US1009707A - Manufacture of steel. - Google Patents

Manufacture of steel. Download PDF

Info

Publication number
US1009707A
US1009707A US53959610A US1910539596A US1009707A US 1009707 A US1009707 A US 1009707A US 53959610 A US53959610 A US 53959610A US 1910539596 A US1910539596 A US 1910539596A US 1009707 A US1009707 A US 1009707A
Authority
US
United States
Prior art keywords
bath
steel
metal
ladle
manufacture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US53959610A
Inventor
Plimmon H Dudley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US53959610A priority Critical patent/US1009707A/en
Application granted granted Critical
Publication of US1009707A publication Critical patent/US1009707A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • C21C5/32Blowing from above

Definitions

  • My invention relates to the manufacture of steel, particularly steel of high grades, for rails and ties, the object being to eliminate or reduce the slags and oxids to a greater degree than has hitherto been done in ordinary practice.
  • My present invention consists in producing a bath of prepared metal, introducing the recarburizing elements therein, allowing the bath to remain undisturbed a predetermined length of time and subsequently, before teeming the ingots, introducing a subsidiary deoxidizing agent.
  • My invention further consists in producing a bath of prepared metal, introducing the recarburizing elements therein, allowing the bath to remain undisturbed a predetermined length of time, pouring the bath into the teeming ladle, and introducing a subsidiary de0Xidizing agent in the ladle underneath the poured slag and then teeming the ingots.
  • the bath of prepared metal may be recarburized in the well known Bessemer converter or other furnace, and after the com- Speeifieation of Letters Patent.
  • the bath is held undisturbed for preferably two and one-half minutes as a minimum time before pouring into the tee1n ing ladle.
  • the subsidiary (lo-oxidizing agent, which may consist of ferro titanium, may be thrown into the teeming ladle as the metal is being poured from the converter into the ladle and the metal with the deoxidizing agent therein, is held in the ladle three or more minutes for the slag from the subsidiary de-oxidizer to rise and escape from the steel.
  • the subsidiary deoxidizing agent should be introduced into the steel after the usual recarburizing agents have had their effect and the slag therefrom has risen, in order that it may have an immediate efl'ect upon the molten steel freed to a considerable extent from the oXids, and it is also important that it be introduced in a position beneath the slag which has risen, in order that it may operate upon the steel proper rather than upon the slag.
  • the particular manner of introducing the ferro titanium in the teeming ladle may consist of simply shoveling it into the bottom of the ladle as pouring begins or any other feasible way may be resorted to, and hence I do not wish to limit the process to this particular manner of introducing it.
  • the bath or charge should be held at leastthree minutes after the introduction of the apteisen (recarburizer), before pouring into the teeming ladle.
  • the ferro titanium is in troduced in the teeming ladle in such proportions as may be required to produce the desired result, the amount ranging from one-tenth of one per cent.
  • the bath of metal produced by melting and reducing is allowed to rest a sullicient period of time to complete the chemical reactions as shown by tests made at suitable intervals, for instance, ten minutes or more before being transferred to the teeming ladle, and ferro titanium is introduced beneath the slag in the teeming ladle in any feasible manner.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Description

PLIIVIIVION' H. DUDLEY, OF NEW YORK, N. Y.
MANUFACTURE OF STEEL.
No Drawing.
To all whom it may, concern:
Be it known that I, PLIMMON H. DUDLEY, a citizen of the United States, and resident of the borough of Manhattan, in the city and State of New York, have invented a new and useful Manufacture of Steel, of which the following is a specification.
My invention relates to the manufacture of steel, particularly steel of high grades, for rails and ties, the object being to eliminate or reduce the slags and oxids to a greater degree than has hitherto been done in ordinary practice.
It has heretofore been the Bessemer practice to recarburize the bath of molten metal and forthwith to proceed to teem the ingots. The result has been that products, for example silicates of iron and manganese and oXids detrimental to the homogeneity and toughness of the steel, have remained therein and serious accidents have resulted therefrom.
1 have found in practice that if, after the incorporation of the spiegeleisen, the molten bath is held in the converter for two, three or more minutes, according to the size of the bath, to allow the chemical reactions to take place, the slag resulting therefrom will separate, rise and escape from the steel. to such an extent that the further cleansing of the bath by ferro titanium to remove more traces of oxids and nitrogen can be accomplished by the use of about one-tenth of the amount of ferro titanium heretofore required for steel of corresponding quality.
My present invention consists in producing a bath of prepared metal, introducing the recarburizing elements therein, allowing the bath to remain undisturbed a predetermined length of time and subsequently, before teeming the ingots, introducing a subsidiary deoxidizing agent.
My invention further consists in producing a bath of prepared metal, introducing the recarburizing elements therein, allowing the bath to remain undisturbed a predetermined length of time, pouring the bath into the teeming ladle, and introducing a subsidiary de0Xidizing agent in the ladle underneath the poured slag and then teeming the ingots.
In carrying the process into practical effect, the bath of prepared metal may be recarburized in the well known Bessemer converter or other furnace, and after the com- Speeifieation of Letters Patent.
Application filed January 22, 1910.
Patented Nov. 21, 1911.
Serial No. 539,596.
pletion of adding the ordinary or usual recarburizers, the bath is held undisturbed for preferably two and one-half minutes as a minimum time before pouring into the tee1n ing ladle. The subsidiary (lo-oxidizing agent, which may consist of ferro titanium, may be thrown into the teeming ladle as the metal is being poured from the converter into the ladle and the metal with the deoxidizing agent therein, is held in the ladle three or more minutes for the slag from the subsidiary de-oxidizer to rise and escape from the steel.
It is important that the subsidiary deoxidizing agent should be introduced into the steel after the usual recarburizing agents have had their effect and the slag therefrom has risen, in order that it may have an immediate efl'ect upon the molten steel freed to a considerable extent from the oXids, and it is also important that it be introduced in a position beneath the slag which has risen, in order that it may operate upon the steel proper rather than upon the slag.
The particular manner of introducing the ferro titanium in the teeming ladle may consist of simply shoveling it into the bottom of the ladle as pouring begins or any other feasible way may be resorted to, and hence I do not wish to limit the process to this particular manner of introducing it. When the heats are recarburized in an intermediate ladle instead of in the converter, the bath or charge should be held at leastthree minutes after the introduction of the spiegeleisen (recarburizer), before pouring into the teeming ladle. The ferro titanium is in troduced in the teeming ladle in such proportions as may be required to produce the desired result, the amount ranging from one-tenth of one per cent. to five tenths of one per cent. of a ten' per cent. alley or its equivalent as compared with one to four per cent. hitherto required where the process has been conducted without the delay after the introduction of the spiegele'isen, and the ferro titanium has been added with the other recarburizers.
In the open hearth process, either acid or basic, the bath of metal produced by melting and reducing, is allowed to rest a sullicient period of time to complete the chemical reactions as shown by tests made at suitable intervals, for instance, ten minutes or more before being transferred to the teeming ladle, and ferro titanium is introduced beneath the slag in the teeming ladle in any feasible manner.
hat I claim is 1. In the manufacture of steel, producing a bath of blown metal, introducing spiegeleisen, allowing the bath to rest a prescribed period of time, and introducing a subsidiary de-oXidizing agent before teeming the ingots.
2. In the manufacture of steel, producing a bath, of metal, allowing the bath to rest a suitable period of time for the slag to rise, transferring the bath into the teeming ladle and introducing ferro titanium in the metal in the teeming ladle beneath the transferred sla In the manufacture of steel, producing a bath of blown metal, recarburizing the bath, allowing the bath to rest a prescribed period of time, pouring the metal, and introducing a subsidiary de-oxidizing agent at the time of pouring and subsequently teeming the ingot.
4. In the manufacture of steel, producing a bath of blown metal, recarburizing the bath, allowing the bath to rest a prescribed period of time, pouring the metal into the teeming ladle and introducing a de-oxidizing agent in the teeming ladle beneath the slag of the poured metal.
5. In the manufacture of steel, producing a bath of blown metal, recarburizing the bath, allowing the bath to rest a prescribed period of time, pouring the bath into the teeming ladle, introducing ferro titanium in the metal in the teeming ladle beneath the poured slag, the quantity of ferro titanium being from one-tenth of one per cent. to five-tenths of one per cent. of a ten per cent. alloy or its equivalent to serve as a subsidiary de-oxidizing or cleansing agent.
In testimony, that I claim the foregoing as my invention, I have signed my name in presence of two witnesses, this 20th day of January 1910.
PLIMMON H. DUDLEY.
WVitnesses F. Gnonon BARRY, HENRY TI-IIEME.
Copies of this patent may be obtained for five cents each, by addressing the "Commissioner of Patents. Washington, D. O.
US53959610A 1910-01-22 1910-01-22 Manufacture of steel. Expired - Lifetime US1009707A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US53959610A US1009707A (en) 1910-01-22 1910-01-22 Manufacture of steel.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US53959610A US1009707A (en) 1910-01-22 1910-01-22 Manufacture of steel.

Publications (1)

Publication Number Publication Date
US1009707A true US1009707A (en) 1911-11-21

Family

ID=3078017

Family Applications (1)

Application Number Title Priority Date Filing Date
US53959610A Expired - Lifetime US1009707A (en) 1910-01-22 1910-01-22 Manufacture of steel.

Country Status (1)

Country Link
US (1) US1009707A (en)

Similar Documents

Publication Publication Date Title
Holappa et al. Inclusion engineering
JPS58501042A (en) Boron alloy additive for continuous casting of boron steel
US3155498A (en) Ductile iron and method of making same
US3375105A (en) Method for the production of fine grained steel
US1009707A (en) Manufacture of steel.
US585036A (en) Making ingots or castings of iron or steel
US3172758A (en) Oxygen process for producing high
JP6114118B2 (en) Method for producing S-containing steel
US3615278A (en) Enameling grade steel and method of producing the same
US1513735A (en) Method of manufacturing low-carbon steels
CN109554517A (en) Method for producing titanium-containing ferritic stainless steel billets by billet continuous casting machine
US2705673A (en) Deoxidizing a heat of steel
Lillieqvist et al. Properties of cast steels improved with rare earth element additions
US3711277A (en) Method of alloying together with semikilling steel
US102912A (en) Improvement in the manufacture of iron and steel
US1775339A (en) Manufacture of irons and steels
US303151A (en) Egbert hadfibld
US584781A (en) Process of making molten iron for malleable castings
US186955A (en) Improvement in composition casting metal for making rolls
US149979A (en) Improvement in the manufacture of homogeneous steel
US585161A (en) Robert a
US1082359A (en) Process of making steel.
US1897017A (en) Process of making low-carbon chromium alloys
US1501202A (en) Steel and process for producing same
US735666A (en) Chromium-nickel steel.