TWM596132U - Elongated material coating equipment - Google Patents

Elongated material coating equipment Download PDF

Info

Publication number
TWM596132U
TWM596132U TW109202447U TW109202447U TWM596132U TW M596132 U TWM596132 U TW M596132U TW 109202447 U TW109202447 U TW 109202447U TW 109202447 U TW109202447 U TW 109202447U TW M596132 U TWM596132 U TW M596132U
Authority
TW
Taiwan
Prior art keywords
area
carrier
oven
transfer machine
processing
Prior art date
Application number
TW109202447U
Other languages
Chinese (zh)
Inventor
賴松立
Original Assignee
力坊興業股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 力坊興業股份有限公司 filed Critical 力坊興業股份有限公司
Priority to TW109202447U priority Critical patent/TWM596132U/en
Publication of TWM596132U publication Critical patent/TWM596132U/en

Links

Images

Landscapes

  • Spray Control Apparatus (AREA)
  • Coating Apparatus (AREA)

Abstract

本創作係有關於一種長型料材塗裝設備,其主要於環境空間架構有運送長型料材進行加工的路徑,於加工路徑上配置有多數個移載機,且沿該加工路徑將環境空間依序分設為上料區、前置處理區、滴水區、烘乾區、至少一噴塗區、烤爐區、冷卻區及下料區,其中所述移載機用以吊掛長型料材,經加工路徑導送長型料材進行前置酸洗處理、水切烘乾、上升噴塗色料、烘烤漆料、下降冷卻,再運送出料;藉此,利用升降區的移載機讓長型料材能於不同高度環境空間內進行一貫作業的噴塗、烘烤加工程序,達到良好的塗裝效能與效率。This creation is about a long material coating equipment, which mainly has a path for transporting long materials for processing in the environmental space structure, and a plurality of transfer machines are arranged on the processing path, and the environment is moved along the processing path The space is divided into loading area, pre-treatment area, dripping area, drying area, at least one spraying area, oven area, cooling area and unloading area in sequence, wherein the transfer machine is used to hang the long type The material is sent to the long material through the processing path for pre-pickling treatment, water-cut drying, ascending spray paint, baking paint, cooling down, and then conveying the material; thereby, using the lifting area to move The machine allows long materials to be sprayed and baked in a consistent operation in different environmental spaces, achieving good coating efficiency and efficiency.

Description

長型料材塗裝設備Long material coating equipment

本創作係有關於一種長型料材塗裝設備,尤指一種利用軌道式天車配合空間運用的設計,有效提供長型料材進行塗裝烤漆一貫作業的加工程序為其創作應用者。This creation is about a long material coating equipment, especially a design that uses a rail type overhead crane to cooperate with the space application, and effectively provides a long material for the consistent process of painting and baking.

按,一般「塗裝烤漆設備」能將物件勾掛懸吊輸送方式進行塗裝烤漆,也因為礙於環境場所之局限,僅適於碗、盤或自行車零件等重量輕之小型物件,對於如車床機台等重量沉重之大型物件則難以鉤件懸吊輸送,故創作人於先前針對上述問題研發申請,並獲准有台灣專利公告第M583332號大物件塗裝烤漆系統,係主要設有一軌道,並於該軌道上配置有至少一台車,又沿該軌道長度向依序設置有一上料區、一噴塗區、一烤爐區及一下料區,而於該噴塗區內係配置有至少一噴塗單元,另於該烤爐區內係配置有至少一烤爐單元,又使該噴塗區及烤爐區各形成有相對之一入口及一出口,另使該軌道貫穿通過該噴塗區及烤爐區之入口及出口。In general, "painting and baking equipment" can be used to hang and suspend the objects for painting and painting. Also because of the limitations of the environment, it is only suitable for small objects such as bowls, plates or bicycle parts that are light in weight. Large objects with heavy weights such as lathes and machines are difficult to suspend and transport. Therefore, the creators previously applied for the above problems and were approved to have Taiwan Patent Announcement No. M583332 for painting and baking systems for large objects, which mainly has a track. At least one car is arranged on the track, and a loading area, a spraying area, a baking area and a lowering area are sequentially arranged along the length of the track, and at least one spraying is arranged in the spraying area At the same time, at least one oven unit is arranged in the oven area, and the spraying area and the oven area are respectively formed with an inlet and an outlet, and the rail passes through the spraying area and the oven The entrance and exit of the district.

上述結構確實有效完成大型物件的噴塗作業,然而,當物件形體為長型條狀如門片、擠型條…等料材時,其面積也屬於大型物件,但因長度問題並不適合經由台車進行輸送噴塗,因台車轉彎等動作會影響長型料材偏移的輸送缺失;有鑑於此,本創作人秉持多年該相關行業之豐富設計開發及實際製作經驗,針對現有之結構及缺失予以研究改良,故特研發並提供一種長型料材塗裝設備,以期達到更佳實用價值性之目的者。The above structure does effectively complete the spraying operation of large objects. However, when the shape of the object is a long bar such as a door piece, an extruded bar, etc., its area is also a large object, but it is not suitable to be carried out by trolley because of the length problem. Conveying and spraying, because the movement of trolley turning and other actions will affect the lack of conveyance of long material deviations; in view of this, the creator upholds many years of rich design development and practical production experience in the relevant industry, and studies and improves on the existing structure and defects Therefore, we specially develop and provide a long material coating equipment in order to achieve better practical value.

本創作之主要目的在於提供一種長型料材塗裝設備,尤其是指一種利用軌道式天車配合空間運用的設計,有效提供長型料材進行塗裝烤漆一貫作業的加工程序為其目的。The main purpose of this creation is to provide a long material coating equipment, especially a design that uses a rail type overhead crane to cooperate with the space application, and effectively provides a long material for the consistent processing process of painting and baking for its purpose.

本創作長型料材塗裝設備之主要目的與功效,係由以下具體技術手段所達成:The main purpose and function of this long material coating equipment are achieved by the following specific technical means:

其主要於環境空間架構有運送長型料材進行加工的路徑,於加工路徑上配置有多數個移載機,且沿該加工路徑將環境空間依序分設為上料區、前置處理區、滴水區、烘乾區、至少一噴塗區、烤爐區、冷卻區及下料區,其中所述移載機用以吊掛長型料材,經加工路徑導送長型料材進行前置酸洗處理、水切烘乾、上升噴塗色料、烘烤漆料、下降冷卻,再運送出料;藉此,利用升降區的移載機讓長型料材能於不同高度環境空間內進行一貫作業的噴塗、烘烤加工程序,達到良好的塗裝效能與效率。It mainly has a path for transporting long materials for processing in the environmental space structure, and a plurality of transfer machines are arranged on the processing path, and the environmental space is sequentially divided into a loading area and a pre-processing area along the processing path , Dripping area, drying area, at least one spraying area, oven area, cooling area and unloading area, wherein the transfer machine is used to hang long materials, and guide the long materials through the processing path before proceeding Pickling treatment, water cutting and drying, ascending spray paint, baking paint, cooling down, and then conveying the material; by using the transfer machine in the lifting area, the long material can be carried out in the environment space of different heights Consistent operation of spraying and baking processing procedures to achieve good coating efficiency and efficiency.

如上所述之長型料材塗裝設備的較佳實施例,其中所述前置處理區內設有多數個處理槽,於每一處理槽內注入有針對長型料材進行表面前置處理的清潔液體。A preferred embodiment of the long material coating equipment as described above, wherein a plurality of treatment tanks are provided in the pretreatment area, and each treatment tank is injected with a surface pretreatment for the long material Cleaning liquid.

如上所述之長型料材塗裝設備的較佳實施例,其中所述前置處理區設有至少一接駁台車,所述接駁台車用以夾取所述載體,讓所述載體上的長型料材於每一處理槽內進行表面前置處理。A preferred embodiment of the long material coating equipment as described above, wherein the pre-treatment area is provided with at least one connecting trolley, which is used to grip the carrier and let the carrier The long material is pre-treated in each treatment tank.

如上所述之長型料材塗裝設備的較佳實施例,其中進一步於所述前置處理區之處理槽後方設有一暫放所述載體的滴水區,讓長型料材於此滴落清潔液體。A preferred embodiment of the long material coating equipment as described above, wherein a drip area where the carrier is temporarily placed is further arranged behind the treatment tank of the pre-treatment area to allow the long material to drip there Clean liquid.

如上所述之長型料材塗裝設備的較佳實施例,其中於所述滴水區與所述烘乾區之間設置一第一移載機,所述第一移載機係對應夾取所述載體由下部空間的前置處理區上升至位於上部空間的烘乾區內進行水切烘乾;再於所述烘乾區另一端設有第二移載機,係對應夾取所述載體由上部空間的烘乾區下降至位於下部空間。A preferred embodiment of the long material coating equipment as described above, wherein a first transfer machine is provided between the dripping area and the drying area, and the first transfer machine is correspondingly gripped The carrier rises from the pre-treatment area in the lower space to the drying area in the upper space for water-cut drying; then a second transfer machine is provided at the other end of the drying area to grip the carrier correspondingly From the drying area of the upper space to the lower space.

如上所述之長型料材塗裝設備的較佳實施例,其中所述下部空間設有一懸吊式輸送機,所述懸吊式輸送機通過所述烘乾區之第二移載機、所述噴塗區、所述烤爐區及所述冷卻區。A preferred embodiment of the long material coating equipment as described above, wherein the lower space is provided with a suspended conveyor, the suspended conveyor passes through the second transfer machine in the drying area, The spraying area, the oven area and the cooling area.

如上所述之長型料材塗裝設備的較佳實施例,其中於所述噴漆區與所述烤爐區之間設置一第三移載機,所述第三移載機係對應夾取所述載體由下部空間上升至位於上部空間的烤爐區內進行表面烤漆烘乾;再於所述烤爐區另一端設有第四移載機,係對應夾取所述載體由上部空間的烤爐區下降至位於下部空間。A preferred embodiment of the long material coating equipment as described above, wherein a third transfer machine is provided between the painting area and the oven area, and the third transfer machine is correspondingly gripped The carrier rises from the lower space to the oven zone located in the upper space for surface baking and drying; and a fourth transfer machine is provided at the other end of the oven zone, corresponding to the carrier that grips the carrier from the upper space The oven area is lowered to the lower space.

如上所述之長型料材塗裝設備的較佳實施例,其中進一步設有一控制室針對所述懸吊式輸送機調整導送所述載體於該些區的速率。As described above, in the preferred embodiment of the long material coating equipment, a control room is further provided for the suspended conveyor to adjust the speed of guiding the carrier in these areas.

為令本創作所運用之技術內容、創作目的及其達成之功效有更完整且清楚的揭露,茲於下詳細說明之,並請一併參閱所揭之圖式及圖號:In order to provide a more complete and clear disclosure of the technical content used in this creation, the purpose of the creation and the effect achieved, please refer to the detailed description below, and please refer to the drawings and figures disclosed:

首先,本創作實際運用技術與手段,請參閱第一~二圖所示,為本創作長型料材塗裝設備示意圖,其主要於上、下部空間(a)、(b)內架構有運送長型料材(B)進行加工的路徑,且沿所述加工路徑依序分設有上料區(1)、前置處理區(2)、滴水區(3)、烘乾區(4)、至少一噴塗區(5)、烤爐區(6)、冷卻區(7)及下料區(8),透過載體(A)吊掛長型料材(B)於該些區運送進行塗裝加工,其中:First of all, the actual technology and methods used in this creation, please refer to the first to second figures, which is a schematic diagram of the long material coating equipment for this creation, which is mainly transported in the upper and lower spaces (a) and (b). The processing path of the long material (B), and along the processing path are sequentially arranged a feeding area (1), a pre-treatment area (2), a dripping area (3), and a drying area (4) , At least one spraying area (5), oven area (6), cooling area (7) and unloading area (8), through the carrier (A) hanging long material (B) transported in these areas for coating Processing, including:

所述上料區(1)與所述下料區(8)位於下部空間(b),並於所述上、下料區(1)、(8)間設有第一滾輪式輸送機(11),所述第一滾輪式輸送機(11)供所述載體(A)承載運送長型料材(B)至所述前置處理區(2);The loading area (1) and the unloading area (8) are located in the lower space (b), and a first roller conveyor is provided between the unloading area (1) and (8) ( 11), the first roller conveyor (11) is used to carry and transport the long material (B) to the pre-processing area (2) by the carrier (A);

所述前置處理區(2)內設有至少一接駁台車(21),所述接駁台車(21)接收由所述上料區(1)所導送的所述載體(A),再於所述前置處理區(2)內設有多數個處理槽(22),於每一處理槽(22)內注入有清潔液體,並透過所述接駁台車(21)運送所述載體(A)至各處理槽(22),以讓長型料材(B)於各處理槽(22)內浸泡進行表面前置處理;At least one connecting trolley (21) is provided in the pre-processing area (2), the connecting trolley (21) receives the carrier (A) guided by the loading area (1), Furthermore, a plurality of processing tanks (22) are provided in the pre-processing area (2), a cleaning liquid is injected into each processing tank (22), and the carrier is transported through the connecting trolley (21) (A) to each treatment tank (22), so that the long material (B) is soaked in each treatment tank (22) for surface pretreatment;

所述滴水區(3)內設有第二滾輪式輸送機(31),所述第二滾輪式輸送機(31)接收由所述接駁台車(21)所導送之所述載體(A),讓完成前置處理的長型料材(B)於所述滴水區(3)滴乾表面水分;A second roller conveyor (31) is provided in the dripping area (3), and the second roller conveyor (31) receives the carrier (A) guided by the connecting trolley (21) ), let the long material (B) complete the pre-treatment in the dripping area (3) drip surface moisture;

所述烘乾區(4)設置於所述上部空間(a),於所述烘乾區(4)對應所述滴水區(3)的一端設有第一移載機(41),所述第一移載機(41)係對應移送由位於下部空間(b)之所述滴水區(3)的載體(A)上升至上部空間(a)之所述烘乾區(4),所述烘乾區(4)內設有第三滾輪式輸送機(42),所述第三滾輪式輸送機(42)用以將所述載體(A)導入所述烘乾區(4)內,讓長型料材(B)進行表面水切烘乾,再於所述烘乾區(4)另一端設有第二移載機(43),所述第二移載機導()送所述載體(A)由所述上部空間(a)的烘乾區(4)下降至下部空間(b);The drying area (4) is provided in the upper space (a), and a first transfer machine (41) is provided at one end of the drying area (4) corresponding to the dripping area (3). The first transfer machine (41) correspondingly transfers the carrier (A) from the dripping area (3) in the lower space (b) to the drying area (4) in the upper space (a), the A third roller conveyor (42) is provided in the drying area (4), and the third roller conveyor (42) is used to introduce the carrier (A) into the drying area (4), Let the long material (B) be subjected to surface water-cut drying, and then a second transfer machine (43) is provided at the other end of the drying area (4), and the second transfer machine guide () sends the The carrier (A) descends from the drying area (4) of the upper space (a) to the lower space (b);

所述下部空間(b)設有一懸吊式輸送機(9),所述懸吊式輸送機(9)通過所述烘乾區(4)之第二移載機(43)、所述噴塗區(5)、所述烤爐區(6)及所述冷卻區(7);The lower space (b) is provided with a suspended conveyor (9), the suspended conveyor (9) passes through the second transfer machine (43) of the drying zone (4), the spraying Zone (5), the oven zone (6) and the cooling zone (7);

所述噴塗區(5)內設有噴塗單元(51),透過所述懸吊式輸送機(9)運載所述烘乾區(4)之第二移載機(43)降下的所述載體(A)進入所述噴塗區(5)內進行長型料材(B)表面噴漆;The spraying area (5) is provided with a spraying unit (51), which carries the lowered carrier of the second transfer machine (43) of the drying area (4) through the suspended conveyor (9) (A) Enter the spraying area (5) and spray paint the surface of the long material (B);

所述烤爐區(6)設置於所述上部空間(a),且內部設有烤爐單元(61),於所述烤爐區(6)對應所述噴塗區(5)的一端設有第三移載機(62),所述第三移載機(62)係對應移送由位於下部空間(b)之所述噴塗區(5)的載體(A)上升至上部空間(a)之所述烤爐區(6),所述烤爐區(6)內設有第四滾輪式輸送機(63),所述第四滾輪式輸送機(63)用以將所述載體(A)導入所述烤爐區(6)內,讓長型料材(B)透過所述烤爐單元(61)進行烘烤乾燥漆料,再於所述烤爐區(6)另一端設有第四移載機(64),所述第四移載機(64)導送所述載體(A)由所述上部空間(a)的烤爐區(6)下降至下部空間(b);The oven area (6) is provided in the upper space (a), and an oven unit (61) is provided inside, and an end of the oven area (6) corresponding to the spraying area (5) is provided The third transfer machine (62), which correspondingly transfers the carrier (A) from the spraying area (5) located in the lower space (b) to the upper space (a) The oven area (6), a fourth roller conveyor (63) is provided in the oven area (6), and the fourth roller conveyor (63) is used to transfer the carrier (A) Introduce into the oven zone (6), let the long material (B) through the oven unit (61) to bake and dry the paint, and then at the other end of the oven zone (6) there is a Four transfer machines (64), the fourth transfer machine (64) guides the carrier (A) from the oven area (6) of the upper space (a) to the lower space (b);

所述冷卻區(7)位於下部空間(b),通過所述懸吊式輸送機(9)運載所述烤爐區(6)之第四移載機(64)降下的所述載體(A)進入所述冷卻區(7)降溫冷卻;The cooling zone (7) is located in the lower space (b), and the carrier (A) lowered by the fourth transfer machine (64) of the oven zone (6) is carried by the suspended conveyor (9) ) Enter the cooling zone (7) Cooling down;

所述下料區(8)對應所述懸吊式輸送機(9)處設有第五移載機(81),所述第五移載機(81)將所述冷卻區(7)的載體(A)導入所述下料區(8)之第一滾輪式輸送機(11),讓長型料材(B)由所述下料區(8)下料者。A fifth transfer machine (81) is provided at the unloading zone (8) corresponding to the suspended conveyor (9), and the fifth transfer machine (81) separates the cooling zone (7) The carrier (A) is introduced into the first roller conveyor (11) of the blanking zone (8), and the long material (B) is discharged from the blanking zone (8).

請參閱第一~七圖所示,於此舉例長型料材(B)為鋁擠型材,當於鋁材擠壓製程中須通過潤滑油液,提供擠壓過程在表面產生摩擦高溫的降溫功用,因此,鋁擠型材表面會附著油液,當於表面塗裝時需通過前置處理將表面進行酸洗處理,以提供較佳的表面附著力;於實際操作時,其施作的環境空間主要分為上、下部空間(a)、(b),於上、下部空間(a)、(b)內規劃出一加工路徑,並於加工路徑上配置有多數個載體(A),於每一載體(A)上可對應吊掛至少一長型料材,當吊掛多數個長型料材時,係能於二長型料材(B)間通過一掛勾件來相互連結;續,沿該加工路徑依序設置有上料區(1)、前置處理區(2)、烘乾區(4)、至少一噴塗區(5)、烤爐區(6)、冷卻區(7)及下料區(8)。Please refer to the first to seventh figures. In this example, the long material (B) is an aluminum extruded profile. When the aluminum extrusion process requires lubricating fluid, it provides a temperature reduction function that produces friction and high temperature on the surface during the extrusion process. Therefore, oil will adhere to the surface of the aluminum extruded profile. When the surface is painted, the surface needs to be pickled by pre-treatment to provide better surface adhesion; in actual operation, the environment space where it is applied It is mainly divided into upper and lower spaces (a) and (b). A processing path is planned in the upper and lower spaces (a) and (b), and a plurality of carriers (A) are arranged on the processing path. At least one long material can be hung on a carrier (A). When hanging many long materials, it can be connected to each other by a hook between the two long materials (B); continued Along the processing path, a loading area (1), a pre-treatment area (2), a drying area (4), at least one spraying area (5), an oven area (6), and a cooling area (7) ) And cutting area (8).

首先,所述上料區(1)、前置處理區(2)位於下部空間(b)內,當長型料材經所述載體(A)勾取後,讓所述載體(A)由上料區(1)的所述第一滾輪輸送機()被平移輸送進去,讓長型料材由上料區(1)經所述接駁台車(21)導入前置處理區(2),進一步於所述前置處理區(2)內設有多數個處理槽(22),於每一處理槽(22)內注入有針對長型料材進行表面前置處理的清潔液體,如酸洗、水洗、皮膜處理、水洗…等等,並透過於所述前置處理區(2)設有至少一接駁台車(21)[如吊車],所述接駁台車(21)用以夾取所述載體(A),讓所述載體(A)上的長型料材於每一處理槽(22)內浸泡進行表面前置處理。當長型料材(B)前置表面處理完成後,透過接駁台車(21)將所述載體(A)導入所述滴水區(3)的第二滾輪式輸送機(31),讓長型料材於所述滴水區(3)滴乾表面水分。First, the loading area (1) and the pre-processing area (2) are located in the lower space (b). When the long material is hooked by the carrier (A), let the carrier (A) The first roller conveyor () in the loading area (1) is transported in translation, allowing long materials to be introduced into the pre-processing area (2) from the loading area (1) via the connecting trolley (21) In addition, a plurality of processing tanks (22) are further provided in the pre-processing area (2), and each processing tank (22) is injected with a cleaning liquid that performs surface pre-processing on long materials, such as acid Washing, water washing, film treatment, water washing, etc., and through the provision of at least one connecting trolley (21) [such as a crane] in the pre-processing area (2), the connecting trolley (21) is used to clamp Taking the carrier (A), the long material on the carrier (A) is soaked in each treatment tank (22) for surface pretreatment. After the pre-surface treatment of the long material (B) is completed, the carrier (A) is introduced into the second roller conveyor (31) of the dripping area (3) through a connecting trolley (21) to let the long The profile material drip the surface moisture in the dripping area (3).

接著,透過所述烘乾區(4)的第一移載機(41)對應夾取位於所述滴水區(3)的載體(11),讓長型料材由下部空間(b)的滴水區(3)上升至位於上部空間(a)的烘乾區(4),當載體(A)進入上部空間(a)後,透過第三滾輪式輸送機(42)將所述載體(A)平移輸送於整個烘乾區(4)內進行水切烘乾,待長型料材表面乾燥後,再經所述烘乾區(4)另一端的第二移載機(43)將載體(A)由上部空間(a)下降至下部空間(b),並讓載體(A)連結吊掛於所述懸吊式輸送機(9)上,透過所述懸吊式輸送機(9)將載體(A)導送至所述噴塗區(5),於所述噴塗區(5)內配置有對應長型料材(B)表面進行噴漆的噴塗單元(51),而所述噴塗單元(51)可依據塗裝物質而做變化,如粉體塗裝、氟碳烤漆…等,而其顏色變化也能透過噴塗區(5)設置數量的改變而做變化,如一色、雙色…等;於噴塗完畢後,再經由所述懸吊式輸送機(9)將載體(A)導送至所述烤爐區(6),透過所述烤爐區(6)的第三移載機(62)對應夾取載體(11),讓長型料材(B)由下部空間(b)上升至位於上部空間(a)的烤爐區(6),當載體(A)進入上部空間(a)後,透過第四滾輪式輸送機(63)將所述載體(A)平移輸送於整個烤爐區(6)內進行表面烤漆乾燥,待長型料材(B)表面乾燥後,待待長型料材表面噴漆乾燥後,再經所述烤爐區(6)另一端的第四移載機(64)將載體(A)由上部空間(a)下降至下部空間(b)。Then, through the first transfer machine (41) of the drying area (4), the carrier (11) located in the dripping area (3) is clamped correspondingly, and the long material is dripped from the lower space (b) The area (3) rises to the drying area (4) located in the upper space (a). After the carrier (A) enters the upper space (a), the carrier (A) is transferred through the third roller conveyor (42) It is transported in parallel in the whole drying area (4) for water cutting and drying. After the surface of the long material is dried, the carrier (A) is transferred to the second transfer machine (43) at the other end of the drying area (4) ) Descending from the upper space (a) to the lower space (b), and allowing the carrier (A) to be linked and hung on the suspended conveyor (9), the carrier is passed through the suspended conveyor (9) (A) Guide to the spraying area (5), a spraying unit (51) corresponding to the surface of the long material (B) for spraying paint is arranged in the spraying area (5), and the spraying unit (51) ) It can be changed according to the coating material, such as powder coating, fluorocarbon baking paint, etc., and its color change can also be changed by changing the number of spraying area (5) settings, such as one-color, two-color..., etc.; After the spraying is completed, the carrier (A) is guided to the oven zone (6) via the suspended conveyor (9), and passes through the third transfer machine (62) of the oven zone (6) )According to the carrier (11), let the long material (B) rise from the lower space (b) to the oven area (6) located in the upper space (a), when the carrier (A) enters the upper space (a) Afterwards, the carrier (A) is transported through the fourth roller conveyor (63) in the entire oven area (6) for surface baking and drying, and after the surface of the long material (B) is dried, it is waited for long After the paint on the surface of the profile is dried, the carrier (A) is lowered from the upper space (a) to the lower space (b) via the fourth transfer machine (64) at the other end of the oven zone (6).

續,當載體(A)下降至下部空間(b)後,讓所述載體(A)連結吊掛於所述懸吊式輸送機(9)上,透過所述懸吊式輸送機(9)將載體(A)導送至所述冷卻區(7),通過所述冷卻區(7)的輸送路徑,讓長型料材(B)進行降溫冷卻,最後,當載體(A)被輸送至所述下料區(8)時,透過第五移載機(81)將所述冷卻區(7)的載體(A)導入所述下料區(8)之第一滾輪式輸送機(11),讓長型料材由所述下料區(8)下料者。Continue, after the carrier (A) descends to the lower space (b), let the carrier (A) be linked and hung on the suspended conveyor (9), through the suspended conveyor (9) The carrier (A) is guided to the cooling zone (7), and the long material (B) is cooled down through the conveying path of the cooling zone (7). Finally, when the carrier (A) is conveyed to During the unloading zone (8), the carrier (A) of the cooling zone (7) is introduced into the first roller conveyor (11) of the unloading zone (8) through the fifth transfer machine (81) ), the long material is discharged from the discharging area (8).

另外,因每一程序處理的時間不同,如噴塗面積大小花費時間、烘乾時間長短..等均影響所述懸吊式輸送機(9)輸送載體(A)時間與速度,故進一步設有一控制室針對所述懸吊式輸送機(9)調整導送所述載體(A)於該些區的速率。In addition, because the processing time of each program is different, such as the size of the spraying area, the length of the drying time, etc., all affect the time and speed of the suspended conveyor (9) conveying carrier (A), so a further The control room adjusts the rate at which the carrier (A) is guided in these areas for the suspended conveyor (9).

然而前述之實施例或圖式並非限定本創作之產品態樣、結構或使用方式,任何所屬技術領域中具有通常知識者之適當變化或修飾,皆應視為不脫離本創作之專利範疇。However, the foregoing embodiments or drawings do not limit the product appearance, structure, or usage of the creation. Any appropriate changes or modifications by those with ordinary knowledge in the technical field should be regarded as not departing from the scope of the patent of the creation.

綜上所述,本創作實施例確能達到所預期之使用功效,又其所揭露之具體構造,不僅未曾見諸於同類產品中,亦未曾公開於申請前,誠已完全符合專利法之規定與要求,爰依法提出新型專利之申請,懇請惠予審查,並賜准專利,則實感德便。In summary, this creative embodiment can achieve the expected use effect, and the specific structure disclosed by it has not only not been seen in similar products, nor has it been disclosed before the application, and has fully complied with the provisions of the Patent Law In response to the requirements, I filed an application for a new type of patent in accordance with the law, and pleaded for the review, and granted the patent, which is really a virtue.

1:上料區1: feeding area

11:第一滾輪式輸送機11: The first roller conveyor

2:前置處理區2: pre-processing area

21:接駁台車21: Connect the trolley

22:處理槽22: Treatment tank

3:滴水區3: drip area

31:第二滾輪式輸送機31: Second roller conveyor

4:烘乾區4: drying area

41:第一移載機41: The first transfer machine

42:第三滾輪式輸送機42: Third roller conveyor

43:第二移載機43: Second transfer machine

5:噴塗區5: spray area

51:噴塗單元51: spraying unit

6:烤爐區6: Oven area

61:烤爐單元61: Oven unit

62:第三移載機62: Third transfer machine

63:第四滾輪式輸送機63: Fourth roller conveyor

64:第四移載機64: Fourth transfer machine

7:冷卻區7: Cooling area

8:下料區8: Cutting area

81:第五移載機81: Fifth transfer machine

9:懸吊式輸送機9: Suspended conveyor

a:上部空間a: upper space

b:下部空間b: lower space

A:載體A: Carrier

B:長型料材B: Long material

第一圖:本創作之整體配置俯視示意圖。The first picture: a schematic plan view of the overall configuration of this creation.

第二圖:本創作塗裝設備運作步驟流程示意圖。The second picture: Schematic diagram of the operation steps of this painting equipment.

第三圖:本創作軌道與載體之示意圖。The third picture: schematic diagram of this creative track and carrier.

第四圖:本創作前置處理區之示意圖。Figure 4: Schematic diagram of the pre-processing area of this creation.

第五圖:本創作載體由下部空間往上部空間輸送之示意圖(烘乾)。Fifth picture: Schematic diagram of the creative carrier conveying from the lower space to the upper space (drying).

第六圖:本創作下部空間的噴塗區示意圖。Figure 6: Schematic diagram of the spray area in the lower space of this creation.

第七圖:本創作載體由下部空間往上部空間輸送之示意圖(烤爐)。Figure 7: Schematic diagram of the creative carrier conveying from the lower space to the upper space (oven).

1:上料區 1: feeding area

11:第一滾輪式輸送機 11: The first roller conveyor

2:前置處理區 2: pre-processing area

21:接駁台車 21: Connect the trolley

22:處理槽 22: Treatment tank

3:滴水區 3: drip area

31:第二滾輪式輸送機 31: Second roller conveyor

4:烘乾區 4: drying area

41:第一移載機 41: The first transfer machine

42:第三滾輪式輸送機 42: Third roller conveyor

43:第二移載機 43: Second transfer machine

5:噴塗區 5: spray area

6:烤爐區 6: Oven area

62:第三移載機 62: Third transfer machine

63:第四滾輪式輸送機 63: Fourth roller conveyor

64:第四移載機 64: Fourth transfer machine

7:冷卻區 7: Cooling area

8:下料區 8: Cutting area

81:第五移載機 81: Fifth transfer machine

9:懸吊式輸送機 9: Suspended conveyor

A:載體 A: Carrier

Claims (2)

一種長型料材塗裝設備,其主要於上、下部空間內架構有運送長型料材進行加工的路徑,且沿所述加工路徑依序分設有上料區、前置處理區、滴水區、烘乾區、至少一噴塗區、烤爐區、冷卻區及下料區,透過載體吊掛長型料材於該些區運送進行塗裝加工,其中: 所述上料區與所述下料區位於下部空間,並於所述上、下料區間設有第一滾輪式輸送機,所述第一滾輪式輸送機供所述載體承載運送長型料材至所述前置處理區; 所述前置處理區內設有至少一接駁台車,所述接駁台車接收由所述上料區所導送的所述載體,再於所述前置處理區內設有多數個處理槽,於每一處理槽內注入有清潔液體,並透過所述接駁台車運送所述載體至各處理槽,以讓長型料材於各處理槽內浸泡進行表面前置處理; 所述滴水區內設有第二滾輪式輸送機,所述第二滾輪式輸送機接收由所述接駁台車所導送之所述載體,讓完成前置處理的長型料材於所述滴水區滴乾表面水分; 所述烘乾區設置於所述上部空間,於所述烘乾區對應所述滴水區的一端設有第一移載機,所述第一移載機係對應移送由位於下部空間之所述滴水區的載體上升至上部空間之所述烘乾區,所述烘乾區內設有第三滾輪式輸送機,所述第三滾輪式輸送機用以將所述載體導入所述烘乾區內,讓長型料材進行表面水切烘乾,再於所述烘乾區另一端設有第二移載機,所述第二移載機導送所述載體由所述上部空間的烘乾區下降至下部空間; 所述下部空間設有一懸吊式輸送機,所述懸吊式輸送機通過所述烘乾區之第二移載機、所述噴塗區、所述烤爐區及所述冷卻區; 所述噴塗區內設有噴塗單元,透過所述懸吊式輸送機運載所述烘乾區之第二移載機降下的所述載體進入所述噴塗區內進行長型料材表面噴漆; 所述烤爐區設置於所述上部空間,且內部設有烤爐單元,於所述烤爐區對應所述噴塗區的一端設有第三移載機,所述第三移載機係對應移送由位於下部空間之所述噴塗區的載體上升至上部空間之所述烤爐區,所述烤爐區內設有第四滾輪式輸送機,所述第四滾輪式輸送機用以將所述載體導入所述烤爐區內,讓長型料材透過所述烤爐單元進行烘烤乾燥漆料,再於所述烤爐區另一端設有第四移載機,所述第四移載機導送所述載體由所述上部空間的烤爐區下降至下部空間; 所述冷卻區位於下部空間,通過所述懸吊式輸送機運載所述烤爐區之第四移載機降下的所述載體進入所述冷卻區降溫冷卻; 所述下料區對應所述懸吊式輸送機處設有第五移載機,所述第五移載機將所述冷卻區的載體導入所述下料區之第一滾輪式輸送機,讓長型料材由所述下料區下料者。 A long material coating equipment, which mainly has a path for transporting long materials for processing in the upper and lower spaces, and is sequentially divided into a feeding area, a pre-processing area, and dripping water along the processing path Area, drying area, at least one spraying area, oven area, cooling area and unloading area, long materials are hung through the carrier and transported in these areas for coating processing, including: The loading area and the unloading area are located in a lower space, and a first roller conveyor is provided in the upper and lower loading areas, and the first roller conveyor is used for the carrier to carry and transport long materials Material to the pre-processing area; At least one connecting trolley is provided in the pre-processing area, the connecting trolley receives the carrier guided by the loading area, and a plurality of processing tanks are provided in the pre-processing area , A cleaning liquid is injected into each treatment tank, and the carrier is transported to each treatment tank through the connecting trolley, so that the long material is soaked in each treatment tank for surface pretreatment; A second roller conveyor is provided in the dripping area, and the second roller conveyor receives the carrier guided by the connecting trolley, and allows the long material to complete the pre-processing in the Drip area drip surface moisture; The drying zone is provided in the upper space, and a first transfer machine is provided at one end of the drying zone corresponding to the drip zone, and the first transfer machine is correspondingly transferred by the The carrier in the dripping zone rises to the drying zone in the upper space, and a third roller conveyor is provided in the drying zone, and the third roller conveyor is used to introduce the carrier into the drying zone Inside, let the long material be surface dried by water cutting, and then a second transfer machine is provided at the other end of the drying area, and the second transfer machine guides the carrier to be dried by the upper space The area drops to the lower space; A suspension conveyor is provided in the lower space, and the suspension conveyor passes through the second transfer machine of the drying area, the spraying area, the oven area, and the cooling area; A spraying unit is provided in the spraying area, and the carrier lowered by the second transfer machine of the drying area is carried through the suspended conveyor into the spraying area to spray paint on the surface of the long material; The oven area is provided in the upper space, and an oven unit is provided inside, and a third transfer machine is provided at one end of the oven area corresponding to the spraying area, and the third transfer machine corresponds to Transfer from the carrier located in the spraying area in the lower space to the oven area in the upper space. A fourth roller conveyor is provided in the oven area. The fourth roller conveyor is used to transfer The carrier is introduced into the oven area, and the long material is allowed to bake and dry the paint through the oven unit, and then a fourth transfer machine is provided at the other end of the oven area, the fourth shift The carrier guides the carrier to descend from the oven area of the upper space to the lower space; The cooling zone is located in the lower space, and the carrier lowered by the fourth transfer machine of the oven zone is carried by the suspended conveyor into the cooling zone to cool down and cool; A fifth transfer machine is provided in the unloading area corresponding to the suspended conveyor, and the fifth transfer machine guides the carrier in the cooling area to the first roller conveyor in the unloading area, The long material is discharged from the discharge area. 如請求項1所述之長型料材塗裝設備,其中進一步包含一控制室,所述控制室用以控制調整所述懸吊式輸送機導送所述載體的速率。The long material coating equipment according to claim 1, further comprising a control room for controlling and adjusting the rate at which the suspended conveyor guides the carrier.
TW109202447U 2020-03-05 2020-03-05 Elongated material coating equipment TWM596132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW109202447U TWM596132U (en) 2020-03-05 2020-03-05 Elongated material coating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109202447U TWM596132U (en) 2020-03-05 2020-03-05 Elongated material coating equipment

Publications (1)

Publication Number Publication Date
TWM596132U true TWM596132U (en) 2020-06-01

Family

ID=72176938

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109202447U TWM596132U (en) 2020-03-05 2020-03-05 Elongated material coating equipment

Country Status (1)

Country Link
TW (1) TWM596132U (en)

Similar Documents

Publication Publication Date Title
CN203991194U (en) A kind of full-automatic spraying production line
CN110314792B (en) Spraying method of automatic spraying unit for workpiece with long and thin structure
CN208341004U (en) A kind of bridge Wavelike steel webplate automatic spraying system
CN205236285U (en) Full -automatic plastic vacuum coating coating line
KR102583026B1 (en) Powder coating system
CN207901839U (en) A kind of water transfer production line
TWM596132U (en) Elongated material coating equipment
CN205731788U (en) Plastic-blasting paint-spraying production line
EP1624970B1 (en) Electrostatic-painting system for metallic manufactured articles and associated method
CN210700806U (en) Automatic spraying production line for workpieces with long and thin structures
KR20220020588A (en) Silicone Extrudate Coating System and Coating Method
CN207430576U (en) Element of the paint solidification on surface and the suspended chain containing this element when preventing from spraying
CN103831215A (en) Vertical-type automatic sectional material painting production line
CN203853248U (en) Vertical automatic spraying production line for proximate matter
CN206543677U (en) A kind of workpiece integrated automation device
CN211914295U (en) Long material coating equipment
CN106179857B (en) It is a kind of suitable for small batch, the automatic coating system and method for multi items components
CN104875307B (en) Production line for plastic spraying and vulcanization
CN215429978U (en) Production line for coating hardware support
CN110237973B (en) Application method of automatic spraying production line for workpieces with slender structures
CN210700739U (en) Automatic spraying unit for workpieces with long and thin structures
CN205628396U (en) Environmental protection and energy saving type automatic spraying assembly line
CN219745299U (en) Coating device for surface of sheet metal part
CN221413681U (en) Pretreatment and electrostatic spraying assembly line
CN214747044U (en) Wine bottle processing preheating device