US20050241857A1 - Method to transport and operate a small footprint tower to reduce environmental impact - Google Patents

Method to transport and operate a small footprint tower to reduce environmental impact Download PDF

Info

Publication number
US20050241857A1
US20050241857A1 US11/117,958 US11795805A US2005241857A1 US 20050241857 A1 US20050241857 A1 US 20050241857A1 US 11795805 A US11795805 A US 11795805A US 2005241857 A1 US2005241857 A1 US 2005241857A1
Authority
US
United States
Prior art keywords
transfigurable
drilling
container
drilling equipment
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/117,958
Inventor
Christopher Beato
Joop Roodenburg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Drillmar Inc
Original Assignee
Drillmar Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drillmar Inc filed Critical Drillmar Inc
Priority to US11/117,958 priority Critical patent/US20050241857A1/en
Publication of US20050241857A1 publication Critical patent/US20050241857A1/en
Assigned to DRILLMAR, INC. reassignment DRILLMAR, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BEATO, MR. CHRISTOPHER LOUIS
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts

Definitions

  • the present embodiments relate generally to methods for a transfigurable standardized shipping container for drilling rigs.
  • FIG. 1 depicts a flow chart of an embodiment of a method to construct and transport a modular drilling.
  • FIG. 2 depicts a side view of an embodiment of a transfigurable container.
  • FIG. 3 depicts a side view of an embodiment of an unfolded transfigurable container.
  • FIG. 4 depicts a side view of an embodiment of a transfigurable container acting as a support to drilling equipment.
  • FIG. 5 examples a partial side view of an erected drilling rig made from a transfigurable container.
  • FIG. 6 examples a partial top view of an erected rig made from a transfigurable container.
  • FIG. 7 depicts a partial side view of an erected drilling rig shown in FIG. 5 , but in the limited footprint configuration for land of offshore use.
  • FIG. 8 depicts a partial top view of an erected drilling rig shown in FIG. 5 but in the limited footprint configuration for land of offshore use.
  • FIG. 9 depicts a side view of a straddle carrier usable with the embodied systems.
  • FIG. 10 depicts a top view of a straddle carrier and the manner of folding according to the embodied methods.
  • FIG. 11 depicts a top view of a containerized straddle carrier and the manner of folding according to the embodied methods.
  • FIGS. 12 a through 12 e provide an example of a rig up sequence showing the erection of the drilling derrick or mast.
  • FIGS. 13 a through 13 c provide an example of a rig up sequence involving a BOP container.
  • the present embodiments save the environment by reducing the number of vessels that are required to ship a drilling rig to different locations around the world.
  • the embodied methods reduce the amount of environmental impact on the earth caused by truck, train, or other types of land transportation. The reduction is accomplished by reducing the space required to transport the standard sized devices.
  • the embodied methods save the environment by reducing the number of vessels that are required to ship a drilling rig to different locations around the world. This method also reduces the amount of environmental impact on the earth when being transported by truck, train or other land transportation device. The reduction is accomplished by reducing the space required to transport the standard sized devices. Once the rig has reached a drilling site the surface area that is needed to setup and operate the drill rig is less than a comparable drilling rig not using the method. The reduction in area that must be cleared of trees is approximately 1200 m2 versus approximately 2000 m2 on a comparable conventional drilling rig.
  • the amount of area that must be cleared on the path to the drilling site is considerably less with a comparable drilling rig. Since the individual weight of the transfigurable containers is less compared with a normal drilling rig the load on the road is less severe. This enables easier transportation across less developed roads and makes the drilling rig easier to be used in less developed countries.
  • the embodied methods reduce the number of vessels needed to transport a drilling rig, the methods provide a reduction of fuel usage; a benefit to both cost and the environment. For example, a common sized drilling rig can be transported with seventeen containers. Other drilling rigs of a comparable size often cannot be broken down into container sized packages of less than seventeen. Usually the drilling rigs of a comparable size require containers and shipping parts doubling and tripling the number used with the embodied methods.
  • An embodiment of the transfigurable container of drilling equipment allows for two or more two pieces of drilling equipment with associated load bearing devices to be attached together using connectors, preferably pivotable connectors.
  • the drilling equipment modules are transformable between an initial shipping container size and shape and a second size and shape.
  • the shipping container can be formed into a rectangular shape when transported and transformed into a non-rectangular shape when in operation.
  • the ability to transform readily between these two sizes and shapes provides an operational drilling structure that can easily be transported and then erected on different locations and in different shapes depending on the operational demands.
  • FIG. 1 depicts a flow chart of the steps in the creation of the transfigurable container.
  • the method to construct and transport a modular drilling rig includes transporting drilling equipment in the form of a transfigurable container to a drilling site.
  • One or more transfigurable shipping containers are placed at a drilling location (Step 200 ).
  • the method can also include a step of forming the standardized transfigurable shipping containers into a larger rectangular shape.
  • the transfigurable shipping containers are unfolded at the drilling location (Step 202 ). Two or more of the transfigurable shipping containers, now unfolded at the drilling site, are connected to one another to operable drilling equipment (Step 204 ).
  • the method can also include a step of forming a mast or derrick from the standardized transfigurable container.
  • the operable drilling equipment is erected into a drilling rig (Step 206 ).
  • Erecting the drilling rig can include setting up the drill floor; a mast substructure; a mast; a control cabin, a drawworks; a blow out preventer; a choke and kill manifold; and a blow out preventer (BOP) control unit.
  • BOP blow out preventer
  • the method can include the step of coupling the drilling equipment to the load bearing supports or load bearing bottom with a moveable coupling selected from the group of, a rotatable coupling between the drilling equipment, a rotatable coupling between load supports, a rotatable coupling between one load bearing support and a load bearing bottom, a device for elevating the drilling equipment above one load bearing support or a load bearing bottom, and a container connector that removably connects the standardized transfigurable shipping containers together.
  • a moveable coupling selected from the group of, a rotatable coupling between the drilling equipment, a rotatable coupling between load supports, a rotatable coupling between one load bearing support and a load bearing bottom, a device for elevating the drilling equipment above one load bearing support or a load bearing bottom, and a container connector that removably connects the standardized transfigurable shipping containers together.
  • Piping and cabling for communication and power cabling are then installed on the drilling rig (Step 208 ).
  • the drilling rig is then in condition to begin operations (Step 210 ).
  • FIG. 2 examples attaching the drilling equipment to either a load bearing support or a load bearing bottom with telescoping, rotatable connectors or with pivotable, rotatable connectors.
  • a transfigurable container ( 10 ) can be attached to the first load bearing support ( 14 ), the second load bearing support ( 16 ), or the load bearing bottom ( 18 ).
  • the drilling equipment can be attached to either load bearing support ( 14 and 16 ) or load bearing bottom ( 18 ) using telescoping, rotatable connectors or pivotable, rotatable connectors, sliding connectors, or non-rotating telescoping connectors.
  • the transfigurable container ( 10 ) can be a component of a modular drilling rig.
  • the transfigurable container ( 10 ) can include a first and second load support ( 14 and 16 ) and a load bearing bottom ( 18 ).
  • the first and second load bearing supports ( 14 and 16 ) can be positioned to form a mast or a derrick.
  • the load bearing bottom ( 18 ) is located between the first and second load bearing supports ( 14 and 16 ), thereby forming a space ( 20 ).
  • the load bearing bottom ( 18 ) can have a lattice construction or be a load-bearing plate.
  • FIG. 3 depicts a side view of an unfolded transfigurable container.
  • FIG. 3 shows examples of drilling equipment attached to the loading bearing structure.
  • a rotatable coupling ( 68 ) can be used between the drilling equipment.
  • a rotatable coupling ( 70 ) can be between the load supports.
  • a rotatable coupling (not shown) can be used between one of the load-bearing supports and the load bearing bottom.
  • FIG. 4 depicts an embodiment of a device for elevating the drilling equipment ( 74 ) above one of the load bearing supports or load bearing bottom.
  • FIG. 4 examples the second load support ( 16 ) and the load bearing bottom ( 18 ) supporting various pieces of solids control equipment ( 50 a , 50 b , 50 c , 50 d , 50 e , and 50 f ).
  • a device for elevating the drilling equipment ( 74 ) can be used rather than a cranage device.
  • the drilling equipment is preferably located within the space between the first and second load bearing supports.
  • the drilling equipment can be attached together and movable from the space to create an operational position outside of the transfigurable container.
  • FIG. 5 examples the drilling equipment erected from the transfigurable container in the offshore embodiment.
  • the drilling equipment can include a mast ( 24 ), a control cabin ( 30 ), a drawworks module ( 32 ), a choke and kill manifold ( 36 ), active mud tank ( 102 ), and a BOP control unit, not shown.
  • drilling equipment examples include a winch ( 40 ), a crown block ( 42 ), a top drive ( 44 ), a rotary table (not shown), piece of solids control equipment ( 50 a ), a second load support ( 16 ), a power source ( 52 ), a hydraulic power unit ( 54 ), a tank ( 56 ), electrical control equipment, a pipe rack, a crane ( 91 ), a traveling block ( 66 ), a container connector ( 76 ) and combinations thereof.
  • the drilling equipment can further include a deck or supporting structure ( 5 ) of an offshore platform.
  • FIG. 6 examples the drilling equipment erected from the transfigurable container in a land embodiment.
  • the drilling equipment can include a casing ( 9 ), such as drill pipe, a drill collar, and bottom hole assembly (BHA).
  • the drilling equipment can include a mast ( 24 ), a drill floor ( 26 ), a mast substructure ( 28 ), a drawworks ( 32 ), a blow out preventer (BOP) ( 34 ), a choke and kill manifold ( 36 ), a well head ( 106 ), and a BOP control unit (not shown).
  • drilling equipment examples include a winch ( 40 ), a second load support ( 16 ), a crown block ( 42 ), a top drive ( 44 ), a rotary table, electrical control equipment, a pipe rack, pipe handling equipment ( 62 ), a crane ( 91 ), a traveling block ( 66 ) and combinations thereof.
  • FIG. 7 examples drilling equipment that can be included inside of a transfigurable container ( 11 ).
  • FIG. 7 shows a control cabin ( 30 ), a mud pump ( 48 a ), a mud tank ( 56 ), electrical control equipment, a pipe rack, pipe handling equipment and combinations thereof.
  • the shipping containers can be assembled to create a mast or derrick.
  • Transfigurable containers for the drilling equipment are transformed to form a portion of an operable drilling rig or standardized shipping containers.
  • the transfigurable containers can be compliant with ISO standards.
  • Typical sizes for standardized shipping containers include overall lengths ranging from about 8 feet to about 64 feet, overall widths ranging from about 2 feet to about 15 feet, and overall heights ranging from about 2 feet to about 15 feet.
  • An example dimension for a transfigurable container is an overall width of 8 feet, an overall height of 9.5 feet, and an overall length of 45 feet, 40 feet, or 20 feet.
  • FIG. 8 examples how a containerized straddle carrier can fold inside a transfigurable shipping container.
  • the transfigurable shipping containers can include containerized straddle carriers ( 119 ) that are adapted to fold inside a standard shipping container.
  • the containerized straddle carrier ( 119 ) with a transfigurable container ( 11 ) can be transported by a truck ( 150 ).
  • FIG. 8 depicts the truck ( 150 ), but only two wheels ( 170 and 171 ) and two frames ( 163 and 164 ) associated with containerized straddle carrier ( 119 ) are shown.
  • the drilling rig can be configured as an offshore oil or natural gas drilling rig or as a land-based oil or natural gas drilling rig.
  • the drilling rigs can be configured for use on a semisubmersible, a tension leg platform, a jack up platform, or another floating vessel.
  • the drilling rigs can be configured for use on a fixed offshore platform, such as a gravity based platform, compliant tower or any other offshore platform that is standing on the seafloor.
  • the modular transfigurable drilling rig can be made from numerous transfigurable containers for drilling equipment.
  • the standardized transfigurable containers can be stacked on skid beams to present a small footprint.
  • the transfigurable containers can be stacked on top of each other to present a very small footprint.
  • the small footprint is useful for offshore platforms and jungle pads.
  • FIG. 9 depicts a top view of an embodiment of a modular drilling rig.
  • FIG. 9 depicts an example of the transfigurable container ( 11 ) with other types of equipment on the drilling rig.
  • FIG. 9 examples locations of the drawworks ( 32 ), a rotary table ( 46 ), a piece of solids control equipment ( 50 b ), a power source ( 52 ), a tank ( 56 ), pipe handling equipment ( 62 ), with casing ( 9 ), piping ( 80 ), a mud tank ( 102 ) and a second load support ( 16 ).
  • the equipment is supported by a drilling rig (floating or fixed) ( 5 ).
  • the transfigurable containers can be lifted on board the drilling rig using a crane available on the drilling rigs.
  • the transfigurable containers ( 11 ), after being unfolded, are connected to form an operational modular drilling rig.
  • the drilling rig can be partially formed from the transfigurable containers and other drilling equipment.
  • the container connectors can be a load bearing device or a non-load bearing device.
  • Examples of the container connectors used as a load bearing device include pins, hydraulic clamps, mechanical clamps, threaded connectors, male receptacles, female receptacles, and combinations thereof.
  • Examples of the container connectors used as a non-load bearing device include threaded connectors, plugs, hydraulic clamps, mechanical clamps, pins, male and female receptacles, and combinations thereof.
  • Piping can be used to connect the drilling equipment together.
  • Cabling can be used with the drilling rig provides communication and/or electrical power between the drilling equipment.
  • a power source is typically connected to the drilling equipment to provide power to the drilling equipment.
  • FIG. 10 depicts a top view of a constructed modular rig using the transfigurable containers and the embodied methods.
  • the methods entail transporting numerous standardized transfigurable shipping containers with drilling equipment to a drilling location.
  • the standardized transfigurable shipping containers with the drilling equipment are unfolded at the drilling location. Two or more of the unfolded transfigurable containers are connected together to form operable drilling equipment and an operable drilling rig.
  • FIG. 10 depicts a top view of a constructed modular rig using the transfigurable containers and the embodied methods.
  • the methods entail transporting numerous standardized transfigurable shipping containers with drilling equipment to a drilling location.
  • the standardized transfigurable shipping containers with the drilling equipment are unfolded at the drilling location. Two or more of the unfolded transfigurable containers are connected together to form operable drilling equipment and an operable drilling rig.
  • FIG. 10 depicts a top view of a constructed modular rig using the transfigurable containers and the embodied methods.
  • the methods entail
  • the drilling equipment includes a control cabin ( 30 ), a drawworks ( 32 ), a BOP control unit ( 38 ), a rotary table ( 46 ), various pumps ( 48 a and 48 b ), solids control equipment ( 50 a , 50 b , and 50 c ), power sources ( 52 a and 52 b ), hydraulic power units ( 54 a , and 54 b ), a tank ( 56 ), electrical control equipment ( 58 ), a pipe rack ( 60 ), a mud pit ( 100 ), an active mud tank ( 102 ), and other such equipment.
  • the connected equipment is erected with piping ( 78 , 80 , and 82 ) and cabling ( 84 , 86 , and 88 ) for communication and power cabling for complete operation.
  • FIG. 11 depicts a top view of a containerized straddle carrier ( 119 ) and the manner of folding according to the embodied methods.
  • the straddle carrier ( 119 ) comprises four wheels (two are identified, 170 and 171 ) that are movably attached to a frame ( 161 , 162 , 163 , and 164 ).
  • the lifting section of the frame is fixably connected to a support section of the frame.
  • the support section of the frame is of the size of a standard size shipping container, preferably an ISO standardized container.
  • the spreader section of the frame is temporarily to the support section.
  • the spreader section connects to the load to be lifted.
  • the lifting section can move the support section in a vertical direction to pick up loads from and to container carriers.
  • the wheels (two are identified, 170 and 171 ) can be folded upwards when the straddle carrier “transforms” to a transportable size.
  • the folding direction of the wheels is depicted in FIG. 11 by the arrows (A, B, C, and D).
  • FIGS. 12 a though 12 e example an embodiment of a rig up procedure for the embodied drilling rig.
  • the procedure begins by moving two transfigurable containers together ( 210 and 212 ).
  • FIGS. 12 a though 12 e example a base container ( 210 ) and a mast or derrick container ( 212 ).
  • hoisting means ( 214 ) which are part of base container ( 210 ) are rotated out towards the mast or derrick container ( 212 ) and then connected to the mast or derrick container ( 212 ).
  • the mast container ( 212 ) is rotated into vertical position and finally locked in place.
  • FIGS. 13 a through 13 c provide an example of a rig up sequence involving a BOP container ( 216 ).
  • the BOP container ( 216 ) is moved towards base container ( 210 ) and connected to base container ( 210 ). After connection is complete, the BOP container ( 216 ) is rotated into vertical position. The rotation can be done using various hoisting means (not shown). The BOP container ( 216 ) with the drill floor is locked firmly in place with the other containers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

A method to construct and transport a modular drilling rig comprising drilling equipment in the form of a transfigurable container begins by transporting transfigurable shipping containers comprising drilling equipment to a drilling location. The method continues by unfolding the transfigurable shipping containers and the drilling equipment at the drilling location, and connecting two or more of the unfolded transfigurable shipping containers to form operable drilling equipment. The operable drilling equipment is erected into a drilling rig, wherein the operable drilling equipment comprises a drill floor, a mast substructure; a mast; a control cabin, a drawworks; a blow out preventer; a choke and kill manifold; a blow out preventer (BOP) control unit (38), not shown. The method ends by connecting piping and cabling for communication and power cabling to the erected operable drilling equipment and, then, operating the drilling rig.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • The present application claims priority to the co-pending Provisional Patent Application No. 60/567,660, entitled “Transfigurable Shipping Container for Drilling Equipment” and filed on May 3, 2004.
  • FIELD
  • The present embodiments relate generally to methods for a transfigurable standardized shipping container for drilling rigs.
  • BACKGROUND
  • A need exists for a system to provide a standardized transfigurable container system because shipping non-standard containers is expensive and difficult.
  • A need exists for a modular drilling rig system and method that provides a drilling rig that can be easily assembled or “unfolded” on-site in order to reduce labor need, time, and expense.
  • A need exists for a drilling rig that has less impact on the ground cover or foliage when being transported. A need also exists for less impact on the ground when the drilling rig is set up and in use.
  • A need also exists for a drilling rig that can be used as a land drilling rig and by assembling the components in a different manner can also be used as an offshore drilling rig.
  • The present embodiments meet these needs.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The detailed description will be better understood in conjunction with the accompanying drawings as follows:
  • FIG. 1 depicts a flow chart of an embodiment of a method to construct and transport a modular drilling.
  • FIG. 2 depicts a side view of an embodiment of a transfigurable container.
  • FIG. 3 depicts a side view of an embodiment of an unfolded transfigurable container.
  • FIG. 4 depicts a side view of an embodiment of a transfigurable container acting as a support to drilling equipment.
  • FIG. 5 examples a partial side view of an erected drilling rig made from a transfigurable container.
  • FIG. 6 examples a partial top view of an erected rig made from a transfigurable container.
  • FIG. 7 depicts a partial side view of an erected drilling rig shown in FIG. 5, but in the limited footprint configuration for land of offshore use.
  • FIG. 8 depicts a partial top view of an erected drilling rig shown in FIG. 5 but in the limited footprint configuration for land of offshore use.
  • FIG. 9 depicts a side view of a straddle carrier usable with the embodied systems.
  • FIG. 10 depicts a top view of a straddle carrier and the manner of folding according to the embodied methods.
  • FIG. 11 depicts a top view of a containerized straddle carrier and the manner of folding according to the embodied methods.
  • FIGS. 12 a through 12 e provide an example of a rig up sequence showing the erection of the drilling derrick or mast.
  • FIGS. 13 a through 13 c provide an example of a rig up sequence involving a BOP container.
  • The present embodiments are detailed below with reference to the listed Figures.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS
  • Before explaining the present embodiments in detail, it is to be understood that the embodiments are not limited to the particular embodiments and that it can be practiced or carried out in various ways.
  • The present embodiments save the environment by reducing the number of vessels that are required to ship a drilling rig to different locations around the world. The embodied methods reduce the amount of environmental impact on the earth caused by truck, train, or other types of land transportation. The reduction is accomplished by reducing the space required to transport the standard sized devices.
  • The embodied methods save the environment by reducing the number of vessels that are required to ship a drilling rig to different locations around the world. This method also reduces the amount of environmental impact on the earth when being transported by truck, train or other land transportation device. The reduction is accomplished by reducing the space required to transport the standard sized devices. Once the rig has reached a drilling site the surface area that is needed to setup and operate the drill rig is less than a comparable drilling rig not using the method. The reduction in area that must be cleared of trees is approximately 1200 m2 versus approximately 2000 m2 on a comparable conventional drilling rig.
  • The amount of area that must be cleared on the path to the drilling site is considerably less with a comparable drilling rig. Since the individual weight of the transfigurable containers is less compared with a normal drilling rig the load on the road is less severe. This enables easier transportation across less developed roads and makes the drilling rig easier to be used in less developed countries.
  • Since the embodied methods reduce the number of vessels needed to transport a drilling rig, the methods provide a reduction of fuel usage; a benefit to both cost and the environment. For example, a common sized drilling rig can be transported with seventeen containers. Other drilling rigs of a comparable size often cannot be broken down into container sized packages of less than seventeen. Usually the drilling rigs of a comparable size require containers and shipping parts doubling and tripling the number used with the embodied methods.
  • An embodiment of the transfigurable container of drilling equipment allows for two or more two pieces of drilling equipment with associated load bearing devices to be attached together using connectors, preferably pivotable connectors. When pivotably connected together, the drilling equipment modules are transformable between an initial shipping container size and shape and a second size and shape. For example, the shipping container can be formed into a rectangular shape when transported and transformed into a non-rectangular shape when in operation. The ability to transform readily between these two sizes and shapes provides an operational drilling structure that can easily be transported and then erected on different locations and in different shapes depending on the operational demands.
  • With reference to the figures, FIG. 1 depicts a flow chart of the steps in the creation of the transfigurable container. The method to construct and transport a modular drilling rig includes transporting drilling equipment in the form of a transfigurable container to a drilling site. One or more transfigurable shipping containers, usually of a standardized container size, are placed at a drilling location (Step 200). The method can also include a step of forming the standardized transfigurable shipping containers into a larger rectangular shape.
  • The transfigurable shipping containers are unfolded at the drilling location (Step 202). Two or more of the transfigurable shipping containers, now unfolded at the drilling site, are connected to one another to operable drilling equipment (Step 204). The method can also include a step of forming a mast or derrick from the standardized transfigurable container.
  • After connecting the containers, the operable drilling equipment is erected into a drilling rig (Step 206). Erecting the drilling rig can include setting up the drill floor; a mast substructure; a mast; a control cabin, a drawworks; a blow out preventer; a choke and kill manifold; and a blow out preventer (BOP) control unit. The method can include the step of coupling the drilling equipment to the load bearing supports or load bearing bottom with a moveable coupling selected from the group of, a rotatable coupling between the drilling equipment, a rotatable coupling between load supports, a rotatable coupling between one load bearing support and a load bearing bottom, a device for elevating the drilling equipment above one load bearing support or a load bearing bottom, and a container connector that removably connects the standardized transfigurable shipping containers together.
  • Piping and cabling for communication and power cabling are then installed on the drilling rig (Step 208). The drilling rig is then in condition to begin operations (Step 210).
  • FIG. 2 examples attaching the drilling equipment to either a load bearing support or a load bearing bottom with telescoping, rotatable connectors or with pivotable, rotatable connectors. A transfigurable container (10) can be attached to the first load bearing support (14), the second load bearing support (16), or the load bearing bottom (18). The drilling equipment can be attached to either load bearing support (14 and 16) or load bearing bottom (18) using telescoping, rotatable connectors or pivotable, rotatable connectors, sliding connectors, or non-rotating telescoping connectors.
  • The transfigurable container (10) can be a component of a modular drilling rig. The transfigurable container (10) can include a first and second load support (14 and 16) and a load bearing bottom (18). The first and second load bearing supports (14 and 16) can be positioned to form a mast or a derrick. The load bearing bottom (18) is located between the first and second load bearing supports (14 and 16), thereby forming a space (20). The load bearing bottom (18) can have a lattice construction or be a load-bearing plate.
  • FIG. 3 depicts a side view of an unfolded transfigurable container. FIG. 3 shows examples of drilling equipment attached to the loading bearing structure. A rotatable coupling (68) can be used between the drilling equipment. A rotatable coupling (70) can be between the load supports. A rotatable coupling (not shown) can be used between one of the load-bearing supports and the load bearing bottom.
  • FIG. 4 depicts an embodiment of a device for elevating the drilling equipment (74) above one of the load bearing supports or load bearing bottom. In particular, FIG. 4 examples the second load support (16) and the load bearing bottom (18) supporting various pieces of solids control equipment (50 a, 50 b, 50 c, 50 d, 50 e, and 50 f). In an alternative embodiment, a device for elevating the drilling equipment (74) can be used rather than a cranage device.
  • The drilling equipment is preferably located within the space between the first and second load bearing supports. The drilling equipment can be attached together and movable from the space to create an operational position outside of the transfigurable container.
  • FIG. 5 examples the drilling equipment erected from the transfigurable container in the offshore embodiment. The drilling equipment can include a mast (24), a control cabin (30), a drawworks module (32), a choke and kill manifold (36), active mud tank (102), and a BOP control unit, not shown. Other types of drilling equipment include a winch (40), a crown block (42), a top drive (44), a rotary table (not shown), piece of solids control equipment (50 a), a second load support (16), a power source (52), a hydraulic power unit (54), a tank (56), electrical control equipment, a pipe rack, a crane (91), a traveling block (66), a container connector (76) and combinations thereof. The drilling equipment can further include a deck or supporting structure (5) of an offshore platform.
  • FIG. 6 examples the drilling equipment erected from the transfigurable container in a land embodiment. The drilling equipment can include a casing (9), such as drill pipe, a drill collar, and bottom hole assembly (BHA). The drilling equipment can include a mast (24), a drill floor (26), a mast substructure (28), a drawworks (32), a blow out preventer (BOP) (34), a choke and kill manifold (36), a well head (106), and a BOP control unit (not shown). Other examples of drilling equipment include a winch (40), a second load support (16), a crown block (42), a top drive (44), a rotary table, electrical control equipment, a pipe rack, pipe handling equipment (62), a crane (91), a traveling block (66) and combinations thereof.
  • FIG. 7 examples drilling equipment that can be included inside of a transfigurable container (11). For example, FIG. 7 shows a control cabin (30), a mud pump (48 a), a mud tank (56), electrical control equipment, a pipe rack, pipe handling equipment and combinations thereof. The shipping containers can be assembled to create a mast or derrick.
  • Transfigurable containers for the drilling equipment are transformed to form a portion of an operable drilling rig or standardized shipping containers. The transfigurable containers can be compliant with ISO standards.
  • Typical sizes for standardized shipping containers include overall lengths ranging from about 8 feet to about 64 feet, overall widths ranging from about 2 feet to about 15 feet, and overall heights ranging from about 2 feet to about 15 feet. An example dimension for a transfigurable container is an overall width of 8 feet, an overall height of 9.5 feet, and an overall length of 45 feet, 40 feet, or 20 feet.
  • FIG. 8 examples how a containerized straddle carrier can fold inside a transfigurable shipping container. The transfigurable shipping containers can include containerized straddle carriers (119) that are adapted to fold inside a standard shipping container. The containerized straddle carrier (119) with a transfigurable container (11) can be transported by a truck (150). FIG. 8 depicts the truck (150), but only two wheels (170 and 171) and two frames (163 and 164) associated with containerized straddle carrier (119) are shown.
  • Another embodiment is a modular transfigurable drilling rig. The drilling rig can be configured as an offshore oil or natural gas drilling rig or as a land-based oil or natural gas drilling rig. The drilling rigs can be configured for use on a semisubmersible, a tension leg platform, a jack up platform, or another floating vessel. The drilling rigs can be configured for use on a fixed offshore platform, such as a gravity based platform, compliant tower or any other offshore platform that is standing on the seafloor. The modular transfigurable drilling rig can be made from numerous transfigurable containers for drilling equipment.
  • The standardized transfigurable containers can be stacked on skid beams to present a small footprint. Alternatively, the transfigurable containers can be stacked on top of each other to present a very small footprint. The small footprint is useful for offshore platforms and jungle pads.
  • FIG. 9 depicts a top view of an embodiment of a modular drilling rig. FIG. 9 depicts an example of the transfigurable container (11) with other types of equipment on the drilling rig. FIG. 9 examples locations of the drawworks (32), a rotary table (46), a piece of solids control equipment (50 b), a power source (52), a tank (56), pipe handling equipment (62), with casing (9), piping (80), a mud tank (102) and a second load support (16). The equipment is supported by a drilling rig (floating or fixed) (5). The transfigurable containers can be lifted on board the drilling rig using a crane available on the drilling rigs.
  • The transfigurable containers (11), after being unfolded, are connected to form an operational modular drilling rig. In another embodiment, the drilling rig can be partially formed from the transfigurable containers and other drilling equipment.
  • The container connectors can be a load bearing device or a non-load bearing device. Examples of the container connectors used as a load bearing device include pins, hydraulic clamps, mechanical clamps, threaded connectors, male receptacles, female receptacles, and combinations thereof. Examples of the container connectors used as a non-load bearing device include threaded connectors, plugs, hydraulic clamps, mechanical clamps, pins, male and female receptacles, and combinations thereof.
  • Piping can be used to connect the drilling equipment together. Cabling can be used with the drilling rig provides communication and/or electrical power between the drilling equipment. A power source is typically connected to the drilling equipment to provide power to the drilling equipment.
  • FIG. 10 depicts a top view of a constructed modular rig using the transfigurable containers and the embodied methods. The methods entail transporting numerous standardized transfigurable shipping containers with drilling equipment to a drilling location. The standardized transfigurable shipping containers with the drilling equipment are unfolded at the drilling location. Two or more of the unfolded transfigurable containers are connected together to form operable drilling equipment and an operable drilling rig. Typically, as shown in FIG. 9, the drilling equipment includes a control cabin (30), a drawworks (32), a BOP control unit (38), a rotary table (46), various pumps (48 a and 48 b), solids control equipment (50 a, 50 b, and 50 c), power sources (52 a and 52 b), hydraulic power units (54 a, and 54 b), a tank (56), electrical control equipment (58), a pipe rack (60), a mud pit (100), an active mud tank (102), and other such equipment. The connected equipment is erected with piping (78, 80, and 82) and cabling (84, 86, and 88) for communication and power cabling for complete operation.
  • FIG. 11 depicts a top view of a containerized straddle carrier (119) and the manner of folding according to the embodied methods. The straddle carrier (119) comprises four wheels (two are identified, 170 and 171) that are movably attached to a frame (161, 162, 163, and 164). The lifting section of the frame is fixably connected to a support section of the frame. The support section of the frame is of the size of a standard size shipping container, preferably an ISO standardized container. The spreader section of the frame is temporarily to the support section. The spreader section connects to the load to be lifted. The lifting section can move the support section in a vertical direction to pick up loads from and to container carriers. The wheels (two are identified, 170 and 171) can be folded upwards when the straddle carrier “transforms” to a transportable size. The folding direction of the wheels (two are identified, 170 and 171) is depicted in FIG. 11 by the arrows (A, B, C, and D).
  • FIGS. 12 a though 12 e example an embodiment of a rig up procedure for the embodied drilling rig. The procedure begins by moving two transfigurable containers together (210 and 212). FIGS. 12 a though 12 e example a base container (210) and a mast or derrick container (212). After the containers are connected, hoisting means (214), which are part of base container (210), are rotated out towards the mast or derrick container (212) and then connected to the mast or derrick container (212). The mast container (212) is rotated into vertical position and finally locked in place.
  • FIGS. 13 a through 13 c provide an example of a rig up sequence involving a BOP container (216). The BOP container (216) is moved towards base container (210) and connected to base container (210). After connection is complete, the BOP container (216) is rotated into vertical position. The rotation can be done using various hoisting means (not shown). The BOP container (216) with the drill floor is locked firmly in place with the other containers.
  • The embodiments have been described in detail with particular reference to certain preferred embodiments thereof, but it will be understood that variations and modifications can be effected within the scope of the embodiments, especially to those skilled in the art.

Claims (20)

1. A method to construct and transport a modular drilling rig, wherein the method comprises the steps of:
a. transporting a transfigurable container comprising drilling equipment to a drilling location;
b. unfolding the transfigurable container to the drilling location, thereby forming unfolded transfigurable container;
c. connecting at least two unfolded transfigurable containers and the drilling equipment to form the module drilling rig;
d. erecting the modular drilling rig at the drilling location;
e. connecting piping and cabling for communication and power cabling to drilling equipment on the modular drilling rig; and
f. operating the modular drilling rig.
2. The method of claim 1, further comprising the step of stacking two or more transfigurable containers on skid beams to present a small footprint for the modular drilling rig.
3. The method of claim 1, further comprising the step of stacking two or more transfigurable containers on top of one another to present a small footprint for the modular drilling rig.
4. The method of claim 1, wherein the step of erecting the modular drilling rig is performed by using a crane.
5. The method of claim 4, wherein the crane is remotely controlled.
6. The method of claim 4, wherein the crane folds inside a second transfigurable container.
7. The method of claim 1, wherein the transfigurable container is compliant with ISO standards.
8. The method of claim 1, further comprising the step of adapting a containerized straddle carrier to fold inside the transfigurable container.
9. The method of claim 1, further comprising the step of attaching the drilling equipment to either a load bearing support or a load bearing bottom with a telescoping, rotatable connector.
10. The method of claim 1, further comprising the step of attaching the drilling equipment to either a load bearing support or a load bearing bottom with a pivotable, rotatable connector.
11. The method of claim 1, further comprising the step of coupling the drilling equipment to a load bearing support or a load bearing bottom with a moveable coupling, wherein the moveable coupling is selected from the group consisting of:
a. a rotatable coupling between the drilling equipment;
b. a rotatable coupling between two or more load supports;
c. a device for elevating the drilling equipment above the load bearing support or the load bearing bottom; and
d. a container connector that removably connects at least two transfigurable shipping containers together.
12. The method of claim 1, further comprising the step of forming a mast from the transfigurable shipping container.
13. The method of claim 1, further comprising the step of forming a derrick from the transfigurable container.
14. The method of claim 1, wherein the drilling equipment comprises: a winch, a crown block, a top drive, a rotary table, a pump, solids control equipment, a power source, a hydraulic power unit, a tank, electrical control equipment, a pipe rack, pipe handling equipment, a crane, a traveling block, a blow out preventer and combinations thereof.
15. The method of claim 1, wherein the transfigurable container is lifted on an offshore platform using a crane that is available on the offshore platform.
16. The method of claim 15, wherein the offshore platform is a selected from the group consisting of a semi-submersible, a tension leg platform, a jack up platform, a floating vessel and combinations thereof.
17. The method of claim 15, wherein the offshore platform is a selected from the group consisting of a gravity based platform, a compliant tower, and a platform connected to the seafloor.
18. The method of claim 1, wherein the modular drilling rig is adapted to be deployed on land or offshore.
19. The method of claim 1, wherein the transfigurable shipping container further comprises a blow out preventer contains and a portion of a drill floor.
20. The method of claim 1, further comprising the step of using a crane to lift the drilling equipment into an operational position.
US11/117,958 2004-05-03 2005-04-29 Method to transport and operate a small footprint tower to reduce environmental impact Abandoned US20050241857A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/117,958 US20050241857A1 (en) 2004-05-03 2005-04-29 Method to transport and operate a small footprint tower to reduce environmental impact

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US56766004P 2004-05-03 2004-05-03
US11/117,958 US20050241857A1 (en) 2004-05-03 2005-04-29 Method to transport and operate a small footprint tower to reduce environmental impact

Publications (1)

Publication Number Publication Date
US20050241857A1 true US20050241857A1 (en) 2005-11-03

Family

ID=35185922

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/117,958 Abandoned US20050241857A1 (en) 2004-05-03 2005-04-29 Method to transport and operate a small footprint tower to reduce environmental impact

Country Status (1)

Country Link
US (1) US20050241857A1 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050279492A1 (en) * 2004-06-07 2005-12-22 Folk Robert A Wellbore top drive systems
US20060231273A1 (en) * 2005-03-24 2006-10-19 Armstrong James E Apparatus for protecting wellheads and method of installing the same
WO2009023042A1 (en) * 2007-04-19 2009-02-19 Wise Well Intervention Services, Inc. Well servicing modular combination unit
CN101985873A (en) * 2010-05-12 2011-03-16 殷江虹 Mechanical operation device for lifting and lowering oil tube of oil well
US20120043136A1 (en) * 2008-08-15 2012-02-23 Dirk Alfermann Drilling rig for deep well drilling
CN103132923A (en) * 2013-03-06 2013-06-05 张家口维克特机械有限公司 Integrated high-wind-pressure down-the-hole drill
CN103615198A (en) * 2013-11-21 2014-03-05 中煤第一建设有限公司 Construction method for using parallel double-mast half-turning method to hoist large box type derrick
US20150135607A1 (en) * 2012-05-09 2015-05-21 Drillmec S.P.A. Well drilling apparatus and assembling and disassembling method
CN104818950A (en) * 2015-05-08 2015-08-05 中国石油集团西部钻探工程有限公司 Swabbing truck derrick workbench
US9267341B2 (en) 2012-05-14 2016-02-23 Nabors Drilling International Limited Drilling rig employing pivoting drilling tower
CN105781445A (en) * 2016-03-29 2016-07-20 宝鸡石油机械有限责任公司 Continuously moving oil rig as well as pull-out and run-in methods thereof
US9410382B2 (en) 2012-05-14 2016-08-09 Nabors Drilling International Limited Drilling rig carriage movable along racks and including pinions driven by electric motors
CN105888582A (en) * 2016-04-26 2016-08-24 中国石油集团渤海石油装备制造有限公司 Double-control tubing device for petroleum workover operation and using method thereof
CN108319230A (en) * 2017-12-19 2018-07-24 昆山吉海实业公司 A kind of intelligent Fully-automatic lock system of container train
US10295263B2 (en) * 2014-12-05 2019-05-21 Schlumberger Technology Corporation System and method using buffer tank for heat exchange
CN112313391A (en) * 2017-10-11 2021-02-02 巴西石油公司 Apparatus, system and method for transporting and installing blowout preventer stack for land-based drilling rig

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3033527A (en) * 1954-10-05 1962-05-08 Wilson John Hart Portable rig, mast and substructure
US3145786A (en) * 1960-07-11 1964-08-25 Leyman Corp Portable drill rig
US3533223A (en) * 1968-04-12 1970-10-13 Walter W Gunn Sand trap trimmer with floatable blade-carrying arm
US3739853A (en) * 1971-06-04 1973-06-19 B Wales Rig substructure and method of moving the same
US4269395A (en) * 1978-07-23 1981-05-26 Newman James L Portable hydraulic rig for performing workover, drilling and other operations on a well
US4290495A (en) * 1979-06-18 1981-09-22 Hydra-Rig, Inc. Portable workover rig with extendable mast substructure, platform mounted drawworks and adjustable wellhead anchor
US4371041A (en) * 1978-09-15 1983-02-01 Drill Systems, Inc. Multi-purpose mobile drill rig
US4582205A (en) * 1983-06-29 1986-04-15 Fmc Corporation Modularized pedestal-mount crane and method of disassembly
US4666340A (en) * 1986-03-28 1987-05-19 Shell Offshore Inc. Offshore platform with removable modules
US4899832A (en) * 1985-08-19 1990-02-13 Bierscheid Jr Robert C Modular well drilling apparatus and methods
US20020166698A1 (en) * 2001-05-01 2002-11-14 Beato Christopher Louis Multipurpose unit with multipurpose tower and method for tendering with a semisubmersible
US6533045B1 (en) * 2001-05-02 2003-03-18 Jack M. Cooper Portable drilling rig
US6554075B2 (en) * 2000-12-15 2003-04-29 Halliburton Energy Services, Inc. CT drilling rig
US6848515B2 (en) * 2003-04-24 2005-02-01 Helmerich & Payne, Inc. Modular drilling rig substructure

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3033527A (en) * 1954-10-05 1962-05-08 Wilson John Hart Portable rig, mast and substructure
US3145786A (en) * 1960-07-11 1964-08-25 Leyman Corp Portable drill rig
US3533223A (en) * 1968-04-12 1970-10-13 Walter W Gunn Sand trap trimmer with floatable blade-carrying arm
US3739853A (en) * 1971-06-04 1973-06-19 B Wales Rig substructure and method of moving the same
US4269395A (en) * 1978-07-23 1981-05-26 Newman James L Portable hydraulic rig for performing workover, drilling and other operations on a well
US4371041A (en) * 1978-09-15 1983-02-01 Drill Systems, Inc. Multi-purpose mobile drill rig
US4290495A (en) * 1979-06-18 1981-09-22 Hydra-Rig, Inc. Portable workover rig with extendable mast substructure, platform mounted drawworks and adjustable wellhead anchor
US4582205A (en) * 1983-06-29 1986-04-15 Fmc Corporation Modularized pedestal-mount crane and method of disassembly
US4899832A (en) * 1985-08-19 1990-02-13 Bierscheid Jr Robert C Modular well drilling apparatus and methods
US4666340A (en) * 1986-03-28 1987-05-19 Shell Offshore Inc. Offshore platform with removable modules
US6554075B2 (en) * 2000-12-15 2003-04-29 Halliburton Energy Services, Inc. CT drilling rig
US20020166698A1 (en) * 2001-05-01 2002-11-14 Beato Christopher Louis Multipurpose unit with multipurpose tower and method for tendering with a semisubmersible
US6533045B1 (en) * 2001-05-02 2003-03-18 Jack M. Cooper Portable drilling rig
US6848515B2 (en) * 2003-04-24 2005-02-01 Helmerich & Payne, Inc. Modular drilling rig substructure

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7222683B2 (en) * 2004-06-07 2007-05-29 Varco I/P, Inc. Wellbore top drive systems
US20050279492A1 (en) * 2004-06-07 2005-12-22 Folk Robert A Wellbore top drive systems
US20060231273A1 (en) * 2005-03-24 2006-10-19 Armstrong James E Apparatus for protecting wellheads and method of installing the same
US7419006B2 (en) * 2005-03-24 2008-09-02 Wzi, Inc. Apparatus for protecting wellheads and method of installing the same
WO2009023042A1 (en) * 2007-04-19 2009-02-19 Wise Well Intervention Services, Inc. Well servicing modular combination unit
US20120043136A1 (en) * 2008-08-15 2012-02-23 Dirk Alfermann Drilling rig for deep well drilling
CN101985873A (en) * 2010-05-12 2011-03-16 殷江虹 Mechanical operation device for lifting and lowering oil tube of oil well
US20150135607A1 (en) * 2012-05-09 2015-05-21 Drillmec S.P.A. Well drilling apparatus and assembling and disassembling method
US9410382B2 (en) 2012-05-14 2016-08-09 Nabors Drilling International Limited Drilling rig carriage movable along racks and including pinions driven by electric motors
US9267341B2 (en) 2012-05-14 2016-02-23 Nabors Drilling International Limited Drilling rig employing pivoting drilling tower
US9273524B2 (en) 2012-05-14 2016-03-01 Nabors Drilling International Limited Drilling rig carriage movable along racks and including pinions driven by electric motors
US9309728B2 (en) 2012-05-14 2016-04-12 Nabors Drilling International Limited Drilling rig employing tubular handling device
US9790751B2 (en) 2012-05-14 2017-10-17 Nabors Drilling International Limited Drilling rig employing top drive
CN103132923A (en) * 2013-03-06 2013-06-05 张家口维克特机械有限公司 Integrated high-wind-pressure down-the-hole drill
CN103615198A (en) * 2013-11-21 2014-03-05 中煤第一建设有限公司 Construction method for using parallel double-mast half-turning method to hoist large box type derrick
US10295263B2 (en) * 2014-12-05 2019-05-21 Schlumberger Technology Corporation System and method using buffer tank for heat exchange
CN104818950A (en) * 2015-05-08 2015-08-05 中国石油集团西部钻探工程有限公司 Swabbing truck derrick workbench
CN105781445A (en) * 2016-03-29 2016-07-20 宝鸡石油机械有限责任公司 Continuously moving oil rig as well as pull-out and run-in methods thereof
CN105888582A (en) * 2016-04-26 2016-08-24 中国石油集团渤海石油装备制造有限公司 Double-control tubing device for petroleum workover operation and using method thereof
CN112313391A (en) * 2017-10-11 2021-02-02 巴西石油公司 Apparatus, system and method for transporting and installing blowout preventer stack for land-based drilling rig
CN108319230A (en) * 2017-12-19 2018-07-24 昆山吉海实业公司 A kind of intelligent Fully-automatic lock system of container train

Similar Documents

Publication Publication Date Title
US7255180B2 (en) Modular drill system requiring limited field assembly and limited equipment support
US20050241857A1 (en) Method to transport and operate a small footprint tower to reduce environmental impact
US10465377B2 (en) Drilling rig with self-elevating drill floor
US9938777B2 (en) Land drilling rig and methods of assembly
US8556003B2 (en) Split sub-basement drill rig
CN104160106A (en) Modular drilling rig system
US6675899B2 (en) Self-erecting rig
EP2364909B1 (en) Deep Water Offshore Apparatus Assembly Method
AU2002231022A1 (en) Self-erecting rig
US10851595B2 (en) Shipping arrangement and assembly procedure for drilling rig structures
EP3688232B1 (en) Plug and abandonment of one or more offshore platform wellbores of an offshore platform using a marine jack-up type vessel
KR20110044497A (en) Transporting process for derrick
GB2495717A (en) Gangway for an offshore structure
WO2016102910A1 (en) Modular tubing rack assembly
Hayes The Minimum Space Platform Rig (MSPR)-Its Adaptability to Onshore Drilling Applications
KR20110045299A (en) Operating process for ship or offshore structure with derrick in low COG condition
KR20130115449A (en) Construction method for jack up type structure

Legal Events

Date Code Title Description
AS Assignment

Owner name: DRILLMAR, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BEATO, MR. CHRISTOPHER LOUIS;REEL/FRAME:017149/0556

Effective date: 20050622

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION