CN207363261U - The antipriming of outer wall template through-wall bolt - Google Patents

The antipriming of outer wall template through-wall bolt Download PDF

Info

Publication number
CN207363261U
CN207363261U CN201721241677.XU CN201721241677U CN207363261U CN 207363261 U CN207363261 U CN 207363261U CN 201721241677 U CN201721241677 U CN 201721241677U CN 207363261 U CN207363261 U CN 207363261U
Authority
CN
China
Prior art keywords
wall
screw rod
antipriming
template
wall template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721241677.XU
Other languages
Chinese (zh)
Inventor
奕锋
徐敏
郦洲
傅华华
金鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Shangyu Jianxin Engineering Consulting Co.,Ltd.
Original Assignee
ZHONGXIN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGXIN CONSTRUCTION GROUP CO Ltd filed Critical ZHONGXIN CONSTRUCTION GROUP CO Ltd
Priority to CN201721241677.XU priority Critical patent/CN207363261U/en
Application granted granted Critical
Publication of CN207363261U publication Critical patent/CN207363261U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Revetment (AREA)

Abstract

The utility model provides the antipriming of outer wall template through-wall bolt.The antipriming of the outer wall template through-wall bolt includes outer wall template, concrete wall, rotating bar, seal ring, gasbag, screw rod, expanded rubber ring, prefabricated plastic casing, groove, plug, waterproof gasket, nut and connecting pipe.For the antipriming of outer wall template through-wall bolt provided by the utility model in concreting, the plug being equipped with can prevent rainwater from entering, and form first of barrier;Bonding of the screw rod with the prefabricated plastic casing by adhesive, coordinates the seal ring to form the entrance that second barrier prevents water;After outer wall template dismounting, the expanded rubber ring is as first of sealing barrier, water-swellable, prevent rainwater from continuing to penetrate into, above-mentioned second barrier is cooperateed with effectively to solve the infiltration hidden danger that wall through-wall bolt is left, the self waterproofing effect of concrete structure is avoided damage to, leak source is eliminated and reaches waterproof purpose.

Description

The antipriming of outer wall template through-wall bolt
Technical field
It the utility model is related to technical field of building construction, more particularly to the antipriming of outer wall template through-wall bolt.
Background technology
, it is necessary to use split bolt fixed form during concrete panel structure construction;When basement wall slab is constructed, in order to solve The infiltration hidden danger that wall through-wall bolt is left, avoids damage to the effect of concrete structure self-waterproofing, using disposable waterproof spiral shell Bolt, in outer wall screw after form removal, blows screw rod with gas welding, blocks up notch with waterproof mortar and smear compacting, with as far as possible Achieve the purpose that to eliminate leak source.
Current outer wall template through-wall bolt is through outer wall template and during concrete wall, due to the presence of provided pipe, Therebetween there are gap, when not tearing exterior wall module open, rainwater easily penetrates into, and has a great impact to concrete wall, is removing During outer wall template, curtain wall template is lacked, its sealing performance weakens significantly, and water resistance reduces, and traditional relies on seal ring merely Mode there will naturally be significant limitation.
Therefore, it is necessary to the antipriming for providing new outer wall template through-wall bolt solves above-mentioned technical problem.
Utility model content
The technical problem that the utility model solves is to provide that water resistance is good, the outer wall template being quickly and expediently installed spiral shell through walls The antipriming of bolt.
In order to solve the above technical problems, the antipriming of outer wall template through-wall bolt provided by the utility model, including:It is mixed Solidifying cob wall body;Outer wall template, the outer wall template are arranged at the both sides of the concrete wall;Prefabricated plastic casing, it is described pre- Plastic bushing processed runs through the concrete wall;Screw rod, the screw rod traverse the prefabricated plastic casing and the outer wall template; Expanded rubber ring, the expanded rubber ring is arranged between the screw rod and the prefabricated plastic casing, and the expanded rubber Ring is arranged at the inside of the prefabricated plastic casing;Seal ring, the seal ring are fixed at the outer side center of the screw rod;Spiral shell Mother, the nut thread connects the screw rod, and the nut is equipped with two;Rotating bar, the rotating bar are fixed on the spiral shell Female outside;Plug, the plug is fixed on the side of the nut, and the plug is threadedly coupled the screw rod;Collision mat Piece, the waterproof gasket are arranged at the inner side of the plug;Groove, the groove are arranged at the sidepiece of the outer wall template, and The plug is inserted into the inside of the groove;Gasbag, the gasbag are connected to the both sides of the screw rod;Connecting pipe, One end of the connecting pipe connects the gasbag, and the other end of the connecting pipe connects with the prefabricated plastic casing It is logical.
The diameter of the prefabricated plastic casing is more than the diameter of the screw rod.
The expanded rubber ring is glued at the inner wall both ends of prefabricated plastic casing, the expanded rubber ring using cyclic structure For a kind of expanded rubber ring of water-swellable.
The seal ring full weld is at the outer side center of the screw rod.
The rotating bar is welded on the outside of the nut, and two rotating bars are mutually 180 ° of distributions.
The section of the plug uses " mountain " character form structure.
The groove is arranged at the outside of the outer wall template using cirque structure.
Two gasbags are glued at the both sides of the screw rod.
Gasbag described in push type is connected at the center of the prefabricated plastic casing by the connecting pipe, and two The connecting pipe is respectively communicated with the top and bottom of the prefabricated plastic casing.
The gasbag is one kind in cylindrical, oval, spherical.
Compared with correlation technique, the antipriming of outer wall template through-wall bolt provided by the utility model has and has as follows Beneficial effect:
The utility model provides the antipriming of outer wall template through-wall bolt, and in concreting, what is be equipped with is described stifled Head can prevent rainwater from entering, and form first of barrier;The screw rod, by the bonding of adhesive, is matched somebody with somebody with the prefabricated plastic casing Close the seal ring and form the entrance that second barrier prevents water;After outer wall template dismounting, the expanded rubber ring is made For first of sealing barrier, water-swellable, prevents rainwater from continuing to penetrate into, and cooperates with above-mentioned second barrier effectively to solve wall The infiltration hidden danger that body through-wall bolt is left, avoids damage to the self waterproofing effect of concrete structure, eliminates leak source and reaches waterproof purpose.
Brief description of the drawings
Fig. 1 is the structural representation of the preferred embodiment of the antipriming of outer wall template through-wall bolt provided by the utility model Figure;
Fig. 2 is the nut of the utility model and the attachment structure schematic diagram of plug;
Fig. 3 is the internal structure schematic diagram of the screw rod of the utility model.
Figure label:1st, outer wall template, 2, concrete wall, 3, rotating bar, 4, seal ring, 5, gasbag, 6, screw rod, 7, Expanded rubber ring, 8, prefabricated plastic casing, 9, groove, 10, plug, 11, waterproof gasket, 12, nut, 13, connecting pipe.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Fig. 1, Fig. 2 and Fig. 3 are please referred to, wherein, Fig. 1 is outer wall template through-wall bolt provided by the utility model The structure diagram of the preferred embodiment of antipriming;Fig. 2 is the nut of the utility model and the attachment structure schematic diagram of plug; Fig. 3 is the internal structure schematic diagram of the screw rod of the utility model.The antipriming of outer wall template through-wall bolt, including:Concrete Wall 2;Outer wall template 1, the outer wall template 1 are arranged at the both sides of the concrete wall 2;For the ease of the screw rod 6 Insertion, prefabricated plastic casing 8, the prefabricated plastic casing 8 runs through the concrete wall 2, and the diameter of the screw rod 6 is less than The diameter of the prefabricated plastic casing 8, easy to the insertion of the screw rod 6.
Screw rod 6, the screw rod 6 traverse the prefabricated plastic casing 8 and the outer wall template 1;Water enters in order to prevent The inside of wall, expanded rubber ring 7, the expanded rubber ring 7 are arranged between the screw rod 6 and the prefabricated plastic casing 8, And the expanded rubber ring 7 is arranged at the inside of the prefabricated plastic casing 8,7 water-swellable of expanded rubber ring, by described in The both sides of prefabricated plastic casing 8 are blocked described in 6 fish of screw rod, avoid the entrance of water.
Seal ring 4, the seal ring 4 are fixed at the outer side center of the screw rod 6;Nut 12,12 screw thread of nut The screw rod 6 is connected, and the nut 12 is equipped with two;For the ease of the locking to the nut 12, rotating bar 3, described turn Lever 3 is fixed on the outside of the nut 12;In order to strengthen the sealing performance of both sides, plug 10, the plug 10 is fixed on institute The side of nut 12 is stated, and the plug 10 is threadedly coupled the screw rod 6;Waterproof gasket 11, the waterproof gasket 11 are arranged at The inner side of the plug 10.
Water enters groove 9 in order to prevent, and the groove 9 is arranged at the sidepiece of the outer wall template 1, and the plug 10 is inserted Enter to the inside of the groove 9.
In order to strengthen the compactness that the screw rod 6 is connected with the prefabricated plastic casing 8, gasbag 5, the gasbag 5 It is connected to the both sides of the screw rod 6;Connecting pipe 13, one end of the connecting pipe 13 connect the gasbag 5, and the company The other end in adapter road 13 is connected with the prefabricated plastic casing 8, is injected adhesive glue in the inside of the gasbag 5, is being pressed During the gasbag 5, glue is penetrated between the screw rod 6 and the prefabricated plastic casing 8, and reinforcement fixation is carried out to the two, Realize and strengthen water resistance.
For the ease of the entrance of the screw rod 6, the diameter of the prefabricated plastic casing 8 is more than the diameter of the screw rod 6.
In order to realize that closure carries out sealing, the expanded rubber ring 7 is glued at prefabricated plastic casing 8 using cyclic structure Inner wall both ends, the expanded rubber ring 7 are a kind of expanded rubber ring of water-swellable.
In order to strengthen stability, 5 full weld of seal ring is at the outer side center of the screw rod 6.
For the ease of manual operation, the rotating bar 3 is welded on the outside of the nut 12, and two rotating bars 3 It is mutually 180 ° of distributions.
In order to realize closure, strengthen sealing performance, the section of the plug 10 uses " mountain " character form structure;The groove 9 The outside of the outer wall template 1 is arranged at using cirque structure.
In order to which to being attached between the screw rod 6 and the prefabricated plastic casing 8, two gasbags 5 are glued In the both sides of the screw rod 6, gasbag 5 described in push type is connected in the prefabricated plastic casing 8 by the connecting pipe 13 Center at, and two connecting pipes 13 are respectively communicated with the top and bottom of the prefabricated plastic casing 8;The air bag Bag 5 is one kind in cylindrical, oval, spherical.
When the utility model is used, when carrying out the concrete wall 2 and pouring, internal reservation described in prefabricated modeling Expect casing 8, and in the glued two expanded rubber rings 7 in the both ends of the prefabricated plastic casing 8, the screw rod 6 is run through into institute The outer wall template 1 of prefabricated plastic casing 8 and 2 both sides of concrete wall is stated, and is opened in the outside of the outer wall template 1 If the groove 9, the nut 12 is screwed in the both sides of the screw rod 6, the plug 10 is rotatably inserted into the groove 9 Inside and by the pressing of the adhesive of the inside of the gasbag 5 enter the screw rod 6 and the prefabricated plastic casing 8 it Between, the two is sealed.
Compared with correlation technique, the antipriming of outer wall template through-wall bolt provided by the utility model has and has as follows Beneficial effect:
The utility model provides the antipriming of outer wall template through-wall bolt, and in concreting, what is be equipped with is described stifled First 10 can prevent rainwater from entering, and form first of barrier;The screw rod 6 passes through the viscous of adhesive with the prefabricated plastic casing 8 Close, coordinate the seal ring 4 to form the entrance that second barrier prevents water;After the outer wall template 1 dismounting, the expansion rubber Rubber ring 7 is used as first of sealing barrier, and water-swellable, prevents rainwater from continuing to penetrate into, and cooperates with above-mentioned second barrier can be effective The infiltration hidden danger left of solution wall through-wall bolt, avoid damage to the self waterproofing effect of concrete structure, eliminate leak source and reach Waterproof purpose.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly used in Other relevant technical fields, are equally included in the patent within the scope of the utility model.

Claims (10)

1. the antipriming of outer wall template through-wall bolt, it is characterised in that including:
Concrete wall;
Outer wall template, the outer wall template are arranged at the both sides of the concrete wall;
Prefabricated plastic casing, the prefabricated plastic casing run through the concrete wall;
Screw rod, the screw rod traverse the prefabricated plastic casing and two pieces of outer wall templates;
Expanded rubber ring, the expanded rubber ring are arranged between the screw rod and the prefabricated plastic casing, the expansion rubber Rubber ring is arranged at the inside of the prefabricated plastic casing;
Seal ring, the seal ring are fixed at the outer side center of the screw rod;
Nut, the nut thread connects the screw rod, and the nut is equipped with two;
Rotating bar, the rotating bar are fixed on the outside of the nut;
Plug, the plug is fixed on the side of the nut, and the plug is threadedly coupled the screw rod;
Waterproof gasket, the waterproof gasket are arranged at the inner side of the plug;
Groove, the groove is arranged at the sidepiece of the outer wall template, and the plug is inserted into the inside of the groove;
Gasbag, the gasbag are connected to the both sides of the screw rod;
Connecting pipe, one end of the connecting pipe connect the gasbag, and the other end of the connecting pipe with it is described pre- Plastic bushing connection processed.
2. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the prefabricated plastic set The diameter of pipe is more than the diameter of the screw rod.
3. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the expanded rubber ring The inner wall both ends of prefabricated plastic casing are glued at using cyclic structure, the expanded rubber ring is a kind of expansion rubber of water-swellable Rubber ring.
4. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the seal ring full weld At the outer side center of the screw rod.
5. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the rotating bar welding In the outside of the nut, and two rotating bars are mutually 180 ° of distributions.
6. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the section of the plug Using " mountain " character form structure.
7. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the groove is using circle Loop configuration is arranged at the outside of the outer wall template.
8. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that two gasbags It is glued at the both sides of the screw rod.
9. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that air bag described in push type Bag is connected at the center of the prefabricated plastic casing by the connecting pipe, and two connecting pipes are respectively communicated with The top and bottom of the prefabricated plastic casing.
10. the antipriming of outer wall template through-wall bolt according to claim 1, it is characterised in that the gasbag is One kind in cylindrical, oval, spherical.
CN201721241677.XU 2017-09-26 2017-09-26 The antipriming of outer wall template through-wall bolt Active CN207363261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721241677.XU CN207363261U (en) 2017-09-26 2017-09-26 The antipriming of outer wall template through-wall bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721241677.XU CN207363261U (en) 2017-09-26 2017-09-26 The antipriming of outer wall template through-wall bolt

Publications (1)

Publication Number Publication Date
CN207363261U true CN207363261U (en) 2018-05-15

Family

ID=62350110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721241677.XU Active CN207363261U (en) 2017-09-26 2017-09-26 The antipriming of outer wall template through-wall bolt

Country Status (1)

Country Link
CN (1) CN207363261U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195513A (en) * 2019-06-25 2019-09-03 中铁一局集团第四工程有限公司 Water-stopping pull rod and waterproof construction method in subway work
CN112109043A (en) * 2020-09-15 2020-12-22 北京建工土木工程有限公司 Three-section type wall-penetrating water stop bolt rapid assembly device
GB2596591A (en) * 2020-07-03 2022-01-05 Sustainable Resources Ltd A tie
CN114232995A (en) * 2021-12-31 2022-03-25 歌山建设集团有限公司 Water stop screw assembly and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195513A (en) * 2019-06-25 2019-09-03 中铁一局集团第四工程有限公司 Water-stopping pull rod and waterproof construction method in subway work
CN110195513B (en) * 2019-06-25 2024-05-07 中铁一局集团第四工程有限公司 Water stop pull rod in subway construction and waterproof construction method
GB2596591A (en) * 2020-07-03 2022-01-05 Sustainable Resources Ltd A tie
GB2596591B (en) * 2020-07-03 2024-05-08 Sustainable Resources Ltd A tie for a formwork
CN112109043A (en) * 2020-09-15 2020-12-22 北京建工土木工程有限公司 Three-section type wall-penetrating water stop bolt rapid assembly device
CN114232995A (en) * 2021-12-31 2022-03-25 歌山建设集团有限公司 Water stop screw assembly and construction method thereof
CN114232995B (en) * 2021-12-31 2023-05-05 歌山建设集团有限公司 Water stop screw rod assembly and construction method thereof

Similar Documents

Publication Publication Date Title
CN207363261U (en) The antipriming of outer wall template through-wall bolt
CN103334519B (en) Overlaid plate type concrete shear wall and longitudinally connected method
CN102979478B (en) Water stopping device for water inrush borehole drilling
CN203411979U (en) Post-grouting device for pile side of cast-in-situ bored pile
CN109915068B (en) Automatic water-absorbing plugging and hole-sealing device and method for near-horizontal coal seam gas extraction drill hole
CN204000838U (en) The anti-Flow Structure Around of diaphragm wall capsule-type
CN207647038U (en) A kind of grout sleeve connection structure of manual exhaust
CN203440820U (en) Improved pouring pile end post-grouting device
CN206928526U (en) A kind of half grout sleeve of bar connecting
CN205908021U (en) Novel basement outer wall sealing screw
CN210370586U (en) Water outlet elevation drilling and grouting water stopping device
CN103382727A (en) Sounding pipe for foundation pile detection
CN104343123A (en) Double-layer film bag device applied to injection pipe sealing in water bursting sand layer and method therefor
CN207960650U (en) Hollow grouting cable anchor hole sealing device
CN204252139U (en) Be applied to the two-layer equation film bagging apparatus of Grouting Pipe sealing in water burst sandy soils
CN202970614U (en) Water burst drilling and water sealing device
CN207364528U (en) A kind of skyscraper drainage system noise reduction energy dissipating PVC pipe
CN203515623U (en) Reinforcing anchor rod
CN108915158A (en) A kind of Separated type combination grout sleeve and connection method
CN105089548A (en) Nearly horizontal high pressure-bearing drilling sealing method and sealing structure
CN204827355U (en) Nearly competent pressure -bearing drilling hole sealing structure
CN112324055B (en) Prefabricated vertical component and sleeve grouting construction method thereof
CN205400670U (en) Grouting tube
CN211817426U (en) Plugging assembly for grouting connection or slurry anchor connection of assembled sleeve
CN202970758U (en) Hole packer used for crushing coal bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210928

Address after: 312000 No. 1111, Shungeng Avenue, Cao'e street, Shangyu District, Shaoxing City, Zhejiang Province (residence declaration)

Patentee after: Shaoxing Shangyu Jianxin Engineering Consulting Co.,Ltd.

Address before: 312353 No. 1111, Shungeng Avenue, economic development zone, Shangyu District, Shaoxing City, Zhejiang Province

Patentee before: ZHONGXIN CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right