Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Николай Антонович Моторный, Владимир Леонидович Седин, Сергей Васильевич ШатовfiledCriticalНиколай Антонович Моторный
Priority to UAU201300183UpriorityCriticalpatent/UA81693U/en
Publication of UA81693UpublicationCriticalpatent/UA81693U/en
A method for fixation of earth massif under the foundation of a construction includes arrangement of injection channels in earth and filling those with consolidation solution. Preliminarily out of the placement of the construction, at depth lower than its foundation, a pit of lowered tubing rings is arranged, and injection channels are arranged as horizontal through gaps with which the first tubbing rings are installed.
UAU201300183U2013-01-032013-01-03Method for fixation of earth massif under the basement of a construction
UA81693U
(en)