UA95193C2 - Method for open rock mining - Google Patents
Method for open rock miningInfo
- Publication number
- UA95193C2 UA95193C2 UAA201007378A UAA201007378A UA95193C2 UA 95193 C2 UA95193 C2 UA 95193C2 UA A201007378 A UAA201007378 A UA A201007378A UA A201007378 A UAA201007378 A UA A201007378A UA 95193 C2 UA95193 C2 UA 95193C2
- Authority
- UA
- Ukraine
- Prior art keywords
- subbench
- self
- propelled
- toe
- production
- Prior art date
Links
Landscapes
- Crushing And Grinding (AREA)
Abstract
A method for open rock mining according to which delivery of mineral from self-propelled breakers to inclined stationary conveyer provided with inclined re-loader is carried out with self-propelled re-loaders that perform fan displacement with respect to receiving hopper of inclined re-loader. At same time one brings into operation two production subbenches, with placement of self-propelled breakers and movable conveyor re-loaders at the toe of the lower production subbench, this is a concentration horizon. Working out of the lower production subbench and delivery of broken mineral to self-propelled breaker is carried out with pneumatic-wheel loader that operates at the toe of the lower production subbench. Working out of the upper production subbench and loading of broken mineral to self-propelled breaker at the toe of the lower production subbench one performs by pneumatic-wheel loader that operates at the toe of the upper production subbench by ore chute.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAA201007378A UA95193C2 (en) | 2010-06-14 | 2010-06-14 | Method for open rock mining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAA201007378A UA95193C2 (en) | 2010-06-14 | 2010-06-14 | Method for open rock mining |
Publications (1)
Publication Number | Publication Date |
---|---|
UA95193C2 true UA95193C2 (en) | 2011-07-11 |
Family
ID=50835218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UAA201007378A UA95193C2 (en) | 2010-06-14 | 2010-06-14 | Method for open rock mining |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA95193C2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2501949C1 (en) * | 2012-07-02 | 2013-12-20 | Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") | Mineral deposit development method |
-
2010
- 2010-06-14 UA UAA201007378A patent/UA95193C2/en unknown
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2501949C1 (en) * | 2012-07-02 | 2013-12-20 | Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") | Mineral deposit development method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201100507A1 (en) | MOBILE CRUSHING STATION | |
RU2016109250A (en) | METHOD FOR SEPARATE DEVELOPMENT AND TRANSPORTATION OF POWERFUL COAL LAYERS WITH EMPTY BREED AND LAYING OF THE EMBEDDED SPACE BY EMPTY BREED | |
GB2498110A (en) | Continuous-extraction mining system | |
RU2011117361A (en) | METHOD AND DEVICE FOR PROCESSING OF FEEDING OF DIVIDED BY LARGE ORE PIECES | |
MX2012000111A (en) | Underground mining. | |
MX2012000112A (en) | Forming a shaft for an underground mine. | |
UA99207C2 (en) | Method for controlling mining in longwall face operations by monitoring the refuse part in the extraction | |
ZA201906164B (en) | Grading method for water-preserving coal mining mine/mine area | |
CN205288654U (en) | Broken system is transported to waste rock in pit | |
UA106290C2 (en) | Method for control of shield support | |
WO2014191196A3 (en) | Discharging of material excavated in underground workings | |
EP2868383A1 (en) | Method for obtaining aggregate of post-mining gangue and machinery for carrying out the method | |
UA95193C2 (en) | Method for open rock mining | |
RU2558051C1 (en) | Method of open development of deposits of solid mineral resources | |
PE20151917A1 (en) | STEEP CONVEYOR FOR OPEN SKY MINING OPERATIONS | |
RU2009119090A (en) | METHOD FOR COMBINED DEVELOPMENT OF MINERAL DEPOSITS | |
RU2495244C2 (en) | Method for open mining of mineral deposits by application of mill holes and cyclical and continuous method (ccm) | |
AU2018315054A1 (en) | Modular relocatable conveyor | |
CN204564519U (en) | Portable panning car | |
RU2011105579A (en) | METHOD OF MINING | |
CN201763387U (en) | Electric finger gate | |
RU2539090C1 (en) | Transfer of muck | |
CN203091037U (en) | Ore crushing system | |
UA114851C2 (en) | THE METHOD OF DISCLOSING THE LOWER Horizons OF AN EXISTING CAREER | |
UA101246C2 (en) | Complex for loading belt conveyor |