TW201144526A - Protective baffle - Google Patents

Protective baffle Download PDF

Info

Publication number
TW201144526A
TW201144526A TW100105358A TW100105358A TW201144526A TW 201144526 A TW201144526 A TW 201144526A TW 100105358 A TW100105358 A TW 100105358A TW 100105358 A TW100105358 A TW 100105358A TW 201144526 A TW201144526 A TW 201144526A
Authority
TW
Taiwan
Prior art keywords
opening
rope
support
sub
hanging
Prior art date
Application number
TW100105358A
Other languages
Chinese (zh)
Other versions
TWI486502B (en
Inventor
Shigeo Yura
Original Assignee
Nippon Steel & Amp Sumikin Metal
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel & Amp Sumikin Metal filed Critical Nippon Steel & Amp Sumikin Metal
Publication of TW201144526A publication Critical patent/TW201144526A/en
Application granted granted Critical
Publication of TWI486502B publication Critical patent/TWI486502B/zh

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Fencing (AREA)

Abstract

The objective of the present invention is to provide a protective baffle applicable to facilities of conveyor belt, wires, water pipes, or tubes and the like that need to install a required size and shape of a facility opening for extending through the protective baffle, or applicable to the location of access openings necessary for people or a variety of vehicles to enter or exit. The solution adopted is to set up opening-use support ropes 50, 51 along support ropes 3a, 3b located at top and bottom of a designed opening 10 formed in the support rope 3 set up between pillars 2, 2. Suspension materials 7 (8) are disposed between the opening-use support ropes 50, 51. Ends of the suspension materials 7 (8) are connected to the opening-use support ropes 50, 51. Sub-support ropes (60-62) are set up at a non-opening side bordered by the suspension materials 7(8) and along the sub-support ropes (60-2) or the opening-use support ropes 50, 51, drilled boards 40 are connected and suspended in such a state as being parallel with the sub-support ropes (60-62) or the opening-use support ropes 50, 51.

Description

201144526 六、發明說明: 【發明所屬之技術領域】 η本發明係屬於以防風、防雪、防塵、防海水飛沫、防 止投物、防球及防止^下物等為目的所構築之防護擔板的 技術領域,進…,係有關於一種防護擔板,該防護擋 板係以對需要用以設置貫穿防護擋板之皮帶輸送帶、電 線、水管、或管等之設施物的設施用開口,或者人或各種 車輛等出人所需之通行用開σ的位置所需之大小、形狀形 成的構成。 【先前技術】 以往’在以防風、防雪、防塵 物、防球及防止落下物等為目 各式各樣的構造、形式。 防海水飛沫、防止投 的之防護擋板,已知並實施 例如在以下的專利文獻!至4所揭示的防護擒板係對 隔者間隔所建立的支柱之間以例如鋼索等舖設合成樹脂樹 脂製之網的構成’設置於例如儲炭場等的周邊並防止 粉塵向周邊地區飛散的目的 制飛砂的目的來使用。可是 防護擋板設置皮帶輸送帶或 在此情況,在現場,以剪刀 斷成使設施物貫穿的大小, 後切斷該合成樹脂樹脂製的 [專利文獻] ,或設置於海岸地帶並作為抑 在該儲炭場等,有必須隔著 配貧、管等之設施物的情況。 專將該合成樹脂樹脂製的網切 或進而以鐵钳專貫穿設施物等 網’而形成開口部。 3 201144526 [專利文獻1]特公昭53_ 10763號公報 [專利文獻2]實公昭63_ 19362號公報 [專利文獻3]實開平5_ 3〇214號公報 [專利文獻4]實公平2一 6715號公報 [專利文獻5]特開2008— 285919號公報 【發明内容】 【發明所欲解決之課題】 該專利文獻1至4所揭示的防護擋板係可設置成使皮 帶輸送帶或配管、管等之設施物對在合成樹脂樹脂製的網 乂剪刀等切斷所形成的開口告卜可是重複承受風負荷或物 體的碰撞力等所造成的大負荷時,該開口部等於形成網之 鋼索的損壞處’等於鋼索彼此間之張力的平衡受到破壞, 以開口部為傷口,心—直擴大而變大,而無法得到充分 A效果,亦失去網的效用。而且,剪刀或鐵鉗等所造 成纟I的切口知害外表的美觀。進而,肢至很高之防護 擋板(例如約25m)的中間位置並在現場切斷的作業係很費 人力時間’尤其亦發生作業員之安全性的問題。 利 丨甲蜎人開發從防硬檔板,並已提出 :(參照該專利絲5),該㈣擋板係即使重複承受 風負何或物體的碰撞力等 部 &成的大負何,亦不會發生局 I而’久性優異,可長期在穩定狀態下健全地使用。 的古舞體而S ’係在上下方向隔著間隔將複數條水平方向 、#用繩架設於隔著間隔所建Α & , M w埂立的支柱之間,並沿著該 201144526 支撐用繩,對構成四角形之複數片鑽孔板連結懸吊成與使 鑽孔板的上邊及下邊在上下相鄰的支撐用繩平行之狀態, 而且作成在水平方向相鄰之鑽孔板之相鄰端部彼此的縱邊 係重疊配置的構成。又,該鑽孔板之上邊的兩端部及下邊 的兩端部與支撐用繩利用保持平行狀態的懸吊構造連結。 即,鑽孔板由於風負荷或物品的碰撞等所造成的重複負 荷,應力特別集中而易損壞,因為利用保持平行狀態的懸 吊構造連結該鑽孔板之上邊的兩端部及下邊的兩端部與支 撐用繩,所以可防止作用於該鑽孔板之上邊的兩端部及下 邊之兩端部的應力集中’因而可提高鑽孔板之端部的強度 及耐久性,而在長期發揮優異的耐用壽命,可健全地使用。 本發明之目的在於提供一種防護擋板,在該專利文獻 5所揭不的防護擋板,&以對需要設置貫穿該防護擋板之 皮帶輸送帶、或配管、管等之設施物的開。,或者人或各 種車輛等出人所需之通行用開口的位置所需之大小、形狀 $成’而且即使重複風負荷或物體的碰撞力等所造成的大 :荷:亦不會發生局部性損,耐久性優異,可長期在穩 疋狀態下健全地使用,進而在美觀上優異。 【解決課題之手段】 作為解決該習知技術之課題的手段,申請專利範圍第 1項之發明的防護擋板,在上下方向隔著間隔將複數條水 =向的切用繩架設於隔著間隔所建立的支柱之間,並 著〇支撐用繩,S複數片鑽孔板將其上邊及下邊連結懸 吊成與支撐用繩平行之狀態, 201144526 其特徵在於: 鑽孔板與無鑽孔板的開口部配置於該支柱之間; 沿著在該支柱之間的上下方向所架設之複數條支撐用 繩中應形成開口部之位置之開口上邊與開口下邊的該支撐 用繩平行地架設開口用支撑繩,並在該上下的開口用支撲 繩之間,將懸吊材料配置於該開口部的縱邊位置,該懸吊 材料之上下的端部與該開口用支撐繩連結; 在以懸吊材料為邊界的非開口側,水平方向的子支撐 用繩架設於該懸吊材料與支柱之間,並沿著該子支樓用繩 或開口用支撑繩,將複數片鑽孔板連結懸吊成與使鑽孔板 之上邊及下邊在上下相鄰的子支樓用繩或開口用支撐繩平 行之狀態。 申凊專利範圍第2項之發明的防護擋板係一種防護擋 在上下方向隔著間隔將複數條水平方向的支擇用繩架 設於隔著間隔所建立的支. .L ^ ^ . ^町叉柱之間,並沿著該支撐用繩,對 複數片鑽孔板將其上邊及下邊 連結懸吊成與支撐用繩平行 之狀態, 其特徵在於: 鑽孔板與無鑽孔板的開口部配置於該支柱之間; 沿者在該支牲之間的卜丁士& 下方向所架設之複數條支撐用 繩中應形成開口部之位晉夕μ 加, t位置之開口上邊的該支撐用繩平行地 表设開口用支禮·鄉,廿肢_ s , 繩並將懸吊材料配置於該開口部的縱 位置,該懸吊材料之上 符抖mp係與該開口用支撐繩連結,該 "材料之下端部係與固定於地面的底板連結; 201144526 在以懸吊材料為邊界的非開口側, 用繩架設於該懸节材料方向的子支撐 或開口用支擇繩,將複數片構之間’並沿著該子支樓用繩 ^ . · 复數片鑽孔板連結懸吊成盘使鑽孔妬 之上邊及下邊在上下相 巾t、使鑽孔板 行之狀態。 支撐用繩或開口用支撐繩平 申請專利範圍第3項之發 範圍第!或2項之防護撐板,其中田板係在申明專利 :吊材料係以吊支柱所構成, 下方向安裝複數個托架; 又狂之側面的上 料支連結構㈣支㈣結成自如狀態; 端利用連結構件鱼支柱\該吊支柱的托架連結’另一 、又柱連結成自如狀態。 申請專利範圍第4項 範圍第1戋2 He 务月的防護擋板係在申請專利 国第1或2項之防護擋板,其令 懸吊材料係以吊鋼索 連結將兩端部加工成環妝成’而該吊鋼索係利用釣環 該開口用支撐織的c鋼索的該環狀端部; 自如狀態’另-端係利用連:構:對該吊鋼索的釣環連結成 該子支擇用繩的對支柱連結成自如狀態; 蠕利用連結構件與支柱吊鋼索的鉤環連結’另- 運結成自如狀態。 範圍第1至4項SI 5項之發明的防護擋板係在申請專利 的縱邊以吊支柱二一:防護擔板,其中開口部之兩端 .'、斤構成,開口用支撐繩的兩端係 201144526 刀別對兩側之吊支柱的托架或吊鋼索的鉤環連結。 申凊專利範圍第6項之發明的防護擋板係在申請專利 範圍第1 i 5項中任一項的防護擋板,其中在開口用支撐 繩與支撐用繩之間’在上下方向設置固定的間隔。 ,申4專利範圍帛7帛之發明的肖護擋板係在申請專利 ’圍第1 6項中任一項的防護擋板其中對開口用支撐 繩或子支撐用繩所連結懸吊的鑽孔板係以比對支撐用繩所 連結懸吊之鑽孔板更小的形狀所構成。 【發明效果】 因為本發明的防護擋板係在該專利文獻5所揭示的防 -擋板’沿著應形成設施用或通行用的開口部U之位置之 開口上邊與開口下邊的支樓用繩3a,或開口上邊的支樓 用繩3a架設開口用支撐繩5〇 並將懸吊材料7(8)配 =口部1〇的縱邊位置,使該懸吊材料7⑻的兩端部 縣;材二:繩5°、51連結的構成’所以能以對需要以該 心吊材枓7⑻為邊界使皮帶輸送帶、或配管 物貫穿的開口,或者人或各 ^ 署觫φ 早輛4出入所需之開口的位 斤需之大小、形狀形成。而 夕路n + 即便篁複風負荷或物體 ,寺所造成的大負荷,亦保持支撐用繩 支標繩5〇、51或子支胸繩 1 X·/**, 之張力的平衡,進 鑽孔板4、40的支撐狀態在長期 ,, α 仕负期穩疋,無局部性損壞的 了月b 1±,耐久性優異,可 推;+ , Λ仕穩疋狀恶下健全地使用, 進而在外表的美觀亦優異。 8 201144526 【實施方式】 本發明之防護擋板將鑽孔拓 ^ 1Λ 賢孔板40、及無鑽孔板40的開 口 4 10配置於支柱2、2之間。况甚 ]著在支柱2、2之間的上 下方向所架設之複數條支撐 又得用繩3…中應形成開口部1 〇之 位置之開口上邊與開口下邊的兮± 瓊的該支撐用繩3a、3b平行地架 設開口用支樓繩5〇、5卜在該上下的開口用支料5〇與 51之間’將懸吊材料7⑻配置於該開口部1〇的縱邊位置, 在以懸吊材料7⑻為邊界的非開口側,將水平方向的子支 撐用繩(60〜62)架設於該懸吊材料7(8)與支柱2、2之間, 並沿著該子支撐用繩(60〜62)或該開口用支撐繩5〇、51, 將複數片鑽孔板40連結懸吊成與使鑽孔板4〇之上邊及下 邊在上下相鄰的該子支撐用繩(6〇〜62)或該開口用支撐繩 50、51平行之狀態。 [第1貫施例] 以下,根據所圖示的實施例,說明本發明的防護擋板。 第1圖〜第4圖所示之本實施例之防護擋板1 a的整體 構成係與在該專利文獻5所揭示的防護擋板相同,係如在 段落編號[0005]的說明所示。 首先,第1實施例的防瘦撞板1A如第1圖之整體圖所 示’沿著在支柱2、2之間所架設的支撐用繩3,將形成四 角形之4片鑽孔板4…連結懸吊成使鑽孔板40之上邊及下 邊與該支撐用繩3平行之狀態,而且作成橫向排列之相鄰 的端部彼此重疊的配置’並在上下方向設置1 8段,構成為 地上高度約25m、左右之支柱的外方尺寸約13m。而且,從 201144526 最上段開始數,在第5段至第8段,形成用以使管等之設 施物貫穿所設置的開口部1〇,在支柱2、2之間橫向排列 地配置鑽孔板40與無鑽孔板40的開口部1〇。此外,第! 圖所示之防護擋板之鑽孔板的孔係因縮尺而無法製圖,所 以省略β己載’在第2圖至第4圖的放大圖表示其具體的形 狀。 如在第2圖將該開口部j。放大表示所示沿著在支柱 2、2之間的上下方向所架設之複數條支標用繩3中應形成 開口。P 1 0之位置(從最上段開始數時第5段至第8段)之開 口上邊與開口下邊的該支㈣繩3a、3b平行地架設開口用 支撐繩50 51 ’在上下方向與該支撐用繩&、隔著約 跡__的間隔Sl'S2上下分別設置2條。又該間隔 係下方向的間隔S2比上方向的間隔Si寬。將間隔&、心 設置於該開口用支撑繩50、51與上下的支樓用繩3a、3b 之間的理由係考慮到由開口用支樓繩5〇所支樓之設置於 第5段的鑽孔板40與由開口下邊之支樓用繩儿所支揮之 第9段的鑽孔板4之風負荷所造成的浮起。即,因為益開 口部U)的支樓用繩3與有開口部1〇的開口用支撲繩5〇、 51係風負荷所造成的浮起相異,所以設置間隙&、心,以 免無開口部ίο的支撐用繩3a(3b)與有開口部1〇的開口用 支樓繩5〇(51)發生干涉。進而,支㈣繩3之上下方Μ 間隔相異係因為具有開〇 Aft 1 rt ,開口部10之開口用支撐繩50、51的 鑽孔板40比車乂 ν而浮起比無開口部1 〇的支撐用繩3小, 因而使下方向的間隔Sl變小,並使下方向的間隔&變大。 10 201144526 又,同時,考慮到以下部的開口用支 之縱邊位置所設置之吊支柱的…51承又在開口部 下方向的間隔s2變大。 乍成使 而將在側面的上下方向安裝複數—a 柱7作為縣女褒復數個托架70.··的吊支 乍為懸吊材料’配置於位於該 5〇、51之間之贫„ A 卜的開口用支撐繩 τ & & '"開口。卩1〇的縱邊位置,該吊支柱7的上 下兩端部盥該Ψ又彺丨的上 '上下的開口用支撐繩50、51連結。 著該開口上邊的支撐用繩3a所 支撐繩50如在第3圖祐* 仃木δ又的開口用 *第3圖放大所示,其兩 該一端盥欹搭7 η 1散7717丄成%狀, '、 3連結成自如狀態,而該&产7 η 與吊支杠7+ L 。叩邊夠5衣70a以銷70b 興币支桎7之上端部的粍架7〇連 所示,利用連結槿杜9 & 另柒50b如第2圖 2 _ & 支柱2連結成自如狀態。 方面,沿著該開口下邊的支撐 的開口用支撐繩51亦1不 f用繩3所平行架設 51"ι與釣環二::部被加… 銷70b與吊支柱7 '、,°成自如狀態,而該鉤環70a以 之下端部的托架70拽处 = 用連結構件2a與支9 _ 連、',。。另一端51b利 丹叉检2連結成自如狀態。 在以該吊支7 & m 為邊界的非開口側,如第1 !S1 3¾ # q 圖所示,將3條水平太& 如第1圖及第2 支柱5 *支柱2向的子支撐用繩(6"2)架設於該吊 係其兩端部被加具體而言’該子切用繩(,62) 結成自如狀態,其一端(6Ga〜62a)與鉤環70a連 的托架了〇連結。^ _以銷7Qb與吊支柱之中間部 自如狀態。 —端利用連結構件2a與支柱2連結成 201144526 沿者該上方位置的開口用支撐繩5〇與子支揮用繩6〇 在水平方向將2片鑽孔板4G、4G連㈣吊成與使鑽孔板 4〇之上邊及下邊在上下相鄰之該上方位置的開口用支樓繩 50和子支禮'用繩6〇平行之狀能,品· 卞仃之狀態,而且作成在水平方向相 鄰之鑽孔板40、40的相鄰縱邊重疊的配置。 又,沿著該子支撐用繩60(61)與子支撐用繩61(62) 在水平方向將2片鑽孔板4G、40連結懸吊成與使鑽孔板 4〇之上邊及下邊在上下相鄰之該子支撐用繩6〇和6i(6i 和62)平行之狀態,而且作成在水平方向相鄰之鑽孔板 40、40的相鄰縱邊重疊的配置。 進而,沿著該子支撐用繩62與該下方位置的開口用支 撐繩51在水平方向將2片鑽孔板4〇、4〇連結懸吊成與使 鑽孔板40之上邊及下邊在上下相鄰之子支撐用繩62和該 下方位置的開口用支撐繩51平行之狀態,而且作成在水平 方向相鄰之鑽孔板40、40的相鄰縱邊重疊的配置。 此外’該開口用支撐繩5 0、51及子支撐用繩(6 〇〜6 2) 所連結懸吊之鑽孔板40的大小係縱橫的尺寸例如是lmx 2m’以比支撐用繩3所連結懸吊之鑽孔板4(例如縱、橫的 尺寸是約1. 2mx2. 8m)更小的形狀構成。 作為將該鑽孔板40的上邊及下邊連結懸吊成與開口 用支樓繩5 0、51和子支撐用繩(6 0 ~ 6 2 )平行之狀態的構 成’在該鑽孔板4 〇 ’沿著其上邊及下邊局部地安裝板懸吊 用補強板44·..,對在該板懸吊用補鬼板44與鑽孔板40設 置於共同位置的孔以銷45a連結環狀的連結構件45,再以 12 201144526 連結構件45對開σ用支ι繩5()(5i)或子支撐⑽⑽似 緊連結’而連結成該鑽孔板4()的上邊及下邊與該開口用支 撐繩50(51)或子支撐用繩(6〇~62)平行之狀態(細節參照第 7圖第9圖及第1〇圖所示的放大圖)。 此外,雖省略圖示,如該專利文獻5的記載所示,亦 可利用士下的構成實施’該構成係沿著各鑽孔板的上邊 及下邊隔著小間距設置於通孔,再將螺旋狀的線對該通孔 穿線成一連串之狀態,並以支樓用繩縫合,而懸吊成平行 之狀態。 該鑽孔板40之吊支柱7側的上邊端部形成為被切除成 ”該開口用支擇絕5G(51)或子支撐用繩(60〜62)的環狀端 部不會發生干涉之角度的去角形&,該去角形狀部分利用 鉚接等安裝鋅鐵板製的補強材料41來補強。而且,作成強 化鉤衣等之剛性構件42以銷43與共同設置於該鑽孔板4。 與補強材料41的連結用孔連結,該剛性構件42的另一側 與該開口用支擇繩5〇的環狀端部5Ga緊連結,而保持於與 該開口用支撐繩50(51)或子支撐用繩(60〜62)平行之狀離 的懸吊構造。 又,雖省略放大表示,該鑽孔板4〇的重疊部分或重疊 部分的附近利用鉚接等安裝補強材料來補強,連結用孔= 同設置於該鑽孔板4〇與補強材料,強化鉤環等之剛性構件 以固疋銷安裴於該連結用孔,並將該剛性構件42的另一側 捲繞於該開口用支撐繩50(51)或子支撐用繩(6〇〜62),而 進行緊連結。 13 201144526 此外,雖然第i實施例的防護擋板係表示以吊支柱7 構成懸吊材料之實施例,但是亦可替代該吊支柱了,以在 後述的段落編號[〇〇26]所說明的吊鋼索8實施。 [第2實施例j 第5圖所示之第2實施例之防護擋板1β的特徵在於: 在作成沿著架設於支柱2、2之間的支樓用繩…片鑽孔 板4...連結懸吊成與該支樓用繩3平行之狀態,而且橫向 排列之相鄰的端部彼此重疊的配置,並在上下方向設置18 段的防護擋板,從最上段開始數,在第5段至第6段所形 成之開口部10的兩端以吊支柱7所構成。此外,第5圖所 示之防護棺板之鑽孔板的孔亦因縮尺而無法製圖,所以省 略記載。 在形成該開口部10的位置(從最上段開始數時第5段 Μ ㈣繩5()'51的兩端對兩側之 吊支柱7之上下端部的托架7。分別在自如狀態連結。對以 該吊支柱7為邊界之左右的非開口側,水平方向的子支撐 用繩6架設於該吊支柱7與支柱2、2之間,並沿著該子支 樓用繩6或開口用支樓繩50、5卜將1片或2片鑽孔板40 連結懸吊成與使鑽孔板40的上邊及下邊在上下相鄰的子 支樓用繩6或開口用支料5〇、51平行之狀[作成在第 4圖中之左側的非開口部所設置之2片鑽孔板4〇、4。之相 鄰的端部彼此重疊的配置。 此外’第2實施例的防護擋板1B亦表示以吊支柱”冓 成懸吊材料之實施例,但是亦可替代該吊支柱7,以在後 14 201144526 述的段落編號[0026 ]所說明的吊鋼索8實施。 因為其他的構成係與在該第j實施例所說明的防護擔 板1A相同,所以省略詳細說明。 [第3實施例] . 第6圖至第10圖所示之第3實施例之防護擋板lc的 特徵在於:在作成沿著架設於支柱2、2之間的支樓用繩3 將4片鑽孔板4...連結懸吊成與該支撐用繩3平行之狀能, 而且橫向排列之相鄰的端部彼此重疊的配置,並在上下方 向設置18段的防護擋板’從最上段開始數,在第i段至第 3段,形成使皮帶輸送帶或配管、管等的設施物貫穿所設 置之開口 10,或者人或各種車辅等出入所需之通行用的開 口 10’並將鑽孔板40與無鑽孔板4〇的開口部1〇橫向排 列地配置於該支柱2、2之間。第6圖所示之防護擋板之鑽 孔板的孔亦因縮尺而無法製圖,戶斤以省略記載,在第7圖 至第10圖的放大圖表示其具體的形狀。 沿者在支柱2、2之間的μ τ 士人& ‘ 门的上下方向所架設之複數條支撐 用繩3...中應形成開口部10之位置(從最上段開始數時第i 段至第3段)之開口上邊的該支撑用繩^平行地架設2條 開口用支樓繩5、5’吊鋼索8配置於該開口部H)的縱邊 位置。第3實施例的吊鋼索8如在第7圖至第㈣放大表 示所示,係利用以銷81a連結—端的鉤㈣連結成一連串 的吊鋼索8構成兩端部被加卫成環狀之3條鋼索8Q的該環 狀端部80a。該吊鋼索8的下端部8〇a與以銷…和固定 於底板9〇之上面的托架91連結,而該底板90固定於地面。 15 201144526 該開口用支樓繩5的-端部5a對該吊鋼索8之上端部 的鉤環81連結成自如狀態,而另—端利用連結構件 支柱2連結成自如狀態。 對 在以該吊鋼索8為邊界的非開口側,將3條 的子支撐用繩(6〇-62)架設於該吊鋼索8與支柱2'2 該子支撐用繩(60,)中,上方 a ^ R1 ^ ^ Z條子支撐用繩(60 ” 61)如在第9圖放大表示所示,將其—端6 置於該吊鋼索8之中n a)對配 之中間的鉤% 81連結,並利用連姓槿株 2 a:另一端與支柱2連結成自如狀態。另一方面,下方位 示,_—底::Γ1Γ圖放大表示所 …成自如狀V,=;用::_91連結的鉤環 結成自如狀態。㈣結構件2a對支柱2連 …著該子支樓用m(6(^62)或開σ用支樓繩5 ,將 鑽孔板4G、40連結懸吊成與使鑽孔板4G之上邊及下邊在 上下相鄰的子支撐用繩(60〜62)或開口用支撐5平行之 狀態,而且作成在水平方向相鄰之鑽孔板 彼此重疊的配置。 州日]% 4 X鑽孔板40的上邊端部係利用鉚接等安裝鋅鐵 的補強材料41來補強,並作成將u螺栓46安裝於 孔板4G與補㈣料41所 / Λη v 且J逆,,.口用孔,該ϋ螺栓 的另一側對該開口用支撐繩5的環狀端部^或子 用繩⑽〜62)的環狀端部⑽a〜62a)連結,而保持於與該開 口用支_ 5或子支樓用繩⑽,)平行之狀態的懸吊構 201144526 造。 此外,雖然第3實施例的防護擋板1(:係表示以吊鋼索 8構成懸吊材料之實施例,但是亦可替代該吊鋼索8,以上 述的吊支柱7構成。在以吊支柱7構成懸吊材料的情況, 對在底板9G之上面的托架91所安裝的鉤環92連結對吊支 柱之下卩的托架70所安裝的釣環7〇a。 因為其他的構成係與在該第i實施例所說明的防護擔 板相同,所以省略詳細說明。 [第4實施例] 第11圖及第12圖所不之第4實施例之防護擋板i D的 脾徵在於:在作成沿著架設於支柱2、2之間的支撐用繩3 而1鑽孔板4 ··連結懸吊成與該支樓用繩3平行之狀態, 且橫向排列之相鄰的端部彼此重疊的配置,並在上下方 ;:置18段的防護擔板,以吊鋼索8、8構成在最下段所 的兩端。此外,第11圖所示的防護播板 將、的開口部形成於最下段的鑽孔板4 間。又,坌n阆 - w 防㈣板之鑽孔板的孔亦因縮尺而 瘵去製圖’所以省略記載。201144526 VI. Description of the invention: [Technical field to which the invention pertains] η The present invention belongs to a protective stretcher constructed for the purpose of preventing wind, snow, dust, seawater droplets, preventing deposits, preventing balls, and preventing artifacts. In the technical field, there is a protective slat that is used for a facility opening for a facility that requires a belt conveyor, a wire, a water pipe, or a pipe to pass through the protective barrier, or The configuration of the size and shape required for the position of the opening σ required for the person or various vehicles and the like. [Prior Art] In the past, various structures and forms have been used for the purpose of preventing wind, snow, dust, ball, and falling objects. A protective baffle that prevents seawater droplets and prevents the injection, is known and implemented, for example, in the following patent documents! The protective slabs disclosed in the fourth aspect are formed such that, for example, a wire made of a synthetic resin resin is laid between the pillars formed by the spacers, for example, in a periphery of a carbon storage field or the like, and the dust is prevented from scattering to the surrounding area. Purpose The purpose of making fly sand is to use. However, the protective baffle is provided with a belt conveyor belt or, in this case, at the site, the size of the facility is cut by scissors, and the synthetic resin resin is cut off [patent literature], or placed on the coast, and In the case of the charcoal field, there is a case where it is necessary to have a facility such as a poor or a pipe. The opening made of the synthetic resin resin net or the iron tongs is used to penetrate the net such as a facility. 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 [Problem to be Solved by the Invention] The protective baffles disclosed in Patent Documents 1 to 4 can be provided as facilities for belt conveyor belts, pipes, pipes, and the like. When the opening of the synthetic resin resin netting scissors or the like is repeated, the opening is equal to the damage caused by the wind load or the collision force of the object, and the opening is equal to the damage of the wire forming the wire. The balance equal to the tension between the cables is broken. The opening is the wound, and the heart is enlarged and enlarged, and the A effect is not obtained, and the effect of the net is also lost. Moreover, the slits made of scissors or iron tongs and the like have an aesthetically pleasing appearance. Further, the operation of the limbs to the middle of the protective baffle (e.g., about 25 m) and the cutting at the site is laborious, and the safety of the worker is particularly problematic. The 丨 丨 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发 开发It will not happen to the Bureau I and it will be excellent for a long time and can be used in a stable state for a long time. The ancient dance body and the S' are placed between the pillars in the horizontal direction and the ## in the vertical direction, and the ropes are placed between the pillars that are separated by the gaps, and are supported along the 201144526. The rope is connected in a state in which a plurality of drilled discs constituting a square shape are suspended in parallel with the support ropes which are adjacent to the upper and lower sides of the drilled plate, and are adjacent to the horizontally adjacent drilled plates. The longitudinal sides of the end portions are arranged to overlap each other. Further, both end portions and lower end portions of the upper side of the drilled plate are coupled to the support rope by a suspension structure that is kept in parallel. That is, the repeated stress caused by the wind load or the collision of the articles, the stress is particularly concentrated and easily damaged, because the two ends of the upper side and the lower side of the drilled plate are connected by a suspension structure that maintains the parallel state. Since the end portion and the supporting rope can prevent stress concentration on both end portions and the lower end portions of the upper side of the drilling plate, the strength and durability of the end portion of the drilling plate can be improved, and in the long term It has excellent durability and can be used in a sound manner. It is an object of the present invention to provide a protective baffle, and a protective baffle disclosed in Patent Document 5, for opening a belt conveyor belt, a pipe, a pipe, or the like that needs to be provided through the protective baffle. . , or the size and shape of the position of the opening for the passage of the person or various vehicles, etc., and the size and shape of the opening, and even if the wind load or the collision force of the object is repeated, the load is large: the locality does not occur. It is excellent in durability and can be used satisfactorily in a stable state for a long period of time, and is excellent in appearance. [Means for Solving the Problem] As a means for solving the problem of the prior art, the protective baffle of the invention of claim 1 is provided with a plurality of water-oriented cutting ropes interposed at intervals in the vertical direction. Between the pillars established by the interval, and the supporting rope, the S plurality of drilling plates suspend the upper side and the lower side to be parallel with the supporting rope, 201144526 is characterized by: drilling plate and no drilling The opening of the plate is disposed between the pillars; the upper side of the opening in which the opening portion is formed in the plurality of supporting ropes that are stretched in the vertical direction between the pillars is erected in parallel with the supporting rope below the opening a support rope for opening, and a suspension material is disposed between the upper and lower openings of the lashing rope at a longitudinal position of the opening, and an upper end portion of the suspension material is coupled to the opening by a support rope; a non-opening side with a hanging material as a boundary, a horizontal sub-supporting rope is arranged between the hanging material and the pillar, and a plurality of drilling plates are used along the sub-tower with a rope or an opening supporting rope Hanging The sub-buildings which are adjacent to the upper and lower sides of the drilling plate are suspended in a state in which the ropes or the opening are supported by the supporting ropes. The protective baffle of the invention of claim 2 is a protective gear which is arranged at intervals in the vertical direction to erect a plurality of horizontally-receiving ropes at intervals between the partitions. L ^ ^ . Between the forks and along the support rope, the plurality of drilled plates are suspended from the upper and lower sides to be parallel with the support rope, and are characterized by: the opening of the drilled plate and the non-drilled plate The portion is disposed between the pillars; the edge of the plurality of support ropes that are erected in the direction of the Buding & The support ropes are arranged in parallel with the support for the opening, the squat, the sling, the sling, the sling, and the slinging material are disposed in the vertical position of the opening, and the slinging material and the supporting rope for the opening are arranged on the hanging material. Linking, the lower part of the material is connected to the bottom plate fixed to the ground; 201144526 On the non-opening side bordered by the hanging material, the sub-support or opening for the suspension material is supported by a rope, Between the plural pieces and use the rope along the sub-tower. A plurality of perforated plates connected to the suspension sheet so that the upper edge and lower disc jealous of drilling vertically with towel t, a state of the drilled plate line. Support rope or opening support rope flat Application No. 3 of the scope of patent application Scope! Or 2 protective slabs, wherein the slab is in the patent: the hoisting material is composed of hanging struts, and a plurality of brackets are installed in the lower direction; and the supporting structure (4) of the mad side is formed in a free state; The end is connected to the other by the bracket of the connecting member fish pillar \ the hanging pillar, and the column is connected to the free state. Patent Application No. 4 Scope 1第2 The protective baffle of He Moon is the protective baffle of the first or second item of the patent application, which makes the suspension material be connected by a hanging cable to form the ring at both ends. The sling is made of the loop end of the c-cord which is supported by the opening of the fishing ring; the free-handling state is used in the other end: the structure: the fishing ring of the hoisting rope is connected to the sub-branch The pair of pillars of the rope are connected in a free state; the creeping joint member is connected to the hook and loop of the pillar crane cable to perform another function. The protective baffles of the inventions of the scope of items 1 to 4 of SI 5 are attached to the longitudinal side of the patent to hang the pillars 21: protective slabs, wherein the ends of the openings are made of ', jin, and two of the supporting ropes for opening End system 201144526 Knife to the brackets of the hanging pillars on both sides or the hook and loop of the suspension cable. The protective baffle of the invention of claim 6 is the protective baffle according to any one of the claims 1 to 5, wherein the fixing support rope and the supporting rope are fixed in the up and down direction. Interval. The invention is directed to the viscous baffle of the invention of the invention, which is a protective baffle of any one of the sixteenth patents of the patent application, wherein the opening is supported by a supporting rope or a sub-supporting rope. The orifice plate is formed in a smaller shape than the drilled plate to which the support rope is suspended. [Effect of the Invention] The protective baffle according to the present invention is used in the branch of the lower side of the opening along the opening of the position where the opening U of the facility or the passage is to be formed. The rope 3a, or the branch above the opening, is erected with the support rope 5a for the opening 3a, and the hanging material 7(8) is assigned to the longitudinal position of the mouth 1〇, so that both ends of the suspension material 7 (8) ; material 2: the structure of the rope 5°, 51 joints, so the opening of the belt conveyor belt or the piping is required to be bordered by the heart hanging material 枓 7 (8), or the person or each unit 觫 φ early 4 The size and shape of the opening required for accessing the opening are formed. And the evening road n + even if the wind load or the object of the wind, the large load caused by the temple, also maintain the balance of the tension of the supporting rope rope 5〇, 51 or the sub-branch rope 1 X·/** The supporting state of the drilling plates 4 and 40 is in the long-term, α α is stable in the negative period, and there is no local damage in the month b 1±, excellent durability, can be pushed; +, Λ仕稳疋And the appearance is also excellent in appearance. 8 201144526 [Embodiment] The protective baffle of the present invention is disposed between the pillars 2, 2 and the opening 4 10 of the borehole drilling plate 40 and the non-drilled plate 40. In other words, the plurality of supports erected in the up and down direction between the pillars 2 and 2, and the support rope of the upper side of the opening of the opening 1 and the lower side of the opening should be formed in the rope 3... 3a and 3b are arranged in parallel with the branch towers 5, 5, and between the upper and lower opening supports 5A and 51, the suspension material 7 (8) is placed at the longitudinal side of the opening 1〇, The suspension material 7 (8) is a non-opening side of the boundary, and the horizontal sub-supporting ropes (60 to 62) are laid between the suspension material 7 (8) and the pillars 2, 2, and along the sub-supporting rope (60 to 62) or the opening support ropes 5, 51, and the plurality of drilled holes 40 are connected and suspended so as to be adjacent to the upper and lower sides of the drilled plate 4 (7). 〇~62) or the state in which the openings are parallel with the support strings 50, 51. [First embodiment] Hereinafter, the shield plate of the present invention will be described based on the illustrated embodiment. The overall configuration of the shield baffle 1a of the present embodiment shown in Figs. 1 to 4 is the same as that of the baffle disclosed in Patent Document 5, as shown in the description of the paragraph number [0005]. First, the anti-skinning plate 1A of the first embodiment is formed as shown in the overall view of Fig. 1 along the supporting ropes 3 which are laid between the pillars 2, 2, and four quadrangular drilling plates 4 are formed... The connection is suspended so that the upper side and the lower side of the drilling plate 40 are parallel to the supporting rope 3, and the arrangement in which the adjacent end portions of the lateral arrangement are overlapped with each other is provided, and 18 segments are arranged in the vertical direction to constitute the ground. The outer dimensions of the pillars with a height of about 25 m and about 26 m are about 13 m. Further, from the top of 201144526, in the fifth to eighth stages, a hole for forming a pipe such as a pipe is inserted through the opening 1〇 provided, and a drilling plate is arranged laterally between the pillars 2 and 2. 40 and the opening portion 1 of the non-drilled plate 40. Also, the first! The hole of the drilling plate of the protective baffle shown in the figure cannot be drawn due to the scale, so that the specific shape of the β-loaded image in the second to fourth figures is omitted. This opening portion j is as shown in Fig. 2 . The enlarged representation indicates that an opening should be formed in the plurality of branch ropes 3 which are erected in the up and down direction between the pillars 2, 2. The opening of the position P 1 0 (the fifth stage to the eighth stage from the top of the uppermost stage) is erected in parallel with the support line 50a of the lower side of the opening (4), 3b, 3b, and the supporting support rope 50 51 'in the up and down direction and the support Two pieces are provided above and below the interval S1'S2 through the rope & Further, the interval S2 in the downward direction is wider than the interval Si in the upper direction. The reason why the interval & the heart is disposed between the opening support ropes 50 and 51 and the upper and lower branch ropes 3a and 3b is considered to be the fifth section of the branch building by the opening branch rope 5〇. The boring plate 40 is floated by the wind load of the boring plate 4 of the ninth segment which is supported by the rope under the opening of the branch. In other words, since the branch rope 3 of the opening portion U) and the opening having the opening portion 1 are different from the floating caused by the wind load 5, 51, the gap is provided, so that the gap & The support rope 3a (3b) having no opening portion ίo interferes with the opening of the opening portion 1〇 with the branch rope 5〇 (51). Further, the upper and lower sides of the branch (four) rope 3 are different in spacing, because the opening Aft 1 rt is provided, and the drilling plate 40 of the opening supporting wires 50, 51 of the opening portion 10 floats more than the rim ν than the opening portion 1 Since the supporting rope 3 of the crucible is small, the interval S1 in the lower direction is made smaller, and the interval & in the lower direction is made larger. In addition, in the case of the lower end of the opening portion, the distance s2 in the direction of the opening portion is increased.乍 使 安装 安装 安装 安装 安装 安装 安装 安装 安装 安装 安装 安装 安装 安装 a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a A. The opening of the support rope τ &&'" opening. The longitudinal side position of the 支柱1〇, the upper and lower ends of the hoisting struts 7 and the upper and lower upper opening support ropes 50 51. The supporting rope 50 supported by the supporting rope 3a on the upper side of the opening is as shown in the enlarged view of Fig. 3, which is shown in Fig. 3, and the two ends are separated by 7 η 1 7717 is in the form of %, ', 3 is connected in a free state, and the & 7 η and the hanging bar 7 + L. The edge is enough for the 5 clothes 70a to pin 70b the truss 7 at the upper end of the 7 As shown in Qilian, the connection 槿Du 9 & 柒 50b is connected to the struts 2 as shown in Fig. 2 _ & the struts 2 are freely connected. In terms of the support of the lower side of the opening, the support rope 51 is also used. The rope 3 is erected in parallel with the 51" ι and the fishing ring 2:: the part is added... The pin 70b and the hanging strut 7 ', are in a free state, and the shackle 70a is at the lower end of the bracket 70 = = with The member 2a is connected to the branch 9 _, '.. The other end 51b is connected to the Lidan fork 2 in a free state. On the non-open side bordering the sling 7 & m, as in the 1 !S1 33⁄4 # q diagram As shown in the figure, the three sub-support ropes (6 " 2), such as the first figure and the second pillar 5 * pillars 2, are erected on both ends of the hoisting system. The cutting rope (, 62) is freely formed, and one end (6Ga to 62a) is connected to the bracket of the shackle 70a. The _ is detached from the middle portion of the sling 7Qb and the hanging struts. The connection to the pillar 2 is 201144526. The opening of the upper position is connected to the two drilled plates 4G, 4G in the horizontal direction by the support rope 5〇 and the sub-spinning rope 6〇. The upper and lower sides of the opening at the upper position adjacent to the upper and lower sides are made of a branch rope 50 and a sub-supporting rope, which are parallel to each other, and are in the state of the product, and are formed in the horizontally adjacent drilling plates 40, 40. The arrangement of the adjacent longitudinal sides is overlapped. Further, the two supporting holes 4G, 40 are suspended in the horizontal direction along the sub-supporting rope 60 (61) and the sub-supporting rope 61 (62). And the state in which the sub-supporting ropes 6A and 6i (6i and 62) adjacent to each other on the upper and lower sides of the drilling plate 4 are parallel, and the drilling plates 40 and 40 adjacent to each other in the horizontal direction are formed. The arrangement of the adjacent longitudinal sides is overlapped. Further, the two supporting drilled wires 4, 4, 4 are connected and suspended in the horizontal direction along the sub-supporting rope 62 and the opening support rope 51 at the lower position. The upper and lower sub-supporting ropes 62 on the upper side and the lower side of the plate 40 are parallel to the opening support line 51 at the lower position, and are formed so as to overlap adjacent longitudinal sides of the horizontally adjacent drilling plates 40, 40. Configuration. Further, the size of the drilled hole 40 suspended by the support ropes 50 and 51 and the sub-supporting ropes (6 〇 to 6 2) is, for example, lmx 2 m' to the support rope 3 The smaller diameter of the boring plate 4 (for example, the longitudinal and lateral dimensions is about 1. 2mx2. 8m). The configuration in which the upper and lower sides of the drilled plate 40 are suspended and connected to the opening support ropes 50 and 51 and the sub-supporting ropes (60 to 6.2) is formed in the drilled plate 4' A plate-supporting reinforcing plate 44·.. is attached to the upper and lower sides of the plate, and a hole that is provided at a common position between the plate for retaining the plate 44 and the drill plate 40 is connected by a pin 45a. The member 45 is further connected to the upper and lower sides of the drilled plate 4 () and the support rope for the opening by the connecting member 45, the connecting member 45, and the support yoke 5 () (5i) or the sub-support (10) (10) 50 (51) or sub-support rope (6〇~62) in parallel (see the enlarged view shown in Figure 9 and Figure 9 for details). Further, although not shown in the drawings, as shown in the description of Patent Document 5, it is also possible to use a configuration in which the structure is provided in the through hole along the upper and lower sides of each of the drilled plates, and then The spiral line is threaded into a series of the through holes, and is sutured with a rope in a branch, and suspended in a parallel state. The upper end portion of the hanging plate 7 on the side of the hanging strut 7 is formed so as to be cut out so that the annular end portion of the opening for the 5G (51) or the sub-supporting rope (60 to 62) does not interfere. The angled shape & the dehorned shape portion is reinforced by a reinforcing material 41 made of a zinc iron plate by riveting or the like. Further, the rigid member 42 formed as a reinforced hook or the like is disposed on the drilled plate 4 by the pin 43. The connecting member is connected to the connecting hole of the reinforcing material 41, and the other side of the rigid member 42 is tightly coupled to the annular end portion 5Ga of the opening cord 5〇, and is held by the opening supporting cord 50 (51). Or the suspension structure in which the sub-supporting ropes (60 to 62) are parallel to each other. Further, the overlapping portion or the overlapping portion of the drilling plate 4〇 is reinforced by a reinforcing material such as caulking or the like, and the reinforcing material is reinforced. The hole is the same as the reinforcing member, and the rigid member of the shackle or the like is fixed to the connecting hole by the fixing pin, and the other side of the rigid member 42 is wound around the opening. Use the support rope 50 (51) or the sub-support rope (6〇~62) to make a tight connection. 13 2011445 Further, although the protective baffle of the i-th embodiment is an embodiment in which the hanging strut 7 constitutes the hanging material, it may be replaced with the hanging strut, and the hanging body described in the paragraph number [〇〇26] described later. The second embodiment of the present invention is the second embodiment of the protective baffle 1β of the second embodiment. The plate 4 is connected in a state of being suspended in parallel with the tether 3 of the branch, and the adjacent ends of the lateral arrangement are overlapped with each other, and an 18-segment guard is provided in the up-and-down direction, starting from the uppermost stage. The number of the opening portions 10 formed in the fifth to sixth stages is constituted by the hanging stay 7. Further, the hole of the drilling plate of the protective sill plate shown in Fig. 5 is also impossible to draw due to the scale. Therefore, in the position where the opening portion 10 is formed (the number of the fifth stage Μ (4) of the rope 5 () '51 from the uppermost stage, the bracket 7 of the lower end portion of the hanging pillar 7 on both sides is respectively. In the freely connected state, the horizontal support sub-cord 6 is placed on the left and right non-opening sides bordering the hanging strut 7 Between the hanging pillar 7 and the pillars 2, 2, and one or two drilling plates 40 are connected and suspended along the sub-building rope 6 or the opening supporting ropes 50, 5 The upper side and the lower side of the orifice plate 40 are parallel to the sub-tower rope 6 or the opening support 5', 51 in the upper and lower sides. [Two holes are formed in the non-opening portion on the left side in Fig. 4 The arrangement in which the adjacent ends of the plates 4, 4 are overlapped with each other. Further, the protective baffle 1B of the second embodiment also shows an embodiment in which the suspension strut is formed into a suspension material, but the hanging strut may be replaced. 7. The hoisting rope 8 described in the paragraph number [0026] described in the following 14 201144526 is implemented. Since the other configuration is the same as that of the protective plate 1A described in the jth embodiment, detailed description thereof will be omitted. [Third Embodiment] The shield baffle lc of the third embodiment shown in Figs. 6 to 10 is characterized in that it is formed along the rope 3 which is bridged between the pillars 2, 2 The sheet drilling plate 4 is connected to be suspended in parallel with the supporting rope 3, and the adjacent end portions of the lateral arrangement are overlapped with each other, and an 18-stage protective baffle is disposed in the up and down direction. In the first stage to the third stage, the opening 10 for the passage of the belt conveyor, the piping, the pipe, etc., or the opening 10 required for the access of the person or various vehicles or the like is formed. 'The drilled plate 40 and the opening 1〇 of the non-drilled plate 4〇 are arranged side by side between the pillars 2 and 2. The hole of the perforated plate of the protective baffle shown in Fig. 6 is also unable to be drawn due to the scale, and the details are omitted in the enlarged views of Figs. 7 to 10. The position of the opening 10 should be formed in the plurality of supporting ropes 3... between the pillars 2 and 2 in the up-and-down direction of the door between the pillars 2 and 2 (the number i when starting from the uppermost section) The supporting ropes on the upper side of the opening of the section to the third section) are arranged in parallel with the two opening supporting ropes 5, 5', and the lifting cable 8 is disposed at the longitudinal position of the opening H). The hoisting cable 8 of the third embodiment, as shown in an enlarged view in Figs. 7 to 4, is connected by a hook (four) connected at the end of the pin 81a into a series of hoisting cables 8 to form a ring portion at both ends. The annular end portion 80a of the strip 8Q. The lower end portion 8〇a of the suspension cable 8 is coupled to a bracket 91 fixed to the upper surface of the bottom plate 9A, and the bottom plate 90 is fixed to the ground. 15 201144526 The shackle 81 of the upper end portion of the hoisting cable 8 is detachably connected to the end portion 5a of the fulcrum rope 5, and the other end is connected to the detachable state by the connecting member struts 2. Three sub-supporting ropes (6〇-62) are erected on the non-opening side bordering the hoisting rope 8 to the hoisting rope 8 and the struts 2'2 of the sub-supporting ropes (60,). The upper a ^ R1 ^ ^ Z strip support rope (60 "61" is shown in the enlarged view of Fig. 9, and the end 6 is placed in the suspension cable 8 na). And use the surname of the surname 2 a: the other end is connected to the pillar 2 in a free state. On the other hand, the lower orientation shows that the _- bottom::Γ1Γ enlargement shows that it is free from the form V, =; with :::_91 The connected shackle is freely formed. (4) The structural member 2a is connected to the struts 2... The sub-tower is suspended by the m (6 (^62) or the open σ with the branch rope 5, and the drilled plates 4G, 40 are connected and suspended. In a state in which the sub-supporting ropes (60 to 62) or the opening support 5 are vertically parallel to the upper and lower sides of the drilled plate 4G, and the horizontally adjacent drilling plates are overlapped with each other. The upper end portion of the X 4 drilling plate 40 is reinforced by a reinforcing material 41 for arranging zinc iron or the like by caulking, and is formed by attaching the u bolt 46 to the orifice plate 4G and the filler (four) material 41 / Λη v and J inverse ,,. With the hole, the other side of the boring bolt is connected to the annular end portion of the support rope 5 or the annular end portions (10) a to 62a) of the sub-strings (10) to 62), and is held in the opening with the opening. _ 5 or the sub-tower rope (10), the parallel suspension of the structure 201144526. In addition, although the protective baffle 1 of the third embodiment (: shows an embodiment in which the suspension cable 8 constitutes a suspension material, Alternatively, the hoisting rope 8 may be formed by the above-described hanging struts 7. In the case where the hanging struts 7 constitute a hanging material, the shackle 92 attached to the bracket 91 above the bottom plate 9G is joined to the pylon The fishing ring 7〇a attached to the bracket 70 of the crucible is the same as the protective strut described in the i-th embodiment, and therefore detailed description thereof will be omitted. [Fourth Embodiment] FIG. 11 and The spleen of the protective baffle i D of the fourth embodiment is not limited to: it is formed along the supporting rope 3 that is placed between the pillars 2 and 2, and the drilling plate 4 is connected and suspended. The branch is in a state in which the ropes 3 are parallel, and the adjacent end portions of the lateral arrangement are overlapped with each other, and are arranged at the upper and lower sides; The plate is formed at both ends of the lowermost stage by the suspension cables 8, 8. Further, the opening portion of the shield board shown in Fig. 11 is formed between the lowermost drilling plates 4. Further, 坌n阆- w The hole of the drilling plate of the (4) plate is also removed due to the scale. Therefore, the description is omitted.

沿著在支柱2、2之pq aa L 用繩 之間的上下方向所架設之複數條支撐 巾繩3中應形成開口部 3a平行地卜1之開°上邊的該支撐用繩 2條吊鋼索8配置於节門 在該第3實施例所說明的 的於4開口部的縱邊位置。該吊鋼索8 的下端部80a如在第19回^ ^ ^ 8 之底 2圖放大表示所示,係與固定於地面 底板90上面的固定構件94連結。 面 17 201144526 該開口用支撐繩5的一 的鉤環81連結成自如狀態 支柱2連結成自如狀態。 端。P 5a對該吊鋼索8之上端部 ,而另—端利用連結構件2a對 ,對以該吊鋼索8為邊界 · 的子支_繩6以將其-端側,將水… 結結成自如狀態’並將另-端對支柱2車8之鉤每81驾 成自如狀態的方式架設於該吊鋼索8與=構;一 著該子支樓用繩6及開口用切繩5=2、2之間1 板40之卜4 * 對鑽孔板40將鑽子丨 邊連結懸吊成與開口用支撐繩5平行之狀熊 將鑽孔板4G之下邊連㈣吊 … 態。 又釋用繩6平行之用 软躓札板的上邊端部 強材…補強,並作成將u螺…= = 4° 一與補強材料41所共同設置的連結用孔,該U螺检46 另一側與該開口用支撐繩5的環狀端部5a或子支撐心 的環狀端部6a緊連結,而保持於與該開口用域繩5平 之狀態的懸吊構造(細節參照第9圖)。 此外1 4實施例的防護擋1D亦可替代該吊鋼素 以上述的吊支柱7構成。 因為其他的構成係與在該第i實施例所說明的防護播 板相同,所以省略詳細說明。 田 雖然以上根據所圖示的實施例說明本發明,但是去然 本發明未限定為上述的實施形態或實施例。所謂的本業者 可因應於需要在一般進行之設計變更或應用的範圍内進行 18 201144526 各種實施形態。 【圖式簡單說明】 1 圖作;_ 示辰不本發明之防護擋板之第 圖。 第2圖係第1圖之π部放大圖。 第3圖係第2圖之羾部放大圖。 第4圖係第2圖之iv部放大圖。 第5圖係表示本發明之防護擋板之第 部分放大圖。 第6圖係表示本發明之防護檔板之第 圖。 第7圖係第6圖之γπ部放大圖。 第8圖係第7圖之\ι部放大圖。 第9圖係第7圖之K部放大圖。 第10圖係第7圖之X部放大圖。 第11圖係表示本發明之防護擋板之第 部分放大圖。 第12圖係第11圖之X π部放大圖。 【主要元件符號說明】 1A ~ 1D 防護撞板 2 支柱 3、3a、3b 支撐用繩 1實施例的整體 2實施例的主要 3實施例的整體 4實施例的主要 19 201144526 4 ' 40 鑽孔板 5、50、51 開口用支撐繩 6 ' 60-62 子支撐用繩 7 吊支柱 8 吊鋼索 90 底板 10 開口部 20The support rope 2 which is erected in the up-and-down direction between the strings of the pq aa L of the pillars 2 and 2 should be formed with the opening 3a parallel to the opening of the support rope 2 8 is disposed at the longitudinal side position of the opening portion of the fourth opening portion described in the third embodiment. The lower end portion 80a of the hoisting rope 8 is shown enlarged in the bottom of Fig. 19, and is coupled to a fixing member 94 fixed to the upper surface of the floor panel 90. Face 17 201144526 The opening is connected to the shackle 81 of one of the support ropes 5 in a freely usable state. end. P 5a is the upper end of the hoisting rope 8 and the other end is paired by the connecting member 2a, and the sub-branch 6 is bounded by the hoisting rope 8 to connect the water-end to the end-side state. 'Set the other end to the strut 2, the hook of the car 8 is mounted on the suspension cable 8 and the = structure; the sub-tower rope 6 and the opening with the cutting rope 5 = 2, 2 Between the 1 plate 40 and the 4 * The drilled plate 40 is connected to the drilled edge to suspend the parallel with the support rope 5 to connect the lower edge of the drilled plate 4G (4). In addition, the upper end of the soft slab is used to reinforce the rope, and the reinforced material is used to make the u-thread...== 4°. The connecting hole is provided together with the reinforcing material 41. One side is closely connected to the annular end portion 5a of the support rope 5 or the annular end portion 6a of the sub-supporting core, and is held in a suspended structure in a state of being closed with the opening-use domain rope 5 (see ninth for details) Figure). Further, the shield 1D of the embodiment of Fig. 4 can also be constructed in place of the suspension struts 7 described above. Since the other configurations are the same as those of the shield board described in the i-th embodiment, a detailed description thereof will be omitted. FIELD OF THE INVENTION The present invention has been described above based on the illustrated embodiments, but the present invention is not limited to the above-described embodiments or examples. The so-called practitioners can implement various embodiments in the context of the design changes or applications that are generally required. [Simple description of the diagram] 1 Figure; _ Chen Chen is not the first diagram of the protective baffle of the invention. Fig. 2 is an enlarged view of the π portion of Fig. 1. Fig. 3 is an enlarged view of the crotch portion of Fig. 2. Fig. 4 is an enlarged view of an iv portion of Fig. 2. Fig. 5 is a partially enlarged view showing the shield of the present invention. Fig. 6 is a view showing the first embodiment of the protective shutter of the present invention. Fig. 7 is an enlarged view of the γπ portion of Fig. 6. Figure 8 is an enlarged view of the \ι portion of Figure 7. Fig. 9 is an enlarged view of a portion K of Fig. 7. Fig. 10 is an enlarged view of a portion X of Fig. 7. Fig. 11 is a partially enlarged view showing the shield of the present invention. Fig. 12 is an enlarged view of the X π portion of Fig. 11. [Description of main components] 1A ~ 1D protective striker 2 Pillars 3, 3a, 3b Supporting rope 1 Overall 2 embodiment of the main 3 embodiment of the main 4 embodiment of the main 19 201144526 4 ' 40 drilling plate 5, 50, 51 opening support rope 6 ' 60-62 sub-support rope 7 hanging strut 8 hanging cable 90 bottom plate 10 opening 20

Claims (1)

201144526 • 七、申請專利範圍: 1· -種防護搶板’在上下方向隔著間隔將複數條水平 方向的支樓用繩架設於隔著間隔所建立的支柱之間,並沿 著該支撐用繩,對複數片鑽孔板將其上邊及下邊連結懸吊 成與支撐用繩平行之狀態, 其特徵在於: 鑽孔板與無鑽孔板的開口部配置於該支柱之間; 石者在該支柱之間的上下方向所架設之複數條支撲用 纖中應形成開口部之位置之開口上邊與開口下邊的該支推 用繩平行地架設開口用支禮繩’並在該上下的開口用支樓 繩之間’將懸吊材料配置於該開口部的縱邊位χ,該懸吊 材料之上下的端部與該開口用支撐繩連結; 在以懸吊材料為邊界的非開口側,水平方向的子支撑 用繩架設於該懸吊材料與支柱之間,並沿著該子支撑用繩 開口用支#、繩’將複數片鑽孔板連結懸吊成與使鑽孔板 之上邊及下邊在上下相鄰的子支撐用繩或開口用支撐繩平 行之狀態。 t 一裡防謖擋板,力μ 丁 +丄 祝槪在上下方向隔著間隔將複數條水 向的支擇用繩架設於隔莫d 4上 π隔者間隔所建立的支柱之間,並 者該支撐用繩,掛福激 H m π 1 Λ 片鑽孔板將其上邊及下邊連結懸 成與支撐用繩平行之狀態, 其特徵在於: 鑽孔板與無鑽孔板的開 沿著在該支柱之間的上 口部配置於該支柱之間; 下方向所架設之複數條支撐用 21 201144526 繩中應形成開口部之位置之開口上邊的該支樓用 架設開口用支撐锶,* μ 繩並將懸吊材料配置於該開口部的縱邊 位置,該懸吊材料之上端部係與該開口用支樓纖連結,,,該 懸吊材料之下端邱私 ° 邛係與固定於地面的底板連結; ?懸吊材料為邊界的非開口側,水平方向的子支撐 用 >繩Ik设於該懸吊# # ώ + 1 或開口用去^ 柱之間,並沿著該子支樓用繩 之上邊及^在上將複數片鑽孔板連結懸吊成與使鑽孔板 行:下相鄰的子支㈣或…支樓繩平 3如申請專利範圍第…項之防 π係以吊支柱所構成,在該吊支柱之側面的上;方二吊 裝複數個托架; 下方向文 Τ用支擇繩的—端部係對該吊 自如狀態,另一端係利用 朱連結成 該子支撑用繩的_端係;構:;對支柱連結成“狀態; 端利用連結構件與支柱連結成自如狀態的托以結,另— 4.如申請專利範圍第丨 材料係以吊鋼索所構成,而該吊::防護擋板,其令懸吊 端部加工成環狀之複數條 用夠環連結將兩 矛、的5亥環狀端部; “1 口用支樓繩的-端部係對 自如狀態’另-端係利用連結 I的㈣連結成 該子支#料的_端係細㈣結成自如狀態; 端利用連結構件與支柱連,:吊鋼索的鉤環連結,另- E運,·、。成自如狀態。 5.如申請專利範圍第〗至 項中任-項的防護擋板, 22 201144526 其1ί7開口部 用支撐繩的 鉤環連結。 之兩端的縱邊以吊支柱或吊鋼索 兩端係分別對兩側之吊支柱的托 所構成,開口 架或吊鋼索的 6_如申請專利範圍第2 其中在開口用支撐繩與支撐 定的間隔。 至5項巾任—項的防護撞板, 用繩之間,在上下方向設置固 項的防護擋板, ^吊的鑽孔板係 的形狀所構成。 7.如申請專利範圍第i至6項中任— 其中對開口用支撐繩或子支撐用繩所連結 以比對支撐用繩所連結懸吊之鑽孔板更小 23201144526 • VII. Scope of application for patents: 1· - Type of protection board: A plurality of horizontal branches are erected between the pillars separated by intervals in the vertical direction and spaced along the support. a rope, in which a plurality of drilled holes are suspended from the upper and lower sides in a state parallel to the supporting rope, wherein: the opening of the drilled plate and the non-drilled plate is disposed between the pillars; The opening of the plurality of struts in the up-and-down direction between the pillars, the opening of the opening where the opening should be formed, and the opening of the supporting rope in parallel with the supporting rope at the lower side of the opening, and the opening and closing opening Between the support ropes, the suspension material is disposed at the longitudinal side of the opening, and the upper end portion of the suspension material is connected to the opening by a support rope; on the non-open side bounded by the suspended material The horizontal sub-supporting rope is arranged between the hanging material and the pillar, and the plurality of drilled holes are connected and suspended along the sub-supporting rope opening with a branch #, rope' Upper and lower sides in the upper and lower The sub-support state cord or support line parallel with the opening of. t 一里谡 谡 , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , The supporting rope and the hanging H m π 1 Λ piece drilling plate are connected to the upper and lower sides thereof in a state of being parallel with the supporting rope, and are characterized in that: the drilling plate and the non-drilling plate are opened along The upper portion of the struts is disposed between the struts; and the plurality of support members 21 are erected in the lower direction; 201144526 The support for the erection of the erection is provided on the upper side of the opening where the opening portion is to be formed in the rope, * a suture material is disposed at a longitudinal side of the opening portion, and an upper end portion of the suspension material is coupled to the opening by a branch fiber, and the lower end of the suspension material is fixed and fixed The bottom plate of the ground is connected; the suspended material is the non-opening side of the boundary, and the horizontal sub-support is used by the rope Ik in the suspension ## ώ + 1 or the opening is used between the columns and along the sub-column The branch is connected to the top of the rope and ^ is connected to the plurality of drilled plates Forming and boring the row: the next adjacent sub-branch (four) or ... the sub-building rope flat 3, as claimed in the patent scope, the anti-π system is composed of a hanging strut, on the side of the hanging strut; Lifting a plurality of brackets; the lower end of the paper is used to support the rope, the end is attached to the hanging state, and the other end is connected by the Zhu to form the sub-supporting rope; the structure is: State; the end is connected to the pillar by a joint member in a free state, and the other is as follows: 4. As claimed in the patent application, the material is composed of a hanging cable, and the hanging: a protective baffle, which suspends the end portion The plurality of strips that are processed into a ring are connected by a loop that connects the two loops of the two spears; the "one end of the branch line of the branch line is freely connected" and the other end is connected by the joint of the joint I (four) The _ end of the sub-support material is fine (4) in a free state; the end is connected to the strut by a connecting member, the shackle of the hoisting cable is connected, and the other is transported. In a state of freedom. 5. For the protective baffle of any of the patent scopes 〗 〖, 22 201144526 The opening of the 1 7 7 is connected by the hook and loop of the support rope. The longitudinal edges of the two ends of the struts or the ends of the hoisting ropes are respectively formed by the brackets of the hanging struts on both sides, and the opening frame or the hoisting rope is 6_ as claimed in the second patent application. interval. The protective bumper of the five items of the towel is composed of a protective baffle between the ropes in the up and down direction, and the shape of the drilled plate system. 7. In the scope of the patent application range i to 6 - where the opening is supported by the support rope or the sub-support rope to be smaller than the drilled plate to which the support rope is attached.
TW100105358A 2010-03-31 2011-02-18 Protective baffle TW201144526A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010084254A JP5411045B2 (en) 2010-03-31 2010-03-31 fence

Publications (2)

Publication Number Publication Date
TW201144526A true TW201144526A (en) 2011-12-16
TWI486502B TWI486502B (en) 2015-06-01

Family

ID=44944343

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100105358A TW201144526A (en) 2010-03-31 2011-02-18 Protective baffle

Country Status (2)

Country Link
JP (1) JP5411045B2 (en)
TW (1) TW201144526A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296253A (en) * 2018-11-12 2019-02-01 王亮 A kind of fence board of the construction with decrease of noise functions
CN115501571B (en) * 2022-09-26 2024-05-24 石家庄铁道大学 Storable windproof unit, large-span windproof net structure thereof and windproof method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57178808U (en) * 1981-05-08 1982-11-12
JPS61148164U (en) * 1985-03-07 1986-09-12
JP4879819B2 (en) * 2007-05-18 2012-02-22 日鐵住金建材株式会社 fence
WO2010001478A1 (en) * 2008-07-04 2010-01-07 日鐵住金建材株式会社 Fence
CN201433357Y (en) * 2008-12-11 2010-03-31 北京中咨正达交通工程科技有限公司 Highway snow protection net
JP5199049B2 (en) * 2008-12-11 2013-05-15 四国化成工業株式会社 Planting fence

Also Published As

Publication number Publication date
JP2011214329A (en) 2011-10-27
TWI486502B (en) 2015-06-01
JP5411045B2 (en) 2014-02-12

Similar Documents

Publication Publication Date Title
JP6215778B2 (en) mosquito net
WO2017151990A1 (en) Containment shroud system
TW201144526A (en) Protective baffle
JP2008019673A (en) Falling-rock protective fence and falling-rock protective net
TR201809854T4 (en) Flotation and fastening system for rigid, metallic and / or high weight nets or mesh.
CN209227564U (en) A kind of slope surface prefabricated section placing device
WO2011022934A1 (en) Prestressed support cable net tent
JP2003129444A5 (en)
JP5376554B2 (en) Scaffolding seat mounting structure for scaffolding
CN201649607U (en) Overhung-type outer wall scaffold
KR200442509Y1 (en) Helicopter safety net to make with the Glassfiber Reinforced Plastic
JP2005307572A (en) Protective fence and construction method thereof
CN108357649A (en) Wind and wave resistance marine devices
JP4879819B2 (en) fence
CN102989091A (en) Rescue net and using method thereof
JP6473326B2 (en) Animal intrusion prevention fence
JP4242236B2 (en) Multi-stage aquaculture basket
CN205663298U (en) Security rail
JP7130691B2 (en) nets and fish ladders
CN202933401U (en) Rescue net
JP7191638B2 (en) Construction method of protective fence and protective fence
CN207211529U (en) A kind of bar-mat reinforcement support base
RU158018U1 (en) NET PROTECTION AGAINST ROCK-BALDING EVENTS
JP7443279B2 (en) A roof frame for curing external framework scaffolding and a rain protection device for external framework scaffolding using a roof frame for curing external framework scaffolding.
CN207565438U (en) Gear plaque device with tool box store function

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees