UA69235C2 - Method for increase of stability of preparatory working - Google Patents
Method for increase of stability of preparatory working Download PDFInfo
- Publication number
- UA69235C2 UA69235C2 UA20031211832A UA20031211832A UA69235C2 UA 69235 C2 UA69235 C2 UA 69235C2 UA 20031211832 A UA20031211832 A UA 20031211832A UA 20031211832 A UA20031211832 A UA 20031211832A UA 69235 C2 UA69235 C2 UA 69235C2
- Authority
- UA
- Ukraine
- Prior art keywords
- working
- lava
- massif
- stability
- increase
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000011435 rock Substances 0.000 claims abstract description 11
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 6
- 239000003245 coal Substances 0.000 claims abstract description 6
- 230000003245 working effect Effects 0.000 claims description 3
- 230000004888 barrier function Effects 0.000 abstract 2
- 238000004880 explosion Methods 0.000 abstract 1
- 238000005553 drilling Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Abstract
Description
Опис винаходуDescription of the invention
Винахід відноситься до області експлуатації шахт, зокрема до способів проведення виробок та їх кріплення. 2 Відомий. "Спосіб охорони пластової виробки", що включає формування попереду лави в бічній стінці виробки з боку масиву вугілля розвантажувальної порожнини поза зоною опорного тиску і зведення за лавою податливого штучного огородження. (Авторське свідоцтво Мо1479663 (51) 4 Е21013/02, Е21С41/04 Бюлетень Відкриття, винаходи, 1989, Мо18).The invention relates to the field of mine operation, in particular to the methods of carrying out workings and their fastening. 2 Famous. "Method of protection of formation production", which includes the formation of a bench in front of the side wall of the production from the side of the coal massif of the discharge cavity outside the zone of support pressure and the construction of a pliable artificial fence behind the bench. (Author's certificate Mo1479663 (51) 4 E21013/02, E21С41/04 Bulletin of Discoveries, Inventions, 1989, Mo18).
Недолік - формування розвантажувальних порожнин треба виконувати на одному місці декілька разів. 70 Найбільш близьким є "Спосіб охорони виїмкових штреків", що включає проведення та кріплення штреків, буріння з них перпендикулярно подовжньої осі свердловин, заряджання їх ВР і камуфлетне висадження. (Авторське свідоцтво Мо1659668 (51) 5 Е21011/00, Бюлетень Відкриття, винаходи, 1991, Мо24).Disadvantage - the formation of unloading cavities must be performed in one place several times. 70 The closest is the "Method of guarding trench lines", which includes laying and fixing lines, drilling them perpendicular to the longitudinal axis of the wells, charging them with explosives and camouflaged planting. (Author's certificate Mo1659668 (51) 5 E21011/00, Bulletin of Discovery, Inventions, 1991, Mo24).
Недоліки - недостатні експлуатаційні характеристики виробки при значних витратах.Disadvantages - insufficient operational characteristics of the product at significant costs.
В основу винаходу поставлена задача удосконалення способу підвищення стійкості підготовчої виробки, у 12 якому зміною технологічної схеми і технологічних параметрів забезпечується можливість підтримання необхідного перерізу виробки при відпрацьовуванні лави, особливо в пологозалягаючих породах, і, за рахунок цього, поліпшення експлуатаційних характеристик виробки при зниженні витрат, поліпшення техніки безпеки ведення робіт.The invention is based on the task of improving the method of increasing the stability of the preparatory product, in which, by changing the technological scheme and technological parameters, it is possible to maintain the necessary cross-section of the product during the development of lava, especially in low-lying rocks, and, due to this, to improve the operational characteristics of the product while reducing costs. improvement of work safety techniques.
Задача вирішується тим, що у відомому способі підвищення стійкості підготовчої виробки, який включає формування розкосини в бічній стінці виробки з боку масиву вугілля, податливого огородження, відпрацьовування лав, згідно з винаходом, перед відпрацьовуванням лави формують податливе огородження з боку масиву і з боку лави шляхом висадження камуфлетних зарядів, поза зоною опорного гірського тиску, а після відпрацювання лави заповнюють розкосину породами підошви виробки, що здійнялися, далі відпрацьовують чергову лаву. сThe problem is solved by the fact that in the known method of increasing the stability of the preparatory work, which includes the formation of a brace in the side wall of the work from the side of the coal massif, a pliable fence, working out the benches, according to the invention, before working out the bench, a pliable fence is formed from the side of the massif and from the side of the bench by landing of camouflage charges, outside the zone of supporting rock pressure, and after working out the lava, the gap is filled with the rocks of the sole of the workings that were made, and then the next lava is worked out. with
На Фіг. наведено схему породної конструкції у відповідності до заявленого способу, Ге) де 1 - підготовча виробка; 2 - аркове кріплення; З - анкерне кріплення; 4 - розкосина; 5 - стійки; 6 - перша лава; 7 - камуфлетне висадження; 8 - цілик; 9 - підошва виробки; 10 - друга лава; 11 - цілик.In Fig. a diagram of the rock construction in accordance with the claimed method is given, Ge) where 1 - preparatory work; 2 - arch attachment; C - anchor fastening; 4 - diagonal; 5 - racks; 6 - first bench; 7 - camouflage landing; 8 - rear sight; 9 - the sole of the product; 10 - the second bench; 11 - whole.
Спосіб реалізується наступним чином.The method is implemented as follows.
На початку виконують проведення підготовчої виробки 1 широким вибоєм за допомогою прохідницького о комбайну. Далі у виробці 1 встановлюють постійне кріплення (аркове податливе зі СВП 2 та анкерне З жорстко се зв'язане з арковим кріпленням 2), а розкосину 4 закріплюють стійками 5. Встановлення анкера з боку масива вугілля зменшує величину конвергенції в розкосині на 6095. Після початку відпрацьовування першої лави 6 з сч підготовчої виробки 1 виконують буріння шпурів, за межею зони опорного тиску, орієнтовною глибиною від2,0 до Фд) 2,5м, У боки виробки в межах вугільного пласту за допомогою бурильної установки даної шахти. Далі шпури 3о заряджають вибуховою речовиною (ВР), що дозволено для даних умов згідно правил безпеки (ПБ). Виконують ее, камуфлетне висадження 7. Це призводить до зниження напружень масива навколо підготовчої виробки 1. Під час відпрацьовування першої лави 6 вздовж підготовчої виробки 1 залишають цілик 8.At the beginning, preparatory work is carried out with 1 wide hole with the help of a combine harvester. Next, in product 1, a permanent fixture is installed (arch flexible with SVP 2 and anchor Z rigidly connected to arch fixture 2), and brace 4 is fixed with struts 5. Installing the anchor on the side of the coal massif reduces the amount of convergence in the brace by 6095. After the start development of the first bench 6 from the preparatory mine 1 is carried out by drilling holes, beyond the boundary of the support pressure zone, with an approximate depth of 2.0 to 2.5 m, to the sides of the mine within the coal seam using the drilling rig of this mine. Next, the holes 3o are charged with an explosive substance (BP), which is allowed for these conditions according to the safety rules (PB). They carry out camouflage planting 7. This leads to a decrease in the stresses of the massif around the preparatory work 1. During the development of the first bench 6 along the preparatory work 1, the target 8 is left.
Після проходу першої лави 6 у підготовчій виробці 1 виконують підривання порід підошви 9 виробки, що « здійнялись. Цією породою заповнюють розкосину 4. Далі починають відпрацьовувати чергову лаву 10 із З 740 залишенням цілика 11. Так під час відпрацьовування лав формують податливе огородження 4, 8, 11. Таким с чином, підготовча виробка зберігає необхідний переріз при відпрацьовуванні лав та може бути використана з» повторно, що виключає необхідність проведення нової підготовчої виробки.After the passage of the first bench 6 in the preparatory production 1, the rocks of the sole 9 of the production that "happened" are carried out. This rock is used to fill the gap 4. Next, they begin working out the next bench 10 with Z 740, leaving the target 11. Thus, during the working out of the benches, they form a pliable fence 4, 8, 11. In this way, the preparatory work retains the necessary cross-section during the working out of the benches and can be used with » repeatedly, which eliminates the need for a new preparatory production.
Даний новий спосіб підвищення стійкості підготовчої виробки може забезпечити необхідну стійкість в пологозалягаючих породах. Камуфлетне висадження, призводить до зниження напружень масиву навколо підготовчої виробки та зменшенню величини підняття підошви виробки. Наявність розкосини призводить до б зниження витрат на транспортування породи, що здійнялась, та забезпечує можливість підтримати необхідний (се) переріз виробки та поліпшити техніку безпеки ведення робіт. іме)This new method of increasing the stability of the preparatory work can provide the necessary stability in the subsiding rocks. Camouflage planting leads to a decrease in massif stresses around the preparatory work and a decrease in the amount of lifting of the sole of the work. The presence of a ramp leads to a reduction in the cost of transporting the generated rock and provides an opportunity to support the required (se) cross-section of the work and improve the safety technique of the work. name)
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UA20031211832A UA69235C2 (en) | 2003-12-18 | 2003-12-18 | Method for increase of stability of preparatory working |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UA20031211832A UA69235C2 (en) | 2003-12-18 | 2003-12-18 | Method for increase of stability of preparatory working |
Publications (2)
Publication Number | Publication Date |
---|---|
UA69235A UA69235A (en) | 2004-08-16 |
UA69235C2 true UA69235C2 (en) | 2007-06-25 |
Family
ID=34513010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UA20031211832A UA69235C2 (en) | 2003-12-18 | 2003-12-18 | Method for increase of stability of preparatory working |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA69235C2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101881167B (en) * | 2010-06-04 | 2012-01-11 | 山东华恒矿业有限公司 | Coal face stump mining method |
-
2003
- 2003-12-18 UA UA20031211832A patent/UA69235C2/en unknown
Also Published As
Publication number | Publication date |
---|---|
UA69235A (en) | 2004-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105937395B (en) | A kind of comprehensive dig of coal mine big cross section hard-rock tunnel combines rapidly and efficiently driving method with big gun pick | |
US6532874B2 (en) | Method of blasting bench of rock with improved blasting efficiency and reduced blasting nuisance | |
CN109339797A (en) | A kind of minimum clear-distance tunnel is appeared damping construction method | |
CN102494571A (en) | Construction method for damped blasting of tunnels | |
RU2402681C1 (en) | Method for development of narrow sloping and inclined ore bodies | |
CN106437711A (en) | Coal seam impact type mine earthquake prevention and control method | |
CN115012936B (en) | Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration | |
CN109405688A (en) | Close on the blasting construction method in existing operation tunnel | |
KR20090047912A (en) | Blasting method of contour holes in two parts with time delay of 20~25ms | |
UA69235C2 (en) | Method for increase of stability of preparatory working | |
CN112964143B (en) | Three-time blasting method for hollow hole straight-hole cut | |
JPH08270374A (en) | Blasting type tunnel construction method | |
RU2309252C1 (en) | Method for large chamber cutting in horizontal layers | |
CN209672960U (en) | Close on the blasting arrangement in existing operation tunnel | |
SU1263868A1 (en) | Method of controlling the strained state of rock about mine working | |
RU2304219C1 (en) | Method for development entry protection | |
CN114810099B (en) | Ultra-thin rock stratum ultra-large span high-speed rail tunnel excavation construction method | |
LU500151B1 (en) | Closed Free Face Cut Blasting Method Capable of Improving Blasting Efficiency | |
SU1580014A1 (en) | Method of guarding mine working | |
RU2415267C1 (en) | Development method of blind ore deposits | |
SU815298A2 (en) | Method of conducting stripping work | |
RU2055209C1 (en) | Method for creating underground drifts such as tunnels | |
SU1606712A1 (en) | Method of opening-up outburst-prone seam | |
RU2684647C1 (en) | Method of managing geomechanical condition of rock massif | |
SU1328549A1 (en) | Method of driving workings close to outburst-hazardous rock |