CN106948552A - Metal roof tile set - Google Patents

Metal roof tile set Download PDF

Info

Publication number
CN106948552A
CN106948552A CN201611007960.6A CN201611007960A CN106948552A CN 106948552 A CN106948552 A CN 106948552A CN 201611007960 A CN201611007960 A CN 201611007960A CN 106948552 A CN106948552 A CN 106948552A
Authority
CN
China
Prior art keywords
tile
metal
combination section
pan
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611007960.6A
Other languages
Chinese (zh)
Inventor
王荣贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Polynum Enterprise Co ltd
Original Assignee
Polynum Enterprise Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from TW104137771A external-priority patent/TWI579442B/en
Priority claimed from TW105212029U external-priority patent/TWM534209U/en
Application filed by Polynum Enterprise Co ltd filed Critical Polynum Enterprise Co ltd
Publication of CN106948552A publication Critical patent/CN106948552A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/02Grooved or vaulted roofing elements
    • E04D1/06Grooved or vaulted roofing elements of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a metal roof tile set, which comprises a plurality of metal plate tiles, a first bracket and a metal cylindrical tile. The metal plate tile is of a U-shaped structure, and the first support and the metal cylindrical tile are of an inverted U-shaped structure. The two sides of each metal plate tile are provided with a first combination part, the two sides of the first support are provided with a second combination part, and the metal plate tiles are positioned on the two sides of the first support. The top of the first support is provided with a third combination part, and the top of the metal cylindrical tile is provided with a fourth combination part. The first combination part and the second combination part are combined by the fixing component, and the third combination part and the fourth combination part are combined to fix the plurality of metal plate tiles, the first support and the metal cylindrical tiles into the metal roof tile group.

Description

Metal roofing tile group
Technical field
The invention relates to a kind of roofing tile, in particular to the metal house of a kind of utilization metal pan tile and metal semicircular tile Watt group.
Background technology
By Gu so far, temple is to use roofing tile as roof mostly, and with Chinese style or oriental general house among the people Also roof can be used as from roofing tile.So, because the material of conventional roofing tiles is excessively heavy, often resulted in by its long-term pressure month after month The infringement deformation of roof structure, or even damage building in itself, therefore many temples have gradually been changed to using by putting down at present The metal tile constituted watt is combined with semicircular tile.
Wait to improve however, still there being some shortcoming poles in the prior art.For example, existing metal semicircular tile is with putting down Watt combination, the problem of having leak mostly, therefore combination and roof structure face of the waterproof layer in semicircular tile and plain tile must be set Between layer.In addition, semicircular tile is with plain tile, the process when combining, assembling is quite numerous and diverse, so as to cause the consuming of time and manpower.
Described before taking a broad view of, the present inventor devises a kind of metal roofing tile group through concentrating on studies for many years, with for existing The missing for having technology is improved, and then the implementation in enhancement industry is utilized.
The content of the invention
In view of above-mentioned problem of the prior art, the purpose of the present invention is exactly to provide a kind of metal roofing tile group, to solve The problem of above-mentioned prior art is to be improved.
According to the purpose of the present invention there is provided a kind of metal roofing tile group, it includes multiple metal pan tiles, first support and metal Semicircular tile.It is U-shaped structure when each metal pan tile is seen by end, the edge of the both sides of each metal pan tile is provided with one first combination section. First support is inverted u-shaped structure, and the both sides of first support are respectively arranged with one second combination section, and the second combination section corresponds to First combination section, the top of first support is provided with one the 3rd combination section;When multiple metal pan tiles are arranged side by side, first support position Between multiple metal pan tiles.Metal semicircular tile is inverted u-shaped structure, and the top of one end of metal semicircular tile is provided with one the 4th combination Portion;When multiple metal pan tiles are arranged side by side, metal semicircular tile is arranged at side and the first support of the both sides of each metal pan tile.Its In, the first combination section is combined with the second combination section by fixation kit, and the 3rd combination section is combined with the 4th combination section, will Multiple metal pan tiles, first support and metal semicircular tile are fixed as metal roofing tile group.
Preferably, there is the other end of each metal pan tile one end of a first end and each metal pan tile to have one the Two ends;First end has one first overlap edge, and the second end has one second overlap edge in contrast to the first overlap edge;Its In multiple metal pan tiles along end direction overlap when, overlapped by the first overlap edge with the second overlap edge, the second overlap edge For the flanging up bent, and the second overlap edge connects two madial walls of metal pan tile.
Preferably, the 3rd combination section can include a latch, and the 4th combination section can be a cavernous structure, by latch patchhole Shape structure, so that the 3rd combination section is combined with the 4th combination section;Either, the 3rd combination section and the 4th combination section can be circular hole, The 3rd combination section and the 4th combination section are passed through by fixation kit, so that the 3rd combination section is combined with the 4th combination section.
Preferably, the first combination section can include the breach of strip, and the second combination section can include the breach of strip.
Preferably, it can more include a second support and an eave tile part, and second support is inverted u-shaped structure, and eave tile part is Dome shape structure, eave tile part is located at the other end of metal semicircular tile, and is sheathed on second support.
Preferably, the both sides of second support have one the 5th combination section respectively, and the top of second support has one the 6th group Conjunction portion, the top of eave tile part has one the 7th combination section, wherein making the first combination section and the 5th combination section group by fixation kit Close, and the 6th combination section is combined with the 7th combination section.
Preferably, the 6th combination section can include a latch, and the 7th combination section can be a cavernous structure, by latch patchhole Shape structure, so that the 6th combination section is combined with the 7th combination section;Either, the 6th combination section and the 7th combination section can be circular hole, The 6th combination section and the 7th combination section are passed through by fixation kit, so that the 6th combination section is combined with the 7th combination section.
Preferably, the 5th combination section can be the breach of strip.
Preferably, metal pan tile further includes 2 first slide rail hook parts, and it is respectively arranged at two madial walls of metal pan tile, gold Category semicircular tile further includes 2 second slide rail hook parts, and it is respectively arranged at two madial walls of metal semicircular tile, when assembling, metal semicircular tile Slide respectively to hooking in the wherein one first slide rail hook part of two metal pan tiles of the both sides of first support 2 second slide rail hook parts.
According to the purpose of the present invention, a kind of metal roofing tile group is separately provided, it includes multiple metal cylinder pan tiles and at least 1 the One support.Multiple metal cylinder pan tiles include metal pan tile and metal semicircular tile respectively.Metal pan tile by end see be U-shaped knot Structure, the side of metal pan tile is provided with one first slide rail hook part, and metal semicircular tile is inverted u-shaped structure, the side one of metal semicircular tile The body formed opposite side for being connected to metal pan tile, and the opposite side of metal semicircular tile has one second slide rail hook part.At least 1 One support is arranged in metal semicircular tile to support metal semicircular tile.Wherein, when multiple metal cylinder pan tiles are connected side by side, wherein a gold medal Second slide rail hook part hook of the metal semicircular tile of category cylinder pan tile is in the first slide rail hook part of the metal pan tile of another metal cylinder pan tile.
Preferably, one end that the other end of metal pan tile has a first end and metal pan tile has a second end, First end has one first overlap edge, and the second end has one second overlap edge in contrast to the first overlap edge, plurality of Metal cylinder pan tile along end direction overlap when, overlapped by the first overlap edge with the second overlap edge, the second overlap edge is past The flanging of upper bending, and the second overlap edge connects two madial walls of metal pan tile.
Preferably, a link position of two madial walls of the second overlap edge connection metal pan tile is equal to or higher than metal pan tile With the connecting line of the integrally formed connection of metal semicircular tile.
Preferably, first support is inverted u-shaped shape or Z-shaped shape, and roof is fixed in the bottom of first support, the The top of one support has one the 3rd combination section, and the wherein side of the another opposite sides of metal semicircular tile is provided with one the 4th combination section, by It is bound to the 4th combination section to fix metal semicircular tile in first support by the 3rd combination section.
Preferably, the 3rd combination section includes a latch, and the 4th combination section includes a cavernous structure, the latch of the 3rd combination section Insert the 4th combination section cavernous structure;Either, the 3rd combination section and the 4th combination section are circular hole, wherein being worn by fixation kit Cross the 3rd combination section and the 4th combination section.
Preferably, multiple metal cylinder pan tiles are respectively one first metal cylinder pan tile, one second metal cylinder pan tile, one the 3rd gold medal Belong to cylinder pan tile, one the 4th metal cylinder pan tile, fifth metal cylinder pan tile and one the 6th metal cylinder pan tile, in order will when assembling Second metal cylinder pan tile, which is connected to the first metal cylinder pan tile, has the side of the 4th combination section, and the 3rd metal cylinder pan tile is connected to The side of the metal pan tile of first metal cylinder pan tile, the second metal cylinder pan tile is connected to the 4th group by the 4th metal cylinder pan tile The side in conjunction portion, fifth metal cylinder pan tile is connected between the second metal cylinder pan tile and the 3rd metal cylinder pan tile, by the 6th gold medal Category cylinder pan tile is connected to the side of the metal pan tile of the 3rd metal cylinder pan tile.
Preferably, a second support and an eave tile part are further included, second support is inverted u-shaped structure, and eave tile part is dome Shape is combined, and eave tile part is located at the other end of metal semicircular tile, and is sheathed on second support.
In summary, metal roofing tile group of the invention, its by combinations of the above structure configuration, so as to effectively subtract Few process, and the time can be reduced with manpower.In addition, by the configuration of metal pan tile, each support and metal semicircular tile, particularly metal Pan tile has specific overlap edge, so that can reach prevents the purpose of leak.
For the above and other objects, features and advantages of the present invention can be become apparent, preferred embodiment cited below particularly, And coordinate institute's accompanying drawings, it is described in detail below.
Brief description of the drawings
1st figure is the exploded perspective view of the first embodiment of the metal roofing tile group of the present invention.
2nd figure is the combination diagram of the first embodiment of the metal roofing tile group of the present invention.
3rd figure is the schematic diagram of the metal pan tile of the first embodiment of the metal roofing tile group of the present invention.
4th figure is that the first support of the first embodiment of the metal roofing tile group of the present invention is combined kenel with the one of metal semicircular tile Schematic diagram.
5th figure is another mating type of the first support with metal semicircular tile of the first embodiment of the metal roofing tile group of the present invention State schematic diagram.
6th figure is the group of second support, metal semicircular tile and the eave tile part of the first embodiment of the metal roofing tile group of the present invention Close schematic diagram.
7th figure is the schematic diagram of the second embodiment of the metal roofing tile group of the present invention.
8th figure is the schematic diagram of the 3rd embodiment of the metal roofing tile group of the present invention.
9th figure is the schematic diagram of the fourth embodiment of the metal roofing tile group of the present invention.
Description of reference numerals:
1:Metal roofing tile group;A~F:Metal cylinder pan tile;10:Metal pan tile;11:First combination section;12:First overlap edge;13: Second overlap edge;121、131:Turn up hem;14:First slide rail hook part;20:First support;21:Second combination section;22:3rd group Conjunction portion;30:Metal semicircular tile;31:4th combination section;32:Second slide rail hook part;40:Second support;41:5th combination section;42: 6th combination section;50:Eave tile part;51:7th combination section;60:Drip-tile;9:Fixation kit.
Embodiment
Advantages of the present invention and feature and reach that its method will be carried out in more detail with reference to exemplary embodiments and accompanying drawing Describe and be easier to understand.However, the present invention can be realized and not it should be understood that being only limitted to set forth herein in different forms Embodiment.On the contrary, to those skilled in the art, this little embodiment provided will make this exposure more thoroughly with Scope of the invention is passed on comprehensively and intactly, and the present invention will only be that attached claims are defined.In figure, into Divide or the size and relative size of component represent in order to clear understandable in the method for lavishing praise on oneself.In entire description, identical component Symbol refers to identical component.As later used, term " and/or " comprising any and all one or more related listed The combination of object.
Unless otherwise defined, all terms (comprising science and technology and scientific terminology) being used in hereinafter have the skill with this area Typically the understood identical meaning of art personnel.Will more it will be appreciated that for example in defined in general used dictionary those Term should be understood there is the meaning consistent with the content of association area, and unless be significantly defined in hereinafter, will not be with mistake Degree idealization or the excessively formal meaning understand.
Illustrative embodiments are described in detail below in conjunction with accompanying drawing.However, these embodiments can be contained in different forms In, and it is not necessarily to be construed as limiting the scope of the claims of the present invention.The offer of these embodiments make it that the exposure of the present invention is complete Whole and bright Liao, those skilled int the art can understand scope of the invention via these embodiments.
The 1st, 2 figures are referred to, it is that the exploded perspective view of the first embodiment of the metal roofing tile group of the present invention and combination are shown It is intended to.As illustrated, metal roofing tile group 1 contains multiple metal pan tiles 10, first support 20 and metal semicircular tile 30.Wherein each Metal pan tile 10, substantially U-shaped structure, and the edge of the both sides of metal pan tile 10 can be respectively equipped with when it is seen by end One combination section 11.The edge of each side of metal pan tile 10 can the first combination section 11 can be the piece that up extends again respectively at two ends Body, and breach is set in lamellar body or breach is not provided with, or can be directly to be set at the edge of each side at the two ends of metal pan tile 10 Breach.Wherein set breach may preferably be the breach of strip.
In addition, first support 20 can integrally be bent and is made by metal material, it can be inverted u-shaped structure.Wherein, first The both sides of support 20 are respectively arranged with one second combination section 21, and the position of the second combination section 21 corresponds to the first combination section 11 Position.Preferably, the second combination section 21 can be breach, and can be the breach of strip.In addition, the top of first support 20 is provided with One the 3rd combination section 22.And metal semicircular tile 30 is inverted u-shaped structure, the top of one end of metal semicircular tile 30 is provided with one the 4th combination Portion 31, and the 4th combination section 31 position correspond to the 3rd combination section 22 position.
Incidentally, first support 20 is settable reinforced ribs, to increase the structural strength that its is overall, so as to suitable Locality support metal semicircular tile 30.And, first support 20 is mutually fixed with roof using its other party such as locking or weld, so as to make Metal roofing tile group 1 is appropriately secured to roof.
As shown in Figure 2, when by metal pan tile 10, the three's carry out group device of 20 and one metal semicircular tile of first support 30, two Individual metal pan tile 10 is located at the both sides of first support 20 respectively.Now, operating personnel can be first fixed by such as blind rivet or screw etc. Component 9(Fixation kit 9 is as depicted in the 4th figure)The first combination section 11 is set to be combined with the second combination section 21.Wherein, the first combination section 11 can be that if the first combination section 11 is does not have breach, fixation kit 9 can be by metal pan tile with breach or with breach 10 wall runs through makes the first combination section 11 be combined with the second combination section 21 again.If when the first combination section 11 and/or the second combination When portion 21 is the breach of strip, now the first combination section 11 can partly overlap with the second combination section 21 or fully overlap. Therefore it can be constructed beneficial to operating personnel, there is the roof of the temple of certain curve in particular for roof structure and can reduce The adjustment process such as breach contraposition.Then, metal semicircular tile 30 is arranged on two metal pan tiles 10 and first support 20, i.e., it is golden Category semicircular tile 30 is arranged on the side of the both sides of each metal pan tile 10 and first support 20, and by the 3rd combination section 22 and the 4th Combination section 31 is combined, so that metal semicircular tile 30 coats the side of the both sides of each metal pan tile 10 and first support 20.That is, metal Semicircular tile 30 will cover the first combination section 11 and the second combination section 21.
It is noted that two madial walls of metal pan tile 10 can be provided with one first slide rail hook part 14, in the present embodiment, It is arranged between two the first combination sections 11, but is not limited thereto.Corresponding, metal semicircular tile 30 corresponds to the first slide rail Hook part 14 and can be provided with one second slide rail hook part 32 in its two side.Therefore, in assembling, using the mode of slip, first make The second slide rail hook part 32 is slipped into first slide rail hook part 14, and 32 pairs of the first slide rail hook part 14 and the second slide rail hook part is hooked and is fixed, Then the 3rd combination section 22 is made to be combined with the 4th combination section 31 again.Wherein, one end of the first slide rail hook part 14(Neighbouring the after assembling One end of four combination sections 31)There can be the structures such as chamfering, in order to which the second slide rail hook part 32 is slipped into the first slide rail hook part 14.
It should be specified, each recycling extra first support 20 of metal roofing tile group 1 and metal semicircular tile 30 are made simultaneously Row connects, and each metal roofing tile group 1 can pass through existing metal pan tile 10 and be connected in series.Below will be to each metal roofing tile group 1 Concatenation connection be described further.
As shown in Figure 3, wherein, the other end of each metal pan tile 10 has the one of a first end and each metal pan tile 10 End has a second end, and first end has one first overlap edge 12, and the second end has in contrast to the first overlap edge 12 One second overlap edge 13.That is, the first overlap edge 12 can be the flanging that bends downwards, and the second overlap edge 13 can be to The flanging of upper bending, and the first overlap edge 12 slightly protrudes from the outer of the body of metal pan tile 10.Therefore, wherein each metal roofing tile group During 1 concatenation connection, i.e., metal pan tile 10 is overlapped along end direction;That is, overlapped by the first overlap edge 12 to the second overlap edge 13。
It is noted that the second overlap edge 13 is the flanging up bent, and the second overlap edge 13 connection metal pan tile 10 two madial walls.Therefore, when rainy, rainwater can be drenched to metal pan tile 10 and metal semicircular tile 30.At the aspect of metal semicircular tile 30, The rainwater of metal semicircular tile 30 can flow to metal pan tile 10 along the profile of metal semicircular tile 30, and in terms of metal pan tile 10, due to Two madial walls of the second overlap edge 13 connection metal pan tile 10, therefore the rainwater of metal pan tile 10 will not flow to room by lap-joint Room, what can be continued flow to next metal pan tile 10.In addition, the first overlap edge 12 can be anti-with one respectively with the second overlap edge 13 Flanging 121,131, further to prevent that rain side from flowing to house by lap-joint.Thereby, metal roofing tile group 1 of the invention can be effective The purpose for reaching preventing water leakage.
On the other hand, for the concatenation between metal semicircular tile 30, one end of metal semicircular tile 30(With the 4th combination section 31 One end)Can be in the shape that slightly sink(Or similar to stepped), insert the other end of another metal semicircular tile 30, and insert its second Slide rail hook part 32, can thereby cover the junction of the 3rd combination section 22 and the 4th combination section 31, and with fixed effect.For It is easy to assembling, one end of metal semicircular tile 30 there can be the structures such as chamfering, another metal is inserted in order to one end of metal semicircular tile 30 Second slide rail hook part 32 of semicircular tile 30.
Implement it is noted that the 3rd combination section 22 and the 4th combination section 31 can be mainly used as in two ways, below It will illustrate respectively.
The 4th figure is referred to, it is the first support and metal semicircular tile of the first embodiment of the metal roofing tile group of the present invention One combines kenel schematic diagram.As illustrated, the 3rd combination section 22 and the 4th combination section 31 of metal semicircular tile 30 of first support 20 It can be borehole structure.Therefore, operating personnel simply can pass through the 3rd combination section 22 and the 4th combination section by fixation kit 9 31, you can the 3rd combination section 22 is combined with the 4th combination section 31.Thereby simple working procedure, can reduce the work of operating personnel Industry time and manpower.
The 5th figure is referred to, it is the first support and metal semicircular tile of the first embodiment of the metal roofing tile group of the present invention Another combination kenel schematic diagram.As illustrated, the 3rd combination section 22 of first support 20, it can be a latch, and metal semicircular tile 30 the 4th combination section 31 can be a cavernous structure, and the preferably recessed cavernous structure in subregion.Therefore, operating personnel The cavernous structure that the 4th combination section 31 is inserted by the latch of the 3rd combination section 22 must only be made, you can make the 3rd combination section 22 and the 4th Combination section 31 is combined.The process that thereby can further reduce operating personnel, and fixation kit 9 use so that effectively Reduce activity duration, manpower and associated materials(Such as fixation kit 9)Expense.
When metal roofing tile group 1 is located at eaves, it can include a second support 40, eave tile part 50 and drip-tile 60 again.With Under will be described further.
The 6th figure is referred to, it is the second support of the first embodiment of the metal roofing tile group of the present invention, metal semicircular tile and hook The combination diagram of head.As illustrated, when metal roofing tile group 1 is located at eaves, it can include a second support 40, eave tile again Part 50 and drip-tile 60.Wherein, second support 40 can be inverted u-shaped structure, and preferably can be further curved to end face direction Folding, and the hood-like structure for being similar to inverted u-shaped is formed, so as to increase the structural strength that its is overall.In addition, second support 40 Both sides can have one the 5th combination section 41 respectively, and the top of second support 40 can have one the 6th combination section 42.Eave tile part 50 Can be circular cover body, top the 6th combination section 42 of correspondence of eave tile part 50 has the 7th combination section 51.During combination, second support 40 The one end protruded positioned at the other end of metal semicircular tile 30, i.e. eaves.During assembling, operating personnel can make second using fixation kit 9 5th combination section 41 of support 40 is combined with the first combination section 11 of metal pan tile 10, and for example fixation kit 9 runs through metal pan tile Wall at 10 the first combination section 11, and through the 5th combination section 41 of second support 40, the two is fixed.Then, make Combined with the 7th combination section 51 of eave tile part 50 6th combination section 42 of second support 40.And drip-tile 60 is arranged at metal pan tile 10 other end(One end with the first overlap edge 12).
It should be specified, the 5th combination section 41 may preferably be the breach of strip, for operating personnel simply Fixation kit 9 is set to pass through and fixed.In addition, the 6th combination section 42 is combined with the 7th combination section 51, can be such as the 3rd combination section 22 Usually mainly can be in two ways as implementation with the 4th combination section 31.First, being the 6th combination section as shown in Figure 4 42 and the 7th combination section 51 all can be circular hole, therefore, operating personnel can be simply by fixation kit 9 through the 6th combination section 42 With the 7th combination section 51, you can the 6th combination section 42 is combined with the 7th combination section 51.Thereby simple working procedure, can be reduced The activity duration of operating personnel and manpower.Its is another, i.e., as shown in Figure 5, and the 6th combination section 42 can be latch, and the 7th group Conjunction portion 51 can be a cavernous structure, and the preferably recessed cavernous structure in subregion.Therefore, operating personnel must only make by The latch of six combination sections 42 inserts the cavernous structure of the 7th combination section 51, you can make the 6th combination section 42 and the knot of the 7th combination section 51 The use of conjunction, the process to reduce operating personnel, and fixation kit 9, so as to effectively reduce activity duration, manpower and related material Material(Such as fixation kit 9)Expense.
Refer to the 7th figure and the 4th, 5 figures;7th figure is the schematic diagram of the second embodiment of the metal roofing tile group of the present invention.Such as Shown in figure, metal roofing tile group 1 contains one or more metal cylinder pan tiles A, at least a first support 20.In the present embodiment, it is It is easy to explanation, metal cylinder pan tile A is using one as aspect of demonstrating, and multiple metal cylinder pan tile A~F application will be in follow-up Embodiment in explain.
Wherein, metal cylinder pan tile A includes metal pan tile 10 and metal semicircular tile 30.Metal pan tile 10 by end see be U-shaped Type structure, the side of metal pan tile 10 is provided with one first slide rail hook part 14, and metal semicircular tile 30 is inverted u-shaped structure, metal cylinder Watts 30 integrally formed opposite side for being connected to metal pan tile 10 in side, and the opposite side of metal semicircular tile 30 has one second to slide Rail hook part 32.First support 20 is arranged to support metal semicircular tile 30 in metal semicircular tile 30, and it is support metal cylinder plate that it, which can also say, Watt A.
When in assembled side-by-side, make the wherein metal semicircular tile 30 of a metal cylinder pan tile A using sliding type second is slided The hook of rail hook part 32 is in the first slide rail hook part 14 of another metal cylinder pan tile A metal pan tile 10.Thereby, you can make two metals Cylinder pan tile A is stably fixed to together.
For further, inverted u-shaped shape and structure or Z-shaped that first support 20 can integrally be bent by metal material Type shape and structure.Roof is fixed in the bottom of first support 20, and the top of first support 20 has one the 3rd combination section 22, metal The wherein side of the another opposite sides of semicircular tile 30 can accordingly be provided with one the 4th combination section 31, and is bound to by the 3rd combination section 22 Four combination sections 31 are to fix metal semicircular tile 30 in first support 20, or can be described as fixing metal cylinder pan tile A in first support 20.
Incidentally, first support 20 is settable reinforced ribs, to increase the structural strength that its is overall, so as to suitable Locality support metal cylinder pan tile A.And, first support 20 is mutually fixed with roof using its other party such as locking or weld, so as to Metal roofing tile group 1 is set to be appropriately secured to roof.
As shown in Figure 4, the 3rd combination section 22 and the 4th combination section 31 can be circular hole.Therefore, operating personnel can be simple By the fixation kits such as blind rivet or screw 9 pass through the 3rd combination section 22 and the 4th combination section 31, you can make the 3rd combination section 22 Combined with the 4th combination section 31.Thereby simple working procedure, can reduce activity duration and the manpower of operating personnel.
As shown in Figure 5, the 3rd combination section 22 can be a latch, and the 4th combination section 31 can be a hole correspondingly Shape structure, and the preferably recessed cavernous structure in subregion.Therefore, operating personnel must only make inserting by the 3rd combination section 22 The cavernous structure of the 4th combination section 31 of pin insertion, you can make the 3rd combination section 22 be combined with the 4th combination section 31.Thereby can more it enter The process of the reduction operating personnel of one step, and fixation kit 9 use, so as to effectively reduce activity duration, manpower and correlation Material(Such as fixation kit 9)Expense.
It is worth special instruction, it can be in the shape that slightly sink that metal semicircular tile 30, which has one end of the 4th combination section 31,(Or it is similar It is stepped), so that the metal semicircular tile 30 of a metal cylinder pan tile A inserts another metal cylinder pan tile A metal semicircular tile 30, so that another Metal cylinder pan tile A metal semicircular tile 30 can cover metal cylinder pan tile A metal semicircular tile 30 and the junction of first support 20, with Reaching prevents the purpose of leak.
The 7th figure is referred to again.On the other hand, the other end of metal pan tile 10 has a first end, and it has one first Overlap edge 12, and one end of metal pan tile 10 has a second end, it has takes in contrast to the one second of the first overlap edge 12 Edge fit 13.Therefore, when multiple metal cylinder pan tile A are overlapped along end direction, by the first overlap edge 12 and the second overlap edge 13 Overlapped.That is, the first overlap edge 12 can be the flanging bent downwards, and the second overlap edge 13 can be folded upward at Flanging, and the first overlap edge 12 slightly protrudes from the outer of the body of metal pan tile 10.Therefore, wherein each metal cylinder pan tile A concatenation During connection, i.e., metal pan tile 10 is overlapped along end direction;That is, overlapped by the first overlap edge 12 to the second overlap edge 13.
It should be specified, the second overlap edge 13 is the flanging up bent, and the second overlap edge 13 connects metallic plate Watts 10 two madial walls.Preferably, a link position of two madial walls of the second overlap edge 13 connection metal pan tile 10 be equal to or Higher than metal pan tile 10 and the connecting line of the integrally formed connection of metal semicircular tile 30;Wherein, connecting line is imaginary line.Therefore, When rainy, rainwater can be drenched to metal pan tile 10 and metal semicircular tile 30.At the aspect of metal semicircular tile 30, the rainwater meeting of metal semicircular tile 30 Metal pan tile 10 is flow to along the profile of metal semicircular tile 30, and at the aspect of metal pan tile 10, because the second overlap edge 13 connects gold Belong to two madial walls of pan tile 10, therefore the rainwater of metal pan tile 10 will not flow to house by lap-joint, flowing to for can continuing is next Individual metal pan tile 10.In addition, the first overlap edge 12 and the second overlap edge 13 can have a Turn up hem respectively, further to prevent Rain side flow to house by lap-joint.
Deserve particular mention, metal cylinder pan tile A can further use a small pot with a handle and a spout for boiling water or herbal medicine 70, to be more securely fixed on room Roof is fixed on top, wherein small pot with a handle and a spout for boiling water or herbal medicine 70, and a hook part hook of small pot with a handle and a spout for boiling water or herbal medicine 70 is in the second overlap edge 13 or the first slide rail hook part 14, in In the present embodiment, small pot with a handle and a spout for boiling water or herbal medicine 70 using hook in the second overlap edge 13 as demonstration aspect, but be not limited.
It will be described further when will be assembled below to multiple metal cylinder pan tile A~F.
The 8th figure is referred to, it is the schematic diagram of the second embodiment of the metal roofing tile group of the present invention.It is many in the present embodiment The individual metal cylinder pan tile A of metal cylinder pan tile using first to the 6th~F is not limited thereto as demonstration aspect, but its quantity.
As illustrated, when assembling, sequentially should preferably be assembled the first to the 6th metal cylinder pan tile A~F, and its In include the assembling of first support 20 certainly, and the assembling instruction of first support 20, i.e., as described above, just no longer being gone to live in the household of one's in-laws on getting married in this State.Similarly, the thin portion assembling instruction between metal cylinder pan tile as also described above, is just not repeated here in this.
First, the second metal cylinder pan tile B is connected into the first metal cylinder pan tile A has the side of the 4th combination section 31;Connect , the 3rd metal cylinder pan tile C is connected to the side of the first metal cylinder pan tile A metal pan tile 10;Followed by by the 4th metal Cylinder pan tile D, which is connected to the second metal cylinder pan tile B, has the side of the 4th combination section 31;Then, by fifth metal cylinder pan tile E connections Between the second metal cylinder pan tile B and the 3rd metal cylinder pan tile C, the 6th metal cylinder pan tile F is connected to the 3rd metal cylinder pan tile C Metal pan tile 10 side.
In simple terms, when multiple metal cylinder pan tile A~F are assembled, it is predominantly similar to diagonal manner in order Assembled, and the assembling of this mode can be easy to user to be constructed.
When metal roofing tile group 1 is located at eaves, it can include a second support 40, eave tile part 50 and drip-tile 60 again.With Under will be described further.
The 9th figure is referred to, it is the schematic diagram of the 3rd embodiment of the metal roofing tile group of the present invention.As illustrated, when gold When belonging to roofing tile group 1 positioned at eaves, it can include a second support 40, eave tile part 50 and drip-tile 60 again.Wherein, second support 40 It can be inverted u-shaped structure, and preferably can further be bent to end face direction, and form the hood-like knot for being similar to inverted u-shaped Structure, so as to increase the structural strength that its is overall.In addition, the both sides of second support 40 can have one the 5th combination section 41 respectively, And the top of second support 40 can have one the 6th combination section 42.Eave tile part 50 can be circular cover body, and the top of eave tile part 50 is right Answering the 6th combination section 42 has the 7th combination section 51.During combination, second support 40 is located at the other end of metal semicircular tile 30, i.e. eaves Prominent one end.During assembling, operating personnel can make the 5th combination section of metal semicircular tile 30 and second support 40 using fixation kit 9 41 combinations, such as fixation kit 9 run through the wall of eave tile part 50 or metal semicircular tile 30 to fix the two.Then, second is made Combined with the 7th combination section 51 of eave tile part 50 6th combination section 42 of support 40.And drip-tile 60 is arranged at metal pan tile 10 The other end(One end with the first overlap edge 12).
It should be specified, the 5th combination section 41 may preferably be the breach of strip, for operating personnel simply Fixation kit 9 is set to pass through and fixed.
In addition, the combination of the 6th combination section 42 and the 7th combination section 51, can be such as the 3rd combination section 22 and the 4th combination section 31 usually mainly can be in two ways as implementation.First, being that the 6th combination section 42 is combined with the 7th as shown in Figure 4 Portion 51 all can be circular hole, therefore, and operating personnel simply can pass through the 6th combination section 42 and the 7th combination section by fixation kit 9 51, you can the 6th combination section 42 is combined with the 7th combination section 51.Thereby simple working procedure, can reduce the work of operating personnel Industry time and manpower.Its is another, i.e., as shown in Figure 5, and the 6th combination section 42 can be latch, and the 7th combination section 51 can be one Cavernous structure.Therefore, operating personnel must only make the cavernous structure that the 7th combination section 51 is inserted by the latch of the 6th combination section 42, i.e., The 6th combination section 42 can be made to be combined with the 7th combination section 51, the process to reduce operating personnel, and fixation kit 9 use, from And effectively reduce activity duration, manpower and associated materials(Such as fixation kit 9)Expense.In above two mode, metal The other end of semicircular tile 30 can be covered in outside eave tile part 50, i.e. cover the junction of the 6th combination section 42 and the 7th combination section 51, Further to prevent leak.
From above-mentioned explanation, metal roofing tile group of the invention, its by predetermined configurations metal pan tile, support and gold Belong to the combination of semicircular tile, process is reduced so as to effective, and the time can be reduced with manpower.Also, by metal pan tile, each support There is specific overlap edge with the configuration of metal semicircular tile, particularly metal pan tile, so that can reach prevents the purpose of leak.
Take a broad view of above-mentioned, it is seen that the present invention has reached the effect to be promoted really in the case where breaking through previous technology, and also non- Those who are familiar with this art can think easily and, its creativeness having, practicality.

Claims (16)

1. a kind of metal roofing tile group, it is characterised in that include:
Multiple metal pan tiles, each metal pan tile by end see be U-shaped structure, the side of the both sides of each metal pan tile Edge is provided with the first combination section;
First support, is inverted u-shaped structure, and the both sides of the first support are respectively arranged with the second combination section, and described second Combination section corresponds to first combination section, and the top of the first support is provided with the 3rd combination section, when the multiple metallic plate When watt being arranged side by side, the first support is located between the multiple metal pan tile;And
Metal semicircular tile, is inverted u-shaped structure, and the top of one end of the metal semicircular tile is provided with the 4th combination section, when the multiple When metal pan tile is arranged side by side, the metal semicircular tile is arranged at the sides of the both sides of each metal pan tile and described first Frame;
Wherein, first combination section is combined with second combination section by fixation kit, and the 3rd combination section with 4th combination section is combined, and the multiple metal pan tile, the first support is fixed as with the metal semicircular tile described Metal roofing tile group.
2. metal roofing tile group as claimed in claim 1, it is characterised in that the other end of each metal pan tile has first end Portion and one end of each metal pan tile have the second end, and the first end has the first overlap edge, the second end The second overlap edge with contrast to first overlap edge, wherein the multiple metal pan tile along end direction overlap when, by Overlapped by first overlap edge with second overlap edge, second overlap edge is the flanging that up bends, and institute State two madial walls that the second overlap edge connects the metal pan tile.
3. metal roofing tile group as claimed in claim 1, it is characterised in that the 3rd combination section includes latch, the described 4th Combination section is cavernous structure, and the cavernous structure is inserted by the latch, so that the 3rd combination section and described 4th group Conjunction portion is combined;Either,
3rd combination section and the 4th combination section are circular hole, and the 3rd combination section is passed through and described by fixation kit 4th combination section, so that the 3rd combination section is combined with the 4th combination section.
4. metal roofing tile group as claimed in claim 1, it is characterised in that first combination section includes the breach of strip, Second combination section includes the breach of strip.
5. metal roofing tile group as claimed in claim 1, it is characterised in that further include second support and eave tile part, described second Support is inverted u-shaped structure, and the eave tile part combines for dome shape, and the eave tile part is located at the other end of the metal semicircular tile, And it is sheathed on the second support.
6. metal roofing tile group as claimed in claim 5, it is characterised in that the both sides of the second support have the 5th group respectively Conjunction portion, the top of the second support has the 6th combination section, and the top of the eave tile part has the 7th combination section, wherein by Fixation kit makes first combination section be combined with the 5th combination section, and the 6th combination section and the 7th combination section It is assembled.
7. metal roofing tile group as claimed in claim 6, it is characterised in that the 6th combination section includes latch, the described 7th Combination section is cavernous structure, and the cavernous structure is inserted by the latch, so that the 6th combination section and described 7th group Conjunction portion is combined;Either,
6th combination section and the 7th combination section are circular hole, and the 6th combination section is passed through and described by fixation kit 7th combination section, so that the 6th combination section is combined with the 7th combination section.
8. the metal roofing tile group as described in claim 6, it is characterised in that the 5th combination section is the breach of strip.
9. metal roofing tile group as claimed in claim 1, it is characterised in that the metal pan tile further includes 2 first slide rails hook Portion, it is respectively arranged at two madial walls of the metal pan tile, and the metal semicircular tile further includes 2 second slide rail hook parts, and it is distinguished Two madial walls of the metal semicircular tile are arranged at, when assembling, the 2 second slide rail hook part of the metal semicircular tile is slided respectively Move to hooking in the first slide rail hook part wherein described in one of metal pan tile described in the two of the both sides of the first support.
10. a kind of metal roofing tile group, it is characterised in that include:
Multiple metal cylinder pan tiles, it is included respectively:
Metal pan tile, what it was seen by end is U-shaped structure, and the side of the metal pan tile is provided with the first slide rail hook part;
Metal semicircular tile, is inverted u-shaped structure, and the side of the metal semicircular tile is integrally formed to be connected to the another of the metal pan tile Side, and the opposite side of the metal semicircular tile has the second slide rail hook part;And
An at least first support, is arranged in the metal semicircular tile to support the metal semicircular tile;
Wherein, when multiple metal cylinder pan tiles are connected side by side, wherein the metal semicircular tile of metal cylinder pan tile described in one The second slide rail hook part hook is in the first slide rail hook part of the metal pan tile of another metal cylinder pan tile.
11. metal roofing tile group as claimed in claim 10, it is characterised in that the other end of the metal pan tile has first end Portion and one end of the metal pan tile have the second end, and the first end has the first overlap edge, the second end tool Have the second overlap edge in contrast to first overlap edge, wherein the multiple metal cylinder pan tile along end direction overlap when, by Overlapped by first overlap edge with second overlap edge, second overlap edge is the flanging that up bends, and institute State two madial walls that the second overlap edge connects the metal pan tile.
12. metal roofing tile group as claimed in claim 11, it is characterised in that second overlap edge connects the metal pan tile Two madial walls link position be equal to or higher than the metal pan tile and the metal semicircular tile integrally formed connection company Wiring.
13. metal roofing tile group as claimed in claim 10, it is characterised in that the first support is inverted u-shaped shape or Z-shaped Type shape, and roof is fixed in the bottom of the first support, the top of the first support has the 3rd combination section, the gold The wherein side for belonging to the another opposite sides of semicircular tile is provided with the 4th combination section, and the 4th combination is bound to by the 3rd combination section Portion is with the fixed metal semicircular tile in the first support.
14. metal roofing tile group as claimed in claim 13, it is characterised in that the 3rd combination section includes latch, described the Four combination sections include cavernous structure, and the latch of the 3rd combination section inserts the cavernous structure of the 4th combination section;Either,
3rd combination section and the 4th combination section be circular hole, wherein by fixation kit through the 3rd combination section with 4th combination section.
15. the metal roofing tile group as described in claim 13 or 14, it is characterised in that the multiple metal cylinder pan tile is respectively One metal cylinder pan tile, the second metal cylinder pan tile, the 3rd metal cylinder pan tile, the 4th metal cylinder pan tile, fifth metal cylinder pan tile and the Six metal cylinder pan tiles, are connected to the first metal cylinder pan tile by the second metal cylinder pan tile in order and have institute when assembling The side of the 4th combination section is stated, the 3rd metal cylinder pan tile is connected to the metal pan tile of the first metal cylinder pan tile Side, the 4th metal cylinder pan tile is connected into the second metal cylinder pan tile has the side of the 4th combination section, Fifth metal cylinder pan tile is connected between the second metal cylinder pan tile and the 3rd metal cylinder pan tile, by described the Six metal cylinder pan tiles are connected to the side of the metal pan tile of the 3rd metal cylinder pan tile.
16. metal roofing tile group as claimed in claim 10, it is characterised in that further include second support and eave tile part, described Two supports are inverted u-shaped structure, and the eave tile part combines for dome shape, and the eave tile part is located at the another of the metal semicircular tile End, and it is sheathed on the second support.
CN201611007960.6A 2015-11-16 2016-11-16 Metal roof tile set Pending CN106948552A (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
TW104137771A TWI579442B (en) 2015-11-16 2015-11-16 Metal roofing tile assembly
TW104137771 2015-11-16
TW105212029U TWM534209U (en) 2016-08-09 2016-08-09 Metal roofing tile assembly
TW105212029 2016-08-09

Publications (1)

Publication Number Publication Date
CN106948552A true CN106948552A (en) 2017-07-14

Family

ID=59040725

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201611007960.6A Pending CN106948552A (en) 2015-11-16 2016-11-16 Metal roof tile set
CN201621230523.6U Expired - Fee Related CN206267426U (en) 2015-11-16 2016-11-16 Metal roof tile set

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201621230523.6U Expired - Fee Related CN206267426U (en) 2015-11-16 2016-11-16 Metal roof tile set

Country Status (1)

Country Link
CN (2) CN106948552A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756080A (en) * 2018-07-09 2018-11-06 汉能移动能源控股集团有限公司 Cylindrical tile and roof tile set

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948552A (en) * 2015-11-16 2017-07-14 齐瓦室企业有限公司 Metal roof tile set

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321902A (en) * 2002-05-02 2003-11-14 Akimori Matsubara Shape and structure of roofing material and fixing method thereof
CN2832968Y (en) * 2005-09-06 2006-11-01 王立柱 Metal tile
CN101886447A (en) * 2010-08-12 2010-11-17 中国建筑股份有限公司 Al-Mg-Mn alloy plate archaizing roof tile and manufacturing method thereof
CN202440999U (en) * 2012-02-02 2012-09-19 金星铜集团有限公司 Connected metal tile
CN206267426U (en) * 2015-11-16 2017-06-20 齐瓦室企业有限公司 Metal roof tile set

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321902A (en) * 2002-05-02 2003-11-14 Akimori Matsubara Shape and structure of roofing material and fixing method thereof
CN2832968Y (en) * 2005-09-06 2006-11-01 王立柱 Metal tile
CN101886447A (en) * 2010-08-12 2010-11-17 中国建筑股份有限公司 Al-Mg-Mn alloy plate archaizing roof tile and manufacturing method thereof
CN202440999U (en) * 2012-02-02 2012-09-19 金星铜集团有限公司 Connected metal tile
CN206267426U (en) * 2015-11-16 2017-06-20 齐瓦室企业有限公司 Metal roof tile set

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756080A (en) * 2018-07-09 2018-11-06 汉能移动能源控股集团有限公司 Cylindrical tile and roof tile set

Also Published As

Publication number Publication date
CN206267426U (en) 2017-06-20

Similar Documents

Publication Publication Date Title
KR101739251B1 (en) Prefabricated building panels
CN206267426U (en) Metal roof tile set
CN106801473A (en) Aluminium alloy structure house
DE112004002582D2 (en) Clip fastening for the quick assembly of fitting devices, such as swivel lever locks, hinge parts in openings in a thin wall
CN201254790Y (en) Straight standing overlock type roof board
CN207392684U (en) A kind of integrated assembled type wall surface decoration system
USD844551S1 (en) Photovoltaic tile
JP5319202B2 (en) Mounting structure
CN205533594U (en) Compound plywood of two side hem metals
CN102704669B (en) The total sub-semigroup mounting method of cross bar inserted sheet
CN202925770U (en) Metal sheet roof connecting bracket
CN207392462U (en) The internal corner structure of steel construction board house
CN207406989U (en) A kind of detachable thermal insulation sleeve
CN206245588U (en) Combined wall board prefabricated components
CN104287623A (en) Base of electric kettle and electric kettle component
CN204062450U (en) Steel angle structure body
CN204334448U (en) Pitched roof solar panel draw bail
CN207700545U (en) A kind of Combined movable house eaves structure
CN204343553U (en) A kind of preventing water leakage building
CN217759808U (en) Skirting line with light
CN204804253U (en) A decorate piece that is used for enamel decorative board and fossil fragments gap
TWI579442B (en) Metal roofing tile assembly
CN204343554U (en) A kind of construction shingle
JP2018053445A (en) Roof structure
CN208578413U (en) Deformable guardrail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170714

WD01 Invention patent application deemed withdrawn after publication