Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Анатолий Владимирович ДовгалюкfiledCriticalАнатолий Владимирович Довгалюк
Priority to UAU201315528UpriorityCriticalpatent/UA89846U/en
Publication of UA89846UpublicationCriticalpatent/UA89846U/en
A shunting device comprises a reaction drum with a drive equipped with a brake, a traction rope in the form of an infinite link with a device of preliminary tension and a gripper and a sheave wheel. In addition, it also comprises an additional multiple-section drum, each section of which is made in the form of a rope roller on its own bearings, a traction drum comprises hemispherical grooves, through which the individual branches of rope pass, wherein the device of preliminary tension of the rope can be placed on the winch frame or separately, the gripper of the traction rope is fastened at least at two points to the rail cars and rope branches pass by the railway track without contact with sleepers and rails.