Приднепровская Государственная Академия Строительства И Архитектуры
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Приднепровская Государственная Академия Строительства И АрхитектурыfiledCriticalПриднепровская Государственная Академия Строительства И Архитектуры
Priority to UAU200906548UpriorityCriticalpatent/UA47471U/en
Publication of UA47471UpublicationCriticalpatent/UA47471U/en
Method for making pile basements through lowering piles to earth is in fact that pile is arranged as steel pipe with screw in it, the pipe is lowered to earth under own weight with simultaneous well drilling with following pipe filling with concrete with layer-by-layer compacting.
UAU200906548U2009-06-222009-06-22Method for making pile basements
UA47471U
(en)