TW299383B - The construction method for concrete tile with paper-mold - Google Patents

The construction method for concrete tile with paper-mold Download PDF

Info

Publication number
TW299383B
TW299383B TW83109992A TW83109992A TW299383B TW 299383 B TW299383 B TW 299383B TW 83109992 A TW83109992 A TW 83109992A TW 83109992 A TW83109992 A TW 83109992A TW 299383 B TW299383 B TW 299383B
Authority
TW
Taiwan
Prior art keywords
paper
concrete
concrete surface
color
floor tile
Prior art date
Application number
TW83109992A
Other languages
Chinese (zh)
Inventor
Ruey-Wenn Chen
Original Assignee
Ruey-Wenn Chen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruey-Wenn Chen filed Critical Ruey-Wenn Chen
Priority to TW83109992A priority Critical patent/TW299383B/en
Application granted granted Critical
Publication of TW299383B publication Critical patent/TW299383B/en

Links

Abstract

A construction method for concrete tile with paper-mold, which features are:Sheet and punch water-proof paper material into hollow for tile pattern thencurl it. First, pave a layer of concrete on the ground which is required topave tile. Then, cover the paper material on wet concrete surface andsprinkle a layer colorful solidified agent to permeate the concrete intosurface. After the concrete and solidified agent are dried, peel the papermold and coat a layer durable protection material, thus finish theconstruction.

Description

'C7 D7 五、創作説明() <發明之揭示> _ 按照一般習用的地磚施工方法,其係是在一般混凝土 地面完成灌漿整平拖工過程後,约十五天等待混凝土乾固 ♦ ,接著塗敷一罾水泥作為地磚與混凝土黏接的界面材料, 其為了增加地坪坡度的排永與地δ專接合時的平整性,第三 至十五天之後Κ水泥内加海菜扮^防止水泥急速乾固 '-授 拌均勻,進行貼地磚工作。链工者必須小心翼翼的將地磚 砍瘛工圈搛花纹予K排列在混凌土上•貼完地磚後三天, 接著用苈漿將地磚接縫填平,對於大靣稹的地1拖工,為 求进磚排列美觀,£E事先須晝K指示線烽依苧舖設菇工 ,由於上列筢工程序極為繁複,造逋消耗轲料.、人工、時 間甚多,同時地磚_工後,常因天候因素或宠工不當,造 成进磚與混凝土;Z間有銳落或凹凸不平的現象,造成長時 間的维修,甚是癍煩,·而旦地磚施工時,會造成大量的垃 圾丟棄物,必須人工加从清潔整理,因此地磚鋪設成本一 直居高不下,影響營建工程的進度掌握,以及施工品質及 成本的维持,ί直得應S卩从改進此種具有明顯使用缺點的地 磚施工方法。 <發明之目的> 嵌本發明之此種紙馍板混凝土地磚確工方法,陁工者 可在所舖設的混凝土地面尚未乾^固/前,以一種不吸水材 質的紙模板鋪設於混凝土上並嵌入其表罾 > 使其構成地磚 形狀之花紋圖案排列者,接著灑下一屠顔色固ib劏,使混 凝土附著顏色,並.增加混凝土表面強度。取下紙模板後塗 本紙張尺度適用中國國家梂準(CNS ) A4規格(210X297公釐) .---r--=-----木------訂------乘 (請先閲讀背面之注意事項再填寫本頁) 經濟部中央標準局員工消費合作社印策'C7 D7 5. Creation Instructions () < Disclosure of the Invention > _ According to the commonly used floor tile construction method, it is to wait for the concrete to dry in about fifteen days after completing the grouting and dragging process on the general concrete floor. Then, apply Yi Yan cement as the interface material between the floor tiles and the concrete. In order to increase the flatness of the floor slope and the ground δ when it is exclusively joined, the sea cement will be added to the cement after the third to fifteen days ^ To prevent the cement from drying out quickly-evenly mixing and carrying out the work of tiling. The chain worker must carefully arrange the floor tiles and cut the patterns to arrange K on the mixed soil. Three days after the floor tiles are pasted, then fill the joints of the floor tiles with the mortar, and drag the ground for the big one. In order to make the arrangement of the bricks beautiful, £ E must be used in advance to lay mushrooms according to the K line. Due to the extremely complicated work procedures listed above, it takes a lot of materials to build. It takes a lot of labor and time. At the same time, the floor tiles , Often due to weather factors or improper pet work, resulting in bricks and concrete; there is a sharp drop or unevenness between Z, resulting in long-term maintenance, which is very troublesome, and when the floor tiles are constructed, it will cause a lot of garbage The discarded materials must be cleaned manually, so the cost of laying the floor tiles remains high, which affects the progress of the construction project and the maintenance of the construction quality and cost. It is necessary to improve the floor tiles with obvious disadvantages. Construction method. < Objective of the Invention > The method of confirming the construction of the paper bun board concrete floor tiles embeded by the present invention can be laid on the concrete with a non-absorbent paper formwork before the paved concrete floor is dry / solid Embed and embed it on the surface to make it form the pattern arrangement of the floor tiles, then sprinkle a color solid 哏 to make the concrete adhere to the color and increase the concrete surface strength. After removing the paper template, the size of the paper is applicable to China National Standard (CNS) A4 specification (210X297mm). --- r-= ----- Wood ------ Order ----- -Multiply (please read the precautions on the back before filling out this page) Printed by the Staff Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs

經濟部中央揉準局員工消費合作社印装 上一層兩久保護材料,即迅速完成混凝土地施工,其可縮 短约三分之二的一般施工所需時間,並可節省昂貴地磚材 料費用,故充份符合拖工經濟效率原則,此為本發明之主 ♦ 要實施目的: , 至於本發現之詳细過程,實拖目的與功效,請參照下 列依附圖所作說明,即可完全瞭解。 第一 11為本發明之紙撗板外覲搆造示意圖 第二圖為本發茂之紙撗板捲境使用狀態造示意圖 第三圈為本發明之紙撗板敷設時的使兩狀態示意圖 第四圖為本發明之實奄流程示意圖 < 1式元泮續號與名稱對照表> 1 0 0 . · y空孔 1 V〇 1 ...紙模板 1 0 2 ...混凝土 第一圖芾示為本發明之紙撗板外覲搆造示意圖•其是 .将一種不吸水材質紙科予以剪裁衝1新欲拼合地磚形狀空 孔1 0 0,箧所剩餘紙模板1 〇 1作為舖設的地磚相接部 泣接缝形狀者,接著將平面展延的紙横板1 0 1予以如第 二圖所示,使之捲澆成束狀摄置,由於減少佔用的空間, 因此儲存乃十分方便者。 第三圈所示為本發明的紙撗板敷設時的使用吠態示意 圖,由此圈可看出當本發明的纸模板1 〇 1鋪設在未乾固 ..家 的混凝土 1 0 2上,該紙模板1 0 1即承受鋪設時迫壓的 力1而嵌入於温凝土表面,使混凝土表屠被纸模板1 0 1 予Κ横壓凹陷形成地磚拼接部位之外表形狀者。 本紙張尺度逋肩中國國家梂準(CNS ) A4说格(210X297公釐) II . „ Μ------訂-------線 f (請先閲讀背面之注意事項再填寫本頁) C7 D7 mm 五、如作説明() 第四圖所示為.本發明實筢流程示意圃,由圖可看出當 本發明欲實沲於混凝土地面鋪設地磚工程時,其首先是在 未乾胃的混凝土表層先予以整平,使其表面光滑平整方!更 筢工',接著將如第二圖所顯示呈捲繞狀的紙模板1 〇 1予 以鋪設在混凝土表面,接著il下色粉材料顔色固ib劑,分 茄於紙模板空孔1 0 0部位的混凝土表面·操作者可手持 違築工具墁刀予以整平落在混凝土表面的色粉%料顏色固 fc劑,庾其均勻塗佈,竑泫整牟所使,¾的墁滑程度 Μ及所灑下的色粉材料顔色固it劑顆粒细度,可主混凝ί 外部分別形成亮面或祖面的表1搆造者,當完成鋪設纸撗 板的混凝土完全硬固之後,即可將紙摸板1 0 1從i昆凝土 表面予以掀起剌雜,原來紙横板1 0 1覆蓋部泣會形或地 5專接縫處,此時可K使甩'吸麈機將混凝土表面剝落的细石 顆粒予Μ吸除清潔乾淨,最後再塗上一層镲亮油形成酎久 保護屠,即可完成整個紙模板混凝土地磚施工過程,此項 陁工技術運用之範圍甚廣,而旦筢工技術效果非常良好, 舉凡各類橋面、路面、人行道、購物中心、停車場或任何 需琴Κ混凝土及地磚作鋪設地面的地方皆可加工’使 其轉換成色彩缜纷有如精緻磚鋪地板一般之庋用效果,然 而其施工之成本與所耗費之時間僅為一般鋪設地磚施工的 三分之一而已,因本身為(R ^ CP混凝土结構,故不會 有脫落破壞的情形發生,因此可永久不壞·毋需维修的煩 惱,顯見其所苻合經濟效用原則,為一具有產業上利用價 值的發明創作者。· 本紙張尺度適用中國國家橾準(CNS ) A4规格(210X297公It ) ^---.--------决------訂---------聲- (請先閱讀背面之注意事項再填寫本頁) 經濟部中央標準局男工消費合作社印装The Ministry of Economic Affairs Central Consumers ’Cooperative Staff Cooperative printed a layer of protective material for two years, that is, quickly completed the construction of the concrete floor, which can shorten the general construction time by about two-thirds and save the cost of expensive floor tiles. The copy conforms to the principle of economic efficiency of draggers, which is the main purpose of the present invention. To implement the purpose: As for the detailed process of this discovery, for the purpose and effectiveness of dragging, please refer to the following descriptions according to the attached drawings to fully understand. The first 11 is a schematic diagram of the outer structure of the paper plate of the present invention. The second figure is a schematic diagram of the use state of the paper roll plate in the state of the world. The third circle is the schematic diagram of the two states when laying the paper plate of the invention. Fourth The figure is a schematic diagram of the actual process of the present invention < 1 type Yuan Pan continuation number and name comparison table > 1 0 0. · Y empty hole 1 V〇1 ... paper template 1 0 2 ... concrete first picture Fu shows the schematic diagram of the structure of the paper outboard of the present invention. It is. A non-absorbent material is cut and punched 1 new floor tile shape hole 1 0 0, and the remaining paper template 1 〇1 for laying If the joints of the floor tiles are in a weeping joint shape, then the flat horizontal paper board 10 1 is placed as shown in the second picture, and it is rolled into a bundle and placed. Since the occupied space is reduced, the storage is Very convenient. The third circle shows a schematic diagram of the use of the bark state when laying the paper decking board of the present invention. From this circle, it can be seen that when the paper formwork 101 of the present invention is laid on the unconsolidated concrete of home 102, The paper template 101 is subjected to the compressive force 1 during laying and is embedded on the surface of the warming soil, so that the concrete surface is covered with paper template 10 1. The size of this paper meets the requirements of the Chinese National Standard (CNS) A4 (210X297mm) II. „Μ ------ Subscribe ------- line f (Please read the precautions on the back before filling in (This page) C7 D7 mm 5. As explained () The fourth figure shows the schematic diagram of the actual process of the present invention. It can be seen from the figure that when the present invention intends to pave the ground tiles on the concrete floor project, the first is Level the concrete surface of the wet stomach first to make the surface smooth and flat! More work ', then lay the rolled paper form 1 〇1 as shown in the second picture on the concrete surface, then il The color-fixing agent for the toner material is divided into the concrete surface of the hole 100 in the paper template. The operator can hold the illegal tool and use the knife to level the toner% material color solid fc agent that falls on the concrete surface. Even if it is evenly coated, the smoothness of ¾ and the fineness of the particles of the toner material and the particle size of the toner material can be coagulated. The external surface can form a bright surface or an ancestor surface, respectively. 1 Constructor, when the concrete for laying the paper slab is completely hardened, the paper touch panel 1 0 1 can be removed from the i Kun concrete table It will be lifted up, and the original paper horizontal board 10 1 cover part will be shaped at the seam or 5 special joints. At this time, the K-swing machine can be used to remove the fine stone particles peeled off the concrete surface and clean it. Finally, apply a layer of cymbals bright oil to form a long-term protection slaughter, you can complete the entire paper formwork concrete floor tile construction process, the application of this construction technology is very wide, and the construction technology is very good, such as all types of bridge decks , Roads, sidewalks, shopping malls, parking lots, or any place that requires QK concrete and floor tiles to be laid on the ground can be processed 'to convert it into a color, which has the same general effect as exquisite brick flooring, but its construction cost and The time it takes is only one-third of the general construction of laying floor tiles, because it is (R ^ CP concrete structure, so there will be no fall-off damage, so it can be permanently not damaged, no maintenance trouble, obviously According to the principle of economic utility, it is an invention creator with industrial use value. · This paper scale is applicable to the Chinese National Standard (CNS) A4 specification (210X297 public It) ^ ---.------ - -Decision ------ Order --------- Sound- (Please read the precautions on the back before filling out this page) Printed by the Male Workers Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs

Claims (1)

告 iABCD 六、申請專利範圍 <專利之範圍> 經濟部中央棣準局男工消費合作社印製 (請先閲讀背面之注意事項再填寫本頁) 1 · 一種紙模板混凝土地磚施工方法,其特徵在於將一種 不吸水材質紙料予K剪裁衝壓所欲拼合地磚形狀空孔,使 所剩餘紙摸板作為鋪設的地磚相接部位接縫形狀者,紙横 板鋪設在未乾固的混凝土上*該紙模板即承受鋪設時迫壓 的力S而嵌入於混凝土表面,!吏混凝土表罾被紙模板予Μ 撗1凹陷形成地磚拼接部泣之外表形狀設地磚工程 時,其言先是在未乾固的混凝土表1先予Μ整平,使其表 Μ光滑平整方工,接著將呈捲繞狀的紙模板予以鋪設 在混凝土表面,接著噴灑下色粉材钭顔色固ib劑,分佈於 紙模板空孔部泣的混凝土表靣,操作者可手持建築工具墁 刀予以整平落在混凝土表面的色粉材顔色固化劑,使其 均勻塗沛,並依整平所使用的墁滑程度K及所灑下 的色粉材料顔色固化劏顆粒翘度,可%混凝土外部分別形 成亮31或祖SI的表層搆造者,當完成湖設紙模板的丨昆凝土 完全硬固之後,即可將紙模板從混凝土表面予K掀起剝離 ,原來紙横板覆蓋部位會形成地磚接缝處,此時可以使甩 吸瞾機將混凝土表面剝落的细石顆拉予以吸除清潔乾淨> 最後再塗上一層擦亮油形成酎久保護層,即可完成整個紙 摸板混凝土地磚拖工過程。 , 本紙張尺度逋用中國國家揉準(CNS )八4規格(210X297公釐)Report iABCD VI. Scope of Patent Application < Scope of Patent > Printed by the Central Diplomatic Bureau of the Ministry of Economic Affairs, Male Workers ’Consumer Cooperative (please read the precautions on the back and then fill out this page) The utility model is characterized in that a paper material of non-absorbent material is cut and punched by K in a shape of a floor tile to be combined and punched, and the remaining paper touch panel is used as the joint shape of the joint portion of the floor tile laid, and the horizontal paper board is laid on the undried concrete * The paper formwork is embedded in the concrete surface under the pressure S of the compressive force when laying! When the concrete surface is covered with paper formwork to form a depression, forming the floor tile splicing section, and the surface shape is set to the floor tile project, the first step is to pre-level the unsolidified concrete surface 1 to make it smooth and flat. Then, the rolled paper formwork is laid on the surface of the concrete, and then sprayed with the powder powder and color solid ib agent, distributed on the concrete surface of the paper form hole, the operator can hold it with a construction tool Level the color powder curing agent that falls on the surface of the concrete to make it evenly coated, and according to the degree of slip K used for leveling and the color curing agent particle warp of the sprayed color of the powder material, the concrete exterior Those who formed the surface structure of Liang 31 or Zu SI respectively, after the completion of the lake design paper template, the Kunming soil is completely hardened, the paper template can be lifted off from the concrete surface and peeled off, the original paper horizontal board covering part will be formed At the joints of the floor tiles, at this time, the flick suction machine can be used to pull the fine stones peeled off the concrete surface to be cleaned > Finally, apply a layer of polishing oil to form a protective layer for a long time to complete the entire paper touch panel Coagulation Land brick dragging process. , This paper uses the Chinese National Standard (CNS) 84 specifications (210X297mm)
TW83109992A 1994-10-28 1994-10-28 The construction method for concrete tile with paper-mold TW299383B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW83109992A TW299383B (en) 1994-10-28 1994-10-28 The construction method for concrete tile with paper-mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW83109992A TW299383B (en) 1994-10-28 1994-10-28 The construction method for concrete tile with paper-mold

Publications (1)

Publication Number Publication Date
TW299383B true TW299383B (en) 1997-03-01

Family

ID=51565546

Family Applications (1)

Application Number Title Priority Date Filing Date
TW83109992A TW299383B (en) 1994-10-28 1994-10-28 The construction method for concrete tile with paper-mold

Country Status (1)

Country Link
TW (1) TW299383B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724642A (en) * 2016-08-11 2018-02-23 中国二十冶集团有限公司 The construction method of color wearing proof terrace
TWI781428B (en) * 2015-12-28 2022-10-21 美商第一模具和建築用品股份有限公司 Formliner for forming a pattern in curable material and method of use

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI781428B (en) * 2015-12-28 2022-10-21 美商第一模具和建築用品股份有限公司 Formliner for forming a pattern in curable material and method of use
US11725402B2 (en) 2015-12-28 2023-08-15 Prime Forming & Construction Supplies, Inc. Formliner for forming a pattern in curable material and method of use
CN107724642A (en) * 2016-08-11 2018-02-23 中国二十冶集团有限公司 The construction method of color wearing proof terrace

Similar Documents

Publication Publication Date Title
US9340062B2 (en) Concrete mosaic and method of forming the same
CN112500069A (en) Concrete integral terrace composite material and construction method
CN107152145A (en) A kind of stone material flooring construction method
US20140000214A1 (en) Decorative aggregate concrete surface preparation process
US20100005743A1 (en) Flexible Cement Veneer
US5169573A (en) Method of forming three-dimensional pattern
TW299383B (en) The construction method for concrete tile with paper-mold
CN112479655A (en) Concrete TWF application system wear-resistant hardening agent
JP2007283607A (en) Molding method of concrete
CN107304632B (en) Stone gum construction method
CN211949245U (en) Roof stone flashing structure
CN212405769U (en) Anti-slip large-gradient decorative surface layer structure
JP4104432B2 (en) Pattern surface formation method
US9404271B1 (en) System and method for creating concrete designs
US20110008594A1 (en) Concrete template and method of use
CN112727005A (en) Production method of whole-body colorful concrete product imitating natural cracks
JP4395126B2 (en) Paving method
JP4405940B2 (en) Pavement repair method
JP3342274B2 (en) Manufacturing method of surface material
CN104594596B (en) Rapid-hardening mortar construction method for mosaic tiles
TWI513884B (en) Eco-friendly mud-brick and process for laying the same to unseasoned concrete to solidify like pavement bricks
JPH11293901A (en) Hydraulic nonslip inorganic floor and formation thereof
CN114575552A (en) Ceramic tile close joint paving method
JP2004132052A (en) Bridge deck waterproofing structure and its construction method
JP2000064564A (en) Surfacing material giving the feeling of exposed type finish

Legal Events

Date Code Title Description
MC4A Revocation of granted patent
MM4A Annulment or lapse of patent due to non-payment of fees