TW405005B - Method and apparatus for repairing pipeline such as drain pipe - Google Patents

Method and apparatus for repairing pipeline such as drain pipe Download PDF

Info

Publication number
TW405005B
TW405005B TW87107879A TW87107879A TW405005B TW 405005 B TW405005 B TW 405005B TW 87107879 A TW87107879 A TW 87107879A TW 87107879 A TW87107879 A TW 87107879A TW 405005 B TW405005 B TW 405005B
Authority
TW
Taiwan
Prior art keywords
repair
pipeline
repairing
pipe
tube
Prior art date
Application number
TW87107879A
Other languages
Chinese (zh)
Inventor
Toshinori Ootsuka
Hisao Mitani
Nobuhiko Onoda
Kazumi Isono
Kenji Hasegawa
Original Assignee
Asahi Tec Corp
Kansei Kogyo K K
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Tec Corp, Kansei Kogyo K K filed Critical Asahi Tec Corp
Application granted granted Critical
Publication of TW405005B publication Critical patent/TW405005B/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L57/00Protection of pipes or objects of similar shape against external or internal damage or wear

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

This invention relates to a kind of method and the apparatus for repairing the pipeline. It is to press laterally to connect in the inner side of the pipe and maintain the repairing material. The repairing material of the lining upon the inner wall of the pipeline could effectively make the job done well and delicate into practice. Procedures include in short, guide the cylinder-type body of the immersed, unhardened curable resin into the pipeline. Activate the fluid press function in the inner lateral of said cylinder-typed body by the non-transparent film-typed body. Among the repairing pipeline methods, solidify the above-mentioned curable resin and using inner lining to fix the overall or local scope of the pipeline inner surface. Inject the unhardened curable resin from one end of the cylinder-typed body and take out the air inside the cylinder from the other lateral side. Use reel to immerse the injected curable resin on the same time and then inverse the film-type body and allocate the film inside the cylinder in advance. Then, the cylinder and the film are driven together into the pipeline.

Description

40500¾五、發明説明(1) 經 濟 部 中 標 準 貝 工 消 費 合 作 社 印 製 B7 [產業上之利用領域] ------------ 1 1 I 本 發 明 係 闢 於 一 種 在 補 修 下 水 管 等 之 管 路 時 將 補 修 材 * | m 接 保 持 在 管 路 之 内 面 側 而 實 行 的 補 修 方 法 及 該 補 修 方 請 先 ft/j 1 1 法 所 使 用 之 管 路 補 修 裝 置 者 〇 讀 背 1 1 [先前之技術] 田 1 I 1 I 由 於 老 化 9 地 震 及 地 盤 下 沈 等 而 使 下 水 管 等 之 管 路 本 體 事 項 1 I 再 1 | 發 生 ϋ 裂 或 連 接 部 僑 離 等 時 必 需 要 迅 速 地 補 修 龜 裂 部 分 1 本 裝 及 連 接 部 0 所 進 入 雨 水 或 地 下 水 之 量 增 加 時 對 下 水 等 之 處 頁 Vw-· 1 I 理 設 施 發 生 很 大 的 負 擔 * 又 下 水 滲 出 於 地 中 時 會 引 起 公 害。 1 1 於 是 不 挖 地 面 而 補 修 地 中 管 等 之 既 設 管 路 的 方 法 有 1 1 在 人 孔 與 人 孔 之 間 之 既 設 管 路 之 長 範 圍 内 加 截 補 修 材 9 在 1 訂 既 設 管 之 内 周 面 形 成 新 的 管 路 的 方 法 及 在 既 設 管 之 局 部 1 I 加 襯 補 修 材 來 補 修 該 損 傷 等 的 方 法 0 1 r ' I 首 先 根 據 第 34圖 及 第 35圖 將 往 之 管 路 之 長 範 圍 部 1 > 分 之 補 修 方 法 說 明 如 下 0 1 線 該 補 修 方 法 為 首 先 將 含 有 未 硬 化 之 熱 硬 化 性 樹 脂 之 筒 1 1 狀 體 Α引進管路Β内 0 接 著 用 水 壓 (請參考i號)來 反 轉 袋 1 I 狀 之 不 透 水 性 膜 狀 體 C之同時 將該反轉的膜狀臂f C從 荷 狀 1 1 I 體 A之開口插入於對該茼狀髏A内 (請參考第34鼷) 〇 膜 狀 體 1 1 C反轉至後端部D而 茼 狀 體 A的全畏大致上被壓接於管路B之 1 1 内 面 的 狀 態 時 » 從 未 圖 示 的 锻 m 車 將 加 壓 加 埶 的 液 體 供 給 1 1 於 由 膜 狀 體 C所形成的膨脹室C ,内 •硬化简狀體A 之 熱 硬 化 1 I 性 樹 脂 (請參考圖35) 〇 1 1 I 之 後 9 回 收 膨 脹 室 C ' 内 之 水 在 管 路 B之兩端位置切斷 1 1 本紙張尺度適用中國國家標準(CNS ) Λ4規格(210X 297公釐) -4 A7__405005__B7五、發明就明(2) 經濟部中央標準局貝工消費合作社印製 加工茼狀體A及膜狀體C而完成補修作業。 膜狀體C為,有時候在切斷加工前被拔出’但在此即做 為内側之不透水性之層來構成為加觀構造之一部分° * 其i,就對既設管路之局部性部分加襯補修材來補修其 損傷等之Μ注方法說明如下。 如第36鼷所示,補修装置X為,具備有向管路B之徑方向 可除腯的膨脹部xl,在該膨脹部xl之外周*捲繞著至少具 有嫌布之片材狀補修材Υ。膨脹部xl連接有設在補修装置 X之周方向上側部之管體補修時,首先,補修装置X係 藉由未圖示之插入於管路B内之轚視攝影櫬之監視器控制 之下,前後拉動鋼索x3而誘導至管路B之損傷部分bl。該 誘導時,膨脹部xl未供給空氣,補修装置X之徑為小於管 路B內徑的《係,藉由輪子X 4的協肋之下可容易地誘導。 如此,將補修裝置X定位於管路B內之後,從管髓x2供給K 綰空氣於膨脹部xl,使膨脹部xl膨脹而將補修材Y向管路B 之徑方向移動而壓接於管路B之内壁。含浸有硬化性樹脂 的補修材Y時,壓接至該硬化性樹脂硬化為止。然後,當 補修材材Y固定在管路B内壁時(硬化性樹脂時*即硬化完 了之後),從管體x2排出膨脹部xl内之空氣*膨脹部xl回 到誘導時之狀態,從管路Β內取出補修装置X。 再者,為加快樹脂之硬化,常有使用加热而可促進其硬 化的樹脂。該時,從管髖x2供給加热的Κ縮空氣。 [發明所欲解決之問題] 然而,以往之對管路内畏範_之補修方法為•到補修完 I I I 扣衣 I I I 訂 I I —^ I 1· 線 (請先閲讀背面之注意事項再¥本頁) 本紙張尺度逋用中國國家標準(CNS ) Λ4規格(210X 297公釐) 5 經濟部中央標準局貝工消費合作社印製 405005_B7__五、發明説明(3) _______ .. —·---·—. 成為止,爾要保持管路為不使用狀態。又’在補修工程現 場反轉用之水壓管理煩雜,經常要確保一定水艇是相當困 難的事。因此,以上述之補修方法難以提供品質均句的加 襯構造。 於是,本發明之具髓的第一之目的,在於提供一種可縮 短補修工程所需要的時間,而且可經常得到一定品質的管 路補修方法。 再者,以往之補修方法為,需要多最的供給於蟛脹室c' 内之水等之液體。舉例來說,其外徑6〇〇·/·,長度20·/· 之除脹室C,需要13t之水,內此一次施工需'^阐給水車等來 搬運好幾次的水。侖且,如果使用热硬化性樹喺昀,堪褥要 加熱該液體用之燃料費及時間而並非霣用。 加K,在上述工法中,如第3 4圖所示,在補修部位之人 孔之上游側需要設止水栓TM便在其補修作業中完全遮斷 排水。於是要實豳在上游俩之人孔配置吸水软管,在下游 側之人孔配置排水软管用泵經吸水軟管抽上上游側之排水 ,經路面流至下游側之排出軟管之換水工程。該排水方法 為,箱要泵之電源,而且路上的吸水軟管及排水软管會成 為通行車輔之障礙,有會發生危險的問题點存在。 於是,本發明之具髏的第二目的,在於提供一種可減少 注入於補修材內之加應流通董之同時,在補修作業中也可 使排水貫穿補修材内而流動之管路補修方法及其裝置者。 另一方面,於4在既設之管路之局部部位補修之以往之 方法中*補修材Y係要阻止管路B之損傷部位bl所嗔出之地 本紙張尺度適用中國國家梯準(CNS ) A4規格(210X 297公^ (請先閱讀背面之注意事項再^-〜本頁) 405005 經 濟 部 中 .標 隼 貝 X 消 费 合 作 社 印 製 五、發明説朋( •1) I I 下 水 以 及 可 耐 長 期 使 用 起 見 要 求 —· 定 之 強 度 0 因 此 ,有 I I I 使 用 玻 璃 級 維 等 之 強 化 纖 維 的 必 要 易 使 用 含 有 嫌 布 者0 I 然 而 激 布 之 端 部 為 容 易 發 生 破 m 尤 其 是 沿 著 該 管 路B 請 先 閱 I I I 之 周 方 向 之 補 修 材 Υ之端部發生破錠時 即無法對補修材Y 讀 背 I I 之 管 路 之 _ 心 方 向 兩 嬸 部 之 管 路 B 形成如第37圔中所示 I I I I 之 平 滑 的 壓 接 部 Ζ >如果無法形成該壓接部時 會在管路B 事 項 I | # I | 内 形 成 段 差 » 在 管 路 Β内流動的固通物等卡在該段差郤而 K «I 本 阻 礙 管 路 内 之 流 動 0 頁 I | 於 是 9 為 了 要 防 止 該 破 绽 可 考 董 用 線 來 交 叉 地 播 其兩 I I 端 然 而 如 此 做 時 不 僅 是 增 加 補 修 材 之 製 造 過 程 而增 I I 加 成 本 而 且 用 線 交 叉 地 鐽 的 闞 係 增 加 補 修 材 該 處 的 厚度 I 訂 9 其 结 果 m 是 無 法 對 管 路 B形成率滑的壓接部Z 0 I | 於 是 本 發 明 之 具 體 的 第 三 之 巨 的 為 9 用 嫌 布 來 做 補修 I 材 時 可 Μ 將 補 修 材 對 管 路 袖 方 向 兩 端 部 之 管 路 平 滑 地S I 1 接 可 形 成 無 境 界 感 的 壓 接 部 0 1 線 又 在 實 行 該 補 修 作 業 之 管 路 中 在 其 内 部 流 動 的 排水 1 1 及 管 路 内 之 结 露 等 所 致 的 水 聚 集 在 管 路 之 底 部 管 路 底部 1 | 的 水 分 高 於 管 路 的 頂 部 水 分 的 情 形 居 多 〇 在 該 種 管 路 的補 1 1 修 作 業 中 從 Μ 注 的 補 修 装 置 X之周方向上側部所設的管 1 1 I 體 之 開 Ρ 供 給 加 熱 空 氣 時 » 只 有 使 管 路 之 頂 部 管 之 樹脂 1 昇 高 溫 度 f 管 路 底 部 為 因 水 分 而 失 去 氣 化 热 > 昇 溫 較 慢〇 1 1 也 就 是 說 在 往 的 補 修 装 置 中 9 在 補 修 材 之 樹 胞 硬化 1 | 時 期 發 生 不 均 勻 情 形 » m Η 形 成 在 管 路 周 方 向 之 全 周 均勻 1 I 硬 化 的 健 全 的 補 修 材 0 1 1 本紙張尺度適用中國國家榡準(CNS ) A4規格(210X297公# ) 7 __405005五、發明説明(5) 經濟部中央標隼局貝工消費合作社印製 作向者保修装 由硬髓 至匮ib人入内 修方 W 接路其 ίφΜ, 全: ΗβΙΞ 插插 Κ 補周裝壓管及 ,側面為 *。 頃 内與管 路之其材的法 $ 内內内激, •內者211^1^材材於 發 Μ 潰 管路及修壁方 u 路之路特脂,後體内第ίηιδϊι修修置 在管法補内修«2管 «管其樹氣之狀路 aMU 補補配 供在方將路補1JI進狀述,性空胞筒管範 述閉, 提但修供管路 第引茼前中化之樹該述利 上封入 ,,補提於管 圈體該對法硬部性於前專 對而插 為化路,襯的 範狀於便方之内化置進謫 U , 件材 的硬管為内工 利筒用M修化* 硬配引申λ?ι材構修 目其的題材完 專之作,補硬狀之先起係ΪΛ1 修入補 四進化課修緻 誚脂懕 _ 路未简入預一明 Μ 補插述 第促硬的補精 申樹體内管入述注而髓發 U2I1狀之上 的來地決該現 之性流行之注前所轉狀之 第筒性 Κ 髓脂勻解使實 的化使實修端出瀆反臢的»1圍性撓 , 具樹均欲 •可 目硬而而補一抽浸Μ述目Ψ»範撓可間之热脂所侧 ,Η一之體脂行之側時予前二 ί 利可之空 明加樹明面好 y 第化狀樹實體部同體與第 專之間部 發是使發內良 d 的硬膜性内狀端之狀體的 請脂空內 本然夠本之率 P 體未之化困筒一捋膜狀》 申樹部之 , 雖能,路效 U 具有性硬範述另子述筒具ta之性內間 是,周上管,c W 成含過述長前其輥前該成 的化該之 於中全 Μ 在中者 U 達將透前較從從用將將達 5 目硬小件 業之 持補置 S 在不化或 第為之縮構 I I — - I - - I I ^ I I I —丁— I I n 象 l o.4°- «(請先閲讀背面之注意事項再^c本頁) 本紙張尺度適用中國國家標準(CNS ) Λ4現格(210Χ297公释) 405005 A7 B7 經濟部中央標準局員工消費合作社印製 五、發明説明( 1 1 的 狀 態 下 f 對 上 述 補 修 材 之 內 部 空 間 注 入加 壓 流 體 來將 補 1 1 I 修 材 壓 接 於 上 述 管 路 内 壁 VX 化 上 述 硬 化性 樹 脂 來 補修 管 1 J 路 內 為 特 戡 之 管 路 補 修 方 法 〇 又 申 請專利範圍第3項之 請 井 1 | 閱 發 明 為 在 具 備 有 讀 背 面 1 1 I 插 入 配 置 於 管 路 内 浸 漬 未 I-*fc 化 之 硬化 性 樹 脂 之可 撓 1 | 性 之 筒 狀 補 修 材 及 意 事 1 項 1 上逑補修材之内部空間注入加壓流體而將補修材壓接於 再 填 1 管 路 内 壁 之 加 壓 手 段 之 管 路 補 修 装 置 中 ,其 特 戡 為 : % 本 頁 1 具 備 有 插 入 於 上 述 補 修 材 内 而 縮 小 其 内部 空 間 之 可撓 性 1 1 之 插 入 構 件 9 1 I 封 閉 補 修 材 與 插 入 構 件 之 間 之 内 部 空 間者 〇 訂 加 K 在 補 修 作 業 中 也 可 使 排 水 貫 穿 補修 材 内 而 流動 為 1 | 巨 的 之 9 串 請專利範圍第4項之發明為 >附加有將插入構 1 J 件 形 成 為 筒 狀 之 空 心 體 藉 縮 小 補 修 材内 之 内 部 空間 之 1 1 同 時 由 貫 穿 而 設 在 其 軸 心 部 之 通 道 使排 水 經 補 修材 内 線 而 通 過 為 其 特 戡 之 構 成 要 件 之 管 路 補 修 方法 0 又 * 在申 請 1 I 專利範圍第5項之發明中 >插入構件為同樣有附加用Κ缩 1 1 1 小 補 修 材 内 之 内 部 空 間 之 同 時 在 其 軸 心部 貫 穿 而 設有 使 1 1 排 水 通 過 之 通 道 之 空 心 體 為 其 特 徵 之 構 成要 件 之 管 路補 修 1 1 裝 置 者 〇 1 | 達 成 具 體 的 第 三 巨 的 之 串 請專利範匯第6項之發明為 1 I 在 具 備 有 向 管 路 之 徑 方 向 膨 脹 自 如 之 膨 脹部 之 補 修 装置 之 1 1 I 刖 述 膨 脹 部 之 外 周 9 安 裝 至 少 具 有 绷 布 之補 修 材 對管 路 1 1 之 内 側 配 置 前 述 補 修 装 置 之 後 , 使 前 述 膨脹 部 m 脹 而使 前 1 1 本紙張尺度適用中國國家標準(CNS ) A4規格(210X 297公# ) A7 B7 經濟部中央標隼局貝工消費合作社印製 五、發明説明( 7) 1 1 述 補 修 材 壓 接 於 管 路 内 面 側 從 管 路 之 内 側 内 襯 之 管 路補 1 | 修 方 法 中 其 特 激 為 將 沿 著 前 述 補 修 材 之 管 路 之 周 方向 1 之 兩 端 部 分 別 予 以 摺 翻 過 來 之 後 安 装 於 前 述 補 修 装 置 之管 請 先 1 | 路 補 修 方 法 者 0 又 申 請專利範圍第7項之發明為 >具備 閱 讀 背 1 有 向 管 路 之 徑 方 向 膨 脹 i 如 之 膨 脹 部 之 同 時 形 成 該 膨脹 之 注 1 | 部 之 可 撓 膜 之 外 周 安 裝 至 少 具 有 郷 布 之 補 修 材 之 管 路補 意 事 項 1 I 修 用 之 補 修 裝 置 中 其 特 激 為 前 述 補 修 材 係 沿 著 該 管路 再 1 1 之 周 方 向 兩 端 部 分 別 予 Μ 摺 翻 過 來 之 狀 態 而 安 裝 於 刖 述可 % 本 頁 裝 1 撓 膜 外 周 之 補 修 裝 置 者 〇 1 1 達 成 具 體 的 第 四 百 的之發明係申請專利範圍第8項乃至 1 1 第10項之發明 〇 申請專利範圃第8項之發明為 在達成上 1 訂 述 具 體 的 第 三 巨 的 之 發 明 之 外 前 述 補 修 材 係 還 浸 漬 有因 1 | 加 熱 而 可 促 進 其 硬 化 的 樹 脂 者 對 管 路 内 面 m 壓 接 該 補修 1 材 之 同 時 附 加 有 對 該 補 修 材 位 於 管 路 底 部 位 置 之 部 位供 1 1 給 比 其 他 部 位 較 多 熱 量 為其特徵的構成要件之管路補修方 線 法 0 申 請專利範圍第9項之發明為 前述補修材係浸潰有 1 I 因 加 熱 來 促 進 其 硬 化 的 樹 脂 而 為 了 要 加 熱 硬 化 該 樹 脂, 1 1 | 附 加 有 在 前 述 膨 脹 部 之 内 部 設 置 具 有 向 下 方 開 P 之 加 熱空 1 1 氣 之 吹 出 口 之 吹 出 管 為 其 特 激 之 構 成 要 件 的 管 路 補 修 装置 1 1 〇 又 甲 請專利範圍第10項之發明為 前述補修材浸漬有 1 1 因 加 热 來 促 進 其 硬 化 的 樹 脂 而 為 了 要 加 热 硬 化 該 樹 脂, 1 I 附 加 有 只 在 前 述 膨 脹 部 對 應 於 管 路 底 部 之 部 分 設 置 霣 熱器 1 1 I 為 其 特 激 之 構 成 要 件 的 管 路 補 修 裝 置 者 0 1 1 [實施發明之形態] 1 1 本紙張尺度適用中國國家標準(CNS)Λ4規格(210x29フ公t) 10 經濟部中央標準局員工消費合作社印製 __405005_B7____五、發明説明(s) 首先,參考第1圖乃至第22圔,將在管路內對較長範臞 予Μ内襯補修材來補修之,發明之實施形態說明如下° 首先,要達成具體的第一目的之發明為如下述° 如第1圈所示,將含有未硬化之硬化性合成樹脂•在工 廠内用反轉手段預先有插入袋狀之膜吠體1之筒狀®3拉進 於管路的下水管5内而配置之。 人孔7內有設置水壓塔9,而筒狀體3之後端3a係安裝於 該水壓塔9之下端部9a。棘狀體1係形成為長於筒狀體3, 從筒狀體3之後端3a向外部延伸的該祺狀想1之後部分la係 插通於水K塔9内的狀慇。水壓塔9之上端部9b係擴開成為 喇叭狀,而膜狀體1之後端lb為安装在該上端部9b之周掾。 又,將膜狀體1形成為興筒狀體3同樣長度,後《水密地 安装於水壓塔9之下端部9a也可以。 膜狀體1為,其後端部lc有連结熱軟管11而在工廠内插 入於筒狀體3內部的闞係,在膜狀體1内有配置熱软管11的 狀態。 再者,事先將膜狀體1及筒狀體3予以連结Μ便在施工現 場作業中,防止膜狀體1對筒狀體3發生僑離。 然後,從後端lb對膜狀體1内加水,如第2圈所示,《該 膜狀髓1而將筒狀«3壓接於下水管5之内面。以該狀《下 對膜狀通1内之水中配置吸取软管13,由該吸取钦管13吸 水而用鍋爐(未圖示)加熱。所加热的水為從热’炊管11再度 回到膜狀髓1内(請參考箭號),使简狀體3内之热硬化性合 成樹脂硬化。 —;-------裝------訂------->— 線 (請先閲讀背面之注意事項再球爲本頁) 本紙張尺度適用中國國家標準(CNS ) A4規格(210X29h>f > 經濟部中央樣準局員工消费合作社印裝 A7405005_B7__五、發明科神(9) 又,有使用空氣,蒸汽等來代替水的情形。 等到热硬化性合成樹脂硬化之後,吸上膜狀體1内之水 來霣行排水,然後,在筒狀邇3以及膜狀體1之下水管5之 兩皤位置霣行切斷加工及回收熱软管11而構成如第3圖所 示之内襯構造,完成對下水管5全骽之補修作業。於是, 由該简狀體及膜狀鱷1可補修密封功能下降之下水管5之連 接部15。 又,也有最後除去腠狀«的情形。 第4圈係說明不使用水壓塔時之一實施例之麵。 將袋狀之膜狀髓P用反轉手段插入於筒狀«3’内之後, 對該等筒狀體3’及膜狀體1’之兩端部安装栓塞16,18(嫫 吠體1'之後端部係被切斷)。栓塞16有安装供給用软管, 栓塞18安裝有排出用砍管22。然後,將筒狀體3'及膜狀髖 1’引進下水管5内,從供給用砍管20供給水來將筒狀體厂 ®接於下水管5之内面。Μ該狀態下·打開設在栓塞18的 閥(未画示)*從排出软管22排水至鍋爐(未圏示)來加热。 將加熱的水從供給用砍管20再度供給於膜狀賭1’内•使筒 狀體3 ’内之热硬化性合成樹脂硬化。 供給用软管20及排出用钦管22為,可在補修工程現場安 装之。又,也有用空氣,蒸汽來代替水的情形。 第5圖係說明不使用水壓塔時之其他實施例之圈。 將縝狀髖1'連接於筒狀體3”内*热软管11'連接於後端 部lc’並用反轉手段插入之後,對該等之筒狀髖3"及鎮狀 體1’之開口部安装栓塞29。對栓塞29安裝有熱砍管11及 本紙張尺度適用t國國家標準(CNS ) Α4規格(210Χ297公嫠) _ 1 ο - I , 11 n 11 n I n I - I I n ~! i 線 (請先閲讀背面之注意事項再18^本頁) __405005_b7_ 五、發明祝明(IQ) 供給軟管24,然後安装排出軟管26。將筒狀體3"及膜狀》 1”拉進下水管5内,從供給軟管2 4通過热軟管11’來供給水 。之後,從排出管26排水至鍋爐(未匾示)而加热,將加熱 的水從熱軟管11’再供給於膜狀®内(請參考箭號)。 如在第6圈詳细地顯示,筒狀體3,3’為在玻璃纖雎及聚 酯钃維等之纖維層17(樹脂吸收M)之外側具備有聚_ •聚 氨基甲酸乙酯或尼龍製等之不透水性之薄膜層19者。孅維 層1係浸潰於不飽和聚酯樹脂或環氧樹脂等之热硬化性合 成樹脂成為遇飽和狀態。雖然使用熱硬化性的樹胞做為硬 化性合成樹脂*但在第4顯所示的狀態時可使用常溫硬化 性及紫外線硬化性的樹脂。該時可併用水、空氣、及蒸汽 來將筒狀體3'懕接於下水管5之内面。 膜狀鼉1,1',1”係聚酯,聚氨基甲酸乙酷或尼龍製等之 不透水性薄膜,其内側附加形成有玻瑰纖維及聚醣纖維等 之纖維層21。如圈所示,在工廠内反轉而插入於简狀體 3,3·,3”内使膜狀體1,1·,1”成為内供,也就是說’使钃維 層17及纖維B21接觸之狀態。欲使膜狀艚1,1’,1"反轉時 I I ·1 I I I I I I I I I 訂— I I 1' I 線 (請先閲讀背面之注意事項再本頁) 經濟部中央標準局貝工消費合作社印裝 水第 用將 利而 , 然 可 力 0 之 髓 流 之 等 氣 空 興 水 候 時 有 氣 空9FC 體 内插 或71體流 廠之 缸 力 壓 用 具 轉 反 的 示 所 第 以如 可用 也使 5 2 f 部時 曲力 彎壓 推之 7 2 體 狀用 環利 端要 先 目)0 用線 丨 想 i Tr I 遺 假 Λ W 來Η反 丨61的 第示 考所 參圖 謫 示 圔 未 装 置 配 工狀 在雄 。 設開 置 有 設在 部成 端構 後。 之33 280 器装 容安 力有 壓成 之構 332 裝部 置端 配先轉, 反30 該口 之入 13 本紙張尺度適用中國國家標準(CNS ) A4規格(21ΌΧ297公釐) 405005 B7 _ 五、發明説明(li) 壓力容器28之後方之收容室56内收容WiigWYlSStt之 膜狀《1,1,,將該膜狀體I,1”之先端從該插人口 30插入® 力容器28内,使其到達安裝口 33°在安裝口 33之外側構成 有固定裝置35。將含有未硬化之热硬ib性合·成樹BI之1S狀 體3, 3"之後端套在該固定装置35之後’鎖緊該固定装置35 之螺栓37。再者,當將未硬化之熱硬化性樹脂浸漬於筒狀 體3, 3”時,從筒狀體之一端注入未硬化之硬化性樹胞,從 其另一皤部側抽出前述筒狀體内部之空氣,用辊子捋之同 時浸漬所注入的硬化性樹脂。鎖緊嫘栓37之後,固定装置 35之環狀鎖緊構件39會將膜狀體1,1”之先端及筒狀體3,3” 之後端固定在安装口 33° 經濟部中央標準局貝工消費合作社印策 (請先閲讀背面之注意事項再^Τ本頁) 從形成在壓力容器28之供給口 41對該颸力容器28内供給 加壓流體時,膜狀艚1,1”為從先端側反轉而插入於筒狀髏 3,3”内。膜狀體1,1”之後端部安装有熱软管11,11',而當 膜狀體1,1”反轉插入之際,該热软管11,11'為同時插入於 膜狀體1,1"内。其结果,不需要配置熱砍管用之特別工程 ,因此,配置热软管時,不會發生因該熱砍管而傷及膜狀 體的情形。 壓力容器28之後方之收容室56内,還設有速度調整輥子 43,45,速度調整輥子43係由馬達47M預定速度回轉來限 制膜狀體1,1”及热软管11,11’之撤出速度的Μ係,謨狀* 1,1"之反轉速度不會變成過快。 插入口 30之内側安装有橡皤製的密封構件49·該密封構 件49係密接於膜狀體1,1',接著密接於热欧管li,11’以防 本紙張尺度適用中國國家標準(CNS ) Λ4規# ( 210X2^7公势) ~ΓΓ~. 經濟部中央橾準局貝工消費合作社印製 405005_B7__五、發日_明(上2 ) — .. _ — _..冊— — *· —.......... . _.. —.—.. 止ffi力容器28内的加壓流體從插人口 30洩漏。 胃者’壓力容器28之先端部32係可卸下安装環51來更換 *因此可準備對愿於膜狀體H"之口徑的安裝口。又,圓 中5 3係防止膜狀驩"及熱软管11>U,下垂的支持輥子, 而55係膜狀艚•及热软管n,u之載置台。 Η將包含有上述反轉配置裝置之嫌種發明記載如下。 (1)由後端部具有不透遇性膜狀體之插入口 *先钃部具備 有固定膜吠體先端用之安装口之懕力容器,以及將含有未 硬Λ之硬化性合成樹脂的筒狀體支持成為反轉而延伸的膜 Μϋβ置在内側的狀態的支持裝置所構成為其特激的反轉 S3胃裝置。(2)前逑安装口兼做為前述支持裝置為其特微 的第(1)項所記載之反轉裝置者。上述反轉配置装置係將 _狀SI反轉而配置在筒狀髓内者;然而,如果安裝口有兼 做支持装置的話,可以簡單的構成而確賁地配置膜狀體於 筒狀體內。 再者’用該反轉配置裝置來實行第4麵所示的方法時, 膜狀Hi’之後端部不安装熱砍管。又,要實行第丨圖所示 的方法時,在反轉插入膜狀體1之後,切除简狀體3之後端 側少許部分。 ip 形成在膜狀體丨"之繼維雇21為,在開始時未浸漬 合成樹脂’但插入於筒狀體3,3,,3"内時從雄維層17吸收 熱硬化性合成樹脂。又,可以使孅維曆21含有少許的热硬 化性合成樹脂,又,如第9鼷所示,對膜狀思1,1,·1”不附 加81維層也可Μ。再者,在最後可將瞑狀髏1,,1"除去如 (請先閱讀背面之注意事項再境^本頁) 裝. 訂 ---線 本紙张尺度適用巾ΒΙϋ家縣(CNS ) Λ4^ ( 21Qx 297公势) 15 經濟部中央標準局貝工消費合作社印製 405005_b7___40500¾ V. Description of the invention (1) Printed by the Standard Shellfish Consumer Cooperative in the Ministry of Economic Affairs, B7 [Industrial Utilization Field] ------------ 1 1 I This invention is based on a repair For pipelines such as water pipes, the repairing material * | m is maintained on the inner side of the pipeline, and the repairing method should be performed by the pipeline repairing device used by the ft / j 1 1 method. READ BACK 1 1 [Previous technology] Field 1 I 1 I Due to the aging 9 earthquake and site sinking, etc., the plumbing matters such as sewer pipes 1 I re 1 | In case of cracks or joints leaving, it is necessary to repair the turtle quickly Cracked part 1 The installation and connection part 0 When the amount of rainwater or groundwater that has entered increases, it places a heavy burden on the sewage, etc. Page Vw- · 1 I When the sewage seeps into the ground, it will lead to Harm. 1 1 Therefore, there are methods for repairing existing pipelines such as ground pipes without digging the ground. 1 1 Adding repair materials to the length of the existing pipeline between manholes and manholes. Method of forming a new pipeline on the surface and 1 I lined with repair materials to repair the damage, etc. 0 1 r 'I First, according to Figure 34 and Figure 35, 1 > The repair method is divided as follows. 0 1 The repair method is to first introduce the cylinder 1 containing the uncured thermosetting resin into the pipeline B. 0 Then use water pressure (please refer to number i) to Invert the bag 1 I-shaped water-impermeable film body C and insert the inverted film-shaped arm f C from the opening of the lotus-shaped 1 1 I body A into the skull A (please refer to page 34)鼷) 〇 Membrane body 1 1 C is reversed to the rear end D and the entire body of the body A is almost crimped to the pipe B 1 1 In the state of the inner surface »A pressurized and pressurized liquid is supplied from a forged m car (not shown) 1 1 into the expansion chamber C formed by the film-shaped body C, and the heat-curing of the internal-hardened simple body A 1 I Resin (please refer to Figure 35) 〇1 1 After 9 I The water in the recovery expansion chamber C 'is cut off at the two ends of the pipe B 1 1 This paper size applies the Chinese National Standard (CNS) Λ4 specification (210X 297 mm) ) -4 A7__405005__B7 V. Invention (2) Printing and processing of corpus callosum A and membranous body C by the Shellfish Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs and completing repair work. The membranous body C is sometimes pulled out before the cutting process, but it is used as an inner water-impermeable layer to form a part of the added structure ° * i, it is a part of the existing pipeline The M injection method of lining the repair part with the repair part to repair its damage is explained below. As shown in Section 36 (a), the repair device X is provided with an expansion portion xl that can be removed in the radial direction of the pipeline B, and a sheet-shaped repair material with at least a suspect cloth is wound around the expansion portion xl *. Alas. When the expansion part xl is connected to a pipe body repaired on the upper side of the repair device X in the circumferential direction, first, the repair device X is controlled by a monitor, which is not shown, and which is inserted into the pipeline B for the despise camera. , Pull the steel cable x3 back and forth to induce the damaged part bl of the pipeline B. During this induction, no air is supplied to the expansion portion x1, and the diameter of the repairing device X is smaller than the inner diameter of the pipe B, and can be easily induced under the ribs of the wheel X4. In this way, after positioning the repairing device X in the pipeline B, the K 绾 air is supplied from the tube pulp x2 to the expansion portion xl, the expansion portion xl is expanded, and the repair material Y is moved in the radial direction of the pipeline B to be crimped to the tube. Inside the road B. When the repairing material Y impregnated with the curable resin is impregnated, the curable resin is hardened. Then, when the repairing material Y is fixed on the inner wall of the pipeline B (when the hardening resin * is cured), the air in the expansion portion xl is discharged from the pipe body x2 * the expansion portion xl is returned to the state at the time of induction, and from the pipe Take out repair device X in road B. Furthermore, in order to accelerate the hardening of the resin, a resin which can accelerate the hardening by heating is often used. At this time, heated K-contracted air is supplied from the tube hip x2. [Problems to be Solved by the Invention] However, in the past, the repair method for the fear in the pipeline was: • Until the repair is completed III. Buttoning III Order II — ^ I 1 · Line (Please read the precautions on the back before ¥ this (Page) This paper uses the Chinese National Standard (CNS) Λ4 specification (210X 297 mm). 5 Printed by the Shellfish Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs. 405005_B7__ V. Description of the invention (3) _______ .. ------ · —. When it is finished, keep the pipeline in an unused state. It ’s also complicated to manage the water pressure for reversing the site of a repair project. It is often difficult to ensure a certain watercraft. Therefore, it is difficult to provide a lining structure of uniform quality with the above repair method. Therefore, the first objective of the present invention is to provide a pipeline repair method that can shorten the time required for repair work and can often obtain a certain quality. In addition, the conventional repair method requires a large amount of liquid such as water to be supplied to the expansion chamber c '. For example, the expansion chamber C with an outer diameter of 600 ··· and a length of 20 · / · requires 13t of water. This time, the construction needs to be carried out by a water wheel and the like to carry water several times. Also, if thermosetting tree shrews are used, the fuel cost and time required to heat the liquid is not used. Add K. In the above construction method, as shown in Figure 34, a water stopper TM needs to be installed on the upstream side of the manhole at the repair site to completely shut off the drainage during the repair operation. Therefore, it is necessary to configure a suction hose in the manhole upstream and a drain hose in the manhole downstream. The pump uses the suction hose to drain the upstream drainage through the suction hose, and changes the water to the downstream drainage hose through the road. engineering. The drainage method is that the tank needs to be powered by the pump, and the suction hose and drainage hose on the road will become an obstacle to the passing of the vehicle, and there are problems that cause danger. Therefore, the second object of the present invention is to provide a pipeline repair method and a pipeline repair method which can reduce the injection of the injection material into the repair material and also allow drainage to flow through the repair material during repair work. Its installers. On the other hand, in the previous method of repairing the local part of the existing pipeline in 4 * The repair material Y is to prevent the damaged part bl of the pipeline B from digging out. The paper size is applicable to the Chinese National Standard (CNS) A4 specifications (210X 297 male ^ (please read the notes on the back before ^-~ this page) 405005 in the Ministry of Economic Affairs. Printed by Biao Xia X Consumer Cooperatives 5. Inventors (• 1) II launching and long-term durability It is required for use-the strength is set to 0. Therefore, there is a need for III to use glass-grade reinforcing fibers. It is easy to use fabric containing 0 I. However, the end of the laser cloth is easy to break m, especially along the pipeline B Please read the repair material Y in the circumferential direction of III. When the ingot breaks, the repair material Y cannot be read back. The smooth crimping part Z > If the crimping part cannot be formed, it will be in the pipeline B matter I | # I | A step difference is formed inside »The solid material flowing in the pipeline B is stuck in the step but K« I originally obstructs the flow in the pipeline 0 page I | So 9 In order to prevent the flaw, you can use the test line To cross-broadcast its two II ends. However, when this is done, it is not only to increase the manufacturing process of the repair material and increase the cost of the II, but also to increase the thickness of the repair material by using a system of lines crossing the ground. I ordered 9 as a result. The pipeline B forms a crimping portion Z 0 I with a smooth rate. Therefore, the specific third of the present invention is 9 when using a cloth to repair I material. The repair material can be applied to the two ends of the pipe sleeve direction. The pipeline is smoothly connected to SI 1 to form a crimped part without a sense of boundary. The line 0 1 again collects water caused by drainage 1 1 flowing inside the pipeline and dew condensation in the pipeline during the repair work.At the bottom of the pipeline, the moisture at the bottom of the pipeline 1 | is higher than the moisture at the top of the pipeline. In the repair work of this kind of pipeline, it is set from the upper side of the repairing device X in the circumferential direction of the M injection. The opening of the tube 1 1 I When heating air is supplied »Only the resin 1 at the top of the tube increases the temperature f The bottom of the tube loses the heat of vaporization due to moisture > The heating is slower 〇1 1 That is to say In the past repairing device 9 The tree cell hardening of the repairing material 1 | The unevenness occurred at the time period »m Η It is formed uniformly throughout the circumference of the pipeline 1 I The hardening repairing material 0 1 1 This paper size applies to China Standard (CNS) A4 specification (210X297 公 #) 7 __405005 V. Description of the invention (5) Printed by the Central Bureau of Standards of the Ministry of Economic Affairs, Shellfish Consumer Cooperative Co., Ltd. Warranty installation from the hard core to the poor. Its ίφΜ, full: ΗβΙΞ Insert the PK repair pressure tube and the side is *. The internal and internal excitation methods of the pipeline and the pipeline are as follows: • The internal 211 ^ 1 ^ material is used to repair the pipeline and repair the road, and the road is special grease. In the pipe method repair internal repair «2 pipe« control its tree gas path aMU supplementary supply for the party to introduce the road repair 1JI into the state description, sexual empty cell tube model closed, mention the repair of the supply line first The former Sinochem tree should be enclosed in the above description, and added to the pipe ring body. The pair of French hard parts are inserted in the former road, and the pattern of the lining is placed inside the box. The hard tube of the material is internally repaired with M repair. * The hard match is an extension of the lambda material, and the subject matter is completed. The first to make up the hard shape is ΪΛ1.懕 _ Lu Weijian enters the pre-Ming M supplementary narrative to promote the hardening of the invigorating insemination Shen Shu injects a note in the body and sends a U2I1-like shape to the ground to determine the current sexual epidemic before the turn of the tube Sexual homogeneous solution of myelin and fat makes the practice bring out the stubborn and irritable »1 perimeter scratches, which are all tree-like desires, but can be hard and can be dipped into the eyes, and the heat of the fan can be seen. The side of the fat, the side of the body fat line of the first one is given to the first two. Ricci's empty and bright tree is good. The first part of the solid body and the second part of the solid tree is the body of the dural endometrium that makes the hair d. The rate of the body P is not mechanized, but the tube is film-like. "Shen Shubei, Although it can, the road effect U has a hard and hard description. The other is that the tube has the nature of ta. The inner is, the upper tube, c W It is said that before the roll, it should be completed in the middle of the whole M. In the U, the U will be more advanced than the follower, and it will be up to 5 meshes in the small and small hardware industry. The replacement S is not reduced or reduced. Structure II —-I--II ^ III —Ding — II n Elephant l o.4 °-«(Please read the precautions on the back before ^ c page) This paper applies the Chinese National Standard (CNS) Λ4 (210 × 297 public release) 405005 A7 B7 Printed by the Consumer Cooperatives of the Central Bureau of Standards of the Ministry of Economic Affairs 5. Description of the invention (in the state of 1 1f. Inject pressurized fluid into the interior space of the above repair materials to crimp the repair materials 1 1 I VX is used to repair the hardening resin on the inner wall of the pipeline to repair the pipe. Method for repairing pipelines 0 Applying for patent No. 3 in the patent application 1 | Please see the invention is a flexible 1 with I- * fc hardened resin impregnated in the pipeline with a read back 1 1 I inserted and arranged in the pipeline 1 | The cylindrical repair material and its meaning 1 Item 1 The inner space of the upper repair material is filled with pressurized fluid, and the repair material is crimped into the pipeline repair device which refills the internal pressure of the pipeline. It is:% This page 1 has the flexibility of inserting into the repair material to reduce its internal space 1 1 Insertion member 9 1 I Seal the internal space between repair material and insert member 〇 Add K during repair work It can also make the drainage flow through the repair material and flow into 1 | 9 of the giant. Please invent the 4th invention of the patent scope. ≫ In addition, the insert structure 1 J is formed into a cylindrical hollow body. Reduce the internal space of the repair material 1 1 At the same time, the pipeline repair method through which the drainage material passes through the inner line of the repair material and passes through the special components of the repair material through the passage provided at the center of the repair material 0 and * In the application 1 I patent In the invention according to the fifth item, the insertion member is a hollow body that also has an internal space in the small repair material 1 1 1 for additional repair, and penetrates through its axis while providing a channel through which 1 1 drainage passes. The characteristics of the components of the pipeline repair 1 1 Device 〇1 | To achieve a specific third largest string, please patent Fanhui No. 6 invention is 1 I expansion in the direction of the direction of the pipeline with free expansion 1 1 I The outer periphery of the expansion part 9 The repair material with at least a stretcher is installed on the inside of the pipeline 1 1 After the repair device is arranged inside the expansion part, the expansion part m is expanded to make the front 1 1 Paper size is applicable to Chinese National Standard (CNS) A4 specification (210X 297 male #) A7 B7 Printed by the Central Bureau of Standards of the Ministry of Economic Affairs Printed by Shellfish Consumer Cooperatives V. Description of the invention (7) 1 1 The repair material is crimped to the inner side of the pipeline The repair of the pipe lined from the inner side of the pipe 1 | In the repair method, the two ends of the pipe 1 along the circumferential direction of the pipe of the repair material are folded over and installed on the pipe of the repair device. Please first 1 | Road repair method 0 and the invention of the seventh scope of the patent application is > equipped with reading back 1 directional expansion in the radial direction of the pipeline i such as the expansion part while forming the expansion Note 1 | Attachment of pipelines with at least a patch of repair material on the outer periphery of the flexible membrane. 1 I In the repair device used for repair, the above-mentioned repair materials are provided along the pipeline and the ends in the direction of 1 1 Μ Overturned and installed on 刖Can be installed on this page. 1 Repair device for the outer periphery of the flexible membrane. 0 1 1 The invention that has reached the specific 400th is the invention in the 8th or 11th scope of the patent application. 0 The invention in the 8th patent scope. In order to achieve the third largest invention specified in 1 above, the repair material mentioned above is also impregnated with resin that can harden by 1 | heating, and the repair material is crimped to the inner surface m of the pipe and added at the same time The pipeline repair method is provided for the repairing material located at the bottom of the pipeline. 1 1 The method of repairing the pipeline with more heat than other parts is a feature of the pipeline. There is a 1 I resin that accelerates its hardening by heating. In order to heat harden the resin, 1 1 | In addition, a blow-out pipe with a heating air 1 1 gas opening that opens downward P is provided inside the expansion section as The composition of its special excitement The pipeline repairing device 1 1 〇 The invention of item 10 of the patent scope is impregnated with the aforementioned repairing material 1 1 A resin that promotes hardening due to heating, and in order to heat and harden the resin, 1 I A heater is installed in the expansion part corresponding to the bottom of the pipeline. 1 1 I is a pipeline repair device which is a special component of the stimulus. 0 1 1 [Implementation of the invention] 1 1 This paper applies Chinese National Standards (CNS) Λ4 specification (210x29 フ 公 t) 10 Printed by the Consumer Cooperatives of the Central Bureau of Standards of the Ministry of Economic Affairs __405005_B7____ V. Description of the invention (s) First, referring to Figure 1 to Figure 22, a longer fan will be given in the pipeline. The lining is repaired with lining repair material. The embodiment of the invention is described below. First, the invention that achieves the specific first objective is as follows. As shown in the first circle, it contains uncured hardening synthetic resin. The inside is reversed by a tube-shaped ® 3 inserted into a bag-shaped membrane bark body 1 and pulled into the drain pipe 5 of the pipeline. Home of. A water pressure tower 9 is provided in the manhole 7, and the rear end 3a of the cylindrical body 3 is installed at the lower end portion 9a of the water pressure tower 9. The spiny body 1 is formed to be longer than the cylindrical body 3, and the rear part 1a of the shape 1 extending from the rear end 3a of the cylindrical body 3 to the outside is inserted into the water K tower 9. The upper end portion 9b of the water pressure tower 9 is expanded into a trumpet shape, and the rear end 1b of the membrane-shaped body 1 is a peripheral ring mounted on the upper end portion 9b. Further, the film-like body 1 may be formed to have the same length as the cylindrical body 3, and the latter may be attached to the lower end portion 9a of the water pressure tower 9 in a watertight manner. The film-like body 1 has a system in which the heat pipe 11 is connected to the rear end lc and inserted into the cylindrical body 3 in the factory. The film-like body 1 has the heat pipe 11 disposed therein. Furthermore, the membrane-like body 1 and the cylindrical body 3 are connected in advance to prevent the membrane-like body 1 from leaving the cylindrical body 3 during the construction site operation. Then, water is added to the membrane-like body 1 from the rear end 1b, and as shown in the second circle, "this membrane-like pith 1 is crimped to the inner surface of the sewer pipe 5". A suction hose 13 is disposed in the water in the shape of the bottom-to-membrane passage 1, and the suction tube 13 absorbs water and heats it with a boiler (not shown). The heated water is returned from the hot 'cooking tube 11 to the membranous pulp 1 again (refer to the arrow), and the thermosetting synthetic resin in the simple body 3 is hardened. —; ------- Installation ------ Order ------- > — Line (please read the precautions on the back first, and then the ball is on this page) This paper size applies to Chinese national standards ( CNS) A4 specification (210X29h > f > Printed by A7405005_B7__ of the Consumer Cooperatives of the Central Procurement Bureau of the Ministry of Economic Affairs. V. Inventor (9) In addition, there are cases where air, steam, etc. are used instead of water. Wait until the thermosetting composition After the resin is hardened, the water in the membrane body 1 is sucked up to drain water, and then the tubular hose 3 and the two pipes of the water pipe 5 below the membrane body 1 are cut and processed and the hot hose 11 is recovered. The lining structure shown in Fig. 3 is completed to complete the repair work on the sewer pipe 5. Therefore, the simple body and the membrane-shaped crocodile 1 can repair the connection portion 15 of the lower water pipe 5 whose sealing function is lowered. In some cases, the 腠 shape may be removed at the end. The fourth circle is an example of an embodiment when the hydraulic tower is not used. After inserting the bag-shaped membrane-shaped pith P into the cylindrical shape «3 'by reversing means, Plugs 16 and 18 are attached to both ends of the cylindrical body 3 'and the membrane body 1' (the ends of the bark body 1 'are cut off). The plug 16 has The supply hose is installed, and the discharge cut pipe 22 is attached to the plug 18. Then, the cylindrical body 3 'and the film-shaped hip 1' are introduced into the drain pipe 5, and water is supplied from the supply cut pipe 20 to the cylindrical body factory. ® is connected to the inner surface of the sewer pipe 5. In this state, the valve (not shown) provided in the plug 18 is opened * The water is drained from the discharge hose 22 to the boiler (not shown) for heating. The heated water is supplied from the supply The pipe 20 is again supplied in the film-shaped bet 1 '. The thermosetting synthetic resin in the cylindrical body 3' is hardened. The supply hose 20 and the discharge tube 22 can be installed at the site of the repair work. It is also possible to use air or steam instead of water. Figure 5 illustrates the ring of other embodiments when no hydraulic tower is used. The hip joint 1 'is connected to the cylindrical body 3 "* heat hose 11' After connecting to the rear end lc 'and inserting it by inversion means, a plug 29 is installed to the opening of the cylindrical hip 3 " and the ball-shaped body 1'. The plug 29 is equipped with a hot cutting tube 11 and this paper size is applicable t National Standard (CNS) Α4 Specification (210 × 297 cm) _ 1 ο-I, 11 n 11 n I n I-II n ~! i cable (please read first Note on the above (18 ^ page) __405005_b7_ V. Invention Invention (IQ) supply hose 24, and then install the discharge hose 26. Pull the cylindrical body 3 " and the film-like "1" into the drain pipe 5, Water is supplied from the supply hose 24 through the hot hose 11 '. After that, the water is discharged from the discharge pipe 26 to a boiler (not shown) and heated, and the heated water is supplied from the hot hose 11' to the membrane® (Please refer to the arrow.) As shown in detail in the sixth circle, the cylindrical body 3, 3 'is provided with a polymer layer outside the fiber layer 17 (resin absorption M) of glass fiber and polyester fiber. • 19 impermeable film layers such as polyurethane or nylon. The curing layer 1 is a thermosetting synthetic resin impregnated with an unsaturated polyester resin, an epoxy resin, or the like, and becomes saturated. Although thermosetting resins are used as the hardening synthetic resin *, in the state shown in the fourth display, normal temperature curing and ultraviolet curing resins can be used. At this time, the cylindrical body 3 'can be connected to the inner surface of the sewer pipe 5 with water, air, and steam in combination. Membrane 鼍 1,1 ', 1 ”is a water-impermeable film made of polyester, polyurethane or nylon, and a fiber layer 21 such as glass fiber and polysaccharide fiber is formed on the inner side. It is shown in the factory that it is inverted and inserted into the simple body 3,3 ·, 3 ”to make the membrane body 1,1 ·, 1” become an internal supply, that is, 'make the dimensional layer 17 and the fiber B21 contact State. If you want to make the membrane 艚 1,1 ', 1 " When reversed II · 1 IIIIIIIII order-II 1' I line (Please read the precautions on the back before this page) The use of water will be beneficial, but the air and air of the force 0 can be air-conditioned. When air is in the air, 9FC is inserted or the body pressure of the 71 body flow plant is reversed. Make the 5 2 f part bending and push the 7 2 body shape to use the ring sharp end first) 0 use the line 丨 think i Tr I leave false Λ W to reflect 丨 61 reference test reference装置 Not equipped with a workmanship in male. It is installed with an end structure. 33 280 container capacity and pressure structure 332 is installed. End-equipment is transferred first, instead of 30. The mouth of the paper is 13. The paper size is applicable to the Chinese National Standard (CNS) A4 (21Ό × 297 mm) 405005 B7 _ V. Description of the invention (li) Contained in the storage room 56 behind the pressure vessel 28 WiigWYlSStt's film-like "1,1, the tip of the film-like body I, 1" is inserted from the inserter 30 into the ® force container 28 so that it reaches the mounting port 33 °. A fixing device is formed outside the mounting port 33 35. The 1S-shaped body 3, 3 containing the unhardened heat-hardened plexiform-formed tree BI is placed behind the fixing device 35 'and the bolt 37 of the fixing device 35 is locked. Furthermore, when the non-hardened thermosetting resin is immersed in the cylindrical body 3, 3 ", the non-hardened hardened tree cell is injected from one end of the cylindrical body, and the aforementioned cylindrical body is extracted from the other crotch side. The air inside is impregnated with a roller while the hardened resin is impregnated. After locking the yoke 37, the ring-shaped locking member 39 of the fixing device 35 will advance the film-like body 1, 1 "tip and the cylindrical body 3 , 3 ”The rear end is fixed at the installation port 33 °. The policy of the Central Laboratories of the Ministry of Economic Affairs of the Central Bureau of Standards and Industry, Co., Ltd. (please read the precautions on the back, and then ^ this page) from the supply port 41 formed in the pressure vessel 28. When the pressurized fluid is supplied in the container 28, the membrane-shaped cymbal 1,1 "is inserted into the tubular skull 3,3" to be reversed from the apex side. The membrane-shaped body 1,1 "is provided with a heat hose 11 at the end , 11 ', and when the film-like body 1,1 "is inserted in the reverse direction, the heat hose 11,11' is simultaneously inserted into the film-like body 1,1 " Special engineering, therefore, when the hot hose is arranged, the film-like body will not be injured by the hot cut pipe. The storage chamber 56 behind the pressure vessel 28 There are also speed-adjusting rollers 43 and 45. The speed-adjusting rollers 43 are controlled by the motor 47M to rotate at a predetermined speed to limit the withdrawal speed of the film-like body 1,1 "and the heat hoses 11,11 '. The reverse speed of 1,1 " will not become too fast. A sealing member 49 made of rubber is installed inside the insertion port 30. The sealing member 49 is tightly connected to the film-like body 1,1 ', and then tightly connected to the heat pipe li, 11' to prevent the paper size from applying the Chinese national standard ( CNS) Λ4 规 # (210X2 ^ 7 public power) ~ ΓΓ ~. Printed by the Shellfish Consumer Cooperative of the Central Bureau of Quasi-Ministry of Economic Affairs 405005_B7__Fifth, the date of issue_ Ming (Part 2) — .. _ — _ .. — * · —.......... _ .. —. — .. The pressurized fluid in the pressure container 28 leaks from the plug 30. The tip portion 32 of the stomacher's pressure vessel 28 can be replaced by removing the mounting ring 51. Therefore, it is possible to prepare a mounting hole for the diameter of the membrane H ". In the circle, the 5 and 3 series are used to prevent the film-shaped "& hot tube 11" U, sagging support rollers, and the 55 series of film-shaped rollers and the heating tube n, u are placed on the table. (1) The invention of the invention including the above-mentioned reverse arrangement device is described below. (1) Insertion port with impermeable membrane-like body at the rear end part * The front part is equipped with a pressure container with a fixing port for fixing the front end of the bark body, and a hardened synthetic resin containing non-hardened Λ The support device in which the tubular body supports a state where the inverted and extended membrane M 反转 β is placed on the inside is a particularly intense inverted S3 gastric device. (2) The front mounting hole also serves as the reversing device described in item (1) of the aforementioned support device. The above-mentioned reverse arrangement device is a device that reverses the _-shaped SI and is arranged in the cylindrical marrow; however, if the mounting port also serves as a support device, the membrane body can be accurately arranged in the cylindrical body with a simple structure. In addition, when the method shown on the fourth side is carried out using this inverted arrangement device, a hot-cut pipe is not attached to the rear end of the film-like Hi '. When the method shown in Fig. 丨 is to be carried out, after inserting the membrane-like body 1 upside down, a part of the rear side of the simple body 3 is excised. The ip is formed in the film-like body. " The follow-up employment 21 is that the synthetic resin is not impregnated at the beginning, but is inserted into the cylindrical body 3,3,, 3 " when the thermosetting synthetic resin is absorbed from the male-dimensional layer 17. . In addition, it is possible to include a small amount of thermosetting synthetic resin in 孅 dimensional calendar 21, and, as shown in Section 9), it is also possible to add a 81-dimensional layer to the film-shaped think 1,1, · 1 ". Furthermore, in In the end, you can remove the skeletal skull 1, 1, 1 "(please read the precautions on the back before you enter the ^ page). Binding --- Threaded paper size applicable towel ΒΙϋ 家 县 (CNS) Λ4 ^ (21Qx 297 Public power) 15 Printed by the Shellfish Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs 405005_b7___

五、發明説明(U 同膜狀體1之情形。 對简狀髖3,3"内插入膜狀體1,1"之後,或對筒狀SB3,3” 内插入膜狀體1”而安装栓塞16,18之後,不同於第1躧’第 4圖及第5圓所示的情形’抽出該膜狀體1,1、1”內之空氣 時,如第10圔及第11圖所示*可將筒狀*8 1,1’,1”及茼狀 «3,3·,3”予K捲成卷狀或摺叠成為小型的鼷係,可以極 簡單地搬蓮至補修工程現場。然後,下水管5之剖面形狀 不一定是圓形的闞係,通常是使用非壓縮性流體的水來將 筒狀體3,3'3”壓接於下水管5之内面全周。該時,抽出膜 狀體1,1',1”内之空氣即可遵免發生如第12圈所示的空氣 滯留3 1,可使攸狀邇1,1',1”之全周為與水接觸。然後, 水予以加熱時,在筒狀體3,3',3”内之热硬化性合成樹脂 為在各部分可均匀地進行硬化。 栓塞29係在施工現埸安裝於筒狀體3”及膜狀體1”之開口 部。 逹成具體的第二目的用之發明為如下述。 第13圈係顯示達成具體的第二目的用的發明之第1實施 形態之管路補修裝置100全體構成之剖面圈,第14圖,第 15圃係頭示局部剖面圖,而第16钃係顯示管路補修方法。 上述管路補修裝罝100為,例如利用埋設在路上G的下水 管5...之管路50中之兩個人孔Μ,Η·來補修管路50者。為了 要補修上述管路50内之跛損部位•將與管路50長度相等長 度之補修材2插入配置於該管路50內。上述補修材2係浸漬 未硬化之硬化性樹脂之可撓性之茼狀體。又,在本簧雎形 本紙張尺度適用中國國家標準(CNS ) Α4規格(210Χ 297公漦) _ ir _ I 1 1 f ’ IJJI 線 (請先閲讀背面之注意事項再块為本頁) 經濟部中央樣準局月工消費合作社印製 405005 五、發明k明(:ϋ) _______ . ........-..................................... ........ ............... ....... ......... 態中,補修材2係形成為涵蓋所嫌接之人孔Μ,ίΓ間之略全 長的範困,然而形成為較短也無妨。 上述補修材2為,與達成前述具糴的第一目的用發明之 實胞形態中說明者相同,係由縝狀體1與筒狀髏3所成。又 ,不限定於此*使用不透遇膜之外俩配置浸潰硬化樹脂的 軟管之一層構造者也可以。 上逑補修材2連结有對其内部空間Ε供給水’蒸汽等加® 流fflL之供給用软管20,及排出内部空間Ε之水,蒸汽之排 出用軟管22。上述软管20,22係連结於強行供給’排出加 懕流體L之給水庫60之加壓裝置61。於是’由上逑加壓装 置61將加壓流體L送進補修材2之内部空間E內時’使補修 材2壓接於管路内壁50A。再者,在本實施形態中’藉软管 20,22來強行供給,排出加壓流體L的構造,然而’也能夠 採用對補修材2之内部空間E注入加腰流體L之非循環型的 給水方法。在上述補修材2之末端’具備有開閉閥VW便修 補時將加壓流體L滯留在内部,補修完了後排出加壓流體L。 插入構件70為從一邊之入口插入上述補修材2内來缩小 其内部空間E的可撓性简狀體,係由不透過性且軟質的樹 胞等之材霣所形成,而不用時摺疊成為僑平狀者。例如, 採用塗覆軟質氯化乙烯樹脂的布编軟管(商檷名沙尼砍管) .i· 等。如第14,15圔所示,其外徑R1係設定成為補修材2之 外徑R之1/2〜2/3之程度。又上述插人構件70係設定為與 補修材2之長度略相同,或稍短,其一端之入口連接有加 壓流傾L1之供給軟管71,另一蟠為封閉。又·補修材2與 本紙悵尺度通用中國國家標準(CNS ) A4規格(210X 297公# ) - 17 - —,-------裝— (請先閲讀背面之注意事項再本頁)V. Description of the invention (U is the same as that of the membranous body 1. After inserting the membranous body 1,1 " into the simple hip 3,3 "or inserting the membranous body 1" into the cylindrical SB3,3 " After embolization of 16, 18, it is different from the situation shown in Fig. 1 and Fig. 4 and Fig. 5 when the air in the membrane-shaped body 1, 1, 1 "is extracted, as shown in Fig. 10 and Fig. 11 * Cylinder shape * 8 1,1 ', 1 "and 茼 3« 3,3 ·, 3 "can be rolled into a roll or folded into a small line, which can be easily moved to the repair site . Then, the cross-sectional shape of the sewer pipe 5 is not necessarily a circular stern system. Generally, water of a non-compressible fluid is used to press the cylindrical body 3,3'3 ”to the entire circumference of the inner surface of the sewer pipe 5. At this time, the air inside the membrane-like body 1,1 ', 1 ”can be extracted to avoid the occurrence of air stagnation 3 1 as shown in the twelfth circle, which can make the entire circumference of the 迩 1,1', 1” equal to Contact with water. When the water is heated, the thermosetting synthetic resin in the cylindrical body 3, 3 ', 3 "can be uniformly hardened in each part. The plug 29 is installed on the cylindrical body during construction 3 ”and the opening of the membrane body 1”. The invention for the second purpose is as follows. The thirteenth circle is a sectional circle showing the entire structure of the pipeline repairing device 100 according to the first embodiment of the invention for achieving the specific second purpose. A partial cross-sectional view is shown, and the 16th line shows a pipeline repair method. The pipeline repair device 100 is, for example, two manholes M in a pipeline 50 of a sewer pipe 5 ... buried on the road G, Η · To repair the pipeline 50. To repair the damaged parts in the pipeline 50, insert the repair material 2 with the same length as the pipeline 50 into the pipeline 50. The repair material 2 is impregnated The flexible body of the hardened hardening resin. In addition, the Chinese National Standard (CNS) A4 specification (210 × 297 mm) applies to the paper size of this spring. _ Ir _ I 1 1 f 'IJJI LINE ( Please read the notes on the back before printing this page.) Printed by the Central Industry Standards Bureau, Ministry of Economic Affairs, Monthly Consumer Cooperative, 405005. V. Invention (: ϋ) _______. ........-.... ......................... ...... ............. In the state, the repair material 2 is formed as a culvert. It is suspected that the manhole M, ΓΓ is slightly full-length, but it may be shorter. The above repair material 2 is the same as that described in the real cell form of the invention that achieves the aforementioned first objective. It is made of the stellate body 1 and the tube-shaped skull 3. It is not limited to this. * It is also possible to use a one-layer structure of hoses that are impregnated with hardened resin in addition to the impermeable membrane. 上 逑 修修 材 2 A supply hose 20 for supplying water, steam, etc. to the internal space E, and a stream fflL, and a hose 22 for discharging water from the internal space E and steam are connected. The hoses 20 and 22 are connected to a pressurizing device 61 for forcibly supplying ' the discharge fluid L to the reservoir 60. Then, "When the pressurizing fluid L is sent into the internal space E of the repairing material 2 by the upper pressurizing device 61", the repairing material 2 is crimped to the inner wall 50A of the pipe. Furthermore, in the present embodiment, the structure of “forcibly supplying and discharging the pressurized fluid L by the hoses 20 and 22,” a non-circulating type in which the internal space E of the repair material 2 is injected with the waist fluid L may be used. Water supply method. At the end of the repair material 2, an on-off valve VW is provided, and the pressurized fluid L is retained inside during repair, and the pressurized fluid L is discharged after completion of the repair. The insertion member 70 is a flexible simple body that is inserted into the above-mentioned repair material 2 from one side entrance to reduce its internal space E, and is formed of a sheet of an impermeable and soft tree sap, which is not folded when not in use. Overseas Chinese flat state. For example, cloth hoses (commercially known as Sani cut pipes), i. As shown in Nos. 14 and 15), the outer diameter R1 is set to approximately 1/2 to 2/3 of the outer diameter R of the repairing material 2. In addition, the above-mentioned insertion member 70 is set to be slightly the same length as the repair material 2, or slightly shorter, and the inlet of one end thereof is connected with a supply hose 71 for pressurizing the flow dump L1, and the other is closed. Also, repair materials 2 and paper size are common Chinese National Standard (CNS) A4 specifications (210X 297 public #)-17--, ------- installation— (Please read the precautions on the back before this page)

、1T 線 A7 405QQ5____- 五、發明兢明(15) 插入構件70為在補修材2之一端之入口密封’内部空間E係 密封之。因此,插入構件70係由於來自上述加壓装置61之 加®流通L1之供給而膨脹,縮小内部空間插入構件70 之内®為,與補修材2之内部空間E之内壓同等或以上為宜 ,例如補修材之内部空間之内壓為〇.5kg/caia時*插入構 件之内壓設定為lkg/cm2 。也就是說,必需要使插入構件 具備有用補修材對管路内壁之壓接力是不會被完全壓平的 強度。 又*上述插入構件70之全長係可設定為短於補修材2之 長度,例如一半左右也可以。又,上逑插入構件70係如果 具有可撓性而可插入於人孔Μ,Μ ’興管路50內者*即一開始 躭可使用與使其膝脹者相同狀態的構件。 管路補修装置100之構成為如上述,Μ下述之方法使用 。首先,從管路補修装置100在工廠內製造過程說明之。 如第16圈所示,從「準備筒狀贗·膜狀《」(a)開始,實 行「硬化性樹脂之混合」(b), 「對筒狀賵浸潰樹脂j (c) ,「將_狀«反轉而插入於筒狀ffi內j (d)* 「將插入構 I ! I I I I i I I 訂—— ^ - 線 (請先閲讀背面之注意事項再^<•本頁) 經濟部中央揉準局貝工消費合作社印製 內 材 修 補 於 入 推 件 著 接 貨 出 冷 , 保場 Γ 現 ,Η e)施 ί至 '行 移 行 實 内 車 運 搬 於 載 装 管 人 捂 材 修 補 將 後 然 J 热 )·加 (h之 J 髓 體滾 流壓 壓加 加 Γ 入 , 注 η /|\ 件 *嫌 流 壓 加 Γ— 入 )»注 (g材 J 修 置補 配對 並 Γ 内 , 入 CD 推 對 了 業 作 修 )·補 (k路 -I 管 化之 硬等 之管 胞水 樹下 性成 化完 硬而 後 最 完 修 補 之 內 路 管 之 狀 筒 之 性 撓 可 之 i f 樹 性 化 硬 之 化 硬 未 漬 浸 說 是 躭 也 本紙張尺度適用中國國家標準(CNS ) Λ4規格(210X 297公)φ ) 18 經濟部中央標準局貝工消费合作社印製 405005 a7 __ _B7_— _ 五、發明辉明(1Γ)) 補修材2插入配置於管路50内,接著,對插入上述補修材2 内之插入構件70內注入加壓流通L1使其膨脹。之後,對上 述密封之補修材2内之狹窄内部空間Ε注入加壓流體來使上 述補修材2壓接於上述管路內壁50Α,硬化上述之硬化性樹 胞來補修管路內者。 根據上述之達成具體的第二目的之發明之第1實施例, 可發揮下述之效果。首先,對補修材2内插入®置缩小内 部空間之插入構件70而密封之管路補修方法及其補修装置 的«係,可縮小補修材2內之内部空間而減少所注入之加 壓流體量,可在短時間内經濟地實行下水管等之管路補修 作業。 又,可減少給水車給水之次數,網«車也可以小型化, 因此可發揮節儉經費之效果。又,插入構件70係不透過性 而软霣的樹脂等之材質形成的醐係,搬蓮時可摺成為僑平 狀,有節省空間之效果。 達成具髖的第二目的之發明為,並非限定於上述第1實 施形態,在其要旨範圃内可自由地變更细部之設計。舉例 來說,加壓流髓並非限定於水,可使用蒸汽及其他之流體 也可Μ。又,在上述補修作業遇程中,省略對加壓流艨之 加热也可實行硬化性樹脂之硬化。又,在現場配置插入構 件也可以。 其次,參考第17圔〜第19圔,將達成具艚的第二目的之 發明之第2實施形態之管路補修裝置101及方法說明如下。 本實施形態係削減加壓流體量之同時,在補修作桊中也可 本紙張尺度適用中國國家標準(CNS ) Λ4规栝(2丨0X 297公f ) 19 I SI. I I I .^1 I n I I I 訂—— T 線 (請先閲讀背面之注意事項再填寫本頁) 405005 at B7 五、發明说明(17) 貫穿補修材内而排水流通之構成,係由可摺叠成偏平狀之 具有氣密性之軟質软管7 2a,及其外周捲繞成為蠼旋狀之 细徑管72b所成的空心體72來構成上述插入構件70者。空 心體72之外徑R1係設定成為補修材2之外徑R之1/2〜2/3左 右。又,該空心體係設定為其長度略等於補修材2之長度 或稍短,且貢穿補修材2内,有加K流體L1之供給砍管71 連接於其细徑管72b之一端。 因此,平常時摺叠成為扁平狀的狀態來搬運及可插入人 孔與管路50内,將由上述加壓裝置6供給之加壓流» L1注 入细徑管72b内而使细徑管72b豎立成為螺旋狀,並將软管 72a膨脹成為空心狀來縮小補修材2之內部空間E之同時, 使通路72A貫穿其軸心部之空心的筒狀體。又,上逑軟管 72a為,例如採用塗覆軟質氯化乙烯樹脂之纒»布软管(商 標名沙尼軟管)。補修材2與插人構件70為在補修材2«之 端部密封,而内部空間E為密封之。 上述K外構成係與達成上述具艚的第二目的之發明之第 1實施形態之管路補修装置1〇〇相同,因此使用相同之圓號 --^-----11裝------訂--1---I線 (請先閲讀背面之注意事項再填寫本頁) 經濟部中央標率局貝工消费合作社印装 用 作 之 述 下 行 實 而 成 構 之 述 上 有 具 係 ο 1 。 置 明裝 說修 其補 略路 省管 而 嫌 步 的 場 現 及 程 過 的 内 廠 Η 在 第 之 明 發 之 的 0 二 第 的 體 具 述 上 10成 置達 装與 修 · 補示 路所 管圈 6 » 1 先第 首如 0 是 方 的 樣 同 態 形 施 實 中 業 作 修 補 在 配 入 插 2 材 修 補 之 狀 茼 硬路 之 # 管» « fi 之 性 撓 可 之 脂 樹 性 化 硬 之 化 預 於 销· 捲 對 次 其 ο 内 20 本紙張尺度適用中國國家標準(CNS ) Α4規格(210X297公嫠) 經濟部中央標準局員工消費合作社印裝 405005 五、發明説明(18 ) 先插入於上逑補修材内,用以縮小補修材之内部空間E之 可撓性之空心體72之细收管72b内注入加壓流體L1而使其 登立成為鏍旋狀,薄以使插入構件膨脹,使其具有一定的 強度W避免被補修材對管路内壁之壓接力所完全壓扁。接 著*將加懕流體L注入於上述密封的補修材内1內部空間E 而使上述補修材壓接於上述管路內壁50A*硬化上述之硬 化樹脂來補修管路內。該時,在管路50内流通之排水《係 經形成在補修材之袖心部之通道72 A而向下游側流動。該 時,如果加壓流體L具有熱霣以便使硬化性樹脂迅速硬化 時,應使用其導热率低於加壓滾體L之加壓流《LI為宜》 此乃因防止加壓流體L之熱董被排水W奪去起見,使加壓滾 «L1具備有隔熱材之作用。可使用空氣等做為加壓流SL1。 在上述之本發明之第2實胞形態中,空心《係由可摺叠 成為騰平的軟管,及在該砍管外周捲繞成為嫘旋狀之细徑 管所成,對該细徑管注入加壓流體而膨脹成為空心狀為其 特街[之管路補修裝置的關係,可發揮下述之效果。首先, 插入構件為简狀之空心體72的管路補修方法及其補修裝fi 的闞係,可嫌小補修材内之內部空間而減少所要注入之加 壓流體量之同時,K形成在其_心部之通路7 2 A來可固滑 地通過排水W的鼷係,不需要做換水之過程,可籣便且安 全地實行管路補修作業。 又,由可摺叠成為扁平吠的軟管72a,及在該吹管之外 周捲繞成為鏍旋之细徑管72 b構成空心ffi的Μ係’ _送時 可節省空間之同時*可簡便地插入於管路内°又•僅僅對 本紙張尺度適用中國國家揉準(CNS)A4規格(210X297公t ) - 21 - ----------裝-- (請先閱讀背面之注意事項再填寫本I) 訂 線 405005 405005 五 經濟部中央橾準局員工消費合作社印製 、發明#明(1¾ 上述细徑管72b注入加壓流鱧L1即簡單且確實地膨脹成為 筒狀而形成空心體的闞係*容易作業。再者,使用空氯等 做為加壓流S8L1時,可同時具有隔熱材之功能。 茲參考第20園〜第22H來說明達成具體的第二目的之發 明之第3實施形態之管路補修裝置1〇3及方法說明如下。本 實施形態是達成上逑具體的第二目的之發明之第2實旛肜 態之同時,及減少加壓流《量之同時,在補修作業中也可 使排水貫穿補修材内而流動者:係由內外雙層之軟質Μ體 7 3a,7 3b來構成上述插入構件7〇,兩者予W局部接合成為 空心體73者。 空心體73為,如鼸中(S)所示,由將内外雙層之耽質筒 體73a,73b間予K局部接合的筒狀體所成,外側之软質筒 ®具有氣密性。然後,其外徑R1係設定成為補修材2之外 徑R之1/2〜2/3左右。又,上述插入構件之空心« 73係其 長度與補修材2之長度略相同或稍長,且設定成為貫穿補 修材2内,其一端有連接加壓流髓L1之供給炊管71。因此 ,空心體73係對其供給加壓流體L1而膨脹,具有以補修材 對管路内壁之Μ接力是無法完全壓扁的強度來縮小補修材 2内部空間Ε之同時,其軸心部貫穿通道73Α的简狀空心β 。對補修材2注入加壓流體L時,通路73Α為如同73’一揉能 夠確保其通道73Α ·可使排水W通過空心狀之通路73Α而流 動。補修材2與插入構件70係在補修材2兩側之端部密封, 内部空間E係被密封。又,内外雙靥之吹質简體73a,73b係 接合成為線狀或面狀均可。 本紙張尺度適用中國國家梯準(CNS ) Λ4規格(210X 297公焓) (請先閲讀背面之注意事項再填寫本頁) -·# -22 - 經濟部中央樣準局真工消费合作社印装 A7 ^___ 405005_!Z___ 五、發明説明(2()) _________________……----------------------------------------------------------- 上述以外的構成為與上述達成具艚的第二目的之發明第 1實腌形態之管路補修100相同的鼷係’使用同一圔虢表示 而省略其說明。 管路補修装置103係構成為如上述*而其作用為如下述 。首先,管路補修装置103在工廠內之製造逢程及現場工 程為如第16鼸所示,與上述達成具賭的第二目的之發明第 1實施形態同樣的方法實行之。 在補修作業中,將浸漬未硬化之硬化性樹脂之可撓性之 茼狀補修材2插入,配置於管路50内。接著’對預先插入 於上述補修材2内,用以縮小補修材2之内部空間E的可撓 性之空心體73内注入加壓滾髓L1而使其膨脹。該時,如果 欲使其具備有隔熱材的功能時,即如同上述達成具顦的第 二目的之發明第1實施形態,使用其導热率低的如空氣等 做為加壓流體L1即可。接著,將加壓流體L注入於上逑密 封的補修材2內之内部空間E内,使上述補修材2壓接於上 述管路內壁50A,硬化上述硬化性樹胞來補修管路50内部 。該時,在管路50内之排水V為經通形成在補修材袖心部 之通道73A而流向下游俩。 Μ上,在上述達成具臞的第二目的之發明第3實施形戆 中,空心體係由可摺叠成為扁平狀之内外雙曆之软質筒鑊 形成之同時,局部地接合上述内外雙層之软質简體間的筒 狀體所成,對上述筒狀艚内注入加壓流體而使其膨脹成為 空心狀為其特徵之管路補修装置的Η係,可發揮下述之功 能β首先,插入構件為筒狀之空心體73的補修裝置及方法 本紙張尺度適用中國國家標準(CNS ) Α4規格(210X 297公釐) _ (請先閱讀背面之注意事項再•本頁) .Is HI J— . -裝· 訂、 1T line A7 405QQ5 ____- 5. Invention invention (15) The inserting member 70 is an inlet seal at one end of the repair material 2 and the internal space E is sealed. Therefore, the insertion member 70 is expanded due to the supply from the pressurizing device 61 plus ® circulation L1, and the internal space of the insertion member 70 is reduced to be equal to or higher than the internal pressure of the internal space E of the repair material 2 For example, when the internal pressure of the internal space of the repair material is 0.5 kg / caia *, the internal pressure of the insert member is set to 1 kg / cm2. That is to say, it is necessary to make the insert member have the strength that the crimping force of the useful repairing material on the inner wall of the pipeline will not be completely flattened. * The entire length of the insertion member 70 may be set to be shorter than the length of the repair material 2, for example, it may be about half. In addition, the palate insertion member 70 is a member that can be inserted into the manhole M, M 'and the pipeline 50 if it is flexible *, that is, at the beginning, a member in the same state as that of the knee sweller can be used. The pipeline repairing device 100 is configured as described above and used in the following manner. First, the manufacturing process in the factory from the pipeline repair apparatus 100 will be described. As shown in the 16th circle, starting from "preparing the cylindrical cymbals and membranes" (a), implementing "mixing of hardening resin" (b), "impregnating the cylindrical cymbals with resin j (c)," will _ 状 «Inverted and inserted into the tube ffi j (d) *" The insertion structure I! IIII i II Order-^-line (please read the precautions on the back before ^ < • this page) Ministry of Economy The printed materials are printed by the Central Bureau of Standardization and Consumer Products Cooperative, repaired on the push-in parts, and received the goods out of the cold. Later J heat) plus (h of the J medulla roll pressure pressure plus Γ, note η / | \ pieces * susceptible flow pressure plus Γ — into) »Note (g material J repair and complement pairing and Γ inside Into the CD, I pushed the right job for repair) · Mending (k-I-tube tuberculosis and other tracheids under the water tree to become hard, and then the most complete repair of the inner tube tube-shaped tube of the flexible tube if tree It is said that the hardening is not hardened or stained. The paper size is applicable to the Chinese National Standard (CNS) Λ4 specification (210X 297 male) φ) 18 Ministry of Economic Affairs Printed by the Central Bureau of Standards for Shellfish Consumer Cooperatives 405005 a7 __ _B7_— _ V. Inventive Brightness (1Γ)) The repair material 2 is inserted into the pipeline 50, and then the insert member 70 inserted into the repair material 2 is injected. Pressurize the flow L1 to expand it. Then, pressurize fluid into the narrow internal space E in the sealed repair material 2 to press the repair material 2 to the inner wall 50A of the pipeline, and harden the hardening tree cell. For repairing the inside of the pipeline. According to the first embodiment of the invention that achieves the specific second object described above, the following effects can be exhibited. First, the insert member 70 inserted into the repair material 2 to reduce the internal space is sealed. The method of repairing the pipeline and the repairing device thereof can reduce the internal space in the repairing material 2 and reduce the amount of pressurized fluid injected, and can economically perform pipeline repairing operations such as sewage pipes in a short time. It can reduce the number of times that the water supply water is supplied to the water tank. The net «car can also be miniaturized, so it can save money. The insert member 70 is made of a material that is impermeable and soft, such as resin. The invention can be folded into a flat shape, which has the effect of saving space. The invention that achieves the second purpose with hips is not limited to the above-mentioned first embodiment, and the detailed design can be freely changed in the gist range. For example The pressurized flow is not limited to water, and steam and other fluids can also be used. In addition, in the process of the above repair work, the heating of the pressurized flow can be omitted to harden the hardening resin. It is also possible to arrange the plug-in unit on the spot. Next, referring to the 17th to the 19th, the pipeline repairing device 101 and method of the second embodiment of the invention having the second object of the invention will be described below. In this embodiment, while reducing the amount of pressurized fluid, the paper size can also be applied to the Chinese National Standard (CNS) Λ4 Regulations (2 丨 0X 297 male f) 19 I SI. III. ^ 1 I n Order III-T line (please read the precautions on the back before filling out this page) 405005 at B7 V. Description of the invention (17) The structure of drainage and flow through the repair material is made of a gas that can be folded into a flat shape. The tight flexible hose 72a and the hollow body 72 formed by winding the outer diameter of the narrow-diameter tube 72b into a spiral shape constitute the insertion member 70 described above. The outer diameter R1 of the hollow body 72 is set to be about 1/2 to 2/3 of the outer diameter R of the repair material 2. In addition, the hollow system is set to have a length which is slightly equal to or shorter than the length of the repair material 2, and a supply chopping tube 71 for adding K fluid L1 is connected to one end of the small-diameter tube 72b. Therefore, it is usually folded into a flat state to carry and can be inserted into the manhole and the pipeline 50, and the pressurized flow »L1 supplied from the pressurizing device 6 is injected into the small-diameter tube 72b to stand the small-diameter tube 72b upright. The tube 72a is formed into a spiral shape, and the tube 72a is expanded into a hollow shape to reduce the internal space E of the repairing material 2 while allowing the passage 72A to pass through the hollow cylindrical body of the axial center portion thereof. The upper hose 72a is, for example, a hose made of soft vinyl chloride resin coated cloth (trade name: Shani hose). The repair material 2 and the insertion member 70 are sealed at the ends of the repair material 2 «, and the internal space E is sealed. The above-mentioned K outer structure is the same as the pipeline repairing device 100 of the first embodiment of the invention having the second purpose described above, so the same round number is used-^ ----- 11 pack ---- --Order--1 --- I line (please read the notes on the back before filling this page) The statement printed by the Shell Standard Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs has a detailed description. ο 1. Zhimingzhuang said repairing and repairing the roads of the provincial roads, which were prosecuted, and the in-factory that had passed through the process. On the 0th and 2nd of the body of the 2nd Mingfa, 10% of the equipment was repaired and repaired. The tube circle 6 »1 first first as 0 is square-shaped homomorphic implementation in the industry to repair in the shape of the 2 pieces of material inserted into the repair of the hard road # tube» «fi nature of the flexibility of the resin Hardening is ahead of sale. Volumes are the next best. Within 20 paper sizes are applicable to Chinese National Standard (CNS) A4 specifications (210X297). Printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs. 405005 5. Description of the invention (18) First Inserted into the upper repair material, the narrow hollow tube 72b of the flexible hollow body 72 for reducing the internal space E of the repair material is injected with pressurized fluid L1 to make it stand in a spiral shape and thin to make the insert member The expansion makes it have a certain strength W to avoid being completely flattened by the crimping force of the repairing material on the inner wall of the pipeline. Then, the filling fluid L is injected into the internal space E of the sealed repairing material 1 and the repairing material is crimped to the inner wall 50A of the pipe, and the hardened resin is hardened to repair the pipe. At this time, the drainage water flowing through the pipeline 50 flows downstream through a passage 72A formed in the sleeve portion of the repair material. At this time, if the pressurized fluid L has a heat sink to rapidly harden the curable resin, a pressurized flow having a thermal conductivity lower than that of the pressurized roller L should be used. "LI is appropriate" This is to prevent the pressurized fluid L In order to remove the heat director from the drainage W, the pressure roller «L1 has the function of heat insulation material. Air or the like can be used as the pressurized flow SL1. In the second embodiment of the present invention, the hollow tube is formed by a flexible tube that can be folded into a flattened tube, and a thin-diameter tube that is wound into a spiral shape around the outer periphery of the chopped tube. The relationship between the pipe repairing device for the special pipe [injection of pressurized fluid and expansion into a hollow shape] exhibits the following effects. First of all, the pipeline repair method of the inserted hollow body 72 and the system for repairing the installation fi can be considered as a small internal space in the repair material and reduce the amount of pressurized fluid to be injected. At the same time, K is formed in the _The path 7 2 A of the heart can smoothly pass through the system of drainage W, and does not need to do the process of changing water. It can easily and safely perform pipeline repair work. In addition, a hollow tube M is formed by a flexible tube 72a that can be folded into a flat bark and a narrow-diameter tube 72 b wound around the outer periphery of the blower tube. _ It can save space while sending. Inserted in the pipeline ° •• Only applicable to the paper size of China National Standard (CNS) A4 (210X297mm t)-21----------- install-(Please read the note on the back first Please fill in this item again. I) Order line 405005 405005 Printed by the Consumer Cooperative of the Central Economic and Technical Bureau of the Ministry of Economic Affairs, Invention # 明 (1¾ The above-mentioned small-diameter tube 72b is injected into the pressurized stream 鳢 L1, which is simply and surely expanded into a tube shape. The hollow system of the hollow body is easy to operate. In addition, when using empty chlorine or the like as the pressurized flow S8L1, it can also function as a heat insulating material. The 20th garden to 22H will be described to achieve the specific second purpose. The third embodiment of the invention is described below for the pipeline repair device 10 and method. This embodiment is the second state of the invention that achieves the specific second purpose of the invention, and reduces the pressure flow. At the same time, during the repair work, the drainage can also pass through the repair material and flow. The above-mentioned insertion member 70 is constituted by the soft M body 7 3a, 7 3b of the inner and outer double layers, and the two are partially joined to form a hollow body 73. The hollow body 73 is, as shown in (S), by The inner and outer double-layered cylindrical bodies 73a, 73b are formed by cylindrical bodies that are partially joined by K, and the outer soft cylinder® is air-tight. Then, its outer diameter R1 is set to be the outer diameter R of the repair material 2. About 1/2 to 2/3. In addition, the hollow of the above-mentioned insert member «73 is a length that is slightly the same as or slightly longer than the length of the repair material 2, and is set to pass through the repair material 2, and a pressure flow is connected at one end thereof. The supply tube 71 for the marrow L1. Therefore, the hollow body 73 expands by supplying the pressurized fluid L1 to it, and has the strength that the M material of the repair material to the inner wall of the pipeline cannot be completely flattened to reduce the internal space of the repair material 2. At the same time, its axial center passes through the simple hollow β of the channel 73A. When the pressurized fluid L is injected into the repairing material 2, the channel 73A can ensure its channel 73A as if rubbed 73 '. The drainage W can pass through the hollow channel. 73Α and flow. The repair material 2 and the insert member 70 are sealed at the ends of the two sides of the repair material 2, inside The space E is sealed. In addition, the internal and external double-blow simplifications 73a, 73b can be joined to form a line or a surface. This paper size applies to the Chinese National Standard (CNS) Λ4 specification (210X 297 enthalpy) (Please (Please read the notes on the back before filling in this page)-· # -22-Printed on A7 ^ 005 405005_! Z ___ by the Real Sample Consumer Cooperatives of the Central Procurement Bureau of the Ministry of Economic Affairs 5. Description of Invention (2 ()) _________________ …… --- -------------------------------------------------- ------ Structures other than the above are the same as those of the pipeline repair 100 of the first solidified form of the invention that achieves the second purpose of the invention. The same system is used to indicate the same system and its description is omitted. The pipeline repairing device 103 is configured as described above * and functions as described below. First, the on-site manufacturing and on-site engineering of the pipeline repairing device 103 in the factory are carried out in the same manner as in the first embodiment of the invention which achieves the second object of gambling as shown in Fig. 16 (a). In the repair work, a flexible reed repair material 2 impregnated with a non-hardened hardening resin is inserted and arranged in the pipeline 50. Next, a pressurized roller L1 is injected into the flexible hollow body 73 inserted in the repairing material 2 in advance to reduce the internal space E of the repairing material 2 to expand it. At this time, if it is desired to have the function of a heat insulating material, that is, as described above, the first embodiment of the invention that achieves the second objective is to use a low thermal conductivity such as air as the pressurized fluid L1. can. Next, the pressurized fluid L is injected into the internal space E in the repair material 2 sealed on the upper cymbal, the repair material 2 is crimped to the inner wall 50A of the pipe, and the hardening dendritic cells are hardened to repair the inside of the pipe 50 . At this time, the drainage V in the pipeline 50 flows downstream through the passage 73A formed in the sleeve core portion of the repair material. On the M, in the third embodiment of the invention that achieves the second object, the hollow system is formed by a flexible tube that can be folded into a flat inner and outer bi-calendar, and the inner and outer double layers are partially joined. It is formed by a soft and simplified cylindrical body, and the system of pipe repairing device characterized by injecting a pressurized fluid into the cylindrical cavity and expanding it into a hollow shape can perform the following functions. Β First, The repairing device and method for inserting the hollow body 73 into a cylindrical shape. The paper size is applicable to the Chinese National Standard (CNS) A4 specification (210X 297 mm) _ (Please read the precautions on the back before this page). Is HI J —.-Binding

-HVI 經濟部中央標準局貝工消費合作社印製 405005 ^ 五、發明说明(U) 的Μ係,可將補修材2內之內部空間予从旛小而減少所注 入之加壓流®鱼之同時,經形成在其粬心都之通路73Α可 使排水W圓滑地通過,因此不需換水通程,可籣便且安全 地S行管路補修作業。 又,由内外燮層之軟質筒艚形成,且將内外雙層之軟質 筒體間局部性接合之简狀篇來形成空心體73的闞係,_送 時可節省空間之同時,可簡便地插入管路内。又,僅僅爵 上述筒狀*内注入加壓流體L1即可膝脹成為空心狀,因此 ,作業容易,且使用空氣等時,可發揮隔熱材之功能。如 Κ上所說明,插入構件係可摺叠成為靥平狀來收容,具有 從人孔可插入管路内之可撓性,而且具備有僅僅補修材對 管路内壁的壓接力是無法使其完全扁平的強度的氣密性外 壁的空心體為宜。 其次,茲參考第23_乃至第33圔,將對既設管路之特定 部分內襯補修材來補修其損傷等之發明之實施形態說明如 下。 首先,就自第23圈至第29圖中所示之對既設管路之特定 部分内襯補修材來補修其損傷等之發明之第1實施形態說 明如下。 本實施例之補修裝置200係具有圚筒狀之本體202。 該本通202係由形成有多数透孔20 2a之網板製成之所諝 穿孔金羼板所構成。 然後,在前述本« 20 2之内俩•設置在本體202甬端部之 末端板204之間之範園内· W補修装置200之中心_ 0為共 本紙張尺度適用中國國家標隼(CNS > Λ4規格(210X297公楚) _ 〇4 - . 裝 訂 . 鍊 (請先閲讀背面之注意事項再填寫本頁) 經濟部中央標準局貝工消費合作社印裝 4Π5〇〇5___ 五、發明説明( 22) 同而同心狀地設置內筒205,與前述本體202之間形成有简 狀之空室206,該內筒20 5之内周側係可在管路内流動的液 體流路207(請參考第23_,第25Β)。 然後,在前述本« 20 2之外周供安裝有將橡膠等片材狀 之可撓材料形成為圓简形狀的可撓膜208,該可撓膜208之 兩端部係由固定環211分別氣密地安装於前述本體2 02之端 部,在可撓膜208之內側形成有圓筒狀之膝脹室J,該膨脹 室J之外側之前述可掼膜2 08之表面成為膨脹部Κ。 再者,在本實施例中,前述空室206係藉由前述多數之 貫穿孔202a而與膨脹室互相連通的闞係•在空間來講*具 有成為膨脹室J之一部分之功能。 然後,在前述空室206内,在一方的末端板204上形成有 給氣孔20 4a,而該給氣孔2 04a設置有內裝未Η示電熱器之 吹出管212。 本實施例所使用之霣加熱器為所諝瞬間热風加熱器,係 · · 對霣熱器供給規定量的空氣之同時施加電壓來在前述吹出 管212内瞬間產生適當溫度之热風者。 在該實施例中,前述兩側之末端板204固定有向外側下 方延伸的撐條209a。在該等撐條209a之下端部,分別設有 兩個_装成為埋轉自如的輪子209b(請參考第24圔)。 然後,有從空氣懕縮櫬214之排出口延伸之給氣软管215 連接於前述給氣孔204a*對前述吹出管212内供給壓播空 氣,同時從發霣櫬等之電源裝置216經霣膣調整裝置217之 電源回路218連接於内裝在前述吸出管212之霣热器來供給 本紙張尺度逋用中國國家標準(CNS ) A4規格(210Χ297&#_ > _ /> c _ ----------裝------訂------線 (請先閲讀背面之注意事項再填寫本頁) A7 405005 B7 五、發明説明(u) 霣源的構成。, 前述霣壓調整裝置217係用以調整霣热器之發熱量之調 整装置,K該裝置來調整供給於電熱器之電源電壓來適當 地調節壓縮空氣之溫度。 吹出管212係如第23圖及第25,26國所示,在前述内筒 205下方之空室206之下部向補修装置200之袖方向延伸而 設置,吹出管212係位於前述中心粬0之下方靠近管路50之 底部50b側之位置。 該吹出管212之吹出口 212a,212b為,在吹出管212之略 全長範圍内保持一定間隔而設有多数個,均向管路50之底 部50b開口之。也就是說,吹出管212係設置在補修裝置 200之中心_下方之底部側。 因此,從該吹出管21 2所吹出之熱風為,不受内筒205阻 礙的狀態下,經形成在本驩202之多數貫穿孔202a而吹向 對應於管路50之底部50b而位之可撓膜208之内面側’集中 地加熱可撓膜208之加熱領域Η。 經濟部中央標準局負工消費合作社印策 在本實施例中,吹出口 212a係向下方閭口之第1吹出口 ,而21 2b係若干向斜下方開口之第2吹出口者(請參考第26 圓)6 此乃因將從吹出管212所吹出之熱風加热的加热領域Η ’ 不限於吹出管212正下方之位置Η,而是以該位置Ν為中央 ,向周方向擴大至補修装置200之中心够』周画約60度之範 圍之位置P1至位置P2為止之領域的闞係。然後*設定前述 、.、、 —. · — . ..... 、·'.....- ”一一—一~«-·"··-. 吹出口 212a,212b之開口徑及指向方向•以便在該加热領 26 (請先閱讀背面之注意事項再填寫本頁) 本紙張尺度適用中國國家梂準(CNS > Μ規格(210X297公釐) 經濟部中央標準局貝工消費合作杜印裝 405005 ;; 五、發明説明(ίΜ) 域Η內之湛度分布為遘當。 又,吹出管212為如所示,涵蓋補修装置200之輔方向 之略全長的闞係,由來自吹出管212之热風所形成之加热 領域11之_方向之畏度為,大致上相當於補修裝置200之袖 方向長度之長度者。 自吹出管212經本钃202之貫穿孔202a而到達膨脹室J之 热Μ為,對前述可撓顏208内面之加熱領域Η實行多量的導 熱之後,如在第25園中用箭號所示,在膨脹室J内或本體 202內上昇,但該時對可撓膜208各部分之內面也導熱。 該導熱為,由於接觸於可撓膜20 8之單位面積的熱風i 較少的關係,從前述底部50b所供給之热量較少。 之後,热風到達膨脹室J之上部,管路50之頂部50c也加 热。 又,前述可搞膜208係將如此加热之空氣供給於膨脹室J 的结果*向管路50之半徑方向外側膨出者。 對上述補修裝置200之臃脹室J空氣的全體路徑為如下述 (請參考第23圓)。 從大氣中吸進而由空氣壓縮機214所加壓之空氣為,經 過第1之可變節潦噴嘴221a及第1之壓力計222之後,藉由 前述給氣軟管21 5而供姶於補修装置200。到達補修装置 2 00之空氣為,經前述給氣孔204a而供給於吹出管212内。 在該吹出管212内•所供姶的空氣為由前述內裝的®热 ,器所加热*瞬間成為所要溫度之热凰。 變成热風的空氣為*從吹出管212之前述吹出口 212a, 本紙張尺度適用中國國家標準(CNS ) Λ4規格(2I0X 297公趋) -97- ----------裝------訂---„---* I線 (請先閱讀背面之注意事項再衡寫本頁) 經濟部中央標準局貝工消費合作社印製 __405005 b7_ 五、發明諍明(25) 212 b吹出,绛本鱺之貫穿孔202a而供給於膨脹室J内。該 時•來自前述吹出口 212a,21 2b之热風為具有某些程度之 流速的闞係,通過前述貫穿孔202a之後·吹向位於管路50 之底部50b上的可撓臢2 08内面的加熱領域Η,從内面加热 該部位之可撓膜208,將热供給於安装在該外供之補修材 233,同時使膝脹室J膨脹來讁補修裝置200實行補修動作 0 供給於膨脹室J的熱風為,加热前述底部50b之後上昇, 從膨脹室J上部開口之排氣孔223藉由排氣軟管224而排出 於裝置外。 該排氣軟管224之另一端部為經第2之可變節流啧嘴221b 而排出热風於大氣中者。 圖中226偽測定空室206内空氣壓之第2壓力計* 227係熱 敏電阻等之溫度感澜器,係用以計澜從膨脹室排出而在排 氣軟管224内流通之空氣之潘度者》 使用具有上述構成的補修装置200來補修排水管等之管 路50的作業為如下述》 在第24圖中,50係表示管路,Μ係表示人孔•管路50内 有發生龜裂50d。 首先,在地面上以前述補修裝置2 00之膨脹室J為收》狀 態下,在其成為膨脹部K之可撓臢2 08之外周面,捲鐃補修 材233而安装。 補修材23 3係將形成為Η材狀之玻瑰雄嫌或塑膠纖維製基 材•並浸淆液狀環氧樹脂或不飽和聚幽樹胞等之加熱而促 本紙張尺度適用中國國家標準(CNS ) Λ4規格(210X297公« > 28 I - I,1TIn . - ' I (請先閱讀背面之注意事項再奏跨本頁) 經濟部中央揉準局員工消費合作社印聚 A7 4_05 B7__ 五、發明娩明(2e;) 進其硬化之合成樹賄之者。更詳言之,即如第28圈所示之 將玻璃纖維之線狀物U予K编纗之玻璃粗眇布233a(相當於 申請專利範画第&項及第7項所迷之「孅布j者)Μ及如第 27圈所示之將強化雄維ΙΓ向任意方向配列的不嫌布的切碎 姣線墊子233b予以鏞合或用接合_接合來形成補修材233 。該玻璃粗妙布233a係在確保補修材之強度上所必要,而 切碎絞媒墊子233b係在浸漬液狀之環氧樹脂或不鉋和醮樹 脂等時為了要提高樹脂之保持率所必要者。該玻璃粗妙布 233a與切碎纹線墊子233b之组合顚序為,相應補修部分之 狀況而逋當地選擇,但通常是在補修裝置200之可撓膜208 之外面*藉由可確保硬化後之補修材與可撓臢208之分離 之薄膜而配置補修材。該補修材之構造為,從補修装置 200側起,依玻璃粗钞布233a,切碎姣線塱子233b之顚序 而構成。然而,在有些狀態下,只用纗布來構成補修材。· 如上述*如果補修材為片材構件時,將沿著管路之周方 向之兩端部分別予K摺«之後捲编於補修裝置即可。也躭 是說,將沿著補修装置周方向之兩端部分別予以摺翻邊來 即可。又,如果補修材為筒狀構件時,在形成筒狀以前之 片材狀之階段時沿著管路之周方向之兩端部分別予K摺Η 過來,形成筒狀而插入於補修装置即可。在摺拥之際,如 第29圈d所示•向補修裝置侧摺詡也可Μ,然而*如第2 9a 所示,向管路側摺翻過來為宜。其理由是,完成内期之後 ,其摺翮部分不明顬,而可得到溧亮的補修面的鼷係》又 ,從補修材之強度而言*如第29國b所示,將摺翻遢來之 本紙張尺度適用中國國家梂準(CNS ) A4規格(210X297公犮) _ 29 - (請先閲讀背面之注意事項再本頁) -裝·-HVI Printed by the Central Bureau of Standards, Ministry of Economic Affairs, Shellfish Consumer Cooperative, 405005 ^ 5. The M series of the invention description (U) can reduce the internal space in the repair material 2 from a small size to reduce the injection of the pressurized stream® fish. At the same time, the passageway 73A formed in the center of the heart can smoothly pass the drainage W, so there is no need to change the water, and the pipeline repair can be performed easily and safely. In addition, the hollow tube 73 is formed by the soft tube 艚 of the inner and outer cylindrical layers, and the soft tube body of the inner and outer double layers is locally connected to form a hollow system of the hollow body 73. It can save space while sending, and can be easily and conveniently Insert into the pipe. In addition, the knee can be swollen into a hollow shape by simply injecting the pressurized fluid L1 into the cylindrical shape *. Therefore, the operation is easy, and when using air or the like, it can function as a heat insulating material. As explained in KK, the insertion member can be folded into a flat shape for storage. It has the flexibility to be inserted into the pipe from the manhole, and it cannot be made with the crimping force of the repairing material on the inner wall of the pipe. A hollow body with an airtight outer wall of completely flat strength is suitable. Secondly, with reference to Articles 23_ to 33 圔, the following describes the embodiments of the invention in which a repairing material is lined with a certain part of an existing pipeline to repair its damage. First, the first embodiment of the invention which repairs the damage and the like by lining the repairing material of a specific part of an existing pipeline as shown in Figs. 23 to 29 will be described below. The repairing device 200 of this embodiment has a cylindrical body 202. The main passage 202 is composed of a perforated gold plate made of a mesh plate having a plurality of through holes 20 2a. Then, within the above two «20 2 • set in the fan garden between the end plate 204 at the end of the body 202 · · the center of the W repair device 200 _ 0 is the total paper size applicable to the Chinese national standard (CNS > Λ4 specification (210X297 Gongchu) _〇4-. Binding. Chain (please read the precautions on the back before filling out this page) Printed by the Central Standards Bureau of the Ministry of Economic Affairs, Shellfish Consumer Cooperative, 4Π55005 ___ 5. Description of the invention (22 ) An inner cylinder 205 is provided concentrically, and a simple hollow chamber 206 is formed between the inner cylinder 205 and the inner cylinder side of the inner cylinder 20 5 is a liquid flow path 207 that can flow in the pipeline (please refer to No. 23_, No. 25B). A flexible film 208 for forming a sheet-like flexible material into a round shape is mounted on the periphery of the aforementioned «20 2, and both ends of the flexible film 208 are provided. The fixed ring 211 is air-tightly installed at the ends of the main body 202, respectively. A cylindrical knee expansion chamber J is formed inside the flexible membrane 208, and the above-mentioned flexible membrane 2 08 outside the expansion chamber J is formed. The surface becomes the expanded portion K. Furthermore, in this embodiment, the aforementioned empty chamber 206 is formed by the aforementioned The through-hole 202a communicates with the expansion chamber. In space, it has the function of becoming part of the expansion chamber J. Then, in the empty chamber 206, an air-supply hole 20 4a is formed in one end plate 204. And the air-supply hole 204a is provided with a blow-out pipe 212 with an unshown electric heater. The instant heater used in this embodiment is the instantaneous hot air heater, which provides a predetermined amount of Those who apply voltage at the same time to the air to generate hot air at an appropriate temperature in the blow-out tube 212 instantly. In this embodiment, the end plates 204 on the two sides are fixed with stays 209a extending downward and outward. The lower end of 209a is equipped with two wheels 209b (refer to section 24). Then, there is an air supply hose 215 extending from the outlet of the air constriction 214. The air hole 204a * supplies pressurized air into the aforementioned blow-out pipe 212, and at the same time, is connected from a power supply device 216 such as a hairpin through a power circuit 218 of the adjustment device 217 to a heater built in the aforementioned suction pipe 212 to supply Paper scale use National Standard (CNS) A4 Specification (210 × 297 &#_ > _ / > c _ ---------- installation ------ order ------ line (please read first Note on the back, please fill out this page again) A7 405005 B7 V. Description of the invention (u) The structure of the radon source. The aforementioned pressure adjustment device 217 is an adjustment device for adjusting the amount of heat generated by the radiator, and the device is used to adjust The voltage of the power supplied to the heater is used to appropriately adjust the temperature of the compressed air. The blow-out pipe 212 is provided in the lower part of the empty chamber 206 below the inner tube 205 and extends toward the sleeve of the repairing device 200 as shown in FIG. 23 and the countries 25 and 26. The blow-out pipe 212 is located at the center 粬 0. The bottom is near the bottom 50b side of the pipe 50. The blow-out ports 212a and 212b of the blow-out pipe 212 are provided at a predetermined interval over a substantially full length of the blow-out pipe 212, and are opened to the bottom portion 50b of the pipe 50. That is, the blow-out pipe 212 is provided on the bottom side of the center_below of the repair apparatus 200. Therefore, the hot air blown from the blow-out pipe 21 2 can be blown to a position corresponding to the bottom 50 b of the pipe 50 through most of the through-holes 202 a formed in the Ben 202 without being obstructed by the inner tube 205. The inner surface side of the flexible film 208 heats the heating area of the flexible film 208 intensively. In this example, the Central Laboratories of the Ministry of Economic Affairs, the Consumer Cooperatives Cooperative Cooperative, in this embodiment, the blower outlet 212a is the first blower outlet to the lower gate, and 21 2b is the second blower outlet that opens diagonally downward (please refer to section (26 circle) 6 This is because the heating area heated by the hot air blown from the blow-out tube 212 is not limited to the position directly below the blow-out tube 212, but is extended to the repair device 200 in the circumferential direction with the position N as the center. The center is enough to draw the system of the area from position P1 to position P2 in a range of about 60 degrees. Then * set the aforementioned, .., —. · —. ....., · '.....- ”one one—one ~«-· " ··-. Opening diameters of the air outlets 212a, 212b And pointing direction • so that the heating collar 26 (please read the precautions on the back before filling this page) This paper size is applicable to China National Standards (CNS > M size (210X297 mm)) Cooperation Du printed 405005; 5. The description of the invention in the (ΗΜ) field of the distribution of the Zangdang. Also, the blow-out pipe 212 is shown in the figure, covering the full length of the repair device 200 in the auxiliary system, from The degree of fear in the _ direction of the heating field 11 formed by the hot air from the blow-out tube 212 is approximately the length equivalent to the length in the sleeve direction of the repair device 200. The self-blow-out tube 212 reaches the expansion through the through hole 202a of the main tube 202 The heat M of the chamber J is that after a large amount of heat is conducted to the heating area Η on the inner surface of the flexible face 208, as shown by an arrow in the 25th circle, it rises in the expansion chamber J or the main body 202, but at this time Heat is also conducted to the inner surface of each part of the flexible film 208. This heat conduction is due to contact with the flexible film 20 8 The smaller the hot air i per unit area is, the less heat is supplied from the bottom 50b. After that, the hot air reaches the upper part of the expansion chamber J, and the top 50c of the pipe 50 is also heated. In addition, the aforementioned achievable film 208 is As a result of supplying the heated air to the expansion chamber J *, those who bulge outward in the radial direction of the pipeline 50. The overall path of the air in the expansion chamber J of the repair device 200 is as follows (refer to circle 23). The air sucked in the atmosphere and pressurized by the air compressor 214 is supplied to the repairing device 200 through the aforementioned air supply hose 21 5 after passing through the first variable joint nozzle 221a and the first pressure gauge 222. The air arriving at the repair device 2000 is supplied to the blow-out tube 212 through the air supply hole 204a. In the blow-out tube 212 • The air supplied is heated by the built-in ® heater, and is instantly heated. The temperature of the required temperature. The air that becomes hot air is * from the aforementioned outlet 212a of the blow-out tube 212. This paper size applies the Chinese National Standard (CNS) Λ4 specification (2I0X 297 public trend) -97- ------ ---- Install ------ Order --- „--- * I line (Please read the (Please pay attention to the balance and write this page) (Printed by the Central Laboratories of the Ministry of Economic Affairs, Shelley Consumer Cooperative) __405005 b7_ V. Invention (25) 212 b is blown out, and the through hole 202a of the sample is supplied to the expansion chamber J. The Hours • The hot air from the aforementioned outlets 212a, 21 2b is a system with a certain flow velocity. After passing through the aforementioned through hole 202a, it is blown to the inner surface of the flexible tube 2 08 located on the bottom 50b of the pipe 50. In the field, the flexible film 208 at this location is heated from the inner surface, and heat is supplied to the repair material 233 installed on the external supply, while the knee expansion chamber J is expanded to perform the repair operation of the repair device 200. The hot air rises after heating the bottom portion 50b, and exhausts from an exhaust hole 223 opened from the upper portion of the expansion chamber J through an exhaust hose 224 to the outside of the device. The other end of the exhaust hose 224 is a hot exhaust air discharged to the atmosphere through the second variable throttle nozzle 221b. In the figure, 226 is a second pressure gauge for falsely measuring the air pressure in the empty chamber 206. 227 is a temperature sensor such as a thermistor. It is used to measure the air discharged from the expansion chamber and circulated in the exhaust hose 224. "Panduer" uses the repairing device 200 having the above-mentioned structure to repair pipes 50 such as drain pipes as follows. "In Fig. 24, 50 indicates a pipeline, and M indicates a manhole. A crack occurred for 50 days. First, in a state where the expansion chamber J of the above-mentioned repairing device 2000 is closed on the ground, the repairing material 233 is rolled and installed on the outer peripheral surface of the flexible knuckle 20 08 which becomes the expansion portion K. Repair material 23 3 series will be formed into a glass-like glass substrate or plastic fiber base material • and impregnated with liquid epoxy resin or unsaturated polycyte, etc., to promote the application of this paper to Chinese national standards (CNS) Λ4 specifications (210X297 male «> 28 I-I, 1TIn.-'I (Please read the precautions on the back before playing across this page) The Central Consumers Bureau of the Ministry of Economic Affairs Consumer Cooperatives Printed A7 4_05 B7__ 5 2. The person who invented the birth (2e;) into the hardened synthetic tree bribe. More specifically, that is, as shown in the 28th circle, the glass cloth 233a ( Corresponds to the "Publisher J" M and items 7 and 7 of the patent application, and the chopped squid line that will strengthen the male dimension IΓ in any direction as shown in lap 27 The mat 233b is bonded or joined to form a repair material 233. The glass coarse cloth 233a is necessary to ensure the strength of the repair material, and the shredded stranded medium mat 233b is impregnated with liquid epoxy resin or It is necessary to improve the resin retention rate when not planing or sizing the resin. The glass coarse cloth 233a and shredded patterns The order of the combination of the wire pads 233b is based on the condition of the repair part, but it is usually selected, but it is usually outside the flexible film 208 of the repair device 200. * By ensuring the separation between the hardened repair material and the flexible 208 The film is provided with a repairing material. The repairing material is structured from the side of the repairing device 200, according to the order of glass coarse banknote cloth 233a and shredded reel 233b. However, in some states, only Use the cloth to form the repair material. · As mentioned above * If the repair material is a sheet member, the two ends along the circumferential direction of the pipe are K-folded «and then rolled into the repair device. That is to say It is sufficient to fold the two ends along the circumferential direction of the repairing device. If the repairing material is a cylindrical member, it is along the circumference of the pipeline at the stage of forming a sheet before the tube. The two ends of the direction are folded by K, respectively, and formed into a tube shape and inserted into the repair device. In the case of folding, as shown in the 29th circle d • Folding to the repair device side is also possible, however * As shown in Figure 9a, it is advisable to fold over to the side of the pipeline. The reason is to complete After this period, the folded part is unknown, and the system of a bright repair surface can be obtained. "In terms of the strength of the repair material, as shown in country 29b, the paper size of the folded paper is applicable. China National Standards (CNS) A4 Specification (210X297) _ 29-(Please read the precautions on the back before this page)-Installation ·

*1T 線 經濟部中央樣準局負工消費合作社印製 405005 A7 B7 五、發明説明(27 ) 兩端部予Μ互相頂住,使補修材成為雙層構造為宜;然而 ,為了必需要確保雙曆構造而在相互頂住的作桊上費神太 多的話,即如第29圈c所示,將摺翻通來的兩端部予以重 叠而設三層構造部也可Μ。三層構造為可進一步提高強度 的《係,將該三層構造部對準於主要受傷部分來内期為宜 。又,只在第29Η顬示摺«狀態•在其他圈中省略摺拥部 分,然而,在第23圔乃至26圖,Μ及第30圖乃至第33圃中 ,可採用前述第29 IBa乃至29d所示之摺翩方法者。 Μ上述的方法安裝補修材於補修装置來實行管路補修時 ,可將在補修材之管路之軸心方向兩端部之對管路之饜接 部處理得漂亮而無境界感,可達成具體的第三之目的。 將以上述方法安裝補修材233於補修装置200配置在面臨 管路50內部之龜裂50d之位置。該時,前述補修裝置200係 Μ其吹出管212之吹出口 212a,212b朝向管路50之底部50b 俩的姿勢配置之。 在有前述想裂50d存在的管路50兩側所設置之人孔Μ内, 從兩邊互相拉動定位用纽234來實行該補修裝置200之配置 作業。 當補修装置200配置在所要位置之後*起動前述空氣壓 鏞機214,對補修装置200之膨脹室J内供給壓縮空氣。 該時,用第1、第2之壓力計222,226來讀取從前述空靝 壓縮機21 4所供給之壓縮空氣之壓力*逋當地操作前述可 變酣流嗔嘴221a而調整,以所要的空氣臞來供給之。 随著懕縮空氣的供給,補修装置200為向管路50之半徑 本紙張尺度適用中國國家標準(CNS > A4規格(210X297公# ) - 30 - ---------裝------訂---Γ--丨線 (請先閱讀背面之注意事項再填寫本頁) 405005 - 經濟部中央標準局員工消費合作社印製 五、發明説明(29 方向膨脹,如第23圖及第25圈所示*前述補修材233成為 懕接於管路50之内面上之狀態。 該時,前述補修材233係成為密接於前述龜裂50d之內側 之狀態。 在本實施例中,將補修材233以上述方法壓接於管路50 之内面上之壓縮空氣為*如前述在吹出管212内由電熱器 加熱的狀態,經多數之貫穿孔202a而供給於膨脹室』内° 於是,如前述,多量的热風吹向管路50之底部50b儺之 可掼膜208内側之加热領域Η的鼷係,如在第26圓所示之圖 表中用斜媒部所示,對管路50之底部50b可集中而供給多 董的热量Q。 因此,雖然在管路50之底部50b有存在若干水份而奪去 化熱的狀態下,但按照通常狀態可加熱補修材2 33之合 成樹脂,比以往可更邕钆地.硬„itL補...修..M X3 3_^ 之後,從形成在膨脹室J上部之排氣孔2 33通過排氣舴管 22 4導向至補修裝置200外而放出於大氣中。 如上述,在本實施例中,有比以往更均勻地硬化,建全 而具有所褥要強度的合成樹脂硬化成為筒狀的剛性高的修 補構造為密接於管路50之內面上而形成,可補修管路50内 有龜裂50d存在的部位,可達成具體的第四之目的。 完成補修材233之硬化時,停止對吹出管212内霣热器之 通霣及空氣之供給,排出補修裝置200之膨脹室J内之空氣。 於是,W預定之壓力圼臃齓狀態之補修装置200之可撓 膜208收縮,拉動定位用缃234而將補修裝置20 0從管路50 (請先閲讀背面之注意事項再本頁) -裝. 訂 -HL· I ........ ‘ ' 本紙張尺度適用中國國家標準(CNS ) Α4規格(210Χ 297公釐) 31 405005 Α7 Β7 五、發明雄明( 内拉出於人孔Μ内而終止補修作業。 再者,在前述吹出管212中,設有第2之吹出口 212b來擴 大加熱領域Η的理由是,因為也考董到當補修裝置200膨脹 時安装有補修材233之補修装置200最初到達管路50之一儼 時,補修装置200為,由於補修装置200之膨脹,以該附著 部分為中心,對管路50向周方向回轉,前述吹出口 212a, 212b之位置有偏離管路50之底部5 0b之可能性的Μ係。 其次,根據第30圆,第31圖來說明將補修材内襯於既設 管路之局部部位來補修其損傷等之發明之第2實豳例如下。 本第2實拖例為,只有吹出管為異於萠述第1霣施例,其 餘為相同。 因此,以下只說明有關吹出管的事項,闞於同樣之黏即 在圔中使用同樣的圓號表示而省略其說明。 在本第2簧施例中,吹出管237係大致上形成為Υ字形狀。 經濟部中央樣準局負工消費合作社印裝 該吹出管237為將其分支管237a沿著補修装置200之袖方 向延伸而設置在位於中心軸0及內筒205下方之空室206内 ,而如同前述實施例,該等各分支管237a為,在其全長範 圍内保持一定間隔分別形成有多數向下方的吹出口 237b。 形成在該等分支管237a之吹出口 237b為,如第31圔所示 ,均向管路50之底部50b開口,在管路50之底部50b側形成 有一定寬度而接受比較多量的從.該等吹出口 237b所吹出之 熱風的熱量的加熱領域Η,而該加熱領域Η之軸方向之長度 為大致上相當於補修装置200之畏度者。 因此,在具有上述以略平行的狀態向補修裝置之軸方向 32 (請先閲讀背面之注意事項再本頁) 本紙張尺度適用中國國家標準(CNS ) Α4規格(210Χ297公漦) 405005 a? B7 五、發明锐明(:30 ) 經濟部中央標準局员工消费合作社印製 延伸之分支管之,形成為分叉狀吹出管237之本第2實施例 中,也如同前述第1實施例,可達成具體的第四之目的。 又,在本實施例中,使用具有上述分支管237a之吹出管 237的理由是,不必形成前述第2之吹出口 212b而可將加热 領域Η向周方向進一步擴大的鼷係。 其次,根據第32圖,第33圖來說明限於既設管路之局部 性部位内襯補修材而補修其損傷等之發明之第3實施例如 下。 本第3實施例係使用形成為片材狀的霣热器F來進行浸漬 於補修材233之,由加熱而促進硬化的合成樹脂之硬化者 。供姶於膨脹室J的空氣係專用Μ將補修材233壓接於管路 50内面者。 在本霣施例之下述說明中*也是只說明與第1實施例不 同之點,共同的部分即用與前述同一圔號而省略其說明。 在本簧施例之補修装置2 00中,未形成有前述貫穿孔 202a及空室206,在未設有前述貫穿孔202a之本髓202之外 側,設置可撓膜208 *且只形成有膨脹室J而已。 在該本體202形成有給氣口 241,有空氣壓鏞機21 4延伸 的軟管242連接於該給氣口 241*但未設有如前述第1實施 例的排氣口及排氣砍管等。 因此,在本實施例之補修装置200中·從软管242供給於 膨脹室J之空氣封在蟛脹室J内而雔存來使安装在臃脹室J 外側之補修材233®接於管路50之内面脚,而經前述軟管 2 42來排出該朦脹室J内之空氣。 (請先閲讀背面之注意事項再^r本頁) •装. *va 線 本紙張尺度適用中國國家標準(CNS ) Λ4規格(210 X 297公) 33 405005 經濟部中央標隼局月工消費合作社印製 五、發明巍明(31) 使用上述構成之補修装置200來補修管路50之補修作業 如下述。 首先,在前述補修裝置200之可撓膜208之外周面且對應 於管路50之底部50b俩之部位,局部地安装片材狀之電熱 器F ° 該電熱器F之安装係將其與例如由聚氛化乙烯樹胞等之 合成樹脂所成,用以剝雕硬化後之補修材233之薄膜243予 以重叠,並將該薄膜2 43捲鐃於膨脹部K之外供而為之》 該霣熱器卩為*例如,出光面狀轚热器(出光興產股份有 限公司製品之商標名),係將聚合物與導霄性粉末之複合 物構成為厚度0.7bb左右之片材狀而具有可撓性者》 該電熱器F係以電源回路218連接於電涯装置216,由霄 源裝置216供給的電力來適當地發熱的構成》 安裝有電熱器F之補修裝置200之薄膜243之外側,有捲 繞而安装形成為片材狀的補修材23 3。 將如此安装有補修材233之補修裝置200*而臨於管路5 0 内之龜裂50d而定位,使前述霣熱器F配置成為對向於管路 50之底部50b,然後對膨脹室J供給K縮空氣。 於是•補修装置200為向管路50之半徑方向膨脹,前述 可撓膜208之外周圃之長度增加,随著可撓膜208之膨脹, 捲繞而安裝的薄膜243及補修材233為鬆懈而使補修材233 壓接於管路50内面側的狀態(請參考第33圖)。 在該狀態下,前述電热器F為位於面臨管路50之底部50b 的位置,集中地加熱位於該S热器F下方之部分之補修材 (請先閲讀背面之注意事項再本頁) 訂 線 本紙張尺度適用中國國家標準(CNS ) A4規格(210X 297公釐) -34 - A7 405005 B7_____ 五、發明(¾•明(32) 233,發揮與前述加熱領域Η同樣的功能。 即,在管路50之底部50b有若干的水存在而奪走氣化熱 的狀態下,也可以使補修材所含有的合成樹脂與周圃同 樣地昇溫,可使補修材233向其周方向全周均勻地硬化。 補修材233之硬化全部完了時,停止對前述霣热器F之通 霣,排出補修装置200之膨脹室J內之空氣。 於是,以預定之壓力而在膨脹狀態之補修装置200之可 撓膜208收鎺。 該可撓膜20 8之收嫌係在薄瞑2 43與補修材233之境界面 分離的狀態發生,對附著於管路50內面之補修材2 33不會 有剝齄力董作用的Μ係,不會損傷到補修構造·電热器F 為與前述薄膜2 43—起附著於補修装置2 00而保持•即以後 拉動定位用钃234而可從管路50内將興補修装置200-起拉 出於人孔Μ內,可终了補修作業。 在該第3實施例中也是如前述,在對應於補修材233之管 路50之底部50b之部位,由霣热器F而可供給比其他部位更 多量之熱量的Μ係,雖然在管路50之底部50b有若干之水 存在,但硬化時間不容易發生不均勻的情形*在管路50之 周方向之全周可形成热硬化合成楢脂均匀硬化的,键全的 補修構造,可達成具體的第四之目的。 [發明之效果] 如上述,使用達成具體的第一之目的用之發明之補修方 法時,可在短時間內完成補修嬝程·而且可防止内蘼構造 發生品質之不均勻情形。 本紙張尺度適用中國國家標準(CNS ) A4規格(210Χ 297公釐) _ 〇 _ ----------^------1Τ---r----^ (請先閲讀背面之注意事項再本頁) 經濟部中央標準局負工消費合作社印製 405005 五、發明祺明(33) 又,從筒狀體之一端注入未硬化之硬化性合成樹脂,從 其另一端部側抽出前述筒狀髓内部空氣,用輥子捋之同時 浸·漬所注入的硬化性合成樹脂的闞係,可有效地浸潰硬化 性合成樹脂。 再者,在配置膜狀體之前,可形成含有硬化性合成樹脂 的筒狀體的闞係,尤其是筒狀體在其外側具備有不透水性 層時,與同時實行筒狀體之形成及膜狀艚之配置,之後浸 潰硬化性合成樹脂之手段比較,能夠充分且均勻溲濱硬化 性合成樹脂,其结果,可提高茼狀體的品質,因此而可提 高內襯構造之品質。 又,根據達成具體的第二目的之發明為,對補修材内插 入•配置内部空間之可&性之插入構件而封閉的補修方法 的Μ係*嫌小補修材料之内部空間而可κ減少要注入的加 壓流《之流量,在短時間內以較經濟的方法可實行下水管 等之管路補修作桊。 經濟部中央樣準局員工消費合作社印装 又*具備有插入於補修材内來縮小其内部空間之可撓性 插入梅件之補修裝置時,可缩小補修材内之内部空間而可 減少加壓流體之潦量。因此,在短時間内以較經濟的方法 可實行下水管等之管路補修作業。 如果插入構件形成為荷狀之空心髑之補修方法時*鑲小 補修材内之内部空間而可減少要注入之要注入的加壓滾髓 流量之同時*形成在其軸心部之通路來可使排水圆滑地通 通。因此,在短時間内以較經濟的方法可實行下水管等之 管路補修作業之同時,不必實行換水的通程,而可簡便且 36 (請先閲讀背面之注意事項再¥寫本頁) 本紙張尺度適用中國國家標準(CNS ) Α4規格(210Χ 297公结) 經濟部中央梯準局貝工消費合作社印製 ____405(^05__ 五、發明税明(34) 安全地實行管路補修作業。 加w,如果插入構件形成為筒狀之空心體之補修裝置時 ’縮小補修材內之内部空間而可減少要注入之要注入的加 懕流髏滾量。再者,形成在其粬心部之通路來可使排水圓 滑地通過。因此,在短時間内Μ較經濟的方法可實行下水 管等之管路補修作業之同時,不必實行換水的過程,而可 簡便且安全地賨行管路補修作業。 再者,根據逹成具體的第三目的之發明為,使用鰌布做 為補修材時,也可使在補修材之管路之輔心方向兩端部之 對管路之壓接部漂亮地完成為無堍界感。 加Μ,根據達成具體的第四目的之發明,補修装置為對 補修材位於管路底部之部位集中地加熱而比其他部位供給 更多的热量,因此•雖然管路底部有水存在而發生氣化熱 之熱損失,但可減輕合成樹脂之昇溫之遲延,可改善在管 路之周方向,浸漬於補修材之,依加热而促進其硬化之合 成樹脂之硬化樹脂之硬化時期之不均勻。因此,雖然是加 熱合成樹_而促進其硬化,但可形成具有均勻硬化之合成 樹脂之健全的補修構造者。 [圖式之簡單說明] 第1圔係顯示有Μ本發明之管路補修方法中,將筒狀體 及膜狀體引進於下水管内之狀態之園。 第2圈係顯示對蟆狀髏内施加水壓,供給加热水之吠態 之Η。 第3圈係顧示補修工程終了時狀態的圖。 本紙張尺度適用中國國家揉準(CNS ) Λ4規格(210X 297公埯) 37 ----------^:------ΐτ------f.^ (請先閲讀背面之注意事項再填珞本頁) 405005 A7 經濟部中央標準局貝工消費合作社印裂 B7五、發明祝明(35) 第4圖係說明不使用水壓塔時之一實施例之圖。 第5圖係說明不使用水壓塔時之其他實施例之圖。 第6_係顯示將膜狀體予Μ反轉而插入於筒狀體内之狀 態的概念圈。 第7匾係顯示反轉具之斜視圖。 第8圖係顬示有闢本發明之反轉配置装置之圓。 第9圈係顯示使用未附加纖維層的膜狀體時的圔》 第10圖係顯示將膜狀體及简狀體捲成為卷狀的概念豳。 第11圈係顯示將膜狀通及筒狀®予以摺叠之吠態之圈。 第12圖係顯示發生空氣滯留部分之狀態之圈。 第13圈係顯示達成具體的第二目的用的發明之第1實施 形態之圖,係管路補修装置之剖面圈。 第14圖係顯示達成具體的第二目的用的發明之第1S施 形態之圃,係管路補修裝置之局部剖面圈。 第15圖係顬示達成具體的第二目的用的發明之第1S施 形態之躧•係管路補修裝置之局部剖面圔。 第16圖係顯示達成具體的第二目的用的發明之第1實施 形態之_,係顯示管路補修方法之流程圈。 第17圖係顯示達成具體的第二目的用的發明之第2»施 形態之圔,係管路補修装置之剖面圖。 第18圖係顯示達成具艚的第二目的用的發明之第2實施 形態之黼,係管路補修装置之局部剖面圓。 第19圈係顧示達成具體的第二目的用的發明之第2»胞 形態之圔,係管路補修装置之局部剖面圓。 本紙張尺度適用中國國家標準(CNS ) Α4規格(210Χ297公釐) _ _ --·-------裝------訂---.---"丨線 (請先閱讀背面之注意事項再填寫本頁) 五 405α〇5 A·/ Β7 、發明勢明(3G) 第20圖係顯示達成具體的第二目的用的發明之第3實施 形態之画,係管路補修裝置之剖面圖。 第21圖係顯示達成具體的第二目的用的發明之第3寶施 形態之圓,係管路補修裝置之局部斜視圔。 第22圖係顬示逹成具鼉的第二目的用的發明之第3S施 形態之園,係管路補修裝置之局部斜視圖。 第23圈係顯示達成具體的第四目的用的發明之第1S施 例之補修裝置之剖面圈。 第24圖係顯示達成具通的第四目的用的,使用發明之第 1實施例之補修作業之說明圔。 第25圈係顯示第23_中沿著媒X-X之剖面圖。 第26圖係顯示達成具通的第四目的用的發明之第1實施 ΟΒΟ 圖明 匾 明說明 說之說 之子之 態墊布 狀線妙 熱絞粗 加碎璃 之切玻 部之之 底材材 路修修 管補補 在成成 置構構 装係係 修 圈 _ — 78 補 2 2 之第第 例 面 剖 之 態 樣 之 置 裝 修 補 於 設 裝 之 材 修 補 將 明 說 係 圈 9 2 第 請 先 閲 讀 背 之 注 項 再 墳 馬 楚 本衣 頁 訂 圖 經濟部中央標準局貝工消費合作社印製 施 實 2 第 之 明 發 的 用 的 百 四 第 。 的圏 體面 具剖 成平 達水 示之 顯置 係裝 画修 Λν »RH 3 補 第之 例 熱 加 之 部 底 路 管 之 面 剖 Y - Y 線 之 圈 ο 3 第 著 沿。 在圓 係明 圈說 31之 第態 狀 0 簧 3 第 之 明 發 之 用 的 目 : 四Z-第 烺 的。之 體圈圖 具面32 成剖第 達縱著 示之沿 顯置在 係裝係 圖修圈 32補33 第之第 例 _ 面 剖 之 39 本紙張尺度適用中國國家標隼(CNS ) A4規格(210X 297公蝥) A7 405005_B7__五、發明iC明(3? 第3 4圈係顧示在K往之下水管補修方法中開始反轉插入 膜狀通時之狀態之匾。 第35鬮係顯示完成反轉插入膜狀通之狀態之0。 第36画係說明Κ往補修下水管之局部性部位之方法之圈。 第37圖係說明Μ往補修下水管之局部性部位之方法中之 壓接部之圖。 [麵號之說明] 1 , 1 · , 11 ”,c ...膜狀體, 2,233, Υ.補修材, 3,3,,3” ,Α...筒狀體, 5.50,Β...下水管, 70,73...插入構件 (空心體), Ε ...内部空間, L , L 1 ...加壓流體, 50Α.…管路内壁, 61...加壓裝置, 72Α,73Α...通路 , XI,Κ...膨脹部, 233a,..玻璃粗钞布, 233b... 切碎狡線墊子, 208...可撓膜, 212,237 ...吹出管, 212a,212b,237b...吹出口, F...電熱器, T...止水栓 , X, 1 00, 1 0 1 , 1 03,200...補修裝置, 11,11*...熱软 管, 28...壓力容器, Μ,Μ、..人孔, 20,24, 71... 供給用砍管, 22,26...排出用软管 ------------裝------訂---:--.—線 (請先閲讀背面之注意事項再填寫本頁) 經濟部中央標準局員工消費合作社印裂 本紙張尺度適用中國國家標隼(CNS ) Λ4規栳(210X 297公替)* 1T printed by Central Procurement Bureau, Ministry of Economic Affairs, Ministry of Economics and Consumer Cooperatives, printed 405005 A7 B7 V. Description of the invention (27) The two ends of the invention should stand against each other, so that the repair material has a double-layer structure; however, it is necessary to ensure that If the double calendar structure takes too much effort to stand against each other, that is, as shown in circle 29c, the folded two ends are overlapped, and a three-layer structure portion may be provided. The three-layer structure is a system that can further increase the strength. It is advisable to align the three-layer structure with the main injured part. Also, the «state» is shown only on the 29th Η 顬. The embracing part is omitted in other circles. However, in the 23rd to 26th, M and 30th to 33rd gardens, the aforementioned 29th IBa to 29d can be used. The foldable method shown. Μ When the above method is used to install the repair material in the repair device to perform pipeline repair, the joints on the pipeline at the two ends of the axial direction of the pipeline of the repair material can be treated beautifully without borders, which can be achieved Specific third purpose. The repairing material 233 is installed in the repairing device 200 in the above-mentioned manner at a position facing a crack 50d inside the pipe 50. At this time, the repairing device 200 is arranged such that the blowout ports 212a and 212b of the blowout pipe 212 face the bottom 50b of the pipe 50. In the manholes M provided on both sides of the pipeline 50 where the aforementioned want to crack 50d exists, the positioning button 234 is pulled from both sides to carry out the configuration of the repairing device 200. After the repair device 200 is arranged at a desired position *, the aforementioned air press 214 is activated to supply compressed air to the expansion chamber J of the repair device 200. At this time, the first and second pressure gauges 222 and 226 are used to read the pressure of the compressed air supplied from the air compressor 21 4 *, and the above-mentioned variable flow nozzle 221a is locally operated and adjusted to the desired value. Air to supply it. With the supply of constricted air, the repair device 200 is directed to the radius of the pipeline 50. The paper size applies the Chinese national standard (CNS > A4 specification (210X297mm #)-30---------- equipment- ----- Order --- Γ-- 丨 line (please read the precautions on the back before filling this page) 405005-Printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs As shown in Fig. 23 and 25th circle, the aforementioned repair material 233 is in a state of being in contact with the inner surface of the pipe 50. At this time, the repair material 233 is in a state of being in close contact with the inside of the crack 50d. In this embodiment In the above, the compressed air that the repairing material 233 is crimped to the inner surface of the pipeline 50 in the above-mentioned manner is * as in the state heated by the electric heater in the blow-out pipe 212, and supplied to the expansion chamber through most of the through holes 202a. ° As described above, a large amount of hot air is blown toward the bottom 50b of the pipeline 50, and the heating system inside the achievable membrane 208 is as shown in the graph shown by the circle in FIG. The bottom 50b of the pipe 50 can be concentrated to supply multiple heat Q. Therefore, although the bottom 50b of the pipe 50 is In the state where there is some moisture and the heat is removed, the synthetic resin that can repair the repair material 2 33 can be heated harder than before. Hard „itL repair ... repair .. M X3 3_ ^ After that, the exhaust holes 2 33 formed in the upper part of the expansion chamber J are guided to the outside of the repairing device 200 through the exhaust snorkel 22 4 and released into the atmosphere. As described above, in this embodiment, the curing is more uniform than in the past. The built-in synthetic resin that has the strength required for the mattress is hardened into a cylindrical shape and has a high rigidity. The repair structure is formed in close contact with the inner surface of the pipe 50. It can repair the part where the crack 50d exists in the pipe 50. A specific fourth objective is achieved. When the hardening of the repair material 233 is completed, the supply of air to the heater in the blow-out pipe 212 and the supply of air are stopped, and the air in the expansion chamber J of the repair device 200 is exhausted. Therefore, W is scheduled to The flexible membrane 208 of the repair device 200 under pressure is contracted, and the positioning device 234 is pulled to pull the repair device 20 0 from the pipeline 50 (please read the precautions on the back first, then this page)-Order. HL- I ........ '' This paper size applies Chinese National Standard (CNS) Α4 Specifications (210 × 297 mm) 31 405005 Α7 Β7 V. Inventive (The inner drawing is terminated due to the inside of the manhole M. In addition, the aforementioned blow-out pipe 212 is provided with a second blow-out port 212b to expand The reason for heating the area is that because the repair device 200 with the repair material 233 installed when the repair device 200 expands first reaches one of the pipelines 50, the repair device 200 is due to the expansion of the repair device 200. This attachment portion is centered, and the pipe 50 is rotated in the circumferential direction. The positions of the aforementioned blowout ports 212a and 212b may be offset from the bottom of the pipe 50 by 50b. Next, based on the 30th circle and the 31st figure, a second example of the invention of lining a repairing material to a part of an existing pipeline to repair the damage and the like will be described below. In the second embodiment, only the blow-out tube is different from the first embodiment described above, and the rest is the same. Therefore, only the matters related to the blow-out tube will be described below, and the same viscosity is used to indicate the same circle in 圔, and the description is omitted. In the second spring embodiment, the blow-out tube 237 is formed in a substantially U-shape. The blow-out pipe 237 is printed by the Central Consumer Bureau of the Ministry of Economic Affairs and the Consumer Cooperative to extend its branch pipe 237a in the direction of the sleeve of the repair device 200 and is provided in an empty chamber 206 located below the central axis 0 and the inner cylinder 205. As in the foregoing embodiment, each of the branch pipes 237a is formed with a plurality of downward blowout ports 237b at a certain interval throughout its entire length. The blower outlets 237b formed in the branch pipes 237a are, as shown in Section 31, open to the bottom 50b of the pipe 50, and a certain width is formed on the side of the bottom 50b of the pipe 50 to accept a relatively large number of slaves. The heating area Η with the heat of the hot air blown out by the blowing outlet 237b, and the length in the axial direction of the heating area Η is substantially equivalent to the fear of the repair device 200. Therefore, with the above-mentioned slightly parallel state toward the axis of the repair device 32 (please read the precautions on the back before this page) This paper size applies the Chinese National Standard (CNS) Α4 size (210 × 297 mm) 405005 a? B7 V. Invented sharp (: 30) The second embodiment of the branched tube 237 printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs and formed into a branched blow-out tube 237 is also the same as the first embodiment described above. To achieve a specific fourth purpose. In the present embodiment, the reason why the blow-out pipe 237 having the branch pipe 237a is used is that it is not necessary to form the second blow-out port 212b, and it is possible to further expand the heating area in the circumferential direction. Next, a third embodiment of the invention, which is limited to repairing the damage by lining the repairing material of a localized portion of an existing pipeline with reference to Figs. 32 and 33, will be described below. The third embodiment is a hardened synthetic resin that is impregnated with a repairing material 233 by using a heater F formed in a sheet shape and is heated to accelerate hardening. The special air system M supplied to the expansion chamber J presses the repairing material 233 to the inner surface of the pipe 50. In the following description of the present embodiment *, only points that are different from the first embodiment are described, and common parts are denoted by the same reference numerals as described above, and descriptions thereof are omitted. In the repair device 2000 of this spring embodiment, the aforementioned through hole 202a and the empty chamber 206 are not formed, and a flexible membrane 208 is provided on the outer side of the medullary 202 without the aforementioned through hole 202a * and only the expansion is formed Room J only. An air supply port 241 is formed in the main body 202, and a hose 242 extending from the air press 214 is connected to the air supply port 241 *, but the exhaust port, exhaust pipe, etc. of the first embodiment are not provided. Therefore, in the repairing device 200 of this embodiment, the air supplied from the hose 242 to the expansion chamber J is sealed in the expansion chamber J and stored so that the repair material 233® installed outside the expansion chamber J is connected to the pipe. The inside of the road 50 is a foot, and the air in the inflation chamber J is exhausted through the aforementioned hose 2 42. (Please read the precautions on the back before ^ r this page) • Install. * Va The size of the paper is applicable to the Chinese National Standard (CNS) Λ4 specification (210 X 297 male) 33 405005 The Ministry of Economic Affairs Central Standards Bureau Monthly Industry Consumer Cooperative Printing V. Inventive Weiming (31) The repairing operation for repairing the pipeline 50 using the repairing device 200 constructed as described above is as follows. First, on the outer peripheral surface of the flexible film 208 of the aforementioned repairing device 200 and corresponding to both the bottom 50b of the pipe 50, a sheet-shaped electric heater F is locally installed. The installation of the electric heater F is similar to, for example, It is made of synthetic resin such as atmospheric vinyl resin cells, and the film 243 used for peeling and repairing the repair material 233 is superimposed, and the film 2 43 is rolled outside the expansion part K and is provided. "Heat heater" is * For example, a light-emitting surface-shaped heater (trade name of Idemitsu Kosan Co., Ltd.) is a composite of a polymer and a conductive powder in a sheet shape with a thickness of about 0.7 bb. Those who have flexibility "The electric heater F is connected to the electric device 216 by a power circuit 218, and the electric power supplied by the Xiaoyuan device 216 is used to generate heat appropriately." The film 243 of the repair device 200 of the electric heater F is installed. On the outside, there is a repair material 23 3 which is wound and formed into a sheet shape. The repairing device 200 * with the repairing material 233 installed in this way is positioned to crack 50d in the pipeline 50, so that the aforementioned heater F is arranged to face the bottom 50b of the pipeline 50, and then to the expansion chamber J Supply K shrink air. Therefore, the repairing device 200 expands in the radial direction of the pipeline 50, and the length of the outer periphery of the flexible film 208 increases. As the flexible film 208 expands, the film 243 and the repairing material 233 installed by winding are loosened. The repair material 233 is crimped to the inner side of the pipe 50 (refer to FIG. 33). In this state, the aforementioned electric heater F is located at the position facing the bottom 50b of the pipeline 50, and the heating material for the portion below the S heater F is concentratedly heated (please read the precautions on the back before this page). The size of the threaded paper is in accordance with the Chinese National Standard (CNS) A4 (210X 297 mm) -34-A7 405005 B7_____ V. Invention (¾ • Ming (32) 233) performs the same function as the aforementioned heating field. That is, in In the state where a small amount of water exists in the bottom 50b of the pipeline 50 and the heat of vaporization is taken away, the synthetic resin contained in the repair material can be heated up in the same way as the weekly garden, and the repair material 233 can be uniform in the entire circumference in the circumferential direction. When all the hardening of the repairing material 233 is completed, the ventilation to the heater F is stopped, and the air in the expansion chamber J of the repairing device 200 is exhausted. Therefore, the repairing device 200 in the expanded state is at a predetermined pressure. The flexible film 208 is closed. The flexible film 20 8 is likely to be collected in a state where the thin film 2 43 is separated from the boundary surface of the repair material 233, and the repair material 2 33 attached to the inner surface of the pipeline 50 will not have The M line that acts as a peeling force will not be damaged Repair structure · The electric heater F is attached to the repairing device 2 00 together with the film 2 43. That is, after pulling the positioning 钃 234, the repairing device 200-from the pipeline 50 can be pulled out of the manhole. In M, the repair work can be terminated. In the third embodiment, as described above, the heater 50 can supply a larger amount of heat to the portion corresponding to the bottom 50b of the pipe 50 of the repair material 233 than the other portions. The M series of heat, although there is some water in the bottom 50b of the pipeline 50, but the hardening time is not easy to occur unevenly. * The heat-curing synthetic grease can be formed uniformly throughout the circumference of the pipeline 50. The complete repair structure can achieve a specific fourth purpose. [Effect of the invention] As mentioned above, when using the repair method of the invention used to achieve the specific first purpose, the repair process can be completed in a short time. In addition, it can prevent the uneven quality of the internal structure. This paper size applies the Chinese National Standard (CNS) A4 specification (210 × 297 mm) _ 〇_ ---------- ^ ----- -1Τ --- r ---- ^ (Please read the notes on the back before this page) Ministry of Economy Printed by the Central Bureau of Standards Consumer Cooperatives 405005 V. Invention Qiming (33) In addition, an unhardened hardening synthetic resin is injected from one end of the cylindrical body, and the air inside the cylindrical pulp is extracted from the other end side. When the rollers are simultaneously dipped and stained, the hardening synthetic resin injection system can effectively impregnate the hardening synthetic resin. In addition, before the film-shaped body is arranged, the cylindrical body containing the hardening synthetic resin can be formed.阚, especially when the cylindrical body is provided with a water-impermeable layer on the outside, it can be sufficiently and uniformly compared with the method of simultaneously forming the cylindrical body and the arrangement of the film-shaped 艚 and then impregnating the hardening synthetic resin 树脂As a result of the hardening synthetic resin, the quality of the corpus callosum can be improved, and therefore the quality of the lining structure can be improved. In addition, according to the invention that achieves the specific second object, the internal space of the repairing method of the M series * which is a small repairing material, which is inserted and arranged in the repairing material and inserts an insertable member of the internal space, can be reduced by κ. The flow of the pressurized flow to be injected can be repaired in a short time and in a more economical manner. Printed by the Consumer Cooperative of the Central Bureau of Procurement, Ministry of Economic Affairs * Equipped with a flexible device inserted into the repair material to reduce its internal space, it can reduce the internal space in the repair material and reduce pressure. The amount of fluid. Therefore, in a short period of time, more economical methods can be used to carry out pipeline repair work. If the inserting member is formed as a repair method of a hollow hollow 髑 of a lotus shape, the internal space in the repairing material can be inlaid to reduce the flow rate of the pressurized roller to be injected, and at the same time, the passage formed in the axial center can be used. Make drainage smooth. Therefore, in a short period of time, it is possible to perform pipeline repairs such as sewers in a more economical manner, and it is not necessary to carry out the water exchange, but it is simple and convenient. (Please read the precautions on the back before writing this page) This paper size is applicable to China National Standard (CNS) A4 specifications (210 × 297). Printed by the Shell Consumer Cooperative of the Central Ladder Bureau of the Ministry of Economic Affairs ____ 405 (^ 05__ V. Invention Taxation (34) Safely implement pipeline repair work Add w. If the inserting device is formed into a cylindrical hollow body repair device, the internal space in the repair material will be reduced to reduce the amount of rolls to be injected. Furthermore, it will be formed in the center of the heart. The drainage can pass smoothly. Therefore, in a short period of time, the more economical method can carry out the pipeline repair work such as the sewer, and it is not necessary to carry out the process of changing water. In addition, according to the invention of the concrete third purpose of the invention, when the cloth is used as the repair material, the pressure on the pipeline at the two ends of the auxiliary center of the pipeline can also be made. Connection drift The ground is finished without a sense of boundary. In addition, according to the invention that achieves the specific fourth object, the repair device is designed to centrally heat the part of the repair material at the bottom of the pipe and supply more heat than other parts. There is water in the bottom of the road to cause heat loss of vaporization heat, but it can reduce the delay of the temperature rise of synthetic resin, improve the perimeter of the pipeline, immerse it in the repair material, and promote the hardening of the hardened synthetic resin by heating. Resin hardening period is uneven. Therefore, although the synthetic tree is heated to promote its hardening, it can form a sound repair structure with a synthetic resin with uniform hardening. [Simplified description of the drawing] The first line shows that Μ In the pipeline repairing method of the present invention, a cylindrical body and a membrane body are introduced into a sewer pipe. The second circle shows a bark of water that applies water pressure to the skull and supplies heated water. The third circle is a diagram of the state of the end of the Gu Shi repair project. This paper size is applicable to the Chinese National Standard (CNS) Λ4 specification (210X 297 cm) 37 ---------- ^: ---- --ΐτ ------ f. ^ (Please read first Please fill in this page for further attention) 405005 A7 Printed B7 of Shellfish Consumer Cooperative of Central Bureau of Standards of the Ministry of Economic Affairs 5. Invention Zhu Ming (35) Figure 4 is a diagram illustrating an embodiment when no hydraulic tower is used. Fig. 5 is a diagram illustrating another embodiment when a water pressure tower is not used. Fig. 6_ is a conceptual circle showing a state in which a membrane body is inverted and inserted into a cylindrical body. An oblique view of the turning tool. Fig. 8 shows a circle provided with the reversing arrangement device of the present invention. Fig. 9 shows a case where a film-like body without a fiber layer is used. Fig. 10 shows a film-like shape. The concept that the body and the simple body roll are rolled. The 11th circle is a circle showing the bark state in which the membrane-shaped tube and the tube® are folded. The 12th circle is a circle showing the state where the air stagnation occurs. The thirteenth circle is a diagram showing the first embodiment of the invention for achieving a specific second purpose, and is a cross-sectional circle of the pipeline repairing device. Fig. 14 is a partial sectional circle of a pipeline repairing device showing a garden of the 1S application form of the invention for achieving a specific second purpose. Fig. 15 is a partial cross-section of a pipeline repair device according to the first embodiment of the invention for achieving a specific second purpose. Fig. 16 shows the first embodiment of the invention for achieving a specific second object, and shows the flow of the pipeline repair method. Fig. 17 is a cross-sectional view of a pipeline repairing device showing the second embodiment of the invention for achieving a specific second purpose. Fig. 18 is a view showing a second embodiment of the invention for achieving the second purpose, which is a partial cross-section of a pipeline repairing device. The 19th circle is the second cell shape of the invention used by Gu Shi to achieve the specific second purpose, and is a partial circle of the pipeline repair device. This paper size applies to China National Standard (CNS) Α4 specification (210 × 297 mm) _ _-· ------------------- Order ---.--- " 丨 (Please Read the notes on the back before filling in this page.) 5405α〇5 A · / Β7, invention potential (3G) Figure 20 is a drawing showing the third embodiment of the invention used to achieve a specific second purpose. Sectional view of road repair device. Fig. 21 is a diagram showing the third form of the invention of the invention used to achieve the specific second object, which is a partial squint of the pipeline repair device. Fig. 22 is a perspective view showing a part of a pipeline repairing device, showing a garden of the 3S application form of the invention with a second purpose. Circle 23 is a sectional circle showing the repair device of the 1S embodiment of the invention for achieving a specific fourth object. Fig. 24 is a diagram for explaining a repairing operation using the first embodiment of the invention for achieving the fourth purpose of the invention. Circle 25 shows a cross-sectional view along the medium X-X in 23_. Fig. 26 shows the first implementation of the invention for achieving the fourth purpose of the general purpose. 〇ΒΟ The plaque clearly states the state of the child. The cloth-like thread is hot-stranded and the glass-cutting substrate is cut. The material road repair pipe repairs the repair circle in the Chengcheng structure structure system. — 78 The 2nd example of the 2nd section of the 2nd aspect of the installation and repair of the material repair in the installation will explain the system 9 2 First read the note of the back and then grave the map of Ma Chu's clothing page and print it out of the 2nd edition of Shifa 2 by Zhibei Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs.圏 面 Decent with a display of flat water display, tie-in painting repair Λν »RH 3 Example of the addition of heat added to the section of the bottom road tube section of the Y-Y line circle ο 3 the first edge. In the circle, the circle states 31st state 0, spring 3, and the purpose of the development: four Z-three. The body circle diagram with surface 32 is cut into the vertical direction, and the edge is displayed in the system diagram repair circle 32 Supplement 33 The first example _ The section 39 is applicable to the Chinese national standard (CNS) A4 (210X 297 male) A7 405005_B7__ V. Invent iC (3? The 3rd and 4th circles are plaques that Gu Shi started to reverse the state when the membrane-shaped channel was inserted in the pipe repair method below K. 35th series Shows that the state of inserting the membrane-shaped channel has been reversed to 0. The 36th drawing is a circle explaining the method of K to repair the local part of the downpipe. The 37th drawing is to explain the method of M to repair the local part of the downpipe. The figure of the crimping part. [Description of surface number] 1, 1 ·, 11 ”, c ... membrane-shaped body, 2,233, Υ. Repair material, 3, 3, 3”, A ... cylindrical body , 5.50, B ... sewer pipe, 70,73 ... insertion member (hollow body), E ... internal space, L, L1 ... pressurized fluid, 50Α .... pipe inner wall, 61. ..Pressure device, 72Α, 73Α ... passage, XI, Κ ... inflation section, 233a, .. glass coarse note cloth, 233b ... shredded cuff cushion, 208 ... flexible membrane, 212,237 ... blowing pipe, 212a, 212b, 237b ... blowing outlet F ... heater, T ... water stopcock, X, 1 00, 1 0 1, 1 03,200 ... repair device, 11,11 * ... heat hose, 28 ... pressure vessel, Μ, Μ, .. manhole, 20,24, 71 ... chopped pipe for supply, 22,26 ... hose for discharge ------------ installation ----- -Order ---: --.-- line (please read the notes on the back before filling out this page) Printed on the paper by the Consumers' Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs, the paper size applies to the Chinese National Standard (CNS) Λ4 Regulations (210X 297 males)

Claims (1)

8Τ1 0787|〇5〇〇5 申請專利範圍 Λ8 Β8 C8 D8 1. 一種管路補修方法 茼狀體引進管路内*藉 用於該筒狀髓之内供, 以便對前述管路内面全 修方法中,其特徽為: 從前述筒狀®之一蟠 從其另一端部供抽出 用輥子捋之同時浸漬 將前逑膜狀髏予Μ反 將該筒狀體與前述膜 2 . —種管路補修方法 形成浸潢未硬化之硬 上述補修材內插入镰小 而封閉補修材與插入構 插入,配置於管路内的 注入加懕潦ιίι來將補修 •係將含有未硬化之硬化性樹脂之 由不透邊性之膜狀體而使流«壓作 硬化鲔述硬化性樹脂而實行内期* 髖或較長範圃內實行補修之管路補 注入未硬化之硬化性樹胞· 前述筒狀髓內部之空氣, 所注入之硬化性樹脂之後, 轉而預先配置於該筒狀思内, 狀驩一起引進前述管路内者。 ,其特微為: 化性樹脂之可撓性茼狀補修材*對 該内部空間用之可摟性之插入構件 件之間之內部空間,以上述補修材 狀態下,對上逑補修材之内部空間 材壓接於上述管路内壁,硬化上述 --------------,訂--.--^--,線 (請先閲讀背面之注項再填寫本頁) 經濟部中央標準局貝工消費合作社印装 性於性 撓接撓 可 壓:可 之 材為之 胞 修戡間 樹 補特空 性 將其部 化 而,内 硬 體中其 ..之 流置小 有化 壓装嫌 備硬 加修而 。 具未 入補内 者係漬 注路材 内,浸 間管修 路法,, 空之補 管方内 部段述 修 修路及 内手上 補補管,之 S 於 來路於材材加入 脂管置:修修之插 , 樹種 配補補 鑒有件 性一入狀述内備構 化3.插筒上路具入 硬 之管插 本紙張尺度逋用中國國家樣準(CNS ) Α4現格(210Χ297公釐) 經濟部中央標準局貝工消費合作社印裝 ΛΗ405005 C8 D8六、申請專利範圍 封閉補修材與插入構件之間之内部空間者。 4. 如申誚專利範園第2項之管路補修方法,其中插入構 件形成為茼狀之空心fi *藉Μ級小補修材内之内部空間之 同時,貫穿其軸心部而設之通道來使排水經補修材内而通 遇者。 5. 如申請專利範圃第3項之管路補修方法,其中該插入 構件形成為用以嫌小補修材内之内部空間之同時*在其軸 心部貫穿而設有使排水通過之通道之空心體者。 6. —種管路補修方法,係具備有向管路之徑方向膨脹自 如之膨脹部之補修装置之前述蟛脹部之外周,安装至少具 有鲴布之補修材•對管路之內側配置前述補修裝置之後* 使前述膨脹部膨脹而使前逑補修材壓接於管路内面俩,從 管路之内側内襯之管路補修方法中,其特激為: 將沿著前述補修材之管路之周方向之兩端部分別予Κ摺 翻過來之後安装於前述補修装置者。 7. —種管路補修裝置,係具備有向管路之徑方向膨脹自 如之膨脹部之同時,在形成該蟛脹部之可撓膨脹之外周, 安裝至少具有纖布之補修材之管路補修用之補修裝置中, 其特微為: 前述補修材係將沿著該管路之周方向兩端部分別予以擂 翻過來之狀態而安装於前述可撓犋之外周者。 8. 如申謂專利範圔第6項之管路補修方法,其中前述補 修材係浸漬有因加热而可促進其硬化的樹脂,對管路内面 俩颸接該補修材之同時對該補修材位於管路底部位置之部 本紙張尺度適用中國國家標準.(CNS ) Α4说格(210Χ297公釐) -0 - I-:-------------、灯----Κ——^ (請先閲讀背面之注意事項再填寫本頁) 405005 骂 D8六、申請專利範圍 補 述 前 中 其 置 裝 修 補 路 〇 管者U 悬 Γ項 熱 7 多第 較圍 位範 部利 他專 其請 比申 給如 供9. 位 加口 要開 了方 為下 而向 , 有 脂具 樹置 的,設 化部 硬内 其之 進部 促脹 可膨 而述 熱前 加在 因 , 有脂 潰樹 浸該 係化 材硬 修熱 補 述 前 中 其 置 装 修 補 〇 路 者管 管之 出 吹 之 Π 出 吹 之 氣 空 熱 加 之 項 7 第 圃 範 利 專 請 Φ 如 热置 加設 要分 了部 為之 而部 , 底 脂路 樹管 的於 化應 硬對 其部 進脹 促膨 來述 热前 加在 因 只 有 , 潰脂。 浸樹者 係該器 材化热 修硬霣 (請先閱讀背面之注意事項再填寫本頁) 線· 經濟部中央揉準局員工消費合作社印製 本紙張尺度適用中國國家標準(CNS ) A4規格(210X297公釐) 38Τ1 0787 | 〇5〇〇5 Application scope of patent Λ8 B8 C8 D8 1. A method for repairing the pipeline The sacral body is introduced into the pipeline * Borrowed from the internal supply of the tubular pith, in order to completely repair the inner surface of the pipeline The special emblem is: from one of the above-mentioned cylindrical shape 供 from the other end of the roller for extraction, while immersing the front 逑 membrane-shaped cross section to the tube-shaped body and the aforementioned film 2. seed tube Road repair method to form hardened hardened dipped. The above repair materials are inserted with small sickle and closed repair materials and inserts are inserted. The injection placed in the pipeline is used to repair and repair. • It contains unhardened hardening resin. The flow is made by the impervious membrane-like body. «Pressing to harden the hardening resin to implement the internal period * Repairing the pipeline in the hip or a longer range to fill the unhardened hardening tree cells. The aforementioned tube After injecting the hardening resin, the air inside the pith-shaped pith is placed in the cylindrical shape in advance, and it is introduced into the aforementioned pipeline together. , Its special features are: flexible resin-like repairing material of chemical resin * the internal space between the insertable members that can be used for the internal space, in the state of the above-mentioned repairing material, the upper repairing material The inner space material is crimped to the inner wall of the above pipeline, and the above-mentioned --------------, order --.-- ^-, line (please read the note on the back before filling in this Page) The Central Standards Bureau of the Ministry of Economic Affairs, Shellfish Consumer Cooperatives, printed sex-to-sex connection, compression and compression: the material can be repaired and repaired by the tree, and its internal characteristics can be divided into the internal hardware .. The liu Xiaohua chemical press is suspected of being hard repaired. Those who have not entered the internal repair system are stained into the road material, the immersion pipe repair method, the internal section of the empty pipe repair side is repairing the road and the internal repair pipe is added. : Repairing and repairing, tree species with supplementary supplements, one-by-one description, and internal structure 3. The tube is inserted into the tube with a hard tube, and the paper size is in accordance with China National Standards (CNS) Α4 (210 × 297) Ii) Printed by the Central Standards Bureau of the Ministry of Economic Affairs, Shellfish Consumer Cooperatives, ΛΗ405005 C8 D8. 6. Those who apply for patents and seal the internal space between repair materials and insert members. 4. For the pipeline repair method of item 2 of Shenyang Patent Fanyuan, the inserting member is formed into a hollow hollow fi *. Borrowing the internal space in the M-level small repair material, it also runs through its axis. Come to make drainage pass through the repair material and meet people. 5. If the pipeline repair method of item 3 of the patent application is applied, the inserting member is formed to be used for the internal space in the repair material, and at the same time, it is provided with a channel through which the drainage passes. Hollow body. 6. —A method for repairing pipelines, which is provided with a repairing material with at least a cloth on the outer periphery of the bulging portion of the bulging portion having a bulging device that expands freely in the radial direction of the pipeline. After repairing device * Inflate the expansion part and press the front repair material to the inner surface of the pipe. In the repair method of the pipe lined from the inner side of the pipe, the special stimulus is: the pipe along the repair material Both ends in the circumferential direction of the road are folded over by K and installed on the repair device. 7. —A pipeline repairing device is provided with an expansion portion that expands freely in the radial direction of the pipeline, and at the same time forms a flexible expansion outer periphery of the bulging portion, installing a pipeline with at least a fiber cloth repair material Among the repairing devices for repairing, the special feature is that the aforementioned repairing materials are installed in the state of both ends of the flexible pipe in a state of being turned over along the circumferential direction of the pipeline. 8. If it is claimed that the pipeline repair method of item 6 of the patent, the aforementioned repair material is impregnated with resin that can promote its hardening due to heating, and the repair material is connected to the inner surface of the pipeline while the repair material is connected. The paper size at the bottom of the pipe applies the Chinese national standard. (CNS) Α4 grid (210 × 297 mm) -0-I-: -------------, lamp --- -Κ —— ^ (Please read the precautions on the back before filling this page) 405005 Scold D8 VI. Before the patent application scope is added, its installation and repair roads are in place 0. The piper U has hanged the item hot 7 more than the surrounding range For altruism, please ask for more than for the offer. If you have a mouth, you must open the way to the bottom. If you have fat, you should set the inner part of the chemical department to swell and expand. Because of this, there is a fat-repaired tree immersed in the chemical material for hard repair and hot repair. Before the installation, it is repaired. The road blower pipe is blown out. The air blown air is added by the 7th item. Set up and set up to be divided into parts for the sake of, the bottom of the fat road tree tube should be hard to expand the part to promote expansion Come to add before the heat because there is only, fat. The tree soaker is the equipment for hot repairing (please read the precautions on the back before filling out this page). The paper printed by the Central Consumers ’Bureau of the Ministry of Economic Affairs, a consumer co-operative society. The paper size applies to the Chinese National Standard (CNS) A4 specifications ( 210X297 mm) 3
TW87107879A 1996-11-22 1998-05-21 Method and apparatus for repairing pipeline such as drain pipe TW405005B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31177996A JP3784901B2 (en) 1996-11-22 1996-11-22 Pipe line rehabilitation equipment such as drain pipes

Publications (1)

Publication Number Publication Date
TW405005B true TW405005B (en) 2000-09-11

Family

ID=18021377

Family Applications (1)

Application Number Title Priority Date Filing Date
TW87107879A TW405005B (en) 1996-11-22 1998-05-21 Method and apparatus for repairing pipeline such as drain pipe

Country Status (2)

Country Link
JP (1) JP3784901B2 (en)
TW (1) TW405005B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9429265B2 (en) 2012-04-12 2016-08-30 Ashimori Industry Co., Ltd. Lining method for conduit and lining material composite for conduit
TWI547663B (en) * 2012-04-13 2016-09-01 Ashimori Ind Co Ltd Pipe lining method and piping lining material
CN110043750A (en) * 2019-03-27 2019-07-23 北京石油化工学院 A kind of skid-mounted type automatic high pressure tipping arrangement

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101287036B1 (en) * 2013-03-08 2013-07-17 호용종합건설주식회사 Boiler vehicle of providing dry steam for renewed pipe
CN110671576A (en) * 2019-09-30 2020-01-10 中国化学工程第十四建设有限公司 Method for integrally repairing trenchless sewage pipeline by hot water overturning and curing
KR102196526B1 (en) * 2020-04-21 2020-12-30 (주)명보이엔지 Non-excavating Repair system with Inner Tube
KR102334207B1 (en) * 2021-03-04 2021-12-03 주식회사 이연건설 Repairing apparatus and method for conduit of non-excavation type

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9429265B2 (en) 2012-04-12 2016-08-30 Ashimori Industry Co., Ltd. Lining method for conduit and lining material composite for conduit
TWI547663B (en) * 2012-04-13 2016-09-01 Ashimori Ind Co Ltd Pipe lining method and piping lining material
CN110043750A (en) * 2019-03-27 2019-07-23 北京石油化工学院 A kind of skid-mounted type automatic high pressure tipping arrangement

Also Published As

Publication number Publication date
JP3784901B2 (en) 2006-06-14
JPH10151670A (en) 1998-06-09

Similar Documents

Publication Publication Date Title
US4778553A (en) Method of lining a pipeline with a flexible tubular sleeve
FI94079C (en) Procedure for installing a replacement pipe in an existing underground pipeline
US6267001B1 (en) Test plug
TW405005B (en) Method and apparatus for repairing pipeline such as drain pipe
JP3839605B2 (en) Manhole lining material
NO174069B (en) PROCEDURE FOR THE INSTALLATION OF A PLASTIC REPLACEMENT BEAM IN AN EXISTING PIPE PIPE
JPH05500411A (en) Installation of lining materials by remote control at difficult-to-access sewer pipe joints and branch pipe entrances
US6652690B1 (en) System for providing heated fluid utilizing exothermic chemical reaction for curing resin in pipe liner/repair process
CN209671866U (en) A kind of pipeline plugging air bag
JP3224246B2 (en) Pipe branch and repair method for pipe having branch
JPH11170368A (en) Manhole hole lining method
JP3450954B2 (en) Plug device for lining members
AU694172B2 (en) Lining material
US5941285A (en) Lining material
JP6986743B2 (en) Pipe rehabilitation method
JP4658562B2 (en) Branch pipe lining method, branch pipe lining apparatus and branch pipe lining material used therefor
JP4279385B2 (en) Method and apparatus for partial repair of pipeline and repair material used therefor
JP3827348B2 (en) Repair material, fixing structure of repair material, and repair method of pipeline
JP4502744B2 (en) Rehabilitation of drainage stack
JP2004325080A (en) Hose-testing apparatus
JPH06234158A (en) Underground pipe repair method
JP3594573B2 (en) Underground pipe repair method
JP4245860B2 (en) Pipe repair method
JP3534930B2 (en) Repair method of branch pipeline, repair bag and repair material
JP2000248610A (en) Tube for repairing pipe

Legal Events

Date Code Title Description
GD4A Issue of patent certificate for granted invention patent
MK4A Expiration of patent term of an invention patent