CN202610827U - Movable foundation of well testing derrick - Google Patents

Movable foundation of well testing derrick Download PDF

Info

Publication number
CN202610827U
CN202610827U CN 201220294976 CN201220294976U CN202610827U CN 202610827 U CN202610827 U CN 202610827U CN 201220294976 CN201220294976 CN 201220294976 CN 201220294976 U CN201220294976 U CN 201220294976U CN 202610827 U CN202610827 U CN 202610827U
Authority
CN
China
Prior art keywords
derrick
main body
line
foundation
center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220294976
Other languages
Chinese (zh)
Inventor
陈万林
孙生荣
张永红
杜加玉
李还向
魏小龙
宋凤军
王巍
宋超
郑懿
肖欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN 201220294976 priority Critical patent/CN202610827U/en
Application granted granted Critical
Publication of CN202610827U publication Critical patent/CN202610827U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of borehole operation sites in an oil field, in particular to a movable foundation of a well testing derrick for well testing and well repairing operation processes of the oil field. The movable foundation at least comprises a main body (1) and support legs (2), wherein the main body (1) is 2.6m in length, 1.6m in width and 0.6m in height, the two support legs (2) are arranged on the main body (1), the center distance between the two support legs (2) is 1.53m, a center line of the support legs (2) is a line parallel to the center line of the main body, and the distance between the line (7) parallel to the center line of the main body and the center line (6) of the main body is the product of a foundation thickness and the tangent value of an included angle between the derrick and the vertical line. The movable foundation overcomes the defect of operating risks such as tip-back of the foundation and inclination of the derrick of the movable foundation of the derrick, is increased in stress area, is reduced in size and weight due to the adoption of a steel structure, and ensures stability and safety during operation in the derrick.

Description

Formation testing derrick removable foundation
Technical field
The utility model relates to oilfield downhole operation site plant technical field, especially for the formation testing derrick removable foundation of oil field formation testing, workover treatment process.
Background technology
Existing derrick removable foundation all exist to sink and tilt (preceding high back is low) to some extent, exists operating risk such as to turn over, derrick is oblique behind the higher basis.Need design again the basis, avoid removable foundation to sink, tilt, improve the safety in the formation testing operation process, guarantee to produce and carry out smoothly.
The key technical problem that needs solution:
1, increases the foundation grounding area, avoid sagging; Possess rational in infrastructurely simultaneously, quality is suitable.Former derrick removable foundation is a concrete structure, and length is respectively 2.1m, 1.2m, 0.6m, floor space 2.52m 2, be mainly used in the 2000m well depth.Ji's plateau project management department formation testing operating area deeply buried reservoir degree is generally darker, and average well depth is about 2800 meters.The removable foundation unit area is stressed to have increased by 49%, is the direct factor that causes the basis to be sunk easily.
2, eliminate the moment of torsion of removable foundation in pressurized process, avoid occurring tilting (preceding high back is low).According to the derrick installation requirement, derrick leans forward 3-5 °, and the derrick leg is on the removable foundation center line, and just there is a driving torque in removable foundation always when being stressed like this, is the low direct factor in high back before causing the basis to take place.
Summary of the invention
The utility model provides a kind of formation testing derrick removable foundation, and it avoids removable foundation to sink, tilt, and improves the safety in the formation testing operation process, guarantees to produce and carries out smoothly.It is applicable to the dark oil well of well depth.
The technical scheme of the utility model is a formation testing derrick removable foundation; It is characterized in that: which comprises at least main body and leg, the long 2.6m of main body, wide 1.6m, high 0.6m; Two legs are arranged on the main body; Two leg center distance are 1.53m, and the line of centres of leg is the parallel lines of main center's line, and the distance of the parallel lines of this main center's line and main center's line is the product of base thickness and derrick and vertical line angle tangent value.
Described body interior is channel-section steel, i iron welded construction, and there is the thick full steel plated of 16mm the outside, and the bottom is the channel-section steel structure.
The beneficial effect of the utility model is: eliminated basic driving torque, avoided basic stress and occur tilting (preceding high back is low); Increased the basic stress area, guaranteed that the derrick footing of formation testing derrick when the operation of 2000~3000m well depth do not sink; Adopt box steel frame construction, original relatively concrete has reduced basic volume and quality.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further, but not as the use of the utility model restriction:
Fig. 1 is a formation testing derrick removable foundation field operation sketch map;
Fig. 2 is formation testing derrick removable foundation and derrick installation sketch map;
Fig. 3 is a formation testing derrick removable foundation processing sketch map;
Among the figure: 1, main body; 2, leg; 3, formation testing derrick; 4, well mouth of oil well; 5, guy wire; 6, main center's line; 7, the parallel lines of main center's line; 8, body front end.
The specific embodiment
Embodiment 1
Formation testing derrick removable foundation; It is characterized in that: which comprises at least main body 1 and leg 2, main body 1 long 2.6m, wide 1.6m, high 0.6m; Two legs 2 are arranged on the main body 1; Two legs, 2 center distance are 1.53m, and the line of centres of leg 2 is the parallel lines 7 of main center's line, and the parallel lines 7 of this main center's line are the product of base thickness and derrick and vertical line angle tangent value with the distance of main center's line 6.
Embodiment 2
Like Fig. 2, shown in 3; This basis comprises that mainly main body 1 and 2, two legs 2 of leg are not positioned on main center's line 6, but is positioned on the parallel lines 7 of main center's line; The parallel lines 7 of this main center's line are for main center's line 6, more near body front end 8.Main body 1 inside is channel-section steel, i iron welded construction, and there is the thick full steel plated of 16mm the outside, and the bottom is the channel-section steel structure.During use, formation testing derrick 3 is installed on the leg 2, and ground is fixed in by guy wire 5 in the top.
This basis is applicable to the BJ18 formation testing derrick of 2000~3000m well depth.During installation, as shown in Figure 1, the underground that the basis is installed is dug compacting and smooth, the lifting basis is in place, the 10cm that bassets, the maintenance level is tamped with soil around the basis derrick can be installed.
Parts that present embodiment is not described in detail and structure belong to well-known components and the common structure or the conventional means of the industry, here not narration one by one.

Claims (2)

1. formation testing derrick removable foundation; It is characterized in that: which comprises at least main body (1) and leg (2), the long 2.6m of main body (1), wide 1.6m, high 0.6m; Two legs (2) are arranged on the main body (1); Two legs (2) center distance is 1.53m, and the line of centres of leg (2) is the parallel lines (7) of main center's line, and the parallel lines of this main center's line (7) are the product of base thickness and derrick and vertical line angle tangent value with the distance of main center's line (6).
2. formation testing derrick removable foundation according to claim 1 is characterized in that: described main body (1) is inner to be channel-section steel, i iron welded construction, and there is the thick full steel plated of 16mm the outside, and the bottom is the channel-section steel structure.
CN 201220294976 2012-06-21 2012-06-21 Movable foundation of well testing derrick Expired - Fee Related CN202610827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220294976 CN202610827U (en) 2012-06-21 2012-06-21 Movable foundation of well testing derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220294976 CN202610827U (en) 2012-06-21 2012-06-21 Movable foundation of well testing derrick

Publications (1)

Publication Number Publication Date
CN202610827U true CN202610827U (en) 2012-12-19

Family

ID=47344539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220294976 Expired - Fee Related CN202610827U (en) 2012-06-21 2012-06-21 Movable foundation of well testing derrick

Country Status (1)

Country Link
CN (1) CN202610827U (en)

Similar Documents

Publication Publication Date Title
CN103628463B (en) The construction method of the ultra-deep vibro replacement stone column of bad ground
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN204717144U (en) A kind of concrete pump pipe setting tool cribbing
CN203979646U (en) Self-floating type pipeline hoist support
CN202610827U (en) Movable foundation of well testing derrick
CN204780981U (en) Outdoor GIS equipment foundations of shallow formula of burying
CN103397668B (en) The regulation method of each sections uneven settlement of foundation of a kind of railway tunnels
CN105429030A (en) Novel electrical inspection frame
CN203834485U (en) Upheaval resisting earth pressure balance device for foundation pit
CN104164888A (en) Concrete deformation-resistant foundation for ultra-high voltage power transmission steel pylon in coal mining area
CN204676565U (en) A kind of novel pit backfill structure
CN203925282U (en) Crawler type deep foundation ditch anchoring rig
CN103850247B (en) A kind of underground continuous wall connector guard shield and construction equipment and construction method
CN206110163U (en) Steel frame quick -mounting tower structure
CN204417975U (en) The narrow edge compaction apparatus of excavator earth shoulder
CN207847103U (en) A kind of concrete pump pipe carrier
CN204418189U (en) A kind of pit backfill structure
CN205024665U (en) Rammer
CN204729013U (en) A kind of colliery embedded hole is drilled mechanism
CN205205901U (en) A groove wall compaction device for gardens ditching construction
CN203866818U (en) Construction equipment for connector protection plate of underground diaphragm wall
CN204919585U (en) A big board basis for colliery collecting space area high tension transmission line
CN203394460U (en) Pry-type installation device for oil pumping units
CN203394459U (en) Skid mounting device for pumping units
CN214883812U (en) Colliery product storehouse is with preventing subsiding product storehouse basis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20160621