US20010017239A1 - Controller of elevator - Google Patents

Controller of elevator Download PDF

Info

Publication number
US20010017239A1
US20010017239A1 US09/785,465 US78546501A US2001017239A1 US 20010017239 A1 US20010017239 A1 US 20010017239A1 US 78546501 A US78546501 A US 78546501A US 2001017239 A1 US2001017239 A1 US 2001017239A1
Authority
US
United States
Prior art keywords
power
discharging
charging
speed
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/785,465
Other versions
US6422351B2 (en
Inventor
Shinobu Tajima
Hiroshi Araki
Ikuro Suga
Kazuyuki Kobayashi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Tokyo Electric Power Company Holdings Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Assigned to THE TOKYO ELECTRIC POWER COMPANY, INCORPORATED, MITSUBISHI DENKI KABUSHIKI KAISHA reassignment THE TOKYO ELECTRIC POWER COMPANY, INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KOBAYASHI, KAZUYUKI, SUGA, IKURO, ARAKI, HIROSHI, TAJIMA, SHINOBU
Publication of US20010017239A1 publication Critical patent/US20010017239A1/en
Application granted granted Critical
Publication of US6422351B2 publication Critical patent/US6422351B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • B66B1/24Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration
    • B66B1/28Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration electrical
    • B66B1/30Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration electrical effective on driving gear, e.g. acting on power electronics, on inverter or rectifier controlled motor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • B66B1/24Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration
    • B66B1/28Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration electrical
    • B66B1/285Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration electrical with the use of a speed pattern generator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering

Definitions

  • This invention relates to a controller of an elevator of an energy saving type to which a secondary battery is applied.
  • FIG. 13 is a view showing the basic construction of a controller for controlling the operation of an elevator by applying a conventional secondary battery thereto.
  • reference numerals 1 and 2 respectively designate a three-phase AC power source and a converter constructed by a diode, etc. and converting AC power outputted from the three-phase AC power source 1 to DC power.
  • the DC power converted by the converter 2 is supplied to a DC bus 3 .
  • the operation of an inverter 4 is controlled by a speed controller for controlling a speed position of the elevator and described later.
  • a direct current supplied through the DC bus 3 is converted to an alternating current of predetermined desirable variable voltage and variable frequency and an AC motor 5 is driven so that a hoisting machine 6 of the elevator directly connected to the AC motor 5 is rotated.
  • a rope 7 wound around the hoisting machine 6 controls elevating and lowering operations of a car 8 and a counterweight 9 connected to both ends of this rope 7 and passengers within the car 8 are moved to a predetermined stage floor.
  • weights of the car 8 and the counterweight 9 are designed such that these weights are approximately equal to each other when passengers half a number limit ride in the car 8 .
  • a power running operation is performed at a lowering time of the car 8 and a regenerative operation is performed at a elevating time of the car 8 .
  • the regenerative operation is performed at the lowering time of the car 8 and the power running operation is performed at the elevating time of the car 8 .
  • An elevator control circuit 10 is constructed by a microcomputer, etc., and manages and controls an entire operation of the elevator.
  • a power accumulating device 11 is arranged between DC buses 3 and accumulates power at the regenerative operation time of the elevator, and supplies the accumulated power to the inverter 4 together with the converter 2 at the power running operation time.
  • the power accumulating device 11 is constructed by a secondary battery 12 and a DC-DC converter 13 for controlling charging and discharging operations of this secondary battery 12 .
  • the DC-DC converter 13 has a voltage lowering type chopper circuit and a voltage raising type chopper circuit.
  • the voltage lowering type chopper circuit is constructed by a reactor 13 a , a gate 13 b for charging current control connected in series to this reactor 13 a , and a diode 13 c connected in reverse parallel to a gate 13 d for discharging current control described later.
  • the voltage raising type chopper circuit is constructed by the reactor 13 a , the gate 13 d for discharging current control connected in series to this reactor 13 a , and a diode 13 e connected in reverse parallel to the above gate 13 b for charging current control.
  • Operations of the gate 13 b for charging current control and the gate 13 d for discharging current control are controlled by a charging-discharging control circuit 15 on the basis of a measuring value from a charging-discharging state measuring device 14 for measuring charging and discharging states of the power accumulating device 11 and a measuring value from a voltage measuring instrument 18 .
  • a current measuring instrument arranged between the secondary battery 12 and the DC-DC converter 13 is used as the charging-discharging state measuring device 14 in this conventional example.
  • a gate 16 for regenerative current control and a regenerative resistor 17 are arranged between DC buses 3 .
  • the voltage measuring instrument 18 measures the voltage of a DC bus 3 .
  • a regenerative control circuit 19 is operated on the basis of regenerative control commands from a speed control circuit described later.
  • the gate 16 for regenerative current control is constructed such that an ON pulse width is controlled on the basis of control of the regenerative control circuit 19 when a measuring voltage provided by the voltage measuring instrument 17 is equal to or greater than a predetermined value at the regenerative operation time. Regenerated power is discharged in the regenerative resistor 17 and is converted to thermal energy and is consumed.
  • An encoder 20 is directly connected to the hoisting machine 6 .
  • the speed control circuit 21 controls a position and a speed of the elevator by controlling an output voltage and an output frequency of the inverter 4 on the basis of speed commands and a speed feedback output from the encoder 22 based on commands from the elevator control circuit 10 .
  • the power accumulating device 11 is constructed by the secondary battery 12 and the DC-DC converter 13 , and an operation of this power accumulating device 11 is controlled by the charging-discharging control circuit 15 .
  • the number of secondary batteries 12 is reduced as much as possible and an output voltage of each secondary battery 12 is lower than the voltage of the DC bus 3 so as to make the controller compact and cheaply construct the controller.
  • the voltage of the DC bus 3 is basically controlled near a voltage provided by rectifying a three-phase AC of the three-phase AC power source 1 .
  • the DC-DC converter 13 is adopted. Operations of the gate 13 b for charging current control and the gate 13 d for discharging current control in this DC-DC converter 13 are controlled by the charging-discharging control circuit 15 .
  • FIGS. 14 and 15 are flow charts showing controls of the charging-discharging control circuit 15 at its discharging and charging times.
  • a current control minor loop, etc. are constructed in voltage control of a control system and the control operation may be more stably performed.
  • the control of the charging-discharging control circuit 15 is here explained by a control system using the bus voltage.
  • the bus voltage of the DC bus 3 is measured by the voltage measuring instrument 17 (step S 11 ).
  • the charging-discharging control circuit 15 compares this measuring voltage with a predetermined desirable voltage set value and judges whether the measuring voltage exceeds the voltage set value or not (step S 12 ). If no measuring voltage exceeds the set value, the charging-discharging control circuit 15 next judges whether the measuring value of a discharging current of the secondary battery 12 provided by the charging-discharging state measuring device 14 exceeds a predetermined value or not (step S 13 ).
  • step S 13 when it is judged in the above step S 13 that no measuring value of the discharging current of the secondary battery 12 provided by the measuring device 14 exceeds the predetermined value, a new gate ON time is calculated by adding the adjusting time DT to the present ON time so as to lengthen the ON pulse width of the gate 13 d for discharging current control (step S 15 ).
  • ON control of the gate 13 d for discharging current control is performed on the basis of the calculated gate ON time, and the calculated gate ON time is stored to a built-in memory as the present ON time (step S 16 ).
  • the measuring value of the discharging current is compared with a supply allotment corresponding current (predetermined value). If this measuring value exceeds the predetermined value, the ON pulse width of the gate 13 d for discharging current control is lengthened and a supply amount is further increased. In contrast to this, when no measuring value of the discharging current exceeds the predetermined value, the ON pulse width of the gate 13 d for discharging current control is shortened and the power supply is clipped.
  • the bus voltage of the DC bus 3 is reduced so that the power supply from the converter 2 is started.
  • the charging-discharging control circuit 15 detects that it is a regenerative state, and increases a charging current to the secondary battery 12 by lengthening the ON pulse width of the gate 13 b for charging current control (step S 21 ⁇ S 22 ⁇ S 23 ).
  • the ON pulse width of the gate 13 b for charging current control is shortly controlled and charging power is also reduced and controlled (step S 21 ⁇ S 22 ⁇ S 24 ).
  • the bus voltage is controlled in a suitable range and a charging operation is performed by monitoring the bus voltage of the DC bus 3 and controlling the charging power. Further, energy is saved by accumulating and re-utilizing power conventionally consumed in the regenerated power.
  • the above regenerative control circuit 19 is operated as a backup and the regenerated power is consumed by a resistor so that the elevator is suitably decelerated.
  • the regenerated power is about 2 KVA and is about 4 KVA at its maximum decelerating value although this regenerated power is different in accordance with a capacity of the elevator, etc.
  • the regenerative control circuit 19 monitors the voltage of the DC bus 3 . If this voltage is equal to or greater than a predetermined value, the ON pulse width of the gate 16 for regenerative current control is controlled by the regenerative control circuit 19 so as to discharge the above power in the regenerative resistor 17 so that the regenerated power flows through the regenerative resistor 17 .
  • the pulse width is simply controlled in accordance with the following formula. Namely, when the voltage of the DC bus 3 for starting turning-on of the gate 16 for regenerative current control is set to VR, a flowing current IR can be simply calculated by turning-on (closing) a circuit since a resistance value of the regenerative resistor 17 is already known.
  • an object of this invention is to provide a controller of an elevator capable of performing stable speed control by using a cheap power accumulating device of a low capacity even at a discharging control time.
  • a controller of an elevator in this invention comprises a converter for rectifying AC power from an AC power source and converting the AC power to DC power; an inverter for converting the DC power outputted from the converter to AC power of a variable voltage and a variable frequency and driving an electric motor and operating the elevator; a power accumulating device arranged between DC buses between the converter and the inverter, and accumulating DC power from the DC buses at a regenerative operation time of the elevator, and supplying the accumulated DC power to the DC buses at a power running operation time; a charging-discharging control device for controlling charging and discharging operations of the power accumulating device with respect to the DC buses; charging-discharging state measuring means for measuring at least one of a temperature, charging and discharging currents, and charging and discharging voltages of the power accumulating device; current detecting means for detecting an output current of the inverter; voltage detecting means for detecting an output voltage of the inverter; speed detecting means for detecting
  • the speed control means has a table set with a limited discharging current with respect to a discharging current and a discharging voltage, and calculates the limited discharging current from the table on the basis of measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring means, and calculates the discharging ability power of the power accumulating device from the calculated limited discharging current and the measuring value of the discharging voltage.
  • the speed control means has a table set with a limited discharging current with respect to a charging degree as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity with a full charging state of the power accumulating device as 100%, and the limited discharging current is calculated from the table on the basis of the charging degree obtained on the basis of measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring means, and the discharging ability power of the power accumulating device is calculated from the calculated limited discharging current and the measuring value of the discharging voltage.
  • the speed control means has plural tables according to the temperature of the power accumulating device, and selects a table according to a temperature measuring value provided by the charging-discharging state measuring means.
  • the speed control means has a table setting a speed pattern according to a load state, and calculates the speed pattern from the table on the basis of a car load measuring value measured by car load measuring means and generates speed commands according to the calculated speed pattern when it is judged on the basis of a measuring value provided by the charging-discharging state measuring means that the power accumulating device is broken.
  • the speed control means has a table set with a maximum speed command value with respect to a car load and the discharging ability power of the power accumulating device, and calculates the discharging ability power of the power accumulating device on the basis of a measuring value of the charging-discharging state measuring means, and calculates maximum speed commands from the table on the basis of a car load measuring value measured by car load measuring means and the calculated discharging ability power, and changes speed commands on the basis of comparison of the speed commands and the maximum speed commands.
  • the speed control means has plural speed pattern tables corresponding to the car load and the discharging ability power of the power accumulating device, and calculates the discharging ability power of the power accumulating device on the basis of the measuring value of the charging-discharging state measuring means, and selects the tables on the basis of the car load measuring value measured by the car load measuring means, and performs speed control according to a selected speed pattern.
  • FIG. 1 is a block diagram showing the construction of a controller of an elevator in this invention.
  • FIG. 2 is a view used to explain speed control of the elevator at a power failure time in this invention and showing a power waveform at a power running operation time of the elevator with a time axis as an axis of abscissa.
  • FIG. 3 is an explanatory view of a table T 1 arranged in a speed control circuit 21 A in an Embodiment mode 1 of this invention in which a limit discharging current is set with respect to a discharging current and a discharging voltage.
  • FIG. 4 is a flow chart showing control of the speed control circuit 21 A in the Embodiment mode 1 of this invention.
  • FIG. 5 is an explanatory view of a table T 2 arranged in a speed control circuit 21 A in an Embodiment mode 2 of this invention in which a limit discharging current is set with respect to a charging degree SOC.
  • FIG. 6 is an explanatory view of tables T 2 a , T 2 b , T 2 c , —arranged in a speed control circuit 21 A in an Embodiment mode 3 of this invention in which a limit discharging current is set with respect to plural charging degree SOCs in accordance with temperature.
  • FIG. 7 is an explanatory view of a table T 3 arranged in a speed control circuit 21 A in an Embodiment mode 4 of this invention in which a speed pattern according to a load state is set.
  • FIG. 8 is an explanatory view of a table T 4 arranged in a speed control circuit 21 A in an Embodiment mode 5 of this invention in which a maximum command speed is set with respect to a car load and discharging ability power of a power accumulating device 11 .
  • FIG. 9 is a flow chart showing control of the speed control circuit 21 A in the Embodiment mode 5 of this invention.
  • FIG. 10 is an explanatory view of a table T 5 arranged in a speed control circuit 21 A in an Embodiment mode 6 of this invention in which a command speed is selected in accordance with discharging ability power and a load measuring value and is set in accordance with the number of timer interruption times.
  • FIG. 11 is an explanatory view of a table T 6 arranged in the speed control circuit 21 A in the Embodiment mode 6 of this invention in which a command speed according to the remaining distance is set.
  • FIG. 12 is a flow chart showing control of the speed control circuit 21 A in the Embodiment mode 6 of this invention.
  • FIG. 13 is a block diagram showing the construction of a controller of an elevator in a conventional example.
  • FIG. 14 is a flow chart showing the control of a charging-discharging control circuit 15 shown in FIG. 13 at its discharging time.
  • FIG. 15 is a flow chart showing the control of the charging-discharging control circuit 15 shown in FIG. 13 at its charging time.
  • the speed of an elevator is controlled on the basis of discharging ability power of a power accumulating device, and the elevator having the power accumulating device of a long battery life is provided.
  • FIG. 1 is a block diagram showing the construction of a controller of the elevator in this invention.
  • the same portions as the conventional example shown in FIG. 13 are designated by the same reference numerals and their explanations are omitted here.
  • New reference numerals 14 A and 21 A respectively designate a charging-discharging state measuring device and a speed control circuit in the present invention.
  • a power failure detector 22 detects a power failure of a three-phase AC power source 1 .
  • a current measuring instrument 23 and a voltage measuring instrument 24 respectively measure an output current and an output voltage of an inverter 4 .
  • a car load measuring instrument 25 is arranged between the cabin of a car 8 and a bottom portion of a car frame and measures a car load.
  • the charging-discharging state measuring device 14 A has each of measuring instruments for measuring charging and discharging currents, charging and discharging voltages and a temperature of a power accumulating device 11 .
  • each of these measuring values and a charging degree, i.e., a full charging state of the power accumulating device 11 is set to 100%, and a SOC (State Of Charge) as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity is outputted to the speed control circuit 21 A.
  • SOC State Of Charge
  • the speed control circuit 21 A outputs speed commands for controlling a speed of the elevator to the inverter 4 in a range of discharging ability power of the power accumulating device 11 at a detecting time of the power failure during running of the elevator on the basis of a power failure detecting signal from the power failure detector 22 or the voltage measuring instrument 18 , charging and discharging states from the charging-discharging state measuring device 14 A, a speed feedback signal from an encoder 20 , each of measuring values from the current measuring instrument 22 and the voltage measuring instrument 23 , and a car load measuring value from a car load measuring instrument.
  • FIG. 2 is a view used to explain speed control at a power failure time in this invention and showing a power waveform at a power running operation time of the elevator with a time axis as an axis of abscissa.
  • a power waveform as shown in FIG. 2 is obtained in the case of full load riding of the elevator and a power running operation such as a ascending direction operation time. Power approximately becomes a total of a power amount depending on the speed of the elevator as shown in FIG. 2 (refer (b)) and a power amount depending on acceleration and deceleration as shown in FIG. 2 (refer (c)).
  • a power curve becomes a peak ( 51 ) during acceleration near a highest speed, and becomes a constant voltage ( 52 ) at a constant speed, and power is reduced ( 53 ) as deceleration is started.
  • a dischargeable current value is generally limited by a temperature of the secondary battery 12 , a battery voltage at a discharging time, etc.
  • the secondary battery 12 becomes expensive. Therefore, it is necessary to limit the discharging from the secondary battery 12 in a specific condition.
  • the discharging current can be replaced with a three-phase AC current of the three-phase AC power source 1 , but a power feeder is large-sized and contract power is increased, etc. so that it becomes expensive.
  • the elevator is operated in an allowable power range of the three-phase AC power source 1 when the discharging current of the power accumulating device 11 is limited.
  • the speed control circuit 21 A has a table T 1 in which a limit discharging current is set with respect to a discharging current and a discharging voltage as shown in FIG. 3.
  • the speed control circuit 21 A calculates discharging ability power of the power accumulating device 11 by using this table T 1 , and also calculates a limit power maximum value provided by a sum of this discharging ability power and limit power of the AC power source 1 .
  • the speed control circuit 21 A then changes speed commands on the basis of the comparison of output power of the inverter 4 and the limit power maximum value.
  • FIG. 3 shows an example of a table for limiting the discharging current on the basis of a voltage of the power accumulating device 11 at its discharging time.
  • the limit power maximum value is made by measuring data of charging and discharging states from the charging-discharging state measuring device 14 A and the above table T 1 .
  • the present discharging current is a discharging current of the secondary battery 12 outputted from the power accumulating device 11 at present.
  • the discharging voltage of the secondary battery 12 is measured and the limit current of a voltage equal to or greater than a voltage in a voltage column is described in an item of the limit current.
  • the present discharging current is equal to or greater than A 1 ampere and the discharging voltage is equal to or greater than V 11 volt.
  • the discharging voltage lies between V 11 volt and V 12 volt, the discharging current is limited to A 12 ampere.
  • a table describing discharging inhibition etc. is used. If the table is set in further detail, more preferable results are naturally obtained. Since the speed control is performed in view of these results, a delay is inevitably caused. Therefore, it is necessary to design the table with a margin. It is simple to multiply the present voltage by this limit current and set limit power.
  • a command speed Vm according to a standard speed pattern is calculated from a running object position, the present command speed, the present position of the elevator, etc. during running of the elevator, and the speed of the elevator is controlled (step S 101 ).
  • the present output power Wc is then calculated on the basis of measuring values of an output current and an output voltage of the inverter 4 from the current measuring instrument 23 and the voltage measuring instrument 24 (step S 102 ).
  • discharging ability power Wo of the power accumulating device 11 is calculated on the basis of a measuring value from the charging-discharging state measuring device 14 A, and predetermined limit power (contract power) of commercial power (three-phase AC power source 1 ) is added to this discharging ability power so that a limit power maximum value Wmax is calculated (step S 103 ).
  • measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring device 14 A are inputted to the speed control circuit 21 A, and the speed control circuit 21 A calculates a corresponding limit discharging current from the table T 1 shown in FIG. 3.
  • the speed control circuit 21 A also calculates the discharging ability power Wo by a product of the calculated limit discharging current and the present discharging voltage, and adds the limit power of commercial power to this calculated discharging ability power Wo and calculates the limit power maximum value Wmax.
  • the output power Wc of the inverter 4 is then compared with the limit power maximum value Wmax. If the present output power Wc is equal to the limit power maximum value Wmax, the previous command speed is set to a late command speed to maintain the speed at that time (step S 104 ⁇ S 105 ). In contrast to this, if no present output power Wc exceeds the limit power maximum value Wmax, the command speed Vm according to the standard speed pattern is set to the present command speed (step S 104 ⁇ S 106 ). Conversely, when the present output power Wc exceeds the limit power maximum value Wmax, a new command speed is calculated by subtracting a deceleration set value Dv from the previous command speed, and using power is reduced (step S 104 ⁇ S 107 ).
  • the speed control is performed on the basis of the calculated command speed, and the calculated command speed is stored to a built-in memory to prepare for the next calculation of the command speed (step S 108 ).
  • the limit discharging current of the above table T 1 has a margin in consideration of a time delay, etc.
  • the elevator is abruptly decelerated when the present output power exceeds the limit power maximum value. However, if processing such as smoothing to the deceleration, etc. is performed in accordance with the present accelerating and decelerating states, a more smooth speed control pattern is obtained.
  • the speed of the elevator can be stably controlled at a discharging time from the power accumulating device 11 in a range in which no excessive burden is imposed on the secondary battery 12 . Accordingly, a cheap power accumulating device having a long life can be constructed.
  • the speed control circuit 21 A has a table T 2 in which a full charging state of the power accumulating device 11 is set to 100% and a limit discharging current is set with respect to a charging degree SOC as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity.
  • the speed control circuit 21 A calculates the limit discharging current from the table T 2 on the basis of the charging degree SOC obtained on the basis of measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring device 14 A.
  • the speed control circuit 21 A also calculates discharging ability power of the power accumulating device 11 from the calculated limit discharging current and the measuring value of the discharging voltage.
  • FIG. 5 shows a table of the limit discharging current with respect to the present charging degree SOC of the power accumulating device 11 .
  • the present charging degree SOC can be calculated by accumulating charging and discharging currents or power of the secondary battery 12 .
  • a high discharging current can be generally obtained at a high SOC level.
  • no discharging current (power) can be increased as the SOC level is reduced.
  • FIG. 5 shows this situation as a table.
  • the speed control circuit 21 A in this Embodiment mode 2 also calculates a command speed in accordance with the flow chart shown in FIG. 4. Accordingly, while a limit of commercial power is kept, the speed of the elevator can be stably controlled at a discharging time from the power accumulating device 11 in a range in which no excessive burden is imposed on the secondary battery 12 . Therefore, a cheap power accumulating device having a long life can be constructed.
  • the speed control circuit 21 A has plural tables T 2 a , T 2 b , T 2 c , . . . according to the temperature of the secondary battery 12 of the power accumulating device 11 as shown in FIG. 6.
  • the speed control circuit 21 A selects a table according to a temperature measuring value of the charging-discharging state measuring device 14 A from the plural tables. Similar to the Embodiment mode 2 , the speed control circuit 21 A then calculates discharging ability power of the power accumulating device 11 , and effects similar to those in the Embodiment modes 1 and 2 can be obtained.
  • the speed control circuit 21 A has a table T 3 in which a speed pattern (e.g., V01, V02, V03, . . . , VOn at a loadless time) according to a load state is set.
  • a speed pattern e.g., V01, V02, V03, . . . , VOn at a loadless time
  • the speed control circuit 21 A calculates the speed pattern from the above table T 3 on the basis of a car load measuring value measured by the car load measuring instrument 25 , and generates speed commands according to the calculated speed pattern.
  • FIG. 7 illustrates a table showing the speed pattern of speed control in the Embodiment mode 4 .
  • This table T 3 shows the pattern at an accelerating time, and describes a speed at each of times t 1 , t 2 , t 3 , . . . , tn after departure. Smooth acceleration can be realized by using this table T 3 .
  • This acceleration table is separately arranged on each of ascending and descending operation sides.
  • a deceleration pattern table corresponding to the above acceleration is used on a deceleration side although this deceleration pattern table is not described here.
  • this table generally uses a speed table with respect to the remaining distance until stoppage instead of speed with respect to time.
  • items of no load, % load, etc. show patterns with respect to the respective loads.
  • the elevator can be smoothly operated within restriction power of the three-phase AC power source 1 (commercial power) by operating the elevator in a preset speed pattern.
  • the elevator In an operating pattern of the conventional elevator, no elevator has an operating pattern according to a load. Therefore, when the elevator is operated in a restriction power range of the commercial power, for example, a loadless raising operation basically becomes a regenerative operation and no discharging from the power accumulating device 11 is required. In contrast to this, a power running operation is performed in a loadless lowering operation so that consumed power is large.
  • the elevator can be operated at an optimum speed by setting the speed table in accordance with loads and directions.
  • the speed control circuit 21 A has a table T 4 in which maximum speed command values V 01max , V 02max , . . . are set with respect to a car load and discharging ability power of the power accumulating device 11 .
  • the speed control circuit 21 A calculates discharging ability powers W01, W02, . . . of the power accumulating device 11 on the basis of a measuring value of the charging-discharging state measuring device 14 A.
  • the speed control circuit 21 A also calculates the maximum speed command values V 01max , V 02max , . . . from the above table T 4 on the basis of a car load measuring value measured by the car load measuring instrument 25 and the calculated discharging ability powers.
  • the speed control circuit 21 A then changes speed commands on the basis of comparison of the speed commands and the maximum speed commands.
  • Speed control of the inverter 4 is first performed on the basis of a command speed Vm according to a standard speed pattern (step S 501 ). Discharging ability power Wo of the power accumulating device 11 is then calculated on the basis of a measuring value from the charging-discharging state measuring device 14 A (step S 502 ).
  • a corresponding maximum command speed Vmax is calculated from the table T 4 shown in FIG. 8 on the basis of a car load measuring value of the car load measuring instrument 25 and the discharging ability power Wo (step S 503 ). Further, the command speed Vm based on the standard speed pattern and the maximum command speed Vmax are compared with each other (step S 504 ).
  • step S 504 ⁇ S 505 the maximum command speed Vmax is set to a command speed.
  • a new command speed is calculated by subtracting a deceleration set value Dv from the previous command speed to decelerate the speed, and using power is reduced (step S 504 ⁇ S 506 ).
  • step S 504 ⁇ S 507 the command speed Vm based on the standard speed pattern is set to a command speed.
  • step S 508 speed control is performed on the basis of the calculated command speed, and the calculated command speed is stored to a built-in memory to prepare for the next calculation of the command speed (step S 508 ).
  • the speed control circuit 21 A has plural, as shown in FIG. 10, tables T 5 in which a command speed value of the elevator is stored every timer interruption of each speed control.
  • the plural tables T 5 are separately arranged every discharging ability power of the power accumulating device and every load of the elevator. For example, when ten tables are arranged every discharging ability power of the power accumulating device and ten tables are arranged in each load every each of these ten tables of the discharging ability power, a total number of tables becomes 100 .
  • the speed control circuit 21 A has a table T 6 in which a command speed according to the remaining distance is set.
  • the speed control circuit 21 A first calculates the command speed according to the remaining distance on the basis of the table T 6 as shown in FIG. 11. Further, the speed control circuit 21 A calculates the discharging ability power of the power accumulating device on the basis of a measuring value of the charging-discharging state measuring device. The speed control circuit 21 A then selects a table T 5 as shown in FIG. 10 in accordance with both data of the discharging ability power and a car load measuring value measured by the car load measuring instrument 25 on the basis of this car load measuring value. The speed control circuit 21 A calculates the command speed from the selected table every control timer interruption. At a timer interruption time, for example, the speed control circuit 21 A calculates v 1 as a command speed at the timer interruption time just after start, and calculates v 2 as a command speed at the next timer interruption time.
  • a command speed is calculated in accordance with the remaining distance until an object floor with reference to the table T 6 . For example, if the remaining distance until the object floor is equal to or greater than dl, the command speed Vd according to the remaining distance is set to vd 1 . If the remaining distance until the object floor is equal to or smaller than d 1 and exceeds d 2 (d 1 >d 2 and command speeds are arranged in a long order of the remaining distance in the table), the command speed Vd according to the remaining distance is set to vd 2 .
  • the command speed Vd according to the remaining distance is set in accordance with this table T 6 (step S 601 ).
  • the command speed Va every timer interruption is compared with the command speed Vd according to the remaining distance. If the command speed Va every timer interruption exceeds the command speed vd according to the remaining distance, the command speed is set to Vd (step S 603 ⁇ S 604 ). In contrast to this, if no command speed va every timer interruption exceeds the command speed Vd according to the remaining distance, the command speed is set to Va (step S 603 ⁇ S 605 ). Namely, the speed of the elevator is accelerated in accordance with the table T 5 shown in FIG. 10 at an accelerating time, and is decelerated in accordance with the table T 6 shown in FIG. 11 at a decelerating time. Thus, the speed control can be smoothly performed until an object floor.

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Power Engineering (AREA)
  • Elevator Control (AREA)

Abstract

This invention provides a controller of an elevator capable of performing stable speed control by using a cheap power accumulating device of a low capacity even at a discharging control time. Therefore, the controller has a converter 2, an inverter 4, a power accumulating device 11 arranged between DC buses 3, a charging-discharging control circuit 15 for controlling charging and discharging operations of the power accumulating device, a power failure detector 22, a current measuring instrument 23 and a voltage measuring instrument 24 for respectively detecting an output current and an output voltage of the inverter, a car load measuring instrument 25, an encoder 20, and a speed control circuit 21A for controlling an operation of the inverter. The speed control circuit 21A calculates output power of the inverter, and calculates discharging ability power of the power accumulating device on the basis of a measuring value of charging and discharging states. The speed control circuit 21A also calculates a limit power maximum value given by a sum of the discharging ability power and limit power of an AC power source, and changes speed commands on the basis of comparison of the output power of the inverter and the limit power maximum value.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0001]
  • This invention relates to a controller of an elevator of an energy saving type to which a secondary battery is applied. [0002]
  • 2. Description of the Related Art [0003]
  • FIG. 13 is a view showing the basic construction of a controller for controlling the operation of an elevator by applying a conventional secondary battery thereto. [0004]
  • In FIG. 13, [0005] reference numerals 1 and 2 respectively designate a three-phase AC power source and a converter constructed by a diode, etc. and converting AC power outputted from the three-phase AC power source 1 to DC power. The DC power converted by the converter 2 is supplied to a DC bus 3. The operation of an inverter 4 is controlled by a speed controller for controlling a speed position of the elevator and described later. A direct current supplied through the DC bus 3 is converted to an alternating current of predetermined desirable variable voltage and variable frequency and an AC motor 5 is driven so that a hoisting machine 6 of the elevator directly connected to the AC motor 5 is rotated. Thus, a rope 7 wound around the hoisting machine 6 controls elevating and lowering operations of a car 8 and a counterweight 9 connected to both ends of this rope 7 and passengers within the car 8 are moved to a predetermined stage floor.
  • Here, weights of the [0006] car 8 and the counterweight 9 are designed such that these weights are approximately equal to each other when passengers half a number limit ride in the car 8. Namely, when the car 8 is elevated and lowered with no load, a power running operation is performed at a lowering time of the car 8 and a regenerative operation is performed at a elevating time of the car 8. Conversely, when the car 8 is lowered in the number limit riding, the regenerative operation is performed at the lowering time of the car 8 and the power running operation is performed at the elevating time of the car 8.
  • An [0007] elevator control circuit 10 is constructed by a microcomputer, etc., and manages and controls an entire operation of the elevator. A power accumulating device 11 is arranged between DC buses 3 and accumulates power at the regenerative operation time of the elevator, and supplies the accumulated power to the inverter 4 together with the converter 2 at the power running operation time. The power accumulating device 11 is constructed by a secondary battery 12 and a DC-DC converter 13 for controlling charging and discharging operations of this secondary battery 12.
  • Here, the DC-[0008] DC converter 13 has a voltage lowering type chopper circuit and a voltage raising type chopper circuit. The voltage lowering type chopper circuit is constructed by a reactor 13 a, a gate 13 b for charging current control connected in series to this reactor 13 a, and a diode 13 c connected in reverse parallel to a gate 13 d for discharging current control described later. The voltage raising type chopper circuit is constructed by the reactor 13 a, the gate 13 d for discharging current control connected in series to this reactor 13 a, and a diode 13 e connected in reverse parallel to the above gate 13 b for charging current control. Operations of the gate 13 b for charging current control and the gate 13 d for discharging current control are controlled by a charging-discharging control circuit 15 on the basis of a measuring value from a charging-discharging state measuring device 14 for measuring charging and discharging states of the power accumulating device 11 and a measuring value from a voltage measuring instrument 18. A current measuring instrument arranged between the secondary battery 12 and the DC-DC converter 13 is used as the charging-discharging state measuring device 14 in this conventional example.
  • A [0009] gate 16 for regenerative current control and a regenerative resistor 17 are arranged between DC buses 3. The voltage measuring instrument 18 measures the voltage of a DC bus 3. A regenerative control circuit 19 is operated on the basis of regenerative control commands from a speed control circuit described later. The gate 16 for regenerative current control is constructed such that an ON pulse width is controlled on the basis of control of the regenerative control circuit 19 when a measuring voltage provided by the voltage measuring instrument 17 is equal to or greater than a predetermined value at the regenerative operation time. Regenerated power is discharged in the regenerative resistor 17 and is converted to thermal energy and is consumed.
  • An [0010] encoder 20 is directly connected to the hoisting machine 6. The speed control circuit 21 controls a position and a speed of the elevator by controlling an output voltage and an output frequency of the inverter 4 on the basis of speed commands and a speed feedback output from the encoder 22 based on commands from the elevator control circuit 10.
  • An operation of the controller having the above construction will next be explained. [0011]
  • At a power running operation time of the elevator, power is supplied to the [0012] inverter 4 from both the three-phase AC power source 1 and the power accumulating device 11. The power accumulating device 11 is constructed by the secondary battery 12 and the DC-DC converter 13, and an operation of this power accumulating device 11 is controlled by the charging-discharging control circuit 15. In general, the number of secondary batteries 12 is reduced as much as possible and an output voltage of each secondary battery 12 is lower than the voltage of the DC bus 3 so as to make the controller compact and cheaply construct the controller. The voltage of the DC bus 3 is basically controlled near a voltage provided by rectifying a three-phase AC of the three-phase AC power source 1. Accordingly, it is necessary to lower the bus voltage of the DC bus 3 at a charging time of the secondary battery 12 and raise the bus voltage of the DC bus 3 at a discharging time of the secondary battery 12. Therefore, the DC-DC converter 13 is adopted. Operations of the gate 13 b for charging current control and the gate 13 d for discharging current control in this DC-DC converter 13 are controlled by the charging-discharging control circuit 15.
  • FIGS. 14 and 15 are flow charts showing controls of the charging-discharging [0013] control circuit 15 at its discharging and charging times.
  • The control of the charging-discharging [0014] control circuit 15 at the discharging time shown in FIG. 14 will first be explained.
  • A current control minor loop, etc. are constructed in voltage control of a control system and the control operation may be more stably performed. However, for simplicity, the control of the charging-discharging [0015] control circuit 15 is here explained by a control system using the bus voltage.
  • First, the bus voltage of the [0016] DC bus 3 is measured by the voltage measuring instrument 17 (step S11). The charging-discharging control circuit 15 compares this measuring voltage with a predetermined desirable voltage set value and judges whether the measuring voltage exceeds the voltage set value or not (step S12). If no measuring voltage exceeds the set value, the charging-discharging control circuit 15 next judges whether the measuring value of a discharging current of the secondary battery 12 provided by the charging-discharging state measuring device 14 exceeds a predetermined value or not (step S13).
  • When the measuring voltage exceeds the set value by these judgments, or when the measuring value of the discharging current of the [0017] secondary battery 12 exceeds the predetermined value even if no measuring voltage exceeds the set value, an adjusting time DT is subtracted from the present ON time to shorten an ON pulse width of the gate 13 d for discharging current control and a new gate ON time is calculated (step S14).
  • In contrast to this, when it is judged in the above step S[0018] 13 that no measuring value of the discharging current of the secondary battery 12 provided by the measuring device 14 exceeds the predetermined value, a new gate ON time is calculated by adding the adjusting time DT to the present ON time so as to lengthen the ON pulse width of the gate 13 d for discharging current control (step S15). Thus, ON control of the gate 13 d for discharging current control is performed on the basis of the calculated gate ON time, and the calculated gate ON time is stored to a built-in memory as the present ON time (step S16).
  • Thus, a more electric current flows from the [0019] secondary battery 12 by lengthening the ON pulse width of the gate 13 d for discharging current control. As a result, supply power is increased and the bus voltage of the DC bus 3 is increased by the power supply. When the power running operation is considered, the elevator requires the power supply and this power is supplied by discharging from the above secondary battery 12 and power supply from the three-phase AC power source 1. When the bus voltage is controlled such that this bus voltage is higher than an output voltage of the converter 2 supplied from the three-phase AC power source 1, all power is supplied from the secondary battery 12. However, the controller is designed such that all power is not supplied from the secondary battery 12, but is supplied from the secondary battery 12 and the three-phase AC power source 1 in a suitable ratio so as to cheaply construct the power accumulating device 11.
  • Namely, in FIG. 14, the measuring value of the discharging current is compared with a supply allotment corresponding current (predetermined value). If this measuring value exceeds the predetermined value, the ON pulse width of the [0020] gate 13 d for discharging current control is lengthened and a supply amount is further increased. In contrast to this, when no measuring value of the discharging current exceeds the predetermined value, the ON pulse width of the gate 13 d for discharging current control is shortened and the power supply is clipped. Thus, since power supplied from the secondary battery 12 is clipped among power required in the inverter 4, the bus voltage of the DC bus 3 is reduced so that the power supply from the converter 2 is started. These operations are performed for a very short time so that a suitable bus voltage is actually obtained to supply required power of the elevator. Thus, power can be supplied from the secondary battery 12 and the three-phase AC power source 1 in a predetermined desirable ratio.
  • The control of the charging-discharging [0021] control circuit 15 at the charging time shown in FIG. 15 will next be explained.
  • When there is power regeneration from the [0022] AC motor 5, the bus voltage of the DC bus 3 is increased by this regenerated power. When this voltage is higher than an output voltage of the converter 2, the power supply from the three-phase AC power source 1 is stopped. When there is no power accumulating device 11 and this stopping state is continued, the voltage of the DC bus 3 is increased. Therefore, when a measuring voltage value of the voltage measuring instrument 17 for detecting the bus voltage of the DC bus 3 reaches a certain predetermined voltage, the regenerative control circuit 19 is operated and closes the gate 16 for regenerative current control. Thus, power flows through the regenerative resistor 17 and the regenerated power is consumed and the elevator is decelerated by electromagnetic braking effects. However, when there is the power accumulating device 11, this power is charged to the power accumulating device 11 by the control of the charging-discharging control circuit 15 with a voltage equal to or smaller than a predetermined voltage.
  • Namely, as shown in FIG. 15, if the measuring value of the bus voltage of the [0023] DC bus 3 provided by the voltage measuring instrument 17 exceeds the predetermined voltage, the charging-discharging control circuit 15 detects that it is a regenerative state, and increases a charging current to the secondary battery 12 by lengthening the ON pulse width of the gate 13 b for charging current control (step S21→S22→S23). When the regenerated power from the elevator is reduced in a short time, the voltage of the DC bus 3 is also correspondingly reduced and no measuring value of the voltage measuring instrument 17 exceeds the predetermined voltage. Accordingly, the ON pulse width of the gate 13 b for charging current control is shortly controlled and charging power is also reduced and controlled (step S21→S22→S24).
  • Thus, the bus voltage is controlled in a suitable range and a charging operation is performed by monitoring the bus voltage of the [0024] DC bus 3 and controlling the charging power. Further, energy is saved by accumulating and re-utilizing power conventionally consumed in the regenerated power. When no power of a charger is consumed for certain reasons such as a breakdown, etc., the above regenerative control circuit 19 is operated as a backup and the regenerated power is consumed by a resistor so that the elevator is suitably decelerated. In a general elevator for housing, the regenerated power is about 2 KVA and is about 4 KVA at its maximum decelerating value although this regenerated power is different in accordance with a capacity of the elevator, etc.
  • The [0025] regenerative control circuit 19 monitors the voltage of the DC bus 3. If this voltage is equal to or greater than a predetermined value, the ON pulse width of the gate 16 for regenerative current control is controlled by the regenerative control circuit 19 so as to discharge the above power in the regenerative resistor 17 so that the regenerated power flows through the regenerative resistor 17. There are various kinds of systems for controlling this pulse width, but the pulse width is simply controlled in accordance with the following formula. Namely, when the voltage of the DC bus 3 for starting turning-on of the gate 16 for regenerative current control is set to VR, a flowing current IR can be simply calculated by turning-on (closing) a circuit since a resistance value of the regenerative resistor 17 is already known. Further, maximum power to be flowed is already known. Therefore, if this maximum power (VA) is set to WR, it is sufficient to generate an ON pulse of duty of WR/(VR×IR) while the DC bus voltage is monitored. However, an object of this construction is to consume all regenerated power in the regenerative resistor 17.
  • However, in the above conventional controller of the elevator, it is necessary to stack the [0026] secondary battery 12 of a large capacity able to charge the regenerated power in the power accumulating device 11 in all conditions in which a temperature and a charging degree of the power accumulating device 11, i.e., a full charging state of the power accumulating device 11 are set to references and a product of a charging-discharging current by a charging-discharging voltage is normalized and accumulated in a capacity, and a SOC (State Of Charge) is obtained as this normalized and accumulated value, etc. Therefore, an expensive and large-sized power accumulating device 11 is required.
  • SUMMARY OF THE INVENTION
  • To solve the above problems, an object of this invention is to provide a controller of an elevator capable of performing stable speed control by using a cheap power accumulating device of a low capacity even at a discharging control time. [0027]
  • To achieve this object, a controller of an elevator in this invention comprises a converter for rectifying AC power from an AC power source and converting the AC power to DC power; an inverter for converting the DC power outputted from the converter to AC power of a variable voltage and a variable frequency and driving an electric motor and operating the elevator; a power accumulating device arranged between DC buses between the converter and the inverter, and accumulating DC power from the DC buses at a regenerative operation time of the elevator, and supplying the accumulated DC power to the DC buses at a power running operation time; a charging-discharging control device for controlling charging and discharging operations of the power accumulating device with respect to the DC buses; charging-discharging state measuring means for measuring at least one of a temperature, charging and discharging currents, and charging and discharging voltages of the power accumulating device; current detecting means for detecting an output current of the inverter; voltage detecting means for detecting an output voltage of the inverter; speed detecting means for detecting a speed of the elevator; and speed control means for controlling an operation of the inverter to perform speed control based on speed commands of the elevator and a detecting value from the speed detecting means; the controller being characterized in that the speed control means calculates output power of the inverter on the basis of a detected current value of the current detecting means and a detected voltage value of the voltage detecting means, and calculates discharging ability power of the power accumulating device on the basis of a measuring value of the charging-discharging state measuring means, and calculates a limited power maximum value given by a sum of the discharging ability power and limited power of the AC power source, and changes speed commands on the basis of comparison of the output power of the inverter and the limited power maximum value. [0028]
  • Further, the speed control means has a table set with a limited discharging current with respect to a discharging current and a discharging voltage, and calculates the limited discharging current from the table on the basis of measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring means, and calculates the discharging ability power of the power accumulating device from the calculated limited discharging current and the measuring value of the discharging voltage. [0029]
  • Further, the speed control means has a table set with a limited discharging current with respect to a charging degree as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity with a full charging state of the power accumulating device as 100%, and the limited discharging current is calculated from the table on the basis of the charging degree obtained on the basis of measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring means, and the discharging ability power of the power accumulating device is calculated from the calculated limited discharging current and the measuring value of the discharging voltage. [0030]
  • Further, the speed control means has plural tables according to the temperature of the power accumulating device, and selects a table according to a temperature measuring value provided by the charging-discharging state measuring means. [0031]
  • Further, the speed control means has a table setting a speed pattern according to a load state, and calculates the speed pattern from the table on the basis of a car load measuring value measured by car load measuring means and generates speed commands according to the calculated speed pattern when it is judged on the basis of a measuring value provided by the charging-discharging state measuring means that the power accumulating device is broken. [0032]
  • Further, the speed control means has a table set with a maximum speed command value with respect to a car load and the discharging ability power of the power accumulating device, and calculates the discharging ability power of the power accumulating device on the basis of a measuring value of the charging-discharging state measuring means, and calculates maximum speed commands from the table on the basis of a car load measuring value measured by car load measuring means and the calculated discharging ability power, and changes speed commands on the basis of comparison of the speed commands and the maximum speed commands. [0033]
  • Further, the speed control means has plural speed pattern tables corresponding to the car load and the discharging ability power of the power accumulating device, and calculates the discharging ability power of the power accumulating device on the basis of the measuring value of the charging-discharging state measuring means, and selects the tables on the basis of the car load measuring value measured by the car load measuring means, and performs speed control according to a selected speed pattern. [0034]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a block diagram showing the construction of a controller of an elevator in this invention. [0035]
  • FIG. 2 is a view used to explain speed control of the elevator at a power failure time in this invention and showing a power waveform at a power running operation time of the elevator with a time axis as an axis of abscissa. [0036]
  • FIG. 3 is an explanatory view of a table T[0037] 1 arranged in a speed control circuit 21A in an Embodiment mode 1 of this invention in which a limit discharging current is set with respect to a discharging current and a discharging voltage.
  • FIG. 4 is a flow chart showing control of the [0038] speed control circuit 21A in the Embodiment mode 1 of this invention.
  • FIG. 5 is an explanatory view of a table T[0039] 2 arranged in a speed control circuit 21A in an Embodiment mode 2 of this invention in which a limit discharging current is set with respect to a charging degree SOC.
  • FIG. 6 is an explanatory view of tables T[0040] 2 a, T2 b, T2 c, —arranged in a speed control circuit 21A in an Embodiment mode 3 of this invention in which a limit discharging current is set with respect to plural charging degree SOCs in accordance with temperature.
  • FIG. 7 is an explanatory view of a table T[0041] 3 arranged in a speed control circuit 21A in an Embodiment mode 4 of this invention in which a speed pattern according to a load state is set.
  • FIG. 8 is an explanatory view of a table T[0042] 4 arranged in a speed control circuit 21A in an Embodiment mode 5 of this invention in which a maximum command speed is set with respect to a car load and discharging ability power of a power accumulating device 11.
  • FIG. 9 is a flow chart showing control of the [0043] speed control circuit 21A in the Embodiment mode 5 of this invention.
  • FIG. 10 is an explanatory view of a table T[0044] 5 arranged in a speed control circuit 21A in an Embodiment mode 6 of this invention in which a command speed is selected in accordance with discharging ability power and a load measuring value and is set in accordance with the number of timer interruption times.
  • FIG. 11 is an explanatory view of a table T[0045] 6 arranged in the speed control circuit 21A in the Embodiment mode 6 of this invention in which a command speed according to the remaining distance is set.
  • FIG. 12 is a flow chart showing control of the [0046] speed control circuit 21A in the Embodiment mode 6 of this invention.
  • FIG. 13 is a block diagram showing the construction of a controller of an elevator in a conventional example. [0047]
  • FIG. 14 is a flow chart showing the control of a charging-discharging [0048] control circuit 15 shown in FIG. 13 at its discharging time.
  • FIG. 15 is a flow chart showing the control of the charging-discharging [0049] control circuit 15 shown in FIG. 13 at its charging time.
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • In this invention, the speed of an elevator is controlled on the basis of discharging ability power of a power accumulating device, and the elevator having the power accumulating device of a long battery life is provided. [0050]
  • FIG. 1 is a block diagram showing the construction of a controller of the elevator in this invention. In FIG. 1, the same portions as the conventional example shown in FIG. 13 are designated by the same reference numerals and their explanations are omitted here. [0051] New reference numerals 14A and 21A respectively designate a charging-discharging state measuring device and a speed control circuit in the present invention. A power failure detector 22 detects a power failure of a three-phase AC power source 1. A current measuring instrument 23 and a voltage measuring instrument 24 respectively measure an output current and an output voltage of an inverter 4. A car load measuring instrument 25 is arranged between the cabin of a car 8 and a bottom portion of a car frame and measures a car load. The charging-discharging state measuring device 14A has each of measuring instruments for measuring charging and discharging currents, charging and discharging voltages and a temperature of a power accumulating device 11. In the charging-discharging state measuring device 14A, each of these measuring values and a charging degree, i.e., a full charging state of the power accumulating device 11 is set to 100%, and a SOC (State Of Charge) as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity is outputted to the speed control circuit 21A. The speed control circuit 21A outputs speed commands for controlling a speed of the elevator to the inverter 4 in a range of discharging ability power of the power accumulating device 11 at a detecting time of the power failure during running of the elevator on the basis of a power failure detecting signal from the power failure detector 22 or the voltage measuring instrument 18, charging and discharging states from the charging-discharging state measuring device 14A, a speed feedback signal from an encoder 20, each of measuring values from the current measuring instrument 22 and the voltage measuring instrument 23, and a car load measuring value from a car load measuring instrument.
  • FIG. 2 is a view used to explain speed control at a power failure time in this invention and showing a power waveform at a power running operation time of the elevator with a time axis as an axis of abscissa. [0052]
  • A power waveform as shown in FIG. 2 (refer (a)) is obtained in the case of full load riding of the elevator and a power running operation such as a ascending direction operation time. Power approximately becomes a total of a power amount depending on the speed of the elevator as shown in FIG. 2 (refer (b)) and a power amount depending on acceleration and deceleration as shown in FIG. 2 (refer (c)). A power curve becomes a peak ([0053] 51) during acceleration near a highest speed, and becomes a constant voltage (52) at a constant speed, and power is reduced (53) as deceleration is started. In discharging from the secondary battery 12, a dischargeable current value is generally limited by a temperature of the secondary battery 12, a battery voltage at a discharging time, etc. When a sufficient secondary battery 12 is stacked in all cases, the secondary battery 12 becomes expensive. Therefore, it is necessary to limit the discharging from the secondary battery 12 in a specific condition. Further, when the discharging from the secondary battery 12 is limited, the discharging current can be replaced with a three-phase AC current of the three-phase AC power source 1, but a power feeder is large-sized and contract power is increased, etc. so that it becomes expensive. Accordingly, in this invention, the elevator is operated in an allowable power range of the three-phase AC power source 1 when the discharging current of the power accumulating device 11 is limited.
  • Each of concrete embodiments will next be explained. [0054]
  • [0055] Embodiment Mode 1
  • In this [0056] Embodiment mode 1, the speed control circuit 21A has a table T1 in which a limit discharging current is set with respect to a discharging current and a discharging voltage as shown in FIG. 3. The speed control circuit 21A calculates discharging ability power of the power accumulating device 11 by using this table T1, and also calculates a limit power maximum value provided by a sum of this discharging ability power and limit power of the AC power source 1. The speed control circuit 21A then changes speed commands on the basis of the comparison of output power of the inverter 4 and the limit power maximum value.
  • FIG. 3 will first be explained. FIG. 3 shows an example of a table for limiting the discharging current on the basis of a voltage of the [0057] power accumulating device 11 at its discharging time. In this example, the limit power maximum value is made by measuring data of charging and discharging states from the charging-discharging state measuring device 14A and the above table T1. In this table, the present discharging current is a discharging current of the secondary battery 12 outputted from the power accumulating device 11 at present. The discharging voltage of the secondary battery 12 is measured and the limit current of a voltage equal to or greater than a voltage in a voltage column is described in an item of the limit current. For example, there is particularly no limit current when the present discharging current is equal to or greater than A1 ampere and the discharging voltage is equal to or greater than V11 volt. However, when the discharging voltage lies between V11 volt and V12 volt, the discharging current is limited to A12 ampere. When the discharging voltage is equal to or smaller than V12 volt, a table describing discharging inhibition etc. is used. If the table is set in further detail, more preferable results are naturally obtained. Since the speed control is performed in view of these results, a delay is inevitably caused. Therefore, it is necessary to design the table with a margin. It is simple to multiply the present voltage by this limit current and set limit power.
  • Control of the [0058] speed control circuit 21A in this Embodiment Mode 1 will next be explained with reference to a flow chart shown in FIG. 4.
  • In FIG. 5, a command speed Vm according to a standard speed pattern is calculated from a running object position, the present command speed, the present position of the elevator, etc. during running of the elevator, and the speed of the elevator is controlled (step S[0059] 101). The present output power Wc is then calculated on the basis of measuring values of an output current and an output voltage of the inverter 4 from the current measuring instrument 23 and the voltage measuring instrument 24 (step S102).
  • Thereafter, discharging ability power Wo of the [0060] power accumulating device 11 is calculated on the basis of a measuring value from the charging-discharging state measuring device 14A, and predetermined limit power (contract power) of commercial power (three-phase AC power source 1) is added to this discharging ability power so that a limit power maximum value Wmax is calculated (step S103). Namely, measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring device 14A are inputted to the speed control circuit 21A, and the speed control circuit 21A calculates a corresponding limit discharging current from the table T1 shown in FIG. 3. The speed control circuit 21A also calculates the discharging ability power Wo by a product of the calculated limit discharging current and the present discharging voltage, and adds the limit power of commercial power to this calculated discharging ability power Wo and calculates the limit power maximum value Wmax.
  • The output power Wc of the [0061] inverter 4 is then compared with the limit power maximum value Wmax. If the present output power Wc is equal to the limit power maximum value Wmax, the previous command speed is set to a late command speed to maintain the speed at that time (step S104→S105). In contrast to this, if no present output power Wc exceeds the limit power maximum value Wmax, the command speed Vm according to the standard speed pattern is set to the present command speed (step S104→S106). Conversely, when the present output power Wc exceeds the limit power maximum value Wmax, a new command speed is calculated by subtracting a deceleration set value Dv from the previous command speed, and using power is reduced (step S104→S107).
  • Thus, the speed control is performed on the basis of the calculated command speed, and the calculated command speed is stored to a built-in memory to prepare for the next calculation of the command speed (step S[0062] 108).
  • In this case, it is preferable that the limit discharging current of the above table T[0063] 1 has a margin in consideration of a time delay, etc. At this time, it is not necessary to set a deceleration degree to be increased so much in consideration of rate of change in discharging ability power and ride feeling. Accordingly, it is not necessary so much that an influence due to deceleration is considered in the inverter 4 at a measuring time of output power outputted at present. If it is necessary to consider this influence, no output power outputted at present is used, but it is sufficient to use expected power in constant running from the present speed and load. The elevator is abruptly decelerated when the present output power exceeds the limit power maximum value. However, if processing such as smoothing to the deceleration, etc. is performed in accordance with the present accelerating and decelerating states, a more smooth speed control pattern is obtained.
  • In the controller of the elevator constructed in this way, while a limit of commercial power is kept, the speed of the elevator can be stably controlled at a discharging time from the [0064] power accumulating device 11 in a range in which no excessive burden is imposed on the secondary battery 12. Accordingly, a cheap power accumulating device having a long life can be constructed.
  • [0065] Embodiment mode 2.
  • In this [0066] Embodiment mode 2, as shown in FIG. 5, the speed control circuit 21A has a table T2 in which a full charging state of the power accumulating device 11 is set to 100% and a limit discharging current is set with respect to a charging degree SOC as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity. The speed control circuit 21A calculates the limit discharging current from the table T2 on the basis of the charging degree SOC obtained on the basis of measuring values of the discharging current and the discharging voltage from the charging-discharging state measuring device 14A. The speed control circuit 21A also calculates discharging ability power of the power accumulating device 11 from the calculated limit discharging current and the measuring value of the discharging voltage.
  • Namely, FIG. 5 shows a table of the limit discharging current with respect to the present charging degree SOC of the [0067] power accumulating device 11. The present charging degree SOC can be calculated by accumulating charging and discharging currents or power of the secondary battery 12. With respect to this present charging degree SOC, a high discharging current can be generally obtained at a high SOC level. However, no discharging current (power) can be increased as the SOC level is reduced. FIG. 5 shows this situation as a table.
  • Similar to the [0068] Embodiment mode 1, the speed control circuit 21A in this Embodiment mode 2 also calculates a command speed in accordance with the flow chart shown in FIG. 4. Accordingly, while a limit of commercial power is kept, the speed of the elevator can be stably controlled at a discharging time from the power accumulating device 11 in a range in which no excessive burden is imposed on the secondary battery 12. Therefore, a cheap power accumulating device having a long life can be constructed.
  • [0069] Embodiment Mode 3
  • In this [0070] Embodiment mode 3, the speed control circuit 21A has plural tables T2 a, T2 b, T2 c, . . . according to the temperature of the secondary battery 12 of the power accumulating device 11 as shown in FIG. 6. The speed control circuit 21A selects a table according to a temperature measuring value of the charging-discharging state measuring device 14A from the plural tables. Similar to the Embodiment mode 2, the speed control circuit 21A then calculates discharging ability power of the power accumulating device 11, and effects similar to those in the Embodiment modes 1 and 2 can be obtained.
  • [0071] Embodiment Mode 4
  • In this [0072] Embodiment mode 4, as shown in FIG. 7, the speed control circuit 21A has a table T3 in which a speed pattern (e.g., V01, V02, V03, . . . , VOn at a loadless time) according to a load state is set. When it is judged on the basis of a measuring value of the charging-discharging state measuring device 14A that the power accumulating device 11 is broken, the speed control circuit 21A calculates the speed pattern from the above table T3 on the basis of a car load measuring value measured by the car load measuring instrument 25, and generates speed commands according to the calculated speed pattern.
  • Namely, FIG. 7 illustrates a table showing the speed pattern of speed control in the [0073] Embodiment mode 4. This table T3 shows the pattern at an accelerating time, and describes a speed at each of times t1, t2, t3, . . . , tn after departure. Smooth acceleration can be realized by using this table T3. This acceleration table is separately arranged on each of ascending and descending operation sides. A deceleration pattern table corresponding to the above acceleration is used on a deceleration side although this deceleration pattern table is not described here. However, this table generally uses a speed table with respect to the remaining distance until stoppage instead of speed with respect to time. In FIG. 7, items of no load, % load, etc. show patterns with respect to the respective loads.
  • When a reduction in output of the [0074] power accumulating device 11 such as an excessive reduction in charging degree SOC level caused by a certain cause (including breakdown) is known before departure, the elevator can be smoothly operated within restriction power of the three-phase AC power source 1 (commercial power) by operating the elevator in a preset speed pattern. In an operating pattern of the conventional elevator, no elevator has an operating pattern according to a load. Therefore, when the elevator is operated in a restriction power range of the commercial power, for example, a loadless raising operation basically becomes a regenerative operation and no discharging from the power accumulating device 11 is required. In contrast to this, a power running operation is performed in a loadless lowering operation so that consumed power is large. Thus, the elevator can be operated at an optimum speed by setting the speed table in accordance with loads and directions.
  • [0075] Embodiment Mode 5
  • In this [0076] Embodiment mode 5, the speed control circuit 21A, as shown in FIG. 8, has a table T4 in which maximum speed command values V01max, V02max, . . . are set with respect to a car load and discharging ability power of the power accumulating device 11. The speed control circuit 21A calculates discharging ability powers W01, W02, . . . of the power accumulating device 11 on the basis of a measuring value of the charging-discharging state measuring device 14A. The speed control circuit 21A also calculates the maximum speed command values V01max, V02max, . . . from the above table T4 on the basis of a car load measuring value measured by the car load measuring instrument 25 and the calculated discharging ability powers. The speed control circuit 21A then changes speed commands on the basis of comparison of the speed commands and the maximum speed commands.
  • Control of the [0077] speed control circuit 21A in this Embodiment mode 5 will next be explained with reference to a flow chart shown in FIG. 9.
  • Speed control of the [0078] inverter 4 is first performed on the basis of a command speed Vm according to a standard speed pattern (step S501). Discharging ability power Wo of the power accumulating device 11 is then calculated on the basis of a measuring value from the charging-discharging state measuring device 14A (step S502).
  • Thereafter, a corresponding maximum command speed Vmax is calculated from the table T[0079] 4 shown in FIG. 8 on the basis of a car load measuring value of the car load measuring instrument 25 and the discharging ability power Wo (step S503). Further, the command speed Vm based on the standard speed pattern and the maximum command speed Vmax are compared with each other (step S504).
  • If the present command speed Vm is equal to the maximum command speed Vmax, the maximum command speed Vmax is set to a command speed (step S[0080] 504→S505). In contrast to this, when the present command speed Vm does not exceed the maximum command speed Vmax, a new command speed is calculated by subtracting a deceleration set value Dv from the previous command speed to decelerate the speed, and using power is reduced (step S504→S506). Conversely, if the present command speed Vm exceeds the maximum command speed Vmax, the command speed Vm based on the standard speed pattern is set to a command speed (step S504→S507).
  • Thus, speed control is performed on the basis of the calculated command speed, and the calculated command speed is stored to a built-in memory to prepare for the next calculation of the command speed (step S[0081] 508).
  • Accordingly, in accordance with the [0082] above Embodiment mode 5, while a limit of commercial power is kept, the speed of the elevator can be stably controlled at a discharging time from the power accumulating device 11 in a range in which no excessive burden is imposed on the secondary battery 12. Therefore, a cheap power accumulating device having a long life can be constructed.
  • [0083] Embodiment Mode 6
  • In this [0084] Embodiment mode 6, the speed control circuit 21A has plural, as shown in FIG. 10, tables T5 in which a command speed value of the elevator is stored every timer interruption of each speed control. The plural tables T5 are separately arranged every discharging ability power of the power accumulating device and every load of the elevator. For example, when ten tables are arranged every discharging ability power of the power accumulating device and ten tables are arranged in each load every each of these ten tables of the discharging ability power, a total number of tables becomes 100. Further, as shown in FIG. 11, the speed control circuit 21A has a table T6 in which a command speed according to the remaining distance is set.
  • Namely, in this [0085] Embodiment mode 6, the speed control circuit 21A first calculates the command speed according to the remaining distance on the basis of the table T6 as shown in FIG. 11. Further, the speed control circuit 21A calculates the discharging ability power of the power accumulating device on the basis of a measuring value of the charging-discharging state measuring device. The speed control circuit 21A then selects a table T5 as shown in FIG. 10 in accordance with both data of the discharging ability power and a car load measuring value measured by the car load measuring instrument 25 on the basis of this car load measuring value. The speed control circuit 21A calculates the command speed from the selected table every control timer interruption. At a timer interruption time, for example, the speed control circuit 21A calculates v1 as a command speed at the timer interruption time just after start, and calculates v2 as a command speed at the next timer interruption time.
  • Control of the [0086] speed control circuit 21A in this Embodiment mode 6 will next be explained with reference to a flow chart shown in FIG. 12.
  • The flow chart shown in FIG. 12 is started every timer interruption. First, a command speed is calculated in accordance with the remaining distance until an object floor with reference to the table T[0087] 6. For example, if the remaining distance until the object floor is equal to or greater than dl, the command speed Vd according to the remaining distance is set to vd1. If the remaining distance until the object floor is equal to or smaller than d1 and exceeds d2 (d1>d2 and command speeds are arranged in a long order of the remaining distance in the table), the command speed Vd according to the remaining distance is set to vd2. Hereinafter, the command speed Vd according to the remaining distance is set in accordance with this table T6 (step S601).
  • A command speed Va according to the number of timer interruption times is next set. Namely, since there is periodically a timer interruption, a table T[0088] 5 shown in FIG. 10 is selected in accordance with both data of the discharging ability power and the car load measuring value every time from start. The command speed Va according to the number of timer interruption times is set from the selected table T5 every control timer interruption (step S602). Since the speed is set to a highest speed in a final table T5, Va=Vmax is set after that.
  • Next, the command speed Va every timer interruption is compared with the command speed Vd according to the remaining distance. If the command speed Va every timer interruption exceeds the command speed vd according to the remaining distance, the command speed is set to Vd (step S[0089] 603→S604). In contrast to this, if no command speed va every timer interruption exceeds the command speed Vd according to the remaining distance, the command speed is set to Va (step S603→S605). Namely, the speed of the elevator is accelerated in accordance with the table T5 shown in FIG. 10 at an accelerating time, and is decelerated in accordance with the table T6 shown in FIG. 11 at a decelerating time. Thus, the speed control can be smoothly performed until an object floor.
  • As mentioned above, in accordance with this invention, it is possible to construct an elevator which can perform stable speed control by using a cheap power accumulating device of a low capacity even at a discharging control time, and has the power accumulating device having a long battery life without reducing energy saving effects. [0090]

Claims (7)

What is claimed is:
1. A controller of an elevator comprising:
a converter for rectifying AC power from an AC power source and converting the AC power to DC power;
an inverter for converting the DC power outputted from said converter to AC power of a variable voltage and a variable frequency and driving an electric motor and operating the elevator;
a power accumulating device arranged between DC buses between said converter and said inverter, and accumulating DC power from the DC buses at a regenerative operation time of the elevator, and supplying the accumulated DC power to the DC buses at a power running operation time;
a charging-discharging control device for controlling charging and discharging operations of said power accumulating device with respect to said DC buses;
charging-discharging state measuring means for measuring at least one of a temperature, charging and discharging currents, and charging and discharging voltages of said power accumulating device;
current detecting means for detecting an output current of said inverter;
voltage detecting means for detecting an output voltage of said inverter;
speed detecting means for detecting a speed of said elevator; and
speed control means for controlling an operation of said inverter to perform speed control based on speed commands of the elevator and a detecting value from said speed detecting means;
the controller being characterized in that said speed control means calculates output power of the inverter on the basis of a detected current value of said current detecting means and a detected voltage value of said voltage detecting means, and calculates discharging ability power of said power accumulating device on the basis of a measuring value of said charging-discharging state measuring means, and calculates a limited power maximum value given by a sum of the discharging ability power and limited power of said AC power source, and changes speed commands on the basis of comparison of the output power of said inverter and said limited power maximum value.
2. A controller of an elevator according to
claim 1
, wherein
said speed control means has a table set with a limited discharging current with respect to a discharging current and a discharging voltage, and calculates the limited discharging current from said table on the basis of measuring values of the discharging current and the discharging voltage from said charging-discharging state measuring means, and calculates the discharging ability power of said power accumulating device from the calculated limited discharging current and the measuring value of the discharging voltage.
3. A controller of an elevator according to
claim 1
, wherein
said speed control means has a table set with a limited discharging current with respect to a charging degree as a value obtained by normalizing and accumulating a product of a charging-discharging current and a charging-discharging voltage by a capacity with a full charging state of said power accumulating device as 100%, and the limited discharging current is calculated from said table on the basis of the charging degree obtained on the basis of measuring values of the discharging current and the discharging voltage from said charging-discharging state measuring means, and the discharging ability power of said power accumulating device is calculated from the calculated limited discharging current and the measuring value of the discharging voltage.
4. A controller of an elevator according to
claim 3
, wherein
said speed control means has plural tables according to the temperature of said power accumulating device, and selects a table according to a temperature measuring value provided by said charging-discharging state measuring means.
5. A controller of an elevator according to
claim 1
, wherein
said speed control means has a table setting a speed pattern according to a load state, and calculates the speed pattern from said table on the basis of a car load measuring value measured by car load measuring means and generates speed commands according to the calculated speed pattern when it is judged on the basis of a measuring value provided by said charging-discharging state measuring means that said power accumulating device is broken.
6. A controller of an elevator according to
claim 1
, wherein
said speed control means has a table set with a maximum speed command value with respect to a car load and the discharging ability power of said power accumulating device, and calculates the discharging ability power of said power accumulating device on the basis of a measuring value of said charging-discharging state measuring means, and calculates maximum speed commands from said table on the basis of a car load measuring value measured by car load measuring means and the calculated discharging ability power, and changes speed commands on the basis of comparison of the speed commands and the maximum speed commands.
7. A controller of an elevator according to
claim 5
, wherein
said speed control means has plural speed pattern tables corresponding to the car load and the discharging ability power of said power accumulating device, and calculates the discharging ability power of said power accumulating device on the basis of the measuring value of said charging-discharging state measuring means, and selects said tables on the basis of the car load measuring value measured by said car load measuring means, and performs speed control according to a selected speed pattern.
US09/785,465 2000-02-28 2001-02-20 Elevator speed controller responsive to dual electrical power sources Expired - Fee Related US6422351B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2000052346A JP4283963B2 (en) 2000-02-28 2000-02-28 Elevator control device
JP2000-052346 2000-02-28

Publications (2)

Publication Number Publication Date
US20010017239A1 true US20010017239A1 (en) 2001-08-30
US6422351B2 US6422351B2 (en) 2002-07-23

Family

ID=18573876

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/785,465 Expired - Fee Related US6422351B2 (en) 2000-02-28 2001-02-20 Elevator speed controller responsive to dual electrical power sources

Country Status (5)

Country Link
US (1) US6422351B2 (en)
JP (1) JP4283963B2 (en)
KR (1) KR100407628B1 (en)
CN (1) CN1229272C (en)
TW (1) TW528722B (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040245952A1 (en) * 2003-06-06 2004-12-09 Fanuc Ltd Motor driving apparatus
EP1908719A1 (en) * 2005-07-26 2008-04-09 Mitsubishi Electric Corporation Elevator device
EP2019071A1 (en) * 2006-05-16 2009-01-28 Mitsubishi Electric Corporation Control device for elevator
WO2009141492A1 (en) * 2008-05-20 2009-11-26 Kone Corporation Power supply arrangement of an elevator
WO2010012859A1 (en) * 2008-08-01 2010-02-04 Kone Corporation Arrangement and method in connection with a transport system
WO2010019123A1 (en) * 2008-08-15 2010-02-18 Otis Elevator Company Management of power from multiple sources in an elevator power system
WO2010019126A1 (en) * 2008-08-15 2010-02-18 Otis Elevator Company Management of power from multiple sources in an elevator power system
WO2011080393A1 (en) * 2009-12-28 2011-07-07 Sandvik Mining And Construction Oy Mining vehicle and method for its energy supply
WO2011128493A1 (en) * 2010-04-16 2011-10-20 Kone Corporation Elevator system
ES2382430A1 (en) * 2009-12-21 2012-06-08 Orona, S. Coop Energy management method and system for an electric motor
FR2988536A1 (en) * 2012-03-21 2013-09-27 Huchez Treuils Method for managing electrical motor of towing device e.g. winch to operate door, involves measuring electric parameters of electrical motor, and adjusting instruction speed according to measured electric parameter
WO2013172818A1 (en) * 2012-05-15 2013-11-21 Otis Elevator Company Elevator backup power supply
US20130307444A1 (en) * 2011-02-01 2013-11-21 Stig Olav Settemsdal Power Supply System for an Electrical Drive of a Marine Vessel
EP2719650A1 (en) * 2011-06-13 2014-04-16 Mitsubishi Electric Corporation Elevator control device
US8714286B2 (en) 2009-12-28 2014-05-06 Sandvik Mining And Construction Oy Mining vehicle and method for its energy supply
US20140210389A1 (en) * 2013-01-29 2014-07-31 Fanuc Corporation Motor control device including electric storage device and resistance discharge device
WO2015047219A1 (en) 2013-09-24 2015-04-02 Otis Elevator Company Elevator system using rescue storage device for increased power
WO2015116931A1 (en) * 2014-01-31 2015-08-06 Eaton Corporation Unidirectional matrix converter with regeneration system
EP1721775A3 (en) * 2005-05-09 2016-10-26 Kabushiki Kaisha Toshiba Control apparatus for an eletric locomotive
EP3126274A1 (en) * 2014-06-10 2017-02-08 KONE Corporation Method for controlling a passenger transport system
US20170057778A1 (en) * 2014-08-06 2017-03-02 Mitsubishi Electric Corporation Elevator control device
US20170070171A1 (en) * 2014-03-11 2017-03-09 Ebara Corporation Driving apparatus for electric motor
US20170250538A1 (en) * 2016-02-25 2017-08-31 Delta Electronics (Shanghai) Co., Ltd. Electric power system and control method thereof
US20180057309A1 (en) * 2016-08-29 2018-03-01 Kone Corporation Elevator
US20190181677A1 (en) * 2016-04-14 2019-06-13 Toshiba Mitsubishi-Electric Industrial Systems Corporation Uninterruptible power supply device
DE10296269B4 (en) 2001-12-10 2019-12-24 Mitsubishi Denki K.K. Control device for lifts
US20200122961A1 (en) * 2018-10-19 2020-04-23 Otis Elevator Company Power supply to ac loads during power source failure in elevator system

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2003033390A1 (en) * 2001-10-17 2005-02-03 三菱電機株式会社 Elevator control device
CN100581969C (en) * 2001-12-10 2010-01-20 三菱电机株式会社 Elevator control apparatus
JP3722811B2 (en) * 2003-06-06 2005-11-30 ファナック株式会社 Motor drive device
US7116067B2 (en) * 2004-09-21 2006-10-03 Honeywell International Inc. Power converter controlling apparatus and method providing ride through capability during power interruption in a motor drive system
JP5095223B2 (en) * 2005-07-26 2012-12-12 三菱電機株式会社 Elevator equipment
EP2112114B1 (en) * 2007-02-14 2014-04-16 Mitsubishi Electric Corporation Elevator
JP5240685B2 (en) * 2007-09-07 2013-07-17 東芝エレベータ株式会社 elevator
JP5245498B2 (en) * 2008-03-31 2013-07-24 株式会社明電舎 Power assist device
US8613344B2 (en) * 2008-08-15 2013-12-24 Otis Elevator Company Line current and energy storage control for an elevator drive
EP2331442B1 (en) 2008-09-04 2013-10-23 Otis Elevator Company Management of power from multiple sources based on elevator usage patterns
DE102009035853A1 (en) 2008-12-16 2010-06-17 Wittenstein Ag Method for operating electrical and / or electromechanical systems
CN102013864A (en) * 2009-09-08 2011-04-13 北京京普瑞科技有限公司 Speed regulating method, speed regulating circuit and lifting device of permanent-magnet motor
JP2011063428A (en) * 2009-09-18 2011-03-31 Toshiba Elevator Co Ltd Rescue operation system for elevator
CN102198900B (en) * 2010-03-23 2013-06-12 上海三菱电梯有限公司 Backup source operation control system of energy feedback elevator
FI20105587A0 (en) * 2010-05-25 2010-05-25 Kone Corp A method for limiting the load on an elevator assembly and an elevator assembly
US9296589B2 (en) * 2010-07-30 2016-03-29 Otis Elevator Company Elevator regenerative drive control referenced to DC bus
KR101248129B1 (en) * 2010-08-19 2013-03-26 주식회사 에버다임 Electrical energy regeneration apparatus for a tower crane
CN102372205B (en) * 2010-08-26 2014-05-28 上海三菱电梯有限公司 Elevator energy-saving device based on cooperative control mode
CN102452588B (en) * 2010-10-21 2014-01-01 上海三菱电梯有限公司 Energy-saving device for elevator
CN102001557A (en) * 2010-12-01 2011-04-06 大连山亿电子有限公司 HYBRID elevator control cabinet and control method thereof
CN102115000A (en) * 2011-01-14 2011-07-06 上海微频莱机电科技有限公司 Integrated controller for fan tower cylinder lifting machine
CN102381602B (en) * 2011-07-04 2014-06-18 上海微频莱机电科技有限公司 Slow descending device of lifting machine
US8773049B2 (en) * 2011-07-13 2014-07-08 General Electric Company System for use in controlling motor torque and method of assembling same
CN102303798B (en) * 2011-08-30 2013-09-18 王旭 Energy-saving method of energy-saving elevator
JP5557815B2 (en) * 2011-09-20 2014-07-23 株式会社日立製作所 Energy saving elevator
CN103010868B (en) * 2011-09-26 2014-08-13 上海三菱电梯有限公司 Elevator energy-saving system and control method thereof
ES2902673T3 (en) 2012-07-18 2022-03-29 Otis Elevator Co Elevator energy management
WO2014058843A2 (en) 2012-10-08 2014-04-17 Trane International Inc. Hvac electrical system power supply packaging system
CN102923537B (en) * 2012-11-13 2014-04-23 天津大学 Integration drive control device for supercapacitor energy storage type elevator
JP2014125288A (en) * 2012-12-25 2014-07-07 Hitachi Ltd Elevator control system
EP2813457B1 (en) * 2013-06-10 2016-03-23 Kone Corporation Method and apparatus for controlling an elevator group
KR101590628B1 (en) * 2013-10-15 2016-02-22 부산항만공사 Apparatus for regenerative power discharge and method thereof
CN105565090B (en) * 2015-11-05 2018-04-24 武汉迪凯威特科技有限公司 Test pill
CN105914099B (en) * 2016-06-19 2017-11-28 江苏怡通控制系统有限公司 A kind of high-power temperature protector
CN106276437A (en) * 2016-08-30 2017-01-04 成都英格瑞德电气有限公司 A kind of efficiently energy-saving device of elevator
CN106241523A (en) * 2016-08-30 2016-12-21 成都英格瑞德电气有限公司 A kind of lift appliance of energy storing and electricity generating
FI3323761T3 (en) * 2016-11-16 2024-01-15 Kone Corp Method, elevator control unit and elevator for moving an elevator car to landing floor in case of event related to main electrical power supply of the elevator
JP6648704B2 (en) * 2017-01-19 2020-02-14 株式会社オートネットワーク技術研究所 In-vehicle control device and in-vehicle power supply device
US10604378B2 (en) * 2017-06-14 2020-03-31 Otis Elevator Company Emergency elevator power management
US10680538B2 (en) * 2017-09-28 2020-06-09 Otis Elevator Company Emergency braking for a drive system
CN110316628B (en) * 2018-03-28 2021-08-03 上海三菱电梯有限公司 Elevator safety system
EP3744672A1 (en) * 2019-05-31 2020-12-02 Cedes AG Limit curve control for elevators
CN112789801B (en) * 2020-12-30 2023-04-04 日立电梯(中国)有限公司 Bus voltage control method, bus voltage control device, elevator controller and storage medium
CN113942903B (en) * 2021-11-04 2023-08-11 上海辛格林纳新时达电机有限公司 Elevator control method and elevator

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3935518A (en) * 1972-12-06 1976-01-27 Vladimir Grigorievich Yatsuk Method of eliminating self oscillations of an induction motor powered from a frequency changer and means for effecting same
JPS5836867A (en) * 1981-08-25 1983-03-03 三菱電機株式会社 Operating device in case of emergency of alternating current elevator
JPS6043094A (en) * 1983-08-17 1985-03-07 Mitsubishi Electric Corp Operating device of elevator when in trouble
JPS61248881A (en) * 1985-04-22 1986-11-06 三菱電機株式会社 Controller for elevator
JP2656684B2 (en) * 1991-06-12 1997-09-24 三菱電機株式会社 Elevator blackout operation device
US5440219A (en) * 1993-05-21 1995-08-08 Wilkerson; Alan W. Induction motor speed control having improved sensing of motor operative conditions
JP3261901B2 (en) * 1994-12-19 2002-03-04 三菱電機株式会社 Elevator emergency operation device
JP3309648B2 (en) * 1995-06-22 2002-07-29 三菱電機株式会社 Elevator control device
JPH09110329A (en) * 1995-10-20 1997-04-28 Hitachi Ltd Elevator drive device
JPH09202551A (en) * 1996-01-29 1997-08-05 Toshiba Elevator Technos Kk Control device for installation work of elevator
US5712456A (en) 1996-04-10 1998-01-27 Otis Elevator Company Flywheel energy storage for operating elevators
KR100303011B1 (en) * 1998-12-12 2002-05-09 장병우 Operation control apparatus for elevator
KR100312771B1 (en) * 1998-12-15 2002-05-09 장병우 Driving control apparatus and method in power failure for elevator

Cited By (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10296269B4 (en) 2001-12-10 2019-12-24 Mitsubishi Denki K.K. Control device for lifts
US7227323B2 (en) * 2003-06-06 2007-06-05 Fanuc Ltd Motor driving apparatus
US20040245952A1 (en) * 2003-06-06 2004-12-09 Fanuc Ltd Motor driving apparatus
EP1721775A3 (en) * 2005-05-09 2016-10-26 Kabushiki Kaisha Toshiba Control apparatus for an eletric locomotive
EP1908719A4 (en) * 2005-07-26 2013-01-16 Mitsubishi Electric Corp Elevator device
EP1908719A1 (en) * 2005-07-26 2008-04-09 Mitsubishi Electric Corporation Elevator device
EP2019071A1 (en) * 2006-05-16 2009-01-28 Mitsubishi Electric Corporation Control device for elevator
EP2019071A4 (en) * 2006-05-16 2013-01-23 Mitsubishi Electric Corp Control device for elevator
EP2288561A1 (en) * 2008-05-20 2011-03-02 Kone Corporation Power supply arrangement of an elevator
WO2009141492A1 (en) * 2008-05-20 2009-11-26 Kone Corporation Power supply arrangement of an elevator
EP2288561A4 (en) * 2008-05-20 2014-08-13 Kone Corp Power supply arrangement of an elevator
US20110068629A1 (en) * 2008-05-20 2011-03-24 Kone Corporation Power supply arrangement of an elevator
US8471403B2 (en) 2008-05-20 2013-06-25 Kone Corporation Power supply arrangement of an elevator
EP2303745A1 (en) * 2008-08-01 2011-04-06 Kone Corporation Arrangement and method in connection with a transport system
WO2010012859A1 (en) * 2008-08-01 2010-02-04 Kone Corporation Arrangement and method in connection with a transport system
US8575869B2 (en) 2008-08-01 2013-11-05 Kone Corporation Arrangement and method in connection with a transport system
EP2303745A4 (en) * 2008-08-01 2014-12-24 Kone Corp Arrangement and method in connection with a transport system
CN102123927A (en) * 2008-08-15 2011-07-13 奥蒂斯电梯公司 Management of power from multiple sources in an elevator power system
WO2010019126A1 (en) * 2008-08-15 2010-02-18 Otis Elevator Company Management of power from multiple sources in an elevator power system
WO2010019123A1 (en) * 2008-08-15 2010-02-18 Otis Elevator Company Management of power from multiple sources in an elevator power system
US20110147130A1 (en) * 2008-08-15 2011-06-23 Otis Elevator Company Management of power from multiple sources in an elevator power system
US8590672B2 (en) 2008-08-15 2013-11-26 Otis Elevator Company Management of power from multiple sources in an elevator power system
ES2382430A1 (en) * 2009-12-21 2012-06-08 Orona, S. Coop Energy management method and system for an electric motor
US8714286B2 (en) 2009-12-28 2014-05-06 Sandvik Mining And Construction Oy Mining vehicle and method for its energy supply
AU2010338146B2 (en) * 2009-12-28 2013-11-07 Sandvik Mining And Construction Oy Mining vehicle and method for its energy supply
WO2011080393A1 (en) * 2009-12-28 2011-07-07 Sandvik Mining And Construction Oy Mining vehicle and method for its energy supply
US8955657B2 (en) 2009-12-28 2015-02-17 Sandvik Mining And Construction Oy Mining vehicle and method for its energy supply
WO2011128493A1 (en) * 2010-04-16 2011-10-20 Kone Corporation Elevator system
US8789660B2 (en) 2010-04-16 2014-07-29 Kone Corporation Elevator system using a movement profile
CN102939255A (en) * 2010-04-16 2013-02-20 通力股份公司 Elevator system
US9381990B2 (en) * 2011-02-01 2016-07-05 Siemens Aktiengesellschaft Power supply system for an electrical drive of a marine vessel
US20130307444A1 (en) * 2011-02-01 2013-11-21 Stig Olav Settemsdal Power Supply System for an Electrical Drive of a Marine Vessel
EP2719650A4 (en) * 2011-06-13 2014-11-12 Mitsubishi Electric Corp Elevator control device
KR101518162B1 (en) 2011-06-13 2015-05-06 미쓰비시덴키 가부시키가이샤 Elevator control device
EP2719650A1 (en) * 2011-06-13 2014-04-16 Mitsubishi Electric Corporation Elevator control device
FR2988536A1 (en) * 2012-03-21 2013-09-27 Huchez Treuils Method for managing electrical motor of towing device e.g. winch to operate door, involves measuring electric parameters of electrical motor, and adjusting instruction speed according to measured electric parameter
US9935494B2 (en) 2012-05-15 2018-04-03 Otis Elevator Company Elevator power supply for inverter controller
EP2850717B1 (en) 2012-05-15 2023-05-03 Otis Elevator Company Elevator backup power supply
WO2013172818A1 (en) * 2012-05-15 2013-11-21 Otis Elevator Company Elevator backup power supply
US9118270B2 (en) * 2013-01-29 2015-08-25 Fanuc Corporation Motor control device including electric storage device and resistance discharge device
US20140210389A1 (en) * 2013-01-29 2014-07-31 Fanuc Corporation Motor control device including electric storage device and resistance discharge device
US10155640B2 (en) 2013-09-24 2018-12-18 Otis Elevator Company Elevator system using rescue storage device for increased power
WO2015047219A1 (en) 2013-09-24 2015-04-02 Otis Elevator Company Elevator system using rescue storage device for increased power
EP3049360A4 (en) * 2013-09-24 2017-05-24 Otis Elevator Company Elevator system using rescue storage device for increased power
WO2015116931A1 (en) * 2014-01-31 2015-08-06 Eaton Corporation Unidirectional matrix converter with regeneration system
US10135353B2 (en) 2014-01-31 2018-11-20 Eaton Intelligent Power Limited Unidirectional matrix converter with regeneration system
US20170070171A1 (en) * 2014-03-11 2017-03-09 Ebara Corporation Driving apparatus for electric motor
US9780713B2 (en) * 2014-03-11 2017-10-03 Ebara Corporation Driving apparatus for electric motor
EP3126274A1 (en) * 2014-06-10 2017-02-08 KONE Corporation Method for controlling a passenger transport system
EP3126274B1 (en) * 2014-06-10 2022-11-30 KONE Corporation Method for controlling a passenger transport system
US10081512B2 (en) * 2014-08-06 2018-09-25 Mitsubishi Electric Corporation Elevator control device
US20170057778A1 (en) * 2014-08-06 2017-03-02 Mitsubishi Electric Corporation Elevator control device
US10411474B2 (en) * 2016-02-25 2019-09-10 Delta Electronics (Shanghai) Co., Ltd. Electric power system and control method thereof
US20170250538A1 (en) * 2016-02-25 2017-08-31 Delta Electronics (Shanghai) Co., Ltd. Electric power system and control method thereof
US20190181677A1 (en) * 2016-04-14 2019-06-13 Toshiba Mitsubishi-Electric Industrial Systems Corporation Uninterruptible power supply device
US10811898B2 (en) * 2016-04-14 2020-10-20 Toshiba Mitsubishi-Electric Industrial Systems Corporation Uninterruptible power supply device
CN107792739A (en) * 2016-08-29 2018-03-13 通力股份公司 Elevator
US20180057309A1 (en) * 2016-08-29 2018-03-01 Kone Corporation Elevator
US10723589B2 (en) * 2016-08-29 2020-07-28 Kone Corporation Elevator
US20200122961A1 (en) * 2018-10-19 2020-04-23 Otis Elevator Company Power supply to ac loads during power source failure in elevator system

Also Published As

Publication number Publication date
JP2001240319A (en) 2001-09-04
TW528722B (en) 2003-04-21
CN1311150A (en) 2001-09-05
KR20010085468A (en) 2001-09-07
KR100407628B1 (en) 2003-12-01
US6422351B2 (en) 2002-07-23
JP4283963B2 (en) 2009-06-24
CN1229272C (en) 2005-11-30

Similar Documents

Publication Publication Date Title
US6422351B2 (en) Elevator speed controller responsive to dual electrical power sources
US6435312B2 (en) Elevator speed controller responsive to power failures
US6435313B2 (en) Controller for dynamically allocating regenerative power to a rechargeable power supply of an elevator
US6439348B2 (en) Elevator controller controlling charging of a battery power source with regenerative power
US6431324B2 (en) Controller scheduling constant current charging of a rechargeable power source of an elevator system
US6827182B2 (en) Elevator controller
US6471013B2 (en) Apparatus for controlling charging and discharging of supplemental power supply of an elevator system
US6431323B2 (en) Elevator power management system having power storage apparatus maintaining a particular charge in accordance with time of day
KR100407626B1 (en) Elevator control apparatus
US6415892B2 (en) Power control including a secondary battery for powering an elevator
WO2001037396A1 (en) Power supply for ac elevator
JP2004043078A (en) Control device for elevator
JP2002211855A (en) Control system for elevator
JP4463912B2 (en) AC elevator power supply
JP4683708B2 (en) Elevator equipment
JP2005324880A (en) Elevator control device

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI DENKI KABUSHIKI KAISHA, JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TAJIMA, SHINOBU;ARAKI, HIROSHI;SUGA, IKURO;AND OTHERS;REEL/FRAME:011558/0470;SIGNING DATES FROM 20001208 TO 20010124

Owner name: THE TOKYO ELECTRIC POWER COMPANY, INCORPORATED, JA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TAJIMA, SHINOBU;ARAKI, HIROSHI;SUGA, IKURO;AND OTHERS;REEL/FRAME:011558/0470;SIGNING DATES FROM 20001208 TO 20010124

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20100723