TWI579442B - Metal roofing tile assembly - Google Patents

Metal roofing tile assembly Download PDF

Info

Publication number
TWI579442B
TWI579442B TW104137771A TW104137771A TWI579442B TW I579442 B TWI579442 B TW I579442B TW 104137771 A TW104137771 A TW 104137771A TW 104137771 A TW104137771 A TW 104137771A TW I579442 B TWI579442 B TW I579442B
Authority
TW
Taiwan
Prior art keywords
metal
combination portion
bracket
combination
roof tile
Prior art date
Application number
TW104137771A
Other languages
Chinese (zh)
Other versions
TW201718992A (en
Inventor
王榮貴
Original Assignee
齊瓦室企業有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 齊瓦室企業有限公司 filed Critical 齊瓦室企業有限公司
Priority to TW104137771A priority Critical patent/TWI579442B/en
Priority to CN201621230523.6U priority patent/CN206267426U/en
Priority to CN201611007960.6A priority patent/CN106948552A/en
Application granted granted Critical
Publication of TWI579442B publication Critical patent/TWI579442B/en
Publication of TW201718992A publication Critical patent/TW201718992A/en

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Description

金屬屋瓦組 Metal roof tile set

本發明是有關於一種屋瓦,特別是有關於一種利用金屬板瓦與金屬筒瓦的金屬屋瓦組。 The present invention relates to a roof tile, and more particularly to a metal roof tile group utilizing a metal tile and a metal can.

由古至今,廟宇大多是使用屋瓦作為屋頂,且以中式或東方風格的一般民間住宅亦會選用屋瓦作為屋頂。然,因傳統屋瓦的材料過於笨重,經過其長期累月的施壓往往造成屋頂結構的損害變形,甚至損害到建築物本身,因此目前許多廟宇已漸漸地改為採用由平瓦與筒瓦組合構成的金屬瓦。 Since ancient times, temples have mostly used roof tiles as roofs, and ordinary folk houses in Chinese or Oriental style also use roof tiles as roofs. However, because the materials of traditional roofing tiles are too cumbersome, the pressure exerted by the long-term and tiring months often causes damage to the roof structure and even damages the building itself. Therefore, many temples have gradually been replaced by flat tiles and cylinders. Metal tile made up.

然而,習知技術中仍存有一些缺點極待改善。舉例來說,習知之金屬製的筒瓦與平瓦的組合,大多存有漏水的問題,因此須設置一防水層於筒瓦與平瓦之組合和屋頂結構面層之間。另外,筒瓦與平瓦在組合、組裝時工序相當繁雜,從而造成時間及人力的耗費。 However, there are still some shortcomings in the prior art that need to be improved. For example, the combination of conventional metal bushes and flat tiles often has the problem of water leakage, so a waterproof layer must be provided between the combination of the tile and the flat tile and the roof structure. In addition, the combination of the tile and the flat tile is quite complicated in assembly and assembly, resulting in time and labor costs.

綜觀前所述,本發明之發明人經多年潛心研究,設計了一種金屬屋瓦組,以針對現有技術之缺失加以改善,進而增進產業上之實施利用。 As described above, the inventors of the present invention have designed a metal roof tile group through years of painstaking research to improve the lack of the prior art, thereby enhancing the industrial use and utilization.

有鑑於上述習知技藝之問題,本發明之目的就是在提供一種金屬屋瓦組,以解決上述習知技術待改善的問題。 In view of the above-mentioned problems of the prior art, it is an object of the present invention to provide a metal roof tile set to solve the above-mentioned problems to be improved by the prior art.

根據本發明之目的,係提供一種金屬屋瓦組,其包含複數個金屬板瓦、第一支架及金屬筒瓦。各金屬板瓦由端部觀之時為U字型結構,各金屬板瓦之兩側的邊緣設有一第一組合部。第一支架為倒U字型結構,第一支架之兩側分別設置有一第二組合部,且第二組合部對應於第一組合部,第一支架之頂部設有一第三組合部;當複數個金屬板瓦並排設置時,第一支架係位於複數個金屬板瓦之間。金屬筒瓦為倒U字型結構,金屬筒瓦之一端的頂部設有一第四組合部;當複數個金屬板瓦並排設置時,金屬筒瓦設置於各金屬板瓦之兩側的側邊及第一支架上。其中,藉由固定元件使第一組合部與第二組合部組合,且第三組合部與第四組合部結合,以將複數個金屬板瓦、第一支架與金屬筒瓦固定為金屬屋瓦組。 In accordance with the purpose of the present invention, a metal roofing tile assembly is provided that includes a plurality of metal panels, a first bracket, and a metal can. Each of the metal slabs has a U-shaped structure when viewed from the end, and a first combined portion is provided at an edge of both sides of each of the metal slabs. The first bracket is an inverted U-shaped structure, a second combination portion is respectively disposed on two sides of the first bracket, and the second combination portion corresponds to the first combination portion, and a third combination portion is disposed on a top portion of the first bracket; When the metal slabs are arranged side by side, the first bracket is located between a plurality of metal slabs. The metal tube is an inverted U-shaped structure, and a top portion of one end of the metal tube is provided with a fourth combination portion; when a plurality of metal sheets are arranged side by side, the metal tube is disposed on the side of each side of the metal sheet and the first bracket. Wherein, the first combination portion and the second combination portion are combined by the fixing member, and the third combination portion and the fourth combination portion are combined to fix the plurality of metal slabs, the first bracket and the metal tube to the metal roof tile group.

較佳地,各金屬板瓦之另一端具有一第一端部及各該金屬板瓦之一端具有一第二端部;第一端部具有一第一搭接邊,第二端部具有相反於第一搭接邊之一第二搭接邊;其中複數個金屬板瓦沿端部方向搭接時,藉由第一搭接邊與第二搭接邊進行搭接。 Preferably, the other end of each of the metal shingles has a first end and one end of each of the metal shingles has a second end; the first end has a first overlapping edge, and the second end has a opposite end One of the lap joints has a second lap joint; wherein the plurality of metal slabs are overlapped in the end direction, and the first lap joint is overlapped with the second lap joint.

承上述,第二搭接邊可為往上彎折的折邊,且第二搭接邊連接金屬板瓦之兩內側壁。 In the above, the second overlapping edge may be a folded edge that is bent upward, and the second overlapping edge is connected to the two inner side walls of the metal tile.

較佳地,第三組合部可包含一插銷,第四組合部可為一孔狀結構,藉由插銷插入孔狀結構,以使第三組合部與第四組合部結合。 Preferably, the third combination portion may include a plug, and the fourth assembly portion may be a hole-like structure, and the plug is inserted into the hole-like structure to join the third combination portion and the fourth combination portion.

較佳地,第三組合部及第四組合部可為圓孔,藉由固定元件穿過第三組合部及第四組合部,以使第三組合部與第四組合部結合。 Preferably, the third combination portion and the fourth combined portion may be circular holes, and the third assembly portion and the fourth combination portion are coupled by the fixing member through the third assembly portion and the fourth combination portion.

較佳地,第一組合部可包含長條狀的缺口。 Preferably, the first combination portion may comprise an elongated strip.

較佳地,第二組合部可包含長條狀的缺口。 Preferably, the second combination portion may comprise an elongated strip.

較佳地,其更可包含一第二支架及一勾頭件,第二支架為倒U字型結構,勾頭件為圓罩狀結構,勾頭件位於金屬筒瓦之另一端,且套設於第二支架。 Preferably, the second bracket is an inverted U-shaped structure, the hook member is a circular cover structure, and the hook member is located at the other end of the metal tubular tile, and is sleeved. In the second bracket.

較佳地,第二支架之兩側分別具有一第五組合部,第二支架之頂部係具有一第六組合部,勾頭件之頂部具有一第七組合部,其中藉由固定元件使第一組合部與第五組合部組合,而將第六組合部與第七組合部結合。 Preferably, each of the two sides of the second bracket has a fifth combination portion, the top of the second bracket has a sixth combination portion, and the top portion of the hook member has a seventh combination portion, wherein the first component is fixed by the fixing member One combination portion is combined with the fifth combination portion, and the sixth combination portion is combined with the seventh combination portion.

較佳地,第六組合部可包含一插銷,第七組合部可為一孔狀結構,藉由插銷插入孔狀結構,以使第六組合部與第七組合部結合。 Preferably, the sixth assembly portion may include a plug, and the seventh assembly portion may be a hole-like structure, and the plug member is inserted into the hole-like structure to join the sixth assembly portion and the seventh combination portion.

較佳地,第六組合部及第七組合部可為圓孔,藉由固定元件穿過第六組合部及第七組合部,以使第六組合部與第七組合部結合。 Preferably, the sixth combining portion and the seventh combining portion may be circular holes, and the sixth combining portion and the seventh combining portion are coupled by the fixing member through the sixth combining portion and the seventh combining portion.

較佳地,第五組合部可為長條狀的缺口。 Preferably, the fifth combination portion may be a long strip-shaped notch.

較佳地,金屬板瓦更包含二第一滑軌勾部,其分別設置於金屬板瓦之兩內側壁,金屬筒瓦更包含二第二滑軌勾部,其分別設置於金屬筒瓦之兩內側壁,於組裝時,金屬筒瓦之二第二滑軌勾部分別滑動對勾於第一支架之兩側的二金屬板瓦的其中一第一滑軌勾部。 Preferably, the metal tile further comprises two first rail hook portions respectively disposed on the two inner side walls of the metal tile, and the metal tube further comprises two second rail hook portions respectively disposed on the inner side walls of the metal tube. During assembly, the second sliding rail hook portions of the metal cylinders respectively slide on one of the first sliding rail hook portions of the two metal slabs on both sides of the first bracket.

綜上所述,本發明之金屬屋瓦組,其藉由上述的組合結構的配置,從而可有效的減少工序,而可減少時間跟人力。另外,藉由金屬 板瓦、各支架與金屬筒瓦的配置,特別是金屬板瓦具有特定的搭接邊,從而可達到防止漏水之目的。 In summary, the metal roof tile set of the present invention can effectively reduce the number of processes by the configuration of the above-mentioned combined structure, and can reduce time and labor. In addition, by metal The arrangement of the tile, the bracket and the metal can, in particular the metal tile, has a specific overlapping edge, so as to prevent leakage.

為讓本發明之上述和其他目的、特徵和優點能更明顯易懂,下文特舉較佳實施例,並配合所附圖式,作詳細說明如下。 The above and other objects, features and advantages of the present invention will become more <RTIgt;

1‧‧‧金屬屋瓦組 1‧‧‧Metal roofing

10‧‧‧金屬板瓦 10‧‧‧Metal slab

11‧‧‧第一組合部 11‧‧‧First Combination Department

12‧‧‧第一搭接邊 12‧‧‧ first lap joint

13‧‧‧第二搭接邊 13‧‧‧second lap joint

121、131‧‧‧反折邊 121, 131‧‧‧ anti-folding

14‧‧‧第一滑軌勾部 14‧‧‧First rail hook

20‧‧‧第一支架 20‧‧‧First bracket

21‧‧‧第二組合部 21‧‧‧ Second Combination Department

22‧‧‧第三組合部 22‧‧‧ Third Combination Department

30‧‧‧金屬筒瓦 30‧‧‧metal canopy

31‧‧‧第四組合部 31‧‧‧ Fourth Combination Department

32‧‧‧第二滑軌勾部 32‧‧‧Second rail hook

40‧‧‧第二支架 40‧‧‧second bracket

41‧‧‧第五組合部 41‧‧‧ Fifth Combination Department

42‧‧‧第六組合部 42‧‧‧The Sixth Combination Department

50‧‧‧勾頭件 50‧‧‧Headpiece

51‧‧‧第七組合部 51‧‧‧ seventh combination department

60‧‧‧滴水瓦 60‧‧‧ drip tiles

9‧‧‧固定元件 9‧‧‧Fixed components

第1圖 係為本發明之金屬屋瓦組之爆炸示意圖。 Fig. 1 is a schematic view showing the explosion of the metal roof tile group of the present invention.

第2圖 係為本發明之金屬屋瓦組之組合示意圖。 Fig. 2 is a schematic view showing the combination of the metal roof tile group of the present invention.

第3圖 係為本發明之金屬屋瓦組之金屬板瓦之示意圖。 Figure 3 is a schematic view of a metal tile of a metal roof tile of the present invention.

第4圖 係為本發明之金屬屋瓦組之第一支架與金屬筒瓦的組合一實 Figure 4 is a combination of the first bracket and the metal cylinder of the metal roof tile of the present invention.

施例示意圖。 Schematic diagram of the example.

第5圖 係為本發明之金屬屋瓦組之第一支架與金屬筒瓦的組合另一 Figure 5 is a combination of the first bracket and the metal cylinder of the metal roof tile of the present invention.

實施例示意圖。 A schematic of an embodiment.

第6圖 係為本發明之金屬屋瓦組之第二支架、金屬筒瓦與勾頭件的 Figure 6 is a second bracket, metal tube and hook head of the metal roof tile set of the present invention.

組合示意圖。 Combination diagram.

為利貴審查員瞭解本發明之技術特徵、內容與優點及其所能達成之功效,茲將本發明配合附圖,並以實施例之表達形式詳細說明如下,而其中所使用之圖式,其主旨僅為示意及輔助說明書之用,未必為本發明實施後之真實比例與精準配置,故不應就所附之圖式的比例與配置關係解讀、侷限本發明於實際實施上的權利範圍,合先敘明。 The technical features, contents, and advantages of the present invention, as well as the advantages thereof, can be understood by the present inventors, and the present invention will be described in detail with reference to the accompanying drawings. The subject matter is only for the purpose of illustration and description. It is not intended to be a true proportion and precise configuration after the implementation of the present invention. Therefore, the scope and configuration relationship of the attached drawings should not be interpreted or limited. First described.

以下將參照相關圖式,說明依本發明之金屬屋瓦組之實施例,為使便於理解,下述實施例中之相同元件係以相同之符號標示來說明。 The embodiments of the metal roofing tile according to the present invention will be described with reference to the related drawings. For ease of understanding, the same components in the following embodiments are denoted by the same reference numerals.

請參閱第1、2圖,其係為本發明之金屬屋瓦組的爆炸示意圖及組合示意圖。如圖所示,金屬屋瓦組1包含了複數個金屬板瓦10、第一支架20及金屬筒瓦30。其中各個金屬板瓦10,其由端部觀之時大致上為U字型結構,且金屬板瓦10的兩側的邊緣可分別設有第一組合部11。金屬板瓦10各側的邊緣的可第一組合部11可為在兩端分別再往上延伸的片體,並於片體上設置缺口或未設置缺口,或可為在金屬板瓦10的兩端的各側的邊緣上直接設置缺口。其中所設置的缺口較佳地可為長條狀的缺口。 Please refer to Figures 1 and 2, which are schematic diagrams and combinations of explosions of the metal roof tile set of the present invention. As shown, the metal roof tile set 1 includes a plurality of metal tile tiles 10, a first bracket 20, and a metal tile 30. Each of the metal slabs 10 is substantially U-shaped when viewed from the end, and the edges of the two sides of the slab 10 may be respectively provided with the first combination portion 11. The first combination portion 11 of the edge of each side of the metal tile 10 may be a sheet extending upward at both ends, and may be provided with a notch or not provided on the sheet, or may be at both ends of the metal tile 10. A notch is directly placed on the edge of each side. The notch provided therein may preferably be a long strip-shaped notch.

另外,第一支架20可由金屬材質一體彎折而製成,其可為倒U字型結構。其中,第一支架20之兩側分別設置有一第二組合部21,且第二組合部21之位置對應於第一組合部11之位置。較佳地,第二組合部21可為缺口,且可為長條狀的缺口。此外,第一支架20之頂部設有一第三組合部22。而金屬筒瓦30為倒U字型結構,金屬筒瓦30之一端的頂部係設有一第四組合部31,且第四組合部31之位置對應於第三組合部22之位置。 In addition, the first bracket 20 may be formed by integrally bending a metal material, and may be an inverted U-shaped structure. A second combining portion 21 is disposed on each side of the first bracket 20, and a position of the second combining portion 21 corresponds to a position of the first combining portion 11. Preferably, the second combination portion 21 can be a notch and can be an elongated notch. In addition, a third combination portion 22 is disposed at the top of the first bracket 20. The metal tile 30 has an inverted U-shaped structure. The top of one end of the metal can 30 is provided with a fourth combining portion 31, and the position of the fourth combining portion 31 corresponds to the position of the third combining portion 22.

順帶一提的是,第一支架20上可設置有補強肋,以增加其整體的結構強度,從而可適當地支撐金屬筒瓦30。且,第一支架20可利用鎖附或焊接等其他方法與屋頂相固定,從而可使金屬屋瓦組1適當地固定於屋頂上。 Incidentally, the first bracket 20 may be provided with reinforcing ribs to increase the overall structural strength thereof, so that the metal shingles 30 can be appropriately supported. Moreover, the first bracket 20 can be fixed to the roof by other methods such as locking or welding, so that the metal roof tile group 1 can be properly fixed to the roof.

如第2圖所示,當將金屬板瓦10、第一支架20及一金屬筒瓦30三者進行組裝置,二個金屬板瓦10分別位於第一支架20之兩側。此時,作業人員可先藉由如拉釘或螺絲等固定元件9(固定元件9如第4圖所繪示)使第一組合部11與第二組合部21結合。其中,第一組合部11可為具有缺口或未具有缺口,若第一組合部11為未具有缺口時,固定元件9可將金屬板瓦10之壁面貫穿再使第一組合部11與第二組合部21結合。若當第一組合部11及/或第二組合部21為長條狀的缺口時,此時第一組合部11與第二組合部21可部分地重疊或完全地重疊。因此可利於作業人員進行施工,尤其是針對屋頂結構具有一定曲線的廟宇的屋頂而可減少缺口對位等調整工序。接著,將金屬筒瓦30設置於二個金屬板瓦10與第一支架20之上,即金屬筒瓦30設置於各金屬板瓦10之兩側的側邊及第一支架20之上,並將第三組合部22與第四組合部31結合,從而金屬筒瓦30將各金屬板瓦10之兩側的側邊及第一支架20包覆。即,金屬筒瓦30將覆蓋住第一組合部11與第二組合部21。 As shown in FIG. 2, when the metal tile 10, the first bracket 20 and the metal cylinder 30 are assembled, the two metal tiles 10 are respectively located on both sides of the first bracket 20. At this time, the operator can first combine the first combining portion 11 with the second combining portion 21 by means of a fixing member 9 such as a rivet or a screw (the fixing member 9 is as shown in FIG. 4). The first combination portion 11 may have a notch or a not-notch. If the first combination portion 11 has no notch, the fixing member 9 may penetrate the wall surface of the metal tile 10 to make the first combination portion 11 and the second combination. The part 21 is combined. When the first combining portion 11 and/or the second combining portion 21 are elongated notches, the first combining portion 11 and the second combining portion 21 may partially overlap or completely overlap at this time. Therefore, it is advantageous for the operator to carry out the construction, especially for the roof of the temple having a certain curve of the roof structure, and the adjustment process such as the gap alignment can be reduced. Next, the metal tile 30 is disposed on the two metal tile 10 and the first bracket 20, that is, the metal tile 30 is disposed on the side of each of the metal tile 10 and the first bracket 20, and the third combination The portion 22 is coupled to the fourth combination portion 31 such that the metal can 30 covers the sides of the respective metal slabs 10 and the first bracket 20. That is, the metal can 30 will cover the first combined portion 11 and the second combined portion 21.

值得一提的是,金屬板瓦10之兩內側壁上可設有一第一滑軌勾部14,於本實施例中,其設置於二個第一組合部11間,但並不以此為限。與之對應的,金屬筒瓦30對應於第一滑軌勾部14而於其兩側壁上可設有一第二滑軌勾部32。因此,在組裝時,可利用滑動的方式,先使第一滑軌勾部14滑入第二滑軌勾部32,而使第一滑軌勾部14與第二滑軌勾部32對勾固定,接著再使第三組合部22與第四組合部31結合。其中,第一滑軌勾部14之一端(組裝後鄰近第四組合部31之一端)可具有倒角等結構,以便於第一滑軌勾部14滑入第二滑軌勾部32。 It is to be noted that a first rail hook portion 14 may be disposed on the inner side walls of the metal tile 10, which is disposed between the two first combination portions 11 in this embodiment, but is not limited thereto. . Correspondingly, the metal cylinder 30 corresponds to the first rail hook portion 14 and a second rail hook portion 32 can be disposed on both side walls thereof. Therefore, during assembly, the first rail hook portion 14 can be first slid into the second rail hook portion 32 by sliding, and the first rail hook portion 14 and the second rail hook portion 32 are hooked. The fixing is performed, and then the third combining portion 22 is combined with the fourth combining portion 31. The one end of the first rail hook portion 14 (adjacent to one end of the fourth assembly portion 31 after assembly) may have a structure such as chamfering to facilitate the sliding of the first rail hook portion 14 into the second rail hook portion 32.

須特別說明的是,各金屬屋瓦組1可再利用額外的第一支架20及金屬筒瓦30作並排連接,且各金屬屋瓦組1可透過現有的金屬板瓦10作串連連接。以下將對各金屬屋瓦組1的串接連接作進一步說明。 It should be particularly noted that each metal roof tile group 1 can be reused by using the additional first bracket 20 and the metal tile 30 for side-by-side connection, and each metal roof tile group 1 can be connected in series through the existing metal tile 10 . The series connection of each metal roof tile group 1 will be further described below.

如第3圖所示,其中,各金屬板瓦10之另一端具有一第一端部及各金屬板瓦10之一端具有一第二端部,而第一端部具有一第一搭接邊12,第二端部具有相反於第一搭接邊12之一第二搭接邊13。也就是說,第一搭接邊12可為向下彎折的折邊,而第二搭接邊13可為向上彎折的折邊,且第一搭接邊12略突出於金屬板瓦10之本體之外。因此,其中各金屬屋瓦組1的串接連接時,即將金屬板瓦10沿端部方向搭接;即,由第一搭接邊12搭接至第二搭接邊13。 As shown in FIG. 3, the other end of each of the metal shingles 10 has a first end portion and one end of each of the metal shingles 10 has a second end portion, and the first end portion has a first overlapping edge 12, The second end has a second overlapping edge 13 opposite one of the first overlapping edges 12. That is, the first lap edge 12 may be a downwardly bent hem, and the second lap edge 13 may be an upwardly bent hem, and the first lap edge 12 slightly protrudes from the metal tile 10 Outside the body. Therefore, when the metal roof tiles 1 are connected in series, the metal tile 10 is overlapped in the end direction; that is, the first overlapping edge 12 is overlapped to the second overlapping edge 13.

值得一提的是,第二搭接邊13為往上彎折的折邊,且第二搭接邊13連接金屬板瓦10之兩內側壁。因此,在下雨時,雨水會淋至金屬板瓦10與金屬筒瓦30上。在金屬筒瓦30方面,金屬筒瓦30上的雨水會順著金屬筒瓦30的外形流至金屬板瓦10上,而在金屬板瓦10方面,由於第二搭接邊13連接金屬板瓦10之兩內側壁,因此金屬板瓦10的雨水不會由搭接處流至房屋,可接續的流至下一個金屬板瓦10。另外,第一搭接邊12與第二搭接邊13可分別具有一反折邊121、131,以更進一步防止雨方由搭接處流至房屋。藉此,本發明之金屬屋瓦組1可有效的達到防漏水的目的。 It is worth mentioning that the second overlapping edge 13 is a folded edge that is bent upward, and the second overlapping edge 13 is connected to the two inner side walls of the metal tile 10 . Therefore, when it rains, rainwater will drip onto the metal tile 10 and the metal tile 30. In the case of the metal can 30, the rainwater on the metal tile 30 flows along the outer shape of the metal tile 30 to the metal tile 10, and in the metal tile 10, since the second overlapping edge 13 connects the two inner side walls of the metal tile 10, Therefore, the rainwater of the metal tile 10 does not flow from the lap to the house, and can continue to flow to the next metal tile 10. In addition, the first lap edge 12 and the second lap edge 13 respectively have a reverse edge 121, 131 to further prevent the rain from flowing from the lap to the house. Thereby, the metal roof tile set 1 of the present invention can effectively achieve the purpose of preventing water leakage.

另一方面,就金屬筒瓦30間的串接而言,金屬筒瓦30之一端(具有第四組合部31之一端)可呈略為下陷狀(或類似於階梯狀),插入另一個金屬筒瓦30之另一端,且插入其第二滑軌勾部32,藉此可覆 蓋住第三組合部22與第四組合部31之結合處,並具有固定之作用。為便於組裝,金屬筒瓦30之一端可具有倒角等結構,以便於金屬筒瓦30之一端插入另一金屬筒瓦30的第二滑軌勾部32。 On the other hand, in the case of the series connection between the metal shingles 30, one end of the metal shingle 30 (having one end of the fourth combining portion 31) may be slightly depressed (or similar to a stepped shape), inserted into the other metal shingle 30. The other end is inserted into its second rail hook portion 32, thereby covering The joint of the third combination portion 22 and the fourth combination portion 31 is covered and has a function of fixing. For ease of assembly, one end of the metal can 30 may have a chamfered structure to facilitate insertion of one end of the metal can 30 into the second rail hook 32 of the other metal can 30.

值得一提的是,第三組合部22與第四組合部31主要可以兩種方式作為實施,以下將分別進行說明。 It is to be noted that the third combining unit 22 and the fourth combining unit 31 can be mainly implemented in two ways, which will be separately described below.

請參閱第4圖,其係為本發明之金屬屋瓦組之第一支架與金屬筒瓦的組合一實施例示意圖。如圖所示,第一支架20的第三組合部22及金屬筒瓦30的第四組合部31可為圓孔結構。因此,作業人員可簡單的藉由固定元件9穿過第三組合部22及第四組合部31,即可使第三組合部22與第四組合部31結合。藉此簡單的施工工序,可減少作業人員的作業時間及人力。 Please refer to FIG. 4 , which is a schematic diagram of an embodiment of a combination of a first bracket and a metal tubular tile of the metal roof tile set of the present invention. As shown, the third combination portion 22 of the first bracket 20 and the fourth combination portion 31 of the metal can 30 may have a circular hole structure. Therefore, the operator can simply join the third combining portion 22 and the fourth combining portion 31 by the fixing member 9 passing through the third combining portion 22 and the fourth combining portion 31. This simple construction process can reduce the working time and manpower of the workers.

請參閱第5圖,其係為本發明之金屬屋瓦組之第一支架與金屬筒瓦的組合另一實施例示意圖。如圖所示,第一支架20的第三組合部22,其可為一插銷,而金屬筒瓦30的第四組合部31可為一孔狀結構,且較佳地為部分區域下凹的孔狀結構。因此,作業人員僅須使由第三組合部22的插銷插入第四組合部31的孔狀結構,即可使第三組合部22與第四組合部31結合。藉此可更進一步的減少作業人員的工序,及固定元件9的使用,從而有效的減少作業時間、人力及相關材料(如固定元件9)的費用。 Please refer to FIG. 5, which is a schematic view of another embodiment of the combination of the first bracket and the metal cylinder of the metal roof tile of the present invention. As shown, the third combination portion 22 of the first bracket 20 can be a latch, and the fourth combination portion 31 of the metal can 30 can be a hole-like structure, and preferably a recessed portion in a partial region. Structure. Therefore, the operator only needs to insert the pin of the third combining portion 22 into the hole-like structure of the fourth combining portion 31, so that the third combining portion 22 and the fourth combining portion 31 can be coupled. Thereby, the workman's process and the use of the fixing member 9 can be further reduced, thereby effectively reducing the work time, manpower, and the cost of related materials (such as the fixing member 9).

當金屬屋瓦組1位於屋簷時,其可再包含一第二支架40、勾頭件50與滴水瓦60。以下將作進一步說明。 When the metal roof tile group 1 is located in the eaves, it may further include a second bracket 40, a hook member 50 and a drip tile 60. Further explanation will be given below.

請參閱第6圖,其係為本發明之第二支架、金屬筒瓦與勾頭件的組合示意圖。如圖所示,當金屬屋瓦組1位於屋簷時,其可再包含一第二支架40、勾頭件50與滴水瓦60。其中,第二支架40可為倒U字型結構,且較佳地可向一端面方向進一步彎折,而形成近似於倒U字型的罩狀結構,從而可增加其整體的結構強度。另外,第二支架40之兩側可分別具有一第五組合部41,而第二支架40之頂部可具有一第六組合部42。勾頭件50可為圓形罩體,勾頭件50之頂部對應第六組合部42具有第七組合部51。組合時,第二支架40位於金屬筒瓦30之另一端,即屋簷突出的一端。組裝時,作業人員可利用固定元件9使第二支架40的第五組合部41與金屬板瓦10的第一組合部11組合,例如固定元件9貫穿金屬板瓦10之第一組合部11處的壁面,並穿過第二支架40的第五組合部41,以將二者固定。接著,使第二支架40的第六組合部42與勾頭件50的第七組合部51組合。而滴水瓦60係設置於金屬板瓦10之另一端(具有第一搭接邊12的一端)。 Please refer to FIG. 6 , which is a schematic diagram of the combination of the second bracket, the metal tube and the hook head of the present invention. As shown, when the metal roof tile group 1 is located in the eaves, it may further include a second bracket 40, a hook member 50 and a drip tile 60. The second bracket 40 can be an inverted U-shaped structure, and is preferably further bent toward an end surface to form a cover-like structure similar to an inverted U-shape, thereby increasing the overall structural strength. In addition, the two sides of the second bracket 40 may have a fifth combination portion 41, and the top of the second bracket 40 may have a sixth combination portion 42. The hook member 50 may be a circular cover, and the top portion of the hook member 50 has a seventh combination portion 51 corresponding to the sixth combination portion 42. When assembled, the second bracket 40 is located at the other end of the metal tile 30, that is, the protruding end of the eaves. When assembled, the operator can combine the fifth combination portion 41 of the second bracket 40 with the first combination portion 11 of the metal tile 10 by means of the fixing member 9, for example, the fixing member 9 penetrates the wall at the first combination portion 11 of the metal tile 10. And passing through the fifth combination portion 41 of the second bracket 40 to fix the two. Next, the sixth combining portion 42 of the second bracket 40 is combined with the seventh combining portion 51 of the hook member 50. The drip tile 60 is disposed at the other end of the metal tile 10 (having one end of the first overlapping edge 12).

須特別說明的是,第五組合部41較佳地可為長條狀的缺口,以供作業人員簡單地使固定元件9穿過並固定。此外,第六組合部42與第七組合部51結合,可如同第三組合部22與第四組合部31一般地主要可以兩種方式作為實施。其一,即如第4圖所示的,第六組合部42與第七組合部51皆可為圓孔,因此,作業人員可簡單的藉由固定元件9穿過第六組合部42與第七組合部51,即可使第六組合部42與第七組合部51結合。藉此簡單的施工工序,可減少作業人員的作業時間及人力。其另一,即如第5圖所示的,第六組合部42可為插銷,而第七組合部51可為一孔狀結構,且較佳地為部分區域下凹的孔狀結構。因此,作業人員僅須使由第 六組合部42的插銷插入第七組合部51的孔狀結構,即可使第六組合部42與第七組合部51結合,以減少作業人員的工序,及固定元件9的使用,從而有效的減少作業時間、人力及相關材料(如固定元件9)的費用。 It should be particularly noted that the fifth combination portion 41 is preferably an elongated notch for the operator to simply pass and fix the fixing member 9. Further, the sixth combining portion 42 is combined with the seventh combining portion 51, and the third combining portion 22 and the fourth combining portion 31 can be implemented mainly in two main ways. For example, as shown in FIG. 4, the sixth combining portion 42 and the seventh combining portion 51 can both be circular holes, so that the operator can simply pass through the sixth combining portion 42 and the fixing member 9 by the fixing member 9. The seventh combining portion 51 can be combined with the seventh combining portion 51. This simple construction process can reduce the working time and manpower of the workers. Alternatively, as shown in Fig. 5, the sixth combining portion 42 may be a pin, and the seventh combining portion 51 may be a hole-like structure, and is preferably a hole-like structure having a concave portion in a partial region. Therefore, the operator only has to make The pin of the sixth combining portion 42 is inserted into the hole-like structure of the seventh combining portion 51, so that the sixth combining portion 42 and the seventh combining portion 51 can be combined to reduce the number of steps of the worker and the use of the fixing member 9, thereby being effective. Reduce the cost of working hours, manpower and related materials (such as fixed components 9).

由上述之說明可知,本發明之金屬屋瓦組,其藉由預定配置的金屬板瓦、支架及金屬筒瓦的組合,從而可有效的減少工序,而可減少時間跟人力。並且,藉由金屬板瓦、各支架與金屬筒瓦的配置,特別是金屬板瓦具有特定的搭接邊,從而可達到防止漏水之目的。 As can be seen from the above description, the metal roof tile set of the present invention can effectively reduce the number of processes by a combination of a predetermined arrangement of the metal tile, the bracket and the metal can, thereby reducing time and labor. Moreover, the arrangement of the metal slabs, the brackets and the metal slats, in particular the metal slabs, has a specific overlapping edge, so that the purpose of preventing water leakage can be achieved.

以上所述僅為舉例性,而非為限制性者。任何未脫離本發明之精神與範疇,而對其進行之等效修改或變更,均應包含於後附之申請專利範圍中。 The above is intended to be illustrative only and not limiting. Any equivalent modifications or alterations to the spirit and scope of the invention are intended to be included in the scope of the appended claims.

1‧‧‧金屬屋瓦組 1‧‧‧Metal roofing

10‧‧‧金屬板瓦 10‧‧‧Metal slab

11‧‧‧第一組合部 11‧‧‧First Combination Department

12‧‧‧第一搭接邊 12‧‧‧ first lap joint

13‧‧‧第二搭接邊 13‧‧‧second lap joint

121、131‧‧‧反折邊 121, 131‧‧‧ anti-folding

14‧‧‧第一滑軌勾部 14‧‧‧First rail hook

20‧‧‧第一支架 20‧‧‧First bracket

21‧‧‧第二組合部 21‧‧‧ Second Combination Department

22‧‧‧第三組合部 22‧‧‧ Third Combination Department

30‧‧‧金屬筒瓦 30‧‧‧metal canopy

31‧‧‧第四組合部 31‧‧‧ Fourth Combination Department

32‧‧‧第二滑軌勾部 32‧‧‧Second rail hook

Claims (12)

一種金屬屋瓦組,係包含:複數個金屬板瓦,各該金屬板瓦由端部觀之係為U字型結構,各該金屬板瓦之兩側的邊緣係設有一第一組合部;一第一支架,係為倒U字型結構,該第一支架之兩側分別設置有一第二組合部,且該第二組合部對應於該第一組合部,該第一支架之頂部係設有一第三組合部,當該複數個金屬板瓦並排設置時,該第一支架係位於該複數個金屬板瓦之間;以及一金屬筒瓦,係為倒U字型結構,該金屬筒瓦之一端的頂部係設有一第四組合部,當該複數個金屬板瓦並排設置時,該金屬筒瓦係設置於各該金屬板瓦之兩側的側邊及該第一支架上;其中,藉由固定元件使該第一組合部與該第二組合部組合,且該第三組合部與該第四組合部結合,以將該複數個金屬板瓦、該第一支架與該金屬筒瓦固定為該金屬屋瓦組;其中各該金屬板瓦之另一端具有一第一端部及各該金屬板瓦之一端具有一第二端部,該第一端部係具有一第一搭接邊,該第二端部係具有相反於該第一搭接邊之一第二搭接邊,其中該複數個金屬板瓦沿端部方向搭接時,藉由該第一搭接邊與該第二搭接邊進行搭接,該第一搭接邊及該第二搭接邊分別具有一反折邊。 A metal roofing tile group comprising: a plurality of metal slabs, each of which has a U-shaped structure, wherein the edges of the two sides of the metal slab are provided with a first combination portion; The bracket is an inverted U-shaped structure, and a second combining portion is disposed on each side of the first bracket, and the second combining portion corresponds to the first combining portion, and a top portion of the first bracket is provided with a third portion a combination portion, when the plurality of metal slabs are arranged side by side, the first bracket is located between the plurality of metal slabs; and a metal slab is an inverted U-shaped structure, and a top of one end of the metal lining is provided with a a fourth combination portion, when the plurality of metal slabs are arranged side by side, the metal lining is disposed on a side of each of the two sides of the metal slab and the first bracket; wherein the first combination portion is fixed by a fixing component Combining with the second combination portion, and the third combination portion is combined with the fourth combination portion to fix the plurality of metal slabs, the first bracket and the metal sleeve to the metal roof tile group; wherein each of the metal The other end of the tile a first end portion and one end of each of the metal shingles have a second end portion, the first end portion having a first overlapping edge, the second end portion having one opposite to the first overlapping edge a second lap joint, wherein the plurality of slabs are overlapped in the end direction, and the first lap joint is overlapped with the second lap edge, the first lap edge and the second lap The edges have an inverted edge. 如申請專利範圍第1項所述的金屬屋瓦組,其中該第二搭接邊係為往上彎折的折邊,且該第二搭接邊連接該金屬板瓦之兩內側壁。 The metal roof tile group of claim 1, wherein the second overlapping edge is a folded upper edge, and the second overlapping edge is connected to the inner side walls of the metal tile. 如申請專利範圍第1項所述的金屬屋瓦組,其中該第三組合部係包含一插銷,該第四組合部係為一孔狀結構,藉由該插銷插入該孔狀結構,以使該第三組合部與該第四組合部結合。 The metal roof tile set according to claim 1, wherein the third combination portion comprises a plug, and the fourth assembly portion is a hole-shaped structure, and the plug is inserted into the hole-shaped structure, so that The third combination portion is combined with the fourth combination portion. 如申請專利範圍第1項所述的金屬屋瓦組,其中該第三組合部及該第四組合部係為圓孔,藉由固定元件穿過該第三組合部及該第四組合部,以使該第三組合部與該第四組合部結合。 The metal roof tile group according to claim 1, wherein the third combination portion and the fourth combination portion are circular holes, and the fixing member passes through the third combination portion and the fourth combination portion. The third combination portion is combined with the fourth combination portion. 如申請專利範圍第1項所述的金屬屋瓦組,其中該第一組合部包含長條狀的缺口。 The metal roof tile set according to claim 1, wherein the first combination portion comprises a long strip-shaped notch. 如申請專利範圍第5項所述的金屬屋瓦組,其中該第二組合部包含長條狀的缺口。 The metal roof tile set of claim 5, wherein the second combination portion comprises a long strip-shaped notch. 如申請專利範圍第1項所述的金屬屋瓦組,其中更包含一第二支架及一勾頭件,該第二支架係為倒U字型結構,該勾頭件係為圓罩狀結合,該勾頭件係位於該金屬筒瓦之另一端,且套設於該第二支架。 The metal roof tile group according to claim 1, further comprising a second bracket and a hook head, wherein the second bracket is an inverted U-shaped structure, and the hook head is a double-shaped joint The hook member is located at the other end of the metal tube and is sleeved on the second bracket. 如申請專利範圍第7項所述的金屬屋瓦組,其中該第二支架之兩側分別具有一第五組合部,該第二支架之頂部係具有一第六組合部,該勾頭件之頂部具有一第七組合部,其中藉由固定元件使該第一組合部與該第五組合部結合,而該第六組合部與該第七組合部組裝結合。 The metal roof tile group of claim 7, wherein the second bracket has a fifth combination portion on each side of the second bracket, and the second bracket has a sixth combination portion on the top of the second bracket. The top portion has a seventh combination portion, wherein the first combination portion is combined with the fifth combination portion by a fixing member, and the sixth combination portion is assembled with the seventh combination portion. 如申請專利範圍第8項所述的金屬屋瓦組,其中該第六組合部係包含一插銷,該第七組合部係為一孔狀結構,藉由該插銷插入該孔狀結構,以使該第六組合部與該第七組合部結合。 The metal roof tile group according to claim 8, wherein the sixth combination portion comprises a plug, and the seventh assembly portion is a hole-shaped structure, and the plug is inserted into the hole-shaped structure, so that The sixth combination portion is combined with the seventh combination portion. 如申請專利範圍第8項所述的金屬屋瓦組,其中該第六組合部及該第七組合部係為圓孔,藉由固定元件穿過該第六組合部及該第七組合部,以使該第六組合部與該第七組合部結合。 The metal roof tile group of claim 8, wherein the sixth combination portion and the seventh combination portion are circular holes, and the fixing member passes through the sixth assembly portion and the seventh combination portion. The sixth combination portion is combined with the seventh combination portion. 如申請專利範圍第8項所述的金屬屋瓦組,其中該第五組合部係為長條狀的缺口。 The metal roof tile group of claim 8, wherein the fifth combination portion is a long strip-shaped notch. 如申請專利範圍第1項所述的金屬屋瓦組,其中該金屬板瓦更包含二第一滑軌勾部,其分別設置於該金屬板瓦之兩內側壁,該金屬筒瓦更包含二第二滑軌勾部,其分別設置於該金屬筒瓦之兩內側壁,於組裝時,該金屬筒瓦之該二第二滑軌勾部分別滑動對勾於該第一支架之兩側的二該金屬板瓦的其中一該第一滑軌勾部。 The metal roof tile group of claim 1, wherein the metal tile further comprises two first rail hook portions respectively disposed on two inner side walls of the metal tile, the metal tubular tile further comprising two second sliding blocks. The rail hook portions are respectively disposed on the inner side walls of the metal tube. When assembled, the two second rail hook portions of the metal tube slide respectively on the two metal sheets of the two sides of the first bracket. One of the first rail hooks.
TW104137771A 2015-11-16 2015-11-16 Metal roofing tile assembly TWI579442B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
TW104137771A TWI579442B (en) 2015-11-16 2015-11-16 Metal roofing tile assembly
CN201621230523.6U CN206267426U (en) 2015-11-16 2016-11-16 Metal roof tile set
CN201611007960.6A CN106948552A (en) 2015-11-16 2016-11-16 Metal roof tile set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW104137771A TWI579442B (en) 2015-11-16 2015-11-16 Metal roofing tile assembly

Publications (2)

Publication Number Publication Date
TWI579442B true TWI579442B (en) 2017-04-21
TW201718992A TW201718992A (en) 2017-06-01

Family

ID=59241168

Family Applications (1)

Application Number Title Priority Date Filing Date
TW104137771A TWI579442B (en) 2015-11-16 2015-11-16 Metal roofing tile assembly

Country Status (1)

Country Link
TW (1) TWI579442B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886447B (en) * 2010-08-12 2012-06-27 中国建筑股份有限公司 Al-Mg-Mn alloy plate archaizing roof tile and manufacturing method thereof
CN204753826U (en) * 2015-07-07 2015-11-11 浙江精工钢结构集团有限公司 Joint construction of unit formula precast concrete outer wall and steel construction building

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886447B (en) * 2010-08-12 2012-06-27 中国建筑股份有限公司 Al-Mg-Mn alloy plate archaizing roof tile and manufacturing method thereof
CN204753826U (en) * 2015-07-07 2015-11-11 浙江精工钢结构集团有限公司 Joint construction of unit formula precast concrete outer wall and steel construction building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
行政院公共工程委員會施工綱要規範第05090章金屬接合 V3.0 2003/09/01 *

Also Published As

Publication number Publication date
TW201718992A (en) 2017-06-01

Similar Documents

Publication Publication Date Title
US10196807B2 (en) Snap-in structure of aluminum alloy wallboard, roof panel, and corner-connecting materials
US20170145695A1 (en) Metal Roof Shingle System and Method of Installation
TWI579442B (en) Metal roofing tile assembly
TWM521099U (en) Metal roofing tile assembly
KR101570104B1 (en) Finishing materials for roof and outer wall of structure
TWI359225B (en)
US20130055652A1 (en) Joinable sheet metal profile for roof gable end
CN207776278U (en) Ultralight steel profile for connecting arc tile
CN106948552A (en) Metal roof tile set
DK2474678T3 (en) Device for covering of a building and bricks to cover means
JP5780163B2 (en) Roofing structure
JP6291456B2 (en) Keraba cap for horizontal roof and roof structure using the same
JP6392571B2 (en) Vertical facing exterior structure
TWM576185U (en) Metal roofing shingle set
KR101303057B1 (en) The rain leader gutter assembly for rainwater drain and thereof construction method
CN211647152U (en) Go out roofing flue mouth and hide rain structure
JP4130819B2 (en) Safety bracket mounting structure on the roof
JP2018053516A (en) Connection structure for metallic vertical roofing material
RU100105U1 (en) ROOF AND WALL PANEL JOINT ASSEMBLY
KR101378976B1 (en) The Eaves Cap For Roof Of House
TWM406631U (en) roof board
JP2017066741A (en) Verge structure of building and verge processing method of building
CN204475684U (en) Ridge tiles
IT201700020762A1 (en) Modular metal element for watertight covering of roofs and building facades
RU142711U1 (en) FASTENING ASSEMBLY

Legal Events

Date Code Title Description
MC4A Revocation of granted patent