TWM334169U - High pressure and leakage ceasing injector - Google Patents

High pressure and leakage ceasing injector Download PDF

Info

Publication number
TWM334169U
TWM334169U TW96219305U TW96219305U TWM334169U TW M334169 U TWM334169 U TW M334169U TW 96219305 U TW96219305 U TW 96219305U TW 96219305 U TW96219305 U TW 96219305U TW M334169 U TWM334169 U TW M334169U
Authority
TW
Taiwan
Prior art keywords
leak
head
leakage
rod
perfusion
Prior art date
Application number
TW96219305U
Other languages
Chinese (zh)
Inventor
feng-qi Yang
Original Assignee
feng-qi Yang
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by feng-qi Yang filed Critical feng-qi Yang
Priority to TW96219305U priority Critical patent/TWM334169U/en
Publication of TWM334169U publication Critical patent/TWM334169U/en

Links

Description

M334169 七、 指定代表圖: (一) 本案指定代表圖為:第圖。 (二) 本代表圖之元件符號簡單說明: (1 0 )高壓止漏灌注器 (1 0 1 )止漏頭 (1011)長T型中空栓桿 (1014) (1014,)塾片 (1015) (1〇15,)橡膠套管 (1 〇 1 6 ) ( 1 〇 1 6,)環肋 (1 0 2 )灌注桿 (1 〇 2 2 )環凹槽 (1 〇 2 4 )銜接頭 (1 0 2 6 )鋼珠 八、 新型說明: 【新型所屬之技術領域】 本創作係關於一種高壓止漏灌注器結構,其主要是 用單一規格止漏頭與不同規格、長度之灌注桿^目互接= 型,使其得以因應於各種建築物壁面不同深度裂縫之灌 防滲止漏需求,解決習知所存在及衍生之諸多缺失者\ 【先前技術】 ' 按,現代的建築物多採鋼筋混凝土建造,利用鋼筋綁 5又出建築物的骨架後,再搭建模板隔出灌漿空間,而後以 預定比例的礫石、沙子、水泥及水調攪混合並灌入模板搭 隔的空間内,待一段時間之自然乾凝固化後,即可拆除模 板’並作後續之牆面粉飾或貼設磁磚,終至完成整體建築 M334169 物之建造。 惟,就建築物的建造而言可能因其建材的偷 設計不當’甚或地震等外力因素的影響,導致居二 一, 龜裂現象’此類微細的裂縫雖 不致影響建築結構的安全性一 ο表縫雖 m + β u 1 到了梅雨季節連續幾天 的下雨,A成雨水由該等裂縫渗入室内,產生室内滴 水的問題,不但會導致油漆、 倶及地板、地毯的毀損,成’更可能造成傢 战為居住者的夢魘。 為解決此類問題,一般是採補縫劑塗佈於建筚牆面的 裂缝處,藉以對該等裂缝表面:U牆面的 仏成隔離,使雨水不致參流 進入裂缝而導致室内漏水,作拿每 / ,π 仁事只證明,此種補救措施的 成效亚不大’因該㈣縫財乾 取得密合關係,甚至存隙有餘隙“ 丄、建采壁面 讦丨糸百餘隙,導致雨水過多時, =渗漏室内的問題發生,自有待設法加以解 【新型内容】 =㈣習知所存在及衍生之諸多問題與缺失,創作人 、進饤研九’基於其從事相關行業之多年經驗與技術 ::而研創本高避止漏灌注器結構,即其主要目的乃在於 =由結構之組成設計,將止漏頭與灌注桿採分離組製接合 广十俾可以同一規格止漏頭搭配各種規格、長度之灌注 頭’以因應不同施工狀態之作業需求者。 韩ί創作之!—目㈣在於經由結構之組成料,使其 -、。構更為簡易’且能獲致理想的灌注止漏效果者。 本創作之再一目的係在於經由結構之組成設計,使其 5 M334169 灌庄杯在作業完成後之折斷作業上,可獲得更為簡易之垂 施者。 ' 為^前揭目的,本創作高壓止漏灌注器於結構設計上 ,主要疋利用單一規格止漏頭與不同規格、長度之灌注才日 組成型’使其得依實際作業需求選擇不同規格、長 iC二且該等灌注桿依其長度規格而於預定位置處 其得以二廐俾利ί自該等環凹槽處予以折斷,據以使 漏兩求=各種建築物壁面不同深度裂縫之灌注防渗止 =方:Γ知所存在及街生之諸多缺失者。. 有關於本創作之姓★甚 ,謹配合圖式再予;=”、技術手段及功效達成方面 請參閲第二:;具雜說明於后: 創作高壓止漏灌注哭:::糸為本創作之較佳實施例’本 漏頭"〇1)句以在結構設計上,主要是由止 頭(…)主體係為斤接組成型,該止漏 該長τ型中空检桿(、中工栓桿(1G11), 2) ’於長丁型中空 1 ) 一端設有-拴頭(1 0 i 管(i〇i5) (1ηι ο11)上套組有數橡膠套 )0015,)二),於橡膠套管(1〇15 0 14,、 兩糕刀別以金屬墊片(1 η Ί 、 υ 1 4 )加以區隔,橡膠叁…η ' 1 0 1 4 )( 1 )外緣製設有複數道環肋(; B) (1015 ,該等橡膠套管(1 1 6 } ( 1 〇 1 6 9 ) 〇1幻〇◦」,◦ !) (HU,)及墊片(; 乃因長丁型中空栓桿( M334169 )-端所設之拴頭(1〇12) T型中空栓桿(J 7 ^、 保丨艮位’另在長 1 〇1 1)尾端則製設有一段外蟫纹f 013) ’利用該段外 奴外螺·、'文(1 / 1 a 、、丄U 1 3 )恰可供斑灌注垣 (102)後端的底部内螺 .^ ^ 内螺紋(1 〇 2 1 )鎖接,俾得將 兩者鎖固成一體,該等灌注桿㈠ 之六角型中空桿體,甘开、日— 符體衣成 、吾声,…/ 貫際作業需求製設成不同規格 ¥ : : Μ古…翟注扣(1 0 2 )依其長度規格而於預定位 )自該等環凹槽(i 0 2 ^ +利於灌注桿(1 〇 2 = = 部内螺紋("川,用::: 預疋型悲的銜接頭广·| η 〇 ,該銜接頭(1 〇 2 4) βw之外螺紋(1 0 2 7 ) (10…上4)的内控孔(1〇25)並以鋼珠 基阻,利用該銜接頭(丄〇 2 4 ) 壓泵浦灌注機(2〇)之丄4)付以與- 士名! I - r Q 2 1 )接組,依此構成 本創作兩壓止漏灌注器(1〇 )之結構; 、工由上述結構組成’在實施建築物牆面的裂縫 防滲止漏作辈t# a ^ 建築物壁面發生漏水的部份採 預疋間隔鑽設出適當數目夕、态 望攝;丨r w 適當孔徑的槽孔(3 0 ),該 2孔2 度必須達到牆面的裂縫處,而後視其 ^ 3 ◦)的深度選擇適合長度的高壓止漏灌注器( 亩2 :將南壓止漏灌注器(1〇)止漏頭(1 ο 1 ) *伸於=:V 3 〇 )内’而使灌注桿(1 〇 2 )的尾端 面外’此時因該止漏頭(1〇1)已插抵於槽孔 的取底部’加上橡膠套.f ( i Q i 5 )(丄〇」 M334169 5’)外與槽孔(3〇)内壁的觸抵,配合橡膠套管(1 〇 1 5 )( 1 Q 1 5,)外的彈性變形裕度,是以可調整 密:該灌注桿(1 0 2 )與止漏頭(工〇丄)長τ型中空 & 1 0 1 1 )與槽孔(3 〇 )的整體密合度,令灌注 才干(102)的ί衣凹槽(丄022)能與牆面平齊,此時 即可將高壓果浦灌注機(2〇)㈣注管(21)套接於 灌庄;f干(1 〇 2 )的銜接頭(丄〇 2 4 ),然後將ρ υ發 泡膠劑等填縫劑藉由高壓打人灌注桿(丄Q 2 )之銜接頭 ^ 1 〇 2 4 )推抵鋼珠(1 0 2 6 ),而使該填縫劑沿内 彺孔(1 0 2 5 );參流而入’最後由止漏頭(丄〇丄)的 =中空栓桿(1〇11)检頭(1〇12)端渗注於 胎面裂缝周緣,經_ J?1·卩主^ . 、,二奴犄間後,該等填缝劑即會乾凝,此 ,只要將高壓止漏灌注器(丄〇 )自灌注桿(^ 2 )的 %凹槽(1 〇 2 2 )處予以折斷,於槽孔(3〇)外飾面 再塗補水泥填平,待凝固後即完成牆面之止漏作業,事立 填缝劑遇水膨張的特性,使盆右下而不政止 /、 W生使其在下雨天發生雨水滲漏現象 \ &成該等填缝卿脹填塞裂縫,進而有效防止渗水 問題,徹底達成建築物牆面裂縫止漏功能者; 即,經由以上說明,可知本創作在高麗止漏灌注 f構设计上’創新地採用止漏頭與灌注桿之分離組製接人 ^ i不但在結構上可獲得簡化,並得以視實際作業需: :擇?合長度的灌注桿’同時高壓止漏灌注器可適 /庄才于與止漏頭的鎖結程度,以取得灌注 ς… 體密合声,人、祐〃止4碩的整 又7 /瞿〉主桿的環凹槽能與牆面平齊,使灌注桿其 M334169 折斷後牆®更美觀,本創作4具產業利用性與實用價值, 誠不失為一優異、突出之創新設計者。 綜上所述,本創作之高壓止漏灌注器結構,經由其結 構之組成,以’確能在建築物牆面滲漏預防方面獲致極佳 之功效’有效解決習知所存在之問題與缺失,整體而士, 誠不失為 — m出之創新設計,爰依法提出專利;請 [ 第 第 第 第 第 第 式簡 圖 圖 圖 圖 圖 圖 tffy 要7L 0 ) 0 1 0 1 〇 1 〇 1 0 1 〇 1 〇 2 圖 1 2 3 4 5 6 主 1 單說明] 係本創作較佳實施例之結構示意圖。 係本創作較佳實施例之結構分解示意圖。 係本創作較佳實施例之側視結構示意圖。 係本創作較佳實施例之實施狀態參考圖(一) 係本創作較佳實施例之實施狀態參考圖(二) 係本創作較佳實施例配合不同長度灌注桿之每 結構示意圖。 貝 件符號說明】 高壓止漏灌注器 )止漏頭 1)長τ型中空栓桿 2 } ( 1 0 1 3 )外螺紋 4 ) ( 1 〇 1 4,)墊片 (1 〇 1 5 ’ )橡膠套管 6 ) ( 1 0 1 6,)環肋 )灌注桿 9M334169 VII. Designated representative map: (1) The representative representative of the case is: Figure. (2) The symbol of the symbol of this representative figure is simple: (1 0) high pressure leakproof perfusion device (1 0 1) stop head (1011) long T type hollow bolt (1014) (1014,) sepal (1015) (1〇15,) rubber bushing (1 〇1 6 ) ( 1 〇1 6,) ring rib (1 0 2 ) perfusion rod (1 〇 2 2 ) ring groove (1 〇 2 4 ) connector (1 0 2 6 ) Steel ball eight, new description: [New technical field] This is a high-pressure leak-stopper structure, which mainly uses a single-size leak-proof head to connect with different specifications and lengths of the pouring rod. = type, so that it can meet the needs of different depths of cracks in various building walls to solve the problem of leakage prevention and leakage, to solve the many defects that existed and derived from the priors\ [Prior Art] ' Press, modern buildings, multi-recycled reinforced concrete After construction, use the steel bars to tie the 5 and the skeleton of the building, then build the formwork to separate the grouting space, and then mix and mix with a predetermined proportion of gravel, sand, cement and water and pour into the space of the template to stay for a while. After the natural solidification, the template can be removed and the subsequent wall flour or magnetic Brick, and finally complete the construction of the overall building M334169. However, as far as the construction of the building is concerned, it may be due to the improper design of the building materials, or even the external factors such as earthquakes, resulting in the occurrence of the two, the crack phenomenon. Such fine cracks do not affect the safety of the building structure. Although the surface seam m + β u 1 has rained for several days in the rainy season, A rainwater has penetrated into the room from these cracks, causing indoor dripping problems, which will not only cause damage to paint, concrete, floor and carpet, but also become more It may cause a home war as a nightmare for the occupants. In order to solve such problems, it is generally applied to the cracks on the wall of the Jianye wall, so that the surface of the cracks is separated from the surface of the U wall, so that the rainwater does not enter the cracks and cause water leakage in the room. For every /, π benevolence only proves that the effectiveness of such remedies is not big enough. When the rain is too much, the problem of leaking inside the room occurs, and it is necessary to try to solve it. [New content] = (4) Many problems and shortcomings existing and derived from the knowledge, the creator, Jin Yanjiu 'based on its related industries Years of experience and technology:: Research and create a high avoidance leaker structure, that is, its main purpose is to = design by the structure of the structure, the leak-stop head and the pouring rod are separated and assembled to form a joint. With a variety of specifications, the length of the filling head 'to meet the needs of different construction conditions of the work. Han 创作 created! - The purpose of (four) is through the composition of the structure, making it -, the structure is more simple 'and can achieve the ideal perfusion The purpose of this leak-proof effect is to design a structure to make the 5 M334169 squirt cups work more easily on the broken work after the completion of the work. Objective, the design of the high-pressure leak-stopper in this design is mainly based on the use of a single-size leak-proof head and different specifications and lengths of the composition of the daily type, so that it can choose different specifications according to the actual operation requirements, and the length is iC. The equal-filling rod is broken at the predetermined position according to its length specification, and is broken from the groove of the ring, so that the leaking two is required to be filled with different depths of various building walls. : Knowing the existence and the many missing people in the street.. About the surname of this creation ★ Very, I would like to cooperate with the schema; =", technical means and efficacy, please refer to the second:; After: Creating a high-pressure leak-stop perfusion crying:::糸 The preferred embodiment of this creation is 'this leaked head"〇1) sentence in the structural design, mainly consisting of the main system of the head (...) Type, the leak detection of the long τ type hollow inspection The rod (, the middle work bolt (1G11), 2) 'in the long-shaped hollow 1) has one end - one head (1 0 i tube (i〇i5) (1ηι ο11), the upper set has a number of rubber sleeves) 0015, 2), in the rubber casing (1〇15 0 14, two cake knives are separated by metal gaskets (1 η Ί, υ 1 4), rubber 叁...η ' 1 0 1 4 ) ( 1 ) The outer edge is made up of a plurality of ring ribs (; B) (1015, these rubber sleeves (1 1 6 } ( 1 〇 1 6 9 ) 〇 1 illusion ◦, ◦ !) (HU,) and gasket (; Because of the long-type hollow bolt (M334169) - the end of the taro (1〇12) T-type hollow bolt (J 7 ^, the protection position 'also at the length of 1 〇 1 1) Then there is a section of external 蟫 f f 013) 'Using the outer slave of the section of the outer snail ·, 'text (1 / 1 a, 丄 U 1 3) just for the bottom of the sputum sputum (102) at the back end of the internal snail. ^ ^ Internal thread (1 〇 2 1 ) is locked, and the two are locked into one body. The hexagonal hollow rod body of the perfusion rod (1), Gan Kai, Ri-fu body suit, my voice, .../ The requirements for the continuous operation are set to different specifications. ¥ : : Μ古...翟Note (1 0 2) is at the predetermined position according to its length specification) Groove (i 0 2 ^ + is good for the filling rod (1 〇 2 = = internal thread (" Chuan, with ::: Pre-type sorrowful joints ·| η 〇, the joint (1 〇 2 4) The inner control hole (1〇25) of the external thread of βw (1 0 2 7 ) (10...up 4) and the base resistance of the steel ball, using the adapter (丄〇2 4 ) pressure pumping and filling machine (2〇)丄 4) Pay with - name! I - r Q 2 1 ) is connected to the group, which constitutes the structure of the two-pressure leak-stopper (1〇) of the creation; the work consists of the above-mentioned structure's crack prevention and leakage prevention in the wall surface of the building. # a ^ The part of the wall where the water leakage occurs is set to the appropriate number of times, and the position is taken; 丨rw the hole of the appropriate aperture (30), the 2 hole 2 degree must reach the crack of the wall , and then look at the depth of its ^ 3 ◦) to select a suitable high-pressure leak-stopper (Acre 2: the south pressure leak-stopper (1〇) stop head (1 ο 1) * stretched at =: V 3 〇 ) inside the 'end end face of the filling rod (1 〇 2 )' at this time because the stop head (1〇1) has been inserted into the bottom of the slot' plus the rubber sleeve.f ( i Q i 5 ) (丄〇) M334169 5') The outer wall is in contact with the inner wall of the slot (3〇), and the elastic deformation margin outside the rubber sleeve (1 〇1 5 ) ( 1 Q 1 5,) is adjustable. Density: The overall tightness of the perfusion rod (1 0 2 ) and the stop head (worker) τ type hollow & 1 0 1 1 ) and the slot (3 〇), so that the perfusion (102) The garment groove (丄022) can be flush with the wall surface. At this point, the high-pressure Guopu filling machine (2〇) (4) injection tube (21) can be sleeved in the potting; f dry (1 〇 2) fitting (丄〇 2 4 ), then the ρ υ styrofoam The caulking agent and the like are pushed against the steel ball (1 0 2 6 ) by the high-pressure man-injection rod (丄Q 2 ) connector ^ 1 〇 2 4 ), and the caulking agent is placed along the inner boring hole (1 0 2 5); the flow into the 'final end of the leaking head (丄〇丄) = hollow bolt (1〇11) head (1〇12) end infiltrated into the periphery of the tread crack, via _ J?1· After the main ^ 、 , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , 2) Break at the place, and fill the outer surface of the slot (3〇) with cement to fill it. After the solidification, the wall surface is stopped. The joint filler is exposed to water and the bottom right. If it is not political, it will cause rainwater leakage in the rainy days. & into these joints, the expansion of the cracks, and thus effectively prevent the problem of water seepage, and completely achieve the function of preventing cracks in the wall of the building; Through the above explanation, we can see that this creation is in Korea. The design of the leak-proof perfusion design is innovative. The innovative use of the leak-stop head and the perfusion rod is not only structurally simplified, but also depends on the actual operation: The length of the perfusion rod 'simultaneous high-pressure leak-proof perfusion device can be adapted to the degree of locking of the leak-proof head to obtain the perfusion ς... The body is close to the sound, and the person, the 〃 〃 4 4 4 4 4 4 4 4 〉The ring groove of the main rod can be flush with the wall surface, so that the M334169 of the pouring rod is broken and the wall® is more beautiful. This industry has four industrial utilization and practical value, and it is an excellent and outstanding innovative designer. In summary, the high-pressure leak-stopper structure of this creation, through its structure, is able to effectively solve the problems and defects in the practice of 'effectively preventing leakage in the wall surface of the building'. , the whole sage, honesty is - m out of the innovative design, 提出 patents; please [the first syllabary diagram map diagram tffy to 7L 0) 0 1 0 1 〇1 〇1 0 1 〇1 〇2 Figure 1 2 3 4 5 6 Main 1 Single Description] The schematic diagram of the preferred embodiment of the present invention. A schematic exploded view of the preferred embodiment of the present invention. A schematic side view of a preferred embodiment of the present invention. BRIEF DESCRIPTION OF THE PREFERRED EMBODIMENT OF THE PREFERRED EMBODIMENT Referring to the drawings (1) The implementation state of the preferred embodiment of the present invention is shown in the accompanying drawings (2). Description of the shell symbol] High pressure leak-stopper) Stop leak head 1) Long τ type hollow bolt 2 } ( 1 0 1 3 ) External thread 4 ) ( 1 〇 1 4,) Gasket (1 〇 1 5 ' ) Rubber sleeve 6) (1 0 1 6,) ring rib) perfusion rod 9

Claims (1)

M334169 長度而與止漏頭鎖接成型者。 圍第1項所述之高壓止漏灌注器 凹槽乃依其規格及長度差異而製 3、依據申請專利範 結構’其中該灌注桿的環 設於不同部位者。 士磁,1:據申明專利範圍第1項所述之高壓止漏灌注器 ^ "以漏頭的橡膠套管外緣乃製設有複數道環肋 者。 十、圖式: 11M334169 Length and lock to the stop head. The high-pressure leak-stopper groove described in item 1 is made according to the difference in specifications and length. 3. According to the patent application structure, the ring of the filling rod is located at different parts. Shi magnetic, 1: According to the high-pressure leak-proof perfusion device mentioned in the first paragraph of the patent scope ^ " The outer edge of the rubber sleeve of the leak head is provided with a plurality of ring ribs. X. Schema: 11
TW96219305U 2007-11-15 2007-11-15 High pressure and leakage ceasing injector TWM334169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW96219305U TWM334169U (en) 2007-11-15 2007-11-15 High pressure and leakage ceasing injector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW96219305U TWM334169U (en) 2007-11-15 2007-11-15 High pressure and leakage ceasing injector

Publications (1)

Publication Number Publication Date
TWM334169U true TWM334169U (en) 2008-06-11

Family

ID=44327332

Family Applications (1)

Application Number Title Priority Date Filing Date
TW96219305U TWM334169U (en) 2007-11-15 2007-11-15 High pressure and leakage ceasing injector

Country Status (1)

Country Link
TW (1) TWM334169U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI451014B (en) * 2011-10-04 2014-09-01
CN110158986A (en) * 2019-06-10 2019-08-23 中鼎国际工程有限责任公司 A kind of construction processes wall crazing restorative procedure and equipment
TWI762990B (en) * 2020-08-05 2022-05-01 駿馳工程股份有限公司 Electric induction anti-seepage reinforcement method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI451014B (en) * 2011-10-04 2014-09-01
CN110158986A (en) * 2019-06-10 2019-08-23 中鼎国际工程有限责任公司 A kind of construction processes wall crazing restorative procedure and equipment
TWI762990B (en) * 2020-08-05 2022-05-01 駿馳工程股份有限公司 Electric induction anti-seepage reinforcement method and system

Similar Documents

Publication Publication Date Title
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN207231732U (en) A kind of assembled piping lane joint waterproofing test device
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN206143827U (en) Underground works crack repairing structure
CN100416006C (en) Method for constructing water-proof telescopic seam between new and old concrete building joints and structure thereof
CN110924702A (en) Hole plugging device for brick-concrete or prefabricated part and operation method thereof
CN107165434B (en) A kind of high-pressure slip-casting blocking method for toilet floor
TWM334169U (en) High pressure and leakage ceasing injector
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN107975248A (en) A kind of toilet leak method for maintaining
CN211231881U (en) Basement outer wall back-opening wall-penetrating pipe waterproof structure
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN101781935A (en) Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN203905265U (en) Building block for assisting function pipeline in penetrating through plain brick wall
CN105887904A (en) Construction method for filling dissolving cavity in outer side of deep foundation pit in karst area
CN214429183U (en) Cable sleeve plugging structure with multi-layer combination of rigidity and flexibility
CN200961756Y (en) Cast-in-situ water-stopping device
CN106337449A (en) Crack repairing structure for underground engineering and construction method of crack repairing structure
CN108265722B (en) Circulating mechanical grout plug
CN208072393U (en) A kind of pile pile of the built-in slip casting pipe with piecing devices
CN215518894U (en) A waterproof construction for indoor waterproof maintenance of basement
CN109706932A (en) A kind of solution cavity stopper structure and construction method
CN209385817U (en) A kind of basement cable sleeve waterproof plugging structure
CN217812524U (en) Cast-in-place wall body bolt hole block structure

Legal Events

Date Code Title Description
MK4K Expiration of patent term of a granted utility model