US20150135607A1 - Well drilling apparatus and assembling and disassembling method - Google Patents
Well drilling apparatus and assembling and disassembling method Download PDFInfo
- Publication number
- US20150135607A1 US20150135607A1 US14/399,847 US201314399847A US2015135607A1 US 20150135607 A1 US20150135607 A1 US 20150135607A1 US 201314399847 A US201314399847 A US 201314399847A US 2015135607 A1 US2015135607 A1 US 2015135607A1
- Authority
- US
- United States
- Prior art keywords
- mast
- sub
- operating configuration
- drill floor
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/345—Arrangements for tilting up whole structures or sections thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/355—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the tilting up of whole buildings or sections thereof, e.g. walls, portal frames
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
Definitions
- the present invention is relative to a drilling apparatus or land rig, which can be moved, and is relative to the relative assembling method.
- the present invention is relative to a well drilling apparatus for the search and the extraction of fossil fuels, such as oil and fuel gases.
- Said drilling apparatus assumes an assembly operating configuration, in which it is completely assembled in a horizontal position, at the level of the ground, and, when it is raised in a vertical position, it assumes a use operating configuration for the drilling, all of this in one single operation.
- the apparatus according to the present invention is modular and can be easily assembled and disassembled, thus allowing said apparatus to be moved from a drilling spot to the next one in a quick manner, hence reducing the amount of time needed to disassemble and re-assemble it.
- Projecting masts which are comprised in said drilling apparatuses or structures, are widely used in ground drilling operations.
- the drilling structure or apparatus comprises a sub-structure.
- said sub-structure comprises sub bases, which lay on the ground.
- the sub-structure is adapted to support a drill floor. Said drill floor and the mast, which is arranged in a vertical position, are raised at a predetermined height from the ground.
- the drill floor comprises different devices, such as: at least one pair of power tongs, a rotary table, and a draw-works, which are typically used during the drilling phases.
- devices such as: at least one pair of power tongs, a rotary table, and a draw-works, which are typically used during the drilling phases.
- the mode of operation and the features of the above-mentioned devices comprised in the drill floor are known to a skilled person.
- the processes needed by the apparatus to shift from an assembly operating configuration to a use operating configuration comprises a first step in which the mast is raised in a vertical position, substantially keeping the drill floor at the level of the ground. Subsequently, the drill floor is raised at the desired height, positioning the rotary table above the drilling well, aligned with said well.
- the sub-structure, the drill floor and the mast are assembled at the level of the ground and connected to one another.
- the fast line of the draw-works is inserted into the fast line shave, which is arranged at the top pf the mast, and through the travelling block, thus becoming the drilling line.
- Said line is fixed, in correspondence to a first deadline of its, to the corresponding deadline anchor.
- Said step of raising the mast is performed by using said draw-works, which exerts the necessary raising force.
- said draw-works which exerts the necessary raising force.
- the drill floor supporting the mast in the vertical position is raised up to the desired height above the drilling well, thus obtaining two movements that are distinct from one another and mutually independent.
- a so-called A-frame is used.
- the raising or tilting movement of the mast is performed by connecting the travelling block to a line tie, which, in the rear part, extends around sheaves that are supported by said A-frame and, in the front part, is anchored to the mast.
- the travelling block and the line tie raise the mast and tilt it in a vertical position against said A-frame.
- the line system used to raise the mast is usually replaced by a direct raising movement by means of hydraulic actuators.
- hydraulic actuators allows users to reduce rig-up times, since one does not need any longer to install an A-frame for the sheaves and sling lines for the raising movement.
- the use of hydraulic actuators allows users to raise the mast only by means of a low-power hydraulic control unit, if necessary with a diesel motor. Therefore, the generators of the work site do not need to be started and the the draw-works does not need to be supplied with power.
- hydraulic actuators allows users to eliminate the A-frame and, therefore, to save the time needed for its installation and removal.
- well drilling apparatuses In the technical field, well drilling apparatuses often need to be moved; in particular they have to be moved from one well to the next one together with all the complementary equipments needed for the operation of a drilling plant.
- the drilling apparatus In the prior art, in order to move a drilling apparatus or land rig, the drilling apparatus has to be disassembled. In order to do so, the drilling apparatus has to be disconnected from the auxiliary devices, the mast has to be lowered from a vertical position to a horizontal position, the whole drilling plant has to be moved towards the next well to perform the drilling operation and, finally, the entire system has to be re-assembled and the auxiliary structures have to be re-connected.
- drilling plants are produced which are able to develop a power up to 3000 HP or 2300 kW and feature a height of the drill floor from the ground of approximately 17 ft or 11 meters, a maximum total height of 156 ft or 47.5 m, 1,500,000 pounds or 681 tons for the hook load, 1,300,000 pounds or 590 tons for the rotary load, and 1,000,000 pounds or 454 tons for the setback load.
- Some constructors of drilling structures mainly develop land rigs with 2000 hp, which can easily be moved and are produced as the type called box substructure.
- This type of structure is characterized by the presence of hydraulic raising devices with plates of large dimensions.
- a top drive is used as well.
- the top drive normally is a rotary device provided with an electric or hydraulic motor, which is suspended and connected to the mast. Said top drive is able to move along a vertical axis inside the mast strong back.
- the top drive and the mast are separate during the transportation phases and are coupled to one another during the assembling phases or even, in some cases, when the mast is already in the vertical position, thus causing the operations to be very complicated, besides requiring a larger amount of time to perform the operations aimed at installing the structure.
- the top drive is associated with a portion of the mast already during the assembling phase. This solution allows users to facilitate the transportation and to reduce the assembling times.
- a mast is known, to which a top drive is directly fixed, so as to cause the two of them to be integral, so that the top drive is always fitted to the mast, even when the land rig is disassembled to be transported.
- the top drive always remains coupled to the mast, even during the rig up phases or during the ring down phases or when it is transported towards the next drilling well.
- the mast is advantageously provided with the top drive already arranged inside the mast strong back.
- the object of the present invention is to solve the drawbacks mentioned above by providing a drilling apparatus in which, in a first assembly operating configuration, the different components are assembled in a horizontal position, substantially at the level of the ground, and, subsequently, said apparatus is raised so as to reach a second use operating configuration, in which the mast is vertical.
- All the steps and the operations needed to raise and/or lower the well drilling apparatus according to the present invention and, in particular, the mast and the sub-structure, are performed by means of a hydraulic actuating device, which pushes said apparatus.
- the drilling apparatus when shifting from one operating configuration to the other, is pushed by said hydraulic actuating device and performs a continuous movement in time, without interruptions or intermediate positions.
- said drilling apparatus is modular and can be quickly assembled and disassembled, so as to be transported from one drilling well to the next one.
- the transportation of the apparatus according to the present invention takes place in a quick manner, with no need for complicated disassembling procedures, which also require a lot of time.
- One aspect of the present invention is relative to a drilling apparatus having the features set forth in appended claim 1 .
- a further aspect of the present invention is relative to the drilling apparatus assembling method according to claim 11 .
- FIG. 1 shows the positioning of the sub-structure and of the actuating device of the drilling apparatus according to the present invention
- FIG. 2 shows the positioning of the draw-works on said sub-structure and of the actuating stands in the spots suited for the assembly of the mast;
- FIG. 3 shows the positioning of the mast base sections on the right and on the left, directly on the sub base, and of the draw-works
- FIG. 4 shows the positioning of the set-back drill floor on suitable stands, the set-back drill floor being coupled to the mast base sections by means of connecting rods;
- FIG. 5 shows the positioning, on suitable trunnions, of the mast starter section, in a horizontal position, and the addition of the mast bottom section provided with boards, which are connected to the set-back, as well as the fixing of the second portion of the drill floor to said bottom section;
- FIGS. 6A and 6B show the positioning and the fixing of the mast strong back to the bottom section and the fixing of the actuating device to the mast strong back; in particular, FIG. 6A shows the fixing of the mast strong back and FIG. 6B shows a detail of the fixing of the actuating device to the mast strong back;
- FIGS. 7A and 7B show the assembling operations of the intermediate section of the mast, in a horizontal position, which is assembled on said actuating stands;
- FIGS. 8A and 8B show the assembling operations of the top section of the mast, in a horizontal position, which is assembled on said actuating stands, and the fixing to said intermediate section of the mast itself;
- FIGS. 9A and 9B show, in sequence, the images of the movement actuated by the actuating stands along the vertical and longitudinal axes in order to connect the end sections of the mast to the mast strong back;
- FIG. 10 shows a freeze-frame of the drilling apparatus during the passage between the two operating configurations, the movement being performed in a continuous manner in time
- FIG. 11 shows the lower part of the drilling apparatus in the use operating configuration
- FIG. 12 shows the release of the actuating device from the mast
- FIG. 13 shows an overall view of the drilling apparatus in the use operating configuration.
- well drilling apparatus 2 is adapted to shift from a first assembly operating configuration to a second use operating configuration and vice versa.
- Said apparatus 2 comprises a sub-structure 21 , which lies on ground “S” and supports said apparatus 2 , a mast 23 , which comprises pivoting points 23 a and fixing points 23 a ′ and is pivoted to said sub-structure 21 by means of said pivoting points 23 a , around which it rotates so as to shift from said assembly operating configuration, which is substantially horizontal, to said use operating configuration, which is vertical, and vice versa.
- the apparatus comprises, furthermore, a drill floor 22 , which can be raised and is connected to the mast, and an actuating device 3 , which is adapted to allow the drilling apparatus to shift from an assembly configuration to a use configuration.
- Said actuating device 3 is a hydraulic device, which is directly connected to mast 23 , preferably by means of a pivot hinge, is adapted to push said mast in order to raise it, and is adapted to hold said mast 23 during the lowering movement with a continuous movement, as shown in FIG. 10 .
- Said actuating device 3 is permanently connected to the apparatus and, in particular, to mast 23 during the passage between the two operating configurations. Indeed, during the passage between the two operating configurations, the connection point between actuating device 3 and apparatus 2 remains unchanged.
- Said drill floor 22 comprises a first portion 22 a , which is pivoted to said mast 23 and projects with respect to said mast 23 , and a second portion 22 b , which is constrained to said mast 23 and rotates with it.
- Said first portion 22 a which is always kept parallel to ground “S” during the raising or rig up and/or the lowering or rig down of drilling apparatus 2 , comprises a rotary table 56 and a driller cabin 24 , which, during the apparatus assembling steps, can be directly installed on drill floor 22 without causing problems in the following assembling steps, since said portion is always parallel to ground “S”, as shown in FIGS. 4 , 5 , 10 and 11 .
- the second portion 22 b which in the use operating configuration mainly serves as walkway for the operators during the drilling phases, is directly fixed to mast 23 perpendicular to ground “S”, as shown in FIGS. 4 , 5 , 10 and 11 .
- the first portion 22 a of drill floor 22 comprises, besides rotary table 56 shown in FIG. 7B and driller cabin 24 , a dead line anchor and a pair of power tongs, which are known to a skilled person.
- said drill floor 21 in order to help the automation of the entire drilling apparatus according to the present invention, besides a well center, where the drilling takes place along a first axis parallel to a vertical axis “Z”, comprises a secondary well or mouse hole, not shown, where the drill rods are temporary arranged and which defines a second axis, parallel to said first axis, and a secondary clamp or mouse hole clamp, not shown, which is adapted to hold the drill rods when they are arranged in the mouse hole.
- Said mast 23 which extends along a longitudinal axis “A”, is modular and comprises a starter section 231 , which is adapted to be constrained to sub-structure 21 , a bottom section 232 , which is constrained to said starter section 231 and to which the first portion 22 a of said drill floor 22 is pivoted and the second portion 22 b is constrained; a strong back, to which actuating device 3 is connected and which is pivoted to said starter section 231 .
- Said strong back comprises suited attachment housings 233 a , where actuating device 3 is pivoted.
- Said mast strong back is connected to at least one further section ( 234 , 235 ), on which a top drive 51 is fixed in a sliding manner, as shown in the accompanying drawings, and which is constrained to said mast strong back.
- mast 23 comprises an intermediate section 234 , which is constrained to said mast strong back, and a top section 235 , which is constrained to said intermediate section 234 .
- said top section 235 there are arranged the top drive, a travelling block 50 and a crown block, as one single assembly, as well as a powered drill line spooler 54 , so as to keep the line on the respective pulleys of the crown block and of travelling block 50 , thus saving time both in the ring-up phase and in the rig-down phase.
- Said devices are preferably constrained to top section 235 of the mast by means of pins.
- top drive 51 is engaged/locked in top section 235 of mast 23 for the entire duration of the transportation.
- top section 235 comprises a locking device, not shown, which is adapted to lock top drive 51 to the top section itself, for example at least one pin that is inserted in a suited housing and, when it is inserted, prevents top drive 51 from moving in top section 235 .
- Said intermediate section 234 and said top section 235 are assembled and fixed to one another in a horizontal position at the level of the ground, so as to help operators perform these operations, thus causing the operations to be carried out more quickly.
- Said intermediate section 234 comprises a first shoulder 234 a and a second shoulder 234 b , on which a back 234 c is hinged.
- Said back 234 c after having been arranged perpendicular to said second shoulder 234 b , is fixed to the first shoulder 234 a assuming the shape of a truncated cone with a “U”-shaped section, so as to be fixed to said mast strong back 233 .
- Top section 235 also has the shape of a truncated cone with a “U”-shaped section, so as to be able to be fixed to intermediate section 234 .
- Said top section 235 comprises two shoulders 235 a , which are hinged to an end of the top of top section 235 , where travelling block 50 and the crown block are comprises, and a back 235 b , which is arranged between said two shoulders 235 a .
- Said back 235 b is adapted to reduce its longitudinal extension in a telescopic manner, preferably by means of telescopic crosspieces, so as to reduce the transverse extension of entire top section 235 , as shown in FIGS. 8A and 8B ; indeed, in FIG.
- top section 235 assume the shape of a truncated cone as mentioned above.
- the reduction of the transverse extension of upper part 245 facilitates the transportation of said section, especially in case of transportation on wheel, when national and international roads have to be used.
- Said shoulders ( 234 a , 234 b , 235 a ) and said back ( 234 c , 235 b ) are connected to one another by means of four stringers, two front stringers and two rear stringers.
- Said rear stringers delimit the back ( 234 c , 235 b ) of said mast 23 , thus causing it to assume the typical shape of a truncated cone with a square base.
- the different sections of the mast are connected to one another by means of suitable pins, which are inserted into suitable connection hinges.
- suitable pins which are inserted into suitable connection hinges.
- a guide 511 On said back ( 234 c , 235 b ) of mast 23 there is arranged a guide 511 , which is adapted to allow top drive 51 to slide along said longitudinal axis “A” in the use operating configuration.
- Said guide 511 is assembled during the assembly of sections ( 231 , 234 , 235 ) of mast 23 , which comprise a respective portion of guide 511 .
- said top drive 51 comprises a pantograph mechanism, not shown, which is adapted to allow the top drive to move from the well center to a drawing point identified in the mouse hole, thus moving from a first axis of the well center to said second axis of the mouse hole.
- intermediate portion 234 and of upper portion 235 is subsequently fixed to mast strong back 233 , which, in turn, is fixed to starter section 231 .
- said sub-structure 21 comprises at least two sub-bases 210 , which are arranged parallel to one another and are adapted to support entire apparatus 2 , and two base sections 214 , each one constrained to a sub-base 210 .
- mast 23 is pivoted on said base sections 214 .
- the sub-structure comprises, furthermore, the boards and stairs, the dog house and the grass hopper, which are shown in FIGS. 12 and 13 but will not be described in detail, since they are known to a skilled person.
- Said sub-structure 21 supports, preferably on sub-bases 210 of sub-structure 21 , preferably in the rear part of the sub-bases themselves, a draw-works 58 , which is provided with a support structure, parapets and accessories. Said draw-works 58 , during the passage from the assembly operating configuration to the user operating configuration of apparatus 2 and vice versa, remains in a low position, arranged on sub-bases 210 of sub-structure 21 .
- Actuating device 3 is adapted to cause drilling apparatus 2 to be subject to a rig-up step and to a rig-down step.
- Said actuating device 3 in its preferred embodiment, comprises a pair of telescopic hydraulic raising cylinders 31 , each of which is connected to mast 23 .
- said pair of cylinders 31 is connected to the arms of mast strong back 233 , for example they are pivoted in the suited attachment housings 233 a mentioned above.
- Actuating device 3 and, in particular, cylinders 31 are fixed to the mast, preferably by means of a pivot hinge, each cylinder in one single point, during the passage from one operating configuration to the other.
- each cylinder of said pair 31 is pivoted to sub-structure 21 , in particular to sub-bases 210 , and, at the opposite end, is pivoted to mast strong back 233 , in corresponding attachment housing 233 a .
- the point of mast 23 in which single cylinder 31 is pivoted remains unchanged during the passage from one operating configuration to the other.
- the present solution does not require, for the passage from one operating configuration to the other, a change of the fixing point in which actuating device 3 is fixed to apparatus 2 .
- said pair of cylinders 31 are telescopic with three sections.
- a further aspect of the present invention is the assembling method for a drilling apparatus 2 .
- Said assembling method comprises the following steps:
- the step of fixing actuating device 3 is performed prior to the step of pivoting starter section 231 of mast 3 .
- the step of positioning sub-structure 21 in the desired site is carried out by positioning the right and left sub-bases 210 and by connecting them to beams 211 , as shown on FIG. 1 .
- the relative position of sub-bases 210 with respect to the given well center has to be controlled.
- Each sub-base 210 houses, in a suited cradle 212 , a hydraulic cylinder 31 of actuating device 3 , which is adapted to move apparatus 2 from one operating configuration to the other.
- Hydraulic cylinders 31 during the transportation from one well to the next one, are held in said cradles 212 and then they are set free and tilted towards the well center during the steps of the assembling method, preferably during the step of positioning sub-structure 21 , as shown in FIG. 1 .
- the support structure of draw-works 58 is installed in the rear part of sub-bases 210 , together with its parapets and accessories, as shown in FIG. 2 .
- the beams needed for the installation of the blow out preventer also known as BOP, not shown, are laid on the ground, in the central area.
- the step of assembling drill floor 22 is performed.
- two stands are provided, on which the beams of the first portion or set-back 22 a of the drill floor, coupled to the lateral board, are laid, as shown in FIG. 4 .
- the beams of the first portion or set-back 22 a are coupled to mast base section 214 by means of trestle connecting rods 22 c.
- the raising beams of the BOP are connected under the beams of the first set-back portion 22 a by means of the fixing pins provided.
- the support beams of rotary table 56 are coupled to the beams of the first set-back section 22 a , thus temporarily projecting.
- the step of pivoting starter section 231 of the mast is performed by positioning said starter section 231 on pivoting points 23 a for the connection of mast 23 in a horizontal position with respect to ground “S”.
- a further mast bottom section 232 is coupled to said starter section 231 .
- the two steps of assembling drill floor 22 and pivoting mast starter section 231 are performed at the same time; in fact, the second section 22 b , together with the board support, is fixed, in turn, to the second section 22 b.
- Said first portion 22 a and said second portion 22 b together, make up drill floor 22 .
- driller cabin 24 is laid on the first portion or set-back 22 a and, at the same time, the rear board is installed on the second portion 22 b of drill floor 22 , as shown in FIG. 5 .
- mast strong back 233 is placed and fixed, for example by means of pivots, to mast starter section 231 .
- This strong back comprises, as mentioned above, suited attachment housings 233 a , where actuating device 3 is pivoted.
- step of fixing actuating device 3 is performed, during which actuating device 3 is fixed to mast 23 .
- actuating device 3 and, in particular, raising cylinders 31 are pivoted to said mast strong back 233 in the suited attachment housings 233 a .
- the respective pivots are inserted into the suited holes comprised in attachment housings 233 a for cylinders 31 , as shown in FIGS. 6A and 6B .
- Said mast strong back 233 is in a horizontal position, parallel to ground “S”, at a predetermined height “Z2” from the ground, at which mast 23 will be fixed.
- the next step of raising apparatus 2 can be performed.
- an assembling step is provided to assemble mast 23 , during which different sections 234 , 235 of mast 23 are prepared and assembled.
- actuating stands 6 comprising hydraulic raising devices are positioned in front of sub-bases 210 , in the spots suited for the assembly of mast 23 , as shown in FIG. 2 .
- a front stand 61 is positioned close to intermediate section 234 , for example at the end of the extension of sub-bases 210 , and a rear stand 63 is positioned at a distance from said front stand 61 that is smaller than the maximum extension of mast 23 , preferably substantially equal to the longitudinal extension of mast 23 from the center of intermediate section 234 to the center of top section 235 .
- an intermediate stand 6 ′ is positioned between said front stand 61 and said rear stand 63 , substantially in the point of junction between intermediate section 234 and top section 235 of mast 23 .
- said intermediate stand 6 ′ is not an actuating stand, but is only fulfills the function of supporting mast 23 during its assembly.
- the actuation of the assembling step, during which the connection of sections ( 234 , 235 ) of the mast is performed, is carried out by the operators at a first height “Z1” from ground “S”, which is lower than height “Z2” mentioned above, thus horizontally building mast 23 , parallel to ground “S”.
- the assembly of mast 23 at height “Z1” allows the personnel responsible for the assembly to work more easily on said mast 23 .
- mast 23 For the purposes of the present invention, the expression “horizontally building mast 23 ” means that mast 23 , by means of said stands 6 , is built parallel to ground “S” where said drilling apparatus 2 is assembled.
- said first height “Z1” from ground “S” is equal, for example, to 1.5 m.
- the assembling step for assembling mast 23 is preferably carried out as follows; belly board 71 and racking board 70 are laid on the ground in the suitable areas, in order to be subsequently coupled to mast 23 , as shown in FIG. 7A .
- first shoulder 234 a of intermediate section 234 is positioned, for example by means of the crane of the work site. Said first shoulder 234 a is placed between front stand 61 and an intermediate stand 6 ′.
- the second shoulder 234 b of intermediate section 23 of mast 23 is positioned, for example by means of the crane of the work site.
- Said second shoulder 234 is deposited on stands ( 61 , 6 ′), as well.
- Said second shoulder 234 b also comprises back 234 c .
- Said back 234 c is hinged to said second shoulder 234 b .
- said back 234 c is raised by means of hydraulic cylinders and coupled to the first shoulder 234 a , thus creating intermediate section 234 with a pyramid frustum structure with a U shape facing downwards, as shown in FIG. 7B .
- Said back 234 c during the transportation from one drilling well to the next one, is arranged parallel to the second shoulder 234 b , to which it is hinged.
- mast top section 235 is positioned, inside which there are locked the crown block, travelling block 50 , top drive 51 and powered drill line spooler 54 .
- Top section 235 is deposited on one single rear stand 63 , in the closed configuration, so as to minimize the width. In said configuration, the two shoulders 235 a are parallel to one another, as shown in FIG. 8A .
- powered drill line spooler 54 is detached and arranged at the base of mast 23 .
- the hydraulic cylinders comprised in said actuating stands 6 are used so as to open the shoulders, spacing them apart, keeping top section 235 suspended by means of raising straps.
- the telescopic crosspieces of back 235 b which are not shown in detail, are fixed.
- mast top section 235 which is always kept suspended, is brought into contact with mast intermediate section 234 , the attachment hinges between one section and the other are caused to coincide and the pins are inserted into the respective hinges.
- Rear stand 63 which is arranged in correspondence to the top of top section 235 , where the crown block and travelling block 50 are arranged, is suited to level mast 23 and facilitate the insertion of the pins to connect sections ( 234 , 235 ) of mast 23 , as shown in FIG. 8B .
- Intermediate section 234 and top section 235 of the mast lie on three stands: front stand 61 , intermediate stand 6 ′ and the rear stand, as shown in FIG. 8B .
- top drive 51 is dragged towards the base of the mast, so as to reduce the overall tilting moment of must 23 , sliding along partially assembled guide 511 .
- racking board 71 and belly board 70 are coupled to respective sections ( 234 , 235 ) of the mast, which are so connected.
- a moving step is provided, during which at least part of mast 23 is moved by means of actuating stands 6 , so as to allow the actuation of the following steps of the method and, in particular, of the step of pivoting mast 23 and of the subsequent rig-up step.
- intermediate section 234 and top section 235 of mast 23 which have been so assembled, are raised, in a leveled manner, by means of front stand 61 and of rear stand 63 until they reach predetermined height “Z2” from ground “S”, so that the heights of the hinges between intermediate section 234 and mast strong back 233 coincide.
- Said height “Z2” is approximately 4 meters from ground “S”.
- FIGS. 9 A ⁇ 9 B These two steps are shown in FIGS. 9 A ⁇ 9 B.
- sections ( 234 , 235 ) of the mast are arranged in such a way that the connectors comprised in intermediate section 234 of the mast are spaced apart from the corresponding connectors of mast strong back 233 by a predetermined distance “X1”.
- the extension of top section 235 , the raising step and the step of bringing sections ( 234 , 235 ) closer, as mentioned above, are performed thanks to the help of said stands 6 ; said stands 6 , indeed, are adapted to extend the top section and to raise the sections of the mast as well as to bring them closer to mast strong back 233 .
- Said stands 6 comprise a plurality of actuators, which are adapted to move mast 23 in a predetermined manner within the orthogonal space defined by axes “X”, “Y” and “Z”, which are orthogonal to one another.
- Said actuators which are comprised in each stand 6 , preferably are hydraulic pistons, which are preferably arranged in such a way that at least one of them operates along “X” axis, at least one of them operates along “Y” axis and at least one of them operates along “Z” axis.
- the step of pivoting mast 23 is performed.
- top drive 51 After the backward movement of mast 23 and the connection to the mast strong back, guide 511 in which top drive 51 slides has further extended, thus allowing top drive 51 to further slide in correspondence to mast strong back 233 , part of mast 23 and on drill floor 22 .
- step 2 during which structure 2 is raised and which comprises, in particular, raising the mast, bringing it to the use operating configuration, and raising drill floor 22 .
- This step is carried out in a continuous manner, without interruptions when shifting from one operating configuration to the other, by simultaneously raising mast 23 and drill floor 22 by means of a thrust, which is actuated by actuating device 3 of the hydraulic type and is directly applied to mast 23 .
- draw-works 58 remains in a low position, arranged on sub-bases 210 of sub-structure 21 .
- This solution allows the use of one single actuating device 3 , thus simplifying the step of raising apparatus 2 and quickening the passage from the assembly operating configuration to the use operating configuration and vice versa.
- This solution furthermore, allows the structure of drill floor 22 to be simplified, since it does not have to support the weight of draw-works 58 . This allows the movements of the drill floor to be simplified, thus simplifying the structure that has to support the drill floor itself.
- draw-works 58 on sub-bases 210 allows an easier maintenance of the draw-back itself, thus facilitating the electric connection to the motors that move the draw-works.
- the beams of the first portion or set-back 22 a and the lateral boards associated therewith detach from their support stands, remaining substantially horizontal and parallel to ground “S”, due to the action of the pantograph mechanism, for example a parallelogram-shaped pantograph mechanism, which is built by trestle connecting rods 22 c.
- the pantograph mechanism for example a parallelogram-shaped pantograph mechanism, which is built by trestle connecting rods 22 c.
- a next step can be performed, during which apparatus 2 is fixed in the use operating configuration, as shown in FIG. 11 .
- the constraining pins are inserted at the base of mast 23 , in particular in fixing points 23 a ′ and the beams of rotary table 56 are leveled off at mast starter section 231 .
- the assembling method according to the present invention comprises further steps to make apparatus 2 operative.
- a dog-house 57 is provided on the ground, close to a side of mast 23 , for example the left side.
- driller cabin 24 is moved in correspondence to rotary table 56 , which is arranged in correspondence to the well center.
- the apparatus according to the present invention comprises, furthermore, at least one jib crane 8 , preferably on the left side of mast 23 . Said jib crane 8 is used, with the help of an equalizer beam and of four ropes, to raise dog-house 57 from the ground to drill floor 22 .
- Dog-house 57 is laid on and constrained to two foldable beams, not shown, which belong to drill floor 22 .
- the raising/drill lines or drill line reeving system are installed.
- the drill line is wound around the reel of draw-works 58 with nine loops. Subsequently, the drill line is let out by powered drill line spooler 54 and the dead line is wound on the dead line anchor and finally fixed with the clamps.
- Raising cylinders 31 after the step of fixing apparatus 2 , are decoupled from mast 23 and preferably closed, so as to protect the telescopic stems of cylinders 31 themselves, as shown in FIG. 12 .
- Said cylinders 31 are kept under drill floor 22 with the same inclination assumed at the end of the step of raising apparatus 2 , so at to be immediately ready to be extracted again and constrained to mast 23 in order to perform the steps of the disassembling or rig-down method of apparatus 2 .
- the disassembling or rig-down method for a drilling apparatus 2 comprises the following steps:
- the disassembling method substantially comprises the steps of the assembling method in a reverse order, with the aim of shifting from the use operating configuration to the assembly operating configuration, so as to allow the apparatus to be disassembled and transported towards another drilling site.
- Well drilling apparatus 2 can be installed on moving or skidding beams that are properly arranged on the ground, so as to allow the entire plant or be translated from one well to an adjacent one. Furthermore, it can be provided with a translation system by means of “hydraulic feet” constrained to the ends of the sub-bases (Walker System).
- the apparatus and the assembling and disassembling method according to the present invention allow the installation of a drilling plant to be quicker, thus significantly reducing the time and the costs needed for the installation and the subsequent disassembling operations.
- actuating devices 3 which push mast 3 to raise it and hold mast 23 during its downward movement, allow the apparatus raising and lowering steps to be simplified, thus increasing the safety in performing these steps.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electromagnetism (AREA)
- Earth Drilling (AREA)
Abstract
A well drilling apparatus (2) and method associated therewith is able to shift between a first assembly operating configuration and a second use operating configuration. The apparatus (2) includes a sub-structure (21), which supports the apparatus (2), a mast (23), which is pivoted to the sub-structure (21), around which it rotates to shift between the assembly operating configuration, which is substantially horizontal, and the use operating configuration. A drill floor (22) is liftable and connected to the mast (23). An actuating device (3) allows the drilling apparatus (2) to shift between the two operating configurations. The actuating device (3) is hydraulic and directly connected to the mast (23). The drill floor (22) includes a first portion (22 a), projects with respect to the mast (23), and a second portion (22 b) constrained to and rotating with the mast (23. A draw-works (58) is permanently installed on the sub-structure (21).
Description
- The present invention is relative to a drilling apparatus or land rig, which can be moved, and is relative to the relative assembling method.
- In particular, the present invention is relative to a well drilling apparatus for the search and the extraction of fossil fuels, such as oil and fuel gases.
- Said drilling apparatus assumes an assembly operating configuration, in which it is completely assembled in a horizontal position, at the level of the ground, and, when it is raised in a vertical position, it assumes a use operating configuration for the drilling, all of this in one single operation.
- Furthermore, the apparatus according to the present invention is modular and can be easily assembled and disassembled, thus allowing said apparatus to be moved from a drilling spot to the next one in a quick manner, hence reducing the amount of time needed to disassemble and re-assemble it.
- Projecting masts, which are comprised in said drilling apparatuses or structures, are widely used in ground drilling operations.
- In the structures or apparatuses described in the prior art, different mast assembly or erection devices are used in order to allow said mast to be positioned, after having been assembled, above the drilling well.
- In its use operating configuration, the drilling structure or apparatus comprises a sub-structure. Normally, said sub-structure comprises sub bases, which lay on the ground. The sub-structure is adapted to support a drill floor. Said drill floor and the mast, which is arranged in a vertical position, are raised at a predetermined height from the ground.
- Normally, the drill floor comprises different devices, such as: at least one pair of power tongs, a rotary table, and a draw-works, which are typically used during the drilling phases. The mode of operation and the features of the above-mentioned devices comprised in the drill floor are known to a skilled person.
- Normally, the processes needed by the apparatus to shift from an assembly operating configuration to a use operating configuration comprises a first step in which the mast is raised in a vertical position, substantially keeping the drill floor at the level of the ground. Subsequently, the drill floor is raised at the desired height, positioning the rotary table above the drilling well, aligned with said well.
- In the prior art, prior to raising the drilling structure or apparatus, the sub-structure, the drill floor and the mast are assembled at the level of the ground and connected to one another. Finally, the fast line of the draw-works is inserted into the fast line shave, which is arranged at the top pf the mast, and through the travelling block, thus becoming the drilling line. Said line is fixed, in correspondence to a first deadline of its, to the corresponding deadline anchor.
- Normally, in order for the apparatus to shift from the assembly operating configuration to the use operating configuration, two consecutive steps have to be performed, in particular a first step of raising the mast from the horizontal position, parallel to the ground, to the vertical position, and a subsequent step of raising the drill floor.
- Said step of raising the mast is performed by using said draw-works, which exerts the necessary raising force. Normally, when the mast is in a horizontal position, two feet of the mast are hinged to the drill floor and, subsequently, when the mast itself is arranged in the vertical position, the two remaining feet are secured as well.
- Normally, in the known art, in order for the mast to be raised, a traction force is applied so as to erect the mast itself in a vertical position.
- In the second step, on the other hand, the drill floor supporting the mast in the vertical position, in turn, is raised up to the desired height above the drilling well, thus obtaining two movements that are distinct from one another and mutually independent.
- Normally, in order to raise the mast from the horizontal position to the vertical position, besides using the draw-works, a so-called A-frame is used. The raising or tilting movement of the mast is performed by connecting the travelling block to a line tie, which, in the rear part, extends around sheaves that are supported by said A-frame and, in the front part, is anchored to the mast. When the draw-works pulls in the line, the travelling block and the line tie raise the mast and tilt it in a vertical position against said A-frame.
- The greater the height and the weight of the mast, the greater the stress to which the line is subject during the mast raising phase, in particular during the first part of the raising movement, when the mast is in a substantially horizontal position.
- For this reason, the line system used to raise the mast is usually replaced by a direct raising movement by means of hydraulic actuators. The use of hydraulic actuators allows users to reduce rig-up times, since one does not need any longer to install an A-frame for the sheaves and sling lines for the raising movement. Furthermore, the use of hydraulic actuators allows users to raise the mast only by means of a low-power hydraulic control unit, if necessary with a diesel motor. Therefore, the generators of the work site do not need to be started and the the draw-works does not need to be supplied with power.
- As mentioned above, the use of hydraulic actuators allows users to eliminate the A-frame and, therefore, to save the time needed for its installation and removal.
- In the technical field, well drilling apparatuses often need to be moved; in particular they have to be moved from one well to the next one together with all the complementary equipments needed for the operation of a drilling plant. In the prior art, in order to move a drilling apparatus or land rig, the drilling apparatus has to be disassembled. In order to do so, the drilling apparatus has to be disconnected from the auxiliary devices, the mast has to be lowered from a vertical position to a horizontal position, the whole drilling plant has to be moved towards the next well to perform the drilling operation and, finally, the entire system has to be re-assembled and the auxiliary structures have to be re-connected.
- Therefore, it is important for the drilling structure or apparatus and, thus, for the entire plant, to be easy to be transported and assembled. In the field of drilling in search for oil, in order to maximize the extraction, a very deep drilling in the ground is often required, so as to re-activate oil wells that are apparently exhausted. This led to the construction of drilling structures that are more and more imposing in terms of dimensions, power and weight.
- Currently, drilling plants are produced which are able to develop a power up to 3000 HP or 2300 kW and feature a height of the drill floor from the ground of approximately 17 ft or 11 meters, a maximum total height of 156 ft or 47.5 m, 1,500,000 pounds or 681 tons for the hook load, 1,300,000 pounds or 590 tons for the rotary load, and 1,000,000 pounds or 454 tons for the setback load.
- Some constructors of drilling structures mainly develop land rigs with 2000 hp, which can easily be moved and are produced as the type called box substructure.
- This type of structure is characterized by the presence of hydraulic raising devices with plates of large dimensions.
- Normally, instead of only using traditional kellies and rotary tables to rotate the series of drill rods, a top drive is used as well.
- The top drive normally is a rotary device provided with an electric or hydraulic motor, which is suspended and connected to the mast. Said top drive is able to move along a vertical axis inside the mast strong back.
- Therefore, the series of drill rods are caused to rotate by said top drive, which reduces the manual work needed for rod addition operations as well as the risk for operators.
- Normally, the top drive and the mast are separate during the transportation phases and are coupled to one another during the assembling phases or even, in some cases, when the mast is already in the vertical position, thus causing the operations to be very complicated, besides requiring a larger amount of time to perform the operations aimed at installing the structure.
- In order to cause the raising phase to be quicker and, thus, reduce the time needed to install the drilling plant or apparatus, it is advisable that the top drive is associated with a portion of the mast already during the assembling phase. This solution allows users to facilitate the transportation and to reduce the assembling times.
- Furthermore, a mast is known, to which a top drive is directly fixed, so as to cause the two of them to be integral, so that the top drive is always fitted to the mast, even when the land rig is disassembled to be transported. The top drive always remains coupled to the mast, even during the rig up phases or during the ring down phases or when it is transported towards the next drilling well.
- Therefore, the mast is advantageously provided with the top drive already arranged inside the mast strong back.
- The object of the present invention is to solve the drawbacks mentioned above by providing a drilling apparatus in which, in a first assembly operating configuration, the different components are assembled in a horizontal position, substantially at the level of the ground, and, subsequently, said apparatus is raised so as to reach a second use operating configuration, in which the mast is vertical.
- All the steps and the operations needed to raise and/or lower the well drilling apparatus according to the present invention and, in particular, the mast and the sub-structure, are performed by means of a hydraulic actuating device, which pushes said apparatus. The drilling apparatus, when shifting from one operating configuration to the other, is pushed by said hydraulic actuating device and performs a continuous movement in time, without interruptions or intermediate positions.
- Furthermore, said drilling apparatus is modular and can be quickly assembled and disassembled, so as to be transported from one drilling well to the next one. The transportation of the apparatus according to the present invention takes place in a quick manner, with no need for complicated disassembling procedures, which also require a lot of time.
- One aspect of the present invention is relative to a drilling apparatus having the features set forth in appended
claim 1. - A further aspect of the present invention is relative to the drilling apparatus assembling method according to claim 11.
- Finally, a further aspect of the present invention is relative to the disassembling method according to claim 15.
- The additional features and advantages of the drilling apparatus and of the assembling method will be best understood upon perusal of the following detailed description of at least one embodiment with reference to the accompanying drawings, which respectively show what follows:
-
FIG. 1 shows the positioning of the sub-structure and of the actuating device of the drilling apparatus according to the present invention; -
FIG. 2 shows the positioning of the draw-works on said sub-structure and of the actuating stands in the spots suited for the assembly of the mast; -
FIG. 3 shows the positioning of the mast base sections on the right and on the left, directly on the sub base, and of the draw-works; -
FIG. 4 shows the positioning of the set-back drill floor on suitable stands, the set-back drill floor being coupled to the mast base sections by means of connecting rods; -
FIG. 5 shows the positioning, on suitable trunnions, of the mast starter section, in a horizontal position, and the addition of the mast bottom section provided with boards, which are connected to the set-back, as well as the fixing of the second portion of the drill floor to said bottom section; -
FIGS. 6A and 6B show the positioning and the fixing of the mast strong back to the bottom section and the fixing of the actuating device to the mast strong back; in particular,FIG. 6A shows the fixing of the mast strong back andFIG. 6B shows a detail of the fixing of the actuating device to the mast strong back; -
FIGS. 7A and 7B show the assembling operations of the intermediate section of the mast, in a horizontal position, which is assembled on said actuating stands; -
FIGS. 8A and 8B show the assembling operations of the top section of the mast, in a horizontal position, which is assembled on said actuating stands, and the fixing to said intermediate section of the mast itself; -
FIGS. 9A and 9B show, in sequence, the images of the movement actuated by the actuating stands along the vertical and longitudinal axes in order to connect the end sections of the mast to the mast strong back; -
FIG. 10 shows a freeze-frame of the drilling apparatus during the passage between the two operating configurations, the movement being performed in a continuous manner in time; -
FIG. 11 shows the lower part of the drilling apparatus in the use operating configuration; -
FIG. 12 shows the release of the actuating device from the mast; -
FIG. 13 shows an overall view of the drilling apparatus in the use operating configuration. - With reference to the figures mentioned above, well
drilling apparatus 2 is adapted to shift from a first assembly operating configuration to a second use operating configuration and vice versa.Said apparatus 2 comprises a sub-structure 21, which lies on ground “S” and supports saidapparatus 2, amast 23, which comprises pivoting points 23 a and fixingpoints 23 a′ and is pivoted to saidsub-structure 21 by means of said pivoting points 23 a, around which it rotates so as to shift from said assembly operating configuration, which is substantially horizontal, to said use operating configuration, which is vertical, and vice versa. - The apparatus comprises, furthermore, a
drill floor 22, which can be raised and is connected to the mast, and anactuating device 3, which is adapted to allow the drilling apparatus to shift from an assembly configuration to a use configuration. Saidactuating device 3 is a hydraulic device, which is directly connected tomast 23, preferably by means of a pivot hinge, is adapted to push said mast in order to raise it, and is adapted to hold saidmast 23 during the lowering movement with a continuous movement, as shown inFIG. 10 . - Said
actuating device 3 is permanently connected to the apparatus and, in particular, tomast 23 during the passage between the two operating configurations. Indeed, during the passage between the two operating configurations, the connection point betweenactuating device 3 andapparatus 2 remains unchanged. - Said
drill floor 22 comprises afirst portion 22 a, which is pivoted to saidmast 23 and projects with respect to saidmast 23, and asecond portion 22 b, which is constrained to saidmast 23 and rotates with it. - Said
first portion 22 a, which is always kept parallel to ground “S” during the raising or rig up and/or the lowering or rig down ofdrilling apparatus 2, comprises a rotary table 56 and a driller cabin 24, which, during the apparatus assembling steps, can be directly installed ondrill floor 22 without causing problems in the following assembling steps, since said portion is always parallel to ground “S”, as shown inFIGS. 4 , 5, 10 and 11. - The
second portion 22 b, which in the use operating configuration mainly serves as walkway for the operators during the drilling phases, is directly fixed tomast 23 perpendicular to ground “S”, as shown inFIGS. 4 , 5, 10 and 11. - In particular, the
first portion 22 a ofdrill floor 22 comprises, besides rotary table 56 shown inFIG. 7B and driller cabin 24, a dead line anchor and a pair of power tongs, which are known to a skilled person. - If necessary, said
drill floor 21, in order to help the automation of the entire drilling apparatus according to the present invention, besides a well center, where the drilling takes place along a first axis parallel to a vertical axis “Z”, comprises a secondary well or mouse hole, not shown, where the drill rods are temporary arranged and which defines a second axis, parallel to said first axis, and a secondary clamp or mouse hole clamp, not shown, which is adapted to hold the drill rods when they are arranged in the mouse hole. - Said
mast 23, which extends along a longitudinal axis “A”, is modular and comprises astarter section 231, which is adapted to be constrained to sub-structure 21, abottom section 232, which is constrained to saidstarter section 231 and to which thefirst portion 22 a of saiddrill floor 22 is pivoted and thesecond portion 22 b is constrained; a strong back, to whichactuating device 3 is connected and which is pivoted to saidstarter section 231. - Said strong back comprises
suited attachment housings 233 a, whereactuating device 3 is pivoted. - Said mast strong back is connected to at least one further section (234, 235), on which a
top drive 51 is fixed in a sliding manner, as shown in the accompanying drawings, and which is constrained to said mast strong back. - In particular,
mast 23 comprises anintermediate section 234, which is constrained to said mast strong back, and atop section 235, which is constrained to saidintermediate section 234. In saidtop section 235 there are arranged the top drive, a travellingblock 50 and a crown block, as one single assembly, as well as a powereddrill line spooler 54, so as to keep the line on the respective pulleys of the crown block and of travellingblock 50, thus saving time both in the ring-up phase and in the rig-down phase. Said devices are preferably constrained totop section 235 of the mast by means of pins. - Furthermore, during the apparatus transportation phases,
top drive 51 is engaged/locked intop section 235 ofmast 23 for the entire duration of the transportation. In order to do so,top section 235 comprises a locking device, not shown, which is adapted to locktop drive 51 to the top section itself, for example at least one pin that is inserted in a suited housing and, when it is inserted, prevents top drive 51 from moving intop section 235. - Said
intermediate section 234 and saidtop section 235 are assembled and fixed to one another in a horizontal position at the level of the ground, so as to help operators perform these operations, thus causing the operations to be carried out more quickly. - Said
intermediate section 234 comprises afirst shoulder 234 a and asecond shoulder 234 b, on which a back 234 c is hinged. Said back 234 c, after having been arranged perpendicular to saidsecond shoulder 234 b, is fixed to thefirst shoulder 234 a assuming the shape of a truncated cone with a “U”-shaped section, so as to be fixed to said maststrong back 233. -
Top section 235 also has the shape of a truncated cone with a “U”-shaped section, so as to be able to be fixed tointermediate section 234. Saidtop section 235 comprises twoshoulders 235 a, which are hinged to an end of the top oftop section 235, where travellingblock 50 and the crown block are comprises, and a back 235 b, which is arranged between said twoshoulders 235 a. Said back 235 b is adapted to reduce its longitudinal extension in a telescopic manner, preferably by means of telescopic crosspieces, so as to reduce the transverse extension of entiretop section 235, as shown inFIGS. 8A and 8B ; indeed, inFIG. 8A shoulders 235 a are parallel to one another, whereas inFIG. 8B two shoulders 8B are spread, thus causingtop section 235 to assume the shape of a truncated cone as mentioned above. The reduction of the transverse extension of upper part 245 facilitates the transportation of said section, especially in case of transportation on wheel, when national and international roads have to be used. - Said shoulders (234 a, 234 b, 235 a) and said back (234 c, 235 b) are connected to one another by means of four stringers, two front stringers and two rear stringers. Said rear stringers delimit the back (234 c, 235 b) of said
mast 23, thus causing it to assume the typical shape of a truncated cone with a square base. - Preferably, the different sections of the mast are connected to one another by means of suitable pins, which are inserted into suitable connection hinges. This aspect is not described in detail, since it is known to a skilled person.
- On said back (234 c, 235 b) of
mast 23 there is arranged aguide 511, which is adapted to allowtop drive 51 to slide along said longitudinal axis “A” in the use operating configuration. - Said
guide 511 is assembled during the assembly of sections (231, 234, 235) ofmast 23, which comprise a respective portion ofguide 511. - In an alternative embodiment, said
top drive 51 comprises a pantograph mechanism, not shown, which is adapted to allow the top drive to move from the well center to a drawing point identified in the mouse hole, thus moving from a first axis of the well center to said second axis of the mouse hole. - The assembly consisting of
intermediate portion 234 and ofupper portion 235 is subsequently fixed to maststrong back 233, which, in turn, is fixed tostarter section 231. - In the preferred embodiment of
drilling apparatus 2, saidsub-structure 21 comprises at least twosub-bases 210, which are arranged parallel to one another and are adapted to supportentire apparatus 2, and twobase sections 214, each one constrained to a sub-base 210. As shown in the accompanying drawings,mast 23 is pivoted on saidbase sections 214. - The sub-structure comprises, furthermore, the boards and stairs, the dog house and the grass hopper, which are shown in
FIGS. 12 and 13 but will not be described in detail, since they are known to a skilled person. - Said
sub-structure 21 supports, preferably onsub-bases 210 ofsub-structure 21, preferably in the rear part of the sub-bases themselves, a draw-works 58, which is provided with a support structure, parapets and accessories. Said draw-works 58, during the passage from the assembly operating configuration to the user operating configuration ofapparatus 2 and vice versa, remains in a low position, arranged onsub-bases 210 ofsub-structure 21. -
Actuating device 3 is adapted to causedrilling apparatus 2 to be subject to a rig-up step and to a rig-down step. - Said
actuating device 3, in its preferred embodiment, comprises a pair of telescopic hydraulic raisingcylinders 31, each of which is connected tomast 23. In particular, said pair ofcylinders 31 is connected to the arms of maststrong back 233, for example they are pivoted in thesuited attachment housings 233 a mentioned above.Actuating device 3 and, in particular,cylinders 31 are fixed to the mast, preferably by means of a pivot hinge, each cylinder in one single point, during the passage from one operating configuration to the other. In particular, each cylinder of saidpair 31, at one end, is pivoted to sub-structure 21, in particular to sub-bases 210, and, at the opposite end, is pivoted to maststrong back 233, in correspondingattachment housing 233 a. The point ofmast 23 in whichsingle cylinder 31 is pivoted remains unchanged during the passage from one operating configuration to the other. The present solution does not require, for the passage from one operating configuration to the other, a change of the fixing point in whichactuating device 3 is fixed toapparatus 2. - Preferably, said pair of
cylinders 31 are telescopic with three sections. - A further aspect of the present invention is the assembling method for a
drilling apparatus 2. Said assembling method comprises the following steps: -
- positioning
sub-structure 21 in the desired site; - assembling
drill floor 22; - pivoting
mast starter section 231 to saidsub-structure 21 in a substantially horizontal position; - fixing
actuating device 3, so as to allowstructure 2 to be lifted; - lifting
structure 2, so as to cause it to shift from the assembly operating configuration, which is substantially horizontal, to the use operating configuration, which is vertical; - fixing
apparatus 2 in the use operating configuration in a vertical position.
- positioning
- In an equivalent alternative embodiment, the step of fixing
actuating device 3 is performed prior to the step of pivotingstarter section 231 ofmast 3. - The step of positioning
sub-structure 21 in the desired site is carried out by positioning the right and left sub-bases 210 and by connecting them tobeams 211, as shown onFIG. 1 . During said step of positioningsub-structure 21, the relative position ofsub-bases 210 with respect to the given well center has to be controlled. Each sub-base 210 houses, in asuited cradle 212, ahydraulic cylinder 31 ofactuating device 3, which is adapted to moveapparatus 2 from one operating configuration to the other. -
Hydraulic cylinders 31, during the transportation from one well to the next one, are held in saidcradles 212 and then they are set free and tilted towards the well center during the steps of the assembling method, preferably during the step of positioningsub-structure 21, as shown inFIG. 1 . Furthermore, during said step, the support structure of draw-works 58 is installed in the rear part ofsub-bases 210, together with its parapets and accessories, as shown inFIG. 2 . Furthermore, during this step, one also installs the right and left structures making upbase section 214, directly lying onsub-bases 210, to whichstarter section 231 ofmast 23 will be directly pivoted, as shown inFIG. 3 . - Preferably, still during the step of positioning
sub-structure 21, the beams needed for the installation of the blow out preventer, also known as BOP, not shown, are laid on the ground, in the central area. - Subsequently, the step of assembling
drill floor 22 is performed. In order to assembledrill floor 22, two stands are provided, on which the beams of the first portion or set-back 22 a of the drill floor, coupled to the lateral board, are laid, as shown inFIG. 4 . - Subsequently, the beams of the first portion or set-
back 22 a are coupled tomast base section 214 by means oftrestle connecting rods 22 c. - Subsequently, the raising beams of the BOP, not shown, are connected under the beams of the first set-
back portion 22 a by means of the fixing pins provided. - Subsequently, the support beams of rotary table 56 are coupled to the beams of the first set-back
section 22 a, thus temporarily projecting. - Subsequently, the step of pivoting
starter section 231 of the mast is performed by positioning saidstarter section 231 on pivotingpoints 23 a for the connection ofmast 23 in a horizontal position with respect to ground “S”. Subsequently, a furthermast bottom section 232 is coupled to saidstarter section 231. Preferably, the two steps of assemblingdrill floor 22 and pivotingmast starter section 231 are performed at the same time; in fact, thesecond section 22 b, together with the board support, is fixed, in turn, to thesecond section 22 b. - Said
first portion 22 a and saidsecond portion 22 b, together, make updrill floor 22. - Preferably, at this point of the assembling procedure, driller cabin 24 is laid on the first portion or set-
back 22 a and, at the same time, the rear board is installed on thesecond portion 22 b ofdrill floor 22, as shown inFIG. 5 . - Subsequently, mast
strong back 233 is placed and fixed, for example by means of pivots, tomast starter section 231. This strong back comprises, as mentioned above,suited attachment housings 233 a, whereactuating device 3 is pivoted. - Subsequently, the step of fixing
actuating device 3 is performed, during whichactuating device 3 is fixed tomast 23. - In the embodiment shown,
actuating device 3 and, in particular, raisingcylinders 31, are pivoted to said mast strong back 233 in thesuited attachment housings 233 a. In order to fix saidcylinders 31, the respective pivots are inserted into the suited holes comprised inattachment housings 233 a forcylinders 31, as shown inFIGS. 6A and 6B . - Said mast
strong back 233 is in a horizontal position, parallel to ground “S”, at a predetermined height “Z2” from the ground, at whichmast 23 will be fixed. - At the end of the step of fixing
actuating device 3, the next step of raisingapparatus 2 can be performed. - Preferably, prior to the step of raising
apparatus 2, an assembling step is provided to assemblemast 23, during whichdifferent sections mast 23 are prepared and assembled. Before performing the mast assembling step mentioned above, actuating stands 6 comprising hydraulic raising devices are positioned in front ofsub-bases 210, in the spots suited for the assembly ofmast 23, as shown inFIG. 2 . Preferably, afront stand 61 is positioned close tointermediate section 234, for example at the end of the extension ofsub-bases 210, and a rear stand 63 is positioned at a distance from saidfront stand 61 that is smaller than the maximum extension ofmast 23, preferably substantially equal to the longitudinal extension ofmast 23 from the center ofintermediate section 234 to the center oftop section 235. Preferably, furthermore, anintermediate stand 6′ is positioned between saidfront stand 61 and said rear stand 63, substantially in the point of junction betweenintermediate section 234 andtop section 235 ofmast 23. Normally, saidintermediate stand 6′ is not an actuating stand, but is only fulfills the function of supportingmast 23 during its assembly. - The actuation of the assembling step, during which the connection of sections (234, 235) of the mast is performed, is carried out by the operators at a first height “Z1” from ground “S”, which is lower than height “Z2” mentioned above, thus horizontally building
mast 23, parallel to ground “S”. - The assembly of
mast 23 at height “Z1” allows the personnel responsible for the assembly to work more easily on saidmast 23. - For the purposes of the present invention, the expression “horizontally building
mast 23” means thatmast 23, by means of said stands 6, is built parallel to ground “S” where saiddrilling apparatus 2 is assembled. - Preferably, said first height “Z1” from ground “S” is equal, for example, to 1.5 m.
- In detail, the assembling step for assembling
mast 23 is preferably carried out as follows;belly board 71 and rackingboard 70 are laid on the ground in the suitable areas, in order to be subsequently coupled tomast 23, as shown inFIG. 7A . - After that, the
first shoulder 234 a ofintermediate section 234 is positioned, for example by means of the crane of the work site. Saidfirst shoulder 234 a is placed betweenfront stand 61 and anintermediate stand 6′. - Subsequently, the
second shoulder 234 b ofintermediate section 23 ofmast 23 is positioned, for example by means of the crane of the work site. Saidsecond shoulder 234 is deposited on stands (61, 6′), as well. Saidsecond shoulder 234 b also comprises back 234 c. Said back 234 c is hinged to saidsecond shoulder 234 b. During the assembling step for assemblingmast 23, said back 234 c is raised by means of hydraulic cylinders and coupled to thefirst shoulder 234 a, thus creatingintermediate section 234 with a pyramid frustum structure with a U shape facing downwards, as shown inFIG. 7B . Said back 234 c, during the transportation from one drilling well to the next one, is arranged parallel to thesecond shoulder 234 b, to which it is hinged. - After that,
mast top section 235 is positioned, inside which there are locked the crown block, travellingblock 50,top drive 51 and powereddrill line spooler 54.Top section 235 is deposited on one single rear stand 63, in the closed configuration, so as to minimize the width. In said configuration, the twoshoulders 235 a are parallel to one another, as shown inFIG. 8A . Preferably, after having depositedtop section 235 on rear stand 63 keeping it suspended, for example by means of a crane, powereddrill line spooler 54 is detached and arranged at the base ofmast 23. - Preferably, in order to shift from the closed configuration to the open configuration, the hydraulic cylinders comprised in said actuating stands 6 are used so as to open the shoulders, spacing them apart, keeping
top section 235 suspended by means of raising straps. Whentop section 235 is in the open configuration, the telescopic crosspieces of back 235 b, which are not shown in detail, are fixed. - Subsequently,
mast top section 235, which is always kept suspended, is brought into contact with mastintermediate section 234, the attachment hinges between one section and the other are caused to coincide and the pins are inserted into the respective hinges. - Rear stand 63, which is arranged in correspondence to the top of
top section 235, where the crown block and travellingblock 50 are arranged, is suited tolevel mast 23 and facilitate the insertion of the pins to connect sections (234, 235) ofmast 23, as shown inFIG. 8B . -
Intermediate section 234 andtop section 235 of the mast lie on three stands:front stand 61,intermediate stand 6′ and the rear stand, as shown inFIG. 8B . - By means of a service winch, which is not shown,
top drive 51 is dragged towards the base of the mast, so as to reduce the overall tilting moment ofmust 23, sliding along partially assembledguide 511. - Subsequently, racking
board 71 andbelly board 70 are coupled to respective sections (234, 235) of the mast, which are so connected. - Subsequently, in order to complete the assembling step for assembling
mast 23, a moving step is provided, during which at least part ofmast 23 is moved by means of actuating stands 6, so as to allow the actuation of the following steps of the method and, in particular, of the step of pivotingmast 23 and of the subsequent rig-up step. In detail, during said moving stepintermediate section 234 andtop section 235 ofmast 23, which have been so assembled, are raised, in a leveled manner, by means offront stand 61 and of rear stand 63 until they reach predetermined height “Z2” from ground “S”, so that the heights of the hinges betweenintermediate section 234 and mast strong back 233 coincide. Said height “Z2” is approximately 4 meters from ground “S”. - Subsequently, the two sections of
mast 23 are translated backwards, by means of stands (61, 63), along longitudinal axis “A” ofmast 23 towards the hinges, until the fixing pins can be inserted. - These two steps are shown in FIGS. 9A÷9B.
- During the previous phases of the mast assembling step, sections (234, 235) of the mast are arranged in such a way that the connectors comprised in
intermediate section 234 of the mast are spaced apart from the corresponding connectors of mast strong back 233 by a predetermined distance “X1”. - Said predetermined distance “X1”, for example equal to 0.5 m, during the step for raising the sections of mast (234, 235) from height “Z1” to height “Z2”, prevents
mast 23 itself from striking against maststrong back 233. Furthermore, predetermined distance “X1”, which spaces apart sections (234, 235) of the mast, facilitates the assembling operations performed by the operators. The backward movement of the sections of the mast, which is equal to distance “X1”, allows the connectors ofintermediate section 234 to perfectly coincide with the connectors of maststrong back 233. - Preferably, the extension of
top section 235, the raising step and the step of bringing sections (234, 235) closer, as mentioned above, are performed thanks to the help of said stands 6; said stands 6, indeed, are adapted to extend the top section and to raise the sections of the mast as well as to bring them closer to maststrong back 233. - Said stands 6 comprise a plurality of actuators, which are adapted to move
mast 23 in a predetermined manner within the orthogonal space defined by axes “X”, “Y” and “Z”, which are orthogonal to one another. - Said actuators, which are comprised in each
stand 6, preferably are hydraulic pistons, which are preferably arranged in such a way that at least one of them operates along “X” axis, at least one of them operates along “Y” axis and at least one of them operates along “Z” axis. - At the end of the moving step for moving
mast 23, the step of pivotingmast 23 is performed. - After the backward movement of
mast 23 and the connection to the mast strong back, guide 511 in which top drive 51 slides has further extended, thus allowingtop drive 51 to further slide in correspondence to maststrong back 233, part ofmast 23 and ondrill floor 22. - After that, another step can be performed, during which
structure 2 is raised and which comprises, in particular, raising the mast, bringing it to the use operating configuration, and raisingdrill floor 22. This step is carried out in a continuous manner, without interruptions when shifting from one operating configuration to the other, by simultaneously raisingmast 23 anddrill floor 22 by means of a thrust, which is actuated by actuatingdevice 3 of the hydraulic type and is directly applied tomast 23. - The simultaneous raising of
drill floor 22 and ofmast 23 is allowed by the fact that: -
- the
first portion 22 a of the drill floor is directly pivoted to the mast and thesecond portion 22 b is fixed to the mast itself; - only one
actuating device 3 is provided, which allowsentire drilling apparatus 2 to be raised.
- the
- In
drilling apparatus 2 according to the present invention, draw-works 58 remains in a low position, arranged onsub-bases 210 ofsub-structure 21. - This solution allows the use of one
single actuating device 3, thus simplifying the step of raisingapparatus 2 and quickening the passage from the assembly operating configuration to the use operating configuration and vice versa. - This solution, furthermore, allows the structure of
drill floor 22 to be simplified, since it does not have to support the weight of draw-works 58. This allows the movements of the drill floor to be simplified, thus simplifying the structure that has to support the drill floor itself. - Furthermore, the position of draw-works 58 on
sub-bases 210 allows an easier maintenance of the draw-back itself, thus facilitating the electric connection to the motors that move the draw-works. - During the raising step, simultaneously with the beginning of the raising movement of
apparatus 2 and, in particular, ofmast 23 by means of thehydraulic cylinders 31, as shown inFIG. 10 , the beams of the first portion or set-back 22 a and the lateral boards associated therewith detach from their support stands, remaining substantially horizontal and parallel to ground “S”, due to the action of the pantograph mechanism, for example a parallelogram-shaped pantograph mechanism, which is built bytrestle connecting rods 22 c. - At the end of the step of raising
apparatus 2, namely whenmast 23 is in the final vertical position andapparatus 2 is in the use operating configuration, a next step can be performed, during whichapparatus 2 is fixed in the use operating configuration, as shown inFIG. 11 . During this step, the constraining pins are inserted at the base ofmast 23, in particular in fixingpoints 23 a′ and the beams of rotary table 56 are leveled off atmast starter section 231. - The assembling method according to the present invention comprises further steps to make
apparatus 2 operative. In particular, a dog-house 57 is provided on the ground, close to a side ofmast 23, for example the left side. Subsequently, driller cabin 24 is moved in correspondence to rotary table 56, which is arranged in correspondence to the well center. The apparatus according to the present invention comprises, furthermore, at least onejib crane 8, preferably on the left side ofmast 23. Saidjib crane 8 is used, with the help of an equalizer beam and of four ropes, to raise dog-house 57 from the ground to drillfloor 22. Dog-house 57 is laid on and constrained to two foldable beams, not shown, which belong to drillfloor 22. - In order to the allow operators to access
drill floor 22, the stairs for the access to the drill floor are assembled and positioned. Finally, the electric and hydraulic connections are completed, as well as the connections of the sludge plant. - In order to start the drilling steps, the raising/drill lines or drill line reeving system are installed.
- The drill line is wound around the reel of draw-
works 58 with nine loops. Subsequently, the drill line is let out by powereddrill line spooler 54 and the dead line is wound on the dead line anchor and finally fixed with the clamps. - Raising
cylinders 31, after the step of fixingapparatus 2, are decoupled frommast 23 and preferably closed, so as to protect the telescopic stems ofcylinders 31 themselves, as shown inFIG. 12 . - Said
cylinders 31 are kept underdrill floor 22 with the same inclination assumed at the end of the step of raisingapparatus 2, so at to be immediately ready to be extracted again and constrained tomast 23 in order to perform the steps of the disassembling or rig-down method ofapparatus 2. - The disassembling or rig-down method for a
drilling apparatus 2 comprises the following steps: -
- releasing
apparatus 2 from the use operating configuration; - lowering
drilling apparatus 2, so as to cause it to shift from the use operating configuration, which is vertical, to the assembly operating configuration, which is substantially horizontal, by means of actuatingdevice 3; - releasing
actuating device 3, so as to allowapparatus 2 to be removed; - disconnecting
mast 23 from saidsub-structure 21 in a substantially horizontal position; - removing
sub-structure 21;
- releasing
- characterized in that:
-
- the step of lowering
apparatus 2 is performed in a single phase in a continuous manner, without interruptions during the passage from one operating configuration to the other; - during the step of lowering
apparatus 2,mast 23 anddrill floor 23 are simultaneously lowered with the support of saidactuating device 3 of the hydraulic type.
- the step of lowering
- The disassembling method substantially comprises the steps of the assembling method in a reverse order, with the aim of shifting from the use operating configuration to the assembly operating configuration, so as to allow the apparatus to be disassembled and transported towards another drilling site.
- The disassembling method will not be described in detail, since it can easily be deduced from the assembling method, which simply has to be performed in a reverse order, and, therefore, can be easily understood by a skilled person.
- Well
drilling apparatus 2, as a whole, can be installed on moving or skidding beams that are properly arranged on the ground, so as to allow the entire plant or be translated from one well to an adjacent one. Furthermore, it can be provided with a translation system by means of “hydraulic feet” constrained to the ends of the sub-bases (Walker System). - The apparatus and the assembling and disassembling method according to the present invention allow the installation of a drilling plant to be quicker, thus significantly reducing the time and the costs needed for the installation and the subsequent disassembling operations.
- The use of
actuating devices 3, which pushmast 3 to raise it and holdmast 23 during its downward movement, allow the apparatus raising and lowering steps to be simplified, thus increasing the safety in performing these steps. -
- Well
drilling apparatus 2 -
Sub-structure 21 -
Sub base 210 -
Beams 211 -
Cradles 212 -
Mast base section 214 -
Drill floor 22 - First portion/set-back of the
drill floor 22 a - Second portion of the
drill floor 22 b -
Trestle connecting rods 22 c -
Mast 23 - Pivoting points 23 a
- Fixing points 23 a′
-
Mast starter section 231 -
Mast bottom section 232 - Mast strong back 233
-
Attachment housings 233 a -
Intermediate section 234 -
First shoulder 234 a -
Second shoulder 234 b - Back 234 c
-
Top section 235 -
Shoulders 235 a - Back 235 b
- Driller Cabin 24
-
Actuating device 3 - Raising
cylinder 31 -
Pins 32 - Travelling
block 50 -
Crown block 50′ -
Top Drive 51 -
Guide 511 - Drilling/fast line 52
- Powered
drill line spooler 54 - Rotary table 56
- Dog-
house 57 - Draw-works 58
- Actuating stands 6
-
Front 61 -
Rear 62 - Intermediate 6′
- Racking
board 71 -
Belly board 70 -
Jib crane 8 - Longitudinal axis A
- Vertical axis Z
- First height Z1
- Second height Z2
- Ground S
- Distance D1
Claims (15)
1. Well drilling apparatus, which is able to shift between a first assembly operating configuration and a second use operating configuration;
said apparatus comprising:
a sub-structure, which lies on the ground and supports said apparatus,
a mast, which comprises pivoting points and fixing points pivoted to said sub-structure by said pivoting points, around which said mast rotates to shift between said assembly operating configuration, which is substantially horizontal, and said use operating configuration, which is substantially vertical;
a drill floor configured to be lifted and is connected to the mast;
an actuating device, for allowing the drilling apparatus to shift between said assembly operating configuration and said use operating configuration;
wherein the actuating device is a hydraulic device, which is directly connected to the mast;
the drill floor comprises a first portion, which is pivoted to said mast and projects with respect to said mast, and a second portion, which is constrained to said mast and rotates with the mast;
a draw-works is permanently installed on the sub-structure.
2. The apparatus according to claim 1 , wherein said mast is modular and comprises:
a mast starter section, adapted to be constrained to the sub-structure;
a mast bottom section, which is constrained to said mast starter section and to which the first portion of said drill floor is pivoted and the second portion of said drill floor is constrained;
a mast strong back, to which the actuating device is connected, and
at least one further section, on which a top drive, which is constrained to said mast strong back, is fixed in a sliding manner.
3. The apparatus according to claim 1 , wherein said sub-structure comprises:
at least two sub-bases, which are arranged parallel to one another and for supporting the apparatus;
at least two mast base sections, each of which is constrained to a sub-base and on which the mast is pivoted.
4. The apparatus according to claim 3 , wherein said draw-works is installed on said two sub-bases.
5. The apparatus according to claim 1 , wherein said first portion of the drill floor is kept parallel to the ground during the shift from one operating configuration to the other operating configuration and comprises a rotary table and a driller cabin.
6. The apparatus according to claim 2 , wherein the mast comprises an intermediate section, which is constrained to said mast strong back, and an upper section, which is constrained to said intermediate section and on which there are already positioned: the top drive, a travelling block, a crown block and a powered drill line spooler.
7. The apparatus according to claim 6 , wherein the intermediate section comprises a first shoulder and a second shoulder, on which a back is hinged;
said back, after having been arranged perpendicular to said second shoulder, is fixed to the first shoulder assuming the shape of a truncated cone with a “U”-shaped section.
8. The apparatus according to claim 5 , wherein the upper section has the shape of a truncated cone with a “U”-shaped section and comprises:
two shoulders, which are hinged at one end to the top of the upper section, and
a back, which is interposed between said two shoulders;
said back is adapted to reduce its transverse extension in a telescopic manner.
9. The apparatus according to claim 1 , wherein said actuating device comprises a pair of telescopic hydraulic raising cylinders, each of which is connected to the mast.
10. The apparatus according to claim 9 , wherein each cylinder is connected to an attachment housing comprised in the mast strong back.
11. Assembling method for a drilling apparatus,
said drilling apparatus comprises: a sub-structure, a mast, a drill floor, which is fixed to said mast, a draw-works, and an actuating device, for causing said apparatus to move between an assembly operating configuration and a use operating configuration;
the method comprising the following steps:
positioning the sub-structure in the desired site;
assembling the drill floor;
pivoting the mast to said sub-structure in a substantially horizontal position;
fixing the actuating device, so as to allow the apparatus to be lifted;
lifting the apparatus, so as to cause the apparatus to shift from the assembly operating configuration to the use operating configuration;
fixing the apparatus in the use operating configuration
wherein:
the step of lifting the apparatus is performed in a continuous manner, without interruptions during the shift from one operating configuration to the other;
during the step of lifting the apparatus, the mast and the drill floor are simultaneously lifted by a thrust, which is actuated by the actuating device, is of the hydraulic type, and is directly applied to the mast;
the draw works remains arranged on the sub-structure during the shift from one operating configuration of the apparatus to the other;
the drill floor comprises a first portion, which is pivoted to said mast and projects with respect to said mast, and a second portion, which is constrained to said mast and rotates with said mast.
12. The method according to claim 11 , wherein an assembling step for assembling the mast is provided, during which the different sections of the mast are prepared and assembled.
13. The method according to claim 12 , wherein the assembling step comprises a moving sub-step for causing at least one portion of the mast to move by actuating stands to allow actuation of the following steps of the method.
14. The method according to claim 13 , wherein, during the moving sub-step, at least one section of the mast is lifted in a leveled manner at a predetermined height from the ground, at which said at least one section is kept parallel to the ground and, subsequently, translated along a longitudinal axis of the mast itself.
15. Disassembling method for a drilling apparatus; said drilling apparatus comprising: a sub-structure, a mast, which is fixed to said sub-structure, a drill floor, which is fixed to said mast, and an actuating device, for causing said apparatus to move between a use operating configuration and an assembly operating configuration; said drill floor comprising a first portion, which is pivoted to said mast and projects with respect to said mast, and a second portion, which is constrained to said mast and rotates with said mast;
said disassembling method comprises the following steps:
releasing the apparatus from the use operating configuration;
lowering the drilling apparatus, so as to cause the drilling apparatus to shift from the use operating configuration to the assembly operating configuration;
releasing the actuating device to allow the apparatus to be removed;
releasing the mast from said sub-structure;
removing the sub-structure;
the step of lowering the apparatus is continuously performed without interruptions during the shift from one operating configuration to the other; during the step of lowering the mast, the mast and the drill floor are simultaneously lowered by said actuating device, which is hydraulic and is directly pivoted to the mast.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITTO2012A000414 | 2012-05-09 | ||
IT000414A ITTO20120414A1 (en) | 2012-05-09 | 2012-05-09 | HARVEST SYSTEM AND ASSEMBLY AND DISASSEMBLY METHOD. |
PCT/IB2013/053529 WO2013168064A2 (en) | 2012-05-09 | 2013-05-03 | Well drilling apparatus and assembling and disassembling method |
Publications (1)
Publication Number | Publication Date |
---|---|
US20150135607A1 true US20150135607A1 (en) | 2015-05-21 |
Family
ID=46397524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/399,847 Abandoned US20150135607A1 (en) | 2012-05-09 | 2013-05-03 | Well drilling apparatus and assembling and disassembling method |
Country Status (8)
Country | Link |
---|---|
US (1) | US20150135607A1 (en) |
EP (1) | EP2847414A2 (en) |
CN (1) | CN104520524A (en) |
BR (1) | BR112014027825A2 (en) |
CA (1) | CA2872646A1 (en) |
IT (1) | ITTO20120414A1 (en) |
RU (1) | RU2014144645A (en) |
WO (1) | WO2013168064A2 (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2015331B1 (en) * | 2015-08-21 | 2017-03-13 | Itrec Bv | Modular drilling rig system. |
WO2017034400A3 (en) * | 2015-08-21 | 2017-04-20 | Itrec B.V. | Modular drilling rig system |
WO2018204428A1 (en) * | 2017-05-02 | 2018-11-08 | Schlumberger Technology Corporation | Manipulator for a mast and substructure raising cylinder |
IT201700112182A1 (en) * | 2017-10-06 | 2019-04-06 | Drillmec Inc | MOBILE DRIVING DEVICE FOR A DRILLING SITE WITH GROUPED WELLS AND ASSEMBLY AND HANDLING METHOD. |
WO2019079899A1 (en) * | 2017-10-25 | 2019-05-02 | Caron Technologies International Inc. | Electrically-powered drilling rig and method for operating thereof |
US11042865B2 (en) | 2014-03-31 | 2021-06-22 | Truist Bank | Web page action guidance system |
US11111734B2 (en) * | 2016-11-07 | 2021-09-07 | Nabors Drilling Technologies Usa, Inc. | Side-saddle cantilever mast |
US11230855B2 (en) | 2016-06-07 | 2022-01-25 | Nabors Drilling Technologies Usa, Inc. | Side saddle slingshot drilling rig |
US11371291B2 (en) | 2018-07-19 | 2022-06-28 | Nabors Drilling Technologies Usa, Inc. | Side saddle slingshot continuous motion rig |
US11401756B2 (en) * | 2017-08-25 | 2022-08-02 | Nabors Drilling Technologies Usa, Inc. | High-capacity mast on a drilling rig |
US20220243456A1 (en) * | 2018-07-19 | 2022-08-04 | Nabors Drilling Technologies Usa, Inc. | Mast assembly for drilling rig |
US11873685B2 (en) | 2020-09-01 | 2024-01-16 | Nabors Drilling Technologies Usa, Inc. | Side saddle traversable drilling rig |
US12054993B2 (en) | 2021-03-16 | 2024-08-06 | Nabors Drilling Technologies Usa, Inc. | Side saddle rig design with retractable top drive |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014200748A1 (en) * | 2014-01-16 | 2015-07-16 | Bentec Gmbh Drilling & Oilfield Systems | Drilling rig with a rod storage area and a rod handling device and method for operating such a drilling rig |
AU2017200699B2 (en) * | 2016-02-15 | 2021-07-01 | Joy Global Surface Mining Inc | Adaptive leveling control system |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3033527A (en) * | 1954-10-05 | 1962-05-08 | Wilson John Hart | Portable rig, mast and substructure |
US3212593A (en) * | 1963-02-07 | 1965-10-19 | Bucyrus Erie Co | Pipe-handling apparatus |
US3351142A (en) * | 1964-06-11 | 1967-11-07 | Wilderman Drilling Ltd | Drilling rig |
US3747695A (en) * | 1971-04-06 | 1973-07-24 | Pyramid Derick And Equipment C | High floor pivoted mast drilling rig |
US3942593A (en) * | 1973-10-17 | 1976-03-09 | Cabot Corporation | Drill rig apparatus |
US4109800A (en) * | 1973-10-10 | 1978-08-29 | Bj-Hughes Inc. | Multi-stage well-drilling mast assembly |
US4135340A (en) * | 1977-03-08 | 1979-01-23 | Chloride Group Limited | Modular drill rig erection systems |
US4290495A (en) * | 1979-06-18 | 1981-09-22 | Hydra-Rig, Inc. | Portable workover rig with extendable mast substructure, platform mounted drawworks and adjustable wellhead anchor |
US5251709A (en) * | 1990-02-06 | 1993-10-12 | Richardson Allan S | Drilling rig |
US20030172599A1 (en) * | 2002-03-13 | 2003-09-18 | Heartland Rig International, Llc | Arrangement for self-elevating drilling rig |
US20050241823A1 (en) * | 2004-05-03 | 2005-11-03 | Beato Christopher L | Modular drill system requiring limited field assembly and limited equipment support |
US20050241857A1 (en) * | 2004-05-03 | 2005-11-03 | Beato Christopher L | Method to transport and operate a small footprint tower to reduce environmental impact |
US20120167485A1 (en) * | 2010-12-30 | 2012-07-05 | T&T Engineering Services, Inc. | Fast transportable drilling rig system |
US20130180186A1 (en) * | 2012-01-16 | 2013-07-18 | National Oilwell Varco, L.P. | Collapsible substructure for a mobile drilling rig |
US20140090333A1 (en) * | 2012-10-01 | 2014-04-03 | Woolslayer Companies, Inc. | Mast assembly with cylinder nested in substructure |
US20150008039A1 (en) * | 2012-03-06 | 2015-01-08 | Itrec B.V. | Modular drilling rig system |
US8955602B2 (en) * | 2010-11-19 | 2015-02-17 | Letourneau Technologies, Inc. | System and methods for continuous and near continuous drilling |
US20150090450A1 (en) * | 2013-09-30 | 2015-04-02 | National Oilwell Varco, L.P. | Performing simultaneous operations on multiple wellbore locations using a single mobile drilling rig |
US9091128B1 (en) * | 2011-11-18 | 2015-07-28 | T&T Engineering Services, Inc. | Drill floor mountable automated pipe racking system |
US20150240562A1 (en) * | 2012-10-04 | 2015-08-27 | Drillmec S.P.A. | Mobile drilling rig |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4221088A (en) * | 1979-01-02 | 1980-09-09 | Pre Corporation Mfg. Co. | Low lift, elevatable high floor drilling mast and substructure arrangement therefor |
US7306055B2 (en) * | 2004-03-02 | 2007-12-11 | Barnes R Michael | Automatic method for installing mobile drilling rig at a drilling site |
CN2739342Y (en) * | 2004-11-03 | 2005-11-09 | 河北建设勘察研究院有限公司钻探机械厂 | Hydrauic hoisting tower direction construction drilling tower completed with drilling machine |
WO2007022300A2 (en) * | 2005-08-16 | 2007-02-22 | Theodore Chen Vora | Rocket rig drilling apparatus |
CN101016827A (en) * | 2007-03-13 | 2007-08-15 | 陕西省核工业地质局工程机械研究所 | 18 m hydraulic pressure rise and fall retractable drill tower |
EP2025860A1 (en) * | 2007-08-17 | 2009-02-18 | BAUER Maschinen GmbH | Deep drilling device and method for erecting a deep drilling device |
-
2012
- 2012-05-09 IT IT000414A patent/ITTO20120414A1/en unknown
-
2013
- 2013-05-03 RU RU2014144645A patent/RU2014144645A/en not_active Application Discontinuation
- 2013-05-03 BR BR112014027825A patent/BR112014027825A2/en not_active IP Right Cessation
- 2013-05-03 US US14/399,847 patent/US20150135607A1/en not_active Abandoned
- 2013-05-03 EP EP13731890.3A patent/EP2847414A2/en not_active Withdrawn
- 2013-05-03 CN CN201380032082.1A patent/CN104520524A/en active Pending
- 2013-05-03 CA CA2872646A patent/CA2872646A1/en not_active Abandoned
- 2013-05-03 WO PCT/IB2013/053529 patent/WO2013168064A2/en active Application Filing
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3033527A (en) * | 1954-10-05 | 1962-05-08 | Wilson John Hart | Portable rig, mast and substructure |
US3212593A (en) * | 1963-02-07 | 1965-10-19 | Bucyrus Erie Co | Pipe-handling apparatus |
US3351142A (en) * | 1964-06-11 | 1967-11-07 | Wilderman Drilling Ltd | Drilling rig |
US3747695A (en) * | 1971-04-06 | 1973-07-24 | Pyramid Derick And Equipment C | High floor pivoted mast drilling rig |
US4109800A (en) * | 1973-10-10 | 1978-08-29 | Bj-Hughes Inc. | Multi-stage well-drilling mast assembly |
US3942593A (en) * | 1973-10-17 | 1976-03-09 | Cabot Corporation | Drill rig apparatus |
US4135340A (en) * | 1977-03-08 | 1979-01-23 | Chloride Group Limited | Modular drill rig erection systems |
US4290495A (en) * | 1979-06-18 | 1981-09-22 | Hydra-Rig, Inc. | Portable workover rig with extendable mast substructure, platform mounted drawworks and adjustable wellhead anchor |
US5251709A (en) * | 1990-02-06 | 1993-10-12 | Richardson Allan S | Drilling rig |
US20030172599A1 (en) * | 2002-03-13 | 2003-09-18 | Heartland Rig International, Llc | Arrangement for self-elevating drilling rig |
US20050241823A1 (en) * | 2004-05-03 | 2005-11-03 | Beato Christopher L | Modular drill system requiring limited field assembly and limited equipment support |
US20050241857A1 (en) * | 2004-05-03 | 2005-11-03 | Beato Christopher L | Method to transport and operate a small footprint tower to reduce environmental impact |
US8955602B2 (en) * | 2010-11-19 | 2015-02-17 | Letourneau Technologies, Inc. | System and methods for continuous and near continuous drilling |
US20120167485A1 (en) * | 2010-12-30 | 2012-07-05 | T&T Engineering Services, Inc. | Fast transportable drilling rig system |
US9027287B2 (en) * | 2010-12-30 | 2015-05-12 | T&T Engineering Services, Inc. | Fast transportable drilling rig system |
US9091128B1 (en) * | 2011-11-18 | 2015-07-28 | T&T Engineering Services, Inc. | Drill floor mountable automated pipe racking system |
US20130180186A1 (en) * | 2012-01-16 | 2013-07-18 | National Oilwell Varco, L.P. | Collapsible substructure for a mobile drilling rig |
US9091125B2 (en) * | 2012-01-16 | 2015-07-28 | National Oilwell Varco, L.P. | Collapsible substructure for a mobile drilling rig |
US20150008039A1 (en) * | 2012-03-06 | 2015-01-08 | Itrec B.V. | Modular drilling rig system |
US20150021095A1 (en) * | 2012-03-06 | 2015-01-22 | Itrec B.V. | Modular drilling rig system |
US20140090333A1 (en) * | 2012-10-01 | 2014-04-03 | Woolslayer Companies, Inc. | Mast assembly with cylinder nested in substructure |
US8720128B2 (en) * | 2012-10-01 | 2014-05-13 | Woolslayer Companies, Inc. | Mast assembly with cylinder nested in substructure |
US20150240562A1 (en) * | 2012-10-04 | 2015-08-27 | Drillmec S.P.A. | Mobile drilling rig |
US20150090450A1 (en) * | 2013-09-30 | 2015-04-02 | National Oilwell Varco, L.P. | Performing simultaneous operations on multiple wellbore locations using a single mobile drilling rig |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11887096B2 (en) | 2014-03-31 | 2024-01-30 | Truist Bank | Web page action guidance system |
US11620627B2 (en) | 2014-03-31 | 2023-04-04 | Truist Bank | Web page action guidance system |
US11443294B2 (en) | 2014-03-31 | 2022-09-13 | Truist Bank | Web page action guidance system |
US11042865B2 (en) | 2014-03-31 | 2021-06-22 | Truist Bank | Web page action guidance system |
WO2017034400A3 (en) * | 2015-08-21 | 2017-04-20 | Itrec B.V. | Modular drilling rig system |
NL2015331B1 (en) * | 2015-08-21 | 2017-03-13 | Itrec Bv | Modular drilling rig system. |
US11230855B2 (en) | 2016-06-07 | 2022-01-25 | Nabors Drilling Technologies Usa, Inc. | Side saddle slingshot drilling rig |
US11111734B2 (en) * | 2016-11-07 | 2021-09-07 | Nabors Drilling Technologies Usa, Inc. | Side-saddle cantilever mast |
WO2018204428A1 (en) * | 2017-05-02 | 2018-11-08 | Schlumberger Technology Corporation | Manipulator for a mast and substructure raising cylinder |
US10508494B2 (en) | 2017-05-02 | 2019-12-17 | Schlumberger Technology Corporation | Manipulator for a mast and substructure raising cylinder |
US20220349268A1 (en) * | 2017-08-25 | 2022-11-03 | Nabors Drilling Technologies Usa, Inc. | High-capacity mast on a drilling rig |
US11401756B2 (en) * | 2017-08-25 | 2022-08-02 | Nabors Drilling Technologies Usa, Inc. | High-capacity mast on a drilling rig |
US11933118B2 (en) * | 2017-08-25 | 2024-03-19 | Nabors Drilling Technologies Usa, Inc. | High-capacity mast on a drilling rig |
IT201700112182A1 (en) * | 2017-10-06 | 2019-04-06 | Drillmec Inc | MOBILE DRIVING DEVICE FOR A DRILLING SITE WITH GROUPED WELLS AND ASSEMBLY AND HANDLING METHOD. |
US20190106945A1 (en) * | 2017-10-06 | 2019-04-11 | Drillmec Inc. | Mobile drilling apparatus for a drilling site with cluster of wells and method of assembling and moving thereof |
US10822883B2 (en) * | 2017-10-06 | 2020-11-03 | Drillmec Inc. | Mobile drilling apparatus for a drilling site with cluster of wells and method of assembling and moving thereof |
WO2019069264A1 (en) * | 2017-10-06 | 2019-04-11 | Drillmec Inc. | Mobile drilling apparatus for a drilling site with cluster of wells and method of assembling and moving thereof |
US11136827B2 (en) | 2017-10-25 | 2021-10-05 | Caron Technologies International Inc. | Electrically-powered drilling rig and method for operating thereof |
WO2019079899A1 (en) * | 2017-10-25 | 2019-05-02 | Caron Technologies International Inc. | Electrically-powered drilling rig and method for operating thereof |
AU2018354469B2 (en) * | 2017-10-25 | 2023-01-05 | Caron Technologies International Inc. | Electrically-powered drilling rig and method for operating thereof |
US20220025708A1 (en) * | 2017-10-25 | 2022-01-27 | Caron Technologies International Inc. | Electrically-powered drilling rig and method for operating thereof |
US12152468B2 (en) * | 2017-10-25 | 2024-11-26 | Caron Technologies International Inc. | Electrically-powered drilling rig and method for operating thereof |
US11572687B2 (en) * | 2018-07-19 | 2023-02-07 | Nabors Drilling Technologies Usa, Inc. | Mast assembly for drilling rig |
US20220243456A1 (en) * | 2018-07-19 | 2022-08-04 | Nabors Drilling Technologies Usa, Inc. | Mast assembly for drilling rig |
US11371291B2 (en) | 2018-07-19 | 2022-06-28 | Nabors Drilling Technologies Usa, Inc. | Side saddle slingshot continuous motion rig |
US11873685B2 (en) | 2020-09-01 | 2024-01-16 | Nabors Drilling Technologies Usa, Inc. | Side saddle traversable drilling rig |
US12054993B2 (en) | 2021-03-16 | 2024-08-06 | Nabors Drilling Technologies Usa, Inc. | Side saddle rig design with retractable top drive |
Also Published As
Publication number | Publication date |
---|---|
CA2872646A1 (en) | 2013-11-14 |
WO2013168064A3 (en) | 2014-05-22 |
ITTO20120414A1 (en) | 2013-11-10 |
RU2014144645A (en) | 2016-07-10 |
WO2013168064A2 (en) | 2013-11-14 |
EP2847414A2 (en) | 2015-03-18 |
BR112014027825A2 (en) | 2017-06-27 |
CN104520524A (en) | 2015-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20150135607A1 (en) | Well drilling apparatus and assembling and disassembling method | |
US9334668B2 (en) | Modular drilling rig system | |
US10094136B2 (en) | Drilling rig system with self-elevating drill floor | |
US9951539B2 (en) | Modular drilling rig system and method for assembling the same | |
US10407937B2 (en) | Methods for elevating drilling rig components with a strand jack | |
JP7475345B2 (en) | Crane, crane assembly method, and crane disassembly method | |
EP2642064A1 (en) | Drilling rig | |
RU2647522C2 (en) | Mobile drilling rig | |
RU2830569C1 (en) | Hydraulic folding and rotating frame for underground installation of core drilling | |
RU2758014C2 (en) | Crane, method for assembling crane and method for disassembling crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: DRILLMEC SPA, ITALY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FERRARI, STEFANO;REEL/FRAME:035672/0069 Effective date: 20141104 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE |