UA98831U - The method of anchoring excavation using protective jumpers - Google Patents

The method of anchoring excavation using protective jumpers

Info

Publication number
UA98831U
UA98831U UAU201412269U UAU201412269U UA98831U UA 98831 U UA98831 U UA 98831U UA U201412269 U UAU201412269 U UA U201412269U UA U201412269 U UAU201412269 U UA U201412269U UA 98831 U UA98831 U UA 98831U
Authority
UA
Ukraine
Prior art keywords
mining
jumpers
protective
excavation
anchoring
Prior art date
Application number
UAU201412269U
Other languages
Russian (ru)
Ukrainian (uk)
Inventor
Oleksandr Petrovych Krukovskyi
Viktor Oleksiiovych Khvorostian
Yurii Yuriievych Bulich
Viktoriia Viktorivna Krukovska
Andrii Olehovych Burkov
Serhii Oleksandrovych Leshchynskyi
Andrii Andriiovych Kolesnyk
Original Assignee
Poliakov M Inst Geo Technical Mechanics Of Nas Ukr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Poliakov M Inst Geo Technical Mechanics Of Nas Ukr filed Critical Poliakov M Inst Geo Technical Mechanics Of Nas Ukr
Priority to UAU201412269U priority Critical patent/UA98831U/en
Publication of UA98831U publication Critical patent/UA98831U/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Спосіб анкерного кріплення гірничої виробки з використанням захисних перемичок, який включає збір та аналіз гірничо-геологічних даних, визначення фізико-механічних властивостей вмісних порід, розрахунок схеми розміщення анкерів, створення анкерно-породної конструкції із силового, опірного, підпірного елементів та основи конструкції. Періодично по довжині виробки зводять захисні перемички - елементи анкерно-породної конструкції, які формують шляхом додавання до основної схеми додаткових посилюючих анкерів, кількість яких визначається в залежності від гірничо-геологічних умов.The method of anchorage mining with the use of protective jumpers, which includes the collection and analysis of mining and geological data, determining the physical and mechanical properties of bearing rocks, calculating the layout of the anchors, creating an anchor-rock structure of the power, support, support elements and bases. Periodically along the length of the work erect protective jumpers - elements of the anchor-rock structure, which is formed by adding to the main scheme additional reinforcing anchors, the number of which is determined depending on the mining and geological conditions.

UAU201412269U 2014-11-14 2014-11-14 The method of anchoring excavation using protective jumpers UA98831U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UAU201412269U UA98831U (en) 2014-11-14 2014-11-14 The method of anchoring excavation using protective jumpers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UAU201412269U UA98831U (en) 2014-11-14 2014-11-14 The method of anchoring excavation using protective jumpers

Publications (1)

Publication Number Publication Date
UA98831U true UA98831U (en) 2015-05-12

Family

ID=53674698

Family Applications (1)

Application Number Title Priority Date Filing Date
UAU201412269U UA98831U (en) 2014-11-14 2014-11-14 The method of anchoring excavation using protective jumpers

Country Status (1)

Country Link
UA (1) UA98831U (en)

Similar Documents

Publication Publication Date Title
EA201690486A1 (en) METHOD OF DEVELOPMENT OF DEPOSITS
AR101411A1 (en) IN SITU EFFORT PROPERTIES
CL2016000012A1 (en) Formwork panel for concrete formwork.
GB2545144B (en) Method using measurements taken while drilling to map mechanical boundaries and mechanical rock properties along a borehole
AR086685A1 (en) ESTIMATE FRACTURE DIMENSIONS FROM MICROSISM DATA
NO20171659A1 (en) Systems and methods for characterizing materials external of a casing
EA201691406A1 (en) DETERMINATION OF WAVE FIELD COMPONENTS
DE112015001314A5 (en) Longwall construction of an underground mining
CA2945472C (en) Fracture treatment analysis based on seismic detection in horizontal and vertical wellbore sections
BR112015009095A2 (en) borehole fluid, method, and method for subsection profiling of an underground well.
CL2018000236A1 (en) Nmr in hydrocarbon generation kinetics
AR092451A1 (en) SYSTEM, METHOD AND COMPUTER PROGRAM FOR OPTIMIZATION OF WELL PLACEMENT AND FRACTURE DESIGN
BR112018005760A2 (en) method, composition, and system of using solid surfactant compounds in well cementing operations
BR112016005207A8 (en) methods and system for treating an underground formation
WO2014193852A3 (en) Earth surveying for improved drilling applications
EA201590327A1 (en) METHOD OF STRENGTHENING A PART IN THE FORM OF A SUPPORT OF PASSING NEXT PARALLEL TUNNELS BY ARMATURE RODS AND METHOD OF DEVELOPMENT
BR112014006873A2 (en) a method for determining a depth of a geological structure in an underground formation, a system for determining a depth of a geological structure in an underground formation, and a non-transient computer readable medium that stores instructions for determining a depth of a geological structure in an underground formation. an underground formation
AR090635A1 (en) APPARATUS, METHODS AND SYSTEMS FOR CORRECTION OF COMPRESSION SPEED
EA201391004A1 (en) METHOD AND SYSTEM FOR DETERMINING THE VERTICAL AMPLITUDE OF BLOCKS OF BLOCKS IN GEOLOGICAL RIPPING
AR099167A1 (en) OPTIMIZED ACIDIFICATION OF A NEXT PRODUCTION WELL TO AN ACUÍFERO
UA98831U (en) The method of anchoring excavation using protective jumpers
CL2018001665A1 (en) Foaming additive for soil conditioning in the presence of mechanical excavation for tunnel construction
PL403284A1 (en) Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement
TANG et al. Mechanical response features of roadway surrounding rock with weak interlayer under dynamic disturbance
BIALY New Devices Used in Determining and Assessing Mechanical Characteristics of Coal