TW201313989A - Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof - Google Patents

Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof Download PDF

Info

Publication number
TW201313989A
TW201313989A TW100133669A TW100133669A TW201313989A TW 201313989 A TW201313989 A TW 201313989A TW 100133669 A TW100133669 A TW 100133669A TW 100133669 A TW100133669 A TW 100133669A TW 201313989 A TW201313989 A TW 201313989A
Authority
TW
Taiwan
Prior art keywords
layer
permeable
aggregate
water
gravel
Prior art date
Application number
TW100133669A
Other languages
Chinese (zh)
Inventor
zhong-wei Ji
Original Assignee
zhong-wei Ji
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by zhong-wei Ji filed Critical zhong-wei Ji
Priority to TW100133669A priority Critical patent/TW201313989A/en
Publication of TW201313989A publication Critical patent/TW201313989A/en

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention discloses a green environmental protection permeable and breathable artificial athletic ground and a construction method of curing permeable support layer thereof wherein the curing permeable support layer is paved on the top of artificial athletic ground, and the top of curing permeable support layer can be integrated with the permeable layer of artificial athletic ground. The curing permeable support layer utilizes recycled and/or recyclable gravel, clean gravel or sand partially or entirely wetted by spraying water. Then bonding agent is sprayed and blended to form a plurality of pores on the curing permeable support layer for allowing water seeping to discharge outside. In contrast, the internal accumulated moisture can be discharged to the outside on sunny days after the raining days. This invention utilizes recycled or recyclable bone material sprayed with onsite mixture of construction bonding agent, thereby achieving prevention of wasting energy along with the effects of cost down and carbon reduction.

Description

一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法Green building environmentally permeable, exhaust artificial sports field and construction method thereof supporting curing permeable layer

本發明係提供一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法。The invention provides a green building environment-permeable, ventilated artificial sports field and a construction method for supporting the cured water-permeable layer.

目前人工運動場、球場、跑道基礎面層,幾乎皆為瀝青混凝土或鋼筋混凝土地面,而所謂的人工運動場即係以PU或合成橡膠或塑膠人工草製成的原料、橡膠顆粒面層、壓克力面層、塑膠人工草面層,鋪設於預定作為運動場、球場、跑道的區域其原有的瀝青混凝土或是鋼筋混凝土地面,其缺點為,當人工運動場所在泡水、淹水後,所有跑道及其面層在淹水退後因泡水過久,又受日照幅射升溫,致使內部水氣無法排出,而使人工運動場所面層突起或皺折而呈波浪狀無法使用,必須拆除重新施作所費不貲,究其原因乃是該人工運動場所,無法向下排水及向上排氣(水氣),即無法呼吸之故也。At present, artificial sports grounds, stadiums, and runway foundation layers are almost all asphalt concrete or reinforced concrete floors, and the so-called artificial sports fields are raw materials made of PU or synthetic rubber or plastic artificial grass, rubber particle surface layer, acrylic. The surface layer and the plastic artificial grass surface layer are laid on the original asphalt concrete or reinforced concrete floor in the area designated as the sports field, stadium and runway. The disadvantage is that when the artificial sports place is in the water, after flooding, all the runways and The surface layer is soaked in water for a long time, and it is heated by the sun radiation, so that the internal water vapor cannot be discharged, and the surface of the artificial sports place is raised or wrinkled and is wavy. It must be removed and reapplied. The reason for this is that the artificial sports place cannot be drained and vented upwards (water vapor), that is, it cannot be breathed.

目前所知的人工運動場、球場跑道結構大致相同,而係概分為具有一原土壤層、一級配層、一瀝青混凝土層AC(或一RC混凝土層)以及上側之人工運動場面層,其主要之施工方法大致如下:The artificial sports field and the stadium track structure are generally the same, and the system is divided into an original soil layer, a first layer, an asphalt concrete layer AC (or a RC concrete layer) and an artificial sports scene layer on the upper side. The construction method is as follows:

(1)原土壤層:先將原有土壤層(路基、路床)依設計之高程整平,再以滾壓機夯實至壓密度壓為95%以上;(1) Original soil layer: firstly level the original soil layer (subgrade, road bed) according to the design elevation, and then compact it to a pressure density of 95% or more with a roller press;

(2)鋪設級配層:再將砂質碎石級配或山土質碎石級配(基層),依設計厚度,鋪設於原土壤層上面整平,同樣再以滾壓機夯實至壓密度壓為95%以上;(2) Laying the graded layer: the sand gravel grade or the mountain soil gravel grade (base layer) shall be laid flat on the original soil layer according to the design thickness, and then compacted to the pressure density by a roller press. The pressure is above 95%;

(3)混凝土層,大致有二種:(3) Concrete layers, roughly two types:

(3-A)瀝青混凝土層:於該碎石級配層上,先行灑一層乳化瀝青底油,接著用鋪裝機第一次將粗粒料瀝青混凝土鋪於該底油上,然後於該粗粒料瀝青混凝土上灑瀝青黏層,再用鋪裝機第二次將細粒料瀝青混凝土鋪於該粗粒料瀝青混凝土上,並進行整平與夯實至壓密度為95%以上;(3-A) Asphalt concrete layer: on the gravel grade layer, a layer of emulsified asphalt base oil is sprayed first, and then the coarse aggregate asphalt concrete is firstly laid on the base oil by a paving machine, and then the coarse layer is Sprinkle the asphalt adhesive layer on the granular asphalt concrete, and then use the paving machine to lay the fine granular asphalt concrete on the coarse aggregate asphalt concrete for the second time, and leveling and compacting to a pressure density of 95% or more;

(3-B)鋼筋混凝土層:某些地區因無法以瀝青混凝土鋪設,則只好以鋼筋混凝土層代替;其先以防潮塑膠布鋪設於碎石級配層上,再用鋼筋混凝土依設計高程及坡度鋪築於該防潮塑膠布上;(3-B) Reinforced concrete layer: In some areas, because it can not be laid with asphalt concrete, it has to be replaced by reinforced concrete layer; it is first laid on the gravel-grade layer with moisture-proof plastic cloth, and then the reinforced concrete is designed with elevation and The slope is laid on the moisture-proof plastic cloth;

(4) 人工運動場面層,因為採用的材料不同而可分成五種:(4) The artificial motion scene layer can be divided into five types because of the different materials used:

(4-A)PP塑膠人工草面層:以PP塑膠製成之塑膠人工草,用膠粘著於前述之混凝土層上,再以玻璃砂(矽砂)填補於塑膠人工草縫隙間;(4-A) PP plastic artificial grass surface layer: plastic artificial grass made of PP plastic, glued to the above concrete layer, and then filled with glass sand (sand sand) in the gap between plastic artificial grass;

(4-B)合成橡膠面層:用天然橡膠與其它材料合成一整捲之合成橡膠彈性面層,用膠粘著於前述之混凝土層上;(4-B) Synthetic rubber surface layer: a full-volume synthetic rubber elastic surface layer is synthesized with natural rubber and other materials, and is adhered to the aforementioned concrete layer;

(4-C) PU面層:用液態狀PU材料(或拌合顆粒狀PU材)分層施作於前述之混凝土層上,最頂層再以顆粒狀PU材鋪設之;(4-C) PU surface layer: layered on the concrete layer with liquid PU material (or mixed granular PU material), and the top layer is laid with granular PU material;

(4-D)橡膠顆粒面層:以顆粒狀PU材或橡膠顆粒材加膠水拌合鋪設於前述之混凝土層上,最頂層以其它材料整平及止滑;(4-D) rubber particle surface layer: the granular PU material or rubber particle material and glue water are mixed and laid on the concrete layer, and the top layer is leveled and slipped with other materials;

(4-E)壓克力面層:係以壓克力漆與其它材料合成後塗著於前述之混凝土層上;(4-E) Acrylic finish: Synthesized with acrylic paint and other materials, coated on the concrete layer;

所述(1)原土壤層之單元,如果人工跑道下方是一地下建築物,該地下建築物屋頂上方具有一混凝土層無法透水,因此,亦需要其他之工法來解決。The unit of the (1) raw soil layer, if there is an underground building under the artificial runway, a concrete layer above the roof of the underground building is impervious to water, and therefore, other methods are needed to solve the problem.

以上所述之所有習用人工運動場、球場跑道,並具有下列之缺點:All of the above-mentioned conventional artificial sports fields and course tracks have the following disadvantages:

一、習用人工運動場、球場跑道的瀝青混凝土層或鋼筋混凝土層,配合不透水之人工運動場材料,致使內部水氣無法排出,而使人工運動場所面層突起或皺折而呈波浪狀無法使用,除了耗能而且不具減碳效用外,雨水無法透過含有柏油之瀝青混凝土層而滲回地下,且瀝青材料具污染,不符合環保概念;1. The artificial concrete field, the asphalt concrete layer or the reinforced concrete layer of the stadium track, combined with the impervious artificial sports field material, can cause the internal water vapor to be discharged, and the surface of the artificial sports place is raised or wrinkled and is wavy and cannot be used. In addition to energy consumption and no carbon reduction effect, rainwater cannot penetrate into the ground through the asphalt concrete layer containing tar, and the asphalt material is polluted and does not conform to the concept of environmental protection;

二、上述瀝青混凝土為基礎面層甚為不良,因近年地球表面地表溫度上升,致使氣候異常,夏天溫度比往年皆高,致使基礎面層,因高溫吸熱,再加上地表之溫室效應,致使基礎面層之表層溫度高達攝氏50-60度,致使瀝青表面因高溫而軟化,進而造成與運動場跑道、球場,上層之彈性面層無法緊密接著,因雙方材質的熱漲冷縮比例不同,因而造成脫層缺點。Second, the above-mentioned asphalt concrete is very poor in the base surface layer. Due to the rising surface temperature of the earth surface in recent years, the climate is abnormal, and the summer temperature is higher than in previous years, resulting in the base surface layer, due to the high temperature endothermic, coupled with the greenhouse effect of the surface, resulting in The surface temperature of the base surface layer is as high as 50-60 degrees Celsius, which causes the surface of the asphalt to soften due to high temperature, which in turn causes the elastic surface layer of the sports field track, the stadium and the upper layer to be in close contact with each other. Causes delamination defects.

三、又由於一般運動場、跑道、球場,所占面積皆很大,且使用基礎面層之材料數量,其需求量亦很大,故所有人工運動場之基礎面層,幾乎皆採用預拌式(即在工廠生產完成,至工地鋪設而已)。如果採用在工場預拌,以預拌車載至工地鋪設,其缺點為鋪設及平整時,水泥漿會因流動或平整搗實、震動時而下沉,其水泥漿會在支撐固化透水層下側與原土壤層或原碎石級配層之間,自然形成致使一片水泥漿薄層,致使運動場無法在下雨時,能夠向下排水及向上排氣(水氣),即無法呼吸,而且材料與能源之耗費亦高,同樣未達減碳節能之標準。Third, because the general sports grounds, runways, and golf courses occupy a large area, and the amount of materials used in the base surface layer is also large, the basic surface layers of all artificial sports fields are almost always pre-mixed ( That is, the production is completed at the factory, and it is laid at the construction site.) If it is premixed in the workshop, it will be laid in the pre-mixed vehicle to the construction site. The disadvantage is that when laying and leveling, the cement slurry will sink due to the flow or smoothing and shaking, and the cement slurry will be under the support curing layer. Between the original soil layer or the original gravel graded layer, the natural formation of a thin layer of cement slurry, so that the playground can not drain and upward exhaust (water vapor) when it is raining, that is, unable to breathe, and the material and Energy consumption is also high, and it does not meet the standards for carbon reduction and energy conservation.

四、另如場拌施工,只噴灑一黏著漿劑12於夯實回收及可回收石礫或清碎石或砂粒之上側,會因黏著漿劑12與拌合材料其物性之故,石礫之上側可黏著,但下側卻無法使黏著漿劑12附著,造成支撐固化透水層因內部骨材間之接觸未能有黏著漿劑12,而握裹不勻,致使黏著不實及強度不足之缺點,且乾燥之骨材會吸收黏著漿劑12之水份,而提早凝結影響工作度。4. Another field mixing construction, only spraying a sticky slurry 12 on the top of the rammed recovery and recoverable gravel or clear gravel or sand, will be due to the physical properties of the adhesive slurry 12 and the mixing material, the gravel The upper side can be adhered, but the lower side can not make the adhesive slurry 12 adhere, resulting in the support curing the water-permeable layer due to the contact between the internal aggregates, the adhesive slurry 12 is not adhered, and the grip is uneven, resulting in poor adhesion and insufficient strength. Disadvantages, and the dry aggregate absorbs the moisture of the adhesive slurry 12, and early condensation affects the degree of work.

五、而前述預拌之過程須將骨材及黏劑運至預拌廠,經預拌後再運至工地鋪設,其預拌車之多次運輸行程造成施工成本增加,以及由預拌廠至施工場所,會因時間、距離而影響混凝土初凝之品質及其結構強度,且施工工作度,亦會造成不便。5. In the process of pre-mixing, the aggregate and the adhesive shall be transported to the pre-mixing plant, and then pre-mixed and transported to the construction site. The multiple transportation journey of the pre-mixed vehicle causes the construction cost to increase, and the pre-mixing plant To the construction site, the quality of the initial setting of the concrete and its structural strength will be affected by the time and distance, and the construction work will also cause inconvenience.

本發明之一目的即在於改善習用人工運動場瀝青混凝土及鋼筋混凝土不透水缺憾,本方法具增加人工運動場透水及排氣功能及水土保持。One of the objects of the present invention is to improve the imperviousness of the conventional artificial sports field asphalt concrete and reinforced concrete. The method has the functions of increasing the permeable and exhausting functions of the artificial sports field and soil and water conservation.

本發明之一目的係在於提供一種綠建築環保透水、排氣人工運動場支撐固化透水層施工方法,可節省施工成本,及利用回收及可回收材料再利用,避免能源之耗費,具減碳與節能功效者,並且不會造成環境污染,符合環保概念者。One object of the present invention is to provide a green building environmentally-permeable and ventilated artificial sports field supporting a solidified permeable layer construction method, which can save construction cost, and utilize recycling and recyclable materials for reuse, avoid energy consumption, reduce carbon and energy saving. Efficient, and will not cause environmental pollution, in line with environmental protection concepts.

本發明之一目的在於提供一種綠建築環保透水、排氣人工運動場支撐固化透水層施工方法,具有快速導引巨大之暴雨、淹水至一排水系統或原土壤層。An object of the present invention is to provide a green building environment-permeable, ventilated artificial sports field supporting a solidified permeable layer construction method, which has a rapid guidance of heavy rain, flooding to a drainage system or a raw soil layer.

為達成上述發明目的,本發明施工方法,利用場拌技術概念下,噴灑水份在骨材表面,並讓骨材吸收水份,再噴灑黏著漿劑於該具有表面水分子之骨材上側拌合,該骨材不會吸收黏著漿劑之水份,可形成優良的工作度及緩凝功能,而骨材下側部份預留一黏著漿劑流動空間,避免黏著漿劑漿泥下沉在支撐固化透水層骨材下側與原土壤層或原碎石級配層之間,因此不會滯積形成一層黏著漿劑之薄層,避免影響支撐固化透水層透水、排氣功能。In order to achieve the above object, the construction method of the present invention uses the field mixing technology concept to spray water on the surface of the aggregate, and allows the aggregate to absorb water, and then spray the adhesive slurry on the upper side of the aggregate having surface water molecules. In combination, the aggregate does not absorb the moisture of the adhesive slurry, and can form an excellent working degree and retarding function, and an adhesive slurry flow space is reserved in the lower part of the aggregate to avoid the sinking of the slurry slurry. Between the underside of the aggregate of the solidified permeable layer and the original soil layer or the original gravel grading layer, the thin layer of the adhesive slurry is not stagnated to avoid affecting the water permeable and venting functions of the supported solidified permeable layer.

而本工法除了採用環保骨材,完成該支撐固化透水層為一種新而有用的基礎面層,同時解決習用基礎面層,所無法克服之工序。In addition to the use of environmentally friendly aggregates, this method of construction completes the support of the solidified permeable layer as a new and useful base surface layer, while at the same time solving the process of using the basic surface layer, which cannot be overcome.

本發明之一種綠建築環保透水、排氣人工運動場支撐固化透水層施工方法,係將該支撐固化透水層鋪設於一經夯實之地上層上側,該方法包括:The invention relates to a green building environmentally-permeable and permeable artificial sports field supporting a solidified water-permeable layer construction method, which is to lay the support cured water-permeable layer on the upper side of the upper layer of the tamping ground, the method comprising:

(A)鋪設骨材於一地上層;(A) laying the aggregate on top of a ground;

(B)將該骨材噴水,讓水分子濕潤該骨材用以延緩黏著漿劑固化,以利施工;(B) spraying the aggregate material, allowing the water molecules to wet the aggregate material to delay the curing of the adhesive slurry for the purpose of construction;

(C)噴黏著漿劑於該骨材;(C) spraying the slurry on the aggregate;

(D)將所述骨材與黏著漿劑於地上層拌合,用以該黏著漿劑結合水分子均勻附著於骨材表面;(D) mixing the aggregate with the adhesive slurry in the ground layer for uniformly adhering the water molecules to the surface of the aggregate;

(E)將上述經拌合之骨材夯平;(E) flattening the above-mentioned mixed bone material;

藉此,該黏著漿劑乾燥後,骨材搭接處結合凝固,該骨材間剩餘之孔隙可以透水、排氣,而完成該支撐支撐固化透水層。Thereby, after the adhesive slurry is dried, the aggregate overlap is solidified, and the remaining pores between the aggregates can be permeable to water and exhaust, and the support is supported to cure the water-permeable layer.

所述支撐固化透水層上側,可用以結合一人工運動場之透水表面層,以完成一綠建築環保透水、排氣人工運動場。The support solidifies the upper side of the water permeable layer, and can be used to combine the permeable surface layer of an artificial sports field to complete a green building environmentally permeable and exhaust artificial sports field.

所述骨材包含回收及可回收骨材、清碎石或砂粒,該回收骨材例如無毒性廢料石礫、回收混凝土石礫。The aggregate comprises recycled and recyclable aggregates, grit or grit, such as non-toxic waste gravel, recycled concrete gravel.

較佳者,該方法(A)、(B)、(C)其施作方式可以選擇一次或經多次重複鋪設,及對應配合一次或多次噴灑該黏著漿劑12於該骨材之局部或全部,以一層或由多層重覆結構完成支撐固化透水層。Preferably, the method (A), (B), (C) can be applied once or repeatedly, and the adhesive slurry 12 is sprayed on the part of the aggregate one or more times. Or all, the support curing the water permeable layer is completed in one layer or by a multi-layered repetitive structure.

較佳者,所述施工方法(D)其中拌合係噴漿後用機械扒子或人工將碎石上下翻動,以利黏著漿劑均勻附著塗佈於碎石上;Preferably, the construction method (D) wherein the mixing system is sprayed with mechanical tweezers or artificially turning the crushed stone up and down, so that the adhesive slurry is uniformly attached and applied to the crushed stone;

較佳者,所述施工方法(E)其中夯平係用整平尺將不平整之地面平整,然後用鋼板或滾壓器材夯平。Preferably, in the construction method (E), the flattening system flattens the uneven ground with a leveling ruler, and then flattens it with a steel plate or a rolling equipment.

該支撐固化透水層所使用之黏著漿劑包含水泥漿、水泥砂漿、多孔隙混凝土、水泥漿及樹脂之混合物、水泥漿及樹脂及海菜粉之混合物、水泥砂漿及樹脂之混合物、水泥砂漿及樹脂及海菜粉之混合物、水泥漿及海菜粉之混合物、水泥砂漿及海菜粉之混合物、聚胺酯樹脂(POLYURETHANE)、溶化之壓克力漿或熱熔瀝青之任一種,用以對多數回收及可回收石礫或清碎石或砂粒搭接處結合凝固,該石礫或清碎石或砂粒間剩餘之孔係可以排水,且成本低廉。The adhesive slurry used for supporting the cured water-permeable layer comprises cement slurry, cement mortar, porous concrete, a mixture of cement slurry and resin, a mixture of cement slurry and resin and seaweed powder, a mixture of cement mortar and resin, cement mortar and resin. Mixture of seaweed powder, mixture of cement slurry and seaweed powder, mixture of cement mortar and seaweed powder, POLYURETHANE, melted acrylic or hot melt asphalt for recovery and recyclability The gravel or gravel or sand lap joint combines to solidify, and the remaining pores between the gravel or the gravel or the sand can be drained and the cost is low.

較佳者,該地上層上方更鋪設以砂質或山土質碎石級配、或清碎石依設計厚度整平、並夯實至具預定壓密度標準之一透水之碎石級配層或清碎石層,該碎石級配層或清碎石層上側結合該支撐固化透水層。Preferably, the upper layer of the ground is further laid with a sand or mountain soil gravel grade, or the clear gravel is leveled according to the design thickness, and is compacted to a gravel graded layer with a predetermined pressure density standard or clear. The gravel layer, the upper side of the gravel grade layer or the clear gravel layer is bonded to the support curing water permeable layer.

本發明進一步於該土壤層或支撐固化透水層、碎石級配層,結合有至少一透排水管或盲管,用以快速導引巨大之暴雨、淹水至一排水系統或原土壤層。The invention further integrates at least one permeable drain pipe or blind pipe in the soil layer or the support curing permeable layer and the gravel grading layer to quickly guide the huge rainstorm, flooding to a drainage system or the original soil layer.

所述之地上層包含原土壤層或碎石濾水層或紅磚粉層或碎石濾水層與原土壤層組合之任一種,因為當人工跑道下方是一地下建築物,該地下建築物屋頂上方具有一混凝土層無法透水,因此,本發明將該地上層一般所採用之原土壤層利用一碎石濾水層鋪設所取代,將該碎石濾水層鋪設於地下建築物上方之混凝土層上側。並埋設所述之透排水管或盲管至該碎石濾水層內部或該原土壤層或級配層內部(例如支撐固化透水層、碎石級配層),將人工運動場之積水藉由該透排水管引流至一原土壤層或一外部排水系統,以解決建築物上方人工運動場無法排水之問題。The above ground layer comprises any one of a raw soil layer or a gravel water filter layer or a red brick powder layer or a crushed stone water layer and a raw soil layer, because when the artificial runway is an underground building, the underground building The concrete layer above the roof is impervious to water. Therefore, the present invention replaces the original soil layer generally used in the upper layer with a gravel water layer, and the gravel water layer is laid on the concrete above the underground building. Upper side of the layer. And embedding the permeable drain pipe or the blind pipe to the inside of the gravel drainage layer or the original soil layer or the gradation layer (for example, supporting a solidified permeable layer, a gravel gradation layer), and the accumulated water of the artificial sports field is used for The permeable drain pipe is drained to an original soil layer or an external drainage system to solve the problem that the artificial sports field above the building cannot be drained.

藉此,本發明與習用比較,具有良好透水、排氣之功效,可以將暴雨、淹水迅速導引致原土壤層或其他排水系統,其利用回收的石礫予以再利用,可節省材料與施工成本及避免能源之耗費,具減碳與節能功效者,提供使用者舒適之運動跑道、球場,並且不會造成環境污染,因可吸水及排氣,故地坪不會造成輻射反射加溫作用,可減低運動場所或學校室外溫度,符合環保概念者。Thereby, compared with the conventional application, the invention has the effects of good water permeability and exhausting, and can quickly guide the rainstorm and flooding to the original soil layer or other drainage system, and reuse the recovered gravel to save materials and materials. Construction cost and energy consumption avoidance, with carbon reduction and energy saving effect, provide users with comfortable sports track and stadium, and will not cause environmental pollution. Because it can absorb water and exhaust, the floor will not cause radiation reflection and heating. It can reduce the temperature of sports places or schools, and is in line with environmental protection concepts.

請參閱第1至4圖所示,本發明提供一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,之一實施例係於預定要鋪設本發明之人工運動場之地上層上側,依照本發明之方法製作形成,所述之人工運動場例如一般運動場、球場、跑道等:Referring to Figures 1 to 4, the present invention provides a green building environmentally-permeable, ventilated artificial sports field and a method for supporting the same, and an embodiment of the method for constructing a cured water-permeable layer, one embodiment of which is to be placed on the upper side of the ground where the artificial sports field of the present invention is to be laid. Manufactured according to the method of the present invention, such as a general sports field, a stadium, a runway, etc.:

本發明之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,係將該支撐固化透水層11鋪設於一經夯實之地上層1上側,本發明施工方法包括:The green building environmentally-permeable, ventilated artificial sports field and the supporting solidified water-permeable layer construction method thereof are disposed on the upper side of the upper layer 1 of the tamping ground, and the construction method of the present invention comprises:

(A)鋪設骨材110於一地上層1;(A) laying the aggregate 110 on an upper layer 1;

(B)將該骨材110噴水,讓水分子濕潤該骨材110用以延緩黏著漿劑12固化,以利施工;(B) spraying the aggregate 110 with water, allowing the water molecules to wet the aggregate 110 for delaying the curing of the adhesive slurry 12 to facilitate construction;

(C)噴黏著漿劑12於該骨材110;(C) spraying the slurry 12 on the aggregate 110;

(D)將所述骨材110與黏著漿劑12於地上層拌合,用以該黏著漿劑12結合水分子均勻附著於骨材110表面;(D) mixing the aggregate 110 and the adhesive slurry 12 in the ground layer for uniformly bonding the water molecules to the surface of the aggregate 110;

(E)將上述經拌合之骨材110夯平;(E) flattening the above-mentioned mixed aggregate 110;

藉此,該黏著漿劑12乾燥後,骨材110搭接處結合凝固,該骨材110間剩餘之孔隙171可以透水、排氣,而完成該支撐固化透水層11。Thereby, after the adhesive slurry 12 is dried, the aggregates of the aggregates 110 are bonded and solidified, and the remaining pores 171 between the aggregates 110 can be permeable to water and exhaust, and the support is cured to the water-permeable layer 11.

所述支撐固化透水層11上側,用以結合一人工運動場之透水面層,以完成一綠建築環保透水、排氣人工運動場。The support solidifies the upper side of the water-permeable layer 11 for combining the permeable surface layer of an artificial sports field to complete an environmentally-permeable and ventilated artificial sports field of a green building.

所述骨材110受水分子濕潤並吸收水份,骨材表面並包覆成一水膜,藉以該黏著漿劑12噴灑在該具水分子之骨材110表面攪拌而融合,該骨材不會吸收黏著漿劑12之水份,除了增加骨材施作之良好工作度,該水分子同時讓該黏著漿劑12緩凝,讓工程施作時間充裕,克服習式預拌施工方法受限於時間短暫,於運輸過程骨材暨黏著漿劑12已產生初凝,工作度不佳,且造成人工運動場支撐固化透水層之強度降低。The aggregate 110 is wetted by water molecules and absorbs water, and the surface of the aggregate is coated with a water film, whereby the adhesive slurry 12 is sprayed on the surface of the aggregate 110 having water molecules to be stirred and fused, and the aggregate does not Absorbing the moisture of the adhesive slurry 12, in addition to increasing the good working degree of the bone material, the water molecules simultaneously allow the adhesive slurry 12 to be retarded, so that the engineering application time is sufficient, and the over-premixed construction method is limited by the conventional method. The time is short. During the transportation process, the aggregate and the adhesive slurry 12 have been initially set, the working degree is not good, and the strength of the artificial sports field supporting the cured water-permeable layer is lowered.

於本實施例該黏著漿劑12噴灑於該骨材110上層部份,該骨材110中層及下層部份留一高度空間讓黏著漿劑12下沉時流止;或將該黏著漿劑12噴灑於該骨材110上層及中層部份,該骨材110下層部份留一高度空間讓黏著漿劑12下沉時流止,藉以避免黏著漿劑12流竄至地上層1及支撐固化透水層11之間形成黏著漿劑12薄層,而影響該支撐固化透水層11透水、排氣之功能,藉此克服習用水泥漿或其他習用黏著漿劑12在地上層1及骨材之間滯留所形成之薄層,致使人工運動場無法透水、排氣。In the embodiment, the adhesive slurry 12 is sprayed on the upper portion of the aggregate 110, and the middle layer and the lower portion of the aggregate 110 leave a height space for the adhesive slurry 12 to sink when it sinks; or the adhesive slurry 12 is sprayed. In the upper layer and the middle portion of the aggregate 110, a lower space of the lower portion of the aggregate 110 leaves a space for the adhesive slurry 12 to sink when it is allowed to sink, so as to prevent the adhesive slurry 12 from flowing to the upper layer 1 and supporting the cured water-permeable layer 11 A thin layer of the adhesive slurry 12 is formed to affect the function of the water-permeable and venting of the support curing water-permeable layer 11, thereby overcoming the formation of the conventional cement slurry or other conventional adhesive slurry 12 between the ground layer 1 and the aggregate. The thin layer makes the artificial sports field unable to pass through and exhaust.

在本實施例,該黏著漿劑12可以調整坍度至可以施工之工作度,但該坍度之黏著漿劑12不易流動,利用配合空氣幫浦將其噴灑應用於上述之施作方式,其噴灑於骨材上更可避免黏著漿劑12往下流竄在地上層1與骨材之間,因此不會形成一層黏著漿劑12薄層,其所完成之人工運動場及其支撐固化透水層具有優良透水、排氣功效。In this embodiment, the adhesive slurry 12 can adjust the twist to the workability of the construction, but the adhesive slurry 12 of the twist is not easy to flow, and the spray is applied to the above-mentioned application mode by using the air pump. Spraying on the aggregate can prevent the adhesive slurry 12 from flowing down between the upper layer 1 and the aggregate, so that a thin layer of the adhesive slurry 12 is not formed, and the artificial sports field and the supporting curing transparent layer thereof have Excellent water and exhaust.

在本實施例,所述施工方法(D)其中拌合係噴漿後用機械扒子或人工將骨材上下翻動,以利黏著漿劑12或水泥漿均勻附著塗佈於骨材上;In this embodiment, the construction method (D) wherein the mixing machine is sprayed with mechanical tweezers or artificially turning the aggregate up and down to facilitate adhesion of the slurry 12 or the cement slurry to the aggregate;

在本實施例,所述施工方法(E)其中夯平係用整平尺將不平整之地面平整,然後用鋼板或滾壓器材夯平。In the present embodiment, the construction method (E) in which the flattening system flattens the uneven ground with a flattening ruler, and then flattened with a steel plate or a rolling equipment.

藉此,本發明與習用比較,具有良好透水、排氣之功效,可以將暴雨、淹水迅速導引致原土壤層或其他排水系統,其利用回收及可回收的石礫予以再利用,可節省材料與施工成本及避免能源之耗費,具減碳與節能功效者,提供使用者舒適之運動跑道、球場,並且不會造成環境污染,可減低運動場所或學校室外溫度,符合環保概念者。Thereby, compared with the conventional application, the invention has the effects of good water permeability and exhausting, and can quickly guide the rainstorm and flooding to the original soil layer or other drainage system, and reuse the recovered and recyclable gravel. It saves materials and construction costs and avoids the consumption of energy. It has carbon reduction and energy saving effects. It provides users with comfortable sports track and stadium, and it will not cause environmental pollution. It can reduce the temperature of sports places or schools and meet the concept of environmental protection.

較佳者,同時依該人工運動場支撐固化透水層11排水方向,施作洩水坡度(圖中未示)用以增加積水之排洩速度。Preferably, at the same time, according to the artificial sports field, the drainage direction of the solidified water-permeable layer 11 is supported, and a water discharge gradient (not shown) is applied to increase the discharge speed of the accumulated water.

本發明之實施例(請參閱第4、5圖),所述地上層1包含原土壤層1A或碎石濾水層1B或紅磚粉層或碎石濾水層1B與原土壤層1A之組合之任一種。In the embodiment of the present invention (please refer to Figures 4 and 5), the above ground layer 1 comprises a raw soil layer 1A or a gravel water filter layer 1B or a red brick powder layer or a gravel water filter layer 1B and a raw soil layer 1A. Any of the combinations.

所述之地上層1如係為原土壤層1A,必須先將預定要鋪設本發明跑道之人工運動場的區域地面原有土壤,依設計之高程予以整平,接著再以滾壓機夯實,夯實的密度較佳者必須壓至95%以上為準之原土壤層1A。If the above-mentioned ground layer 1 is the original soil layer 1A, the original ground soil in the area where the artificial sports field of the runway of the present invention is to be laid must be firstly leveled according to the design elevation, and then compacted by a rolling machine. The density of the original one must be pressed to the original soil layer 1A which is more than 95%.

請同時參閱第2及3圖,本創作之一實施方式,前述之施工方法該骨材110包含:以回收及可回收石礫或清碎石或砂粒、無毒性廢料石礫、回收混凝土石礫之任一種,鋪設於該地上層1上,利用機具夯實,將該石礫或清碎石或砂粒任一種之骨材110噴水,讓水分子濕潤該骨材110以利施工;並迅速噴灑一黏著漿劑12於該夯實回收及可回收石礫或清碎石或砂粒上,當該黏著漿劑12凝固結合該回收及可回收石礫或清碎石或砂粒之間的搭接處,回收及可回收石礫或清碎石或砂粒間所餘下之間隙形成複數孔隙114,而完成本發明可透水、排氣之支撐固化透水層11。Please also refer to Figures 2 and 3, one embodiment of the present invention, the construction method described above, the aggregate 110 comprises: recycled and reclaimable gravel or grit or sand, non-toxic waste gravel, recycled concrete gravel Any one of them is laid on the upper layer 1 of the ground, and is smashed with the implement, and the aggregate of the gravel or the gravel or the sand is sprayed with water, so that the water molecules wet the aggregate 110 for construction; and spray one quickly. The adhesive slurry 12 is applied to the rammed recovered and reclaimable gravel or grit or sand, and the adhesive slurry 12 is solidified in combination with the recovered and reclaimed gravel or the gravel or the grit between the grit and recovered. And the remaining gaps between the recyclable gravel or the clear gravel or the sand particles form a plurality of pores 114, and the water-permeable and exhaust-permeable support curing water-permeable layer 11 of the present invention is completed.

該回收及可回收骨材係選自回收混凝土石礫、各種無毒性廢料石礫之任一種或利用清碎石或砂粒,局部或全部結合黏著漿劑12,該支撐固化透水層11所使用之黏著漿劑12包含水泥漿、水泥砂漿、多孔隙混凝土、水泥漿及樹脂之混合物、水泥漿及樹脂及海菜粉之混合物、水泥砂漿及樹脂之混合物、水泥砂漿及樹脂及海菜粉之混合物、水泥漿及海菜粉之混合物、水泥砂漿及海菜粉之混合物、聚胺酯樹脂(POLYURETHANE)、溶化之壓克力漿或熱熔瀝青之任一種,用以對該骨材110在本實施例,例如多數回收及可回收石礫或清碎石或砂粒或碎石搭接處結合凝固,該回收及可回收石礫或清碎石或砂粒或碎石間剩餘之孔隙可以排水。The recovered and recyclable aggregate is selected from any one of recycled concrete gravel, various non-toxic waste gravel, or partially or wholly bonded with an adhesive slurry 12, which is used for curing the water permeable layer 11 Adhesive slurry 12 comprises cement slurry, cement mortar, porous concrete, mixture of cement slurry and resin, mixture of cement slurry and resin and seaweed powder, mixture of cement mortar and resin, mixture of cement mortar and resin and seaweed powder, cement Any of a mixture of pulp and seaweed powder, a mixture of cement mortar and seaweed powder, a polyurethane resin (POLYURETHANE), a melted acrylic paste or a hot melt asphalt for use in the present embodiment, for example, most of the recovery And recyclable gravel or gravel or sand or gravel lap joints are combined and solidified, and the recovered and reclaimed gravel or clear gravel or the remaining pores between the gravel or gravel can be drained.

前述之黏著漿劑12如係採用水泥漿或水泥砂漿,其中所加入之水分在於讓水泥漿或水泥砂漿具有適當之稠度,結合於該些回收及可回收石礫或清碎石或砂粒搭接處結合凝固,該回收及可回收石礫或清碎石或砂粒間剩餘之孔隙可以排水,且成本低廉。The foregoing adhesive slurry 12 is made of cement slurry or cement mortar, wherein the added moisture is to make the cement slurry or cement mortar have a proper consistency, and is combined with the recovered and reclaimable gravel or clear gravel or sand. Combined with solidification, the recovered and reclaimed gravel or clear gravel or the remaining pores between the sand can be drained and the cost is low.

該多孔隙混凝土係為一種半乾拌之混凝土態樣,相對於一般之混凝土其混合之水分較少,但緩凝時間加長,以利拌合施工時結合於該些回收及可回收石礫或清碎石或砂粒搭接處結合凝固,該回收及可回收石礫或清碎石或砂粒間剩餘之孔隙可以排水,且成本低廉。The porous concrete system is a semi-dry concrete structure, which has less water to be mixed than the general concrete, but the retarding time is lengthened to facilitate the combination of the recovered and reclaimable gravel or The gravel or sand lap joint combines solidification, and the recovered and reclaimed gravel or clear gravel or the remaining pores between the sand can be drained and the cost is low.

相對於一般水泥或混凝土早期之初凝所帶來之施工限制與不便,所述之水泥砂將加樹脂、溶化之壓克力漿或熱熔瀝青具有適當黏稠度,其初凝及凝固時間較長,對現場施工程序之時間延緩可以配合及克服,而可以成為本發明之優良黏著漿劑12;而水泥漿及樹脂之混合物、水泥漿及樹脂及海菜粉之混合物、水泥砂漿及樹脂之混合物、水泥砂漿及樹脂及海菜粉之混合物、水泥漿及海菜粉之混合物、水泥砂漿及海菜粉之混合物恰當地給予回收及可回收石礫或清碎石或砂粒之間能形成透水孔114,因此本發明對於水分及樹脂或海菜粉之調配,相對一般之水泥砂漿是屬於半乾拌之態樣,其中該樹脂或海菜粉可以混合延緩水泥漿或水泥砂漿之初凝時間,且控制適當之稠度,結合於該些骨材110在本實施例例如回收及可回收石礫或清碎石或砂粒搭接處結合凝固,該回收及可回收石礫或清碎石或砂粒間剩餘之孔隙可以排水,且成本低廉。Compared with the construction restrictions and inconvenience caused by the early initial solidification of cement or concrete, the cement sand will have a suitable viscosity with resin, melted acrylic or hot melt asphalt, and its initial setting and solidification time are better. Long, the time delay of the on-site construction procedure can be combined and overcome, and can be the excellent adhesive slurry 12 of the present invention; the mixture of cement slurry and resin, the mixture of cement slurry and resin and seaweed powder, the mixture of cement mortar and resin a mixture of cement mortar and resin and seaweed powder, a mixture of cement slurry and seaweed powder, a mixture of cement mortar and seaweed powder, and a water-permeable hole 114 can be formed between the recovered and reclaimed gravel or the gravel or the sand. The invention relates to the mixing of water and resin or seaweed powder, and the general cement mortar belongs to a semi-dry mixed state, wherein the resin or seaweed powder can be mixed to delay the initial setting time of the cement slurry or cement mortar, and control the appropriate consistency. In combination with the aggregates 110, in this embodiment, for example, recycled and reclaimable gravel or grit or sand lap joints are solidified, this time Between gravel and recycled sand or gravel or clear the remaining apertures can be drained, and low cost.

本發明之黏著漿劑12易於噴灑在該些骨材110在本實施例例如回收及可回收石礫或清碎石或砂粒上,流動性控制在可以讓機具噴出即可,適當的乾燥收縮黏結該些回收及可回收石礫或清碎石或砂粒之搭接處,並讓回收及可回收石礫或清碎石或砂粒間之其他剩餘孔隙114不被該黏著漿劑12覆蓋,形成優良之排水孔,且工序迅速、簡便,可以大量節省時間及成本。The adhesive slurry 12 of the present invention is easy to be sprayed on the aggregates 110 in the present embodiment such as recycled and reclaimable gravel or clear gravel or grit, and the fluidity is controlled so that the implement can be ejected, and the appropriate dry shrinkage bonding is carried out. The recovered and reclaimable gravel or gravel or grit lap joints, and the recovered and reclaimable gravel or grit or other remaining pores 114 between the grit are not covered by the adhesive slurry 12, forming an excellent The drainage hole is fast and simple, and can save a lot of time and cost.

該方法(A)、(B)、(C)其施作方式可以選擇一次或經多次重複鋪設,及對應配合一次或多次噴灑該黏著漿劑12於該骨材之局部或全部,以由多層重覆結構完成支撐固化透水層,藉以適用各種不同要求之支撐固化透水層。The method (A), (B), (C) can be selected one time or repeated times, and correspondingly one or more sprays of the adhesive slurry 12 on part or all of the aggregate, The solidified water-permeable layer is supported by a multi-layered repetitive structure to support the curing and permeable layer of various requirements.

請同時參閱第6圖,本發明一實施例,該地上層1上方進一步更鋪設以砂質或山土質之碎石級配層或清碎石層13依設計厚度整平,並夯實至具預定壓密度標準之一碎石級配層或清碎石層13,該碎石級配層或清碎石層13經由夯實上側並結合於該支撐固化透水層11下方,於本發明可以承受車輛等較大重量之重壓,用以防止本發明整體所組成的透水結構功能受外力重壓而破壞及增進排水功能。Please refer to FIG. 6 at the same time. According to an embodiment of the present invention, the sand layer or the gravel layer 13 of the sand or mountain soil is further laid on the upper layer 1 and leveled according to the design thickness. a crushed stone grading layer or a clear gravel layer 13 which is bonded to the underside of the supporting solidified water permeable layer 11 via the tamping upper side, and can withstand the vehicle, etc. in the present invention. The heavy weight of the larger weight is used to prevent the function of the permeable structure composed of the whole of the invention from being damaged by external force and to impair the drainage function.

本發明上側所結合之透水面層15經由本發明支撐固化透水層11到達土壤層1A(地上層1)以順利排水,相對地,本發明內部之積水受輻射日照或大地溫度之影響,所產生之水氣可以經由反向蒸發出,而避免水積在該透水面層15內部,經過日曬會導致其本身結構產生水氣膨脹脆裂或變形。The water permeable surface layer 15 combined with the upper side of the present invention reaches the soil layer 1A (the ground layer 1) through the support curing water permeable layer 11 of the present invention to smoothly drain, and the water inside the invention is relatively affected by the radiation sunshine or the ground temperature. The water vapor can be evaporated out through the reverse direction, and water is prevented from accumulating inside the water permeable surface layer 15. After the sun exposure, the water vapor expansion and embrittlement or deformation of the structure itself is caused.

請參閱第7圖,本發明進一步於該土壤層1A或支撐固化透水層11、碎石級配層13,結合有至少一透排水管17或一盲管,該透排水管17表面具有複數孔隙171,用以快速導引巨大之暴雨、淹水至一排水系統18;因此,在本實施例及圖示,將該透排水管17結合該碎石級配層或清碎石層13內部,而將雨水等導引至一排水系統18或引流至原土壤層,因此增加排水量及排水速率。Referring to FIG. 7 , the present invention further integrates the soil layer 1A or the support curing water-permeable layer 11 and the gravel grading layer 13 with at least one permeable drain pipe 17 or a blind tube having a plurality of pores on the surface thereof. 171, for quickly guiding a huge storm, flooding to a drainage system 18; therefore, in the present embodiment and the illustration, the permeable pipe 17 is combined with the interior of the gravel grading layer or the gravel layer 13, Rainwater or the like is directed to a drainage system 18 or drained to the original soil layer, thereby increasing the displacement and drainage rate.

請參閱第8圖,本發明之另一實施例,所述本發明之人工跑道下方是一地下建築物3,該地下建築物3屋頂上方具有一混凝土層4無法透水,因此,本發明將該地上層1一般所採用之原土壤層1A利用一碎石濾水層1B鋪設所取代,將該碎石濾水層1B鋪設於地下建築物3上方之混凝土層4上側,該碎石濾水層1B兩側延伸至原土壤層,因此,可以將本發明所滲透之水份由該碎石濾水層1B導引至人工運動場兩側或周邊之原土壤層。Referring to FIG. 8 , another embodiment of the present invention, below the artificial runway of the present invention is an underground building 3 having a concrete layer 4 above the roof of the underground building 3 that is impervious to water. Therefore, the present invention The original soil layer 1A generally used in the above-ground layer 1 is replaced by a gravel water layer 1B, and the gravel water layer 1B is laid on the upper side of the concrete layer 4 above the underground building 3, the gravel water layer The sides of 1B extend to the original soil layer, so that the water permeated by the present invention can be guided from the gravel water filter layer 1B to the original soil layer on both sides or around the artificial sports field.

所述之碎石濾水層1B上側更結合有一原土壤層1A,該原土壤層1A用以增加本發明之人工運動場高程,以配合現地高度之需要及增加排水之路徑;更有進者,可以使用並埋設所述之透排水管17至該碎石濾水層1B或該原土壤層1A或該支撐固化透水層11、碎石級配層或清碎石層13內部,將人工運動場之積水藉由該透排水管17引流至該原土壤層1A或一排水系統18,以解決建築物上方人工運動場無法排水之問題。其施作工序及結構,以及所產生之功效完全相同於前述之實施例不予贅述。The upper side of the gravel water filter layer 1B is further combined with a raw soil layer 1A for increasing the artificial sports field elevation of the present invention to meet the needs of the local height and increasing the drainage path; The permeable drain pipe 17 may be used and embedded in the gravel water filter layer 1B or the raw soil layer 1A or the support solidified water permeable layer 11, the gravel grading layer or the gravel layer 13, and the artificial sports field may be used. The accumulated water is drained to the original soil layer 1A or a drainage system 18 by the permeable drain pipe 17 to solve the problem that the artificial sports field above the building cannot be drained. The operation steps and structures, and the effects produced are completely the same as those of the foregoing embodiments.

前數之支撐固化透水層11鋪設於人工運動場內,另於距離及地坪面積寬闊,為避免地震及熱帳冷縮應力對其產生變化或龜裂,該支撐固化透水層11進一步可施以複數伸縮縫來避免變形或龜裂,其伸縮縫施作與一般建築工程相同不再贅述。The first support curing layer 10 is laid in the artificial sports field, and the distance and the floor area are wide. In order to avoid the change or crack of the earthquake and the heat shrinkage stress, the support curing layer 11 can be further applied. A plurality of expansion joints are used to avoid deformation or cracking, and the expansion joints are the same as those of general construction projects and will not be described again.

藉此,該綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所完成之人工運動場形成透水、排氣功能,可以將該人工運動場表層之流體水分導入地上層之原土壤層吸收排水或引流至一排水系統,而有別於習用之人工運動場不透水及瀝青混凝土等基礎環境污染之缺陷;本發明具有良好透水、排氣之功效,其利用回收及可回收石礫予以再利用,可節省材料與施工成本及避免能源之耗費,具減碳與節能功效者,提供使用者舒適之運動跑道,並且不會造成環境污染,符合環保概念者,且改良習用之瀝青混凝土或鋼筋混凝土之不透水及污染環境之缺憾。Thereby, the artificial sports field completed by the environmentally permeable and ventilated artificial sports field of the green building and the supporting solidified permeable layer construction method form a water permeable and exhausting function, and the fluid moisture of the surface of the artificial sports field can be introduced into the original soil layer of the upper ground layer for absorption. Drainage or drainage to a drainage system, which is different from the defects of the basic environmental pollution such as water impervious and asphalt concrete used in the conventional artificial sports field; the invention has good permeable and exhausting effects, and is reused by recycling and reclaimable gravel It can save material and construction costs and avoid energy consumption. It has carbon reduction and energy saving effect, provides users with comfortable sports track, and does not cause environmental pollution. It conforms to environmental protection concepts and improves the conventional asphalt concrete or reinforced concrete. Imperfections in imperviousness and environmental pollution.

上列詳細說明係針對本發明之一可行實施例之具體說明,惟該實施例並非用以限制本發明之專利範圍,凡未脫離本發明技藝精神所為之等效實施或變更,均應包含於本案之專利範圍中。The detailed description of the preferred embodiments of the present invention is intended to be limited to the scope of the invention, and is not intended to limit the scope of the invention. The patent scope of this case.

而,本發明可以解決習用之缺弊,不會有造成地下水層污染的問題產生,符合綠能與環保概念,並且以環保回收物再行利用,而又能再提供具有較佳之透水、排氣,除了節能、減碳,可減低運動場所或學校室外溫度,提昇人工運動場之使用價值與功能,促進產業之發展,充分符合法定發明專利要件,爰依法提出申請,懇請 貴局核准本件發明專利申請案,以勵新發明,至感德便。However, the present invention can solve the drawbacks of the conventional use, does not cause the problem of causing groundwater layer pollution, conforms to the concept of green energy and environmental protection, and reuses the environmentally-friendly recyclables, and can provide better water permeability and exhaust. In addition to energy conservation and carbon reduction, it can reduce the outdoor temperature of sports venues or schools, enhance the use value and function of artificial sports fields, promote the development of the industry, fully comply with the statutory invention patent requirements, and apply for it according to law. You are requested to approve the invention patent application. The case, invented by Li Xin, to the sense of virtue.

1...地上層1. . . Above ground

11...支撐固化透水層11. . . Support curing layer

110...骨材110. . . Aggregate

114...孔隙114. . . Porosity

12...黏著漿劑12. . . Adhesive

13...碎石級配層或清碎石層13. . . Gravel grade or clear gravel

15...透水面層15. . . Permeable surface layer

17...透排水管17. . . Drainage pipe

171...孔隙171. . . Porosity

18...排水系統18. . . Drainage system

1A...原土壤層1A. . . Original soil layer

1B...碎石濾水層1B. . . Crushed stone drainage layer

3...地下建築物3. . . Underground building

4...混凝土層4. . . Concrete layer

第1圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法之骨材夯實結構剖視放大示意圖。1 is an enlarged schematic cross-sectional view showing a ramming structure of a green building environmentally-permeable, ventilated artificial sports field and a supporting solidified permeable layer construction method according to the present invention.

第2圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所之骨材噴灑黏著劑剖視放大示意圖。2 is an enlarged schematic cross-sectional view showing a green material sprayable adhesive of a green building environmentally-permeable, ventilated artificial sports field and a supporting curing permeable layer thereof according to the present invention.

第3圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所之骨材與灑黏著劑拌合剖視放大示意圖。Fig. 3 is an enlarged schematic cross-sectional view showing the mixing of the aggregate and the sprinkling agent of the green building environmentally-permeable, ventilated artificial sports field and the method for supporting the cured water-permeable layer according to the present invention.

第4圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所製成之跑道之又一實施例結構剖視示意圖。Figure 4 is a schematic cross-sectional view showing still another embodiment of a runway made by a green building environmentally-permeable, ventilated artificial sports field and a supporting curing layer thereof.

第5圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所製成之跑道之一實施例施工步驟示意圖。Fig. 5 is a schematic view showing the construction steps of an embodiment of a runway made by a green building environmentally-permeable, ventilated artificial sports field and a supporting curing permeable layer construction method thereof.

第6圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所製成之跑道之另一實施例結構剖視示意圖。Figure 6 is a schematic cross-sectional view showing another embodiment of a runway made by a green building environmentally-permeable, ventilated artificial sports field and a supporting curing layer thereof.

第7圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所製成之跑道之一實施例結構剖視示意圖。Figure 7 is a schematic cross-sectional view showing an embodiment of a runway made by a green building environmentally-permeable, ventilated artificial sports field and a supporting curing permeable layer construction method thereof.

第8圖係以本發明一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法所製成之跑道之另一實施例結構剖視示意圖。Figure 8 is a schematic cross-sectional view showing another embodiment of a runway made by a green building environmentally-permeable, ventilated artificial sports field and a supporting curing permeable layer construction method thereof.

11...支撐固化透水層11. . . Support curing layer

110...骨材110. . . Aggregate

114...孔隙114. . . Porosity

12...黏著漿劑12. . . Adhesive

Claims (15)

一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,本發明施工方法包括:(A)鋪設骨材於一地上層;(B)將該骨材噴水,讓水分子濕潤該骨材;(C)噴黏著漿劑於該骨材;(D)將所述骨材與黏著漿劑於地上層拌合,用以該黏著漿劑結合水分子均勻附著於骨材表面;(E)將上述經拌合之骨材夯平;藉此,該黏著漿劑乾燥後,骨材搭接處結合凝固,該骨材間剩餘之孔隙可以透水、排氣,而完成該支撐固化透水層。The invention relates to a green building environmentally-permeable water-permeable, exhaust artificial sports field and a construction method thereof for supporting the cured water-permeable layer. The construction method of the invention comprises: (A) laying the aggregate material on an upper layer; (B) spraying the aggregate material to wet the water molecules. (C) spraying the slurry on the aggregate; (D) mixing the aggregate with the adhesive slurry on the ground layer, and the adhesive slurry is combined with water molecules to uniformly adhere to the surface of the aggregate; E) flattening the above-mentioned mixed bone material; thereby, after the adhesive slurry is dried, the aggregate overlap is solidified, and the remaining pores between the aggregates can be permeable to water and exhaust, and the support is cured and permeable. Floor. 依據申請專利範圍第1項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該方法(B)將該骨材噴水讓水分子濕潤該骨材,及方法(C)噴黏著漿劑於該骨材,所述骨材不會吸收黏著漿劑內之水份,具有良好工作度,及該黏著漿劑可以緩凝。The method for constructing a green building environmentally-permeable, ventilated artificial sports field and a supporting curing and permeable layer thereof according to the first aspect of the patent application scope, wherein the method (B) sprays the aggregate material to make the water molecules wet the aggregate material, and The method (C) sprays the slurry on the aggregate, the aggregate does not absorb the moisture in the adhesive slurry, has a good working degree, and the adhesive slurry can be retarded. 依據申請專利範圍第1項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該黏著漿劑噴灑於該骨材上層部份,該骨材中層及下層部份留一高度空間讓黏著漿劑下沉時流止。The invention relates to a green building environmentally-permeable and ventilated artificial sports field and a supporting and curing water-permeable layer construction method thereof according to claim 1, wherein the adhesive slurry is sprayed on the upper part of the aggregate, and the middle layer and the lower layer of the aggregate Part of the height is left to allow the adhesive to sink when it sinks. 依據申請專利範圍第1項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該黏著漿劑噴灑於該骨材上層及中層部份,該骨材下層部份留一高度空間讓黏著漿劑下沉時流止。The invention relates to a green building environmentally-permeable and ventilated artificial sports field and a supporting and curing water-permeable layer construction method thereof according to claim 1, wherein the adhesive slurry is sprayed on the upper layer and the middle portion of the aggregate, and the lower layer of the aggregate Part of the height is left to allow the adhesive to sink when it sinks. 依據申請專利範圍第1至4項之任一項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該方法其中該方法(A)、(B)、(C)其施作方式可以選擇一次或經多次重複鋪設骨材,及對應配合一次或多次噴灑該黏著漿劑於該骨材之局部或全部,以完成支撐固化透水層。The method for constructing a green building environmentally-permeable, ventilated artificial sports field and a supporting curing and permeable layer thereof according to any one of claims 1 to 4, wherein the method (A), (B), (C) The manner of application can be selected once or repeatedly, the bone material is repeatedly laid, and the adhesive slurry is sprayed on the part or all of the aggregate one or more times to complete the support to cure the water-permeable layer. 依據申請專利範圍第1至4項之任一項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該黏著漿劑可以調整坍度至可以施工之工作度,但該坍度之黏著漿劑不易流動,將其噴灑於骨材上,更可避免黏著漿劑往下流竄在地上層1與骨材之間,因此不會形成一層黏著漿劑薄層。The invention relates to a green building environmentally-permeable and ventilated artificial sports field and a supporting curing and permeable layer construction method thereof according to any one of claims 1 to 4, wherein the adhesive slurry can adjust the twist to the work that can be constructed. Degree, but the adhesive slurry of the twist is not easy to flow, spray it on the aggregate, and it can prevent the adhesive slurry from flowing down between the upper layer 1 and the aggregate, so that a thin layer of adhesive slurry is not formed. . 依據申請專利範圍第6項之任一項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,所述施工方法(D)其中拌合係噴漿後用人工或機械扒子將骨材上下翻動,以利黏著漿劑或水泥漿均勻附著塗佈於骨材上。The invention relates to a green building environmentally-permeable and ventilated artificial sports field and a supporting and solidified water-permeable layer construction method thereof according to any one of claims 6 to 6, wherein the construction method (D) wherein the mixing system is used after spraying The artificial or mechanical tweezers turn the aggregate up and down to facilitate the adhesion of the slurry or cement slurry to the aggregate. 依據申請專利範圍第6項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,所述施工方法(E)其中夯平係用整平尺將不平整之地面平整,然後用鋼板或滾壓器材依坡度夯平。According to the sixth aspect of the patent application, a green building environmentally-permeable, ventilated artificial sports field and a construction method thereof supporting the cured water-permeable layer, wherein the construction method (E) wherein the flattening ruler is uneven The ground is leveled and then flattened with steel or rolling equipment depending on the slope. 依據申請專利範圍第1項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該地上層包含原土壤層或碎石濾水層或紅磚粉層或原土壤層結合碎石濾水層之組合。The method for constructing a green building environmentally-permeable, ventilated artificial sports field and a supporting curing and permeable layer thereof according to the first aspect of the patent application scope, wherein the ground layer comprises a raw soil layer or a gravel water filter layer or a red brick powder layer or The original soil layer is combined with a combination of gravel drainage layers. 依據申請專利範圍第6項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該支撐固化透水層上側更結合一透水面層。The invention relates to a green building environmentally-permeable and ventilated artificial sports field and a supporting and curing water-permeable layer construction method thereof according to the sixth aspect of the patent application scope, wherein the upper side of the support curing water-permeable layer is further combined with a water-permeable surface layer. 依據申請專利範圍第6項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該地上層上方更鋪設一碎石級配層或清碎石層,該碎石級配層或清碎石層上側結合該支撐固化透水層。According to the sixth aspect of the patent application, a green building environmentally-permeable, ventilated artificial sports field and a supporting solidified permeable layer construction method thereof, wherein a gravel-grade layer or a gravel layer is further disposed above the upper layer of the ground, The upper side of the gravel grade or clear gravel layer is bonded to the support to cure the water permeable layer. 依據申請專利範圍第11項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,進一步於該碎石級配層或清碎石層之任一層,結合有至少一透排水管或一盲管。According to claim 11, the green building environmentally-permeable, ventilated artificial sports field and the supporting solidified permeable layer construction method thereof are further combined with any one of the gravel grade layer or the clear gravel layer. At least one venting pipe or a blind pipe. 依據申請專利範圍第9項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,進一步於該支撐固化透水層、原土壤層、碎石濾水層之任一層,結合有至少一透排水管或一盲管。According to the invention of claim 9, the green building environmentally-permeable and ventilated artificial sports field and the supporting curing and permeable layer construction method thereof, wherein the supporting solidified permeable layer, the original soil layer and the gravel drainage layer are further One layer, combined with at least one permeable drain or a blind tube. 依據申請專利範圍第6項之任一項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該支撐固化透水層所使用之黏著漿劑包含水泥漿、水泥砂漿、多孔隙混凝土、水泥漿及樹脂之混合物、水泥漿及樹脂及海菜粉之混合物、水泥砂漿及樹脂之混合物、水泥砂漿及樹脂及海菜粉之混合物、水泥漿及海菜粉之混合物、水泥砂漿及海菜粉之混合物、聚胺酯樹脂、溶化之壓克力漿或熱熔瀝青之任一種。The method for constructing a green building environmentally-permeable, ventilated artificial sports field and a supporting curing and permeable layer thereof according to any one of claims 6 to 6, wherein the adhesive slurry used for supporting the cured water-permeable layer comprises cement slurry, Cement mortar, porous concrete, mixture of cement slurry and resin, mixture of cement slurry and resin and seaweed powder, mixture of cement mortar and resin, mixture of cement mortar and resin and seaweed powder, mixture of cement slurry and seaweed powder, cement Any of a mixture of mortar and seaweed powder, a polyurethane resin, a melted acrylic or a hot melt asphalt. 依據申請專利範圍第6項之任一項所述之一種綠建築環保透水、排氣人工運動場及其支撐固化透水層施工方法,其中,該骨材包含回收及可回收骨材、清碎石或砂粒。The invention relates to a green building environmentally-permeable and ventilated artificial sports field and a supporting curing and permeable layer construction method thereof according to any one of the claims, wherein the aggregate comprises recycled and recyclable aggregates, clear gravel or Sand grain.
TW100133669A 2011-09-19 2011-09-19 Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof TW201313989A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100133669A TW201313989A (en) 2011-09-19 2011-09-19 Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100133669A TW201313989A (en) 2011-09-19 2011-09-19 Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof

Publications (1)

Publication Number Publication Date
TW201313989A true TW201313989A (en) 2013-04-01

Family

ID=48802378

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100133669A TW201313989A (en) 2011-09-19 2011-09-19 Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof

Country Status (1)

Country Link
TW (1) TW201313989A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110172891A (en) * 2019-05-27 2019-08-27 南京固柏橡塑制品有限公司 A kind of sport runway special (purpose) rubber plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110172891A (en) * 2019-05-27 2019-08-27 南京固柏橡塑制品有限公司 A kind of sport runway special (purpose) rubber plate
CN110172891B (en) * 2019-05-27 2021-05-25 南京固柏橡塑制品有限公司 Special rubber slab of sports track

Similar Documents

Publication Publication Date Title
CN207277119U (en) A kind of colorful water permeable concrete pavement structure
CN202031001U (en) Compound water-permeable road structure
CN201386248Y (en) Anti-blockage permeable brick
CN103352407A (en) Construction process of roadbed structure with sand-based water-permeable bricks
CN106758642A (en) A kind of colorful water-permeable concrete entirety pavement structure and its construction method
JP6203157B2 (en) Permeable pavement structure
CN113430887A (en) Municipal road sponge drainage noise reduction comprehensive treatment construction process
CN114606823B (en) Cement-based permeable concrete pavement structure and paving method thereof
CN106677003A (en) Pervious concrete structure and preparation method thereof
CN102400430A (en) Construction method and structure of environmentally friendly, permeable and evacuating artificial playground of green building
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN209211198U (en) A kind of urban environmental protection road surface
CN102619153A (en) Construction method of green building, environmental protection, permeable and venting artificial playground and structure of artificial playground
CN206721596U (en) A kind of pavement structure of permeable road
CN202064260U (en) Environmental-friendly, permeable and exhausting man-made stadium used as green building
CN206521660U (en) A kind of porous pavement is mated formation plate and porous pavement paving structure
CN103015289A (en) Environmental-protection water-permeation and gas exhaust artificial sport ground and supporting curing water-permeation layer construction method thereof
TW201313989A (en) Green environmental protection permeable and breathable artificial athletic ground and construction method of curing permeable support layer thereof
TW201500617A (en) Man-made athletic field and athletic runway structure featuring eco-green building and construction method thereof
CN210194383U (en) Road surface structure of colored runway
CN106996063A (en) A kind of pavement structure of permeable road
KR200378316Y1 (en) Double layer paying material which is used by recycle tire,grit, and colored rubber
KR200368103Y1 (en) Double layer paying material which is used by recycle tire,grit, and colored rubber.
CN112030652A (en) Preparation method of ecological water-permeable concrete pavement
CN201843043U (en) Environment-friendly artificial stadium structure of green building