UA84929U - Method for dump formation in mode of rock deformation - Google Patents

Method for dump formation in mode of rock deformation

Info

Publication number
UA84929U
UA84929U UAU201303737U UAU201303737U UA84929U UA 84929 U UA84929 U UA 84929U UA U201303737 U UAU201303737 U UA U201303737U UA U201303737 U UAU201303737 U UA U201303737U UA 84929 U UA84929 U UA 84929U
Authority
UA
Ukraine
Prior art keywords
dump
filling
support ledge
rocks
level
Prior art date
Application number
UAU201303737U
Other languages
Russian (ru)
Ukrainian (uk)
Inventor
Юрий Михайлович Николашин
Олег Алексеевич Вусик
Ярослав Викторович Кебал
Александр Владимирович Домничев
Юрий Николаевич Куцый
Original Assignee
Государственное Высшее Учебное Заведение "Криворожский Национальный Университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное Высшее Учебное Заведение "Криворожский Национальный Университет" filed Critical Государственное Высшее Учебное Заведение "Криворожский Национальный Университет"
Priority to UAU201303737U priority Critical patent/UA84929U/en
Publication of UA84929U publication Critical patent/UA84929U/en

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A method for dump formation in mode of controlled deformations of rocks includes filling the dump level with support ledge to total height equal to 1.1-1.5 of the limiting height of the slope, with fixation of shear deformations of rocks in zone of formation of the support ledge, after filling the level to the width of the dump cut excavator is displaced to leveled plane within the front support ledge, and the cycle of filling is repeated, and displacement of excavator to neighboring site and following filling of the next dump cut is carried out at split coming to existence. The initial cycle of filling rocks of an one-level dump with temporary support ledge is carried out to a worked out deep pit filled with underground waters, with abrupt angles of inclination of the sides of the dump cuts with width A.
UAU201303737U 2013-03-26 2013-03-26 Method for dump formation in mode of rock deformation UA84929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UAU201303737U UA84929U (en) 2013-03-26 2013-03-26 Method for dump formation in mode of rock deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UAU201303737U UA84929U (en) 2013-03-26 2013-03-26 Method for dump formation in mode of rock deformation

Publications (1)

Publication Number Publication Date
UA84929U true UA84929U (en) 2013-11-11

Family

ID=52284397

Family Applications (1)

Application Number Title Priority Date Filing Date
UAU201303737U UA84929U (en) 2013-03-26 2013-03-26 Method for dump formation in mode of rock deformation

Country Status (1)

Country Link
UA (1) UA84929U (en)

Similar Documents

Publication Publication Date Title
NZ599362A (en) Auger grouted displacement pile
CN104847406B (en) Method for fracturing retained filled wall of adjacent coal face
PH12018550061A1 (en) Method for forming a stable foundation ground
Porathur et al. Slope stability assessment approach for multiple seams highwall mining extractions
CN204492660U (en) Rectangular percussion drill bit for diaphragm wall construction
CN204002927U (en) The incrusted processing structure of a kind of shield structure
UA84929U (en) Method for dump formation in mode of rock deformation
CN104564136B (en) A kind of artificial false bottom and preparation method thereof
RU2477792C1 (en) Method for defining height of water conveying cracks zone over mined-out area at stratified deposits
EA201600052A1 (en) METHOD OF CONSTRUCTION OF PILES WITH EXTENSION
CN104264724A (en) Method for grouting and reinforcing horizontal deep holes in foundation under existing building
RU2522495C1 (en) Complete stowage of bottom layer breakage cuts at declining excavation of minerals
RU2569352C1 (en) Determination of second working degassing influence on coal ore massifs
周晓军 et al. Asymmetric rock pressure on shallow tunnel in strata with inclined ground surface
UA54734U (en) Method for reclamation of downslopes
RU2016144259A (en) A method of constructing a foundation on the basis of mining in a coal and shale mine
RU2014140463A (en) The method of installing the rack in the ground and the rack installed in the ground
SA515360290B1 (en) Method and device for producing a foundation element
CN103628484B (en) Soil rock geology deep foundation ditch oppositely docks construction method
UA98480U (en) Method of combating of protrusion of soil mining
UA100176C2 (en) Method for filling a worked-out deep pit
RU2012124924A (en) METHOD FOR COMBINED DEVELOPMENT OF CROSS-OPERATING ORE BODIES
UA81693U (en) Method for fixation of earth massif under the basement of a construction
CZ2012600A3 (en) Technology of mining and packing of underground extracted coal seams ion
UA52255U (en) Method for restoration of land