CN206267426U - Metal roof tile set - Google Patents

Metal roof tile set Download PDF

Info

Publication number
CN206267426U
CN206267426U CN201621230523.6U CN201621230523U CN206267426U CN 206267426 U CN206267426 U CN 206267426U CN 201621230523 U CN201621230523 U CN 201621230523U CN 206267426 U CN206267426 U CN 206267426U
Authority
CN
China
Prior art keywords
tile
metal
combination section
pan
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621230523.6U
Other languages
Chinese (zh)
Inventor
王荣贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Polynum Enterprise Co ltd
Original Assignee
Polynum Enterprise Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from TW104137771A external-priority patent/TWI579442B/en
Priority claimed from TW105212029U external-priority patent/TWM534209U/en
Application filed by Polynum Enterprise Co ltd filed Critical Polynum Enterprise Co ltd
Application granted granted Critical
Publication of CN206267426U publication Critical patent/CN206267426U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/02Grooved or vaulted roofing elements
    • E04D1/06Grooved or vaulted roofing elements of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a metal roof tile group, it contains a plurality of sheet metal tiles, first support and metal shell tile. The metal plate tile is of a U-shaped structure, and the first support and the metal cylindrical tile are of an inverted U-shaped structure. The two sides of each metal plate tile are provided with a first combination part, the two sides of the first support are provided with a second combination part, and the metal plate tiles are positioned on the two sides of the first support. The top of the first support is provided with a third combination part, and the top of the metal cylindrical tile is provided with a fourth combination part. The first combination part and the second combination part are combined by the fixing component, and the third combination part and the fourth combination part are combined to fix the plurality of metal plate tiles, the first support and the metal cylindrical tiles into the metal roof tile group.

Description

Metal roofing tile group
Technical field
The utility model relates to a kind of roofing tile, in particular to a kind of utilization metal pan tile and the gold of metal semicircular tile Category roofing tile group.
Background technology
By Gu so far, temple is mostly to use roofing tile as roof, and with Chinese style or oriental general house among the people Also can be from roofing tile as roof.So, because the material of conventional roofing tiles is excessively heavy, often resulted in by its long-term pressure month after month The infringement deformation of roof structure, or even damage building in itself, therefore many temples gradually are changed to use by putting down at present The metal tile for constituting watt is combined with semicircular tile.
However, still have some shortcoming poles in the prior art to wait to improve.For example, existing metal semicircular tile with it is flat Watt combination, have a problem of leak, therefore combination and roof structure face of the waterproof layer in semicircular tile and plain tile must be set mostly Between layer.In addition, semicircular tile and plain tile in combination, assembling operation quite it is numerous and diverse, so as to cause the consuming of time and manpower.
Described before taking a broad view of, inventor of the present utility model devises a kind of metal roofing tile group, with pin through concentrating on studies for many years Missing to prior art is improved, and then the implementation utilization in enhancement industry.
Utility model content
In view of above-mentioned problem of the prior art, the purpose of this utility model be exactly providing a kind of metal roofing tile group, with Solve the problems, such as that above-mentioned prior art is waited to improve.
According to the purpose of this utility model, there is provided a kind of metal roofing tile group, its include multiple metal pan tiles, first support and Metal semicircular tile.It is U-shaped structure when each metal pan tile is seen by end, the edge of the both sides of each metal pan tile is provided with one first combination Portion.First support is inverted u-shaped structure, and the both sides of first support are respectively arranged with one second combination section, and the second combination section pair One the 3rd combination section should be provided with the first combination section, at the top of first support;When multiple metal pan tiles are arranged side by side, first Frame is located between multiple metal pan tiles.Metal semicircular tile is inverted u-shaped structure, and one the 4th group is provided with the top of one end of metal semicircular tile Conjunction portion;When multiple metal pan tiles are arranged side by side, metal semicircular tile is arranged at side and the first support of the both sides of each metal pan tile. Wherein, the first combination section is made to be combined with the second combination section by fixation kit, and the 3rd combination section is combined with the 4th combination section, with Multiple metal pan tiles, first support and metal semicircular tile are fixed as metal roofing tile group.
Preferably, there is the other end of each metal pan tile one end of a first end and each metal pan tile to have one the Two ends;First end has one first overlap edge, and the second end has one second overlap edge in contrast to the first overlap edge;Its When middle multiple metal pan tiles are overlapped along end direction, overlapped with the second overlap edge by the first overlap edge, the second overlap edge It is the flanging for up bending, and the second overlap edge connects two madial walls of metal pan tile.
Preferably, the 3rd combination section can include a latch, and the 4th combination section can be a cavernous structure, by latch patchhole Shape structure, so that the 3rd combination section is combined with the 4th combination section;Or, the 3rd combination section and the 4th combination section can be circular hole, The 3rd combination section and the 4th combination section are passed through by fixation kit, so that the 3rd combination section is combined with the 4th combination section.
Preferably, the first combination section can include the breach of strip, and the second combination section can include the breach of strip.
Preferably, it can more include a second support and an eave tile part, and second support is inverted u-shaped structure, and eave tile part is Dome shape structure, eave tile part is located at the other end of metal semicircular tile, and is sheathed on second support.
Preferably, the top that the both sides of second support have one the 5th combination section, second support respectively has one the 6th group Conjunction portion, the top of eave tile part has one the 7th combination section, wherein making the first combination section and the 5th combination section group by fixation kit Close, and the 6th combination section is combined with the 7th combination section.
Preferably, the 6th combination section can include a latch, and the 7th combination section can be a cavernous structure, by latch patchhole Shape structure, so that the 6th combination section is combined with the 7th combination section;Or, the 6th combination section and the 7th combination section can be circular hole, The 6th combination section and the 7th combination section are passed through by fixation kit, so that the 6th combination section is combined with the 7th combination section.
Preferably, the 5th combination section can be the breach of strip.
Preferably, metal pan tile further includes 2 first slide rail hook parts, its two madial wall for being respectively arranged at metal pan tile, gold Category semicircular tile further includes 2 second slide rail hook parts, its two madial wall for being respectively arranged at metal semicircular tile, when assembling, metal semicircular tile The wherein one first slide rail hook part to hooking the two metal pan tiles in the both sides of first support is slided respectively in 2 second slide rail hook parts.
According to the purpose of this utility model, a kind of metal roofing tile group is separately provided, it includes multiple metal cylinder pan tiles and at least One first support.Multiple metal cylinder pan tiles include metal pan tile and metal semicircular tile respectively.Metal pan tile is U-shaped by end sight Structure, the side of metal pan tile is provided with one first slide rail hook part, and metal semicircular tile is inverted u-shaped structure, the side of metal semicircular tile The integrally formed opposite side for being connected to metal pan tile, and the opposite side of metal semicircular tile has one second slide rail hook part.At least one First support is arranged in metal semicircular tile to support metal semicircular tile.Wherein, when multiple metal cylinder pan tiles are connected side by side, wherein one Second slide rail hook part hook of the metal semicircular tile of metal cylinder pan tile is hooked in the first slide rail of the metal pan tile of another metal cylinder pan tile Portion.
Preferably, one end that the other end of metal pan tile has a first end and metal pan tile has a second end, First end has one first overlap edge, and the second end has one second overlap edge in contrast to the first overlap edge, plurality of When metal cylinder pan tile is overlapped along end direction, overlapped with the second overlap edge by the first overlap edge, the second overlap edge is past The flanging of upper bending, and the second overlap edge connects two madial walls of metal pan tile.
Preferably, a link position of two madial walls of the second overlap edge connection metal pan tile is equal to or higher than metal pan tile With the connecting line of the integrally formed connection of metal semicircular tile.
Preferably, first support is inverted u-shaped shape or Z-shaped shape, and roof is fixed in the bottom of first support, the The top of one support has one the 3rd combination section, and the wherein side of the another opposite sides of metal semicircular tile is provided with one the 4th combination section, by It is bound to the 4th combination section to fix metal semicircular tile in first support by the 3rd combination section.
Preferably, the 3rd combination section includes a latch, and the 4th combination section includes a cavernous structure, the latch of the 3rd combination section Insert the 4th combination section cavernous structure;Or, the 3rd combination section and the 4th combination section are circular hole, wherein being worn by fixation kit Cross the 3rd combination section and the 4th combination section.
Preferably, multiple metal cylinder pan tiles are respectively one first metal cylinder pan tile, one second metal cylinder pan tile, one the 3rd gold medal Category cylinder pan tile, one the 4th metal cylinder pan tile, fifth metal cylinder pan tile and one the 6th metal cylinder pan tile, in order will when assembling Second metal cylinder pan tile is connected to side of the first metal cylinder pan tile with the 4th combination section, and the 3rd metal cylinder pan tile is connected to The side of the metal pan tile of the first metal cylinder pan tile, the second metal cylinder pan tile is connected to the 4th group by the 4th metal cylinder pan tile The side in conjunction portion, fifth metal cylinder pan tile is connected between the second metal cylinder pan tile and the 3rd metal cylinder pan tile, by the 6th gold medal Category cylinder pan tile is connected to the side of the metal pan tile of the 3rd metal cylinder pan tile.
Preferably, a second support and an eave tile part are further included, second support is inverted u-shaped structure, and eave tile part is dome Shape is combined, and eave tile part is located at the other end of metal semicircular tile, and is sheathed on second support.
In sum, metal roofing tile group of the present utility model, its by combinations of the above structure configuration so that can be effective Reduction operation, and the time can be reduced with manpower.In addition, by the configuration of metal pan tile, each support and metal semicircular tile, particularly Metal pan tile has specific overlap edge, and the purpose of leak is prevented so as to can reach.
It is that above and other objects, features and advantages of the present utility model can be become apparent, preferred reality cited below particularly Example is applied, and coordinates institute's accompanying drawings, be described in detail below.
Brief description of the drawings
1st figure is the exploded perspective view of the first embodiment of metal roofing tile group of the present utility model.
2nd figure is the combination diagram of the first embodiment of metal roofing tile group of the present utility model.
3rd figure is the schematic diagram of the metal pan tile of the first embodiment of metal roofing tile group of the present utility model.
4th figure is that the first support of the first embodiment of metal roofing tile group of the present utility model is combined with the one of metal semicircular tile Kenel schematic diagram.
5th figure is another knot of the first support with metal semicircular tile of the first embodiment of metal roofing tile group of the present utility model Mould assembly state schematic diagram.
6th figure is second support, metal semicircular tile and the eave tile part of the first embodiment of metal roofing tile group of the present utility model Combination diagram.
7th figure is the schematic diagram of the second embodiment of metal roofing tile group of the present utility model.
8th figure is the schematic diagram of the 3rd embodiment of metal roofing tile group of the present utility model.
9th figure is the schematic diagram of the fourth embodiment of metal roofing tile group of the present utility model.
Description of reference numerals:
1:Metal roofing tile group;A~F:Metal cylinder pan tile;10:Metal pan tile;11:First combination section;12:First overlap edge; 13:Second overlap edge;121、131:Turn up hem;14:First slide rail hook part;20:First support;21:Second combination section;22:The Three combination sections;30:Metal semicircular tile;31:4th combination section;32:Second slide rail hook part;40:Second support;41:5th combination section; 42:6th combination section;50:Eave tile part;51:7th combination section;60:Drip-tile;9:Fixation kit.
Specific embodiment
Advantage of the present utility model and feature and reach its method will be carried out with reference to exemplary embodiments and accompanying drawing it is more detailed Carefully describe and be easier to understand.However, the utility model can be realized and not it should be understood that being only limitted to this in different forms The embodiment of place statement.On the contrary, to those skilled in the art, this little embodiment for being provided will make this exposure more Plus thoroughly with comprehensively and intactly pass on category of the present utility model, and the utility model will only be attached claims Defined.In figure, the size and relative size of composition or component are represented in order to clear understandable in the method for lavishing praise on oneself.Entire chapter explanation In book, identical element numbers refer to identical component.As later used, term " and/or " include any and institute There is the combination of one or more related listed objects.
Unless otherwise defined, all terms (comprising science and technology and scientific terminology) being used in hereinafter have the skill with this area Typically the understood identical meaning of art personnel.By more it will be appreciated that for example in defined in the dictionary for typically being used those Term should be understood there is the meaning consistent with the content of association area, and unless be significantly defined in hereinafter, will not be with mistake Degree idealization or the excessively formal meaning understand.
Illustrative embodiments are described in detail below in conjunction with accompanying drawing.However, these embodiments can be contained in different forms In, and be not necessarily to be construed as limiting the scope of the claims of the present utility model.The offer of these embodiments causes the utility model Exposure completely with bright Liao, those skilled int the art can understand category of the present utility model via these embodiments.
The 1st, 2 figures are referred to, it is the exploded perspective view and group of the first embodiment of metal roofing tile group of the present utility model Close schematic diagram.As illustrated, metal roofing tile group 1 contains multiple metal pan tiles 10, first support 20 and metal semicircular tile 30.Wherein Each metal pan tile 10, substantially U-shaped structure when it is seen by end, and the edge of the both sides of metal pan tile 10 can set respectively There is the first combination section 11.The edge of each side of metal pan tile 10 can the first combination section 11 can up extend again respectively at two ends Lamellar body, and breach is set in lamellar body or breach is not provided with, or can be directly to be set at the edge of each side at the two ends of metal pan tile 10 Put breach.Wherein set breach may preferably be the breach of strip.
In addition, first support 20 can be made up of the bending of metal material one, it can be inverted u-shaped structure.Wherein, first The both sides of support 20 are respectively arranged with one second combination section 21, and the position of the second combination section 21 corresponds to the first combination section 11 Position.Preferably, the second combination section 21 can be breach, and can be the breach of strip.Additionally, the top of first support 20 is provided with One the 3rd combination section 22.And metal semicircular tile 30 is inverted u-shaped structure, one the 4th combination is provided with the top of one end of metal semicircular tile 30 Portion 31, and the 4th combination section 31 position correspond to the 3rd combination section 22 position.
Incidentally, first support 20 is settable reinforced ribs, to increase its overall structural strength, so as to can fit Locality supports metal semicircular tile 30.And, first support 20 is mutually fixed with roof using locking or its other party such as weld, so as to can make Metal roofing tile group 1 is appropriately secured to roof.
As shown in Figure 2, when metal pan tile 10, the three of 20 and one metal semicircular tile of first support 30 are carried out into a group device, two Individual metal pan tile 10 is respectively positioned at the both sides of first support 20.Now, operating personnel can be first fixed by such as blind rivet or screw etc. Component 9(Fixation kit 9 is as depicted in the 4th figure)The first combination section 11 is set to be combined with the second combination section 21.Wherein, the first combination section 11 can be with breach or with breach, if when the first combination section 11 is not to have breach, fixation kit 9 can be by metal pan tile 10 wall runs through makes the first combination section 11 be combined with the second combination section 21 again.If when the first combination section 11 and/or the second combination When portion 21 is the breach of strip, now the first combination section 11 can partly overlap with the second combination section 21 or fully overlap. Therefore can be constructed beneficial to operating personnel, there is the roof of the temple of certain curve in particular for roof structure and can reduce The adjustment operation such as breach contraposition.Then, metal semicircular tile 30 is arranged on two metal pan tiles 10 and first support 20, i.e. gold Category semicircular tile 30 is arranged on the side of the both sides of each metal pan tile 10 and first support 20, and by the 3rd combination section 22 and the 4th Combination section 31 combines, so that metal semicircular tile 30 coats the side of the both sides of each metal pan tile 10 and first support 20.That is, metal Semicircular tile 30 will cover the first combination section 11 and the second combination section 21.
It is noted that two madial walls of metal pan tile 10 can be provided with one first slide rail hook part 14, in the present embodiment, Between it is arranged at two the first combination sections 11, but it is not limited thereto.Corresponding, metal semicircular tile 30 corresponds to the first slide rail Hook part 14 and can be provided with one second slide rail hook part 32 in its two side.Therefore, in assembling, using the mode slided, first make The second slide rail hook part 32 is slipped into first slide rail hook part 14, and the first slide rail hook part 14 and the second slide rail hook part 32 pairs is hooked and is fixed, Then the 3rd combination section 22 is made to be combined with the 4th combination section 31 again.Wherein, one end of the first slide rail hook part 14(Neighbouring the after assembling One end of four combination sections 31)There can be the structures such as chamfering, the second slide rail hook part 32 is slipped into order to the first slide rail hook part 14.
Should be specified, each recycling extra first support 20 of metal roofing tile group 1 and metal semicircular tile 30 are made simultaneously Row connects, and each metal roofing tile group 1 can pass through existing metal pan tile 10 and be connected in series in.Below will be to each metal roofing tile group 1 Concatenation connection be described further.
As shown in Figure 3, wherein, the other end of each metal pan tile 10 has the one of a first end and each metal pan tile 10 End has a second end, and first end has one first overlap edge 12, and the second end has in contrast to the first overlap edge 12 One second overlap edge 13.That is, the first overlap edge 12 can be downwards bending flanging, and the second overlap edge 13 can be to The flanging of upper bending, and the first overlap edge 12 slightly protrudes from the outer of the body of metal pan tile 10.Therefore, wherein each metal roofing tile group When 1 concatenation is connected, will metal pan tile 10 overlapped along end direction;That is, overlapped to the second overlap edge by the first overlap edge 12 13。
It is noted that the second overlap edge 13 is the flanging for up bending, and the connection metal pan tile of the second overlap edge 13 10 two madial walls.Therefore, when rainy, rainwater can be drenched to metal pan tile 10 and metal semicircular tile 30.At the aspect of metal semicircular tile 30, The rainwater of metal semicircular tile 30 can flow to metal pan tile 10 along the profile of metal semicircular tile 30, and in terms of metal pan tile 10, due to Two madial walls of the connection metal of the second overlap edge 13 pan tile 10, therefore the rainwater of metal pan tile 10 will not flow to room by lap-joint Room, what can be continued flow to next metal pan tile 10.In addition, the first overlap edge 12 can be anti-with one respectively with the second overlap edge 13 Flanging 121,131, further to prevent rain side from flowing to house by lap-joint.Thereby, metal roofing tile group 1 of the present utility model can It is effectively accomplished the purpose of preventing water leakage.
On the other hand, for the concatenation between metal semicircular tile 30, one end of metal semicircular tile 30(With the 4th combination section 31 One end)Can be in the shape that slightly sink(Or similar to stepped), insert the other end of another metal semicircular tile 30, and insert its second Slide rail hook part 32, can thereby cover the junction of the 3rd combination section 22 and the 4th combination section 31, and with fixed effect.For Being easy to one end of assembling, metal semicircular tile 30 can have the structures such as chamfering, and another metal is inserted in the one end in order to metal semicircular tile 30 Second slide rail hook part 32 of semicircular tile 30.
It is noted that the 3rd combination section 22 and the 4th combination section 31 can mainly implement in conduct in two ways, below To illustrate respectively.
The 4th figure is referred to, it is the first support and metal cylinder of the first embodiment of metal roofing tile group of the present utility model Watt the embodiment schematic diagram of combination one.As illustrated, the 4th group of the 3rd combination section 22 of first support 20 and metal semicircular tile 30 Conjunction portion 31 can be borehole structure.Therefore, operating personnel simply can pass through the 3rd combination section 22 and the 4th group by fixation kit 9 Conjunction portion 31, you can make the 3rd combination section 22 be combined with the 4th combination section 31.Thereby simple working procedure, can reduce operating personnel Activity duration and manpower.
The 5th figure is referred to, it is the first support and metal cylinder of the first embodiment of metal roofing tile group of the present utility model Watt another embodiment schematic diagram of combination.As illustrated, the 3rd combination section 22 of first support 20, it can be a latch, and golden The 4th combination section 31 for belonging to semicircular tile 30 can be a cavernous structure, and the preferably recessed cavernous structure in subregion.Therefore, make Industry personnel must only make to insert the cavernous structure of the 4th combination section 31 by the latch of the 3rd combination section 22, you can make the 3rd combination section 22 Combined with the 4th combination section 31.Thereby can further reduce the operation of operating personnel, and fixation kit 9 use so that It is effective to reduce activity duration, manpower and associated materials(Such as fixation kit 9)Expense.
When metal roofing tile group 1 is located at eaves, it can again include a second support 40, eave tile part 50 and drip-tile 60.With Under will be described further.
The 6th figure is referred to, it is the second support of the first embodiment of metal roofing tile group of the present utility model, metal semicircular tile With the combination diagram of eave tile part.As illustrated, when metal roofing tile group 1 be located at eaves when, its can include again a second support 40, Eave tile part 50 and drip-tile 60.Wherein, second support 40 can be inverted u-shaped structure, and preferably can enter one to end face direction Step bending, and the hood-like structure for being similar to inverted u-shaped is formed, so as to its overall structural strength can be increased.In addition, second support 40 both sides can respectively have one the 5th combination section 41, and the top of second support 40 can have one the 6th combination section 42.Eave tile Part 50 can be circular cover body, and the combination section 42 of top correspondence the 6th of eave tile part 50 has the 7th combination section 51.During combination, second Frame 40 is located at one end that the other end of metal semicircular tile 30, i.e. eaves are protruded.During assembling, operating personnel can be made using fixation kit 9 5th combination section 41 of second support 40 is combined with the first combination section 11 of metal pan tile 10, and for example fixation kit 9 runs through metal Wall at first combination section 11 of pan tile 10, and through the 5th combination section 41 of second support 40, the two is fixed.Connect , the 6th combination section 42 of second support 40 is combined with the 7th combination section 51 of eave tile part 50.And drip-tile 60 is arranged at gold Belong to the other end of pan tile 10(One end with the first overlap edge 12).
Should be specified, the 5th combination section 41 may preferably be the breach of strip, for operating personnel simply Fixation kit 9 is set to pass through and fixed.Additionally, the 6th combination section 42 is combined with the 7th combination section 51, can be such as the 3rd combination section 22 Usually mainly can in two ways as implementation with the 4th combination section 31.First, being the 6th combination section as shown in Figure 4 42 and the 7th combination section 51 all can be circular hole, therefore, operating personnel can be simply by fixation kit 9 through the 6th combination section 42 With the 7th combination section 51, you can the 6th combination section 42 is combined with the 7th combination section 51.Thereby simple working procedure, can be reduced The activity duration of operating personnel and manpower.Its is another, i.e., as shown in Figure 5, the 6th combination section 42 can be latch, and the 7th group Conjunction portion 51 can be a cavernous structure, and the preferably recessed cavernous structure in subregion.Therefore, operating personnel must only make by The latch of six combination sections 42 inserts the cavernous structure of the 7th combination section 51, you can make the 6th combination section 42 and the knot of the 7th combination section 51 Close, to reduce the operation of operating personnel, and fixation kit 9 use, so as to effectively reduce activity duration, manpower and related material Material(Such as fixation kit 9)Expense.
Refer to the 7th figure and the 4th, 5 figures;7th figure is the signal of the second embodiment of metal roofing tile group of the present utility model Figure.As illustrated, metal roofing tile group 1 contains one or more metal cylinder pan tiles A, at least a first support 20.In the present embodiment In, for convenience of description, metal cylinder pan tile A, will be in using one as demonstration aspect, and the application of multiple metal cylinder pan tile A~F Explained in follow-up embodiment.
Wherein, metal cylinder pan tile A includes metal pan tile 10 and metal semicircular tile 30.Metal pan tile 10 is U-shaped by end sight Type structure, the side of metal pan tile 10 is provided with one first slide rail hook part 14, and metal semicircular tile 30 is inverted u-shaped structure, metal cylinder Watts 30 integrally formed opposite side for being connected to metal pan tile 10 in side, and the opposite side of metal semicircular tile 30 has one second to slide Rail hook part 32.First support 20 is arranged to support metal semicircular tile 30 in metal semicircular tile 30, and it is support metal cylinder plate that it can also say Watt A.
When in assembled side-by-side, make the wherein metal semicircular tile 30 of a metal cylinder pan tile A using sliding type second is slided The hook of rail hook part 32 is in the first slide rail hook part 14 of the metal pan tile 10 of another metal cylinder pan tile A.Thereby, you can make two metals Cylinder pan tile A is stably fixed to together.
For further, first support 20 can be by the inverted u-shaped shape and structure or Z-shaped of metal material one bending Type shape and structure.Roof is fixed in the bottom of first support 20, and the top of first support 20 has one the 3rd combination section 22, metal The wherein side of the another opposite sides of semicircular tile 30 can accordingly be provided with one the 4th combination section 31, and is bound to by the 3rd combination section 22 Four combination sections 31 are fixing metal semicircular tile 30 in first support 20, or can be described as fixing metal cylinder pan tile A in first support 20.
Incidentally, first support 20 is settable reinforced ribs, to increase its overall structural strength, so as to can fit Locality supports metal cylinder pan tile A.And, first support 20 is mutually fixed with roof using locking or its other party such as weld, so that can Metal roofing tile group 1 is set to be appropriately secured to roof.
As shown in Figure 4, the 3rd combination section 22 and the 4th combination section 31 can be circular hole.Therefore, operating personnel can be simple By the fixation kits such as blind rivet or screw 9 pass through the 3rd combination section 22 and the 4th combination section 31, you can make the 3rd combination section 22 Combined with the 4th combination section 31.Thereby simple working procedure, can reduce activity duration and the manpower of operating personnel.
As shown in Figure 5, the 3rd combination section 22 can be a latch, and the 4th combination section 31 can be correspondingly a hole Shape structure, and the preferably recessed cavernous structure in subregion.Therefore, operating personnel must only make inserting by the 3rd combination section 22 The cavernous structure of the 4th combination section 31 of pin insertion, you can make the 3rd combination section 22 be combined with the 4th combination section 31.Thereby can more enter The operation of the reduction operating personnel of one step, and fixation kit 9 use, so as to effectively reduce activity duration, manpower and correlation Material(Such as fixation kit 9)Expense.
It is worth special instruction, it can be in the shape that slightly sink that metal semicircular tile 30 has one end of the 4th combination section 31(Or it is similar It is stepped), the metal semicircular tile 30 of another metal cylinder pan tile A is inserted for the metal semicircular tile 30 of a metal cylinder pan tile A, so that another The metal semicircular tile 30 of metal cylinder pan tile A can cover the metal semicircular tile 30 of metal cylinder pan tile A and the junction of first support 20, with Reach the purpose for preventing leak.
The 7th figure is referred to again.On the other hand, the other end of metal pan tile 10 has a first end, and it has one first Overlap edge 12, and one end of metal pan tile 10 has a second end, it has takes in contrast to the one second of the first overlap edge 12 Edge fit 13.Therefore, when multiple metal cylinder pan tile A are overlapped along end direction, by the first overlap edge 12 and the second overlap edge 13 Overlapped.That is, the first overlap edge 12 can be the flanging of bending downwards, and the second overlap edge 13 can be folded upward at Flanging, and the first overlap edge 12 slightly protrudes from the outer of the body of metal pan tile 10.Therefore, wherein the concatenation of each metal cylinder pan tile A During connection, will metal pan tile 10 along end direction overlap;That is, overlapped to the second overlap edge 13 by the first overlap edge 12.
Should be specified, the second overlap edge 13 is the flanging for up bending, and the second overlap edge 13 connects metallic plate Watts 10 two madial walls.Preferably, a link position of two madial walls of the connection of the second overlap edge 13 metal pan tile 10 be equal to or Higher than metal pan tile 10 and the connecting line of the integrally formed connection of metal semicircular tile 30;Wherein, connecting line is imaginary line.Therefore, When rainy, rainwater can be drenched to metal pan tile 10 and metal semicircular tile 30.At the aspect of metal semicircular tile 30, the rainwater meeting of metal semicircular tile 30 Metal pan tile 10 is flow to along the profile of metal semicircular tile 30, and at the aspect of metal pan tile 10, because the second overlap edge 13 connects gold Belong to two madial walls of pan tile 10, therefore the rainwater of metal pan tile 10 will not flow to house by lap-joint, flowing to for can continuing is next Individual metal pan tile 10.In addition, the first overlap edge 12 and the second overlap edge 13 can respectively have a Turn up hem, further to prevent Rain side flow to house by lap-joint.
Deserve particular mention, metal cylinder pan tile A can further use a small pot with a handle and a spout for boiling water or herbal medicine 70, to be more securely fixed on room Roof is fixed on top, wherein small pot with a handle and a spout for boiling water or herbal medicine 70, and a hook part hook of small pot with a handle and a spout for boiling water or herbal medicine 70 is in the second overlap edge 13 or the first slide rail hook part 14, in In the present embodiment, small pot with a handle and a spout for boiling water or herbal medicine 70, in the second overlap edge 13 as demonstration aspect, but is not limited using hook.
It will be described further when will below be assembled to multiple metal cylinder pan tile A~F.
The 8th figure is referred to, it is the schematic diagram of the second embodiment of metal roofing tile group of the present utility model.The present embodiment In, the metal cylinder pan tile A of multiple metal cylinder pan tiles using first to the 6th~F is not limited thereto as demonstration aspect, but its quantity.
As illustrated, when assembling, sequentially should preferably be assembled the first to the 6th metal cylinder pan tile A~F, and its In the assembling comprising first support 20 certainly, and the assembling instruction of first support 20, i.e., as described above, just no longer being gone to live in the household of one's in-laws on getting married in this State.Similarly, the thin portion assembling instruction between metal cylinder pan tile as also described above, is just not repeated here in this.
First, the second metal cylinder pan tile B is connected to sides of the first metal cylinder pan tile A with the 4th combination section 31;Connect , the 3rd metal cylinder pan tile C is connected to the side of the metal pan tile 10 of the first metal cylinder pan tile A;Followed by by the 4th metal Cylinder pan tile D is connected to sides of the second metal cylinder pan tile B with the 4th combination section 31;Then, by fifth metal cylinder pan tile E connections Between the second metal cylinder pan tile B and the 3rd metal cylinder pan tile C, the 6th metal cylinder pan tile F is connected to the 3rd metal cylinder pan tile C Metal pan tile 10 side.
In simple terms, when multiple metal cylinder pan tile A~F are assembled, it is mainly similar to diagonal manner in order Assembled, and the assembling of this mode can be easy to user to be constructed.
When metal roofing tile group 1 is located at eaves, it can again include a second support 40, eave tile part 50 and drip-tile 60.With Under will be described further.
The 9th figure is referred to, it is the schematic diagram of the 3rd embodiment of metal roofing tile group of the present utility model.As illustrated, When metal roofing tile group 1 is located at eaves, it can again include a second support 40, eave tile part 50 and drip-tile 60.Wherein, second Frame 40 can be inverted u-shaped structure, and preferably can further be bent to end face direction, and form the cover for being similar to inverted u-shaped Shape structure, so as to its overall structural strength can be increased.In addition, the both sides of second support 40 can respectively have one the 5th combination section 41, and the top of second support 40 can have one the 6th combination section 42.Eave tile part 50 can be circular cover body, the top of eave tile part 50 The combination section 42 of correspondence the 6th has the 7th combination section 51.During combination, second support 40 is located at the other end of metal semicircular tile 30, i.e. room One end that eaves is protruded.During assembling, operating personnel can be such that metal semicircular tile 30 is combined with the 5th of second support 40 the using fixation kit 9 Portion 41 is combined, and such as fixation kit 9 is fixed through the wall of eave tile part 50 or metal semicircular tile 30 with by the two.Then, is made Combined with the 7th combination section 51 of eave tile part 50 6th combination section 42 of two supports 40.And drip-tile 60 is arranged at metal pan tile 10 The other end(One end with the first overlap edge 12).
Should be specified, the 5th combination section 41 may preferably be the breach of strip, for operating personnel simply Fixation kit 9 is set to pass through and fixed.
In addition, the combination of the 6th combination section 42 and the 7th combination section 51, can be such as the 3rd combination section 22 and the 4th combination section 31 usually mainly can in two ways as implementation.First, being that the 6th combination section 42 is combined with the 7th as shown in Figure 4 Portion 51 all can be circular hole, therefore, operating personnel simply can pass through the 6th combination section 42 and the 7th combination section by fixation kit 9 51, you can the 6th combination section 42 is combined with the 7th combination section 51.Thereby simple working procedure, can reduce the work of operating personnel Industry time and manpower.Its is another, i.e., as shown in Figure 5, the 6th combination section 42 can be latch, and the 7th combination section 51 can be one Cavernous structure.Therefore, operating personnel must only make to insert the cavernous structure of the 7th combination section 51 by the latch of the 6th combination section 42, i.e., The 6th combination section 42 can be made to be combined with the 7th combination section 51, to reduce the operation of operating personnel, and fixation kit 9 use, from And effectively reduce activity duration, manpower and associated materials(Such as fixation kit 9)Expense.In above two mode, metal The other end of semicircular tile 30 can be covered in outside eave tile part 50, i.e. cover the junction of the 6th combination section 42 and the 7th combination section 51, Further to prevent leak.
From above-mentioned explanation, metal roofing tile group of the present utility model, its by predetermined configurations metal pan tile, support And the combination of metal semicircular tile, so as to operation can be reduced effectively, and the time can be reduced with manpower.Also, by metal pan tile, respectively The configuration of support and metal semicircular tile, particularly metal pan tile has specific overlap edge, the purpose of leak is prevented so as to can reach.
Take a broad view of above-mentioned, it is seen that the utility model has reached the effect to be promoted really in the case where previous technology is broken through, and Also non-those who are familiar with this art can think easily and, creativeness, practicality that it has.

Claims (16)

1. a kind of metal roofing tile group, it is characterised in that include:
Multiple metal pan tiles, each metal pan tile is U-shaped structure, the side of the both sides of each metal pan tile by end sight Edge is provided with the first combination section;
First support, is inverted u-shaped structure, and the both sides of the first support are respectively arranged with the second combination section, and described second Combination section corresponds to first combination section, the 3rd combination section is provided with the top of the first support, when the multiple metallic plate When watt being arranged side by side, the first support is located between the multiple metal pan tile;And
Metal semicircular tile, is inverted u-shaped structure, the 4th combination section is provided with the top of one end of the metal semicircular tile, when the multiple When metal pan tile is arranged side by side, the metal semicircular tile is arranged at the side of the both sides of each metal pan tile and described first Frame;
Wherein, first combination section is combined with second combination section by fixation kit, and the 3rd combination section with 4th combination section combines, and the multiple metal pan tile, the first support is fixed as with the metal semicircular tile described Metal roofing tile group.
2. metal roofing tile group as claimed in claim 1, it is characterised in that the other end of each metal pan tile has first end One end of portion and each metal pan tile has the second end, and the first end has the first overlap edge, the second end With the second overlap edge in contrast to first overlap edge, wherein when the multiple metal pan tile is overlapped along end direction, by Overlapped with second overlap edge by first overlap edge, second overlap edge is the flanging for up bending, and institute State two madial walls that the second overlap edge connects the metal pan tile.
3. metal roofing tile group as claimed in claim 1, it is characterised in that the 3rd combination section includes latch, the described 4th Combination section is cavernous structure, and the cavernous structure is inserted by the latch so that the 3rd combination section with described 4th group Conjunction portion combines;Or,
3rd combination section and the 4th combination section are circular hole, by fixation kit through the 3rd combination section and described 4th combination section, so that the 3rd combination section is combined with the 4th combination section.
4. metal roofing tile group as claimed in claim 1, it is characterised in that breach of first combination section comprising strip, Breach of second combination section comprising strip.
5. metal roofing tile group as claimed in claim 1, it is characterised in that further include second support and eave tile part, described second Support is inverted u-shaped structure, and the eave tile part is combined for dome shape, and the eave tile part is located at the other end of the metal semicircular tile, And it is sheathed on the second support.
6. metal roofing tile group as claimed in claim 5, it is characterised in that the both sides of the second support have the 5th group respectively Conjunction portion, the top that the top of the second support has the 6th combination section, the eave tile part has the 7th combination section, wherein by Fixation kit makes first combination section be combined with the 5th combination section, and the 6th combination section and the 7th combination section It is assembled.
7. metal roofing tile group as claimed in claim 6, it is characterised in that the 6th combination section includes latch, the described 7th Combination section is cavernous structure, and the cavernous structure is inserted by the latch so that the 6th combination section with described 7th group Conjunction portion combines;Or,
6th combination section and the 7th combination section are circular hole, by fixation kit through the 6th combination section and described 7th combination section, so that the 6th combination section is combined with the 7th combination section.
8. the metal roofing tile group as described in claim 6, it is characterised in that the 5th combination section is the breach of strip.
9. metal roofing tile group as claimed in claim 1, it is characterised in that the metal pan tile further includes 2 first slide rails hook Portion, its two madial wall for being respectively arranged at the metal pan tile, the metal semicircular tile further includes 2 second slide rail hook parts, its difference Two madial walls of the metal semicircular tile are arranged at, when assembling, described 2 second slide rail hook parts of the metal semicircular tile are slided respectively It is dynamic to hook in the both sides of the first support two described in metal pan tile the first slide rail hook part wherein described in.
10. a kind of metal roofing tile group, it is characterised in that include:
Multiple metal cylinder pan tiles, it is included respectively:
Metal pan tile, it is U-shaped structure by end sight, and the side of the metal pan tile is provided with the first slide rail hook part;
Metal semicircular tile, is inverted u-shaped structure, and the side of the metal semicircular tile is integrally formed to be connected to the another of the metal pan tile Side, and the opposite side of the metal semicircular tile has the second slide rail hook part;And
An at least first support, is arranged in the metal semicircular tile to support the metal semicircular tile;
Wherein, when multiple metal cylinder pan tiles are connected side by side, wherein the metal semicircular tile of metal cylinder pan tile described in The second slide rail hook part hook is in the first slide rail hook part of the metal pan tile of another metal cylinder pan tile.
11. metal roofing tile groups as claimed in claim 10, it is characterised in that the other end of the metal pan tile has first end One end of portion and the metal pan tile has the second end, and the first end has the first overlap edge, the second end tool There is the second overlap edge in contrast to first overlap edge, wherein when the multiple metal cylinder pan tile is overlapped along end direction, by Overlapped with second overlap edge by first overlap edge, second overlap edge is the flanging for up bending, and institute State two madial walls that the second overlap edge connects the metal pan tile.
12. metal roofing tile groups as claimed in claim 11, it is characterised in that second overlap edge connects the metal pan tile The link position of two madial walls be equal to or higher than the company of the metal pan tile and the integrally formed connection of the metal semicircular tile Wiring.
13. metal roofing tile groups as claimed in claim 10, it is characterised in that the first support is inverted u-shaped shape or Z-shaped Type shape, and roof is fixed in the bottom of the first support, the top of the first support has the 3rd combination section, the gold The wherein side for belonging to the another opposite sides of semicircular tile is provided with the 4th combination section, and the 4th combination is bound to by the 3rd combination section Portion is with the fixation metal semicircular tile in the first support.
14. metal roofing tile groups as claimed in claim 13, it is characterised in that the 3rd combination section includes latch, described the Four combination sections include cavernous structure, and the latch of the 3rd combination section inserts the cavernous structure of the 4th combination section;Or,
3rd combination section and the 4th combination section are circular hole, wherein by fixation kit through the 3rd combination section with 4th combination section.
The 15. metal roofing tile group as described in claim 13 or 14, it is characterised in that the multiple metal cylinder pan tile is respectively One metal cylinder pan tile, the second metal cylinder pan tile, the 3rd metal cylinder pan tile, the 4th metal cylinder pan tile, fifth metal cylinder pan tile and the Six metal cylinder pan tiles, are connected to the second metal cylinder pan tile the first metal cylinder pan tile and have institute in order when assembling The side of the 4th combination section is stated, the 3rd metal cylinder pan tile is connected to the metal pan tile of the first metal cylinder pan tile Side, the 4th metal cylinder pan tile is connected into the second metal cylinder pan tile has the side of the 4th combination section, Fifth metal cylinder pan tile is connected between the second metal cylinder pan tile and the 3rd metal cylinder pan tile, by described the Six metal cylinder pan tiles are connected to the side of the metal pan tile of the 3rd metal cylinder pan tile.
16. metal roofing tile groups as claimed in claim 10, it is characterised in that further include second support and eave tile part, described Two supports are inverted u-shaped structure, and the eave tile part is combined for dome shape, and the eave tile part is located at the another of the metal semicircular tile End, and it is sheathed on the second support.
CN201621230523.6U 2015-11-16 2016-11-16 Metal roof tile set Expired - Fee Related CN206267426U (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
TW104137771 2015-11-16
TW104137771A TWI579442B (en) 2015-11-16 2015-11-16 Metal roofing tile assembly
TW105212029 2016-08-09
TW105212029U TWM534209U (en) 2016-08-09 2016-08-09 Metal roofing tile assembly

Publications (1)

Publication Number Publication Date
CN206267426U true CN206267426U (en) 2017-06-20

Family

ID=59040725

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201621230523.6U Expired - Fee Related CN206267426U (en) 2015-11-16 2016-11-16 Metal roof tile set
CN201611007960.6A Pending CN106948552A (en) 2015-11-16 2016-11-16 Metal roof tile set

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201611007960.6A Pending CN106948552A (en) 2015-11-16 2016-11-16 Metal roof tile set

Country Status (1)

Country Link
CN (2) CN206267426U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948552A (en) * 2015-11-16 2017-07-14 齐瓦室企业有限公司 Metal roof tile set

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756080A (en) * 2018-07-09 2018-11-06 汉能移动能源控股集团有限公司 Cylindrical tile and roof tile set

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321902A (en) * 2002-05-02 2003-11-14 Akimori Matsubara Shape and structure of roofing material and fixing method thereof
CN2832968Y (en) * 2005-09-06 2006-11-01 王立柱 Metal tile
CN101886447B (en) * 2010-08-12 2012-06-27 中国建筑股份有限公司 Al-Mg-Mn alloy plate archaizing roof tile and manufacturing method thereof
CN202440999U (en) * 2012-02-02 2012-09-19 金星铜集团有限公司 Connected metal tile
CN206267426U (en) * 2015-11-16 2017-06-20 齐瓦室企业有限公司 Metal roof tile set

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948552A (en) * 2015-11-16 2017-07-14 齐瓦室企业有限公司 Metal roof tile set

Also Published As

Publication number Publication date
CN106948552A (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN206267426U (en) Metal roof tile set
KR101739251B1 (en) Prefabricated building panels
KR101682202B1 (en) A exterior panels of a building
CN202416721U (en) Lower-hidden upper-seam fixed high standing side hidden-interlocking roof panel structure
CN201254790Y (en) Straight standing overlock type roof board
CN205712779U (en) The mounting structure of roofing glazed tiles
CN109025081A (en) A kind of multi-functional Al-Mg-Mn Roof system and construction method
CN209586032U (en) Windowsill component
CN202866088U (en) Combined type opening skylight installing support
CN203905314U (en) Steel structure building roof temperature deformation joint structure
CN202925770U (en) Metal sheet roof connecting bracket
France-Presse France decrees new rooftops must be covered in plants or solar panels
CN202248572U (en) Waterproof structure of metal member and metal roofing structure
CN102704669B (en) The total sub-semigroup mounting method of cross bar inserted sheet
CN204334448U (en) Pitched roof solar panel draw bail
CN205208971U (en) Venetian blind type solar water heater
HRP20220647T1 (en) Eave
CN207700545U (en) A kind of Combined movable house eaves structure
CN203145341U (en) Steel structure ridge waterproof structure
CN204343553U (en) A kind of preventing water leakage building
CN203867090U (en) Metal roof plate free end wind-resistant connecting piece capable of meeting requirements on thermal expansion and contraction
CN204062450U (en) Steel angle structure body
CN204343554U (en) A kind of construction shingle
CN208830641U (en) A kind of parquets stone material
CN205000520U (en) Kitchen drainage floor board, whole kitchen and building body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20211116