M403518 五、新型說明: 【新型所屬之技術領域】 [〇〇〇1] 本創作係有關於一種高壓灌注頭結構,尤其是指一 種利用地板式的打洞施工同時配合該二段式的灌注頭設 計,讓滲漏可完全被密合,達到完善的灌注不滲漏的效 果者。 【先前技術】 [0002] 按,建築構築時,養護不確實,或是混凝土品質欠 佳,造成許多的微小縫隙,如同開放式的水管般,下雨 時,水穿透過防水層的破口處,充漫著這些裂縫,因毛 細作用這些水分慢慢滲出室内艢;而建築物發生漏水現 象時,需由專業的人士進行抓漏偵測,以測知漏水的位 置後,再利用止水針頭將膠體灌入牆面内部,以封閉漏 水地區,來避免漏水現象不斷擴大,維護建築物結構的 完整性與強度。 [0003] 一般止水針頭其主要用於建物結構之防水補強,而 藉由止水針頭可將液態防水補強材料高壓灌注於建物結 構之裂縫中,嗣俟液態防水補強材料硬化以達到建物結 構之防水、補強目的者。而現有的止水針頭結構大'致上 為一具螺紋的中空管狀螺管上依序設置有固定錐套、一 橡膠製成的套管、推頂套環及一螺帽,於螺管上則再設 置有一注入嘴,藉此當測知建築物的漏水地點時,先於 牆面上鑽設一孔洞,然後將止水針頭置入於該孔洞中後 ,轉動螺帽,利用螺帽推頂推頂套環及套管,使套管一 端受到固定錐套的抵壓而抵靠於孔洞的内緣面上,再由 表單編號A0101 第3頁/共丨2頁 [0004]Έ403518 注入嘴中注入膠體,使膠體通過螺管及固定錐套後,注 入牆面内部,使膠體在凝固後能達到止漏的作用。然上 述結構,在結構及使用上實存在有下列各項缺失: 1、因止水針頭在完成灌膠後,需將外露於牆面外側的 部份以切除或敲斷等方式予以截斷,然後再將孔洞覆土 填平,而習用的止水針頭在截斷螺管時,需同時截斷套 設於其上的推頂套環,如此不僅會造成止水針頭在後續 處理上的麻煩,同時所截斷的部份螺管及注入嘴等結構 並無法重覆使用,因而造成肯源的浪費 [0005] 2、止水針頭在截斷時, 管形成平整的截斷面,而 露部份,如此便會造成覆M403518 V. New description: [New technical field] [〇〇〇1] This creation is about a high-pressure perfusion head structure, especially a floor-type hole-piercing construction with the two-stage filling head. Designed to allow leakage to be completely adhered to achieve perfect perfusion without leakage. [Prior Art] [0002] According to the building construction, the maintenance is not correct, or the quality of the concrete is not good, resulting in many tiny gaps, like an open water pipe. When it rains, the water penetrates through the breach of the waterproof layer. Filled with these cracks, the water slowly leaks out of the chamber due to capillary action; when water leaks in the building, it is necessary for a professional person to conduct a leak detection to detect the location of the leak and then use the water stop needle. The colloid is poured into the interior of the wall to close the leaking area to avoid the continuous expansion of water leakage and maintain the integrity and strength of the building structure. [0003] Generally, the water-stopping needle is mainly used for waterproofing and strengthening of the structure of the building, and the liquid waterproofing reinforcing material can be infused into the crack of the building structure by the water-stopping needle, and the liquid waterproof reinforcing material is hardened to achieve the structure of the building. Waterproof, reinforcing purposes. The existing water-stopping needle structure is provided with a fixed taper sleeve, a rubber sleeve, a push-top collar and a nut on the threaded hollow tubular screw. Then, an injection nozzle is further disposed, so that when the leakage location of the building is detected, a hole is drilled on the wall surface, and then the water stop needle is placed in the hole, the nut is turned, and the nut is pushed by the nut. Push the top collar and the sleeve so that one end of the sleeve is pressed against the inner edge of the hole by the fixed taper sleeve, and then injected into the mouth by Form No. A0101 Page 3 / Total 2 Page [0004] Έ 403518 The gel is injected into the wall, and the colloid is injected into the wall surface through the screw tube and the fixed taper sleeve, so that the colloid can achieve the function of stopping leakage after solidification. However, in the above structure, there are the following defects in the structure and use: 1. After the water-stopping needle is finished, the part exposed to the outside of the wall should be cut off or broken, and then cut. The hole is covered with soil, and the conventional water stop needle needs to cut off the push-on collar set on the screw when the pipe is cut off, so that not only the trouble of the water stop needle in the subsequent processing, but also the truncation Part of the structure of the solenoid and the injection nozzle cannot be reused, thus causing waste of the source [0005] 2. When the water stop needle is cut off, the tube forms a flat cross section, and the exposed part will cause cover
往無法使螺 歪斜的外 與不便。 [0006] 3、因一般止水針頭大都由樓板之底舜失花板處施打 ,因此,施工人員須仰頭施工,造成施工緩慢且不易操 作。 !nte!丨 ’i,.厂-,- [0007] 緣是,本創作人秉持务存_^目關行業之豐富設計開 »Η · · .V、 * *、·》-·’ I.; 發及實際製作經驗,再次針對其中尚存缺失予以克服改 進,特再提供一種高壓灌注頭結構更臻完善之構造,期 達到更佳實用價值性之目的者。 【新型内容】 [0008] 本創作之高壓灌注頭結構的主要目的係在改善現有 技術的缺失,以藉由本創作利用地板式的打洞施工同時 配合該二段式的灌注頭設計,讓滲漏可完全被密合,達 到完善的灌注不滲漏的效果者。 表單編號Α0101 第4頁/共12頁 [0009] [0009] [0010] [0011] [0012] 是以,本創作高壓灌注頭結構欲達上述目的與功效,係 由以下之技術所實現: 其主要係設有灌注導引段對應連結嵌入段,該嵌入 段具有注射管’且外部套設有膠墊體,而注射管對應與 灌注導引段連結,而灌注導引段上設有接頭與施壓之灌 注設備連結;藉此,以當建築物有滲漏現象時,於樓板 地面端上對應施工鑿洞,而可對應將嵌入段嵌塞於洞内 ,讓灌注導引段迫緊嵌入段,使膠墊體因壓掣擠壓而膨 脹穩固抵掣在洞内,同時在灌注後該嵌入段留下填補於 洞内,達到加強防漏的效果與功效為目的者。 【實施方式】 為令本創作所運用之技術内容、創作目的及其達成 之功效有更完整且清楚的揭露,茲於下詳細說明之,並 請一併參閱所揭之圖式及圖號: 首先’請參閱附圖所示,如第一〜四周,其主要係 包含有灌注導引段(3)與嵌人段:(1),其中該嵌入 段(1 )具設有一注射管(丄丄),於注射管(丄丄) 一端設有鎖接部(1 1 1 ),以利用鎖接部(丄丄工) 對應穿設㈣(2 )而與灌注導引段(3 )連結,而該 注射管(1 1 )外部係對應套設有膠墊體(1 2),而 該膠墊體(1 2)可為一個以上,且在兩膠墊體(1 2 )之間對應套設墊圈(2),接續,於灌注導引段(3 )上設有接頭(3 1)與施壓之灌注設備〔圖中未示〕 連結者。 表箪編號A0101 [0013]M403518 請一併參閱第 四圖所示,當建築物有滲漏現象 時,其係於樓板之地板端面上對應滲漏處而施工鑿洞, 而其孔洞之大小為可對應嵌設嵌入段(1 )為準,藉以 將嵌入段(1 )對應嵌塞於孔洞内後,利用該灌注導引 段(3)與嵌入段(1 )之注射管(1 1 )鎖接部(丄 1 1 )鎖設的關係,而讓灌注導引段(3)迫緊嵌入段 ,使膠墊體(12)因壓掣擠壓而膨脹穩固抵掣在孔洞 内,爾後,再讓灌注導引段(3)上的接頭與施壓灌注 設備連結,將液態防水補強材料昂屋灌注經由灌注導引 段(3 )、嵌入段(漏而填補於建 物結構之裂縫中,而在灌 —w 螺出脫離嵌入段(1 ), 洞内,嗣俟液態防水補強 以達到建物結構之防水、 效果與功效者。It is impossible to make the screw slanted outside and inconvenient. [0006] 3. Because the general water stop needles are mostly applied by the bottom of the floor slab, the construction workers must work upside down, resulting in slow construction and difficulty in operation. ! Nte!丨'i,.厂-,- [0007] The edge is that the creator insists on the _^--------------------------------------------------------------------------------- The experience of the hair production and actual production, once again overcome the improvement of the remaining defects, and then provide a more compact structure of the high-pressure perfusion head structure, and achieve the purpose of better practical value. [New content] [0008] The main purpose of the high-pressure perfusion head structure of the present invention is to improve the lack of the prior art, so that the floor-type hole-piercing construction can be combined with the two-stage perfusion head design to make leakage Can be completely sealed to achieve a perfect perfusion without leakage effect. [0012] [0012] [0012] [0012] [0012] [0012] [0012] [0012] The present invention is intended to achieve the above purposes and effects, by the following technology: The main body is provided with a perfusion guiding section corresponding to the connecting embedding section, the embedding section has a syringe tube and the outer sleeve is provided with a rubber pad body, and the injection tube is correspondingly connected with the perfusion guiding section, and the perfusion guiding section is provided with a joint and The pressure pouring device is connected; thereby, when the building has leakage phenomenon, the corresponding construction hole is formed on the ground end of the floor, and the embedded portion can be embedded in the hole, so that the filling guiding section is tightly embedded. The segment causes the rubber pad body to expand and stabilize against the pressure in the hole, and at the same time, the embedded portion is left in the hole after the filling, so as to achieve the effect and effect of strengthening the leakage prevention. [Embodiment] In order to make the technical content, creative purpose and the effect achieved by this creation more complete and clear, please elaborate below, and please refer to the drawings and drawings: First of all, please refer to the accompanying drawings, as shown in the first to fourth quarters, which mainly include a perfusion guiding section (3) and an inlay section: (1), wherein the embedding section (1) is provided with an injection tube (丄)丄), a locking portion (1 1 1 ) is provided at one end of the injection tube (丄丄), and is connected to the perfusion guiding portion (3) by means of a locking portion (completed) corresponding to the wearing (4) (2). The outer portion of the injection tube (1 1 ) is provided with a rubber body (12), and the rubber body (12) may be more than one, and the corresponding sleeve between the two rubber bodies (1 2 ) The gasket (2) is connected, and the joint (3 1) is connected to the pouring guiding section (3) and the pressing device (not shown). Table No. A0101 [0013] M403518 Please refer to the fourth figure together. When there is leakage in the building, it is tied to the leakage surface of the floor surface of the floor and the hole is constructed. The size of the hole is Corresponding to the embedded embedded segment (1), after the embedded segment (1) is correspondingly embedded in the hole, the filling guide segment (3) and the injection tube (1 1) of the embedded segment (1) are locked. The relationship of the joint (丄1 1 ) is locked, and the perfusion guiding section (3) is tightly inserted into the section, so that the rubber pad body (12) expands and contracts in the hole due to the pressing and pressing, and then The joint on the pouring guiding section (3) is connected with the pressure-injecting device, and the liquid waterproof reinforcing material is poured into the crack of the building structure through the filling guiding section (3) and the embedded section (drained in the crack of the building structure) Irrigation-w screw out of the embedded section (1), inside the hole, 嗣俟 liquid waterproof reinforcement to achieve the waterproof, effect and efficacy of the structure.
[0014] 前述之實施例或圖式4¾¾¾¾^結構樣態或 尺寸,任何所屬技術領域者之適當變化 或修飾,皆應視為不脫離本;|彳作^^利範疇。 [0015] 藉由以上所述,該元件之組成與使用實施說明可知 ’本創作與現有技術相較下,係具有諸多優點,钦述如 下: [0016] 1、本創作高㈣注頭結構,於完成灌膠後,只需將灌 注導引段螺出麟嵌人段,無需進行裁斷施工 具有便利性。 表單編號Α0101 第6頁/共丨2頁 M403518 » [0017] 2、本創作高壓灌注頭結構,嵌入段留下填補於孔洞内 ,係可達到加強防漏的效果與功效者。 [0018] 3、本創作高壓灌注頭結構,由樓板地面施工灌注,讓 ,施工人員方便操作施工,達到施工便利的簡易操作功 效。 [0019] 綜上所述,本創作實施例確能達到所預期之使用功 效,又其所揭露之具體構造,不僅未曾見諸於同類產品 中,亦未曾公開於申請前,誠已完全符合專利法之規定 與要求,爰依法提出新型專利之申請,懇請惠予審查, 並賜准專利,則實感德便。 【圖式簡單說明】 [0020] 第一 圖 :本創作之立體分解示意圖 [0021] 第二 圖 :本創作之整體外觀示意圖 [0022] Aif 一 ryt 弟二圃 :本創作之剖視示意圖 [0023] 第四圖 :本創作之施工示意圖 【主要元件符號說明】 [0024] <本創作> [0025] [0026] [0027] [0028] (1 ) 嵌入段 (11) 注射管 (111) 鎖接部 (12) 膠墊體 (2 ) 墊圈 (3 ) 灌注導引段 (31) 接頭 表單編號A0101 第7頁/共12頁[0014] The foregoing embodiments, or the structural forms or dimensions of the drawings, any suitable variations or modifications of those skilled in the art should be considered as not departing from the scope of the invention. [0015] From the above, the composition of the component and the implementation description can be seen that 'this creation has many advantages compared with the prior art, and the following is stated: [0016] 1. This creation has a high (four) injection head structure. After the completion of the filling, it is only necessary to screw the perfusion guiding section out of the lining, which is convenient without cutting. Form No. Α0101 Page 6/Total 2 pages M403518 » [0017] 2. The structure of the high-pressure perfusion head of this creation, embedded in the section left in the hole, can achieve the effect and effect of strengthening leakage prevention. [0018] 3. The structure of the high-pressure perfusion head of the present invention is poured by the floor construction of the floor, so that the construction personnel can conveniently operate and construct, and the simple operation effect of the construction is convenient. [0019] In summary, the present embodiment can achieve the expected use efficiency, and the specific structure disclosed therein has not been seen in similar products, nor has it been disclosed before the application, and has completely complied with the patent. The provisions and requirements of the law, the application for a new type of patent in accordance with the law, the application for review, and the grant of a patent, the real sense of virtue. [Simplified illustration of the drawing] [0020] The first picture: a three-dimensional decomposition diagram of the creation [0021] The second picture: the overall appearance of the creation [0022] Aif a ryt brother two: a schematic view of the creation [0023] 4th: Schematic diagram of the construction of the present invention [Key element symbol description] [0024] <This creation> [0025] [0028] [0028] (1) Embedding section (11) Injection tube (111) Locking part (12) Pad body (2) Washer (3) Filling guide section (31) Connector form number A0101 Page 7 of 12