TWI513877B - The anchored seismic isolated floating foundation system and construction method - Google Patents

The anchored seismic isolated floating foundation system and construction method Download PDF

Info

Publication number
TWI513877B
TWI513877B TW102118886A TW102118886A TWI513877B TW I513877 B TWI513877 B TW I513877B TW 102118886 A TW102118886 A TW 102118886A TW 102118886 A TW102118886 A TW 102118886A TW I513877 B TWI513877 B TW I513877B
Authority
TW
Taiwan
Prior art keywords
floating
foundation
steel
concrete
floating foundation
Prior art date
Application number
TW102118886A
Other languages
Chinese (zh)
Other versions
TW201445023A (en
Inventor
Hsiang Jung Lin
Original Assignee
Hsiang Jung Lin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hsiang Jung Lin filed Critical Hsiang Jung Lin
Priority to TW102118886A priority Critical patent/TWI513877B/en
Publication of TW201445023A publication Critical patent/TW201445023A/en
Application granted granted Critical
Publication of TWI513877B publication Critical patent/TWI513877B/en

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Foundations (AREA)

Description

繫留隔震漂浮基礎系統及其構築工法 Tethered isolation and floating floating foundation system and its construction method

本發明所屬之技術領域:本隔震浮動基礎系統構築之工法,特別係於工廠內完成如第20、21、及22圖所示以鋼筋、模板、絕水發泡材料(21,兼作內模)及彈性隔震活動支承上部總成(23a)組成之各式浮動基礎單元模組(25W0S0至25W2S2,簡稱單元模組)、繫纜柱(22)及側模側撐(24)等,使各式單元模組能利用現有之車輛及道路載運至易淹水地區供組合成完整之浮動基礎模組(簡稱浮基模組)並於加強側模側撐及組立頂版鋼筋後,只需於現場澆注水密性混凝土即可完成所需體積之浮動基礎;然後於現場埋設繫柱(4)及安裝浮筒(5)以繫纜(16)與浮動基礎上繫纜柱(22)連接來完成整個繫留隔震浮動基礎系統之施工方法;來大量簡化浮動基礎之現場施工作業並解決傳統大體積浮動基礎無法由陸上運輸至易淹水地區之困難。 The technical field to which the present invention pertains: the construction method of the isolated and isolated floating foundation system, in particular, is completed in the factory as shown in Figures 20, 21, and 22 with steel bars, stencils, and water-insulating foam materials (21, also serving as internal molds). And various types of floating base unit modules (25W0S0 to 25W2S2, referred to as unit modules), bollards (22) and side mold side supports (24) composed of the upper assembly (23a) of the elastic isolation movable support All types of unit modules can be transported to flood-prone areas by existing vehicles and roads for assembly into a complete floating foundation module (referred to as a floating base module) and after reinforcing the sideform side braces and assembling the top plate reinforcement, only The floating foundation of the required volume can be completed by pouring the watertight concrete on site; then the bollard (4) and the installation buoy (5) are buried on the site to connect the tether (16) with the floating foundation bollard (22). The construction method of the entire tethered and isolated floating foundation system; to greatly simplify the on-site construction work of the floating foundation and solve the difficulty that the traditional large-volume floating foundation cannot be transported from land to flood-prone areas.

本發明相關之先前技術: Prior art related to the present invention:

1.傳統之浮動基礎在遭遇地震而水平左右震動時,如第1圖之(a)所示當地面移動方向(17)向左時,傳統浮動基礎(1)因慣性力而移動方向為向右(18),傳統浮動基礎、繫柱束框(14)與傳統繫柱(13)會相互碰撞;當地面移動方向相反時,則會使傳統浮動基礎、繫柱束框與傳統繫柱間受到拉扯,如此往復地作用會使繫柱束框(14)損壞而脫離,因此當水淹時則會如第1圖之(a1)所示導致傳統浮動基礎(1)有四處漂流而有撞毀之危險。 1. The traditional floating foundation is shaken horizontally when it encounters an earthquake. When the local surface moving direction (17) is to the left as shown in Fig. 1(a), the traditional floating foundation (1) moves in the direction due to the inertial force. Right (18), the traditional floating foundation, the bollard frame (14) and the traditional bollar (13) will collide with each other; when the local plane moves in the opposite direction, it will make the traditional floating foundation, the bollard frame and the traditional bollar Being pulled, such reciprocating action will damage the bobbin frame (14) and detach it, so when flooded, it will cause the traditional floating foundation (1) to have four drifts and collide as shown in (a1) of Fig. 1 The danger of destruction.

2.傳統之浮動基礎在遭遇地震而垂直上下震動時,如第1圖之(b)所示當地面移動方向(17)向上時,傳統浮動基礎(1)因慣性力而移動方向為向下 (18),傳統浮動基礎(1)與地面會相互碰撞,傳統浮動基礎與地面往復碰撞後會使浮動基礎底版及外牆受損毀,因此當水淹時則會如第1圖之(b1)所示使水經由損毀處滲入傳統浮動基礎(1)內,會導致浮動基礎傾斜甚致沉沒之危險。 2. When the traditional floating foundation vibrates vertically up and down in the event of an earthquake, as shown in Figure 1 (b), when the local surface moving direction (17) is upward, the traditional floating foundation (1) moves downward due to the inertial force. (18), the traditional floating foundation (1) and the ground will collide with each other. The traditional floating foundation will collide with the ground and cause the floating base plate and the outer wall to be damaged. Therefore, when flooded, it will be as shown in Figure 1 (b1). The infiltration of water into the traditional floating foundation (1) via the damage can result in the risk of the sinking of the floating foundation sinking.

3.傳統之浮動基礎(1)係如第1圖之(c)所示以繫纜(16)直接連接地面下之傳統錨碇(15)來固定,當水淹甚高時則會如第1圖之(c1)所示因傳統錨碇(15)在水面下甚深,會使傳統浮動基礎(1)傾斜,當水流速大時浮動基礎恐有傾覆沉沒之危險。 3. The traditional floating foundation (1) is fixed as shown in Figure 1 (c) with the tether (16) directly connected to the traditional anchor (15) under the ground. When the flooding is high, it will be as 1 (c1) shows that the traditional anchor foundation (15) is deep under the water surface, which will tilt the traditional floating foundation (1). When the water flow rate is large, the floating foundation may be overturned and sunk.

4.傳統之浮動基礎體積大者係於水邊或船塢內預鑄完成,再由水路拖曳至泊地錨碇,但此方式因體積大無法經由陸路運輸故無法用於陸上易淹水地區房舍之防淹,故易淹水地區內陸上體積大之浮動基礎只能在現場製造;但體積大之浮動基礎在現場製造時需於現場依底版、牆身、頂版等順序來彎紮鋼筋、組拆模板、安裝其他配合之支撐構件等,然後配合該順序澆注混凝土來完成浮動基礎之施作,因此其施工作業繁複而需時甚久。 4. The traditional floating foundation is bulky at the water's edge or in the dock, and then towed by the waterway to the mooring anchor. However, this method cannot be used for land-based flooded areas due to its large size and cannot be transported by land. It is flood-proof, so the bulky floating foundation in the inland flooded area can only be manufactured on site; but the large floating foundation needs to be bent at the site according to the order of the bottom plate, the wall body and the top plate. The group is demolished, other supporting members are installed, and then the concrete is poured in accordance with the sequence to complete the application of the floating foundation. Therefore, the construction work is complicated and takes a long time.

本發明之內容: The content of the invention:

1.本發明是一種繫留隔震浮動基礎系統及其構築工法,該系統如第7及40圖所示係將內具有隔牆(2c)及絕水發泡材料(21)底版下有彈性隔震活動支承(23a)之水密性鋼筋混凝土隔震浮動基礎(2),置於含有活動支承下承鋼鈑(23b1)之地面上支承基礎版(3)上,再以浮動基礎上之繫纜柱(22)以繫纜(16)與穿過繫柱(4)之浮筒(5)連接成之繫留隔震浮動基礎系統;能於遭遇地震時浮動基礎及繫留系統不受損壞,而於水漲高於地面時即使受流木或漂浮物撞擊,仍能安全地浮在水上固定範圍之繫留隔震浮動基礎系統。 1. The present invention is a mooring-isolated floating base system and a construction method thereof. The system has a partition wall (2c) and a water-repellent foam material (21) under the bottom plate as shown in Figures 7 and 40. The watertight reinforced concrete isolated floating foundation (2) of the seismic isolation support (23a) is placed on the ground support basic plate (3) with the movable support lower steel raft (23b1), and then on the floating foundation The bollard (22) is a tethered floating base system connected by a tether (16) and a buoy (5) passing through the bollard (4); the floating foundation and the tethered system are protected from damage during an earthquake. When the water rises above the ground, even if it is hit by drifting wood or floating objects, it can safely float on the fixed-seismic floating base system in the fixed area of the water.

2.本繫留隔震浮動基礎系統構築之工法,係於工廠內完成如第20、21及22圖所示以鋼筋、模板、保護層墊塊、絕水發泡材料(21)及彈性隔震活動支承上部總成(23a)組成之各式浮動基礎單元模組(25W0S0至25W2S2,簡稱單元模組);並在工廠內完成如第10及15圖所示之繫纜柱(22)、浮筒(5)、 繫柱(4)及側模側撐(24)等構件;再如第30、33及37圖於現場完成地面基礎版(3)構築後,於基礎版上組合各式單元模組,並於各單元模組加強側模側撐(24)及組立浮動基礎頂版鋼筋(2a1)後,於現場澆注水密性混凝土來完成鋼筋混凝土隔震浮動基礎(2);再如第39及40圖在現場進行繫柱(4)之埋設及浮筒(5)、繫纜(16)之安裝來完成整個繫留隔震浮動基礎系統構築之工法。 2. The construction method of the system for seismic isolation and floating foundation system is completed in the factory as shown in Figures 20, 21 and 22 with steel bars, stencils, protective layer blocks, water-tight foaming materials (21) and elastic partitions. Each of the floating base unit modules (25W0S0 to 25W2S2, referred to as a unit module) composed of the upper assembly (23a) of the seismic activity support; and the bollard (22) shown in Figures 10 and 15 is completed in the factory, Float (5), The column (4) and the side mold side support (24) and other components; and after the completion of the ground basic version (3) on the site as shown in Figures 30, 33 and 37, the various unit modules are combined on the basic plate, and After the unit modules strengthen the side mold side braces (24) and form the floating foundation top plate steel bars (2a1), the watertight concrete is poured on site to complete the reinforced concrete isolation floating foundation (2); as shown in Figures 39 and 40 The installation of the bollard (4) and the installation of the buoy (5) and the tether (16) are carried out on site to complete the construction of the entire tethered isolation and floating foundation system.

1.目前傳統之浮動基礎在遭遇地震而浮動基礎因慣性力而水平左右震動時,如第1圖之(a)所示傳統之浮動基礎(1)會與傳統繫柱束框(14)及傳統繫柱(13)相互碰撞及拉扯導致傳統繫柱束框(14)損壞而脫離,因此當水淹時會如第1圖之(a1)所示使傳統浮動基礎(1)四處漂流而有受流木或飄浮物撞毀之危險。 1. At present, the traditional floating foundation is subjected to an earthquake and the floating foundation is horizontally vibrated by the inertial force. The traditional floating foundation (1) shown in Figure 1 (a) will be combined with the traditional bobbin beam frame (14). The traditional bollards (13) collide and pull each other, causing the traditional bobbin bundle frame (14) to be damaged and detached. Therefore, when flooding, the traditional floating foundation (1) is drifted as shown in (a1) of Fig. 1 Risk of being hit by falling trees or floating objects.

2.傳統之浮動基礎在遭遇地震而浮動基礎因慣性力而垂直上下震動時,如第1圖之(b)所示傳統浮動基礎(1)會與地面相互碰撞會導致傳統浮動基礎底版與外牆受損毀,因此當水淹時如第1圖之(b1)所示則會使水經由損毀處滲入傳統浮動基礎內,會導致浮動基礎傾斜甚致於有沉沒之危險。 2. The traditional floating foundation is subjected to an earthquake and the floating foundation is vertically vibrated up and down due to the inertial force. As shown in Fig. 1(b), the traditional floating foundation (1) will collide with the ground, which will result in the traditional floating foundation and the outer layer. The wall is damaged, so when flooded, as shown in Figure 1 (b1), water will seep into the traditional floating foundation through the damage, which will cause the floating foundation to tilt to the danger of sinking.

3.另外傳統浮動基礎(1)如第1圖之(c)所示係以繫纜(16)直接連接地面下之傳統錨碇(15)來固定,當水淹甚高時如第1圖之(c1)所示則會因傳統錨碇(15)在水面下甚深,而使傳統浮動基礎傾斜,當水流速大時浮動基礎恐有傾覆沉沒之危險。 3. The other traditional floating foundation (1) is fixed as shown in Figure 1 (c) with the tether (16) directly connected to the traditional anchor (15) under the ground. When the flooding is very high, as shown in Figure 1. The (c1) shows that the traditional anchor foundation (15) is deep under the water surface, and the traditional floating foundation is inclined. When the water flow rate is large, the floating foundation may be overwhelmed.

4.傳統之浮動基礎體積大者係於水邊或船塢內預鑄完成,再由水路拖曳至泊地錨碇,但此方式因體積大無法經由陸路運輸故無法用於陸上易淹水地區房舍之防淹。故易淹水地區內陸上體積大之浮動基礎因廠鑄無法陸上運輸只能在現場製造;但體積大之浮動基礎在現場製造時需於現場依底版、牆身、頂版等順序來彎紮鋼筋、組拆模板、安裝其他配合之構件及澆注混凝土來完成浮動基礎之施作,因此其施工作業繁複而需時甚久。 4. The traditional floating foundation is bulky at the water's edge or in the dock, and then towed by the waterway to the mooring anchor. However, this method cannot be used for land-based flooded areas due to its large size and cannot be transported by land. Flood prevention. Therefore, the large floating base in the inland waters of the flood-prone area can only be manufactured on site due to the inability of land-based transportation; however, the large-scale floating foundation needs to be bent at the site according to the order of the bottom plate, the wall body and the top plate. Reinforcement, group demoulding, installation of other matching components and pouring concrete to complete the construction of the floating foundation, so the construction work is complicated and takes a long time.

1.本發明之繫留隔震浮動基礎(2)如第7及9圖所示底部具有彈性隔震活動支承上部總成(23a,含底面鐵氟龍板),浮動基礎係置於含有活動支承下承鋼鈑(23b1,頂面含鐵氟龍板)之地面基礎版(3)上,當地震時浮動基礎與地面有水平相對移動時,由於浮動基礎底部之彈性隔震活動支承上部總成(23a)與地面基礎版(3)之鐵氟龍板間之低摩擦力,會使浮動基礎在地面基礎版上滑動而不受地震水平力之損害;當浮動基礎用繫纜(16)與其上之繫纜柱(22)及距浮動基礎相當距離穿過繫柱(4)上之浮筒(5)連接構成繫留系統後,能使浮動基礎遭遇地震時本身及繫留系統不會互相撞擊而受損壞,因此當水漲高於地面時如第5圖所示能安全地浮在水上固定範圍而不四處漂流致有撞毀之危險。 1. The tethered floating base of the present invention (2) has a resilient isolation movable support upper assembly (23a, including a bottom Teflon plate) at the bottom as shown in Figures 7 and 9, and the floating foundation is placed to contain activities. Supporting the ground support plate (3) of the lower steel shovel (23b1, top surface containing Teflon plate), when the floating foundation and the ground move horizontally relative to each other during the earthquake, the upper part of the floating base supports the upper part The low friction between the (23a) and the ground-based version (3) of the Teflon plate will cause the floating foundation to slide on the ground basic plate without being damaged by the horizontal force of the earthquake; when the floating foundation is used (16) After connecting the bollard (22) and the float (5) on the bollard (4) at a considerable distance from the floating foundation to form a mooring system, the floating foundation can be subjected to an earthquake and the tethering system does not The impact is damaged, so when the water rises above the ground, as shown in Figure 5, it can safely float on the fixed surface of the water without drifting around to cause the danger of collision.

2.本發明之繫留隔震浮動基礎(2)如第7及9圖所示底部具有彈性隔震活動支承上部總成(23a,含橡膠支承墊(23a5))當地震時浮動基礎與地面有垂直相對移動時,該橡膠支承墊能吸收垂直震動之能量,使浮動基礎不因地震垂直力而使其底版及外牆遭受損毀。因此當水淹漲高於地面時配合前述之繫留系統亦如第5圖所示自然能安全地浮在水上固定範圍而不四處漂流致有被撞毀之危險。 2. The tethered floating base of the present invention (2) as shown in Figures 7 and 9 has an elastic isolation movable support upper assembly (23a, rubber bearing pad (23a5)). When there is vertical relative movement, the rubber support pad can absorb the energy of the vertical vibration, so that the floating foundation does not damage the bottom plate and the outer wall due to the vertical force of the earthquake. Therefore, when the water floods above the ground, the above-mentioned mooring system can naturally float safely on the water fixed range as shown in Fig. 5 without drifting around to cause the danger of being destroyed.

3.本發明之繫留隔震浮動基礎(2)如第6及7圖所示特別因於內有隔牆(2c)將浮動基礎內部分隔成數個獨立之內艙,並將內艙之空間以絕水發泡材料(21)填滿,當浮動基礎在漂浮時即使受流木或漂浮物撞擊致外牆或底版受損之狀況下,仍能使滲水無法進入浮動基礎內部之空間而保持浮動基礎原有之浮力,使浮動基礎能安全地浮在水面上而不會沉沒。 3. The tethered floating base of the present invention (2) is shown in Figures 6 and 7 because of the partition wall (2c), which partitions the interior of the floating foundation into a plurality of independent inner compartments, and the space of the inner compartment Filled with the water-insulating foaming material (21), when the floating foundation is floating, even if the outer wall or the bottom plate is damaged by the impact of the drifting wood or floating objects, the water seepage cannot enter the space inside the floating foundation and remain floating. The original buoyancy of the foundation allows the floating foundation to float safely on the surface without sinking.

4.本發明如第7及40圖所示由浮動基礎上之繫纜柱(22)及距浮動基礎相當距離之繫柱(4)與穿過其中之浮筒(5)以繫纜(16)連接而構成繫留系統;如第5圖所示當水淹時浮筒(5)會沿繫柱(4)上下隨水面浮動,因此當水淹甚高於地面時,經由浮筒(5)連接浮動基礎(2)與繫柱(4)之繫纜(16)仍能與水面保持水平,因此當水流速大時浮動基礎不會受傾斜之繫纜拉扯而生傾覆之危險。 4. The present invention, as shown in Figures 7 and 40, is provided by a bollard (22) on a floating foundation and a bollard (4) at a considerable distance from the floating foundation and a tumbler (5) passing therethrough to tie the tether (16) Connected to form a mooring system; as shown in Figure 5, the buoy (5) floats up and down the water along the bollard (4) when flooded, so when the flooding is higher than the ground, the float is connected via the buoy (5) The tether (16) of the foundation (2) and the bollar (4) can still be level with the water surface, so that when the water flow rate is large, the floating foundation is not caught by the inclined tether and is overturned.

5.本發明之繫留隔震浮動基礎系統構築之工法,係為解決廠鑄大體積浮動基礎無法經由陸上運輸及現場製造大體積浮動基礎因現場施工作業繁複 而需時甚久之問題,今說明如下: 5. The construction method of the tethered floating floating foundation system of the present invention is to solve the problem that the large-volume floating foundation of the factory cannot be transported by land and the large-volume floating foundation is manufactured on site, because the on-site construction work is complicated. The problem that takes a long time is as follows:

a.首先於工廠內完成能利用現有車輛及道路載運至易淹及水地區之各式浮動基礎單元模組(簡稱單元模組);如第18圖所示以寬X長X高=(6-7.5m)X(8-10m)X2.9m為例之浮動基礎說明,將該浮動基礎規劃成不含浮動基礎頂版之3行X 4列共12個(2-2.5m)X(2-2.5m)X2.9m之浮動基礎單元(25),然後將該等浮動基礎單元模組化成暫未澆注水密性混凝土之單元模組,而如第19、20、21及22圖所示之4個W2S2型(25W2S2)、4個WIS1a型(25WIS1a)、1個W0S0型(25 W0S0)、1個W0S1型(25 W0S1)及2個W1S2型(25W1S2)之單元模組。 a. Firstly, complete various floating basic unit modules (referred to as unit modules) that can be transported to the flooded and watery areas by using existing vehicles and roads; as shown in Figure 18, width X length X height = (6) -7.5m) X (8-10m) X2.9m is an example of floating foundation. The floating base is planned to be 3 rows of X 4 columns without floating base top plate (12-2.5m) X (2 -2.5m) X2.9m floating base unit (25), and then modularize the floating base unit into a unit module for temporarily uncasting watertight concrete, as shown in Figures 19, 20, 21 and 22 Four W2S2 type (25W2S2), four WIS1a type (25WIS1a), one W0S0 type (25 W0S0), one W0S1 type (25 W0S1) and two W1S2 type (25W1S2) unit modules.

b.再於工廠內如第20、21及22圖所示依現場所需之型式及數量以浮動基礎外牆鋼筋(2b1)、浮動基礎外牆鋼模(2b2)、外牆鋼模固定螺栓(2b3)、浮動基礎隔牆鋼筋(2c1)、浮動基礎底版鋼筋(2d1)、浮動基礎底模(2d2)、環型保護層墊塊(2e)、方型保護層墊塊(2f)及絕水發泡材料(21)等材料配合彈性隔震活動支承上部總成(23a)來組成所需之單元模組;同時在工廠內完成如第9、17、10及15圖所示之彈性隔震活動支承下部總成(23b)、側模側撐(24)、浮筒(5)、繫柱(4)及繫纜柱(22)等構件備用。 b. In the factory as shown in Figures 20, 21 and 22, according to the type and quantity required by the site, floating foundation reinforced concrete (2b1), floating foundation siding (2b2), external wall steel fixing bolt (2b3), floating base partition steel bar (2c1), floating base plate steel bar (2d1), floating foundation bottom die (2d2), ring-shaped protective layer pad (2e), square protective layer pad (2f) and Materials such as water-foamed material (21) are combined with elastic isolation to support the upper assembly (23a) to form the required unit modules; and the elastic partitions as shown in Figures 9, 17, 10 and 15 are completed in the factory. The seismic activity supports the lower assembly (23b), the side mold side supports (24), the floats (5), the bollards (4), and the bollards (22).

c.當如第30圖所示於現場完成含有支承下承鋼鈑(23b1,含鐵氟龍板(23d))之地面基礎版(3)構築後,於該基礎版上組合前面a點所述之12個各型單元模組(各單元模組間之接縫貼防水膠布來防止漏漿),並如第34圖於各單元模組外模加強側模側撐(24)後,先吊移各單元模組內絕水發泡材料(21)於完成各單元模組間橫向鋼筋之續接後(可用焊接或鋼筋續接器),於現場澆注浮動基礎底版水密性混凝土;接著於安裝繫纜柱(22)後於底版混凝土上塗新舊混凝土面接合劑(26),再如第35圖裝回各單元模組內絕水發泡材料(21)後澆注浮動基礎外牆及隔牆水密性混凝土;接著如第37圖於組立浮動基礎頂版鋼筋(2a1)及於外牆、隔牆混凝土頂面上塗新舊混凝土面接合劑(26)後,再澆注浮動基礎頂版水密性混凝土即可完成所需體積之繫留隔震浮動基礎。如依第24及25圖所示組合單元模組則除可完成2行X2列及2行X3列較小體積之浮動基礎外,若再依第26圖所示之單元模組數量或較此單元模組數量更多之方式組合單元模組則可完成5行X5列或更大體積之 浮動基礎,如此可以大量地簡化大體積浮動基礎現場製造之施工作業並且縮短其施工時程,同時並解決傳統大體積浮動基礎在水邊或船塢內預鑄完成後,只能由水路拖曳至泊地而無法由陸上運輸至易淹水陸上地區之困難。 c. When the ground foundation version (3) containing the supporting lower steel shovel (23b1, containing Teflon plate (23d)) is constructed on site, as shown in Figure 30, the front point a is combined on the basic plate. 12 types of unit modules (the joints between each unit module are covered with waterproof tape to prevent leakage), and as shown in Figure 34, after reinforcing the side mold side supports (24) in the outer molds of each unit module, Hanging the water-tight foaming material (21) in each unit module to complete the continuous reinforcement of the transverse steel bars between the modules (using welding or reinforcing steel splicer), pouring the floating foundation bottom watertight concrete on site; After installing the bollard (22), apply new and old concrete surface bonding agent (26) to the bottom concrete, and then replace the water-insulating foaming material (21) in each unit module as shown in Figure 35, and then cast the floating foundation exterior wall and partition wall. Watertight concrete; then, as shown in Figure 37, after assembling the floating foundation top plate steel (2a1) and coating the new concrete surface joint agent (26) on the outer wall and the partition wall concrete top surface, the floating foundation top plate watertight concrete is poured. A tethered floating base of the required volume can be completed. According to the combination of the unit modules shown in Figures 24 and 25, in addition to the floating base of the smaller volume of 2 rows X2 columns and 2 rows X3 columns, if the number of unit modules shown in Figure 26 is more than this The number of unit modules is more. The combination unit module can complete 5 rows X5 columns or larger. Floating foundation, which can greatly simplify the construction work of large-volume floating foundation on-site manufacturing and shorten the construction time, and solve the problem that the traditional large-volume floating foundation can only be towed by the waterway after completion of the waterside or dock. It is difficult to transport from land to flooded land areas.

d.最後在現場如第39及40圖進行繫柱(4)之埋設及浮筒(5)之安裝,並將繫纜(16)連接至浮動基礎之繫纜柱(22)上來完成浮繫留系統後,即可完成整個繫留隔震浮動基礎系統之構築。 d. Finally, the installation of the bollar (4) and the installation of the buoy (5) are carried out at the site as in Figures 39 and 40, and the tether (16) is attached to the bollard (22) of the floating foundation to complete the floating tether. After the system, the construction of the entire tethered isolation floating base system can be completed.

1.本發明之繫留隔震浮動基礎系統,因浮動基礎為水密性混凝土其內具有隔牆及絕水發泡材料且浮動基礎底部有彈性隔震活動支承,且浮動基礎置於含有活動支承下承鋼鈑之地面上支承基礎版上,再以繫纜與浮動基礎上之繫纜柱及繫柱上之浮筒連接構成之繫留系統後,能於遭遇地震時浮動基礎及繫留系統不受損壞,而於水漲高於地面時浮動基礎即使受漂流木或漂浮物撞擊仍能安全地浮在水面上,再配合於浮動基礎建造之輕型房屋可以提供易淹水地區居民能有安全居住之設施。 1. The system of the tethered floating base system of the present invention, the floating foundation is a watertight concrete having a partition wall and a water-tight foaming material, and the bottom of the floating foundation is supported by elastic isolation activities, and the floating foundation is placed with movable support. On the ground supporting the foundation plate of the lower steel shovel, after the mooring system is connected with the bollard on the floating foundation and the buoy on the bollard, the floating foundation and the mooring system can be encountered in the event of an earthquake. Damaged, and when the water rises above the ground, the floating foundation can float safely on the surface even if it is hit by drifting wood or floating objects. The light-weight house built with the floating foundation can provide residents in flood-prone areas with safe living. facility.

2.本發明之繫留隔震浮動基礎系統構築工法,係於工廠內完成能利用現有之車輛及道路載運至易淹水地區供組合之各式浮動基礎單元模組及繫纜柱、浮筒、繫柱及側模側撐等構件;只要在現場一完成地面基礎版構築後,即可於地面基礎版上組合所需體積浮動基礎之單元模組及相關配合之構件,只需於現場澆注混凝土即可在短時間內迅速地完成所需體積之繫留隔震浮動基礎;然後在現場進行繫柱之埋設及浮筒、繫纜之安裝即可完成整個繫留隔震浮動基礎系統之構築。 2. The construction method of the tethered floating floating foundation system of the present invention is to complete various floating basic unit modules, bollards and buoys, which can be combined with existing vehicles and roads to be flooded areas for use in the factory. Members such as the bollards and side struts; as long as the ground foundation is constructed on site, the unit modules of the required volume floating foundation and related components can be combined on the ground basic plate, and only the concrete is poured on site. The required volume of the suspension and isolation floating foundation can be quickly completed in a short time; then the installation of the bollard and the installation of the buoy and the tether can complete the construction of the entire tethered floating basic system.

1‧‧‧傳統浮動基礎 1‧‧‧Traditional floating foundation

11‧‧‧水密性混凝土 11‧‧‧Watertight concrete

12‧‧‧輕型房屋 12‧‧‧Light houses

13‧‧‧傳統繫柱 13‧‧‧Traditional column

14‧‧‧繫柱束框 14‧‧‧Using column frame

15‧‧‧傳統錨碇 15‧‧‧Traditional anchor

16‧‧‧繫纜 16‧‧‧Cable

17‧‧‧地面移動方向 17‧‧‧ Ground moving direction

18‧‧‧浮動基礎移動方向 18‧‧‧Floating basic movement direction

2‧‧‧繫留隔震浮動基礎(簡稱浮動基礎) 2‧‧‧Tethered isolation and floating foundation (referred to as floating foundation)

2a‧‧‧浮動基礎頂版 2a‧‧‧ Floating Basic Top Edition

2a1‧‧‧浮動基礎頂版鋼筋 2a1‧‧‧Floating foundation top plate reinforcement

2b‧‧‧浮動基礎外牆 2b‧‧‧ Floating Foundation Exterior

2b1‧‧‧浮動基礎外牆鋼筋 2b1‧‧‧ Floating Foundation Exterior Reinforcement

2b2‧‧‧浮動基礎外牆鋼模 2b2‧‧‧Floating basic exterior steel mould

2b3‧‧‧外牆鋼模固定螺栓 2b3‧‧‧External wall steel form fixing bolts

2c‧‧‧浮動基礎隔牆 2c‧‧‧Floating base partition

2c1‧‧‧浮動基礎隔牆鋼筋 2c1‧‧‧ Floating base partition reinforcement

2d‧‧‧浮動基礎底版 2d‧‧‧ Floating base plate

2d1‧‧‧浮動基礎底版鋼筋 2d1‧‧‧Floating base plate reinforcement

2d2‧‧‧浮動基礎底模 2d2‧‧‧Floating basic counter

2d3‧‧‧浮動基礎底模承材 2d3‧‧‧Floating basic base moulding material

2e‧‧‧環型保護層墊塊 2e‧‧‧ ring-shaped protective layer spacer

2f‧‧‧方型保護層墊塊 2f‧‧‧ square protective layer spacer

21‧‧‧絕水發泡材料 21‧‧‧Waterproof foaming material

22‧‧‧繫纜柱 22‧‧‧ bollard

22a‧‧‧繫纜柱鋼殼 22a‧‧‧ bollard steel shell

22b‧‧‧繫纜柱橫斜管 22b‧‧‧ bollard transverse tube

22c‧‧‧繫纜柱錨碇管 22c‧‧‧ bollard anchor pipe

23‧‧‧隔震活動支承 23‧‧‧isolated activity support

23a‧‧‧隔震支承上部總成 23a‧‧‧Isolation support upper assembly

23a1‧‧‧支承上承鋼鈑 23a1‧‧‧Supporting steel rafts

23a2‧‧‧支承固定鋼鈑 23a2‧‧‧Supported fixed steel files

23a3‧‧‧支承固定鋼鈑剪力筋 23a3‧‧‧Support fixed steel truss shear ribs

23a4‧‧‧支承上部固定螺栓 23a4‧‧‧Support upper fixing bolt

23a5‧‧‧橡膠支承墊 23a5‧‧‧Rubber support pad

23a6‧‧‧支承固定鋼鈑補強筋 23a6‧‧‧Support fixed steel reinforced ribs

23b‧‧‧隔震支承下部總成 23b‧‧‧Isolation support lower assembly

23b1‧‧‧支承下承鋼鈑 23b1‧‧‧Support under steel raft

23b2‧‧‧支承下承鋼鈑補強剪力筋 23b2‧‧‧Supporting under-supported steel reinforced reinforcing shear ribs

23b3‧‧‧支承下承鋼鈑補強筋 23b3‧‧‧Supported under steel reinforced ribs

23c‧‧‧環氧樹脂塗層 23c‧‧‧ epoxy coating

23d‧‧‧鐵氟龍板(PTFE) 23d‧‧‧Teflon plate (PTFE)

24‧‧‧側模側撐 24‧‧‧ sideform side support

24a‧‧‧T型側撐 24a‧‧‧T-type side support

24a1‧‧‧T型側撐槽型孔 24a1‧‧‧T-type side bracket hole

24a2‧‧‧側撐槽口 24a2‧‧‧ side brackets

24a3‧‧‧T型側撐頂鈑 24a3‧‧‧T-type side struts

24a4‧‧‧側撐槽口側鈑 24a4‧‧‧ side bracket side 钣

24a5‧‧‧T型側撐加勁鈑 24a5‧‧‧T-type side support stiffener钣

24a6‧‧‧固定樁定位鈑 24a6‧‧‧Fixed pile positioning钣

24a7‧‧‧T型側撐底鈑 24a7‧‧‧T-type side sill

24a8‧‧‧調整鈑 24a8‧‧‧Adjustment

24a9‧‧‧固定樁 24a9‧‧‧fixed pile

24b‧‧‧L型斜撐 24b‧‧‧L type bracing

24c‧‧‧螺栓 24c‧‧‧ bolt

24c1‧‧‧墊圈 24c1‧‧‧washer

24c2‧‧‧螺栓孔 24c2‧‧‧Bolt hole

24c3‧‧‧十字型螺帽 24c3‧‧‧Cross-type nut

25‧‧‧浮動基礎單元 25‧‧‧ Floating base unit

25W0S0‧‧‧W0S0型浮動基礎單元模組(無外牆、無隔牆) 25W0S0‧‧‧W0S0 floating basic unit module (no external wall, no partition)

25W0S1‧‧‧W0S1型浮動基礎單元模組(無外牆、一面隔牆) 25W0S1‧‧‧W0S1 floating base unit module (no external wall, one partition)

25W0S2‧‧‧W0S2型浮動基礎單元模組(無外牆、二面隔牆) 25W0S2‧‧‧W0S2 floating basic unit module (no external wall, two-sided partition)

25W1S0‧‧‧W1S0型浮動基礎單元模組(一面外牆、無隔牆) 25W1S0‧‧‧W1S0 floating basic unit module (one external wall, no partition)

25W1S1a‧‧‧W1S1a型浮動基礎單元模組(一面外牆、一面不接外牆之隔牆) 25W1S1a‧‧‧W1S1a floating base unit module (one wall, one wall without a wall)

25W1S1b‧‧‧W1S1b型浮動基礎單元模組(一面外牆、一面接外牆之隔牆) 25W1S1b‧‧‧W1S1b floating basic unit module (one outer wall, one side connected to the outer wall)

25W1S2‧‧‧W1S2型浮動基礎單元模組(一面外牆、二面隔牆) 25W1S2‧‧‧W1S2 floating basic unit module (one outer wall, two sides partition wall)

25W2S0‧‧‧W2S0型浮動基礎單元模組(二面外牆、無隔牆) 25W2S0‧‧‧W2S0 floating base unit module (two-sided exterior wall, no partition wall)

25W2S1‧‧‧W2S1型浮動基礎單元模組(二面外牆、一面隔牆) 25W2S1‧‧‧W2S1 floating base unit module (two-sided outer wall, one partition)

25W2S2‧‧‧W2S2型浮動基礎單元模組(二面外牆、二面隔牆) 25W2S2‧‧‧W2S2 floating base unit module (two-sided outer wall, two-sided partition wall)

26‧‧‧新舊混泥土面接合劑 26‧‧‧New and old concrete surface joints

3‧‧‧地面基礎版 3‧‧‧ Ground Basic Edition

3a‧‧‧地面基礎版開挖 3a‧‧‧ Ground Foundation Excavation

3b‧‧‧地面基礎版鋼筋 3b‧‧‧ Ground Foundation Rebar

3c‧‧‧地面基礎版側模 3c‧‧‧ Ground-based version of the sideform

31‧‧‧地面下基礎 31‧‧‧ Ground under the ground

31a‧‧‧地面下基礎開挖 31a‧‧‧Underground excavation

31b‧‧‧地面下基礎鋼筋 31b‧‧‧Underground foundation reinforcement

33‧‧‧混凝土 33‧‧‧ concrete

4‧‧‧繫柱 4‧‧‧ column

41‧‧‧繫柱蓋鈑 41‧‧‧Tie cover

42‧‧‧蓋鈑錨筋 42‧‧‧ Covering anchor

43‧‧‧柱洞 43‧‧‧ column hole

5‧‧‧浮筒 5‧‧‧Float

51‧‧‧浮筒頂部鋼鈑 51‧‧‧Float top steel raft

52‧‧‧浮筒外殼鋼鈑 52‧‧‧Float shell steel 钣

53‧‧‧浮筒內殼鋼鈑 53‧‧‧Float inner casing

54‧‧‧浮筒底部鋼鈑 54‧‧‧ 钣 bottom of the pontoon

55‧‧‧浮筒內加勁鈑 55‧‧‧Floating inside the pontoon

56‧‧‧繫環錨筋 56‧‧‧ring ring anchor

6‧‧‧草地 6‧‧‧ grass

第1圖:傳統浮動基礎受震害及水淹示意圖 Figure 1: Schematic diagram of the damage and flooding of the traditional floating foundation

第2圖:繫留隔震浮動基礎系統示意圖 Figure 2: Schematic diagram of the tethered floating base system

第3圖:繫留隔震浮動基礎系統因地震而水平移動示意圖 Figure 3: Schematic diagram of the horizontal movement of the tethered floating base system due to earthquakes

第4圖:繫留隔震浮動基礎系統因地震而垂直移動示意圖 Figure 4: Schematic diagram of the vertical movement of the tethered floating base system due to earthquakes

第5圖:繫留隔震浮動基礎系統在水漲時漂浮示意圖 Figure 5: Schematic diagram of the floating system of the mooring isolation floating system when the water rises

第6圖:繫留隔震浮動基礎平面示意圖 Figure 6: Schematic diagram of the tethered floating base

第7圖:繫留隔震浮動基礎A-A剖面示意圖 Figure 7: Schematic diagram of the A-A section of the mooring isolation floating foundation

第8圖:繫留隔震浮動基礎B-B剖面示意圖 Figure 8: Schematic diagram of the B-B section of the mooring isolation floating foundation

第9圖:彈性隔震活動支承示意圖 Figure 9: Schematic diagram of elastic isolation activity support

第10圖:浮筒及繫柱示意圖 Figure 10: Schematic diagram of the buoy and the bollard

第11圖:浮筒及繫柱C-C剖面示意圖 Figure 11: Schematic diagram of the pontoon and bollard C-C

第12圖:浮筒D-D剖面示意圖 Figure 12: Schematic diagram of the pontoon D-D

第13圖:浮筒E-E剖面示意圖 Figure 13: Schematic diagram of the pontoon E-E

第14圖:繫柱蓋鈑示意圖 Figure 14: Schematic diagram of the column cover

第15圖:繫纜柱示意圖 Figure 15: Schematic diagram of the bollard

第16圖:繫纜柱F-F剖面示意圖 Figure 16: Schematic diagram of the cable column F-F

第17圖:側模側撐示意圖 Figure 17: Schematic diagram of side mold side braces

第18圖:繫留隔震浮動基礎分解成單元(3行X4列)示意圖 Figure 18: Schematic diagram of the decomposition of the floating isolation base into units (3 rows x 4 columns)

第19圖:繫留隔震浮動基礎(3行X4列)單元模組示意圖 Figure 19: Schematic diagram of unit module for mooring isolation floating base (3 rows x 4 columns)

第20圖:W0S0、W0S1及W0S2型浮動基礎單元模組示意圖 Figure 20: Schematic diagram of W0S0, W0S1 and W0S2 floating base unit modules

第21圖:W1S0、W1S1a、W1S1b及W1S2型浮動基礎單元模組示意圖 Figure 21: Schematic diagram of W1S0, W1S1a, W1S1b and W1S2 floating base unit modules

第22圖:W2S0、W2S1及W2S2型浮動基礎單元模組示意圖 Figure 22: Schematic diagram of W2S0, W2S1 and W2S2 floating base unit modules

第23圖:浮動基礎單元模組組成3行X4列浮動基礎模組示意圖 Figure 23: Schematic diagram of a floating base unit module consisting of 3 rows and 4 columns of floating basic modules

第24圖:浮動基礎單元模組組成2行X2列浮動基礎模組示意圖 Figure 24: Schematic diagram of the floating base unit module consisting of 2 rows and 2 columns of floating basic modules

第25圖:浮動基礎單元模組組成2行X3列浮動基礎模組示意圖 Figure 25: Schematic diagram of a floating base unit module consisting of 2 rows and 3 columns of floating basic modules

第26圖:浮動基礎單元模組組成5行X5列浮動基礎模組示意圖 Figure 26: Schematic diagram of a floating base unit module consisting of 5 rows and 5 columns of floating basic modules

第27圖:地面基礎系統開挖組模示意圖 Figure 27: Schematic diagram of the excavation of the ground foundation system

第28圖:地面基礎系統鋼筋組立示意圖 Figure 28: Schematic diagram of the reinforcement of the ground foundation system

第29圖:地面基礎系統隔震支承下部總成安裝示意圖 Figure 29: Schematic diagram of the installation of the lower assembly of the ground-based system isolation support

第30圖:地面基礎系統混凝土澆注完成示意圖 Figure 30: Schematic diagram of concrete pouring of ground foundation system

第31圖:繫留隔震浮動基礎底模承材配置完成示意圖 Figure 31: Schematic diagram of the completion of the configuration of the mooring isolation base model

第32圖:繫留隔震浮動基礎單元模組組成浮動基礎模組示意圖 Figure 32: Schematic diagram of a floating base module consisting of a mooring-isolated floating base unit module

第33圖:繫留隔震浮動基礎模組側模側撐完成示意圖 Figure 33: Schematic diagram of the lateral side bracing of the mooring isolation floating foundation module

第34圖:繫留隔震浮動基礎底版混凝土澆注完成示意圖 Figure 34: Schematic diagram of completion of tethered floating base foundation concrete pouring

第35圖:繫留隔震浮動基礎裝回防水發泡材料示意圖 Figure 35: Schematic diagram of the waterproofing foaming material for the tethered floating base

第36圖:繫留隔震浮動基礎牆身混凝土澆置完成示意圖 Figure 36: Schematic diagram of the concrete pouring of the floating isolation foundation wall

第37圖:繫留隔震浮動基礎頂版鋼筋組立完成示意圖 Figure 37: Schematic diagram of the completion of the tie-barrier floating foundation top plate reinforcement

第38圖:繫留隔震浮動基礎頂版混凝土澆置完成示意圖 Figure 38: Schematic diagram of the completion of the roofing of the floating isolation foundation

第39圖:浮動基礎繫柱及浮筒施工示意圖 Figure 39: Schematic diagram of floating foundation bollard and pontoon construction

第40圖:繫留隔震浮動基礎及浮動基礎繫留系統完成示意圖 Figure 40: Schematic diagram of the completion of the tethered floating base and the floating foundation tethering system

第41圖:繫留隔震浮動基礎系統構件廠內製造流程圖 Figure 41: In-plant manufacturing flow chart for the tethered isolated floating foundation system components

第42圖:繫留隔震浮動基礎系統現場施工流程圖 Figure 42: On-site construction flow chart of the system for the isolation and suspension of floating system

本發明實施之方式佐以相關圖示及流程圖第41及42圖分別說明如下: The manner of implementation of the present invention is illustrated by the related drawings and flowcharts 41 and 42 respectively.

壹、工廠內作業(各種浮動基礎單元模組及構件製造) 壹, factory operations (various floating base unit modules and component manufacturing)

一、隔震活動支承製造 I. Seismic activity support manufacturing

步驟a1、隔震活動支承材料整備:準備製造隔震活動支承用之鋼筋、鋼鈑、螺栓、環氧樹脂、鐵氟龍板及橡膠支承墊等材料。 Step a1, isolation and vibration support material preparation: preparation of materials for seismic isolation, such as steel bars, steel files, bolts, epoxy resin, Teflon plates and rubber support pads.

步驟a2、活動支承鋼鈑加工:將鋼鈑加工成如第9圖所示之支承上承鋼鈑(23a1)、支承固定鋼鈑(23a2)及支承下承鋼鈑(23b1)。 Step a2, movable supporting steel boring processing: the steel shovel is processed into a supporting upper steel shovel (23a1), a supporting fixed steel shovel (23a2) and a supporting lower shovel (23b1) as shown in Fig. 9.

步驟a3、剪力筋及補強筋加工:將鋼筋加工成支承固定鋼鈑剪力筋(23a3)、支承固定鋼鈑補強筋(23a6)、支承下承鋼鈑剪力筋(23b2)及支承下承鋼鈑補強筋(23b3)。 Step a3, shear ribs and reinforcing ribs processing: processing the steel bars into supporting fixed steel truss shear ribs (23a3), supporting fixed steel reinforced reinforcing ribs (23a6), supporting lower steel truss shearing ribs (23b2) and supporting Chenggang reinforced ribs (23b3).

步驟a4、鋼鈑焊接鋼筋及固定螺栓:將支承上部固定螺栓(23a4)、支承固定鋼鈑剪力筋(23a3)及支承固定鋼鈑補強筋(23a6)焊接在支承固定鋼鈑(23a2)上;亦將支承下承鋼鈑補強剪力筋(23b2)及支承下承鋼鈑補強筋(23b3)焊接在支承下承鋼鈑(23b1)上。 Step a4, steel reinforced bar and fixing bolt: welding the upper fixing bolt (23a4), the supporting fixed steel rib (23a3) and the supporting fixed steel reinforced rib (23a6) to the supporting fixed steel raft (23a2) The support steel reinforced reinforcing shear rib (23b2) and the supporting lower steel reinforced rib (23b3) are also welded on the supporting lower steel shovel (23b1).

步驟a5、上承鋼鈑安裝橡膠支承墊:將支承上承鋼鈑(23a1)塗環氧樹脂層(23c)後並安裝橡膠支承墊(23a5),然後再黏貼鐵氟龍板(23d)。 Step a5, installing the rubber support pad on the upper steel shovel: the epoxy resin layer (23c) is attached to the upper steel shovel (23a1) and the rubber support pad (23a5) is attached, and then the Teflon plate (23d) is attached.

步驟a6、隔震支承上部總成組合:將步驟a4中完成螺栓及鋼筋焊接之支承固定鋼鈑(23a2)與步驟a5中完成橡膠支承墊及鐵氟龍板安裝之支承上承鋼鈑(23a1)組合成隔震支承上部總成(23a)。 Step a6, the vibration isolation support upper assembly combination: the support fixed steel shovel (23a2) for completing the bolt and the steel bar welding in the step a4 and the support bearing steel 钣 (23a1) for completing the rubber support pad and the Teflon plate installation in the step a5 ) is combined into an isolation support upper assembly (23a).

步驟a7、隔震支承下部總成組合:將步驟a4中完成鋼筋焊接之支承下承鋼鈑(23b1)塗以環氧樹脂層(23c)後,再黏貼鐵氟龍板(23d)以組合成隔震支承下部總成(23b)。 Step a7, the vibration isolation support lower assembly assembly: the support steel shovel (23b1) which is finished in the step a4 is coated with the epoxy resin layer (23c), and then the Teflon plate (23d) is adhered to form The vibration is supported by the lower assembly (23b).

步驟a8、隔震支承上下部總成廠內堆置:將製造完成之隔震支承上部總成 (23a)及隔震支承下部總成(23b)編號堆置備用。 Step a8, the isolation and support of the upper and lower assembly in the factory: the completed seismic isolation support upper assembly (23a) and the isolation support lower assembly (23b) are stacked for standby.

二、浮動基礎單元模組製造 Second, floating basic unit module manufacturing

步驟b1、浮動基礎單元模組材料整備:準備製造浮動基礎單元模組(簡稱單元模組)用之鋼筋、底模、鋼模、固定螺栓、絕水發泡材料、環形及方形保護層墊塊等材料。 Step b1, floating base unit module material preparation: ready to manufacture floating base unit module (referred to as unit module) for reinforcing steel, bottom mold, steel mold, fixing bolt, water-insulating foam material, ring and square protective layer block And other materials.

步驟b2、單元模組模板組立:如第20、21及22圖所示依現場所需之型式及數量用浮動基礎底模(2d2)及浮動基礎外牆鋼模(2b2),以外牆鋼模固定螺栓(2b3)組合成各型單元模組之模板。 Step b2, unit module template assembly: as shown in Figures 20, 21 and 22, the floating base mold (2d2) and the floating foundation outer wall steel mold (2b2) according to the type and quantity required by the site, the outer wall steel mold The fixing bolts (2b3) are combined into a template of each type of unit module.

步驟b3、單元模組安裝彈性隔震活動支承上部總成:如第19圖依所需要之單元模組配合安裝上該型單元模組所需彈性隔震活動支承上部總成(23a)。 Step b3, the unit module is installed with an elastic isolation movable support upper assembly: as shown in Fig. 19, the unit module required to be fitted with the elastic isolation activity supporting upper assembly (23a) of the unit module.

步驟b4、單元模組底版、外牆、隔牆鋼筋組立:在各型模組之浮動基礎底模(2d2)上及浮動基礎外牆鋼模(2b2)旁,以浮動基礎底版鋼筋(2d1)、浮動基礎外牆鋼筋(2b1)、浮動基礎隔牆鋼筋(2c1)配合環型保護層墊塊(2e)及方型保護層墊塊(2f)組立單元模組之底版、外牆及隔牆之鋼筋。 Step b4, unit module bottom plate, outer wall, partition wall reinforcement group: on the floating foundation bottom mold (2d2) of each type module and next to the floating foundation outer wall steel mold (2b2), to float the basic bottom plate steel bar (2d1) , floating foundation outer wall steel bar (2b1), floating base partition wall steel bar (2c1) with ring type protective layer pad (2e) and square protective layer pad (2f) base unit, outer wall and partition wall Rebar.

步驟b5、單元模組安裝絕水發泡材料:在各型已完成鋼筋組立之模組內吊裝絕水發泡材料(21),兼做外牆及隔牆之免拆內模板。 Step b5, the unit module is installed with the water-tight foaming material: the water-insulating foaming material (21) is hoisted in the module of each type of steel bar which has been completed, and the outer template of the outer wall and the partition wall is also used.

步驟b6、單元模組廠內堆置:將完成之各型浮動基礎單元模組編號堆置備用。 Step b6: Stacking in the unit module factory: stacking the completed floating basic unit module numbers for standby.

三、浮動基礎繫柱製造 Third, floating foundation column manufacturing

步驟c1、繫柱材料整備:準備製造繫柱用之鋼筋、鋼鈑及鋼管等材料。 Step c1, the material of the bollard is prepared: preparing materials for the steel bars, steel shovel and steel pipes for the bollard.

步驟c2、繫柱製造:將鋼管裁切成如第10圖所示之繫柱(4)所需之長度,若長度太長無法於路上運輸則裁切成可於路上運輸之長度,然後再於現場焊接成所需之長度。 Step c2, manufacturing of the bollard: cutting the steel pipe into the length required for the bollard (4) as shown in Fig. 10. If the length is too long to be transported on the road, the length is cut to be transportable on the road, and then Solder to the required length on site.

步驟c3、繫柱蓋鈑製造:將鋼筋裁切成如第14圖所示之蓋鈑錨筋(42),將鋼鈑裁切成圓形之鋼鈑,然後將蓋鈑錨筋焊接在圓形鋼鈑上以完成繫 柱蓋鈑(41)。 Step c3, manufacturing the column cover: cutting the steel bar into a shackle anchor rib (42) as shown in Fig. 14, cutting the steel shovel into a round steel shovel, and then welding the shovel anchor rib to the circle Steel slab Column cover 钣 (41).

步驟c4、繫柱及蓋鈑廠內堆置:將完成之繫柱(4)及繫柱蓋鈑(41)堆置備用。 Step c4, stacking in the column and the lid factory: stacking the completed column (4) and the column cover (41) for use.

四、浮筒製造 Four, pontoon manufacturing

步驟d1、浮筒材料整備:準備製造浮筒用之鋼筋、鋼鈑及絕水發泡材料等材料。 Step d1: Float material preparation: Prepare materials such as steel bars, steel shovel and water-repellent foam materials for pontoons.

步驟d2、鋼鈑加工:將鋼鈑裁切成並碾彎成如第11、12及13圖所示浮筒(5)之浮筒頂部鋼鈑(51)、浮筒外殼鋼鈑(52)、浮筒內殼鋼鈑(53)、浮筒底部鋼鈑(54)及浮筒內加勁鈑(55)等浮筒構件。 Step d2, steel boring processing: the steel shovel is cut into and rolled into a pontoon top steel raft (51), a pontoon shell steel raft (52), and a pontoon in the pontoon (5) shown in Figures 11, 12 and 13 Float members such as shell steel crucible (53), steel raft at the bottom of the pontoon (54), and rifle (55).

步驟d3、鋼筋加工:將鋼筋裁切成並彎成繫環錨筋(56)。 Step d3, steel bar processing: the steel bar is cut into and bent into a ring anchor (56).

步驟d4、浮筒構件組合成浮筒:將步驟d2完成之浮筒外殼鋼鈑(52)、浮筒內殼鋼鈑(53)、浮筒底部鋼鈑(54)、浮筒內加勁鈑(55)及繫環錨筋(56)等浮筒構件依第12及13圖焊接完成(不含頂部鋼鈑)。 Step d4, the pontoon members are combined into a pontoon: the pontoon shell steel raft (52), the pontoon inner shell steel raft (53), the pontoon bottom steel raft (54), the pontoon stiffener (55) and the mooring ring anchor completed in step d2 The pontoon members such as ribs (56) are welded according to Figures 12 and 13 (without top steel shovel).

步驟d5、浮筒內填絕水發泡材料:將上步驟未完成之浮筒內填絕水發泡材料(21)。 Step d5: Filling the pontoon with a water-repellent foaming material: filling the effluent foaming material (21) into the unfinished pontoon.

步驟d6、浮筒製造完成:將上步驟未完成而內填絕水發泡材料之浮筒,與浮筒頂部鋼鈑(51)焊接以完成整個浮筒之製造。 Step d6, the pontoon is completed: the pontoon which is filled with the water-repellent foaming material is not completed, and is welded with the stern steel shovel (51) to complete the manufacture of the entire pontoon.

步驟d7、浮筒廠內堆置:將完成之浮筒堆置備用。 Step d7, stacking in the float factory: stacking the completed floats for use.

五、繫纜柱製造 Fifth, the cable string manufacturing

步驟e1、繫纜柱材料整備:準備製造繫纜柱用之鋼管、鋼鈑及混凝土等材料。 Step e1, the material of the bollard is prepared: the steel pipe, the steel shovel and the concrete for preparing the bollard are prepared.

步驟e2、鋼管鋼鈑加工:如第15及16圖所示將所需直徑之鋼管裁切成繫纜柱錨碇管(22c)、彎成繫纜柱橫斜管(22b),並將裁切之鋼鈑與鋼管焊接成繫纜柱鋼殼(22a)。 Step e2, steel pipe shovel processing: as shown in Figures 15 and 16, the required diameter of the steel pipe is cut into a bollard anchor pipe (22c), bent into a bollard yoke (22b), and will be cut The cut steel shovel and the steel pipe are welded into a bollard steel shell (22a).

步驟e3、繫纜柱組裝:將繫纜柱橫斜管(22b)及繫纜柱錨碇管(22c)內填混凝土(33)後,將繫纜柱橫斜管(22b)安裝入繫纜柱鋼殼(22a)內,再將繫纜 柱錨碇管(22c)插入繫纜柱鋼殼(22a)內,然後再將鋼殼內部填以混凝土(33)即完成繫纜柱(22)之組裝。 Step e3, bollard assembly: After the bollard transverse pipe (22b) and the bollard anchor pipe (22c) are filled with concrete (33), the bollard transverse pipe (22b) is installed into the tether. Inside the column steel shell (22a), then the tether The column anchor pipe (22c) is inserted into the bollard steel shell (22a), and then the inside of the steel shell is filled with concrete (33) to complete the assembly of the bollard (22).

步驟e4、繫纜柱廠內堆置:將完成之繫纜柱堆置備用。 Step e4, stacking in the bollard factory: stacking the completed bollards for use.

六、側模側撐製造 Six, side mold side support manufacturing

步驟f1、側模側撐材料整備:準備製造側模側撐用之鋼鈑、T型鋼、L型鋼、螺栓、墊圈及螺帽等材料。 Step f1, side mold side support material preparation: ready to manufacture side sill side sill steel shovel, T-shaped steel, L-shaped steel, bolts, washers and nuts and other materials.

步驟f2、T型側撐製造:將鋼鈑及T型鋼加工焊接成如第17圖所示之具有T型側撐槽型孔(24a1)、側撐槽口(24a2)、T型側撐頂鈑(24a3)、側撐槽口側鈑(24a4)、T型側撐加勁鈑(24a5)、固定樁定位鈑(24a6)及T型側撐底鈑(24a7)之T型側撐(24a)。 Step f2, T-type side support manufacturing: welding steel shovel and T-shaped steel into a T-shaped side groove type hole (24a1), side support groove (24a2), T-type side struts as shown in Fig. 17钣(24a3), side support notch side 钣 (24a4), T-type side support stiffener 24 (24a5), fixed pile positioning 钣 (24a6) and T-type side sill 钣 (24a7) T-type side struts (24a) .

步驟f3、L型斜撐製造:將鋼鈑及L型鋼加工焊接成如第17圖所示之L型斜撐(24b)。 Step f3, L-type diagonal bracing: The steel crucible and the L-shaped steel are processed and welded into an L-shaped bracing (24b) as shown in Fig. 17.

步驟f4、側模側撐假組合:將T型側撐(24a)、L型斜撐(24b)與配合之螺栓(24c)、墊圈(24c1)及十字型螺帽(24c3)假組合成側模側撐(24)以確定能於現場組合;另調整鈑(24a8)係用以調整側模側撐之高度,固定樁(24a9)則用以將側模側撐固定在地上。 Step f4, side mold side support dummy combination: the T-type side support (24a), the L-type diagonal support (24b) and the matching bolt (24c), the washer (24c1) and the cross-shaped nut (24c3) are falsely combined into one side The mold side supports (24) are determined to be combinable on site; the other adjustments (24a8) are used to adjust the height of the side mold side braces, and the fixed piles (24a9) are used to fix the side mold side supports to the ground.

步驟f5、側模側撐廠內堆置:將完成之側模側撐(24)堆置備用。 Step f5, stacking the side mold side support factory: stacking the completed side mold side supports (24) for use.

貳、現場作業(地面基礎版、浮動基礎建造及浮動基礎繫留系統施工) 贰, on-site operation (ground foundation, floating foundation construction and floating foundation tethering system construction)

七、地面基礎版建造 Seven, ground basic construction

(以下用3行X 4列共12個單元模組構成之浮動基礎來說明) (The following is a description of the floating basis of a total of 12 unit modules in 3 rows x 4 columns)

步驟g1、整地:浮動基礎建造基地整理。 Step g1, preparation: finishing of the floating foundation construction base.

步驟g2、基礎版、基礎開挖及側模組立:如第27圖在基地內之浮動基礎用地進行基礎版(3a)開挖及地下基礎開挖(31a)後,於開挖後組立地面基礎版側模(3c)。 Step g2, basic version, foundation excavation and side module stand: If the basic version (3a) excavation and underground foundation excavation (31a) are carried out on the floating foundation land in the base as shown in Figure 27, the ground is set up after excavation. Basic version of the side mold (3c).

步驟g3、基礎版及基礎鋼筋組立:接著如第28圖所示完成地面基礎版鋼筋 (3b)及地面下基礎鋼筋(31b)之組立。 Step g3, the basic plate and the base steel bar assembly: then complete the ground foundation plate as shown in Figure 28 (3b) and the formation of the underlying foundation reinforcement (31b).

步驟g4、基礎版安裝活動支承下部總成:如第29圖所示在完成地面基礎版鋼筋上依所需之位置安裝活動支承下部總成(23b)。 Step g4, the basic version of the installation support lower assembly: as shown in Fig. 29, the movable support lower assembly (23b) is mounted on the ground basic reinforcement in a desired position.

步驟g5、基礎版及基礎澆注混凝土:如第30圖所示完成地面基礎版(3)及地面下基礎(31)之混凝土澆注。 Step g5, base plate and foundation cast concrete: as shown in Fig. 30, the concrete foundation (3) and the foundation under the ground (31) are poured.

步驟g6、基礎版及基礎養護:接著以灑水或噴灑養護劑對混凝土進行養護。 Step g6, basic version and basic maintenance: The concrete is then cured by watering or spraying a curing agent.

八、繫留隔震浮動基礎建造 Eight, tied and isolated floating foundation construction

步驟h1、浮動基礎底模承材排置:如第31圖所示在地面基礎版(3)上進行並完成浮動基礎底模承材(2d3)之排置。 Step h1, floating base bottom mold material arrangement: as shown in Fig. 31, the floating basic bottom mold material (2d3) is arranged on the ground basic plate (3).

步驟h2、浮動基礎單元模組吊裝組合:接著如第32圖所示在浮動基礎底模承材(2d3)上吊組所需之各型浮動基礎單元模組,以外牆鋼模固定螺栓(2b3)將相鄰之單元模組接合成完整之浮動基礎模組。 Step h2, floating base unit module hoisting combination: then, as shown in Fig. 32, the floating basic unit module required for the floating foundation bottom mold material (2d3), the outer wall steel mold fixing bolt (2b3) Join adjacent unit modules into a complete floating base module.

步驟h3、浮動基礎模組組立側模側向支撐:如第33圖所示在單元模組之浮動基礎外牆鋼模(2b2)旁,以T型側撐(24a)、L型斜撐(24b)經由各撐材及外牆鋼模上之螺栓孔(24c2)以配合之螺栓(24c)、墊圈(24c1)及十字型螺帽(24c3)將撐材組合成浮動基礎側模側撐(24),並以調整板(24a8)調整側模側撐之高度,以固定樁(24a9)將側模側撐固定在地上以提供浮動基礎側模之側向支承力。 Step h3, the floating basic module sets the side mold lateral support: as shown in Fig. 33, next to the floating foundation outer wall steel mold (2b2) of the unit module, the T-shaped side support (24a) and the L-shaped diagonal support ( 24b) Combine the struts into floating base sideform side struts via bolts (24c2) on the struts and outer wall steel molds with matching bolts (24c), washers (24c1) and cross nuts (24c3) ( 24), and adjust the height of the side mold side brace with the adjusting plate (24a8), and fix the side mold side brace on the ground with the fixing pile (24a9) to provide the lateral supporting force of the floating base side mold.

步驟h4、浮動基礎模組吊移絕水發泡材料及鋼筋續接:為便利浮動基礎底版(2d)混凝土之澆注,如第34圖所示先將各浮動基礎單元模組內之絕水發泡材料(21)吊移,再將各單元模組之模板接縫用防水膠帶黏貼以防水泥漿漏漿;而各單元模組間橫向鋼筋之接續則以鋼筋續接器或焊接來續接。 Step h4, floating base module hoisting water-proof foaming material and reinforcing steel continuation: In order to facilitate the pouring of the floating base plate (2d) concrete, as shown in Figure 34, the water-insulated in each floating base unit module is firstly The foam material (21) is hoisted, and the template joints of each unit module are adhered with waterproof tape to prevent the slurry from leaking; and the transverse reinforcement of each unit module is continued by the steel splicer or welding.

步驟h5、浮動基礎底版澆注混凝土:於浮動基礎模組內完成清理乾淨後,如第34圖所示完成浮動基礎底版(2d)水密性混凝土之澆注。 Step h5, floating base plate casting concrete: After cleaning in the floating foundation module, complete the pouring of the floating foundation plate (2d) watertight concrete as shown in Fig. 34.

步驟h6、浮動基礎模組裝回絕水發泡材料及安裝繫纜柱:當浮動基礎底版 完成後如第34圖所示於底版混凝土面上塗新舊混凝土面接合劑(26)及如第35圖所示裝回各浮動基礎模組內絕水發泡材料(21)後,該絕水發泡材料兼做為浮動基礎外牆及隔牆之免拆內模板;然後於浮動基礎外牆鋼筋(2b1)上之適當位置安裝繫纜柱(22)。 Step h6, the floating base mold is assembled back to the water-insulating foam material and the installation bollard: when floating base plate After completion, as shown in Figure 34, the new concrete surface joint agent (26) is coated on the bottom concrete surface and the water-repellent foam material (21) in each floating base module is replaced as shown in Fig. 35. The foam material is also used as a free-form internal template for the floating foundation exterior wall and the partition wall; then the bollard (22) is installed at an appropriate position on the floating foundation exterior reinforcement (2b1).

步驟h7、浮動基礎牆身澆注混凝土:接著如第36圖所示進行並完成浮動基礎外牆(2b)及浮動基礎隔牆(2c)水密性混凝土之澆注。 Step h7, pouring concrete foundation wall concrete: Then, as shown in Fig. 36, the pouring of the floating foundation outer wall (2b) and the floating foundation partition wall (2c) watertight concrete is completed.

步驟h8、浮動基礎頂版鋼筋組立:在浮動基礎完成外牆及隔牆後,如第37圖於外牆及隔牆頂部之混凝土面上塗新舊混凝土面接合劑(26),進行並完成浮動基礎頂版鋼筋(2a1)之組立。 Step h8, floating foundation top plate reinforcement group: After the outer wall and the partition wall are completed on the floating foundation, the new concrete surface joint agent (26) is coated on the concrete surface of the outer wall and the top of the partition wall as shown in Fig. 37, and the floating foundation is completed and completed. The top plate steel (2a1) is assembled.

步驟h9、浮動基礎頂版澆注混凝土:在浮動基礎完成頂版鋼筋組立後,如第38圖所示進行並完成浮動基礎頂版(2a)水密性混凝土之澆注,然後進行混凝土之養護。 Step h9, floating foundation top-casting concrete: After the top plate reinforcement is completed on the floating foundation, as shown in Fig. 38, the floating foundation top plate (2a) watertight concrete is poured, and then the concrete is cured.

步驟h10、浮動基礎拆除各式支撐及模板並養護:當浮動基礎混凝土養護至足夠強度後,拆除浮動基礎之各式支撐及模板,如此則完成繫留隔震浮動基礎之建造。 Step h10, the floating foundation removes various supports and templates and maintains: When the floating foundation concrete is cured to sufficient strength, the various supports and templates of the floating foundation are removed, thus completing the construction of the tethered floating base.

九、浮動基礎繫留系統施工 Nine, floating foundation tethering system construction

步驟j1、鑽挖柱洞:當浮動基礎施工完成後在浮動基礎四角外之預定位置,如第39圖之(a)所示進行並完成繫柱(4)埋設用柱洞(43)之鑽挖。 Step j1, drilling the column hole: after the floating foundation construction is completed, at a predetermined position outside the four corners of the floating foundation, as shown in (a) of FIG. 39, the drilling of the column hole (43) for the bollard (4) is completed. dig.

步驟j2、繫柱吊裝:接著如第39圖之(b)所示將繫柱(4)吊入柱洞(43)內。 Step j2, bollard lifting: Next, the bollard (4) is hung into the column hole (43) as shown in Fig. 39 (b).

步驟j3、繫柱錨碇混凝土澆灌:然後再如第39圖之(b)所示將柱洞(43)內之繫柱(4)周圍以混凝土(33)回填來固定繫柱。 Step j3, the column anchor concrete is poured: Then, as shown in FIG. 39(b), the column (4) in the column hole (43) is backfilled with concrete (33) to fix the column.

步驟j4、浮筒安裝:接著如第39圖之(c)所示將浮筒(5)穿入繫柱(4)內以完成浮筒之安裝。 Step j4, pontoon installation: Next, as shown in Fig. 39 (c), the pontoon (5) is inserted into the bollar (4) to complete the installation of the pontoon.

步驟j5、繫柱內回填混凝土:然後再如第39圖之(d)所示於繫柱(4)內以混凝土(33)回填,隨即將繫柱蓋鈑(41)安裝在繫柱(4)之頂部來完成繫柱及浮筒之埋設及安裝。 Step j5, backfilling the concrete in the column: then backfilling the concrete (33) in the bollard (4) as shown in Figure 39 (d), and then installing the column cover (41) on the bollard (4) The top of the column is used to complete the burying and installation of the bollard and the pontoon.

步驟j6、繫纜連接繫纜柱與浮筒:接著如第40圖所示用繫纜(16)將浮動基礎上之繫纜柱(22)與繫柱(4)上之浮筒(5)連接,以完成整個浮動基礎繫留系統之施工。 Step j6, tethering the bollard and the buoy: then attaching the bollard (22) on the floating foundation to the buoy (5) on the bollard (4) with a tether (16) as shown in Fig. 40, To complete the construction of the entire floating foundation tethering system.

11‧‧‧水密性混凝土 11‧‧‧Watertight concrete

12‧‧‧輕型房屋 12‧‧‧Light houses

16‧‧‧繫纜 16‧‧‧Cable

2‧‧‧繫留隔震浮動基礎(簡稱浮動基礎) 2‧‧‧Tethered isolation and floating foundation (referred to as floating foundation)

2a1‧‧‧浮動基礎頂版鋼筋 2a1‧‧‧Floating foundation top plate reinforcement

2b1‧‧‧浮動基礎外牆鋼筋 2b1‧‧‧ Floating Foundation Exterior Reinforcement

2b2‧‧‧浮動基礎外牆鋼模 2b2‧‧‧Floating basic exterior steel mould

2b3‧‧‧外牆鋼模固定螺栓 2b3‧‧‧External wall steel form fixing bolts

2c‧‧‧浮動基礎隔牆 2c‧‧‧Floating base partition

2c1‧‧‧浮動基礎隔牆鋼筋 2c1‧‧‧ Floating base partition reinforcement

2d‧‧‧浮動基礎底版 2d‧‧‧ Floating base plate

2d1‧‧‧浮動基礎底版鋼筋 2d1‧‧‧Floating base plate reinforcement

2d2‧‧‧浮動基礎底模 2d2‧‧‧Floating basic counter

2d3‧‧‧浮動基礎底模承材 2d3‧‧‧Floating basic base moulding material

2e‧‧‧環型保護層墊塊 2e‧‧‧ ring-shaped protective layer spacer

2f‧‧‧方型保護層墊塊 2f‧‧‧ square protective layer spacer

21‧‧‧絕水發泡材料 21‧‧‧Waterproof foaming material

22‧‧‧繫纜柱 22‧‧‧ bollard

23‧‧‧彈性隔震活動支承 23‧‧‧Support for elastic isolation

23a‧‧‧彈性隔震支承上部總成 23a‧‧‧Elastic isolation support upper assembly

23a1‧‧‧支承上承鋼鈑 23a1‧‧‧Supporting steel rafts

23a2‧‧‧支承固定鋼鈑 23a2‧‧‧Supported fixed steel files

23a3‧‧‧支承固定鋼鈑補強剪力筋 23a3‧‧‧Supported fixed steel reinforced reinforcing shear ribs

23a4‧‧‧支承上部總成固定螺栓 23a4‧‧‧Support upper assembly fixing bolts

23a5‧‧‧橡膠支承墊 23a5‧‧‧Rubber support pad

23a6‧‧‧支承固定鋼鈑補強筋 23a6‧‧‧Support fixed steel reinforced ribs

23b‧‧‧彈性隔震活動支承下部總成 23b‧‧‧Flexible isolation activities supporting the lower assembly

23b1‧‧‧支承下承鋼鈑 23b1‧‧‧Support under steel raft

23b2‧‧‧支承下承鋼鈑補強剪力筋 23b2‧‧‧Supporting under-supported steel reinforced reinforcing shear ribs

23b3‧‧‧支承下承鋼鈑補強筋 23b3‧‧‧Supported under steel reinforced ribs

23c‧‧‧環氧樹脂塗層 23c‧‧‧ epoxy coating

23d‧‧‧鐵氟龍板(PTFE) 23d‧‧‧Teflon plate (PTFE)

24‧‧‧側模側撐 24‧‧‧ sideform side support

25W0S0‧‧‧W0S0型浮動基礎單元模組(無外牆、無隔牆) 25W0S0‧‧‧W0S0 floating basic unit module (no external wall, no partition)

25W0S1‧‧‧W0S1型浮動基礎單元模組(無外牆、一面隔牆) 25W0S1‧‧‧W0S1 floating base unit module (no external wall, one partition)

25W0S2‧‧‧W0S2型浮動基礎單元模組(無外牆、二面隔牆) 25W0S2‧‧‧W0S2 floating basic unit module (no external wall, two-sided partition)

25W1S0‧‧‧W1S0型浮動基礎單元模組(一面外牆、無隔牆) 25W1S0‧‧‧W1S0 floating basic unit module (one external wall, no partition)

25W1S1a‧‧‧W1S1a型浮動基礎單元模組(一面外牆、一面不接外牆之隔牆) 25W1S1a‧‧‧W1S1a floating base unit module (one wall, one wall without a wall)

25W1S1b‧‧‧W1S1b型浮動基礎單元模組(一面外牆、一面接外牆之隔牆) 25W1S1b‧‧‧W1S1b floating basic unit module (one outer wall, one side connected to the outer wall)

25W1S2‧‧‧W1S2型浮動基礎單元模組(一面外牆、二面隔牆) 25W1S2‧‧‧W1S2 floating basic unit module (one outer wall, two sides partition wall)

25W2S0‧‧‧W2S0型浮動基礎單元模組(二面外牆、無隔牆) 25W2S0‧‧‧W2S0 floating base unit module (two-sided exterior wall, no partition wall)

25W2S1‧‧‧W2S1型浮動基礎單元模組(二面外牆、一面隔牆) 25W2S1‧‧‧W2S1 floating base unit module (two-sided outer wall, one partition)

25W2S2‧‧‧W2S2型浮動基礎單元模組(二面外牆、二面隔牆) 25W2S2‧‧‧W2S2 floating base unit module (two-sided outer wall, two-sided partition wall)

3‧‧‧地面基礎版 3‧‧‧ Ground Basic Edition

3b‧‧‧地面基礎版鋼筋 3b‧‧‧ Ground Foundation Rebar

31‧‧‧地下基礎 31‧‧‧Underground foundation

31b‧‧‧地面下基礎鋼筋 31b‧‧‧Underground foundation reinforcement

33‧‧‧混凝土 33‧‧‧ concrete

4‧‧‧繫柱 4‧‧‧ column

41‧‧‧繫柱蓋鈑 41‧‧‧Tie cover

42‧‧‧蓋鈑錨筋 42‧‧‧ Covering anchor

5‧‧‧浮筒 5‧‧‧Float

6‧‧‧草地 6‧‧‧ grass

Claims (3)

一種繫留隔震浮動基礎系統構築工法,其步驟為:g1,「整地」,浮動基礎建造基地整理;g2,「基礎版基礎開挖及側模組立」,基地內之浮動基礎用地面基礎版及地下基礎開挖,隨後組立地面基礎版側模;g3,「基礎版及基礎鋼筋組立」,地面基礎版鋼筋及地面下基礎鋼筋組立;g4,「基礎版安裝活動支承下部總成」,在地面基礎版鋼筋上依所需之位置安裝活動支承下部總成;g5,「基礎版及基礎澆注混凝土」,進行及完成地面基礎版及地面下基礎之混凝土澆注;g6,「基礎版及基礎養護」,接著以灑水或噴灑養護劑對混凝土進行養護;h1,「浮動基礎底模承材排置」,在地面基礎版上進行並完成浮動基礎底模承材之排置;h2,「浮動基礎單元模組吊裝組合」,在浮動基礎底模承材上吊組所需之各型浮動基礎單元模組,並以螺栓將相鄰之單元模組接合成完整之浮動基礎模組;h3,「浮動基礎模組組立側模側向支撐」,在浮動基礎模組之浮動基礎外牆鋼模旁,以T型側撐、L型斜撐及配合之零件將撐材組合成浮動基礎側模側撐,以提供浮動基礎側模之側向支承力;h4,「浮動基礎模組吊移絕水發泡材料及鋼筋續接」,將各浮動基礎單元模組內之絕水發泡材料吊移,模板接縫用防水膠帶黏貼,各單元模組間橫向鋼筋之接續則以鋼筋續接器或焊接來續接;h5,「浮動基礎底版澆注混凝土」,於浮動基礎模組內清理乾淨後,進行並完成浮動基礎底版混凝土之澆注;h6,「浮動基礎模組裝回絕水發泡材料及安裝繫纜柱」,於底版混凝土面 上塗新舊混凝土面接合劑及裝回各浮動基礎單元模組內絕水發泡材料,再於浮動基礎外牆鋼筋上安裝繫纜柱;h7,「浮動基礎牆身澆注混凝土」,接著進行並完成浮動基礎外牆及浮動基礎隔牆混凝土之澆注;h8,「浮動基礎頂版鋼筋組立」,於外牆及隔牆頂部之混凝土面上塗新舊混凝土面接合劑,進行並完成浮動基礎頂版鋼筋之組立;h9,「浮動基礎頂版澆注混凝土」,進行並完成浮動基礎頂版混凝土之澆注及養護;h10,「浮動基礎拆除各式支撐及模板並養護」,當浮動基礎混凝土養護至足夠強度後,拆除浮動基礎之各式支撐及模板,來完成隔震浮動基礎系統之施工;j1,「鑽挖柱洞」,當浮動基礎施工完成後在浮動基礎四角外之預定位置,進行鑽挖並完成繫柱埋設用之柱洞;j2,「繫柱吊裝」,接著將繫柱吊入柱洞內;j3,「繫柱錨碇混凝土澆灌」,然後再將柱洞內之繫柱周圍以混凝土回填來固定繫柱;j4,「浮筒安裝」,接著將浮筒穿入繫柱內來安裝浮筒;j5,「繫柱內回填混凝土」,於繫柱內回填混凝土,並安裝繫柱蓋鈑;j6,「繫纜連接繫纜柱與浮筒」,最後用繫纜將浮動基礎上之繫纜柱與繫柱上之浮筒連接,來完成浮動基礎繫留系統之施工,如此即完成整個繫留隔震浮動基礎系統之施工。 A method for constructing a tethered and isolated floating foundation system, the steps are: g1, “land preparation”, floating foundation construction base finishing; g2, “basic version foundation excavation and side module standing”, ground foundation for floating foundation in the base Excavation of the foundation and underground foundation, followed by the formation of the ground-based version of the sideform; g3, "Basic version and foundation reinforcement", the ground foundation reinforcement and the foundation reinforcement under the ground; g4, "Basic installation activity support lower assembly", Install the movable support lower assembly on the ground foundation steel bar according to the required position; g5, "Basic version and foundation pouring concrete", carry out and complete the concrete foundation and the concrete foundation under the ground; g6, "Basic version and foundation "Conservation", followed by watering or spraying curing agent to maintain the concrete; h1, "floating basic bottom mold material placement", on the ground basic plate and complete the floating foundation bottom mold material placement; h2, " Floating base unit module hoisting combination, each type of floating base unit module required for hanging on the floating foundation bottom mold material, and bolting adjacent unit modules Complete complete floating base module; h3, "floating base module assembly side mold lateral support", next to the floating foundation outer wall steel mold of the floating foundation module, with T-shaped side support, L-shaped diagonal support and matching The part combines the struts into a floating foundation side sill to provide the lateral support force of the floating foundation side dies; h4, "Floating base module hoisting the water-repellent foam material and reinforcing steel continuation", each floating base unit The water-repellent foaming material in the module is hoisted, the template joint is adhered with waterproof tape, and the transverse reinforcement of each unit module is continued by the steel splicer or welding; h5, “floating base plate pouring concrete” After cleaning in the floating foundation module, carry out and complete the casting of the floating foundation plate concrete; h6, "Floating the base mold assembled back to the water-insulating foam material and installing the bollard", in the bottom concrete surface Applying new and old concrete surface bonding agent and replacing the water-insulating foaming material in each floating base unit module, and then installing the bollard on the floating foundation external wall steel; h7, “floating foundation wall pouring concrete”, then proceeding and completing Floating foundation external wall and floating foundation partition concrete pouring; h8, "floating foundation top plate steel assembly", applying new and old concrete surface cement on the concrete surface of the outer wall and the top of the partition wall, and carrying out and completing the floating foundation top plate steel H9, "floating foundation top casting concrete", carrying out and completing the pouring and maintenance of floating foundation topping concrete; h10, "floating foundation demolition of various supports and formwork and maintenance", when the floating foundation concrete is cured to sufficient strength , removing all kinds of supports and templates of the floating foundation to complete the construction of the isolated floating floating foundation system; j1, “drilling the column hole”, after the floating foundation construction is completed, drilling and completing at a predetermined position outside the four corners of the floating foundation Column hole for column burying; j2, "column hoisting", then hoisting the column into the column hole; j3, "column anchor concrete pouring" Then, the column around the column is filled with concrete to fix the column; j4, "float installation", then the pontoon is inserted into the column to install the pontoon; j5, "backfill concrete in the column", on the column Backfill concrete and install the column cover 钣; j6, “Tethering the bollard and the pontoon”, and finally connect the bollard on the floating foundation with the pontoon on the bollard to complete the floating foundation tether. The construction of the system, thus completing the construction of the entire tethered isolation and floating foundation system. 如申請專利範圍第1項所述一種繫留隔震浮動基礎系統工法,其中之浮動基礎單元模組,係在單元模組之底模上有具方型保護層墊塊之底版鋼筋,復在其上置有方形絕水發泡材料,在該絕水發泡材料外或置有具環型保護層墊塊之多個外牆鋼筋,並於外牆鋼筋外或以多個外牆鋼模圍成來組成立方體之單元模組;另在該等單元模組底模下配合需要,或裝有 彈性隔震活動支承上部總成;將該等多個適當型式之基礎單元模組組合後,即可組成未含頂版而供澆鑄混凝土之隔震浮動基礎之模組。 For example, in the method of claim 1, the floating base unit module has a bottom plate steel with a square protective layer block on the bottom mold of the unit module, The square is provided with a square water-tight foaming material, and a plurality of outer wall steel bars with ring-shaped protective layer blocks are arranged outside the water-insulating foaming material, and the outer wall steel bars or the outer wall steel molds are used. Enclosed to form a unit module of a cube; another need to fit under the bottom mold of the unit modules, or The elastic isolation activity supports the upper assembly; after combining the plurality of appropriate types of basic unit modules, the module of the isolated floating foundation without the top plate for casting the concrete can be formed. 如申請專利範圍第1項所述一種繫留隔震浮動基礎系統工法,其中之浮筒係由浮筒頂部鋼鈑、外殼鋼鈑、內殼鋼鈑、底部鋼鈑組成中空之圓柱體,筒體內以加勁鈑加勁,其他空間則填以填絕水發泡材料,使其在漲水時能帶動繫纜沿著繫柱上下浮動;而其中之繫柱係將鋼管內填充以混凝土,頂部以直徑略大於鋼管之繫柱蓋鈑封頂所構成之鋼柱,於漲水時可使穿入柱中之浮筒沿著圓柱上下浮動並防止其脫離柱頂。 For example, in the method of claim 1, the pontoon is a hollow cylinder composed of a steel raft at the top of the pontoon, a steel sill of the outer shell, a steel sill of the inner shell, and a steel sill at the bottom, and the cylinder is Stiffen and stiffen, and other spaces are filled with water-filled foaming material to make the mooring up and down along the bollard when the water is rising; and the bollard is filled with concrete and the top is slightly smaller in diameter. A steel column consisting of a column cap and a cap of a steel pipe can float the pontoon penetrating into the column up and down the column and prevent it from coming off the top of the column when the water is raised.
TW102118886A 2013-05-29 2013-05-29 The anchored seismic isolated floating foundation system and construction method TWI513877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW102118886A TWI513877B (en) 2013-05-29 2013-05-29 The anchored seismic isolated floating foundation system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW102118886A TWI513877B (en) 2013-05-29 2013-05-29 The anchored seismic isolated floating foundation system and construction method

Publications (2)

Publication Number Publication Date
TW201445023A TW201445023A (en) 2014-12-01
TWI513877B true TWI513877B (en) 2015-12-21

Family

ID=52706937

Family Applications (1)

Application Number Title Priority Date Filing Date
TW102118886A TWI513877B (en) 2013-05-29 2013-05-29 The anchored seismic isolated floating foundation system and construction method

Country Status (1)

Country Link
TW (1) TWI513877B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW350891B (en) * 1995-02-17 1999-01-21 Nikkensekkei Ltd Soft pad and the installation method
TWM300221U (en) * 2006-02-10 2006-11-01 Jian-Jr Shiu Base frame capable of house riding and floating above the water

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW350891B (en) * 1995-02-17 1999-01-21 Nikkensekkei Ltd Soft pad and the installation method
TWM300221U (en) * 2006-02-10 2006-11-01 Jian-Jr Shiu Base frame capable of house riding and floating above the water

Also Published As

Publication number Publication date
TW201445023A (en) 2014-12-01

Similar Documents

Publication Publication Date Title
AU2009289381B2 (en) Offshore station, foundation for an offshore station, and method for building an offshore station
US9567720B2 (en) Offshore platform for a marine environment
JP4060790B2 (en) Modular offshore structure
US11339551B2 (en) Additive manufacturing of support structures
CN106522263B (en) A kind of wind-powered electricity generation complete machine construction method of four bucket foundations and concrete support structure
CN103122642B (en) Construction method of vertical post support change
KR100383409B1 (en) Construction Method of Direct Foundation for using Caisson
KR20110107888A (en) Construction method of the pier without the temporary dam in the sea or the river
AU2012313196B2 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
US4080916A (en) Maritime platform assemblies
CN111042164B (en) Composite special-shaped cofferdam and construction method
KR101703441B1 (en) Cassion manufacturing method of bottom-up, pre-cast and a base plate type using floating dock, system, floating dock and cassion using thereof
JP2016084660A (en) Foundation structure of off-shore wind turbine generator
US4232491A (en) Swimming pool deck
KR100995667B1 (en) System-block and construction method using the same
US5024557A (en) Method and apparatus for constructing an offshore hollow column
TWI513877B (en) The anchored seismic isolated floating foundation system and construction method
JP2681503B2 (en) Steel sink and its installation method
RU53312U1 (en) BRIDGE OF BRIDGE SUPPORT
KR100553954B1 (en) Temporary coffering structure using dead load and buoyancy and construction or repairing method for irrigation structure using the same
KR101510453B1 (en) Method for constructing steel house bridge footing using steel plate
RU2263176C1 (en) Protective case for bridge pier grillage and erection method thereof
KR102557753B1 (en) U-shaped caisson and its buoyancy launch method
JPH0323689B2 (en)
SU1721169A1 (en) Built-up hydraulic structure