TWM601766U - Sound insulation support frame structure - Google Patents

Sound insulation support frame structure Download PDF

Info

Publication number
TWM601766U
TWM601766U TW109204499U TW109204499U TWM601766U TW M601766 U TWM601766 U TW M601766U TW 109204499 U TW109204499 U TW 109204499U TW 109204499 U TW109204499 U TW 109204499U TW M601766 U TWM601766 U TW M601766U
Authority
TW
Taiwan
Prior art keywords
frame structure
support frame
sound insulation
adjusting seat
base
Prior art date
Application number
TW109204499U
Other languages
Chinese (zh)
Inventor
辛文佐
Original Assignee
辛文佐
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 辛文佐 filed Critical 辛文佐
Priority to TW109204499U priority Critical patent/TWM601766U/en
Publication of TWM601766U publication Critical patent/TWM601766U/en

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

一種隔音支撐架結構,係包括一基座、一鎖固件及一調整座,該基座具有一組設平台及一插設端,該插設端係由該組設平台一側向下延伸形成,該組設平台另一側形成一穿孔,該鎖固件對應貫穿該穿孔,該調整座與所述基座相對設置,該調整座一側向上凸設一桿體。 A sound insulation support frame structure includes a base, a locking member and an adjusting seat. The base has a set of platform and an insertion end, and the insertion end is formed by extending downward from one side of the assembly platform A perforation is formed on the other side of the assembling platform, the locking member correspondingly penetrates the perforation, the adjusting seat is arranged opposite to the base, and a rod is protruding upward on one side of the adjusting seat.

Description

隔音支撐架結構 Sound insulation support frame structure

本創作係有關於一種應用於建築樓板或牆板的支撐架,尤指一種可大幅減少人力成本、降低工時並提升施工便利性之隔音支撐架結構。 This creation is about a support frame applied to building floor or wall panels, especially a sound insulation support frame structure that can greatly reduce labor costs, reduce working hours, and improve construction convenience.

建築物的防水、隔熱、隔音等需求,一直是業界急欲改善的課題,以屋頂漏水來說,室內發生滲水現象形成壁癌一向是惱人的惡夢,追溯其原因,不外乎是屋頂或牆面因預留伸縮縫或產生縫隙,導致水沿著縫隙而自牆面滲出,灌築水泥混凝土時,分次施工灌築的接合處容易自然形成出縫隙;受到地震、強風等加諸於建築物之外力,或是建築物經熱脹冷縮或日曬雨淋的緩慢風化,均可導致建築物自然形成裂痕或縫隙,使得建築物或多或少都有滲水的問題。 The needs of building waterproofing, heat insulation, and sound insulation have always been issues that the industry is eager to improve. Taking roof leaks as an example, wall cancer caused by indoor water seepage has always been an annoying nightmare. Tracing back the cause is nothing more than the roof. Or because of the reserved expansion joints or gaps on the wall, water seeps from the wall along the gap. When the cement concrete is poured, the joints of the sub-construction and grouting are easy to naturally form gaps; earthquakes, strong winds, etc. External forces from the building, or the slow weathering of the building after thermal expansion and contraction, or sun and rain, can cause the building to naturally form cracks or gaps, making the building more or less water seepage problems.

以建築物的屋頂舉例來說,以往屋頂的防水、止漏工程可分為硬質或軟質材料的施工法,其中硬質材料工法是於漏水板面重新以水泥或七厘石砂漿粉刷;軟質材料施工法則利用瀝青、環氧樹脂、聚胺基甲酸乙酯(PU)等高分子防水材噴灑、粉刷於滲水牆面,來達到阻隔水分的目的。然而,不論何種施工法,皆須靠大量的人力不斷地在地面上來回舖設、粉刷,如此不僅造成人力及工時的耗費外,施工步驟上也較為繁雜。 Take the roof of a building as an example. In the past, the waterproofing and leak-stopping works of the roof can be divided into construction methods of hard or soft materials. The construction method of hard materials is to repaint the surface of the leaking board with cement or seven-point stone mortar; construction with soft materials The law uses asphalt, epoxy resin, polyurethane (PU) and other polymer waterproof materials to spray and paint on the seepage wall to achieve the purpose of blocking moisture. However, no matter what kind of construction method, a lot of manpower is required to continuously lay and paint the ground back and forth. This not only causes the cost of manpower and man-hours, but also the construction steps are more complicated.

是以,要如何解決上述習用之問題與缺失,即為本創作之創 作人與從事此行業之相關廠商所亟欲研究改善之方向所在者。 Therefore, how to solve the above-mentioned problems and deficiencies of conventional use is the creation of this creation. Those who want to study the direction of improvement urgently by the people and related manufacturers engaged in this industry.

爰此,為有效解決上述之問題,本創作之主要目的在於提供一種可大幅減少人力成本之隔音支撐架結構。 Therefore, in order to effectively solve the above-mentioned problems, the main purpose of this creation is to provide a sound insulation support frame structure that can greatly reduce labor costs.

本創作之次要目的,在於提供一種可大幅降低工時之隔音支撐架結構。 The secondary purpose of this creation is to provide a sound insulation support frame structure that can greatly reduce working hours.

本創作之次要目的,在於提供一種可大幅提升施工便利性之隔音支撐架結構。 The secondary purpose of this creation is to provide a sound insulation support frame structure that can greatly improve the convenience of construction.

為達上述目的,本創作係提供一種隔音支撐架結構,係包括一基座、一鎖固件及一調整座,該基座具有一組設平台及一插設端,該插設端係由該組設平台一側向下延伸形成,該組設平台另一側形成一穿孔,該鎖固件對應貫穿該穿孔,該調整座與所述基座相對設置,該調整座一側向上凸設一桿體。 In order to achieve the above-mentioned purpose, this creation provides a sound insulation support frame structure, which includes a base, a locking member and an adjustment seat. The base has a set of platform and an insertion end, and the insertion end is One side of the assembling platform extends downward, and the other side of the assembling platform is formed with a perforation, the lock piece correspondingly penetrates the perforation, the adjusting seat is arranged opposite to the base, and one side of the adjusting seat is protruded with a rod body.

在一實施例中,所述基座與調整座之間更設有一支撐件形成一中空部,所述鎖固件對應貫穿該中空部。 In one embodiment, a support member is further provided between the base and the adjusting seat to form a hollow portion, and the locking member correspondingly penetrates the hollow portion.

在一實施例中,更具有一延長螺件,該延長螺件具有一第一端部及一第二端部,該第一端部對應貫設於所述支撐件之中空部內。 In one embodiment, there is an extended screw member, the extended screw member has a first end and a second end, and the first end is correspondingly penetrated in the hollow portion of the support member.

在一實施例中,所述第一端部之直徑係小於第二端部之直徑,所述第二端部之直徑係等於所述支撐件之直徑。 In one embodiment, the diameter of the first end is smaller than the diameter of the second end, and the diameter of the second end is equal to the diameter of the support.

在一實施例中,所述支撐件及延長螺件之外周側更形成有複數螺紋。 In one embodiment, a plurality of threads are formed on the outer peripheral side of the support member and the extension screw member.

在一實施例中,所述調整座之兩端更形成一凸部,至少一凹 槽對應開設於該凸部之外側或內側,該凹槽上對應繞設至少一鐵絲。 In an embodiment, both ends of the adjusting seat further form a convex portion, at least one concave The groove is correspondingly opened on the outer side or the inner side of the convex portion, and at least one iron wire is correspondingly wound on the groove.

在一實施例中,於所述調整座上更設有至少一凸台,所述鐵絲對應繞設於該凸台上。 In an embodiment, at least one boss is further provided on the adjusting seat, and the iron wire is correspondingly wound on the boss.

在一實施例中,所述桿體係透過一紅外線感測裝置進行一標高動作以令該桿體形成一標高點。 In one embodiment, the rod system performs an elevation action through an infrared sensing device to make the rod body form an elevation point.

透過本創作此結構的設計,於開始進行建築物防水、止漏的水泥鋪設工程前,首先,先利用一器具於欲防水的地面上穿鑿形成一孔洞,接著將所述基座的插設端插入該孔洞內,再將該支撐件透過該鎖固件貫設該支撐件的中空部,得以令該支撐件固定在該基座上,再將該調整座設置於該支撐件上,令該調整座可牢固地固設於該支撐件上,最後,再利用一紅外線感測裝置進行一標高動作以令該桿體形成一標高點後,將超過該標高點的桿體進行剪除以保留該標高點以下的桿體,如此一來,施工人員僅需針對保留的桿體高度進行水泥的鋪設,達到改善靠大量的人力不斷地在地面上來回舖設、粉刷,進而大幅減少人力成本、降低工時外,還簡化了工程步驟,大幅提升施工便利性。 Through the design of this structure, before starting the building waterproof and leak-proof cement paving project, first use a tool to form a hole in the ground to be waterproofed, and then insert the end of the base Insert the support into the hole, and then penetrate the hollow part of the support through the locking member to fix the support on the base, and then set the adjusting seat on the support to make the adjustment The base can be firmly fixed on the support, and finally, an infrared sensing device is used to perform an elevation action to make the rod body form an elevation point, and then the rod body exceeding the elevation point is cut to retain the elevation As a result, the construction personnel only need to lay the cement according to the reserved height of the pole, so as to improve the continuous laying and painting on the ground with a lot of manpower, thereby greatly reducing labor costs and reducing man-hours In addition, it simplifies the engineering steps and greatly improves the convenience of construction.

2:隔音支撐架結構 2: Sound insulation support frame structure

200:組設平台 200: Assemble the platform

201:插設端 201: Plug-in end

202:穿孔 202: Piercing

21:鎖固件 21: Lock firmware

22:調整座 22: adjustment seat

220:凸部 220: convex

221:凹槽 221: Groove

23:桿體 23: Rod body

20:基座 20: Pedestal

230:標高點 230: Elevation point

24:凸台 24: boss

3:支撐件 3: Support

30:中空部 30: hollow part

4:延長螺件 4: Extension screw

40:第一端部 40: first end

41:第二端部 41: second end

5:鐵絲 5: Wire

6:器具 6: Appliance

7:地面 7: Ground

70:孔洞 70: Hole

8:水泥 8: Cement

9:鋼筋 9: Rebar

第1圖係為本創作隔音支撐架結構第一實施例之結構示意圖; Figure 1 is a schematic structural diagram of the first embodiment of the creative sound insulation support frame structure;

第2圖係為本創作隔音支撐架結構第二實施例之結構示意圖; Figure 2 is a schematic structural diagram of the second embodiment of the creative sound insulation support frame structure;

第3圖係為本創作隔音支撐架結構第一實施例之實施流程圖一; Figure 3 is the first implementation flowchart of the first embodiment of the creation of the sound-proof support frame structure;

第4圖係為本創作隔音支撐架結構第一實施例之實施流程圖二; Figure 4 is the second implementation flowchart of the first embodiment of the creation of the sound-proof support frame structure;

第5圖係為本創作隔音支撐架結構第一實施例之實施流程圖三; Figure 5 is the third implementation flowchart of the first embodiment of the creation of the sound-proof support frame structure;

第6圖係為本創作隔音支撐架結構第三實施例之結構示意圖。 Figure 6 is a schematic structural diagram of the third embodiment of the creative sound insulation support frame structure.

本創作之上述目的及其結構與功能上的特性,將依據所附圖式之較佳實施例予以說明。 The above-mentioned purpose of this creation and its structural and functional characteristics will be described based on the preferred embodiments of the accompanying drawings.

請參閱第1圖,係為本創作隔音支撐架結構第一實施例之結構示意圖,如圖所示,一種隔音支撐架結構2,係包括一基座20、一鎖固件21及一調整座22,該基座20具有一組設平台200及一插設端201,該插設端201係由該組設平台200一側向下延伸形成,該組設平台200另一側形成一穿孔202。 Please refer to Figure 1, which is a schematic structural diagram of the first embodiment of the sound-insulating support frame structure of the creation. As shown in the figure, a sound-insulating support frame structure 2 includes a base 20, a fastener 21 and an adjustment seat 22 The base 20 has a set of platform 200 and an insertion end 201, the insertion end 201 is formed by extending downward from one side of the assembly platform 200, and a through hole 202 is formed on the other side of the assembly platform 200.

於本實施例中,其中所述基座20與調整座22之間更設有一支撐件3形成一中空部30,並且該支撐件3藉由所述鎖固件21對應貫穿該中空部30及所述穿孔202,以令該支撐件3固設於所述基座20上,然而,支撐件3的設置並非是必要的,其也可直接形成於該穿孔202的內部,合先敘明。 In this embodiment, a supporting member 3 is further provided between the base 20 and the adjusting seat 22 to form a hollow portion 30, and the supporting member 3 penetrates the hollow portion 30 and the hollow portion 30 by the locking member 21. The perforation 202 is used to fix the support 3 on the base 20. However, the arrangement of the support 3 is not necessary, and it can also be directly formed inside the perforation 202, as described first.

該調整座22與所述基座20相對設置並與所述支撐件3相組設,該調整座22一側向上凸設一桿體23,此外,該調整座22之兩端更形成有一凸部220,於該凸部220相對應的外側或內側位置處開設至少一凹槽221,該凹槽221上對應繞設至少一鐵絲5(請一併參閱第4圖),進一步說明,施工人員在進行施工時,會在該調整座22上架設複數鋼筋9,並透過所述鐵絲5繞設於該凹槽221內以令該等鋼筋9與該凸部220相綁設固定,進以使得該等鋼筋9牢固地架設於該調整座22上。 The adjusting seat 22 is arranged opposite to the base 20 and assembled with the support 3, and a rod 23 is protruding upward on one side of the adjusting seat 22. In addition, both ends of the adjusting seat 22 are further formed with a convex At least one groove 221 is defined at the outer or inner position corresponding to the convex portion 220, and at least one iron wire 5 is correspondingly wound on the groove 221 (please refer to Fig. 4 together). For further explanation, the construction personnel During construction, a plurality of steel bars 9 will be erected on the adjusting seat 22, and the steel wires 5 will be wound in the groove 221 so that the steel bars 9 and the convex portion 220 are bound and fixed to make The steel bars 9 are firmly erected on the adjusting seat 22.

此外,請參閱第2圖,係為本創作第二實施例之結構示意圖,於所述調整座22上還可以設有至少一凸台24,所述鐵絲5對應繞設於該凸台 24上,透過該凸台24的結構設計,更可加強鋼筋9與該調整座22的牢固性,達到增加整體結構強度。 In addition, please refer to Figure 2, which is a schematic structural diagram of the second embodiment of the creation. At least one boss 24 may be provided on the adjusting seat 22, and the iron wire 5 is correspondingly wound around the boss On 24, through the structural design of the boss 24, the firmness of the steel bar 9 and the adjusting seat 22 can be strengthened, so as to increase the overall structural strength.

此外,於本實施中,前述之支撐件3的外周側環設有複數螺紋作說明,而螺紋之結構係為了提供部件之間彼此相組合時達到更優秀的固定作用,當然,支撐件3的外周側也可不具有複數螺紋,合先敘明。 In addition, in this embodiment, the outer peripheral side ring of the aforementioned support 3 is provided with a plurality of threads for illustration, and the structure of the threads is to provide a better fixing effect when the components are combined with each other. Of course, the support 3 The outer peripheral side may not have plural threads, which shall be explained first.

續請一併參閱第3至5圖,透過本創作此結構的設計,於開始進行建築物防水、止漏的水泥8鋪設工程前,首先,先利用一器具6於欲防水的地面7上穿鑿形成一孔洞70,接著將所述基座20的插設端201插入該孔洞70內,再將該支撐件3透過該鎖固件21貫設該支撐件3的中空部30,得以令該支撐件3固定在該基座20上,再將該調整座22設置於該支撐件3上,令該調整座22可牢固地固設於該支撐件3上,最後,再利用一紅外線感測裝置(圖中未示)進行一標高動作以令該桿體23形成一標高點230後,將超過該標高點230的桿體23進行剪除以保留該標高點230以下的桿體23,如此一來,施工人員僅需針對保留的桿體23高度進行水泥8的鋪設,達到改善靠大量的人力不斷地在地面7上來回舖設、粉刷,進而大幅減少人力成本、降低工時外,還簡化了工程步驟,大幅提升施工便利性。 Please refer to Figures 3 to 5 together. Through the design of this structure, before starting the construction of the waterproof and leak-proof cement 8 paving project, first, first use a tool 6 to pierce the ground 7 to be waterproofed A hole 70 is formed, and then the insertion end 201 of the base 20 is inserted into the hole 70, and then the supporting member 3 is penetrated through the hollow portion 30 of the supporting member 3 through the locking member 21, so that the supporting member 3 is fixed on the base 20, and then the adjusting seat 22 is set on the support 3, so that the adjusting seat 22 can be firmly fixed on the support 3, and finally, an infrared sensing device ( (Not shown in the figure) After performing an elevation action to make the rod body 23 form an elevation point 230, the rod body 23 that exceeds the elevation point 230 is cut to retain the rod body 23 below the elevation point 230, so that, The construction personnel only need to lay the cement 8 according to the height of the remaining pole 23, so as to improve the continuous laying and painting on the ground 7 by a large amount of manpower, thereby greatly reducing labor costs and man-hours, and simplifying the engineering steps. , Which greatly improves the convenience of construction.

請參閱第6圖,係為本創作隔音支撐架結構第三實施例之結構示意圖,所述隔音支撐架結構改良部份元件及元件間之相對應之關係與前述隔音支撐架結構相同,故在此不再贅述,惟本隔音支撐架結構與前述最主要之差異為,更具有一延長螺件4,該延長螺件4具有一第一端部40及一第二端部41,該第一端部40對應貫設於所述支撐件3之中空部30內,並且所述第一端部40之直徑係小於第二端部41之直徑,所述第二端部41之直徑 係等於所述支撐件3之直徑,當然,該延長螺件4的外周側也可與前述支撐件3之結構相同,即也可於延長螺件4的外周側形成複數螺紋,以提供部件之間彼此相組合時達到更優秀的固定作用,因此,若須將水泥8鋪設的更為厚實,可透過裝設該延長螺件4來增加鋪設的厚度。 Please refer to Figure 6, which is a structural diagram of the third embodiment of the sound insulation support frame structure. The improved parts of the sound insulation support frame structure and the corresponding relationship between the elements are the same as the aforementioned sound insulation support frame structure. This will not be repeated here, but the main difference between the structure of the sound insulation support frame and the foregoing is that there is an extension screw 4 which has a first end 40 and a second end 41. The end 40 is correspondingly disposed in the hollow 30 of the support 3, and the diameter of the first end 40 is smaller than the diameter of the second end 41, and the diameter of the second end 41 Is equal to the diameter of the support 3, of course, the outer peripheral side of the extended screw 4 can also have the same structure as the aforementioned support 3, that is, multiple threads can be formed on the outer peripheral side of the extended screw 4 to provide a When they are combined with each other, a better fixing effect is achieved. Therefore, if the cement 8 needs to be laid thicker, the extension screw 4 can be installed to increase the laying thickness.

以上所述,本創作相較於習知具有下列優點: As mentioned above, this creation has the following advantages over conventional knowledge:

1.可大幅減少人力成本; 1. Can greatly reduce labor costs;

2.可大幅降低工時; 2. Can significantly reduce working hours;

3.可大幅提升施工便利性。 3. It can greatly improve the convenience of construction.

以上已將本創作做一詳細說明,惟以上所述者,僅為本創作之一較佳實施例而已,當不能限定本創作實施之範圍,即凡依本創作申請範圍所作之均等變化與修飾等,皆應仍屬本創作之專利涵蓋範圍。 The above has been a detailed description of this creation, but the above is only one of the preferred embodiments of this creation, and should not limit the scope of implementation of this creation, that is, all equal changes and modifications made in accordance with the scope of this creation application Etc., should still be covered by the patent of this creation.

2:隔音支撐架結構 2: Sound insulation support frame structure

200:組設平台 200: Assemble the platform

201:插設端 201: Plug-in end

202:穿孔 202: Piercing

21:鎖固件 21: Lock firmware

22:調整座 22: adjustment seat

220:凸部 220: convex

20:基座 20: Pedestal

221:凹槽 221: Groove

23:桿體 23: Rod body

230:標高點 230: Elevation point

3:支撐件 3: Support

30:中空部 30: hollow part

Claims (8)

一種隔音支撐架結構,係包括: A sound insulation support frame structure includes: 一基座,具有一組設平台及一插設端,該插設端係由該組設平台一側向下延伸形成,該組設平台另一側形成一穿孔; A base with a set of platform and an insertion end, the insertion end is formed by extending downward from one side of the assembling platform, and a perforation is formed on the other side of the assembling platform; 一鎖固件,其係對應貫穿該穿孔;及 A locking piece corresponding to the perforation; and 一調整座,係與所述基座相對設置,該調整座一側向上凸設一桿體。 An adjustment seat is arranged opposite to the base, and one side of the adjustment seat is protruded with a rod body. 如請求項1所述隔音支撐架結構,其中所述基座與調整座之間更設有一支撐件形成一中空部,所述鎖固件對應貫穿該中空部。 According to the soundproof support frame structure of claim 1, a support member is further provided between the base and the adjusting seat to form a hollow portion, and the locking member correspondingly penetrates the hollow portion. 如請求項2所述隔音支撐架結構,其中更具有一延長螺件,該延長螺件具有一第一端部及一第二端部,該第一端部對應貫設於所述支撐件之中空部內。 According to claim 2, the sound-insulating support frame structure further has an extended screw element, the extended screw element has a first end and a second end, and the first end correspondingly penetrates through the support member Inside the hollow section. 如請求項3所述隔音支撐架結構,其中所述第一端部之直徑係小於第二端部之直徑,所述第二端部之直徑係等於所述支撐件之直徑。 The sound insulation support frame structure according to claim 3, wherein the diameter of the first end is smaller than the diameter of the second end, and the diameter of the second end is equal to the diameter of the support. 如請求項3所述隔音支撐架結構,其中所述支撐件及延長螺件之外周側更形成有複數螺紋。 According to claim 3, the soundproof support frame structure, wherein the outer peripheral side of the support member and the extension screw member is further formed with a plurality of threads. 如請求項1所述隔音支撐架結構,其中所述調整座之兩端更形成一凸部,至少一凹槽對應開設於該凸部之外側或內側,該凹槽上對應繞設至少一鐵絲。 According to the sound insulation support frame structure of claim 1, wherein both ends of the adjusting seat further form a convex portion, at least one groove is correspondingly opened on the outside or inside of the convex portion, and at least one iron wire is correspondingly wound on the groove . 如請求項6所述隔音支撐架結構,其中於所述調整座上更設有至少一凸台,所述鐵絲對應繞設於該凸台上。 According to the sound insulation support frame structure of claim 6, wherein at least one boss is further provided on the adjusting seat, and the iron wire is correspondingly wound on the boss. 如請求項1所述隔音支撐架結構,其中所述桿體係透過一紅外線感測裝置進行一標高動作以令該桿體形成一標高點。 According to claim 1, the soundproof support frame structure, wherein the pole system performs an elevation action through an infrared sensing device to make the pole body form an elevation point.
TW109204499U 2020-04-16 2020-04-16 Sound insulation support frame structure TWM601766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW109204499U TWM601766U (en) 2020-04-16 2020-04-16 Sound insulation support frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109204499U TWM601766U (en) 2020-04-16 2020-04-16 Sound insulation support frame structure

Publications (1)

Publication Number Publication Date
TWM601766U true TWM601766U (en) 2020-09-21

Family

ID=74094593

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109204499U TWM601766U (en) 2020-04-16 2020-04-16 Sound insulation support frame structure

Country Status (1)

Country Link
TW (1) TWM601766U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI752467B (en) * 2020-04-16 2022-01-11 辛文佐 Soundproofing support frame structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI752467B (en) * 2020-04-16 2022-01-11 辛文佐 Soundproofing support frame structure

Similar Documents

Publication Publication Date Title
EP3258021A1 (en) Construction module and modular construction system comprising one or more of said construction modules
US6945001B1 (en) Building using external facing material for construction
JP3936583B2 (en) Assembled dome
US20180245348A1 (en) Method of Waterproofing Building Roofs and Building Panels
US20070130841A1 (en) Construction module system and method
CN110130546B (en) Assembled anti-seismic inner partition wall and installation method thereof
TWM601766U (en) Sound insulation support frame structure
CN205348554U (en) Assembled wallboard and assembled station room
CN106939671A (en) Metal sandwich roof plate construction method
TWI752467B (en) Soundproofing support frame structure
CN114737694A (en) Composite integral heat-insulation assembled large wallboard and manufacturing method thereof
CN105464283A (en) Fabricated wallboard and fabricated station building
TWM633929U (en) Improved structure of grid base rail construction
CN112196212B (en) Solid stone decorative column attached to outer wall and construction method thereof
TWM605543U (en) Improved structure of track type construction
JP6742694B2 (en) Roof structure
CN212027183U (en) Improved fixing structure of support frame
JP4063829B2 (en) Exterior insulation building with prestressed precast concrete body
TWM599831U (en) Improved fastening structure for a supporting rack
JP4087959B2 (en) Building floor panels and construction methods
Riegler-Floors et al. Detachable Connections and Constructions
JP4828388B2 (en) Assembled resin house
CN215167330U (en) Roof natural stone slab tile structure
CN213979640U (en) Improved structure of track type construction
CN106703177A (en) Big prefabricated house