux Publ DEVICE FOR THE TENSIONING OF TENSIONS IN COMPOSITE MATERIAL.
DE4215731A1 (en) * 1992-05-13 1993-11-18 Rene P Schmid Process for erecting concrete walls using formwork, and device and means for carrying out this process
NL1015785C2 (en) * 2000-07-24 2002-01-25 Hordijk Verpakkingsind Bv Draw bar with rapid coupling is for stabilizing casing used for filling with concrete and comprises bar of inert material, preferably plastic, inserted through casing, being provided with fixture devices for counter holders

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3430914A (en) * 1967-05-18 1969-03-04 Superior Concrete Accessories Tie rod assembly for a concrete wall form and with novel spacer members for the form sides
US4208030A (en) * 1978-06-15 1980-06-17 Wilson Thomas W Concrete form tie rod and fastener
US4234156A (en) * 1979-04-24 1980-11-18 Acrow-Richmond Limited Snap-tie
WO1996015335A1 (en) * 1994-11-09 1996-05-23 Superdex Investments Limited Shuttering element
US6854229B2 (en) * 2003-05-29 2005-02-15 H.K. Marketing Llc Form tie sleeves for composite action insulated concrete sandwich walls

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160281361A1 (en) * 2013-12-17 2016-09-29 Benjamin Baader Insulated concrete panel form and method of making same
US10006200B2 (en) * 2013-12-17 2018-06-26 Benjamin Baader Insulated concrete panel form and method of making same
US20190093355A1 (en) * 2013-12-17 2019-03-28 Benjamin Baader Insulated concrete panel form and method of making same
US20180223533A1 (en) * 2017-02-08 2018-08-09 Michael G. RUSH Adjustable rebar positioning device
US10450751B2 (en) * 2017-02-08 2019-10-22 Michael G. RUSH Adjustable rebar positioning device
CN110499914A (en) * 2019-08-06 2019-11-26 深圳市胜德建筑科技有限公司 Anti- bank formwork reinforcement built-in fitting, anti-bank formwork reinforcement structure and its construction method
WO2021202963A1 (en) * 2020-04-03 2021-10-07 Cetres Holdings, Llc Reinforced tie rod and a building wall using the same
CN113898175A (en) * 2021-08-30 2022-01-07 成都建工第二建筑工程有限公司 Opposite-pulling fixing structure of ultra-high turnover rate non-penetrating sleeve

Also Published As

Publication number Publication date
WO2007053027A1 (en) 2007-05-10
JP2009515067A (en) 2009-04-09
NO20063831L (en) 2007-05-04
EP1945883A4 (en) 2014-07-09
EP1945883B1 (en) 2015-04-29
DK1945883T3 (en) 2015-07-27
JP4888490B2 (en) 2012-02-29
CA2665789A1 (en) 2007-05-10
NO333274B1 (en) 2013-04-29
EP1945883A1 (en) 2008-07-23
CA2665789C (en) 2012-01-31

Similar Documents

Publication Publication Date Title
EP1945883B1 (en) A tie rod for formwork
KR100707685B1 (en) A embeded anchor with socket nut
JP2021119296A (en) Construction method for connection structure of precast structural member and overtime hardening material
JP7402100B2 (en) Concrete member joints and concrete member connection methods
US9033302B2 (en) Taper-ended form tie
KR101559919B1 (en) Insert Pin Type Insulation Deck Plate
JPH11280021A (en) Saddle structural body for cable stayed bridge cable
CN220868520U (en) Bridge-cut-off type heat-insulation composite integrated plate and cast-in-situ concrete wall
JP3160839B2 (en) Tie bar with socket for concrete pavement
KR200377078Y1 (en) A embeded anchor with socket nut
JP5255543B2 (en) Mixed girder joint structure
KR102606151B1 (en) Fixing device of heat insulating material for sandwich concrete wall
CN216340879U (en) Post-pouring formwork device
KR20050071286A (en) The construction method and shrinkage joint for crack in concrete construction
JP7385064B2 (en) Precast concrete plate fittings
RU2433911C1 (en) Reinforcement moulding unit for production of prefabricated elements
KR200306733Y1 (en) Apparatus for fixing a concrete form
JP7303766B2 (en) Construction method of panel unit and structure
KR200372771Y1 (en) Fixing Bracket of Tie for Aluminum Euroform
JP6932049B2 (en) Connection structure and connection method
JPS6316770Y2 (en)
KR200282461Y1 (en) Insert for concrete slab
KR100528825B1 (en) Apparatus for repairing and reinforcing using FRP panel reinforced with wire mesh and umbrella rib shaped anchor, and constructing method for repairing and reinforcing reinforced concrete structures using the apparatus
KR200372352Y1 (en) The shrinkage joint for crack in concrete construction
KR100722376B1 (en) Tie for Aluminum Euroform

Legal Events

Date Code Title Description
AS Assignment

Owner name: SKJORESTAD, VIDAR, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIMONSEN, JOHN A.;SKJORESTAD, VIDAR;ERSDAL, BIRGER;REEL/FRAME:021283/0991

Effective date: 20080610

Owner name: JURISDICTIO STAVANGERIS AS, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIMONSEN, JOHN A.;SKJORESTAD, VIDAR;ERSDAL, BIRGER;REEL/FRAME:021283/0991

Effective date: 20080610

Owner name: JURISDICTIO BERGENSIS AS, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIMONSEN, JOHN A.;SKJORESTAD, VIDAR;ERSDAL, BIRGER;REEL/FRAME:021283/0991

Effective date: 20080610

Owner name: SIMONSEN, JOHN A., NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIMONSEN, JOHN A.;SKJORESTAD, VIDAR;ERSDAL, BIRGER;REEL/FRAME:021283/0991

Effective date: 20080610

Owner name: ERSDAL, BIRGER, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIMONSEN, JOHN A.;SKJORESTAD, VIDAR;ERSDAL, BIRGER;REEL/FRAME:021283/0991

Effective date: 20080610

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION