UA52874A - Method of manufacture of repair-overloading complex (srpk-19) - Google Patents

Method of manufacture of repair-overloading complex (srpk-19) Download PDF

Info

Publication number
UA52874A
UA52874A UA2001042225A UA200142225A UA52874A UA 52874 A UA52874 A UA 52874A UA 2001042225 A UA2001042225 A UA 2001042225A UA 200142225 A UA200142225 A UA 200142225A UA 52874 A UA52874 A UA 52874A
Authority
UA
Ukraine
Prior art keywords
dock
pontoon
section
compartment
deck
Prior art date
Application number
UA2001042225A
Other languages
Russian (ru)
Ukrainian (uk)
Inventor
Михайло Іванович Мануйлов
Original Assignee
Михайло Іванович Мануйлов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Михайло Іванович Мануйлов filed Critical Михайло Іванович Мануйлов
Priority to UA2001042225A priority Critical patent/UA52874A/en
Publication of UA52874A publication Critical patent/UA52874A/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Method of manufacture of repair-overloading complex by changing dimensions and suspending of upper part of housing in the form of pontoon, two-fold sequential ballasting of vessel or lifting-draining of dock, separation of upper part. First, supporting units in the form of posts and/or supports are mounted on the stockpile deck or side walls of dock tower, then the dock is semisubmerged, the pontoon turned with placed on it housing or section in the form of pontoon with longitudinal bottom of and/or board, for example, directly or for 180 degrees, for example, section of -shaped vessel with board and/or coaming of hold or separate section with dual bottom of dry-cargo ship with cut off ends and units which emerge for overall size of mentioned supporting units. After draining of dock the section is fastened with mentioned posts or dock is overlapped by mentioned section or pontoon with the help of powerful floating crane. In this case, above stockpile deck an overlap and additional section with cut are formed, then overlaps are connected with coast with the help of bridge in the form of pontoon and rail tracks.

Description

Опис винаходуDescription of the invention

Винахід на деклараційний патент відноситься до технології суднобудування, переобладнання плавучих засобів для перевантаження вантажів. Відомі способи переобладнання недостатньо ефективні.The invention for the declaratory patent relates to the technology of shipbuilding, conversion of floating means for cargo transshipment. Known methods of conversion are not effective enough.

Завдання винаходу - спосіб виконання ремонтно-перевантажувального комплексу, який забезпечить високу ефективність об'єкта при його експлуатації. 1. Аналог, заявка в Укрпатент Мо 99063517 від 22.06.1999р. Спосіб модернізації плавучого засобу, який включає такі дії, як зрізання палубних вузлів, герметизація отворів, розгортання секції на 180 градусів і в такому положенні встановлення над зануреним плавучим засобом і після осушення доку в днищі, яке при цьому перетворюють на палубу, прорізання отворів - люків для пропускання вантажу, при цьому використовують корпус судна з подвійним дном, наприклад, баржу-секцію.The task of the invention is a method of performing the repair and handling complex, which will ensure the high efficiency of the object during its operation. 1. Analogue, application to Ukrpatent No. 99063517 dated June 22, 1999. A method of modernizing a floating vehicle, which includes such actions as cutting deck nodes, sealing holes, unfolding the section by 180 degrees and in this position, installing it above the submerged floating vehicle and after drying the dock in the bottom, which at the same time turns into a deck, cutting holes - hatches for the passage of cargo, while using the hull of a vessel with a double bottom, for example, a barge-section.

Спільні ознаки - використання розгорнутого на 180 градусів корпуса баржі-секції, введення її на плаву в напівзанурений док і після його осушення скріплення з вузлами плавучого засобу. Позитивна якість -- зниження 72 витрат на виготовлення перекриття доку.The common features are the use of a barge-section body deployed by 180 degrees, its introduction afloat into a semi-submerged dock and, after it has been drained, its connection with the units of the floating vehicle. Positive quality - reduction of 72 costs for the manufacture of the dock floor.

Недоліки - спосіб не забезпечує переобладнання діючого плавучого дока, підвищення його поперечної остійності в напівзануреному стані, особливо при накочуванні на його верхнє перекриття, тобто палубу великовагових вагонів з вантажем, крім того, не забезпечує використання дока для обробки суден, що знижує ефективність пристрою, виконаного за цим способом. 2. Аналог, заявка в Укрпатент Мо99116339 від 23.11.1999р. Пересувний перевантажувальний комплекс і спосіб його виконання шляхом встановлення -е -Подібного понтона з подвійним дном, розгорнутого на 180 градусів і встановлення на бортах бокових понтонів і при цьому утворення катамаранного плавучого засобу для перевантаження насипного вантажу із вагона в трюм баржі.Disadvantages - the method does not ensure the conversion of an operating floating dock, increasing its transverse stability in a semi-submerged state, especially when rolling onto its upper floor, i.e. the deck of heavy-duty wagons with cargo, in addition, it does not ensure the use of the dock for handling ships, which reduces the efficiency of the device made in this way. 2. Analogue, application to Ukrpatent Mo99116339 dated November 23, 1999. A mobile transshipment complex and a method of its implementation by installing a similar pontoon with a double bottom, deployed by 180 degrees and installing on the sides of the side pontoons and at the same time forming a catamaran floating means for transshipment of bulk cargo from a car into a barge hold.

Спільні ознаки - встановлення на плавучому понтоні додатково розгорнутого на 180 градусів корпуса -- -подібного понтона і його закріплення на бортах бокових понтонів. «Common features are the installation on the floating pontoon of an additional 180-degree hull-like pontoon and its fixing on the sides of the side pontoons. "

Позитивна якість-об'єкт, виконаний за цим способом має велику поперечну остійність, навіть при наявності на його палубі вагонів з вантажем.A positive quality is that an object made in this way has great transverse stability, even if there are wagons with cargo on its deck.

Недоліки - об'єкт-катамаран, не має універсальності, не забезпечує приймання у відсік суден для їх ремонту і/чи обробки, крім того, має великі габарити, не може розміститися в плавучому доку, що знижує М ефективність об'єкта, виконаному за цим способом. -Disadvantages - the catamaran object does not have universality, does not ensure the acceptance of ships in the compartment for their repair and/or processing, in addition, it has large dimensions, it cannot be placed in a floating dock, which reduces the M efficiency of the object, made according to in this way. -

З. Прототип, книга авторів А.В.Гундобін і Г.Н.Фінкель"Розмірна модернізація і переобладнання суден" вид."Суднобудування", Л.: 1977 р., С.192. На с. 111-112 методи збільшення розмірів суден шляхом підвішування со верхньої частини корпуса у вигляді понтона шляхом двократного послідовного баластування судна, або Га підйому-осушення дока, відділення верхньої частини, яка при цьому залишається спертою на закріплені на башті 3о доку опорні вузли у вигляді кронштейнів з прорізами між ними і з якими її скріплюють з утворенням моста і о який з'єднує башти і відсік з прорізом і при цьому нижню частину віддаляють і виводять із доку.Z. Prototype, book by A.V.Gundobin and G.N.Finkel "Dimensional modernization and conversion of ships" ed. "Shipbuilding", L.: 1977, p.192. On the village 111-112 methods of increasing the size of ships by suspending the upper part of the hull in the form of a pontoon by means of two consecutive ballasting of the ship, or by raising and draining the dock, separating the upper part, which at the same time remains supported on the support nodes fixed on the tower 3o dock in the form of brackets with slots between them and with which it is fastened with the formation of a bridge and which connects the towers and the compartment with the slot and at the same time the lower part is removed and removed from the dock.

Позитивна якість - збільшення розмірів плавучого засобу шляхом закріплення над ним великогабаритних блоків секцій корпуса, підвищення продуктивності і зниження витрат на переобладнання. «Positive quality - increasing the size of the floating vehicle by fixing large-sized blocks of hull sections above it, increasing productivity and reducing conversion costs. "

Недоліки - спосіб не забезпечує використання секцій з інших суден і підвищення поперечної і повздовжньої З остійності об'єкта, його універсальність, спроможність забезпечення приймання у відсік інших суден, їх с обробку і/чи навантаження, а також накочування на верхню палубу вагонів з вантажем для його розвантаження в з» судно, яке розміщено в доку.Disadvantages - the method does not ensure the use of sections from other vessels and the increase of transverse and longitudinal stability of the object, its versatility, the ability to ensure the reception of other vessels in the compartment, their processing and/or loading, as well as rolling onto the upper deck of wagons with cargo for its unloading in a vessel placed in the dock.

В основу винаходу поставлено завдання - Спосіб виконання ремонтно-перевантажувального комплексу із існуючого плавучого дока з використанням його як для ремонту і/чи обробки суден, так і для перевантаження 42 вантажів із вагона в трюм баржі і, навпаки, підвищення остійності, розширення експлуатаційної можливості і-й об'єкта, який виконано відповідно до запропонованого способу. ка 1. Поставлене завдання - Спосіб виконання ремонтно-перевантажувального комплексу, який розв'язується шляхом зміни розмірів і підвішування верхньої частини корпусу у вигляді понтона і двократного послідовного со баластування судна або підйому-осушення дока, відділення верхньої частини, яка при цьому залишається -і 20 спертою на закріплені на башті доку опорні вузли у вигляді кронштейнів з прорізами між ними, з якими її скріплюють з утворенням моста, який при цьому з'єднує башти і відсік з прорізом, і потім нижню частину - т» понтон відділяють і виводять з доку, який відрізняється тим, що спочатку на стапельній палубі і/чи на бокові стінки башти дока встановлюють опорні вузли у вигляді стояків і/чи кронштейнів, док напівзанурюють / заводять понтон з розміщеним на ньому корпусом або секцією з повздовжнім дном і/чи бортом, наприклад, прямо чи з 29 розворотом на 180 градусів, наприклад, секцію -- -подібного судна з боргом і/чи комінгсом трюма або окрему в. секцію з подвійним дном суховантажного судна із зрізаними кінцями і вузлами, які виходять за габарит згаданих опорних вузлів і після осушення доку секцію скріплюють зі згаданими стояками, при цьому над стапельною палубою утворюють перекриття і додатковий відсік з прорізом, або перекриття доку виконують із згаданих секцій зо допомогою крана, потім перекриття з'єднують з берегом за допомогою додаткового моста у вигляді понтона і 60 рейкових колій, цим досягається створення із судно-ремонтного плавучого дока універсального ремонтно-перевантажувального комплексу, який може проводити розвантаження з вагонів навалочних і/чи наливних вантажів прямо в трюм судна-баржі, яке розміщують в доковому відсіку, а також підвищення остійності дока в напівзануреному стані з вантажем на його палубі, зниження витрат енергоресурсів на перебаластування докового понтона при зміні барж, в цілому підвищення експлуатаційної і економічної ефективності об'єкта, 62 виконаного за цим способом.The invention is based on the task - a method of performing a repair and transshipment complex from an existing floating dock using it both for the repair and/or treatment of ships, and for transshipment of 42 cargoes from a car into the hold of a barge and, conversely, increasing stability, expanding operational capabilities and -th object, which is made according to the proposed method. ka 1. The task - The method of carrying out the repair and transshipment complex, which is solved by changing the dimensions and hanging the upper part of the hull in the form of a pontoon and two consecutive co-ballasting of the vessel or lifting and draining of the dock, separation of the upper part, which at the same time remains - and 20, resting on the support nodes fixed on the tower of the dock in the form of brackets with slots between them, with which it is fastened to form a bridge, which at the same time connects the towers and the compartment with the slot, and then the lower part - the pontoon is separated and removed from the dock , which differs in that first on the slipway deck and/or on the side walls of the dock tower, supporting units in the form of risers and/or brackets are installed, the dock is semi-submerged / the pontoon is placed on it with a hull or a section with a longitudinal bottom and/or side, for example , straight or with a 29 turn of 180 degrees, for example, a section of a similar vessel with a bilge and/or coamings of a hold or a separate in. a section with a double bottom of a dry cargo ship with cut ends and nodes that go beyond the dimensions of the mentioned supporting nodes and after drying the dock, the section is fastened with the mentioned risers, while an overlap and an additional compartment with a slot are formed above the slipway deck, or the overlap of the dock is made from the mentioned sections of with the help of a crane, then the overlap is connected to the shore with the help of an additional bridge in the form of a pontoon and 60 rail tracks, thereby creating a universal repair and transshipment complex from the ship repair floating dock, which can unload bulk and/or bulk cargo directly from wagons in the hold of the barge vessel, which is placed in the dock compartment, as well as increasing the stability of the dock in a semi-submerged state with cargo on its deck, reducing energy costs for ballasting the dock pontoon when changing barges, in general, increasing the operational and economic efficiency of the facility, 62 completed in this way.

2. Поставлене завдання - Спосіб виконання ремонтно-переватажувального комплексу розв'язується також тим, що на бокових стінках відсіка закріплюють опори у вигляді кронштейна для рейкових колій пересувної балки у вигляді мостового крана з лебідкою і з можливістю встановлення знімного моста-апарелі на причальному кінці / Докового відсіка, цим досягається механізація обробки суден, які розміщують у відсіку, а також встановлення апарелі для перевантаження накатних вантажів, підвищення ефективності комплекса, 3. Поставлене завдання - Спосіб виконання ремонтно-перевангажувального комплексу, розв'язується також тим, що після встановлення основного перекриття доку, його нарощують додатковими секціями, наприклад, -- -подібного судна за допомогою плавучого крана, при цьому секції розрізають в межах 70 вантажопідйомності крана, цим досягається можливість встановлення на опори секції різних розмірів, а також у випадку відсутності підйомного понтона, розв'язання завдання в непередбачених і/чи складних умовах виконання комплексу. 4. Поставлене завдання - Спосіб виконання ремонтно-перевантажувального комплексу розв'язується також тим, що опорні вузли, стояки і кронштейни, які скріплюють з ше -Подібною секцією, виконані з можливістю їх /5 рознімання і за допомогою понтона при напівзанурені дока виведення з нього згаданого перекриття доку, цим досягається можливість після рознімання і віддалення перекриття приймання на стапельну палубу доку судна з необмеженою висотою надбудови і щогли, або вантажного обладнання, використання плавучого дока в його початковому стані, підвищення ефективності комплексу, який виконано відповідно до запропонованого способу.2. The task - The method of carrying out the repair and transshipment complex is also solved by the fact that supports are fixed on the side walls of the compartment in the form of a bracket for rail tracks of a movable beam in the form of a bridge crane with a winch and with the possibility of installing a removable bridge-apparatus at the mooring end / of the dock compartment, thereby mechanization of the handling of vessels placed in the compartment, as well as the installation of equipment for overloading roll-on cargoes, increasing the efficiency of the complex, is achieved. dock, it is built up with additional sections, for example, a similar vessel with the help of a floating crane, while the sections are cut within 70 of the crane's carrying capacity, this makes it possible to install sections of different sizes on supports, as well as in the absence of a lifting pontoon, solving tasks in unforeseen and/or composition them conditions of performance of the complex. 4. The task - The method of carrying out the repair and transshipment complex is also solved by the fact that the support nodes, risers and brackets, which fasten with a similar section, are made with the possibility of their /5 disconnection and with the help of a pontoon when the dock is semi-submerged, it can be removed from it of the mentioned dock overlap, thereby achieving the possibility, after disconnection and removal of the overlap, of receiving a vessel with an unlimited height of the superstructure and mast or cargo equipment on the slipway deck, using the floating dock in its original state, increasing the efficiency of the complex, which is made in accordance with the proposed method.

Опис креслень об'єктаDescription of object drawings

Фіг. 1- Спосіб виконання ремонтно-перевантажувального комплексу. вигляд збоку.Fig. 1- The method of performing the repair and transshipment complex. side view

Фіг.2 -- те ж саме, вигляд в плані.Fig. 2 is the same, plan view.

Фіг. 3 - те ж саме, перетин по А-А на фіг. 1, перекриття плавучого дока, його докового відсіка корпусом баржі-секції, яка розгорнута на 180 градусів за допомогою додаткового понтона.Fig. 3 - the same, cross-section along A-A in fig. 1, overlapping of the floating dock, its dock compartment with the hull of the barge section, which is deployed 180 degrees with the help of an additional pontoon.

Фіг 4 - те ж саме, перетин по Б-Б на фіг. 1, перекриття докового відсіка секцією подвійного дна суховантажного судна. «Fig. 4 is the same, cross-section along B-B in fig. 1, overlapping of the dock compartment with a section of the double bottom of a dry cargo ship. "

Фіг. 5 - те ж саме, ремонтно-перевантажувальний комплекс в складеному вигляді збоку.Fig. 5 - the same, repair and transshipment complex in folded form from the side.

Фіг. 6 - те ж саме, перегин по В-В на фіг. 5 у варіанті перевантаження насипного вантажу.Fig. 6 - the same, a bend along B-B in fig. 5 in the variant of overloading bulk cargo.

Фіг. 7 - те ж саме, перетин по Г-Г на фіг. 5, у варіанті обробки чи ремонту судна. «г зо Фіг. 8 - те ж саме, перетин по Д-Д на фіг. 2, варіант розбирання комплексу .Fig. 7 - the same, cross-section along GG in fig. 5, in the variant of treatment or repair of the vessel. "g from Fig. 8 - the same, cross-section along DD in fig. 2, variant of disassembling the complex.

Опис позначено на кресленнях - 1 - Перевантажувальний комплекс, 2 - плавучий док, з якого виконують перевантажувальний комплекс 1.3- (у верхня частина доку /по прототипу/ у вигляді понтона, яку заводять на плаву , 4 - плавучий понтон для заведення понтона - верхньої частини 3. 5 - башта доку 2. 6 - кронштейн для закріплення верхньої частини сThe description is indicated on the drawings - 1 - Transshipment complex, 2 - floating dock, from which the transshipment complex is made 3. 5 - dock tower 2. 6 - bracket for fixing the upper part of the

Зв Ппонтона 3.7 - проріз між кронштейнами 6. 8 - міст, який з'єднує башти 5, це те ж саме, що верхня частина юFrom Pponton 3.7 - the slot between the brackets 6. 8 - the bridge that connects the towers 5, this is the same as the upper part of

З,а також перекриття 21 для встановлення рейкових колій 27. 9 - палуба башти 5. 10 - доковий відсік для встановлення судна 30, 11 - стапельна палуба доку 2. 12 - бокова стінка башти 5. 13 - стояки, які встановлені на палубі 11 для сполучення з комінгсом 18. 14 - додаткові кронштейни для сполучення з вузлами - -подібного судна, тобто понтона 3. 15 - подвійне дно понтона 3. 16 - подвійний борт - бокова « стінка судна 3, який утворює простір для судна 30. 17 - борт понтона, тобто судна 3. 18 -комінгс, який з с сполучують з стояком 13 і використовують в якості опіру понтону 3. 19 - трюм судна З він же є частиною докового відсіку 10. 20 - проріз в подвійному дні 15 понтона З і в перекритті 21 для пропускання вантажу 29. з 21 - верхнє перекриття докового відсіку 10, тобто міст 8 - те ж саме. 22 - додатковий відсік між бортом 17 і стінкою 12 башти 5, який збільшує площу ватерлінії при напівзануренні доку і його остійність, 23 - проріз між стінкою 9 і бортом 17 для переміщення генерального вантажу, наприклад, металобрухту при розробці судна 30. с 24 - берег. 25 - клиновий понтон у вигляді мосту, який разом з 26 - проміжним понтоном і рейковими коліями 27 з'єднує з берегом 24 верхнє перекриття 21. 26 - залізничний вагон. 29 - навалочний вантаж. 30 - судно у ю вигляді баржі для приймання вантажу 29. 31 - додаткова секція для збільшення перекриття 21. 32 - плавучий о кран. 33 - кронштейни для рейкових колій. 34 - пересувна балка - мостовий кран. 35 - лебідка крана 34. 36 - пересувний кран на башті 5 дока 2. 37 - знімний міст - апарель. 38 - причальний кінець комплексу 1 наWith, as well as an overlap 21 for installing rail tracks 27. 9 - deck of the tower 5. 10 - dock compartment for installing the vessel 30, 11 - slipway deck of the dock 2. 12 - side wall of the tower 5. 13 - risers that are installed on the deck 11 for connection with the coaming 18. 14 - additional brackets for connection with the nodes of a similar vessel, that is, a pontoon 3. 15 - a double bottom of a pontoon 3. 16 - a double side - a side wall of a vessel 3, which forms a space for a vessel 30. 17 - the side of the pontoon, i.e. the vessel 3. 18 - coamings, which are connected with the riser 13 and used as a support for the pontoon 3. 19 - the hold of the vessel C, which is also part of the dock compartment 10. 20 - the slot in the double bottom 15 of the pontoon C and in floor 21 for the passage of cargo 29. from 21 - the upper floor of the dock compartment 10, i.e. bridge 8 - the same. 22 - an additional compartment between side 17 and wall 12 of tower 5, which increases the area of the waterline when the dock is semi-submerged and its stability, 23 - a slot between wall 9 and side 17 for the movement of general cargo, for example, scrap metal during the development of the vessel 30. c 24 - shore . 25 - a wedge pontoon in the form of a bridge, which, together with 26 - an intermediate pontoon and rail tracks 27, connects the upper floor 21 with the shore 24. 26 - a railway car. 29 - bulk cargo. 30 - a vessel in the form of a barge for receiving cargo 29. 31 - an additional section to increase the overlap 21. 32 - a floating crane. 33 - brackets for rail tracks. 34 - mobile beam - bridge crane. 35 - crane winch 34. 36 - mobile crane on tower 5 of dock 2. 37 - removable bridge - apparatus. 38 - mooring end of complex 1 on

Ш- перекритті 21 і палубі 11. ї» Опис способу в статиці і динаміціSh- floor 21 and deck 11. i" Description of the method in statics and dynamics

На фіг. 1,2,3,4 показано Спосіб виконання ремонтно-перевантажувального комплексу і шляхом зміни розмірів і підвищування верхньої частини в вигляді понтона З, шляхом двократного послідовного баластування плавучого в дока 2, або підйому-осушенню поддона 4, відділення верхньої частини 3, яка при цьому залишається спертою на закріплені на башті 5 опорні вузли у вигляді кронштейнів б з прорізами 7 і з якими її скріплюють, зIn fig. 1, 2, 3, 4 shows the method of carrying out the repair and transshipment complex and by changing the dimensions and raising the upper part in the form of a pontoon Z, by double consecutive ballasting of the floating in the dock 2, or lifting and draining the pallet 4, separation of the upper part 3, which at it remains supported on the support nodes fixed on the tower 5 in the form of brackets b with slots 7 and with which it is fastened, with

Р утворенням моста 8, який при цьому з'єднує палуби 9 баштів 5, утворює доковий відсік 10 з прорізом 7 і при цьому нижню частину, тобто понтон 4 відділяють і виводять із дока 2, який відрізняється тим, що спочатку на стапельній палубі 11 і/чи на бокових стінках 12 баштів 5 дока 2 встановлюють опорні вузли у вигляді стояків во 13 чи додаткових кронштейнів. 14 - напівзанурюють док 2, заводять в нього понтон 4 з розміщеною на його палубі корпусом або секцією в вигляді понтона З з повздовжнім подвійним дном 15 і/чи з подвійним бортом 16, наприклад, прямо чи з розгортанням на 180 градусів, наприклад, секцію ш- -подібного судна .в вигляді понтона З з бортом 17 і/чи з комінгсом 18 трюма 19, або окремої секції з подвійним дном 16 суховантажного судна із зрізаними кінцями і вузлами /не показано/, які виходять за габарит стояків 13 і кронштейнів 14 і 65 після осушення дока 2 скріплюють понтон З із згаданими стояками 13 і кронштейнами 14, при цьому над стапельною палубою 11 в понтоні З і його перекритті 21 виконують додатковий проріз 20, а між боковою стінкоюP by the formation of a bridge 8, which at the same time connects the decks 9 of the towers 5, forms a dock compartment 10 with a slot 7 and at the same time the lower part, that is, the pontoon 4 is separated and removed from the dock 2, which differs in that initially on the slipway deck 11 and / or on the side walls 12 of the towers 5 of the dock 2, support nodes in the form of risers 13 or additional brackets are installed. 14 - dock 2 is semi-immersed, a pontoon 4 with a hull placed on its deck or a section in the form of a pontoon C with a longitudinal double bottom 15 and/or with a double side 16 is introduced into it, for example, directly or with a 180 degree deployment, for example, a section w - - a similar vessel in the form of a pontoon C with a side 17 and/or with a coaming 18, a hold 19, or a separate section with a double bottom 16 of a dry cargo vessel with cut ends and nodes /not shown/ that go beyond the dimensions of the risers 13 and brackets 14 and 65, after drying the dock 2, fasten the pontoon Z with the mentioned risers 13 and brackets 14, while above the slipway deck 11 in the pontoon Z and its roof 21, an additional slot 20 is made, and between the side wall

12 башти 5 і бортом 17 додатковий відсік 22 з прорізом 23.12 tower 5 and side 17 additional compartment 22 with slot 23.

Потім перекриття 21 з'єднують з берегом 24 за допомогою моста в вигляді додаткового понтона, в вигляді клина 23 і проміжного понтона 26 і рейкових колій 27, або перекриття 21 доку 2 виконують із згаданих секцій З за допомогою крана 32, цим досягається створення із судноремонтного плавучого дока 2 ремонтно-перевантажувального комплексу 1, який може проводити розвантаження із вагона 28 самопливом навалочного вантажу 29 прямо в трюм судна в вигляді баржі 30, яке розміщують в доковому відсіку 10, а також підвищення остійності дока 2 в напівзануреному стані з вантажем кілька вагонів 28 на його перекритті 21, зниження витрат енергоресурсів на перебаластування дока 2 при зміні баржі 30. 70 Після встановлення основної секції - перекриття 21 дока 2, при необхідності, перекриття 21 нарощують додатковими секціями 31, наприклад жкжш -ПОДІбНОЇ форми, за допомогою плавучого крана 32, при цьому секції 31 попередньо розрізують в доці в межах вантажопідйомності крана 32 з можливістю встановлення на опори 13 і 14 секції 31 різних розмірів, що виконують у випадку відсутності в порту понтона 4 або без його використання.Then the floor 21 is connected to the shore 24 with the help of a bridge in the form of an additional pontoon, in the form of a wedge 23 and an intermediate pontoon 26 and rails 27, or the floor 21 of dock 2 is made from the mentioned sections C with the help of a crane 32, thereby creating a ship repair the floating dock 2 of the repair and transshipment complex 1, which can unload bulk cargo 29 from the car 28 by gravity directly into the hold of the vessel in the form of a barge 30, which is placed in the dock compartment 10, as well as increasing the stability of the dock 2 in a semi-submerged state with the cargo of several cars 28 on its floor 21, reduction of energy costs for ballasting of dock 2 when changing barge 30. 70 After installation of the main section - floor 21 of dock 2, if necessary, floor 21 is increased with additional sections 31, for example, similar in shape, using a floating crane 32, at the same time, sections 31 are pre-cut in the dock within the load capacity of the crane 32 with the possibility of installation on the ry 13 and 14 of section 31 of different sizes, which are performed in the absence of pontoon 4 in the port or without its use.

Потім на бокових стінках, тобто подвійному борту -- 16 відсіка 10 дока 2, встановлюють додаткові опори у /5 Вигляді кронштейна 33 для рейкових колій пересувної балки 34 у вигляді мостового крана з лебідкою 35, з можливістю за його допомогою або за допомогою крана 36, який є на башті встановлення знімного моста в вигляді апарелі 37 на причальному кінці 38 докового відсіка 10 і для механізації обробки суден, які ставлять для ремонту чи обробки і перевантаження металобрухту під прорізом 20, або прорізом 23 для перевантаження прямо в вагон або інше судно.Then on the side walls, that is, the double side -- 16 of the compartment 10 of the dock 2, additional supports are installed in /5 View of the bracket 33 for the rail tracks of the mobile beam 34 in the form of a bridge crane with a winch 35, with the possibility of using it or using a crane 36, which is on the tower for installing a removable bridge in the form of a device 37 at the berth end 38 of the dock compartment 10 and for the mechanization of the processing of ships that are placed for repair or processing and transshipment of scrap metal under slot 20, or slot 23 for transshipment directly into a wagon or another vessel.

Опірні вузли 13 і 14 для скріплення секції, тобто перекриття 21 з стапельною палубою 11 виконують роз'ємними, з можливістю за допомогою понтона 4 при напівзануренні дока 2 їх виведення із відсіка 10 і послідовної роботи дока 2 як плавучого дока в попередньому стані, що підвищує універсальність об'єкта, який виконано за запропонованим способом. В окремих випадках понтон З в якості перекриття 21 доку 2 встановлюють за допомогою потужного плавучого крана 32, вагопідйомність якого більше ніж вага понтону 3.The supporting units 13 and 14 for fastening the section, i.e. the overlap 21 with the slipway deck 11 are made removable, with the possibility of removing them from the compartment 10 with the help of the pontoon 4 when the dock 2 is semi-immersed and the sequential operation of the dock 2 as a floating dock in the previous state, which increases universality of the object, which is made according to the proposed method. In some cases, pontoon C as an overlap 21 of dock 2 is installed with the help of a powerful floating crane 32, the weight capacity of which is greater than the weight of pontoon 3.

Приклад конкретного виконанняAn example of a specific implementation

Запропоновано спосіб виконання ремонтно-перевантажувального комплексу 1 шляхом переобладнання « судноремонтного плавучого дока 2, наприклад, його розміри - довжина найбільша 83,4м, довжина понтона дока 2 -67,0м. ширина понтона дока 29,бм, його стапельна палуба 11 разом з крінолином має довжину 83,4м, ширину 21,5м, в світлі ширина -19,7м, дві башти 5 мають висоту 9,2м, ширину 4,Ом, доковий понтон 2 має розміри 67,0 «г зо х 29,6 х 4,0М, осадка в баласті 2,02м, осадка з вантажем - судном вагою 2500 тонн - З,бм, один рухомий палубний стріловий кран в/п 5,0т, з стрілою довжиною 23,0м, який обслуговує площу стапельної палуби 11. -A method of carrying out the repair and transshipment complex 1 by converting the "ship repair floating dock 2" is proposed, for example, its dimensions - the longest length is 83.4 m, the length of the pontoon of the dock 2 - 67.0 m. the width of the dock pontoon is 29.bm, its slipway deck 11 together with the crinoline is 83.4m long, 21.5m wide, -19.7m wide in the light, two towers 5 are 9.2m high, 4.Om wide, dock pontoon 2 has dimensions of 67.0 "g z o x 29.6 x 4.0 M, draft in ballast 2.02 m, draft with cargo - a vessel weighing 2500 tons - Z,bm, one mobile deck jib crane v/p 5.0t, with boom with a length of 23.0 m, which serves the area of slipway deck 11. -

Спочатку на стапельній палубі 11 біля бокових стінок 12 на відстані меншою мірою до подвійного борту 16 3 встановлюють опорні стояки 13, висотою 2,5-2,8м і додаткові кронштейни 6 і 14 з прорізом 7.First, on the slipway deck 11 near the side walls 12 at a smaller distance to the double side 16 3, support risers 13, 2.5-2.8 m high and additional brackets 6 and 14 with a slot 7 are installed.

Готовлять перекриття 21 в вигляді ше -ПОДІібНнОї секції, її розміри 76,5 х 15,0 х 3,Зм з подвійним дном 15 сThe floor 21 is being prepared in the form of a double-sided section, its dimensions are 76.5 x 15.0 x 3.3 cm with a double bottom 15 s

ІЛчи подвійним бортом 16, з розгортанням на 180 градусів з комінгсом 17, бортом 17, трюмом 19, яку ю встановлюють на занурений понтон 4 попереднє або в іншому доці і заводять в доковий відсік 10, в якому за допомогою корпуса понтона З з перекриттям 21 виконують міст 8, який з'єднує башти 5 і при осушенні дока 2 корпус понтона З встановлюють на стояки 13 і кронштейни 14, після чого понтон 4 виводять із відсіка 10, док 2 і його стапельну палубу 11 осушують, зверху палубу 9 баштів 5 з'єднують з перекриттям 21, а також знизу, на « Вівні стояків 13 виконують нижнє перекриття і при цьому утворюють додатковий відсік 22 з прорізом 23 для з с забезпечення можливості перевантаження вантажу, наприклад, металобрухту з стапельної палуби 11 вгору крізь проріз 23 шириною до З,5м. ;» Відсіки 22 разом з відсіками в баштах 5 мають площу ватерлінії близько 100Окв.метрів, тобто 10 тонн на 1см осадки, що дасть змогу накочувати дві вітки вагонів до 10-12 одиниць вагою 1000 тонн,Ilchi with a double side 16, with a deployment of 180 degrees with a coaming 17, a side 17, a hold 19, which is installed on a submerged pontoon 4 in the previous or another dock and brought into the dock compartment 10, in which, with the help of the pontoon body Z with an overlap 21, they perform bridge 8, which connects towers 5 and when dock 2 is drained, the body of pontoon Z is installed on risers 13 and brackets 14, after which pontoon 4 is removed from compartment 10, dock 2 and its slip deck 11 are drained, on top of deck 9 of towers 5 with connected to the floor 21, as well as from the bottom, on the sides of the risers 13 make the lower floor and at the same time form an additional compartment 22 with a slot 23 to ensure the possibility of overloading the cargo, for example, scrap metal from the slipway deck 11 up through the slot 23 wide to Z, 5 m. ;" Compartments 22, together with the compartments in towers 5, have a waterline area of about 100 square meters, that is, 10 tons per 1 cm of sediment, which will make it possible to roll two lines of cars up to 10-12 units weighing 1000 tons,

У такому випадку нижні вузли перекриття при сполученні з верхніми вузлами баржі ЗО виконують функцію с опору, а баржа - функцію додаткового опорного понтону для комплексу 1, а при вивантаженні вантажу з вагонів 20 в баржу 30 і віддаленні порожних вагонів виникне додатковий простір для вільного виведення баржі ЗО із ю відсіка 10, при цьому знижують обсяг баластно-осушувальних робіт і витрат енергії.In this case, the lower nodes of the ceiling when connected to the upper nodes of the ZO barge perform the function of a support, and the barge acts as an additional support pontoon for complex 1, and when the cargo is unloaded from wagons 20 to barge 30 and empty wagons are moved away, additional space will be created for the free removal of the barge ZO from the right of compartment 10, while reducing the amount of ballast-draining work and energy consumption.

Го! Насипний вантаж 29 із вагона 20 перевантажують в трюм баржі 30 самопливом або за допомогою вібратора 5ор не показано)/.Go! The bulk cargo 29 from the wagon 20 is reloaded into the hold of the barge 30 by gravity or with the help of a vibrator 5or (not shown)/.

Ш- При наявності у дока 2 запасів остійності, понтон З з перекриттям 21 виконують з корпусу суховантажного ї» судна, наприклад, "КИШІНІВ" його розміри 117,0 х 15,0 х 6б,5м, з довжиною подвійного дна його трюма разом з машинним відділенням 80,0-90,0м, ширина 15,Ом. висота 1,Ом, вага біля 500 тонн, яке встановлюють прямо або з розворотом на 180 градусів, з використанням його борту як стінки відсіка 22 і з'єднання рейковими коліями дво 28 з проміжним понтоном 26 і клиновим понтоном 25 з можливістю переміщення по берегу 24 лебідкою /не показаної),Ш- If the dock has 2 reserves of stability, pontoon Z with an overlap 21 is made from the hull of a dry cargo ship, for example, "KISHINIV", its dimensions are 117.0 x 15.0 x 6b.5m, with the length of the double bottom of its hold together with engine room 80.0-90.0m, width 15.0m. height 1, Ohm, weight about 500 tons, which is installed straight or with a turn of 180 degrees, using its side as a wall of the compartment 22 and connecting with two rail tracks 28 with an intermediate pontoon 26 and a wedge pontoon 25 with the possibility of moving along the shore 24 winch /not shown),

Р В окремих випадках, при наявності в порту потужного плавучого крана в/п 500-600 тонн, понтон З в якості перекриття 21 доку 2 встановлюють за допомогою крана 32 разом, без розрізання на секції, цим зменшують витрати праці, часу, коштів. во На перекритті 21 понтона З виконують прорізні люки 20 між коліями 27 для перевантаження вантажу 29 з вагонів - хоперів 28 в/п 70-72 тонни в баржу 30.R In some cases, if there is a powerful floating crane in the port of 500-600 tons, pontoon Z as an overlap 21 of dock 2 is installed with the help of a crane 32 together, without cutting it into sections, thereby reducing the cost of labor, time, and money. On the floor 21 of pontoon Z, cut-through hatches 20 are made between tracks 27 for transshipment of cargo 29 from wagons - hoppers 28 of 70-72 tons to barge 30.

На бокових стінках-подвійному боргу 16 понтона З встановлюють кронштейни 33 для рейок пересувного мостового крана 34 з лебідкою З5 в/п 5,0-140,0 тонн переміщення і складування вантажу або металобрухту з прорізу 23 баштовим краном 36 в вагон 28, берег, іншу баржу. 65 При розформуванні комплексу 1 у відсіку 10 розрізують вузли стояків 13, кронштейнів 14 від борту 17, комінгсу 18, док 2 притоплюють, під понтон-перекриття З заводять понтон 4, з ліхтера дм/38,25 х 11,0 х 5,Ом/Brackets 33 for the rails of a mobile bridge crane 34 with a winch Z5 of 5.0-140.0 tons are installed on the side walls-double deck 16 of pontoon Z for the movement and storage of cargo or scrap metal from slot 23 by tower crane 36 to wagon 28, shore, another barge. 65 When complex 1 is dismantled in compartment 10, the nodes of risers 13, brackets 14 from the side 17, coamings 18, dock 2 are sunk, pontoon 4 is set up under the pontoon-overlap C, made of a lighter dm/38.25 x 11.0 x 5.Om /

закріплюють, док 2 додатково притоплюють, відривають понтон З перекриття 21 від опор 13 і кронштейнів 14 і 6, понтон-перекриття 21 виводять .з відсіка 10, утворюють відкритий простір над палубою 11, яку готують для приймання морського судна з необмеженою висотою надбудови і щогли.are fixed, dock 2 is additionally flooded, the pontoon is detached From the floor 21 from the supports 13 and brackets 14 and 6, the pontoon-floor 21 is removed from the compartment 10, forming an open space above the deck 11, which is being prepared for receiving a sea vessel with an unlimited height of superstructure and mast .

Зразки трюмних барж-секції для використання як перекриття 21 дока 2, це баржі УДЛ "С-2000"776,5 х 15,0 х 3,Зм/ вага секції біля 400 тонн. Баржа проект Р29 в/п 3000 тонн /86,0 х 17,6 х 4,0м/ вага близько 500 тонн та інші баржі або суховантажні судна з подвійним дном.Samples of bilge barge sections for use as a floor of 21 dock 2, these are barges UDL "S-2000" 776.5 x 15.0 x 3.Zm/ weight of the section is about 400 tons. Barge project P29 v/p 3000 tons /86.0 x 17.6 x 4.0 m/ weight about 500 tons and other barges or dry cargo vessels with a double bottom.

Запропонований об'єкт підвищує можливості використання плавучих доків, які не мають завантаження, розширюють їх використання і підвищують ефективність об'єкта, виконаного відповідно до запропонованого 7/0 способу.The proposed object increases the possibilities of using floating docks that do not have loading, expands their use and increases the efficiency of the object made according to the proposed 7/0 method.

Література: 1. Книга "Розмірна модернізація і переобладнання суден" автори А.В.Гундобін і Г.Н.Фінкель, вид. "Суднобудування", Ленінград,1977 р. 192 с. на стор.111-112. 2. Патент України на винахід Мо45458 МПК 8650-67/69, В650-1/02. Устаткування для перевантаження /5 навалочних вантажів -- аналог.Literature: 1. The book "Extensive modernization and conversion of ships" by A.V. Gundobin and G.N. Finkel, ed. "Shipbuilding", Leningrad, 1977, 192 p. on pages 111-112. 2. Patent of Ukraine for the invention Mo45458 IPC 8650-67/69, B650-1/02. Equipment for overloading /5 bulk cargoes - analog.

З.Заявка в Укрпатент Мо 99063517 від 22.06 1999р. Спосіб модернізації плавучого засобу - аналог. 4 Заявка в Укрпатент Мо99116339 від 23.11.1999р. Пересувний перевантажувальний комплекс і спосіб його виконання- аналог. 5. Заявка в Укрпатент Мо2000020585 /2758 від 02.02.2000р. Перевантажувальний комплекс М.І.Мануйлова /ПК-7/ та спосіб його виконання -- аналог.Z. Application to Ukrpatent No. 99063517 dated June 22, 1999. The method of modernization of the floating means is analogous. 4 Application to Ukrpatent No. 99116339 dated November 23, 1999. The mobile transshipment complex and the method of its execution are analogous. 5. Application to Ukrpatent Mo2000020585 /2758 dated 02.02.2000. M.I.Manuylov's transshipment complex /PK-7/ and the method of its implementation - analogue.

Claims (4)

Формула винаходуThe formula of the invention 1. Спосіб виконання ремонтно-перевантажувального комплексу, що виконується шляхом зміни розмірів і підвішування верхньої частини корпуса в вигляді понтона, двократного послідовного баластування судна або « підйому-осушення дока, відділення верхньої частини, яка при цьому спирається на закріплені на башті дока опорні вузли у вигляді кронштейнів з прорізами між ними, з якими її скріплюють з утворенням моста, який з'єднує башти і відсік з прорізом, і при цьому нижню частину віддаляють і виводять із дока, який відрізняється «т зр тим, що спочатку на стапельній палубі і/чи бокових стінках башти дока встановлюють опорні вузли у вигляді стояків і/чи кронштейнів, напівзанурюють док, заводять понтон з розміщеним на ньому корпусом або секцією в о вигляді понтона з повздовжнім дном і/чи бортом, наприклад, прямо чи з розворотом на 180 градусів, наприклад со секцію І -подібного судна з бортом і/чи комінгсом трюму або окрему секцію з подвійним дном суховантажного судна із зрізаними кінцями і вузлами, які виходять за габарит згаданих опорних вузлів, і після осушення дока секцію скріплюють зі згаданими стояками або перекриття дока згаданими секцією чи понтоном виконують за Іо) допомогою потужного плавучого крана, при цьому над стапельною палубою утворюють перекриття і додатковий відсік з прорізом, потім перекриття з'єднують з берегом за допомогою моста у вигляді понтона і рейкових колій.1. The method of carrying out the repair and transshipment complex, which is carried out by changing the dimensions and hanging the upper part of the hull in the form of a pontoon, double consecutive ballasting of the vessel or "lifting and draining the dock, separating the upper part, which at the same time rests on the support nodes fixed on the dock tower in in the form of brackets with slots between them, with which it is fastened to form a bridge that connects the towers and the compartment with the slot, and at the same time the lower part is removed and taken out of the dock, which differs "t from what was originally on the slipway deck and/ or on the side walls of the dock tower, supporting units in the form of risers and/or brackets are installed, the dock is semi-immersed, a pontoon with a body placed on it or a section in the form of a pontoon with a longitudinal bottom and/or side, for example, straight or with a 180-degree turn, is brought in, for example, with the section of an I-shaped vessel with a side and/or coaming of the hold or a separate section with a double bottom of a bulk carrier with cut ends and knots , which go beyond the dimensions of the mentioned support units, and after drying the dock, the section is fastened with the mentioned risers or the dock is covered with the mentioned section or pontoon using a powerful floating crane, while an overlap and an additional compartment with a slot are formed above the slipway deck, then an overlap with connected to the shore by means of a bridge in the form of a pontoon and rail tracks. 2. Спосіб за п. 1, який відрізняється тим , що на бокових стінках відсіку закріплюють опори у вигляді « кронштейна для рейкових колій для пересувної балки в вигляді мостового крана з лебідкою і можливістю встановлення знімного моста-апарелі на причальному кінці докового відсіку. -2. The method according to claim 1, which is distinguished by the fact that supports are fixed on the side walls of the compartment in the form of a bracket for rail tracks for a movable beam in the form of a bridge crane with a winch and the possibility of installing a removable bridge-apparatus at the mooring end of the docking compartment. - с with 3. Спосіб за п. 1, який відрізняється тим, що після встановлення основного перекриття дока його нарощують "з додатковими секціями, наприклад, || -подібного судна за допомогою плавучого крана, при цьому секції3. The method according to claim 1, which differs in that after the installation of the main deck of the dock, it is built up "with additional sections, for example, a ||-shaped vessel using a floating crane, while the sections " . К-4 . виконують в межах вантажопідйомності крана." . K-4 . are performed within the crane's carrying capacity. 4. Спосіб за п. 1, який відрізняється тим, що перекриття скріплене з опорними стояками і кронштейнами з сл 45 можливістю їх рознімання і виведення перекриття із відсіку дока. іме)4. The method according to claim 1, which is distinguished by the fact that the ceiling is attached to the support risers and brackets with the possibility of disconnecting them and removing the ceiling from the dock compartment. name) Фіг. 1 (ее) -070 Фіг. 2 2» й т Фіг. ЗFig. 1 (ee) -070 Fig. 2 2" and t Fig. WITH Фіг. 4 Р» Фіг. 5Fig. 4 P» Fig. 5 Фіг. 6 60 йFig. 6 60th Фіг. 7Fig. 7 Фіг. 8 бо Офіційний бюлетень "Промислоава власність". Книга 1 "Винаходи, корисні моделі, топографії інтегральних мікросхем", 2003, М 1, 15.01.2003. Державний департамент інтелектуальної власності Міністерства освіти і науки України.Fig. 8 bo Official Bulletin "Industrial Property". Book 1 "Inventions, useful models, topographies of integrated microcircuits", 2003, M 1, 15.01.2003. State Department of Intellectual Property of the Ministry of Education and Science of Ukraine. « « їч- с с ІС в) ші с ;»« « ich- s s IS c) shi s ;" 1 іме) (ее) - 50 с»1 name) (ee) - 50 s» 60 б560 b5
UA2001042225A 2001-05-22 2001-05-22 Method of manufacture of repair-overloading complex (srpk-19) UA52874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
UA2001042225A UA52874A (en) 2001-05-22 2001-05-22 Method of manufacture of repair-overloading complex (srpk-19)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
UA2001042225A UA52874A (en) 2001-05-22 2001-05-22 Method of manufacture of repair-overloading complex (srpk-19)

Publications (1)

Publication Number Publication Date
UA52874A true UA52874A (en) 2003-01-15

Family

ID=74173642

Family Applications (1)

Application Number Title Priority Date Filing Date
UA2001042225A UA52874A (en) 2001-05-22 2001-05-22 Method of manufacture of repair-overloading complex (srpk-19)

Country Status (1)

Country Link
UA (1) UA52874A (en)

Similar Documents

Publication Publication Date Title
CN106379481B (en) container ship capable of loading and unloading goods
KR100664915B1 (en) Ship of burden
CN101941510A (en) Method for improving ship handling efficiency of containers (or bulk cargo) and equipment thereof
KR100914385B1 (en) Method to load big size block to floating dock and rendezvous on the sea for erection using the same
JP4759620B2 (en) Inundation method applied to tandem construction method
WO2012039619A2 (en) Vessel comprising a hull with a deck and a cargo area extending in a length direction of the deck
WO2011078420A1 (en) Floating hybrid mobile harbor
UA52874A (en) Method of manufacture of repair-overloading complex (srpk-19)
JP6681191B2 (en) Floating structure construction method and floating structure of floating structure
US6863484B2 (en) Catamaran transfer vessel
JP3414781B2 (en) Horizontal mobile cargo handling equipment
US5862770A (en) Sea-based transportation and load handling system
JP2017114264A (en) Floating facility construction method and floating structure for floating facility
US6334401B1 (en) Floating structure for the transfer of cargo
KR101263247B1 (en) Mobile harbor
AU2011320016A1 (en) A marine vessel for and method of transferring RORO cargo between vessels at sea
UA48369A (en) Floating dock as a transfer complex (urpk-18)
RU2464200C1 (en) Two-hull vessel
KR20040087633A (en) The pontoon type freight amassment floor of wharf with difference of tide level
RU2827914C1 (en) Autonomous unmanned underwater vehicle lowering and lifting device
RU2394749C2 (en) Floating re-loader
KR101112158B1 (en) Mobile portal crane and vessel with the crane
RU2207288C2 (en) Device for loading/unloding and transportation of heavy cargo on lighter-vessel
JPH0115448B2 (en)
UA62675A (en) Method of dismantling a ship for metal and its use as a wharf (pk-29)