Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Яків Аронович Купінський, Яков Аронович КупинскийfiledCriticalЯків Аронович Купінський
Priority to UA97126146ApriorityCriticalpatent/UA29042A/en
Publication of UA29042ApublicationCriticalpatent/UA29042A/en
Underground Structures, Protecting, Testing And Restoring Foundations
(AREA)
Abstract
The invention relates to basement with deep laying. The method includes arrangement in soil of well with ballast supply to well at compacting bottom and walls of well with ballast and following filling well with concrete mix. Arrangement of well is performed by screwing to earth executive body equipped with screw blades, and ballast supply is performed without extraction of executive body of well through its hollow shaft, compacting of soil with crushed rock pressing is performed with same unit due to its turn with respect to vertical axis, after that executive body is taken out of well, and after that well is filled with concrete mix.
UA97126146A1997-12-181997-12-18Method to make basement and appliance for implementation of method
UA29042A
(en)