PL403284A1 - Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement - Google Patents

Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement

Info

Publication number
PL403284A1
PL403284A1 PL403284A PL40328413A PL403284A1 PL 403284 A1 PL403284 A1 PL 403284A1 PL 403284 A PL403284 A PL 403284A PL 40328413 A PL40328413 A PL 40328413A PL 403284 A1 PL403284 A1 PL 403284A1
Authority
PL
Poland
Prior art keywords
section
pavement
excavation
complex devices
perform
Prior art date
Application number
PL403284A
Other languages
Polish (pl)
Other versions
PL231572B1 (en
Inventor
Mirosław Taras
Janusz Chmielewski
Mirosław Masiakiewicz
Antoni Golonka
Juliusz Urbański
Krystian Haraszczuk
Marian Semeniuk
Roman Steć
Jan Hajduk
Wojciech Hajduk
Krzysztof Lisiecki
Artur Szyszka
Małgorzata Pawlik-Karyba
Piotr Marczak
Zbigniew Pater
Original Assignee
SIGMA Spółka Akcyjna
Hajduk Group Spółka Z Ograniczoną Odpowiedzialnością
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIGMA Spółka Akcyjna, Hajduk Group Spółka Z Ograniczoną Odpowiedzialnością filed Critical SIGMA Spółka Akcyjna
Priority to PL403284A priority Critical patent/PL231572B1/en
Priority to PCT/PL2014/000026 priority patent/WO2014158039A2/en
Publication of PL403284A1 publication Critical patent/PL403284A1/en
Publication of PL231572B1 publication Critical patent/PL231572B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/02Driving inclined tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/04Provisional protective covers for working space for use in drifting galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
    • E21D9/065Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end with devices for provisionally supporting the front face
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • E21D9/0875Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/126Loading devices or installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Manipulator (AREA)

Abstract

W skład kompleksu do wykonywania wyrobisk wchodzi obudowa krocząca (1), która składa się z szeregu zazębiających się sekcji (11), pierwszej sekcji (11a), drugiej sekcji (11b) aż do ostatniej sekcji (11z). Pierwsza sekcja (11a) połączona jest z drugą sekcją (11b) za pośrednictwem dwóch par przesuwników, dolnej pary (12) i górnej pary (13). Do czoła pierwszej sekcji (11 a) zamocowane jest urządzenie urabiające (2) o ujawnionej w opisie konstrukcji. Nadto do ostatniej sekcji (11z) zamocowany jest manipulator (7), zaś do wcześniejszych sekcji dwie kotwiarki (9). Ujawniono także sposób wykonywania wyrobisk.The excavation complex includes a walking support (1), which consists of a series of interlocking sections (11), the first section (11a), the second section (11b) and the last section (11z). The first section (11a) is connected to the second section (11b) via two pairs of shifters, a lower pair (12) and an upper pair (13). To the face of the first section (11a) a mining device (2) of the construction disclosed in the description is attached. Moreover, a manipulator (7) is attached to the last section (11z), and two anchor bolts (9) to the previous sections. Also disclosed is the method of making excavations.

PL403284A 2013-03-23 2013-03-23 Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement PL231572B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PL403284A PL231572B1 (en) 2013-03-23 2013-03-23 Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement
PCT/PL2014/000026 WO2014158039A2 (en) 2013-03-23 2014-03-21 Method of driving drifts and a set of machines for driving drifts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL403284A PL231572B1 (en) 2013-03-23 2013-03-23 Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement

Publications (2)

Publication Number Publication Date
PL403284A1 true PL403284A1 (en) 2014-09-29
PL231572B1 PL231572B1 (en) 2019-03-29

Family

ID=50628878

Family Applications (1)

Application Number Title Priority Date Filing Date
PL403284A PL231572B1 (en) 2013-03-23 2013-03-23 Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement

Country Status (2)

Country Link
PL (1) PL231572B1 (en)
WO (1) WO2014158039A2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457686A (en) * 2018-04-18 2018-08-28 贵州大学 A kind of balanced type Telescopic movable supporting arch up and down
CN111271061A (en) * 2020-03-09 2020-06-12 新能矿业有限公司 Fully mechanized mining end mining rack removing method

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR495338A (en) * 1918-12-06 1919-10-04 Frederick James Trumpour Hydraulic machines for tunneling
GB309518A (en) * 1928-01-09 1929-04-09 Francois Cementation Co Ltd Improvements in or relating to excavating or tunnelling apparatus
DE1156738B (en) 1959-05-09 1963-11-07 Georg Schoenfeld Progressive protection for the underground tunneling
US3861748A (en) 1974-02-08 1975-01-21 Robbins Co Earth boring machine and method
PL88164B1 (en) 1974-11-21 1976-08-31
PL95368B1 (en) 1975-07-28 1977-10-31 BOTTOM TROUBLE HOUSING OF PATHWAY ANCERS
PL97625B1 (en) 1976-01-30 1978-03-30 TROUBLE ARC ENCLOSURE OF THE PATHWAY
DE2646586C3 (en) * 1976-10-15 1981-05-21 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Shield driving device, especially for driving rock and seam sections in underground mining operations
HU174578B (en) 1977-03-25 1980-02-28 Ut Vasuttervezoe Vallalat Apparatus for tunnelling particularly for stable and inhomogeneous soil conditions
GB2037346B (en) * 1978-12-15 1982-10-27 Coal Ind Slideway means and excavating machines comprising slideway means
PL137926B2 (en) 1984-12-19 1986-07-31 Lubelska Polt Gallery driving combined cutter loader
BE905437A (en) * 1986-09-16 1987-03-16 Denys Nv Sequential part-cutting tunnelling machine - has non-rotary cutter drum contg. partition with openings for drive shaft with swivelable rotary cutter
DE3831725A1 (en) * 1988-09-17 1990-03-22 Holzmann Philipp Ag DRIVING SHIELD
PL194412B1 (en) 2001-08-02 2007-05-31 Ct Kt Maszyn Gorniczych Komag Self-advancing roof supports

Also Published As

Publication number Publication date
WO2014158039A2 (en) 2014-10-02
WO2014158039A3 (en) 2015-09-17
PL231572B1 (en) 2019-03-29

Similar Documents

Publication Publication Date Title
EA201690486A1 (en) METHOD OF DEVELOPMENT OF DEPOSITS
EA201792656A1 (en) HIGH EFFICIENCY DRILLING AND LIFTING SYSTEM
MY188196A (en) Tunnel construction method by using pre-support and post-support, and suitable device therefor
MX2015009684A (en) System and method for providing a continuous wellbore survey.
AR099591A1 (en) PASSIVE CEMENT ACCELERATOR
FI20115587A0 (en) A method for creating a betting plan
AR100596A1 (en) TRAINING OF MULTILATERAL WELLS
CL2018000236A1 (en) Nmr in hydrocarbon generation kinetics
AR098687A1 (en) SYSTEM AND METHOD TO TREAT AN UNDERGROUND TRAINING WITH A DEVICE COMPOSITION
AR096127A1 (en) COMPOSITION, USE AND FERTIRRIGATION SYSTEM
AR096590A1 (en) CLAY INHIBITORS FOR DRILLING, FRACTURING, AND OTHER PROCEDURES
AR097725A1 (en) WELL DRILLING OPERATIONS INVOLVING COMPUTATIONAL METHODS THAT PRODUCE DEPRESSION PROFILES
PE20150175A1 (en) METHOD OF EXPLOITATION OF POTASSIUM SALTS FROM AN UNDERGROUND DEPOSIT
PL403284A1 (en) Method for performing the excavation of the pavement and complex devices to perform excavation of the pavement
CL2018000721A1 (en) Sensor device, systems and methods to monitor the movement of the earth and other structures.
SA516370488B1 (en) System and method for cart-based proxy flow simulation procedure for ranking geostatistical realizations of rock properties
CL2015000769A1 (en) Method to produce a reinforced structure in the ground.
AR107861A1 (en) SYSTEM AND METHOD FOR DRILLING WITH SAND AND TUNNELING WITH ACID OF WELLS PUNCHED
AR098046A1 (en) GUIDANCE OF WELL FUND TOOLS
BR112016006432A2 (en) method to seal a well
CO2017010535A2 (en) Device for uniform grout distribution
Ying-chao et al. Numerical simulation analysis of dewatering and recharge process of deep foundation pits
PE20181430A1 (en) FOAMING ADDITIVE FOR SOIL CONDITIONING IN THE PRESENCE OF MECHANICAL EXCAVATION FOR CONSTRUCTION OF TUNNELS
CO2018010492A2 (en) Wireless downhole system for tunneling arrangements
AR091738A1 (en) SYSTEM, METHOD AND COMPUTER PROGRAM TO SIMULATE SCENARIOS OF PERFORATION EVENTS