TW201723312A - Transportation and installation method for underwater base of super-large offshore wind turbine, and transportation and installation vehicle thereof capable of simplifying installation process, improving operation efficiency and reducing operation cost - Google Patents

Transportation and installation method for underwater base of super-large offshore wind turbine, and transportation and installation vehicle thereof capable of simplifying installation process, improving operation efficiency and reducing operation cost Download PDF

Info

Publication number
TW201723312A
TW201723312A TW104143406A TW104143406A TW201723312A TW 201723312 A TW201723312 A TW 201723312A TW 104143406 A TW104143406 A TW 104143406A TW 104143406 A TW104143406 A TW 104143406A TW 201723312 A TW201723312 A TW 201723312A
Authority
TW
Taiwan
Prior art keywords
base
floating
installation
dock
fan
Prior art date
Application number
TW104143406A
Other languages
Chinese (zh)
Other versions
TWI593879B (en
Inventor
陳林福
Original Assignee
財團法人船舶暨海洋產業研發中心
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 財團法人船舶暨海洋產業研發中心 filed Critical 財團法人船舶暨海洋產業研發中心
Priority to TW104143406A priority Critical patent/TWI593879B/en
Publication of TW201723312A publication Critical patent/TW201723312A/en
Application granted granted Critical
Publication of TWI593879B publication Critical patent/TWI593879B/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

Provided are a transportation and installation method for an underwater base of a super-large offshore wind turbine, and a transportation and installation vehicle thereof. A super-large wind turbine base is carried by a floating dock boat combined with a buoyant apparatus, and is transported by a tugboat to an installation location, so as to complete a shore loading step, a sailing fastening step and a sea towing step. A dynamic positioning propeller of the buoyant apparatus is provided to perform positioning, so that the wind turbine base is combined with an underwater pile pre-embedded in the installation location to complete a pre-installation step and a positioning and installation step. By using an existing machine to transport and install the wind turbine base, the present invention is provided with the advantages of simplifying installation process, improving operation efficiency and reducing operation cost, so as to increase international competitiveness of the local marine engineering industry thereby carrying out an independent offshore wind power construction.

Description

超大型離岸風機水下基座之運輸安裝方法及其運輸安裝用載具 Transportation and installation method of super large offshore wind turbine underwater base and vehicle for transportation and installation

本發明係與一種風機之水下基座的運輸安裝方法及運輸安裝載具有關,特別是指一種超大型離岸風機水下基座之運輸安裝方法及其運輸安裝用載具。 The invention relates to a transportation installation method and a transportation installation load of an underwater base of a wind turbine, in particular to a transportation installation method of a super large offshore wind turbine underwater base and a transport installation vehicle.

產生電力的方式繁多,有火力發電、核能發電、太陽能發電、風力發電等,其中,風力發電係利用大自然所產生的風力產生電能,且其具有建構成本低廉、不會排放廢氣或產生廢料等優點,係能有效打造綠能低碳環境,並逐步邁向非核家園,而海上風性較陸地具有風期長、風速高、風力平穩、不受遮蔽以及不影響環境景觀等優勢,因此,離岸安裝風力機架逐漸成為風力發電的主要趨勢。 There are many ways to generate electricity, such as thermal power generation, nuclear power generation, solar power generation, and wind power generation. Among them, wind power generation uses the wind generated by nature to generate electricity, and it has a low cost, no emissions, or waste. The advantage is that it can effectively create a green energy and low carbon environment, and gradually move towards non-nuclear homes. Offshore winds have advantages such as long wind period, high wind speed, stable wind, no shelter, and no impact on the environmental landscape. The installation of wind power racks on the shore has gradually become a major trend in wind power generation.

然而,台灣海峽的環境因素十分複雜,位於強颱易侵襲區、太平洋火環地震帶且海峽具有特殊的地質與地形,使得支撐風力機架運轉之風機基座必須加高、加大且強度更強,在水深超過30公尺海域之風機基座之重量將超過千噸,而台灣現有之起重機設備所能載重之負荷範圍為700噸~800噸之間,因此,風機基座之運輸及安裝作業必須採行分段作業或使用昂貴之起重設 備支援,有耗工、費時以及成本高昂之缺點,是以,本發明人在觀察到上述缺點後,認為離岸之風機基座運輸及安裝方法仍有進一步改良之必要,而遂有本發明之產生。 However, the environmental factors in the Taiwan Strait are very complex. They are located in the strong Taiwan-invasion zone, the Pacific Fire Ring seismic zone and the strait has special geological and topographical features, so that the fan base supporting the wind turbine operation must be raised, enlarged and stronger. Strong, the weight of the fan base in the water depth of more than 30 meters will exceed 1,000 tons, while the existing crane equipment in Taiwan can load between 700 tons and 800 tons, so the transportation and installation of the fan base Jobs must be segmented or used for expensive resets In addition, there is a disadvantage of being labor-intensive, time-consuming, and costly. Therefore, after observing the above disadvantages, the inventors believe that there is still a need for further improvement of the offshore fan base transportation and installation method, and the present invention is Produced.

本發明之目的係在提供一種超大型離岸風機水下基座之運輸安裝方法及其運輸安裝用載具,其係可利用現有機具運輸安裝超大型離岸風機水下基座,而具有簡化安裝程序、提升作業效率以及降低作業成本之優點。 The object of the present invention is to provide a transportation installation method for a super large offshore wind turbine underwater base and a transportation and installation vehicle thereof, which can be used for transporting and installing a super large offshore wind turbine underwater base by using existing equipment, and is simplified. The advantages of installing programs, improving work efficiency, and reducing operating costs.

為達上述目的,本發明所提供之超大型離岸風機水下基座之運輸安裝用載具,係包含有:一浮塢船,其係具有一底座,該底座之二側係分別設有一側壁,令該浮塢船之另外二側分別形成有一第一開口以及一第二開口,又該底座之頂面係於該第一開口處設有二滑軌,且該等滑軌係朝該第二開口延伸,此外,該浮塢船更設有數個繫纜樁,該等繫纜樁係各設於該底座之頂面且鄰近該底座之周緣處;以及一浮具,其係設於該底座之頂面,該浮具朝該第一開口處係開設有一缺口,使該浮具概呈U字型,且該缺口係大於該等滑軌間的距離,又該浮具於該缺口二側係分別設有至少一絞車,每一絞車係設有一鋼索,另該浮具於每一絞車處係設有可伸縮之二油壓插梢,且該等油壓插梢係朝該缺口設置,此外,該浮具底側係設有數台動態定位推進器;還有至少一拖船,其係透過至少一纜繩綁設於該浮塢船之繫纜樁。 In order to achieve the above objective, the carrier for transporting and installing the super large offshore wind turbine underwater base provided by the present invention comprises: a floating dock ship having a base, and two sides of the base are respectively provided with a a side wall, wherein the other two sides of the floating dock are respectively formed with a first opening and a second opening, and the top surface of the base is provided with two sliding rails at the first opening, and the sliding rails are facing the The second opening is extended. In addition, the floating dock is further provided with a plurality of bollards, each of which is disposed on a top surface of the base and adjacent to a circumference of the base; and a floating device that is fastened to a top surface of the base, the floating device is provided with a notch at the first opening, so that the floating device is U-shaped, and the notch is larger than the distance between the sliding rails, and the floating device is in the gap The side system is respectively provided with at least one winch, each winch is provided with a steel cable, and the floating device is provided with a retractable two hydraulic pressure plug at each winch, and the hydraulic inserts are arranged toward the gap In addition, the bottom side of the float is provided with a plurality of dynamic positioning thrusters; and at least one tugboat, Attached to the bollard of the floating dock by at least one cable.

而本發明所提供之超大型離岸風機水下基座之運輸 安裝方法,其步驟係包含有:岸際裝載步驟:將超大型之一風機基座由一碼頭滑動進入該碼頭邊停靠之浮塢船,且該風機基座係停放至該浮具之缺口處;航行繫固步驟:該風機基座係具有四支撐腳,每一支撐腳上各設有一繫固元件,該等油壓插梢外伸且將該等絞車下放,扣緊該等繫固元件;海上拖航步驟:透過該拖船帶引,拖動該浮塢船,將該風機基座運輸至一安裝地點;安裝前置步驟:該安裝地點係預先埋設有對應該風機基座之水下基樁,該浮塢船係由該拖船帶引於該安裝地點進行大略定位,接著該浮塢船進水下沉,該浮具連同該風機基座自然浮起,而該浮具之動態定位推進器下放,該浮塢船由該拖船帶離;定位安裝步驟:該浮具提供浮力及穩度,而該等動態定位推進器協助定位,該等絞車控制該等鋼索沉放,該風機基座靠重力自行下沉,且該等支撐腳係分別與該等水下基樁套合,該等絞車與該等動態定位推進器提供該風機基座進行最後定位校調,再將該等絞車脫鉤回收該等鋼索;浮具回收步驟:該浮具駛回該浮塢船,該浮塢船排水並向上舉昇該浮具,該拖船即將該浮塢船連同該浮具帶回該碼頭。 The transportation of the super large offshore fan underwater base provided by the invention The installation method comprises the following steps: a shore loading step: sliding a very large one of the fan bases from a dock into a floating dock ship docked at the dock, and the fan base is parked to the gap of the floating device. Navigation fixing step: the fan base has four supporting legs, each supporting leg is provided with a fastening component, and the hydraulic inserts are extended and the winches are lowered, and the fastening components are fastened Sea towing step: through the tugboat, drag the floating dock ship, transport the fan base to an installation location; installation pre-step: the installation site is pre-buried with underwater corresponding to the fan base a foundation pile, the floating dock ship is led by the tug boat to the installation site for rough positioning, and then the floating dock ship sinks into the water, the floating device naturally floats together with the fan base, and the floating gear is dynamically positioned The propeller is lowered, the floating dock is taken away by the tug; the positioning installation step: the buoy provides buoyancy and stability, and the dynamic positioning propellers assist in positioning, the winches control the cable sinking, the fan base Seat sinks by gravity, and The support foot is respectively engaged with the underwater piles, and the winches and the dynamic positioning pushers provide the fan base for final positioning and adjustment, and then the hooks are unhooked to recover the cables; the float recovery step The floater drives back to the floating dock vessel, which drains and lifts the float upwards, and the tugboat brings the floating dock boat back to the dock along with the float.

本發明所提供之超大型離岸風機水下基座之運輸安裝方法及其運輸安裝用載具,係藉由該浮塢船結合該浮具承載超大型之一風機基座,再透過該拖船運送至該安裝地點,更透過該浮具之動態定位推進器進行定位,使該風機基座精確的裝設於該安裝地點,其係可利用現有機具運輸安裝該風機基座,而具有簡化安裝程序、提升作業效率以及降低作業成本之優點。 The transportation and installation method of the super large offshore wind turbine underwater base provided by the invention and the transport and installation vehicle thereof are carried by the floating dock ship combined with the floating gear to carry a super large one of the fan bases, and then through the tugboat Transported to the installation site, and further positioned by the dynamic positioning thruster of the floating device, the fan base is accurately installed at the installation site, and the fan base can be transported and installed by using existing tools, and the installation is simplified. The advantages of procedures, increased operational efficiency, and reduced operating costs.

10‧‧‧浮塢船 10‧‧‧ floating dock

11‧‧‧底座 11‧‧‧Base

111‧‧‧滑軌 111‧‧‧Slide rails

12‧‧‧側壁 12‧‧‧ side wall

13‧‧‧第一開口 13‧‧‧First opening

14‧‧‧第二開口 14‧‧‧second opening

15‧‧‧繫纜樁 15‧‧‧ bollard

20‧‧‧浮具 20‧‧‧ floating gear

21‧‧‧缺口 21‧‧ ‧ gap

22‧‧‧絞車 22‧‧‧ winch

23‧‧‧鋼索 23‧‧‧Steel cable

24‧‧‧油壓插梢 24‧‧‧Hydraulic inserts

25‧‧‧動態定位推進器 25‧‧‧ Dynamic Positioning Propeller

30‧‧‧拖船 30‧‧‧Tugboat

31‧‧‧纜繩 31‧‧‧ Cable

200‧‧‧風機基座 200‧‧‧Fan base

201‧‧‧支撐腳 201‧‧‧Support feet

202‧‧‧繫固元件 202‧‧‧ securing components

203‧‧‧定位孔 203‧‧‧Positioning holes

300‧‧‧碼頭 300‧‧‧Wharf

301‧‧‧滑軌 301‧‧‧rails

400‧‧‧安裝地點 400‧‧‧Installation location

500‧‧‧水下基樁 500‧‧‧Underwater pile

600‧‧‧自走式移動平台 600‧‧‧Self-moving mobile platform

第1圖係本發明之立體圖。 Figure 1 is a perspective view of the present invention.

第2圖係本發明之油壓插梢第一位置示意圖。 Figure 2 is a schematic view of the first position of the hydraulic insert of the present invention.

第3圖係本發明之油壓插梢第二位置示意圖。 Figure 3 is a schematic view of the second position of the hydraulic insert of the present invention.

第4圖係本發明之浮具前視圖。 Figure 4 is a front view of the float of the present invention.

第5圖係本發明之流程圖。 Figure 5 is a flow chart of the present invention.

第6圖係本發明之岸際裝載步驟示意圖。 Figure 6 is a schematic illustration of the shore loading step of the present invention.

第7圖係本發明之航行繫固步驟示意圖。 Figure 7 is a schematic view of the navigational securing step of the present invention.

第8圖係本發明之海上拖航步驟示意圖。 Figure 8 is a schematic view of the sea towing step of the present invention.

第9圖係本發明之安裝前置步驟示意圖。 Figure 9 is a schematic view of the pre-installation steps of the present invention.

第10圖係本發明之定位安裝步驟示意圖。 Figure 10 is a schematic view showing the positioning and mounting steps of the present invention.

第11圖係本發明之浮具回收步驟示意圖。 Figure 11 is a schematic view showing the recycling step of the float of the present invention.

請參閱第1圖、第2圖、第3圖及第4圖所示,係為本發明之立體圖、油壓插梢第一位置示意圖、油壓插梢第二位置示意圖及浮具前視圖,其係揭露有一種超大型離岸風機水下基座之運輸安裝用載具,並包含有:一浮塢船10,其係具有一底座11,該底座11之二側係分別設有一側壁12,令該浮塢船10之另外二側分別形成有一第一開口13以及一第二開口14,又該底座11之頂面係於該第一開口13處設有二滑軌111,且該等滑軌111係朝該第二開口14延伸, 此外,該浮塢船更設有數個繫纜樁15,該等繫纜樁15係各設於該底座11之頂面且鄰近該底座11之周緣處,於本發明中,係具有四個該繫纜樁15,且該等繫纜樁15係分別設於該底座11之四邊角處。 Please refer to FIG. 1 , FIG. 2 , FIG. 3 and FIG. 4 , which are perspective views of the present invention, a first position diagram of the hydraulic pressure insert, a second position diagram of the hydraulic pressure insert, and a front view of the float. The utility model discloses a transportation and mounting vehicle for an underwater pedestal of a super large offshore fan, and comprises: a floating docking vessel 10 having a base 11 and a side wall 12 respectively provided on the two sides of the base 11 The first opening 13 and the second opening 14 are respectively formed on the other two sides of the floating dock 10. The top surface of the base 11 is provided with two sliding rails 111 at the first opening 13 , and the same The slide rail 111 extends toward the second opening 14 In addition, the floating dock is further provided with a plurality of bollards 15 which are respectively disposed on the top surface of the base 11 and adjacent to the periphery of the base 11. In the present invention, there are four The bollards 15 are provided, and the bollards 15 are respectively disposed at four corners of the base 11.

一浮具20,其係設於該底座11之頂面,該浮具20朝該第一開口13處係開設有一缺口21,使該浮具20概呈U字型,且該缺口21係大於該等滑軌111間的距離,又該浮具20於該缺口21二側係分別設有至少一絞車22,每一絞車22係設有一鋼索23,而該浮具20於每一絞車22處係設有可伸縮之二油壓插梢24,且該等油壓插梢24係朝該缺口21設置,此外,該浮具20底側係設有數台動態定位推進器25,該等動態定位推進器25係可伸縮,當該浮具20結合於該浮塢船10時,該等動態定位推進器25係為收起之狀態,當該浮具20脫離於該浮塢船10時,該等動態定位推進器25係為下放之狀態。 A float 20 is disposed on the top surface of the base 11. The float 20 defines a notch 21 toward the first opening 13, so that the float 20 is U-shaped, and the notch 21 is larger than The distance between the slide rails 111 and the float 20 are respectively provided with at least one winch 22 on each side of the notch 21, and each winch 22 is provided with a steel cable 23, and the float 20 is at each winch 22 The two hydraulic inserts 24 are disposed, and the hydraulic inserts 24 are disposed toward the notch 21. In addition, a plurality of dynamic positioning pushers 25 are disposed on the bottom side of the floating device 20, and the dynamic positioning is performed. The pusher 25 is retractable. When the float 20 is coupled to the floating dock 10, the dynamic positioning pushers 25 are in a stowed state. When the float 20 is disengaged from the floating dock 10, the The dynamic positioning thruster 25 is in a state of being lowered.

至少一拖船30,其係透過至少一纜繩31綁設於該浮塢船10之繫纜樁15,於本發明中,係具有一該拖船30以及二該纜繩31,該拖船30係由二該纜繩31綁設於該浮塢船10之繫纜樁15。 At least one tugboat 30 is affixed to the bollard 15 of the floating dock vessel 10 via at least one cable 31. In the present invention, there is a tugboat 30 and two such cables 31, and the tugboat 30 is composed of two The cable 31 is tied to the bollard 15 of the floating dock 10.

請再參閱第5圖所示,係為本發明之流程圖,其係揭露有一種超大型離岸風機水下基座之運輸安裝方法,並包含有下列步驟: Please refer to FIG. 5 again, which is a flow chart of the present invention, which discloses a method for transporting and installing an underwater pedestal of a super large offshore fan, and includes the following steps:

岸際裝載步驟:請配合參閱第6圖所示,將超大型 之一風機基座200由一碼頭300滑動進入該碼頭300邊停靠之浮塢船10,且該風機基座200係停放至該浮具20之缺口21處。 Shore loading steps: Please refer to Figure 6 to see the super large One of the fan bases 200 is slid into a docking vessel 10 docked by the dock 300, and the fan base 200 is parked to the notch 21 of the float 20.

航行繫固步驟:請配合參閱第7圖所示,該風機基座200係具有四支撐腳201,每一支撐腳201上各設有一繫固元件202,該繫固元件202係穿設有二定位孔203,該等油壓插梢24係外伸並插設於相對應之定位孔203,以定位該風機基座200,接續將該等絞車22下放,扣緊該等繫固元件202。 Navigation securing step: Please refer to FIG. 7 , the fan base 200 has four supporting legs 201 , and each supporting leg 201 is provided with a fastening component 202 , and the fastening component 202 is provided with two The positioning holes 203 extend outwardly and are inserted into the corresponding positioning holes 203 to position the fan base 200, and then the winches 22 are lowered to fasten the fastening elements 202.

海上拖航步驟:請配合參閱第8圖所示,透過該拖船30帶引,拖動該浮塢船10,將該風機基座200運輸至一安裝地點400。 Sea towing step: Please refer to the figure 8 to drive the floating dock 10 through the tugboat 30 to transport the fan base 200 to an installation location 400.

安裝前置步驟:請配合參閱第9圖所示,該安裝地點400係預先埋設有對應該風機基座200之水下基樁500,該浮塢船10係由該拖船30帶引於該安裝地點400進行大略定位,接著該浮塢船10進水下沉,該浮具20連同該風機基座200自然浮起,而該浮具20之動態定位推進器25下放,該浮塢船10由該拖船30帶離。 Pre-installation steps: Please refer to FIG. 9 , the installation site 400 is pre-embedded with an underwater foundation 500 corresponding to the fan base 200, and the floating dock 10 is led by the tug 30 to the installation. The location 400 is roughly positioned, and then the floating dock 10 is submerged, the float 20 is naturally floated together with the fan base 200, and the dynamic positioning pusher 25 of the float 20 is lowered, the floating dock 10 is The tugboat 30 is taken away.

定位安裝步驟:請配合參閱第10圖所示,該浮具20提供浮力及穩度,而該等動態定位推進器25協助定位,該等絞車22控制該等鋼索23沉放,該風機基座200靠重力自行下沉,且該等支撐腳201係分別與該等水下基樁500套合,該等絞車22與該等動態定位推進器25提供該風機基座200進行最後定位校調,再將該等絞車22脫鉤回收該等鋼索23。 Positioning installation step: Please refer to FIG. 10, the float 20 provides buoyancy and stability, and the dynamic positioning pushers 25 assist in positioning, the winches 22 control the cable 23 to be placed, the fan base 200 is self-sinking by gravity, and the support legs 201 are respectively engaged with the underwater piles 500, and the winches 22 and the dynamic positioning pushers 25 provide the fan base 200 for final positioning and adjustment. The winches 22 are then unhooked to recover the cables 23.

浮具回收步驟:請配合參閱第11圖所示,該浮具20駛回該浮塢船10,該浮塢船10排水並向上舉昇該浮具20,該拖船30即將該浮塢船10連同該浮具20帶回該碼頭300。 Float recycling step: Please refer to Fig. 11 to return the floating device 20 back to the floating dock vessel 10. The floating docking vessel 10 drains and lifts the floating vessel 20 upwards, and the tugboat 30 is about to float the floating docking vessel 10 Together with the float 20, the dock 300 is brought back.

為供進一步瞭解本發明之構造特徵、運用技術手段及所預期達成之功效,茲將本發明使用方法加以敘述,相信當可由此而對本發明有更深入且具體之瞭解,如下所述:請再繼續參閱第6圖所示,係為本發明之岸際裝載步驟示意圖,將該風機基座200由該碼頭300運送至該浮塢船10時,係先將該風機基座200設置於一自走式移動平台600,該自走式移動平台600係可於該碼頭300所設之滑軌301滑動,同時,該浮塢船10係停靠於該碼頭300邊,該底座11之滑軌111係與該碼頭300之滑軌301接合,使該風機基座200透過該自走式移動平台600經由該第一開口13載運滑動進入該浮塢船10,並停放至該浮具20之缺口21處,再將該風機基座200鎖定於該底座11之滑軌111。 In order to further understand the structural features of the present invention, the technical means, and the intended effects, the method of use of the present invention will be described. It is believed that the present invention can be more deeply and specifically understood as follows: Continuing to refer to FIG. 6, which is a schematic diagram of the shore loading step of the present invention, when the fan base 200 is transported from the dock 300 to the floating dock vessel 10, the fan base 200 is first set to The walk-through mobile platform 600, the self-propelled mobile platform 600 is slidable on the slide rail 301 provided by the dock 300, and the floating docker 10 is docked on the side of the dock 300, and the slide rail 111 of the base 11 is Engaging with the slide rail 301 of the dock 300, the fan base 200 is slid into the floating dock vessel 10 through the first opening 13 through the self-propelled mobile platform 600, and parked to the notch 21 of the float 20 Then, the fan base 200 is locked to the slide rail 111 of the base 11.

請再參閱第7圖及第8圖所示,係為本發明之航行繫固步驟示意圖及海上拖航步驟示意圖,該風機基座200停放於該浮具20之缺口21處時,將該等油壓插梢24外伸並插設於相對應之定位孔203,以定位該風機基座200,再將該等絞車22下放,扣緊該等繫固元件202,完成航行繫固步驟後即可透過該拖船30帶引,拖動該浮塢船10,將該風機基座200運輸至該安裝地點400。 Please refer to FIG. 7 and FIG. 8 again, which are schematic diagrams of the navigation securing steps of the present invention and a schematic diagram of the sea towing steps. When the fan base 200 is parked at the notch 21 of the floating device 20, the same The hydraulic insert 24 is extended and inserted into the corresponding positioning hole 203 to position the fan base 200, and then the winch 22 is lowered, and the securing elements 202 are fastened, and the navigation securing step is completed. The floating dock 10 can be pulled through the tugboat 30 to transport the fan base 200 to the installation site 400.

請再參閱第9圖及第10圖所示,係為本發明之安裝 前置步驟示意圖及定位安裝步驟示意圖,該安裝地點400係預先埋設有對應該風機基座200之水下基樁500,該浮塢船10係由該拖船30帶引於該安裝地點400進行大略定位,接著該浮塢船10進水下沉,該浮具20連同該水下風機200自然浮起,而該浮具20之動態定位推進器25下放,該浮塢船10由該拖船30帶離,該浮具20係提供浮力及穩度,而該等動態定位推進器25則協助定位,該等絞車22控制該等鋼索23沉放,該風機基座200靠重力自行平穩下沉,且該等支撐腳201係分別與該等水下基樁500套合,該等絞車22與該等動態定位推進器25提供該風機基座200進行最後定位校調,令該風機基座200與該等水下基樁500之結合更為精確,完成定位安裝步驟後,即可將該等絞車22脫鉤回收該等鋼索23。 Please refer to FIG. 9 and FIG. 10 again for the installation of the present invention. A schematic diagram of a pre-step and a positioning installation step. The installation site 400 is pre-embedded with an underwater foundation 500 corresponding to the fan base 200. The floating dock 10 is led by the tug 30 to the installation site 400 for generalization. Positioning, then the floating dock 10 sinks into the water, the float 20 is naturally floated together with the underwater fan 200, and the dynamic positioning pusher 25 of the float 20 is lowered, the floating dock 10 is taken by the tug 30 Offset, the float 20 provides buoyancy and stability, and the dynamic positioning pushers 25 assist in positioning, the winches 22 control the cable 23 to be placed, and the fan base 200 sinks by gravity itself, and The support legs 201 are respectively engaged with the underwater piles 500, and the winches 22 and the dynamic positioning pushers 25 provide the fan base 200 for final positioning and adjustment, so that the fan base 200 and the fan base 200 The combination of the underwater foundation piles 500 is more precise, and after the positioning and installation steps are completed, the winches 22 can be unhooked to recover the steel cables 23.

請再參閱第11圖所示,係為本發明之浮具回收步驟示意圖,該浮具20利用該等動態定位推進器25駛回該浮塢船10,該浮塢船10排水並向上舉昇該浮具20,令該浮具20置於初始位置,該拖船30即將該浮塢船10連同該浮具20帶回該碼頭300,以供下一次使用。 Please refer to FIG. 11 again, which is a schematic diagram of the recycling process of the floating device of the present invention. The floating device 20 uses the dynamic positioning thrusters 25 to drive back to the floating docking vessel 10, and the floating docking vessel 10 drains and lifts upwards. The float 20 places the float 20 in an initial position and the tug 30 brings the floating dock 10 together with the float 20 back to the dock 300 for the next use.

藉此,係藉由該浮塢船10結合該浮具20承載超大型之風機基座200,再透過該拖船30運送至該安裝地點400,更透過該浮具20之動態定位推進器25進行定位,使該風機基座200精確的裝設於該安裝地點400,其係可利用現有機具運輸安裝該風機基座200,而具有簡化安裝程序、提升作業效率以及降低作業成本之優點。 Thereby, the floating dock 20 is coupled to the float 20 to carry the ultra-large fan base 200, and then transported to the installation site 400 through the tug 30, and further through the dynamic positioning pusher 25 of the float 20. The positioning of the fan base 200 is precisely installed at the installation site 400, which can transport and install the fan base 200 by using existing tools, and has the advantages of simplifying the installation procedure, improving work efficiency, and reducing operating cost.

茲,再將本發明之特徵及其可達成之預期功效陳述如下:本發明之超大型離岸風機水下基座之運輸安裝方法及其運輸安裝用載具,係透過該浮塢船10結合該浮具20承載超大型之風機基座200,再藉由該拖船30運送至該安裝地點400,更透過該浮具20之動態定位推進器25進行定位,使該風機基座200精確的裝設於該安裝地點400,其係可利用現有機具運輸安裝該風機基座200,而具有簡化安裝程序、提升作業效率以及降低作業成本之優點。 Further, the features of the present invention and the achievable expected effects thereof are set forth as follows: The transportation installation method of the super large offshore wind turbine underwater base of the present invention and the transport mounting vehicle thereof are combined by the floating dock ship 10 The floating device 20 carries the ultra-large fan base 200, and is transported to the installation site 400 by the tug 30, and is further positioned by the dynamic positioning pusher 25 of the floating device 20, so that the fan base 200 is accurately mounted. It is provided at the installation site 400, which can transport and install the fan base 200 by using existing tools, and has the advantages of simplifying the installation procedure, improving the work efficiency, and reducing the operation cost.

綜上所述,本發明在同類產品中實有其極佳之進步實用性,同時遍查國內外關於此類結構之技術資料,文獻中亦未發現有相同的構造存在在先,是以,本發明實已具備發明專利要件,爰依法提出申請。 In summary, the present invention has excellent advancement and practicability in similar products, and at the same time, the technical materials of such structures are frequently investigated at home and abroad, and the same structure is not found in the literature. The invention already has the invention patent requirements, and the application is filed according to law.

惟,以上所述者,僅係本發明之一較佳可行實施例而已,故舉凡應用本發明說明書及申請專利範圍所為之等效結構變化,理應包含在本發明之專利範圍內。 However, the above-mentioned ones are merely preferred embodiments of the present invention, and the equivalent structural changes of the present invention and the scope of the claims are intended to be included in the scope of the present invention.

10‧‧‧浮塢船 10‧‧‧ floating dock

11‧‧‧底座 11‧‧‧Base

111‧‧‧滑軌 111‧‧‧Slide rails

12‧‧‧側壁 12‧‧‧ side wall

13‧‧‧第一開口 13‧‧‧First opening

14‧‧‧第二開口 14‧‧‧second opening

15‧‧‧繫纜樁 15‧‧‧ bollard

20‧‧‧浮具 20‧‧‧ floating gear

21‧‧‧缺口 21‧‧ ‧ gap

22‧‧‧絞車 22‧‧‧ winch

30‧‧‧拖船 30‧‧‧Tugboat

31‧‧‧纜繩 31‧‧‧ Cable

Claims (5)

一種超大型離岸風機水下基座之運輸安裝用載具,其係包含有:一浮塢船,其係具有一底座,該底座之二側係分別設有一側壁,令該浮塢船之另外二側分別形成有一第一開口以及一第二開口,又該底座之頂面係於該第一開口處設有二滑軌,且該等滑軌係朝該第二開口延伸,此外,該浮塢船更設有數個繫纜樁,該等繫纜樁係各設於該底座之頂面且鄰近該底座之周緣處;一浮具,其係設於該底座之頂面,該浮具朝該第一開口處係開設有一缺口,使該浮具概呈U字型,且該缺口係大於該等滑軌間的距離,又該浮具於該缺口二側係分別設有至少一絞車,每一絞車係設有一鋼索,另該浮具於每一絞車處係設有可伸縮之二油壓插梢,且該等油壓插梢係朝該缺口設置,此外,該浮具底側係設有數台動態定位推進器;至少一拖船,其係透過至少一纜繩綁設於該浮塢船之繫纜樁。 The utility model relates to a transport and installation vehicle for an underwater pedestal of an ultra-large offshore wind turbine, which comprises: a floating dock ship having a base, and two sides of the base are respectively provided with a side wall for the floating dock ship The other two sides are respectively formed with a first opening and a second opening. The top surface of the base is provided with two sliding rails at the first opening, and the sliding rails extend toward the second opening. The floating dock is further provided with a plurality of bollards, each of which is disposed on a top surface of the base and adjacent to a periphery of the base; a floating device is disposed on a top surface of the base, the floating device A notch is formed in the first opening, so that the floating device is U-shaped, and the notch is larger than the distance between the sliding rails, and the floating device is respectively provided with at least one winch on the two sides of the notch. Each of the winches is provided with a steel cable, and the floating device is provided with a retractable two hydraulic inserts at each of the winches, and the hydraulic inserts are disposed toward the notch, and further, the bottom side of the floating device is There are several dynamic positioning thrusters; at least one tugboat is attached to the floating dock ship through at least one cable The bollard. 依據申請專利範圍第1項所述之超大型離岸風機水下基座之運輸安裝用載具,其中,該浮具之動態定位推進器係可伸縮,當該浮具結合於該浮塢船時,該等動態定位推進器係為收起之狀態,當該浮具脫離於該浮塢船時,該等動態定位推進器係為下放之狀態。 The transport mounting vehicle for the super large offshore wind turbine underwater base according to claim 1, wherein the dynamic positioning thruster of the floating device is retractable, and when the floating device is coupled to the floating dock The dynamic positioning thrusters are in a stowed state, and when the floating gear is disengaged from the floating dock, the dynamic positioning thrusters are in a lowered state. 一種超大型離岸風機水下基座之運輸安裝方法,其係使用如申請專利範圍第1項所述之超大型離岸風機水下基座之運輸安 裝用載具進行,並包含有以下步驟:岸際裝載步驟:將超大型之一風機基座由一碼頭滑動進入該碼頭邊停靠之浮塢船,且該風機基座係停放至該浮具之缺口處;航行繫固步驟:該風機基座係具有四支撐腳,每一支撐腳上各設有一繫固元件,該等油壓插梢外伸且將該等絞車下放,扣緊該等繫固元件;海上拖航步驟:透過該拖船帶引,拖動該浮塢船,將該風機基座運輸至一安裝地點;安裝前置步驟:該安裝地點係預先埋設有對應該風機基座之水下基樁,該浮塢船係由該拖船帶引於該安裝地點進行大略定位,接著該浮塢船進水下沉,該浮具連同該風機基座自然浮起,而該浮具之動態定位推進器下放,該浮塢船由該拖船帶離;定位安裝步驟:該浮具提供浮力及穩度,而該等動態定位推進器協助定位,該等絞車控制該等鋼索沉放,該風機基座靠重力自行下沉,且該等支撐腳係分別與該等水下基樁套合,該等絞車與該等動態定位推進器提供該風機基座進行最後定位校調,再將該等絞車脫鉤回收該等鋼索;浮具回收步驟:該浮具駛回該浮塢船,該浮塢船排水並向上舉昇該浮具,該拖船即將該浮塢船連同該浮具帶回該碼頭。 The utility model relates to a transportation and installation method for an underwater pedestal of a super large offshore fan, which uses the transportation base of the underwater pedestal of the super large offshore fan as described in claim 1 of the patent application scope. The loading vehicle is carried out and includes the following steps: a shore loading step: sliding a very large one of the fan bases from a dock into a floating dock ship docked at the dock, and the fan base is parked to the floating device The gap of the navigation; the step of the navigation system: the base of the fan has four supporting legs, each of which is provided with a fastening component, and the hydraulic inserts are extended and the winches are lowered, and the fastening is fastened. Fastening component; sea towing step: through the tugboat, dragging the floating dock ship, transporting the fan base to an installation location; installation pre-step: the installation site is pre-embedded with the corresponding fan base The underwater foundation pile, the floating dock ship is led by the tug boat to the installation site for rough positioning, and then the floating dock ship sinks into the water, the floating device naturally floats together with the fan base, and the floating device The dynamic positioning thruster is lowered, the floating dock ship is taken away by the tug; the positioning installation step: the floating gear provides buoyancy and stability, and the dynamic positioning thrusters assist positioning, the winches control the cable sinking, The fan base sinks by gravity And the support legs are respectively engaged with the underwater piles, the winches and the dynamic positioning thrusters provide the fan base for final positioning and adjustment, and then the winches are unhooked to recover the cables; Recycling step: The floater drives back to the floating dock vessel, which drains and lifts the float, which tug the boat is brought back to the dock along with the float. 依據申請專利範圍第3項所述之超大型離岸風機水下基座之運輸安裝方法,其中,於該岸際裝載步驟,該風機基座設置於一自走式移動平台,該自走式移動平台係可於該碼頭所設之滑軌 滑動,同時,該浮塢船係停靠於該碼頭邊,該底座之滑軌係與該碼頭之滑軌接合,使該風機基座透過該自走式移動平台經由該第一開口載運滑動進入該浮塢船。 The method for transporting and installing an ultra-large offshore wind turbine underwater base according to claim 3, wherein in the shore loading step, the fan base is disposed on a self-propelled mobile platform, the self-propelled The mobile platform is a rail that can be set up at the terminal. Sliding, at the same time, the floating dock ship is docked at the side of the dock, the sliding rail of the base is engaged with the sliding rail of the dock, so that the fan base is slid through the first opening through the self-propelled mobile platform. Floating dock boat. 依據申請專利範圍第3項所述之超大型離岸風機水下基座之運輸安裝方法,其中,於該航行繫固步驟,該風機基座之繫固元件係穿設有二定位孔,該等油壓插梢係可插設於相對應之定位孔,以定位該風機基座。 The method for transporting and installing the super large offshore wind turbine underwater base according to the third aspect of the patent application, wherein in the navigation securing step, the fastening component of the fan base is provided with two positioning holes, The hydraulic insert can be inserted into the corresponding positioning hole to position the fan base.
TW104143406A 2015-12-23 2015-12-23 Method for installing and transporting a large offshore wind turbine submersible pedestal and its transport and installation vehicle TWI593879B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW104143406A TWI593879B (en) 2015-12-23 2015-12-23 Method for installing and transporting a large offshore wind turbine submersible pedestal and its transport and installation vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW104143406A TWI593879B (en) 2015-12-23 2015-12-23 Method for installing and transporting a large offshore wind turbine submersible pedestal and its transport and installation vehicle

Publications (2)

Publication Number Publication Date
TW201723312A true TW201723312A (en) 2017-07-01
TWI593879B TWI593879B (en) 2017-08-01

Family

ID=60047164

Family Applications (1)

Application Number Title Priority Date Filing Date
TW104143406A TWI593879B (en) 2015-12-23 2015-12-23 Method for installing and transporting a large offshore wind turbine submersible pedestal and its transport and installation vehicle

Country Status (1)

Country Link
TW (1) TWI593879B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI691647B (en) * 2018-12-24 2020-04-21 財團法人船舶暨海洋產業研發中心 Equipment and method for controlling simultaneous release and posture adjustment and securing release of underwater base

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2932771B1 (en) * 2008-06-20 2010-06-04 Technip France STRUCTURE FOR TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WIND TURBINE OR HYDROLIENNE AND METHODS OF TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WINDMILL OR HYDROLIENNE.
TW201202547A (en) * 2010-07-09 2012-01-16 Wen-Yun Chen An offshore wind power generator and base thereof
JP5555272B2 (en) * 2012-02-21 2014-07-23 第一建設機工株式会社 Construction method for offshore wind power generation facilities
TWI512192B (en) * 2012-08-22 2015-12-11 Ship And Ocean Ind R&D Ct Offshore installation of wind turbines

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI691647B (en) * 2018-12-24 2020-04-21 財團法人船舶暨海洋產業研發中心 Equipment and method for controlling simultaneous release and posture adjustment and securing release of underwater base

Also Published As

Publication number Publication date
TWI593879B (en) 2017-08-01

Similar Documents

Publication Publication Date Title
KR101407427B1 (en) Marine Pile Installing Apparatus and Installing Method Using It
US10919606B2 (en) Seabed base structure and method for installation of same
CN101837929B (en) Operation method for lifting fan for barge in shoal area
CN104727336A (en) Construction method of large single-pipe pile foundation of shallow-sea wind power plant
KR101667042B1 (en) Integrated Device offshore wind turbine installation
CN108626078B (en) Auxiliary transportation and erection process for offshore wind turbine Spar type floating foundation barge
CA2916763A1 (en) Platform for tidal turbines
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
JP2012107585A (en) Ship for installing offshore wind turbines and method for installing offshore wind turbines using the same
CN103074878A (en) Construction method for artificial island platform
CN103119222A (en) Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
TWI593879B (en) Method for installing and transporting a large offshore wind turbine submersible pedestal and its transport and installation vehicle
CN106976526B (en) The transportation installation method and transport installation carrier of the underwater pedestal of ultra-large type offshore blower
US8181589B2 (en) Gravity anchor
KR101724593B1 (en) Construction method for marine wind generator using exclusive barge ship
CN203064175U (en) Artificial island platform
KR101297669B1 (en) Installation method using vessel for installing sea wind power generator
JP2014227765A (en) Installation method for ocean wind power generation facility, and barge for ocean wind power generation facility
AU2010250147B2 (en) Method for installing a topside module on an offshore support structure
KR101510864B1 (en) Offshore wind power generator installation method and floating dock used at this
GB2460547A (en) Marine transportation pontoon
TWM521669U (en) Transportation and installation vehicle for underwater base of very large scale offshore wind turbine
GB2580079A (en) Common docking platform for assembly and transportation of underwater base.
Crowle et al. Installation Innovation for floating offshore wind
TWI691646B (en) Common undertaking platform for underwater base assembly and transportation