US20020056265A1 - Piecing method and piecing device for the spinning machine - Google Patents

Piecing method and piecing device for the spinning machine Download PDF

Info

Publication number
US20020056265A1
US20020056265A1 US09/976,149 US97614901A US2002056265A1 US 20020056265 A1 US20020056265 A1 US 20020056265A1 US 97614901 A US97614901 A US 97614901A US 2002056265 A1 US2002056265 A1 US 2002056265A1
Authority
US
United States
Prior art keywords
sliver
piecing
air
nozzle
yarn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/976,149
Other versions
US6453656B1 (en
Inventor
Noboru Nakayama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Assigned to MURATA KIKAI KABUSHIKI KAISHA reassignment MURATA KIKAI KABUSHIKI KAISHA ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: NAKAYAMA, NOBORU
Publication of US20020056265A1 publication Critical patent/US20020056265A1/en
Application granted granted Critical
Publication of US6453656B1 publication Critical patent/US6453656B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/11Spinning by false-twisting
    • D01H1/115Spinning by false-twisting using pneumatic means
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H15/00Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing
    • D01H15/002Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing for false-twisting spinning machines
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H4/00Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
    • D01H4/02Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques imparting twist by a fluid, e.g. air vortex

Definitions

  • the present invention relates to a piecing method and a piecing device for piecing a cut spun yarn on the winding package side and the sliver of a spinning machine for drafting a sliver and then winding to a winding package after spinning by a twisting device of such as a pneumatic type.
  • FIGS. 8, 10 is a draft device, and a back roller 11 , a third roller 12 , a middle roller 13 laid across an apron belt 14 , and a front roller 15 are formed in this order from the upstream side.
  • a sliver S from a first sliver guide 16 in the upstream side of the back roller 11 is drafted in a designated drafting ration between each roller and is supplied to a twisting device 17 .
  • a second sliver guide 16 a is provided between the third roller 12 and the middle roller 13 .
  • the twisting device 17 comprises a guide hole (fiber introducing hole) 20 for guiding a fiber bundle F drafted in the draft device 10 to a guide member 18 located opposing to the tip of a hollow guide shaft member 25 to be mentioned later on, a spinning nozzle 22 with a nozzle hole 21 for generating whirling air flow in the tip (spinning point) of the hollow guide shaft member 25 to be mentioned later on projected, a nozzle block 24 for holding the spinning nozzle 22 and forming an air room 23 , the hollow guide shaft member 25 wherein the tip is provided facing the spinning nozzle 22 , and a holding member 26 for closing the air room 23 by joining to the nozzle block 24 , and which holds on the hollow guide shaft member 25 , and separates the hollow guide shaft member 25 to the spinning nozzle 22 during a yarn breakage.
  • a guide hole fiber introducing hole
  • the fiber bundle F drafted by the draft device 10 is guided along the guide member 18 from the guide hole 20 , and then enters inside the hollow guide shaft member 25 .
  • the end tip of the fiber of which is released from the nip at the front roller 15 at the time being, is whirled by the whirling flow injected from the nozzle hole 21 , is wound by reversing on the tip section of the hollow guide shaft member 25 , and is sucked in while winding to the fiber entering the hollow guide shaft member 25 , to be a spun yarn Y like a true twist of which the most part of the fiber is to be a wrapping fiber.
  • the spun yarn Y is wound to the winding package (not shown in the drawings) by passing between a delivery roller 28 and a nip roller 29 cintacting with the delivery roller 28 which compose the yarn feeding device in the downstream side of the twisting device 17 .
  • an air shower tube 32 for blowing pressurized air to the sliver S during piecing, and a suction pipe 34 for holding the spun yarn at the winding package side and sucking the fiber blew off by the pressurized air from the air shower tube 32 are provided.
  • the driving (compressed air injection from the nozzle hole 21 ) of the twisting device 17 is stopped while the hollow guide shaft member 25 is transferred to a state in which separated from the nozzle block 24 .
  • the nip roller 29 is separated from the delivery roller 28 and the yarn feeding is stopped.
  • the spun yarn Y at the winding package side is held by a yarn feeding roller 30 which composes the yarn delivering member, and is fed back to the yarn discharging side of the twisting device 17 by being passed through the nip roller 29 and the delivery roller 28 .
  • the spun yarn Y is fed toward the draft device 10 , and in cooperation with the air flow (not shown in the drawings) toward the fiber bundle inlet of the guide hole 20 , as a leading yarn Y (parent yarn), is passed through the opposite direction of the spinning direction inside the hollow guide shaft member 25 .
  • the yarn tip of the leading yarn Y projects from the guide hole 20 of the spinning nozzle 22 in cooperation with the air flow toward the fiber bundle inlet mentioned above, and the yarn tip of the leading yarn Y is to be held by being sucked by the suction pipe 34 provided between the spinning nozzle 22 and the front roller 15 . Then, as shown in FIG. 10, the holding member 26 is joined with the nozzle block 24 again.
  • the yarn feeding roller 30 is released from the yarn path, and starts running in the winding direction of the leading yarn Y by the nip roller 29 and the delivery roller 28 .
  • the fiber composing the sliver S is wound around the outer periphery of the leading yarn Y, the piecing is carried out and the spinning is recommenced.
  • the fiber amount of the sliver S of which is to enter the guide hole 20 of the spinning nozzle 22 for piecing is the normal fiber amount, in other words, the fiber amount same as the leading yarn Y
  • the joint thickness is to be theoretically 2 times that of the leading yarn Y in the cross section, and in diameter, 1.4 times.
  • the object of the present invention is to solve the problems mentioned above, and to provide a piecing method and a piecing device of a spinning machine capable of blowing off the sliver effectively during piecing and controlling the joint thickness.
  • the present invention to reach the object mentioned above, relates to a piecing method for blowing pressurized air to a sliver and sucking and guiding by a suction pipe provided between a twisting device and a draft device to carry out piecing to a leading yarn fed back to the twisting device and the sliver from the draft device, wherein the pressurized air is made to be blown opposing toward the sliver from the periphery of a spinning nozzle of the twisting device.
  • the pressurized air can be blown from a position close to the sliver, and since there are no obstacles for the blowing, the sliver can be blown off efficiently.
  • the pressurized air can be set to be weaker than the suction force of the spinning nozzle of the twisting device during piecing, and the joint thickness by the piecing can be controlled to be a desired thickness by selecting the blowing time of the pressurized air.
  • the joint thickness can be controlled by blowing off and eliminating a part of the fiber of the sliver to enter the guide hole of the spinning nozzle.
  • the present invention relates to a piecing method for blowing pressurized air to a sliver and sucking and guiding by a suction pipe provided between a twisting device and a draft device to carry out piecing to a leading yarn fed back to the twisting device and the sliver from the draft device, wherein an air nozzle for blowing pressurized air opposing to the sliver delivered from the draft device is provided around a spinning nozzle of the twisting device.
  • FIG. 1 is an expanded sectional view showing a spinning nozzle and an air nozzle of a piecing device according to an embodiment of the present invention.
  • FIG. 2 is a front view of the spinning nozzle and the air nozzle of the piecing device according to an embodiment of the present invention.
  • FIG. 3 is a diagram showing the entire spinning machine according to an embodiment of the present invention.
  • FIG. 4 is a time chart showing the driving timing of each device during piecing.
  • FIG. 5 is a diagram showing the relationship between the stop timing of the air nozzle and the joint thickness.
  • FIG. 6 is a diagram showing the relationship between the length of the pipe from a valve to the air nozzle and the port number of the valve, and the decrease in the pressure of the air after the stopping of the air nozzle.
  • FIG. 7 is a diagram showing another embodiment of the air nozzle.
  • FIG. 8 is a diagram showing the whole structure of the conventional spinning machine.
  • FIG. 9 is a diagram showing the conventional piecing device and the method of the same.
  • FIG. 10 is a diagram showing the conventional piecing device and the method of the same.
  • the main point of the present invention is that an air nozzle 40 for injecting compressed air to the sliver S during piecing and for sucking and eliminating to the suction pipe 34 is provided around the tip section of the spinning nozzle 22 of the twisting device 17 .
  • the air nozzle 40 As shown in FIG. 1 and FIG. 2, the air nozzle 40 according to the embodiment of the present invention is formed in a circular form along the entire periphery of the periclinal of the spinning nozzle 22 .
  • an air passage way 41 connected to a compressed air supplying means of which is not shown in the drawings, and an air stocking unit 42 for storing the pressurized air supplied to the air passage way 41 temporarily are connected to the air nozzle 40 .
  • the air stocking unit 42 is formed in a circular form along the entire periphery of the periclinal of the spinning nozzle 22 , in the same manner as the air nozzle 40 .
  • the pressurized air supplied into the air passage way 41 from the compressed air supplying means is stocked in the air stocking unit 42 temporarily, and then injected from the air nozzle 40 as to oppose toward the sliver S delivered from the front roller 15 of a draft device 10 .
  • the air nozzle 40 is capable of blowing pressurized air from a position more close to the sliver S.
  • the basic piecing operation is the same as the conventional piecing operation.
  • the back roller 11 and the third roller 12 which are part of the draft rollers composing the draft device 10 are stopped while the middle roller 13 and the front roller 15 of which are located in the downstream side are kept at a driving state.
  • the yarn delivery by the delivery roller 28 and the nip roller 29 are also maintained at a driving state for a while.
  • the sliver S is pulled off from the middle roller 13 which is driving, and stops under the condition in which the tip section of the sliver S is located between the third roller 12 and the middle roller 13 .
  • the tip section of the sliver S is held by the second sliver guide 16 a.
  • the driving (compressed air injection from the nozzle hole 21 ) of the twisting device 17 stops following the stopping of part of the draft rollers of the draft device 10 . Then, the hollow guide shaft member 25 is transferred to a state in which separated from the nozzle block 24 . Under such state, preceding the piecing operation, the nip roller 29 is separated from the delivery roller 28 and the yarn delivery is stopped. Then, the spun yarn Y of the winding package P side is held by the yarn feeding roller 30 which composes a yarn delivering member, and is back fed to the yarn discharging side of the twisting device 17 while passed through the nip roller 29 and the delivery roller 28 .
  • the spun yarn Y is then fed toward the draft device 10 by the rotation of the yarn feeding roller 30 , and in cooperation with the air flow (not shown in the drawings) toward the fiber bundle inlet of the guide hole 20 , as a leading yarn, is inserted to the opposite direction of the spinning direction inside the hollow guide shaft member 25 .
  • the yarn end of the leading yarn projects from the guide hole 20 of the spinning nozzle 22 in cooperation with the air flow toward the fiber bundle inlet, and the yarn tip of the leading yarn is sucked by the suction pipe 34 provided between the nozzle 22 and the front roller 15 and is held. Then, the holding member 26 is fit into the nozzle block 24 again and the piecing preparation completes.
  • the draft rollers (back roller 11 and third roller 12 ) which were stopped are redriven, and the sliver S is passed through the middle roller 13 and the front roller 15 and is delivered to the downstream side.
  • the pressurized air is blew out from the air nozzle 40 provided around the spinning nozzle 22 to oppose toward the sliver S fed from the draft device 10 , the tip section of the sliver S is blew off, sucked and eliminated by the suction pipe 34 . As a result the fiber is prevented from getting clogged in the guide hole 20 .
  • FIG. 4 is a time chart showing the driving timing of the draft rollers (back roller 11 and third roller 12 ), the twisting device 17 (compressed air injection from the nozzle hole 21 ), the air nozzle 40 and the nip roller 29 , after the piecing preparation is completed by holding the yarn tip of the leading yarn by the suction pipe 34 .
  • the driving timing of each device will be described.
  • the draft rollers 11 , 12 are put “ON” at time Ta, and the sliver S is delivered to the downstream side through the middle roller 13 and the front roller 15 .
  • the air nozzle 40 is still put “ON”.
  • the twisting device 17 is put “ON” and the piecing is carried out.
  • the air nozzle 40 is put “OFF”, and the air inside the air stocking unit 42 is injected gradually from the air nozzle 40 .
  • the injection of the compressed air from the air nozzle 40 is stopped completely.
  • the joint thickness by the piecing can be controlled to be a desired value.
  • the joint thickness can be controlled.
  • the pressurized air from the air nozzle 40 was set to be weaker than the suction force of the spinning nozzle 22 , since when the pressurized air is stronger than the suction force of the spinning nozzle 22 , all of the fiber of the sliver S fed from the draft device 10 is blown off without entering the guide hole 20 .
  • the horizontal line shows the timing for stopping the air nozzle, and the stop timing slows down by going to the right, and shows that the blowing time is long.
  • the vertical line shows the joint thickness, and 1 shows that the thickness is the same as the leading yarn Y.
  • the stop timing of the air nozzle 40 is fast, and since the blowing of the pressurized air stops before the sliver S reaches the spinning nozzle 22 , the fiber of the sliver S is not blew off at all. Therefore, the amount of fiber of the sliver S entering the spinning nozzle 22 , is to be the normal fiber amount (same yarn amount as leading yarn Y), and the diameter of the joint thickness is to be theoretically 1.4 times that of the leading yarn Y, as in the same manner as the conventional technology.
  • Point (d) shows that the joint thickness gets to the ideal thickness which is almost the same as the thickness of the leading yarn Y.
  • the stop timing of the air nozzle 40 at point (d) is the same as the timing in which the tip section of the leading yarn Y enters the guide hole 20 of the spinning nozzle 22 .
  • the joint thickness can be neared with the thickness of the leading yarn Y, and the quality of the spun yarn as a product can be improved by preventing the generation of yarn defects.
  • the length of the pipe between the valve (not shown in the drawings) of the air compressing means and the air nozzle 40 can be lengthened, or the port number of the valve can be decreased.
  • point P indicates the stop timing of the air nozzle 40
  • line 1 indicates the state in which the pipe length is 20 cm and the port number of the valve is 3
  • line 2 indicates the state in which the pipe length is 20 cm and the port number of the valve is 2
  • line 3 indicates the state in which the pipe length is 220 cm and the port number of the valve is 3
  • line 4 indicates the state in which the pipe length is 220 cm and the port number of the valve is 2.
  • the air stocking unit 42 shown in FIG. 1 and FIG. 2 is provided to soften the decrease in the pressure of the pressurized air. Therefore, the present invention is not to be limited to the embodiments illustrated in the drawings and the air stocking unit 42 is not required to be provided.
  • the air nozzle 40 is to be provided in a circular form along the entire periphery of the spinning nozzle 22 , however, the present invention is not to be limited to this point, and for example, as shown in FIG. 7, a plurality of air nozzles 40 ′ can be provided around the spinning nozzle 22 .
  • the pressurized air can be blown to the sliver efficiently and reliably, the sliver can be blown off completely, and the generation of yarn defects can be prevented.
  • the joint thickness can be neared to that of the thickness of the leading yarn.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

The object of the present invention is to provide a piecing method and a piecing device of a spinning machine capable of blowing off the sliver effectively during piecing and controlling the joint thickness. According to a means for sucking by guiding to the suction pipe 34 provided between the twisting device 17 and the draft device 10 by blowing pressurized air to the sliver S as to carry out piecing of the leading yarn Y fed back to the twisting device 17 and the sliver S from the draft device 10, the pressurized air is blew opposing toward the sliver S from the periphery of the spinning nozzle 22 of the twisting device 17.

Description

    FIELD OF THE INVENTION
  • The present invention relates to a piecing method and a piecing device for piecing a cut spun yarn on the winding package side and the sliver of a spinning machine for drafting a sliver and then winding to a winding package after spinning by a twisting device of such as a pneumatic type. [0001]
  • BACKGROUND OF THE INVENTION
  • First, the structure of the relevant part of the spinning machine will be described with reference to FIG. 8. [0002]
  • Referring to FIGS. 8, 10 is a draft device, and a [0003] back roller 11, a third roller 12, a middle roller 13 laid across an apron belt 14, and a front roller 15 are formed in this order from the upstream side. A sliver S from a first sliver guide 16 in the upstream side of the back roller 11 is drafted in a designated drafting ration between each roller and is supplied to a twisting device 17. A second sliver guide 16 a is provided between the third roller 12 and the middle roller 13.
  • The [0004] twisting device 17 comprises a guide hole (fiber introducing hole) 20 for guiding a fiber bundle F drafted in the draft device 10 to a guide member 18 located opposing to the tip of a hollow guide shaft member 25 to be mentioned later on, a spinning nozzle 22 with a nozzle hole 21 for generating whirling air flow in the tip (spinning point) of the hollow guide shaft member 25 to be mentioned later on projected, a nozzle block 24 for holding the spinning nozzle 22 and forming an air room 23, the hollow guide shaft member 25 wherein the tip is provided facing the spinning nozzle 22, and a holding member 26 for closing the air room 23 by joining to the nozzle block 24, and which holds on the hollow guide shaft member 25, and separates the hollow guide shaft member 25 to the spinning nozzle 22 during a yarn breakage.
  • The fiber bundle F drafted by the [0005] draft device 10 is guided along the guide member 18 from the guide hole 20, and then enters inside the hollow guide shaft member 25. The end tip of the fiber of which is released from the nip at the front roller 15 at the time being, is whirled by the whirling flow injected from the nozzle hole 21, is wound by reversing on the tip section of the hollow guide shaft member 25, and is sucked in while winding to the fiber entering the hollow guide shaft member 25, to be a spun yarn Y like a true twist of which the most part of the fiber is to be a wrapping fiber. Moreover, the spun yarn Y is wound to the winding package (not shown in the drawings) by passing between a delivery roller 28 and a nip roller 29 cintacting with the delivery roller 28 which compose the yarn feeding device in the downstream side of the twisting device 17.
  • Between the [0006] draft device 10 and the twisting device 17, an air shower tube 32 for blowing pressurized air to the sliver S during piecing, and a suction pipe 34 for holding the spun yarn at the winding package side and sucking the fiber blew off by the pressurized air from the air shower tube 32, are provided.
  • Next, the conventional piecing operation after the yarn breakage will be described in reference to FIG. 9 through FIG. 10. [0007]
  • When yarn breakage occurs, the [0008] back roller 11 and the third roller 12 which are a part of the draft rollers composing the draft device 10 are stopped, and the middle roller 13 and the front roller 15 which is in the downstream side are maintained at driving state. At the time being, the yarn feeding by the delivery roller 28 and the nip roller 29 are also maintained at a driving state for a while. As a result, as shown in FIG. 9, the sliver S is broken by the driving middle roller 13, and the sliver S stops with the tip section Sa positioned between the third roller 12 and the middle roller 13. At this time, the tip section Sa of the sliver S is held by the second sliver guide 16 a.
  • Following the stopping of a part of the draft rollers of the [0009] draft device 10, the driving (compressed air injection from the nozzle hole 21) of the twisting device 17 is stopped while the hollow guide shaft member 25 is transferred to a state in which separated from the nozzle block 24. Under such condition, preceding the piecing operation, the nip roller 29 is separated from the delivery roller 28 and the yarn feeding is stopped. Subsequently, the spun yarn Y at the winding package side is held by a yarn feeding roller 30 which composes the yarn delivering member, and is fed back to the yarn discharging side of the twisting device 17 by being passed through the nip roller 29 and the delivery roller 28. Then, by the rotation of the yarn feeding roller 30, the spun yarn Y is fed toward the draft device 10, and in cooperation with the air flow (not shown in the drawings) toward the fiber bundle inlet of the guide hole 20, as a leading yarn Y (parent yarn), is passed through the opposite direction of the spinning direction inside the hollow guide shaft member 25.
  • Furthermore, by rotating the [0010] yarn feeding roller 30, the yarn tip of the leading yarn Y, projects from the guide hole 20 of the spinning nozzle 22 in cooperation with the air flow toward the fiber bundle inlet mentioned above, and the yarn tip of the leading yarn Y is to be held by being sucked by the suction pipe 34 provided between the spinning nozzle 22 and the front roller 15. Then, as shown in FIG. 10, the holding member 26 is joined with the nozzle block 24 again.
  • Then, the draft rollers ([0011] back roller 11 and third roller 12) which were stopped are redriven, the sliver S is passed through the middle roller 13 and the front roller 15 and is delivered to the downstream side. At the time being, the tip section of the sliver S is blew off by the pressurized air from the air shower tube 32 and is sucked and eliminated by the suction pipe 34 so that the guide hole 20 of the spinning nozzle 22 is not blocked.
  • Under the state in which the leading yarn (spun yarn) Y is held as in the manner stated above, the [0012] yarn feeding roller 30 is released from the yarn path, and starts running in the winding direction of the leading yarn Y by the nip roller 29 and the delivery roller 28. After redriving the injection of the whirling air flow from the nozzle hole 21, by stopping the injection of the pressurized air from the air shower tube 32, the fiber composing the sliver S is wound around the outer periphery of the leading yarn Y, the piecing is carried out and the spinning is recommenced.
  • However, there were problems in the piecing method and the piecing device of aforementioned conventional spinning machine as to be described in the following. [0013]
  • That is, since the distance between the [0014] air shower tube 32 and the sliver S is long, and the pressurized air hits the front roller 15 of the draft device 10, it was inefficient and there were cases in which the joint is bunched up together without the fiber of which the fiber length is long and unlikely to be blown off being eliminated completely.
  • Moreover, after stopping the injection of the pressurized air from the [0015] air shower tube 32, since the fiber amount of the sliver S of which is to enter the guide hole 20 of the spinning nozzle 22 for piecing, is the normal fiber amount, in other words, the fiber amount same as the leading yarn Y, the joint thickness is to be theoretically 2 times that of the leading yarn Y in the cross section, and in diameter, 1.4 times.
  • These were to be yarn defects, and there was a problem in that the quality of the spun yarn as a product decreases. [0016]
  • The object of the present invention is to solve the problems mentioned above, and to provide a piecing method and a piecing device of a spinning machine capable of blowing off the sliver effectively during piecing and controlling the joint thickness. [0017]
  • SUMMARY OF THE INVENTION
  • The present invention to reach the object mentioned above, relates to a piecing method for blowing pressurized air to a sliver and sucking and guiding by a suction pipe provided between a twisting device and a draft device to carry out piecing to a leading yarn fed back to the twisting device and the sliver from the draft device, wherein the pressurized air is made to be blown opposing toward the sliver from the periphery of a spinning nozzle of the twisting device. [0018]
  • If constructed likewise, the pressurized air can be blown from a position close to the sliver, and since there are no obstacles for the blowing, the sliver can be blown off efficiently. [0019]
  • Moreover, the pressurized air can be set to be weaker than the suction force of the spinning nozzle of the twisting device during piecing, and the joint thickness by the piecing can be controlled to be a desired thickness by selecting the blowing time of the pressurized air. [0020]
  • Accordingly, the joint thickness can be controlled by blowing off and eliminating a part of the fiber of the sliver to enter the guide hole of the spinning nozzle. [0021]
  • Moreover, the present invention relates to a piecing method for blowing pressurized air to a sliver and sucking and guiding by a suction pipe provided between a twisting device and a draft device to carry out piecing to a leading yarn fed back to the twisting device and the sliver from the draft device, wherein an air nozzle for blowing pressurized air opposing to the sliver delivered from the draft device is provided around a spinning nozzle of the twisting device.[0022]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is an expanded sectional view showing a spinning nozzle and an air nozzle of a piecing device according to an embodiment of the present invention. [0023]
  • FIG. 2 is a front view of the spinning nozzle and the air nozzle of the piecing device according to an embodiment of the present invention. [0024]
  • FIG. 3 is a diagram showing the entire spinning machine according to an embodiment of the present invention. [0025]
  • FIG. 4 is a time chart showing the driving timing of each device during piecing. [0026]
  • FIG. 5 is a diagram showing the relationship between the stop timing of the air nozzle and the joint thickness. [0027]
  • FIG. 6 is a diagram showing the relationship between the length of the pipe from a valve to the air nozzle and the port number of the valve, and the decrease in the pressure of the air after the stopping of the air nozzle. [0028]
  • FIG. 7 is a diagram showing another embodiment of the air nozzle. [0029]
  • FIG. 8 is a diagram showing the whole structure of the conventional spinning machine. [0030]
  • FIG. 9 is a diagram showing the conventional piecing device and the method of the same. [0031]
  • FIG. 10 is a diagram showing the conventional piecing device and the method of the same.[0032]
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • A preferred embodiment according to the present invention will now be described in reference to the accompanying drawings. [0033]
  • The entire structure of the spinning machine according to an embodiment of the present invention is the same as the spinning machine illustrated in FIG. 8. Therefore, for the same members, the same reference numbers will be used and the description will be abbreviated. [0034]
  • The main point of the present invention is that an [0035] air nozzle 40 for injecting compressed air to the sliver S during piecing and for sucking and eliminating to the suction pipe 34 is provided around the tip section of the spinning nozzle 22 of the twisting device 17.
  • As shown in FIG. 1 and FIG. 2, the [0036] air nozzle 40 according to the embodiment of the present invention is formed in a circular form along the entire periphery of the periclinal of the spinning nozzle 22. In addition, an air passage way 41 connected to a compressed air supplying means of which is not shown in the drawings, and an air stocking unit 42 for storing the pressurized air supplied to the air passage way 41 temporarily are connected to the air nozzle 40. The air stocking unit 42 is formed in a circular form along the entire periphery of the periclinal of the spinning nozzle 22, in the same manner as the air nozzle 40.
  • The pressurized air supplied into the [0037] air passage way 41 from the compressed air supplying means is stocked in the air stocking unit 42 temporarily, and then injected from the air nozzle 40 as to oppose toward the sliver S delivered from the front roller 15 of a draft device 10.
  • As it is evident from the drawings, there are no obstacles between the [0038] air nozzle 40 and the sliver S which is delivered from the draft device 10, and the pressurized air from the air nozzle 40 can be blown reliably to the sliver S. Moreover, comparing to the conventional air shower 32 illustrated in FIG. 8, the air nozzle 40 is capable of blowing pressurized air from a position more close to the sliver S.
  • The piecing operation after the yarn breakage in the spinning machine according to the embodiment of present invention provided with [0039] such air nozzle 40 will now be described.
  • The basic piecing operation is the same as the conventional piecing operation. When a yarn breakage occurs, first, the [0040] back roller 11 and the third roller 12 which are part of the draft rollers composing the draft device 10 are stopped while the middle roller 13 and the front roller 15 of which are located in the downstream side are kept at a driving state. At the time being, the yarn delivery by the delivery roller 28 and the nip roller 29 are also maintained at a driving state for a while. As a result, the sliver S is pulled off from the middle roller 13 which is driving, and stops under the condition in which the tip section of the sliver S is located between the third roller 12 and the middle roller 13. At the time being, the tip section of the sliver S is held by the second sliver guide 16 a.
  • The driving (compressed air injection from the nozzle hole [0041] 21) of the twisting device 17 stops following the stopping of part of the draft rollers of the draft device 10. Then, the hollow guide shaft member 25 is transferred to a state in which separated from the nozzle block 24. Under such state, preceding the piecing operation, the nip roller 29 is separated from the delivery roller 28 and the yarn delivery is stopped. Then, the spun yarn Y of the winding package P side is held by the yarn feeding roller 30 which composes a yarn delivering member, and is back fed to the yarn discharging side of the twisting device 17 while passed through the nip roller 29 and the delivery roller 28. The spun yarn Y is then fed toward the draft device 10 by the rotation of the yarn feeding roller 30, and in cooperation with the air flow (not shown in the drawings) toward the fiber bundle inlet of the guide hole 20, as a leading yarn, is inserted to the opposite direction of the spinning direction inside the hollow guide shaft member 25.
  • Furthermore, by rotating the [0042] yarn feeding roller 30, the yarn end of the leading yarn projects from the guide hole 20 of the spinning nozzle 22 in cooperation with the air flow toward the fiber bundle inlet, and the yarn tip of the leading yarn is sucked by the suction pipe 34 provided between the nozzle 22 and the front roller 15 and is held. Then, the holding member 26 is fit into the nozzle block 24 again and the piecing preparation completes.
  • Then, the draft rollers (back [0043] roller 11 and third roller 12) which were stopped are redriven, and the sliver S is passed through the middle roller 13 and the front roller 15 and is delivered to the downstream side. At the time being, the pressurized air is blew out from the air nozzle 40 provided around the spinning nozzle 22 to oppose toward the sliver S fed from the draft device 10, the tip section of the sliver S is blew off, sucked and eliminated by the suction pipe 34. As a result the fiber is prevented from getting clogged in the guide hole 20.
  • Under such state in that the leading yarn (spun yarn) Y is held, the [0044] yarn feeding roller 30 is released from the yarn path, and the running in the winding direction of the leading yarn Y by the nip roller 29 and the delivery roller 28 are started, and after the injection of the whirling air flow from the nozzle hole 21 is redriven, by stopping the injection of the pressurized air from the air nozzle 40, the fiber composing the sliver S is wound around the leading yarn Y and the piecing is carried out, and the spinning is restarted.
  • FIG. 4 is a time chart showing the driving timing of the draft rollers (back [0045] roller 11 and third roller 12), the twisting device 17 (compressed air injection from the nozzle hole 21), the air nozzle 40 and the nip roller 29, after the piecing preparation is completed by holding the yarn tip of the leading yarn by the suction pipe 34. Referring to FIG. 4, the driving timing of each device will be described.
  • First, when the yarn tip of the leading yarn is held by the [0046] suction pipe 34, the air nozzle 40 is put “ON”, and the pressurized air is blew to the sliver S and it is blew off. As a result, the fiber is prevented from being clogged in the guide hole 20 of the spinning nozzle 22. At the time being, the draft rollers 11,12, the twisting device 17 and the nip roller 29 are put “OFF”, and are stopped.
  • Then, the [0047] draft rollers 11,12 are put “ON” at time Ta, and the sliver S is delivered to the downstream side through the middle roller 13 and the front roller 15. At the time being, the air nozzle 40 is still put “ON”.
  • Next, at time Tb somewhat late from time Ta, the time the [0048] draft rollers 11,12 are put “ON”, the nip roller 29 is put “ON” and the running of the leading yarn Y in the winding direction by the nip roller 29 and the delivery roller 28 is started.
  • Then, at time Tc, the twisting [0049] device 17 is put “ON” and the piecing is carried out. Lastly, at time Td, the air nozzle 40 is put “OFF”, and the air inside the air stocking unit 42 is injected gradually from the air nozzle 40. At time Te, the injection of the compressed air from the air nozzle 40 is stopped completely.
  • According to the embodiment of the present invention, since the pressurized air is injected to oppose the sliver S which is delivered by the [0050] draft device 10 from the periphery of the spinning nozzle 22, there are no obstacles and the operation efficiency is high.
  • Moreover, comparing to the conventional device, since the pressurized air is injected from a position more close to the sliver S, the sliver S can be blew off efficiently, and the fiber of which is less prone to be blew off, such as long fiber, can also be blew off reliably. [0051]
  • Furthermore, according to the present invention, by setting the pressurized air from the [0052] air nozzle 40 to be weaker than the suction force of the spinning nozzle 22 of the twisting device 17 during piecing, and selecting the blowing time of the pressurized air, the joint thickness by the piecing can be controlled to be a desired value.
  • In other words, by blowing pressurized air from the [0053] air nozzle 40 to the sliver S which is to be inserted into the guide hole 20 of the spinning nozzle 22 from the draft device 10, and blowing off and eliminating a part of the fiber composing the sliver S, the joint thickness can be controlled. The pressurized air from the air nozzle 40 was set to be weaker than the suction force of the spinning nozzle 22, since when the pressurized air is stronger than the suction force of the spinning nozzle 22, all of the fiber of the sliver S fed from the draft device 10 is blew off without entering the guide hole 20.
  • Next, referring to FIG. 5, the relationship between the stop timing of the air nozzle and the joint thickness will be described. [0054]
  • In the figure, the horizontal line shows the timing for stopping the air nozzle, and the stop timing slows down by going to the right, and shows that the blowing time is long. The vertical line shows the joint thickness, and [0055] 1 shows that the thickness is the same as the leading yarn Y.
  • First, from point (a) to point (b), the stop timing of the [0056] air nozzle 40 is fast, and since the blowing of the pressurized air stops before the sliver S reaches the spinning nozzle 22, the fiber of the sliver S is not blew off at all. Therefore, the amount of fiber of the sliver S entering the spinning nozzle 22, is to be the normal fiber amount (same yarn amount as leading yarn Y), and the diameter of the joint thickness is to be theoretically 1.4 times that of the leading yarn Y, as in the same manner as the conventional technology.
  • Then, as the stop timing of the [0057] air nozzle 40 slows down than point (b), the joint thickness gradually gets thin since the fiber amount decreases by a part of the fiber of the tip section of the sliver S being blew off by the pressurized air.
  • Point (d) shows that the joint thickness gets to the ideal thickness which is almost the same as the thickness of the leading yarn Y. The stop timing of the [0058] air nozzle 40 at point (d) is the same as the timing in which the tip section of the leading yarn Y enters the guide hole 20 of the spinning nozzle 22.
  • From point (d) to point (c), the stop timing of the [0059] air nozzle 40 is slow, and the joint thickness from the end section of the leading yarn Y to the back section is to be thinner than the thickness of the leading yarn Y.
  • Furthermore, when the stop timing of the [0060] air nozzle 40 slows down and passes over point (e), the piecing cannot be carried out.
  • Considering various conditions such as the transferring speed of the leading yarn Y and the sliver S, by setting the stop timing of the [0061] air nozzle 40 at point (d), the joint thickness can be neared with the thickness of the leading yarn Y, and the quality of the spun yarn as a product can be improved by preventing the generation of yarn defects.
  • By lengthening the time between the stopping of the [0062] air nozzle 40 to the complete stopping of the blowing of the pressurized air, in other words, by softening the decrease in the pressure of the air, the tendency between point (b) through point (c) of FIG. 5 can be softened. The softening in the tendency of point (b) through point (c) has effect in that the setting of the stop timing of the air nozzle 40 is facilitated.
  • For softening the decrease in the pressure of the pressurized air, for example, the length of the pipe between the valve (not shown in the drawings) of the air compressing means and the [0063] air nozzle 40 can be lengthened, or the port number of the valve can be decreased.
  • Referring to FIG. 6, the relationship between the length of the pipe between the valve (not shown in the drawings) of the air compressing means and the [0064] air nozzle 40, and the port number of the valve, and the decrease in the pressure of the air after the stopping of the air nozzle 40 will be described.
  • In the figure, point P indicates the stop timing of the [0065] air nozzle 40, line 1 indicates the state in which the pipe length is 20 cm and the port number of the valve is 3, line 2 indicates the state in which the pipe length is 20 cm and the port number of the valve is 2, line 3 indicates the state in which the pipe length is 220 cm and the port number of the valve is 3, and line 4 indicates the state in which the pipe length is 220 cm and the port number of the valve is 2.
  • As it is evident from the figure, when lengthening the pipe length, the decrease in the pressure of the pressurized air softens since the pipe serves as a tank and suppresses the decrease in the pressure. Moreover, by decreasing the port number of the valve, the decrease in the pressure of the pressurized air softens since when the port number of the valve is large, the pressurized air leaks from the port and the decrease in the pressure becomes intense. Thus, by decreasing the port number of the valve, the pressurized air leaking from the port can be prevented. [0066]
  • The [0067] air stocking unit 42 shown in FIG. 1 and FIG. 2 is provided to soften the decrease in the pressure of the pressurized air. Therefore, the present invention is not to be limited to the embodiments illustrated in the drawings and the air stocking unit 42 is not required to be provided.
  • Moreover, referring to FIG. 1 and FIG. 2, it was described that the [0068] air nozzle 40 is to be provided in a circular form along the entire periphery of the spinning nozzle 22, however, the present invention is not to be limited to this point, and for example, as shown in FIG. 7, a plurality of air nozzles 40′ can be provided around the spinning nozzle 22.
  • According to the present invention described above, following beneficial effects can be expected. [0069]
  • Since the pressurized air can be blown to the sliver efficiently and reliably, the sliver can be blown off completely, and the generation of yarn defects can be prevented. [0070]
  • By controlling the joint thickness, the joint thickness can be neared to that of the thickness of the leading yarn. [0071]
  • Since the distance from the air nozzle to the sliver is close, the pressure control of the pressurized air blew is easy. [0072]

Claims (3)

1. A piecing method of a spinning machine for blowing pressurized air to a sliver and sucking and guiding by a suction pipe provided between a twisting device and a draft device to carry out piecing to a leading yarn fed back to the twisting device and the sliver from the draft device;
wherein the pressurized air is blew opposing toward the sliver from the periphery of a spinning nozzle of the twisting device.
2. A piecing method of a spinning machine according to claim 1 wherein the pressurized air is set to be weaker than the suction force of the spinning nozzle of the twisting device during piecing, and the joint thickness by the piecing is controlled to be a desired value by selecting the blowing time of the pressurized air.
3. A piecing device of a spinning machine for blowing pressurized air to the sliver and sucking and guiding by the suction pipe provided between the twisting device and the draft device to carry out piecing to a leading yarn fed back to the twisting device and the sliver from the draft device;
wherein an air nozzle for blowing pressurized air opposing to the sliver delivered from the draft device is provided around the spinning nozzle of the twisting device.
US09/976,149 2000-11-15 2001-10-15 Piecing method and piecing device for the spinning machine Expired - Fee Related US6453656B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2000348620A JP2002155435A (en) 2000-11-15 2000-11-15 Piecing method and apparatus therefor in spinning machine
JP2000-348620 2000-11-15

Publications (2)

Publication Number Publication Date
US20020056265A1 true US20020056265A1 (en) 2002-05-16
US6453656B1 US6453656B1 (en) 2002-09-24

Family

ID=18822174

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/976,149 Expired - Fee Related US6453656B1 (en) 2000-11-15 2001-10-15 Piecing method and piecing device for the spinning machine

Country Status (5)

Country Link
US (1) US6453656B1 (en)
EP (1) EP1207224B1 (en)
JP (1) JP2002155435A (en)
CN (1) CN1353218A (en)
DE (1) DE60103721T2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586672A (en) * 2015-12-03 2016-05-18 江南大学 Method for reducing twist deterrent effect of yarn guide hook
US20200181810A1 (en) * 2016-07-14 2020-06-11 Maschinenfabrik Rieter Ag Method for Processing a Strand-Shaped Fiber Sliver, and Roving Frame Machine

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10256344A1 (en) * 2002-11-22 2004-06-03 Wilhelm Stahlecker Gmbh Air-jet spinning device
EP1564317A1 (en) * 2004-02-10 2005-08-17 Maschinenfabrik Rieter Ag Method for obtaining a pieced yarn lenght having constant mass in a vortex Spinning procedure
DE102007009074A1 (en) * 2007-02-24 2008-08-28 Oerlikon Textile Gmbh & Co. Kg spinning device
JP2013067885A (en) * 2011-09-21 2013-04-18 Murata Mach Ltd Air spinning device, spinning unit, spinning machine and air spinning method
DE102012101039A1 (en) * 2012-02-09 2013-08-14 Maschinenfabrik Rieter Ag Air-jet spinning machine with separate spinning and piecing nozzles
DE102012108380A1 (en) * 2012-06-19 2013-12-19 Maschinenfabrik Rieter Ag Air-jet spinning machine and method of operating the same
JP2015224398A (en) * 2014-05-26 2015-12-14 村田機械株式会社 Spinning machine and spinning method
JP2015224397A (en) * 2014-05-26 2015-12-14 村田機械株式会社 Spinning machine and spinning method
CH709953A1 (en) * 2014-07-30 2016-02-15 Rieter Ag Maschf Method for operating an air spinning machine.
JP2017071865A (en) * 2015-10-06 2017-04-13 村田機械株式会社 Spinning machine

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07122167B2 (en) * 1992-03-16 1995-12-25 村田機械株式会社 Yarn splicing method for spinning device
JP2616428B2 (en) * 1994-01-25 1997-06-04 村田機械株式会社 Splicing method of spinning machine
JP2708001B2 (en) * 1995-02-10 1998-02-04 村田機械株式会社 Splicing device for spinning machine
KR100296977B1 (en) * 1996-01-30 2001-11-22 무라타 기카이 가부시키가이샤 Fishing method of spinning machine
JP2921479B2 (en) 1996-01-30 1999-07-19 村田機械株式会社 Spinning machine piecing method
TW341605B (en) * 1996-05-16 1998-10-01 Murada Kikai Kk Piecing method for a spinning machine
JP2930010B2 (en) * 1996-05-16 1999-08-03 村田機械株式会社 Spinning machine piecing method and apparatus
JP2973961B2 (en) * 1997-01-13 1999-11-08 村田機械株式会社 Spinning machine piecing method and apparatus
JP3064951B2 (en) * 1997-04-24 2000-07-12 村田機械株式会社 Threader
EP0990719B1 (en) * 1998-10-02 2003-05-28 W. SCHLAFHORST AG & CO. Spinning device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586672A (en) * 2015-12-03 2016-05-18 江南大学 Method for reducing twist deterrent effect of yarn guide hook
US20200181810A1 (en) * 2016-07-14 2020-06-11 Maschinenfabrik Rieter Ag Method for Processing a Strand-Shaped Fiber Sliver, and Roving Frame Machine
US10837128B2 (en) * 2016-07-14 2020-11-17 Maschinenfabrik Rieter Ag Method for processing a strand-shaped fiber sliver, and roving frame machine

Also Published As

Publication number Publication date
EP1207224A3 (en) 2002-11-27
EP1207224A2 (en) 2002-05-22
EP1207224B1 (en) 2004-06-09
CN1353218A (en) 2002-06-12
DE60103721T2 (en) 2005-06-23
JP2002155435A (en) 2002-05-31
DE60103721D1 (en) 2004-07-15
US6453656B1 (en) 2002-09-24

Similar Documents

Publication Publication Date Title
JP4062869B2 (en) Core yarn manufacturing apparatus and core yarn manufacturing method
JP4801146B2 (en) Spinning resumption method, spinning apparatus and jet spinning machine in a jet spinning machine
US5511373A (en) Method and apparatus for piecing a sliver and at least one of a leading yarn and a bobbin yarn
US5419110A (en) Piecing method and apparatus in a spinning machine
EP1207224B1 (en) Piecing method and piecing device for the spinning machine
JP2930010B2 (en) Spinning machine piecing method and apparatus
JP3575470B2 (en) Spinning method and apparatus
JP2973961B2 (en) Spinning machine piecing method and apparatus
JP2003166132A (en) Spinning machinery and spinning method
CS213316B2 (en) Double twist spinning or twining spindle with threading device controlled by the air
JP2003278034A (en) Spinning device
JP3341726B2 (en) Spinning equipment
JP3341732B2 (en) Pneumatic spinning apparatus and splicing method thereof
JPH06287823A (en) Method for ending in spinning device
JP2002069761A (en) Spinning process
JPH06287824A (en) Method for ending in spinning device
JPH09268446A (en) Piecing in fine spinning frame
JP2626500B2 (en) Splicing method for spinning device
JP2001226841A (en) Method for piecing and apparatus for setting piecing condition
JPS5812939B2 (en) Slab yarn
JP2003268637A (en) Spinning device and yarn ending method
JP2001234438A (en) Method for setting piecing condition in spinning machine, and device therefor
JPH08337933A (en) Yarn piecing device in loom
JPH06287822A (en) Method for ending in spinning device
JPH0524255B2 (en)

Legal Events

Date Code Title Description
AS Assignment

Owner name: MURATA KIKAI KABUSHIKI KAISHA, JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:NAKAYAMA, NOBORU;REEL/FRAME:012253/0760

Effective date: 20011001

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20100924